HomeMy WebLinkAboutC601 STORM SEWER PLAN AND PROFILES
T
M
S
T
M
S
T
M
S
T
M
S
T
M
POND INFORMATION
EXISTING:||PROPOSED:
2yr = 869.31 ||2yr = 867.78
10-yr = 869.82 ||10-yr = 868.47
100-yr = 870.31 ||100-yr = 869.79
SPILLWAY = NONE ||SPILLWAY = 869.80
POND INFORMATION
PROPOSED:
2yr = 867.23
10-yr = 867.72
100-yr = 868.52
SPILLWAY = 869.20
100 TO 103
855
860
865
870
875
855
860
865
870
875
-1+00 -0+50 0+00 0+50 1+00 1+50 2+00
103 TO 101
855
860
865
870
875
855
860
865
870
875
-0+500+000+501+001+502+002+50 C601
ST
O
R
M
S
E
W
E
R
P
L
A
N
A
N
D
P
R
O
F
I
L
E
W
S
N
E
STORM SEWER NOTES
1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE EPA OR
APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH
CONSTRUCTION ACTIVITIES AND STORMWATER POLLUTION PREVENTION PLAN.
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS,
LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW
FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT.
PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE
APPLICABLE.
3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT
LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER
SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT
WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF
CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES,
PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND
CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.
5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS,
SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF
UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN
COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE
CONTRACTOR.
6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES
ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS
FOR WORKER SAFETY.
8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE
BACKFILLED WITH GRANULAR MATERIAL.
9.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING
UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEER
OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
10.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM / SANITARY SEWER
SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER LINE IN PROXIMITY OF WATER LINE
SHALL BE C900 WATER MAIN GRADE PVC.
11.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED
FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM
SEWERS IS 18" OR LESS.
12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE
CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS
NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER.
13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE
DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS.
14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.
15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE
TRAFFIC BEARING RING AND COVERS.
16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING
DRAWINGS.
17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER INSTALLATION.
18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW FINISH GRADE
ELEVATIONS.
19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND
DEBRIS.
20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT
STRUCTURE IS WATERTIGHT.
21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL
HAVE TRAFFIC BEARING RING AND COVERS.
22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR CHANNEL
FROM INVERT IN TO INVERT OUT.
23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE
ALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER.
24.ALL HDPE PIPE SHALL BE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED EQUAL.
25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS, CLEANOUTS,
REDUCERS, ETC., SHALL BE OF HDPE MATERIAL COMPARABLE WITH STORAGE PIPES.
26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE COMPACTED IN 8"
LIFTS TO 95% MAXIMUM DRY DENSITY.
27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM SEWER
CONNECTION.
ELECTRICAL RISER
GUY ANCHOR
ELECTRIC JUNCTION BOX
ORNAMENTAL LIGHT
GENERATOR
STREET LIGHT
ELECTRIC MANHOLE
ELECTRIC OUTLET
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
RIGHT OF WAY LINE
FENCE
GUARD RAIL
BOUNDARY LINE
CISTERN
DRINKING FOUNTAIN
FIRE DEPT HOOKUP
FIRE HYDRANT
POST INDICATOR VALVE
CHILLED WATER MANHOLE
WATER MANHOLE
SPRINKLER CONTROL BOX
SPRINKLER CONTROL VALVE
SPRINKLER
SPIGOT
WELL HEAD
WATER METER
WATER VALVE
GAS METER
GAS VALVE
ELECTRIC METER
LIQUID PROPANE GAS TANK
MONITORING WELL
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL
BOLLARD
FLAG POLE
PARKING METER
POST
SIGN
PARKING WHEEL STOP
DOWN SPOUT
HANDICAPPED SPACE
GATE POST
COMMUNICATIONS RISER
STORM CLEANOUT
BEEHIVE INLET
CURB INLET
FLOOR DRAIN
ROUND INLET
SQUARE INLET
STORM MANHOLE
SANITARY SEWER CLEANOUT
LIFT STATION
SANITARY SEWER MANHOLE
SANITARY STUB MARKER
SEPTIC TANK
PARKING LOT LIGHT (1 HEAD)
PARKING LOT LIGHT (3 HEAD)
PARKING LOT LIGHT (4 HEAD)
PARKING LOT LIGHT (2 HEAD)
DISTRIBUTION BOX
ROW RIGHT OF WAY
ESMT EASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
TOC TOP OF CASTING
CMP CORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
SSD SUB SURFACE DRAIN PIPE
STM STORM
SAN SANITARY
STR STRUCTURE
CO CLEANOUT
STORM SEWER PLAN
AND PROFILE LEGEND
UTILITIES
ABBREVIATIONS
OTHER
LINE TYPES
FLOW LINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER MAIN
STORM SEWER MAIN
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
AERIAL COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
G G G
W W
E(A)E(A)
E(U)E(U)
COM(U)COM(U)
COM(A)COM(A)
OHU OHU
FM FM
AERIAL FIBER OPTIC CABLEFO(A)FO(A)
UNDERGROUND FIBER OPTICFO(U)FO(U)
EMERGENCY FLOOD ROUTE
SANITARY SEWER LATERALSANSAN
ROOF DRAINSTMSTM
SUB SURFACE DRAIN
FLOW DIRECTION AND SLOPE
HORIZONTAL SCALE: 1" = 30'
VERTICAL SCALE: 1" = 3'
RE
V
I
S
I
O
N
S
A
N
D
I
S
S
U
E
S
Pa
r
t
o
f
t
h
e
S
E
/
4
o
f
S
e
c
t
i
o
n
2
3
,
T
o
w
n
s
h
i
p
1
8
N
o
r
t
h
,
R
a
n
g
e
3
E
a
s
t
,
C
l
a
y
T
o
w
n
s
h
i
p
,
H
a
m
i
l
t
o
n
C
o
u
n
t
y
,
I
n
d
i
a
n
a
W15.0483
PR
E
P
A
R
E
D
F
O
R
:
12
4
2
W
E
S
T
1
3
6
T
H
S
T
R
E
E
T
,
C
A
R
M
E
L
,
I
N
4
6
0
3
2
PROJECT NO.
SHEET NO.
CH
E
C
K
E
D
B
Y
:
DR
A
W
N
B
Y
:
RL
W
DE
S
I
G
N
E
D
B
Y
:
DW
G
N
A
M
E
:
PR
O
J
E
C
T
N
O
.
:
W1
5
.
0
4
8
3
DA
T
E
BY
05
.
1
9
.
2
0
1
6
SS
R
DA
T
E
:
RL
W
EN
G
I
N
E
E
R
S
31
7
|
8
4
6
-
6
6
1
1
80
0
|
4
5
2
-
6
4
0
8
31
7
|
8
4
3
-
0
5
4
6
fa
x
W E I H E
La
n
d
S
u
r
v
e
y
i
n
g
|
C
i
v
i
l
E
n
g
i
n
e
e
r
i
n
g
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
AL
L
A
N
H
.
W
E
I
H
E
,
P
.
E
.
,
L
.
S
.
-
F
O
U
N
D
E
R
10
5
0
5
N
.
C
o
l
l
e
g
e
A
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
I
n
d
i
a
n
a
4
6
2
8
0
we
i
h
e
.
n
e
t
Know what's below.
before you dig.Call
R
TR
A
D
E
R
'
S
P
O
I
N
T
C
H
U
R
C
H
O
F
C
A
R
M
E
L
SU
B
M
I
T
T
E
D
F
O
R
I
N
I
T
I
A
L
R
E
V
I
E
W
12
.
1
8
.
2
0
1
5
ML
T
THE SITE DOES NOT LIE IN A SPECIAL FLOOD
HAZARD AREA AS ESTABLISHED BY THE FEDERAL
EMERGENCY MANAGEMENT AGENCY - NATIONAL
FLOOD INSURANCE PROGRAM, WHEN PLOTTED
BY SCALE ON FLOOD INSURANCE RATE
#18057C207G, DATED NOVEMBER 19, 2014
FLOOD STATEMENT
STEVEN SCOTT RUCKER P.E. 11300279
SU
B
M
I
T
T
E
D
F
O
R
T
A
C
R
E
V
I
S
I
O
N
S
03
.
1
4
.
2
0
1
6
ML
T
NO EARTH DISTURBING
ACTIVITY MAY TAKE
PLACE WITHOUT AN
APPROVED STORM
WATER MANAGEMENT
PERMIT
NOTE
SU
B
M
I
T
T
E
D
F
O
R
D
R
A
I
N
A
G
E
A
P
P
R
O
V
A
L
04
.
2
0
.
2
0
1
6
ML
T
RE
V
I
S
E
D
F
O
R
D
R
A
I
N
A
G
E
A
P
P
R
O
V
A
L
05
.
1
2
.
2
0
1
6
ML
T
FI
N
A
L
C
O
N
S
T
R
U
C
T
I
O
N
P
L
A
N
S
05
.
1
9
.
2
0
1
6
ML
T
FINISHED GRADE
EXISTING GRADE
GRANULAR BACKFILL
PROFILE LEGEND
HYDRAULIC GRADE LINE