HomeMy WebLinkAboutC900 PROJECT SPECIFICATIONSEROSION CONTROL SPECIFICATIONS
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE
CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE
ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING WILL BE APPLIED TO ANY AREAS LEFT INACTIVE FOR 15 DAYS OR MORE.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND
FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT
TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE
CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE.
6.ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE
THEIR EFFECTIVENESS.
7.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT
SEEDING PROCEDURES SHALL BE USED.
8.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS.
RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND
EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED.
9.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY
OF THE CONTRACTOR AND/OR OWNER.
10.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION
(FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5,
CONSTRUCTION ACTIVITY STORMWATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S
AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL
AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER
MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY
CONSTRUCTION ACTIVITY..
11.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS.
EARTHWORK SPECIFICATIONS
1.SCOPE OF WORK
1.A.EXTENT: THE WORK REQUIRED UNDER THIS SECTION CONSISTS OF ALL EXCAVATING, FILLING,
ROUGH GRADING AND RELATED ITEMS NECESSARY TO COMPLETE THE WORK INDICATED ON THE
DRAWINGS AND DESCRIBED IN THE SPECIFICATIONS.
1.A.1.IN GENERAL THE ITEMS OF WORK TO BE PERFORMED UNDER THIS SECTION SHALL INCLUDE
CLEARING AND GRUBBING, REMOVAL OF TREES AND STUMPS (WHERE REQUIRED), PROTECTION
OF TREES TO REMAIN, STRIPPING AND STORAGE OF TOPSOIL, FILL, COMPACTION AND ROUGH
GRADING OF ENTIRE SITE AS INDICATED ON THE DRAWINGS.
1.A.2.EXCAVATED MATERIAL THAT IS SUITABLE MAY BE USED FOR FILLS. ALL UNSUITABLE MATERIALS
AND ALL SURPLUS EXCAVATED MATERIAL NOT REQUIRED SHALL BE REMOVED FROM THE SITE.
THE LOCATION OF DUMP AND LENGTH OF HAUL SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
1.A.3.PROVIDE AND PLACE ANY ADDITIONAL FILL MATERIAL FROM OFF THE SITE AS MAY BE
NECESSARY TO PRODUCE THE GRADES REQUIRED. FILL OBTAINED FROM OFF SITE SHALL BE OF
KIND AND QUALITY AS SPECIFIED TO FILLS HEREIN AND THE SOURCE APPROVED BY THE
ENGINEER AND OWNER.
1.A.4.THE CONTRACTOR SHALL ACCEPT THE SITE AS HE FINDS IT AND SHALL REMOVE ALL TRASH,
RUBBISH AND DEBRIS FROM THE SITE PRIOR TO STARTING EXCAVATION.
1.B.WORK INCLUDED: THE FOLLOWING ITEMS OF RELATED WORK ARE SPECIFIED AND INCLUDED IN
OTHER SECTIONS OF THESE SPECIFICATIONS.
1.B.1.EXCAVATION, GRADING AND BACKFILLING FOR UTILITY LINES.
1.B.2.STORM DRAINAGE SYSTEMS.
1.B.3.SANITARY SEWER SYSTEMS.
1.B.4.WATER SUPPLY SYSTEMS.
1.B.5.DRIVES AND PAVING.
2.BENCHMARKS
2.A.MAINTAIN CAREFULLY ALL BENCHMARKS, MONUMENTS AND OTHER REFERENCE POINTS, IF
DISTURBED OR DESTROYED REPLACE AS DIRECTED BY ENGINEER.
3.PROTECTION OF TREES
3.A.GENERAL PROTECTION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF
TOPS, TRUNKS AND ROOTS OF EXISTING TREES ON THE PROJECT SITE THAT ARE TO REMAIN.
EXISTING TREES SUBJECT TO CONSTRUCTION DAMAGE SHALL BE BOXED, FENCED OR OTHERWISE
PROTECTED BEFORE ANY WORK IS STARTED, DO NOT STOCKPILE WITHIN BRANCH SPREAD.
REMOVE INTERFERING BRANCHES WITHOUT INJURY TO TRUNKS AND COVER SCARS WITH TREE
PAINT.
4.REMOVAL OF TREES
4.A.REMOVE ALL TREES AND STUMPS FROM AREA TO BE OCCUPIED BY ROAD AND SURFACED AREAS.
REMOVAL OF TREES OUTSIDE THESE AREAS SHALL ONLY BE DONE AS NOTED ON DRAWINGS OR
APPROVED BY THE OWNER.
4.B.ALL BRUSH, STUMPS, WOOD AND OTHER REFUSE FROM THE TREES SHALL BE REMOVED FROM SITE
OR BURNED WITH PROPER PERMITS (WHERE APPLICABLE).
5.STRIPPING OF TOPSOIL
5.A.REMOVE TOPSOIL TO A DEPTH OF 6 INCHES (OR MORE IF REQUIRED) FROM THE AREAS TO BE
OCCUPIED BY ROADS, WALKS, BUILDINGS, AND PARKING AREAS. PILE AND STORE TOPSOIL AT A
LOCATION WHERE IT WILL NOT INTERFERE WITH CONSTRUCTION OPERATIONS. TOPSOIL SHALL BE
REASONABLY FREE FROM SUBSOIL, DEBRIS AND STONES.
6.SITE GRADING
6.A.GRADES: DO ALL CUTTING, FILLING, COMPACTING OF FILLS AND ROUGH GRADING REQUIRED TO
BRING ENTIRE PROJECT AREA TO SUBGRADE AS SHOWN ON THE DRAWINGS. UNDERCUT OPEN
AREAS 4 INCHES FOR TOPSOIL.
6.B.ROUGH GRADING: THE TOLERANCE FOR PAVED AREAS SHALL NOT EXCEED 0.10 FEET ABOVE
ESTABLISHED SUBGRADE. ALL OTHER AREAS SHALL NOT EXCEED 0.10 FEET PLUS OR MINUS THE
ESTABLISHED GRADE. PROVIDE ROUNDING AT TOP AND BOTTOM OF BANKS AND OTHER BREAKS IN
GRADE. ALL OPEN AREAS SHALL BE GRADED A MINIMUM OF 0.5% AND A MAXIMUM OF 3:1 SLOPE.
6.C.SUBGRADE SHALL BE PROOFROLLED WITH SUITABLE EQUIPMENT AND ALL SPONGY AND
OTHERWISE UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH SUITABLE MATERIAL.
6.D.SUBGRADE FOR STREETS AND PAVED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED
PROCTOR.
6.E.SEE PROJECT MANUAL AND SOILS REPORT FOR REQUIREMENTS REGARDING UNDERCUTTING AND
SUBGRADE PREPARATION FOR PAVEMENT.
6.F.ALL FILL MATERIAL SHALL BE FORMED FROM SOIL FREE OF DELETERIOUS MATERIAL. PRIOR TO
PLACEMENT OF FILL, A SAMPLE OF THE PROPOSED MATERIAL SHALL BE SUBMITTED TO THE SOILS
ENGINEER FOR APPROVAL. THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO EXCEED 8" IN
LOOSE THICKNESS AND SHALL BE SPREAD AND COMPACTED AT THE PROPER MOISTURE CONTENT.
6.G.ALL FILL MATERIAL IN AREAS OUTSIDE OF BUILDING AND PAVEMENT AREAS SHALL BE COMPACTED
LIGHTLY WITH EACH LIFT AND PROTECTED FORM EROSION. AREAS OF BUILDING CONSTRUCTION
SHALL HAVE SUITABLE FILL MATERIAL PLACED AND COMPACTED IN ACCORDANCE WITH THE SOILS
ENGINEER'S REPORT (MINIMUM 95% MODIFIED PROCTOR).
7.DISPOSITION OF UTILITIES
7.A.RULES AND REGULATIONS GOVERNING THE RESPECTIVE UTILITIES SHALL BE OBSERVED IN
EXECUTING ALL WORK UNDER THIS SECTION.
7.B.IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND
CONDITIONS PERTAINING TO HIS PHASE OF THE WORK. IT SHALL ALSO BE THE CONTRACTORS
RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES BEFORE WORK IS STARTED.
THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNERS OR THE ENGINEERS OF ANY CHANGES,
ERRORS OR OMISSIONS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR
RESUMES.
7.C.WHERE ACTIVE UTILITIES ARE ENCOUNTERED BUT NOT SHOWN ON THE DRAWINGS, THE ENGINEER
SHALL BE ADVISED BEFORE WORK IS CONTINUED.
7.D.INACTIVE AND ABANDONED UTILITIES ENCOUNTERED IN EXCAVATING AND GRADING OPERATIONS
SHALL BE REPORTED TO THE ENGINEER. THEY SHALL BE REMOVED, PLUGGED OR CAPPED AS
DIRECTED BY THE ENGINEER.
8.SEEDING PREPARATION
8.A.SOLVE ANY SURFACE OR SUBSURFACE DRAINAGE PROBLEMS AND CONSTRUCT PERMANENT
EROSION CONTROL STRUCTURES.
8.B.REMOVE ALL ROCKS, ROOTS OR OTHER MATERIALS THAT MAY INTERFERE WITH SEEDBED
PREPARATION.
8.C.PERFORM THE MAJOR FILLING SHAPING AND SMOOTHING OF GULLIED OR SEVERELY ERODED
AREAS.
PAVING SPECIFICATIONS
1.SCOPE OF WORK
1.A.THE WORK REQUIRED UNDER THIS SECTION INCLUDES ALL EXTERIOR CONCRETE AND BITUMINOUS
PAVING AND RELATED ITEMS NECESSARY TO COMPLETE THE WORK INDICATED ON DRAWINGS AND
DESCRIBED IN THE SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO: ALL DRIVES, PARKING AREAS
IN CONTRACT LIMITS CURBS AND GUTTERS SIDEWALKS AND CONCRETE SLABS, EXTERIOR STEPS
2.MATERIALS
2.A.CONCRETE: CONCRETE SHALL BE READY-MADE AND SHALL BE A MIX OF PROPORTIONED FINE AND
COARSE AGGREGATES WITH PORTLAND CEMENT AND WATER. MINIMUM CEMENT CONTENT SHALL
BE 6 BAGS PER CUBIC YARD OF CONCRETE AND MAXIMUM WATER CONTENT SHALL BE 5.5 U.S.
GALLONS PER SACK OF CEMENT, INCLUDING MOISTURE IN THE AGGREGATE. SLUMP FOR NORMAL
WEIGHT CONCRETE SHALL BE A MAXIMUM OF 4 INCHES AND A MINIMUM OF 2 INCHES. THE SLUMP
OF MACHINE PLACE CONCRETE SHALL BE NO LESS THAN 1-1/4 INCHES NOR MORE THAN 3 INCHES.
STANDARD TEST ASTM C0143 SHALL BE USED TO MEASURE SLUMP. MINIMUM COMPRESSIVE
STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 PSI. ALL EXTERIOR CONCRETE SHALL HAVE
AIR ENTRAINMENT OF 5% TO 8% BY VOLUME PER ASTM C0260. RETEMPERING OF DELIVERED
CONCRETE WILL NOT BE ALLOWED. CONCRETE SHALL BE COMPOSED OF:
2.A.1.PORTLAND CEMENT: CONFORMING TO ASTM C-150, TYPE IA OR TYPE IIIA.
2.A.2.AGGREGATES: CONFORMING TO ASTM C-33.
2.A.3.WATER: SHALL BE CLEAR AND FREE FROM INJURIOUS AMOUNTS OF OILS, ACIDS, ALKALIC
ORGANIC MATERIALS OR OTHER DELETERIOUS SUBSTANCES.
2.B.WELDED STEEL WIRE FABRIC: WHERE REQUIRED FOR CONCRETE REINFORCEMENT SHALL
CONFORM TO ASTM A185.
2.C.PRE MOLDED JOINT FILLER: SHALL BE NON-EXTRUDING TYPE MEETING ASTM D-544, EXCEPT THAT
PRE MOLDED JOINT FILLER USED IN CONCRETE WALK CONSTRUCTION MAY BE EITHER
NON-EXTRUDING OR RESILIENT.
2.D.BITUMINOUS PAVEMENT MATERIALS: ALL MATERIALS PROPOSED FOR THE CONSTRUCTION OF
BITUMINOUS PAVEMENTS SHALL COMPLY WITH THE INDIANA DEPARTMENT OF TRANSPORTATION
SPECIFICATIONS LATEST VERSION SHALL BE USED.
2.E.COMPACTED AGGREGATE SUB-BASE: SHALL BE CRUSHED STONE OR GRAVEL. CRUSHED GRAVEL
SHALL BE A MINIMUM OF 35% CRUSHED MATERIAL. FINES SHALL BE LIMITED TO A MAXIMUM OF 8%
OF THE TOTAL. MATERIAL SHALL BE FREE FROM AN EXCESS OF FLAT, ELONGATED, THINLY
LAMINATED SOFT OR DISINTEGRATED PIECES, AND SHALL BE FREE FROM FRAGMENTS COATED
WITH DIRT. COMPACTED AGGREGATE SHALL BE GRADED AS FOLLOWS: PER LATEST REVISIONS.
SIEVE SIZE % PASSING
1-1/2"100
1"80-100
3/4"79-90
1/2"55-80
#4 35-60
#8 25-50
#30 12-30
#200 5-10
3.APPLICATION
3.A.GRADING: DO ANY NECESSARY GRADING IN ADDITION TO THAT PERFORMED IN ACCORDANCE WITH
EARTHWORK SECTION, TO BRING SUB GRADES, AFTER FINAL COMPACTION, TO THE REQUIRED
GRADES AND SECTIONS FOR SITE IMPROVEMENT.
3.B.PREPARATION OF SUB-GRADE: REMOVE SPONGY AND OTHERWISE UNSUITABLE MATERIAL AND
REPLACE WITH STABLE MATERIAL. NO TRAFFIC WILL BE ALLOWED ON PREPARED SUB-GRADE
PRIOR TO PAVING.
3.C.COMPACTION OF SUB-GRADE: THE FIRST 6 INCHES BELOW THE SUB-GRADE SHALL BE COMPACTED
TO AT LEAST 100% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE PROVISIONS OF
AASHTO T-99. WATER SHALL BE PREVENTED FOR STANDING ON THE COMPACTED SUB-GRADE
3.D.UTILITY STRUCTURES: CHECK FOR CORRECT ELEVATION OF ALL MANHOLE COVERS, INLETS, VALVE
BOXES AND SIMILAR STRUCTURES LOCATED WITHIN AREAS TO BE PAVED AND MARK, OR HAVE
MADE ANY NECESSARY ADJUSTMENTS IN SUCH STRUCTURES.
3.E.PLACING CONCRETE:
3.E.1.SUBGRADE: PLACE CONCRETE ONLY ON A MOIST, COMPACTED SUBGRADE OF BASE FREE
FROM LOOSE MATERIAL. PLACE NO CONCRETE ON A MUDDY OR FROZEN SUBGRADE
3.E.2.FORMS: ALL FORMS SHALL BE FREE FROM WARP, TIGHT ENOUGH TO PREVENT LEAKAGE AND
SUBSTANTIAL ENOUGH TO MAINTAIN THEIR SHAPE AND POSITION WITHOUT SPRINGING OR
SETTING, WHEN CONCRETE IS PLACED. FORMS SHALL BE CLEAN AND SMOOTH IMMEDIATELY
BEFORE PLACING CONCRETE.
3.E.3.PLACING CONCRETE: CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE HANDING
AS PRACTICABLE. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC TEMPERATURE OF
35 DEGREES F, OR LESS, PARAGRAPH 702.10 OF THE INDIANA DEPARTMENT OF
TRANSPORTATION SPECIFICATIONS, LATEST REVISION SHALL BE FOLLOWED.
3.F.CONCRETE CURB:
3.F.1.EXPANSION JOINTS: SHALL BE 1/2 INCH THICK PRE MOLDED AT ENDS OF ALL RETURNS AND A
MAXIMUM SPACING OF 100 FEET.
3.F.2.CONTRACTION JOINTS: UNLESS OTHERWISE PROVIDED, CONTRACTION JOINTS SHALL BE
JOINTS SPACED 10 FEET ON CENTER.
3.F.3.FINISH: TAMP AND SCREED CONCRETE AS SOON AS PLACED, AND FILL ANY HONEYCOMBED
PLACES, FINISH SQUARE CORNERS TO 1/4 INCH RADIUS AND OTHER CORNERS TO RADII
SHOWN.
3.G.CONCRETE WALKS AND EXTERIOR STEPS:
3.G.1.SLOPES: PROVIDE ¼ INCH PER FOOT CROSS SLOPE. MAKE ADJUSTMENTS IN SLOPES A WALK
INTERSECTIONS AS NECESSARY TO PROVIDE PROPER DRAINAGE.
3.G.2.DIMENSIONS: WALKS AND STEPS SHALL BE ONE COURSE CONSTRUCTION AND OF WIDTHS AND
DETAILS SHOWN ON THE DRAWINGS.
3.G.3.FINISH: SCREED CONCRETE AND TROWEL WITH A STEEL TROWEL TO A HARD DENSE SURFACE
AFTER SURFACE WATER HAS DISAPPEARED. APPLY MEDIUM BROOM FINISH AND SCRIBE
CONTROL JOINTS AT 6 FEET SPACING. PROVIDE ½ INCH EXPANSION JOINTS WHERE SIDEWALKS
INTERSECT, AND AT A MAXIMUM SPACING OF 48 FEET BETWEEN EXPANSION JOINTS.
3.H.CURING CONCRETE: EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE
METHODS DESCRIBED IN SECTION 501.17 OF THE INDIANA DEPARTMENT OF TRANSPORTATION
SPECIFICATIONS, LATEST REVISION SHALL BE USED.
3.I.BITUMINOUS PAVEMENT: HOT ASPHALT CONCRETE PAVEMENT SHALL BE AS SPECIFIED IN SECTION
402 OF THE INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS, LATEST REVISIONS
SHALL BE USED. PAVING WILL NOT BE PERMITTED DURING UNFAVORABLE WEATHER OR WHEN THE
TEMPERATURE IS 40 DEGREES F. AND FALLING.
3.J.COMPACTED AGGREGATE SUB-BASE: THE THICKNESS SHOWN ON THE DRAWINGS IS THE MINIMUM
THICKNESS OF THE FULL COMPACTED SUB-BASE. COMPACTION SHALL BE ACCOMPLISHED BY
ROLLING WITH A SMOOTH WHEELED ROLLER WEIGHING 8 TO 10 TONS. COMPACT TO 95%
COMPACTION USING STANDARD TESTING PROCEDURES. ALONG CURBS, HEADERS AND WALLS AND
AT ALL PLACES NOT ACCESSIBLE TO THE ROLLER, THE AGGREGATE MATERIAL SHALL BE TAMPED
WITH MECHANICAL TAMPERS OR WITH APPROVED TAMPERS.
STORM SEWER SPECIFICATIONS
1.SCOPE OF WORK
1.A.THE WORK UNDER THIS SECTION INCLUDES ALL STORM SEWERS, STORM WATER INLETS, AND
RELATED ITEMS, INCLUDING EXCAVATING AND BACKFILLING, NECESSARY TO COMPLETE THE WORK
SHOWN ON THE DRAWINGS.
2.MATERIALS
2.A.STORM SEWERS:
2.A.1.REINFORCED CONCRETE SEWER PIPE SHALL CONFORM TO ASTM C-76 CLASS 3 LATEST REVISION
WITH JOINTS CONFORMING TO ASTM C-443 LATEST REVISION.
2.A.2.STORM SEWERS HANCOR "HIQ" PIPE AND ADS OR APPROVED EQUAL: WITH THE FOLLOWING
REQUIREMENTS:
2.A.2.a.4 INCH THROUGH 10 INCH MEETING AASHTO M252 TYPE S. 12 INCH THROUGH 36 INCH MEETING
AASHTO M294 TYPE S.
2.A.2.b.GASKETS MEETING ASTM D1056 GRADE 2A2.
2.A.2.c.FITTINGS MEETING ASSHTO M252 OR AASHTO M294, MEETING ASTM D3350 CELL
CLASSIFICATION 324420C: OR ASTM D3350 TYPE III, CLASS C, CATEGORY 4, GRADE P33.
2.B.DRAINAGE STRUCTURES:
2.B.1.PRECAST REINFORCED CONCRETE DRAINAGE SECTIONS AND STEPS SHALL CONFORM TO ASTM
C-478 LATEST REVISION AND LATEST REVISION OF INDOT PRECAST STRUCTURE DETAILS.
2.B.2.CASTINGS SHALL BE OF UNIFORM QUALITY, FREE FROM BLOW HOLES, POROSITY, HARD SPOTS,
SHRINKAGE DISTORTION OR OTHER DEFECTS, THEY SHALL BE SMOOTH AND WELL CLEANED BY
SHOT BLASTING OR BY SOME OTHER APPROVED METHOD. THEY SHALL BE COATED WITH
ASPHALT PAINT WHICH SHALL RESULT IN A SMOOTH COATING. TOUGH AND TENACIOUS WHEN
COLD, NOT TACKY OR BRITTLE. THEY SHALL BE GRAY IRON MEETING ASTM A-48 LATEST
REVISION.
2.B.3.JOINTS - STRUCTURE SECTIONS SHALL BE JOINTED WITH RUBBER TYPE GASKETS, THE RUBBER
TYPE GASKETS SHALL MEET ASTM C-443 LATEST REVISION.
2.C.SUBDRAINS:
2.C.1.PERFORATED PLASTIC PIPE SUBDRAINS SHALL CONFORM TO ASTM D3034, SDR 35, ASTM D2729,
OR ASTM F405.
3.APPLICATION
3.A.PERMITS AND CODES: THE INTENT OF THIS SECTION OF THE SPECIFICATIONS IS THAT THE
CONTRACTOR'S BID ON THE WORK COVERED HEREIN SHALL BE BASED UPON THE DRAWINGS AND
SPECIFICATIONS BUT THAT THE WORK SHALL COMPLY WITH ALL, APPLICABLE CODES AN
REGULATIONS AS AMENDED BY ANY WAIVERS. CONTRACTOR SHALL FURNISH ALL BONDS
NECESSARY TO GET PERMITS FOR CUTS AND CONNECTIONS TO EXISTING SEWERS.
3.B.LOCAL STANDARDS: THE TERM "LOCAL STANDARDS" AS USED HEREIN MEANS THE STANDARDS OF
DESIGN AND CONSTRUCTION OF THE RESPECTIVE MUNICIPAL DEPARTMENT AND/OR UTILITY
COMPANY.
3.C.EXISTING IMPROVEMENTS: MAINTAIN IN OPERATING CONDITION ALL ACTIVE UTILITIES, SEWERS
AND OTHER DRAINS ENCOUNTERED IN THE SEWER INSTALLATION. REPAIR TO THE SATISFACTION
OF THE OWNER ANY DAMAGE TO EXISTING ACTIVE IMPROVEMENTS.
3.D.WORKMANSHIP: TO CONFORM TO ALL LOCAL, STATE AND NATIONAL CODES AND TO BE APPROVED
BY ALL LOCAL AND STATE AGENCIES HAVING JURISDICTION.
3.E.TRENCHING: LAY ALL PIPE IN OPEN TRENCHES, EXCEPT WHEN THE LOCAL AUTHORITY GIVE
WRITTEN PERMISSION FOR TUNNELING. OPEN THE TRENCH SUFFICIENTLY AHEAD OF PIPE LAYING
TO REVEAL ANY OBSTRUCTIONS. THE WIDTH OF THE TRENCH SHALL BE THE INSIDE PIPE DIAMETER
PLUS 24 INCHES FOR 12 INCHES ABOVE THE PIPE. SHEET AND BRACE TRENCH AS NECESSARY TO
PROTECT WORKMEN AND ADJACENT STRUCTURES. ALL TRENCHING TO COMPLY WITH
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARDS. KEEP TRENCHES FREE FROM
WATER WHILE CONSTRUCTION IS IN PROGRESS. UNDER NO CIRCUMSTANCES LAY PIPE OR
APPURTENANCES IN STANDING WATER. CONDUCT THE DISCHARGE FORM TRENCH DEWATERING TO
DRAINS OR NATURAL DRAINAGE CHANNELS.
3.F.SPECIAL SUPPORTS: WHENEVER, IN THE OPINION OF THE ENGINEER, THE SOIL AT OR BELOW THE
PIPE GRADE IS UNSUITABLE FOR SUPPORTING SEWERS AND APPURTENANCES SPECIFIED IN THIS
SECTION, SUCH SPECIAL SUPPORT, IN ADDITION THOSE SHOWN OR SPECIFIED, SHALL BE PROVIDED
AS THE ENGINEER MAY DIRECT, AND THE CONTRACT WILL BE ADJUSTED.
3.G.BACKFILLING
3.G.1.RCP BACKFILLING: FOR DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE, BACKFILL
WITH EARTH OR GRANULAR MATERIAL FREE FROM LARGE STONES, ROCK FRAGMENTS, ROOTS
OR SOD. TAMP THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE. FOR THE
REMAINING TRENCH DEPTH, BACKFILL WITH EARTH OR GRANULAR MATERIAL CONTAINING
STONES OR ROCKS NOT LARGER THAN 4 INCHES. BACKFILL UNDER WALKS, PARKING AREAS,
DRIVEWAYS AND STREETS SHALL BE GRANULAR MATERIAL ONLY THOROUGHLY COMPACTED BY
APPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 5 FEET OF PAVED ROADWAYS
SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANULAR MATERIALS.
3.G.2.HDPE BACKFILLING: FOR DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE, BACKFILL
WITH GRANULAR MATERIAL. COMPACT THIS BACKFILL THOROUGHLY TAKING CARE NOT TO
DISTURB THE PIPE. FOR THE REMAINING TRENCH DEPTH, BACKFILL WITH EARTH OR GRANULAR
MATERIAL CONTAINING STONES OR ROCKS NOT LARGER THAN 4 INCHES. BACKFILL UNDER
WALKS, PARKING AREAS, DRIVEWAYS AND STREETS SHALL BE GRANULAR MATERIAL ONLY
THOROUGHLY COMPACTED BY APPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 5
FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANULAR
MATERIALS.
3.H.SUBDRAINS: ALL SUBDRAINS ON SITE SHALL BE OF THE SIZE AS SHOWN AND SHALL BE PLACED AS
SHOWN ON THE PLANS. THEY SHALL BE CONSTRUCTED TO THE GRADES AS SHOWN ON THE PLANS.
3.I.UTILITIES: IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL EXISTING
UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF THE WORK. IT SHALL ALSO, BE THE
CONTRACTORS RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES BEFORE
WORK IS STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNERS OR THE ENGINEER
OF ANY CHANGES, ERRORS OR OMISSIONS FOUND ON THESE PLANS OR IN THE FIELD BEFORE
WORK IS STARTED OR RESUMED.
NOTE: THE ENGINEER AND/OR OWNER DISCLAIM ANY
ROLE IN THE CONSTRUCTION MEANS AND METHODS
ASSOCIATED WITH THE PROJECT AS SET FORTH IN
THESE PLANS.
PAVEMENT MARKING SPECIFICATIONS
1.SUMMARY
1.A.SECTION INCLUDES:
1.A.1.PAINTING AND MARKING OF PAVEMENTS.
1.B.REFERENCES
1.B.1.THE PUBLICATIONS LISTED BELOW FORM A PART OF THIS SPECIFICATION TO THE EXTENT
REFERENCED. PUBLICATIONS ARE REFERENCED WITHIN THE TEXT BY THE BASIC DESIGNATION
ONLY.
1.B.2.AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION (AASHTO):
1.B.2.a.AASHTO M247 - GLASS BEADS USED IN TRAFFIC PAINTS
1.B.2.b.AASHTO M248 - READY-MIXED WHITE AND YELLOW TRAFFIC PAINTS
1.B.3.ASTM INTERNATIONAL (ASTM):
1.B.3.a.ASTM D4414 - STANDARD PRACTICE FOR MEASUREMENT OF WET FILM THICKNESS BY
NOTCHED GAUGES.
1.B.4.FEDERAL SPECIFICATIONS (FS):
1.B.4.a.FS A-A-2886 - PAINT, TRAFFIC, SOLVENT BASED (SUPERSEDES FS TT-P-85 AND FS TT-P-115,
TYPE I)
1.B.4.b.FS TT-B-1325 - BEADS (GLASS SPHERES) RETRO-REFLECTIVE
1.B.4.c.FS TT-P-1952 - PAINT, TRAFFIC AND AIRFIELD MARKING, WATERBORNE
1.C.PROJECT CONDITIONS
1.C.1.MAINTAIN ACCESS FOR VEHICULAR AND PEDESTRIAN TRAFFIC AS REQUIRED FOR OTHER
CONSTRUCTION ACTIVITIES. UTILIZE FLAGMEN, BARRICADES, WARNING SIGNS, AND WARNING
LIGHTS AS REQUIRED.
1.D.QUALITY ASSURANCE
1.D.1.USE TRAINED AND EXPERIENCED PERSONNEL IN APPLYING THE PRODUCTS AND OPERATING THE
EQUIPMENT REQUIRED FOR PROPERLY PERFORMED WORK.
2.PRODUCTS
2.A.MATERIALS
2.A.1.PAINT SHALL BE WATERBORNE OR SOLVENT BORNE, COLORS AS SHOWN OR SPECIFIED HEREIN.
PAVEMENT MARKING PAINTS SHALL COMPLY WITH APPLICABLE STATE AND LOCAL LAWS
ENACTED TO ENSURE COMPLIANCE WITH FEDERAL CLEAN AIR STANDARDS. PAINT MATERIALS
SHALL CONFORM TO THE RESTRICTIONS OF THE LOCAL AIR POLLUTION CONTROL DISTRICT.
2.A.2.WATERBORNE PAINT: PAINTS SHALL CONFORM TO FS TT-P-1952.
2.A.3.SOLVENT BORNE PAINT: PAINT SHALL CONFORM TO FS A-A-2886 OR AASHTO M248. PAINT SHALL
BE NON_BLEEDING, QUICK_DRYING, AND ALKYD PETROLEUM BASE PAINT SUITABLE FOR
TRAFFIC_BEARING SURFACE AND BE MIXED IN ACCORDANCE WITH MANUFACTURE'S
INSTRUCTIONS BEFORE APPLICATION FOR COLORS WHITE, YELLOW, BLUE, AND RED.
2.A.4.GLASS BEADS: AASHTO M 247, TYPE 1 OR FS TT-B-1325, TYPE 1, GRADATION A.
3.EXECUTION
3.A.EXAMINATION
3.A.1.EXAMINE THE WORK AREA AND CORRECT CONDITIONS DETRIMENTAL TO TIMELY AND PROPER
COMPLETION OF THE WORK. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS ARE
CORRECTED.
3.B.PREPARATION
3.B.1.SWEEP AND CLEAN SURFACE TO ELIMINATE LOOSE MATERIAL AND DUST.
3.B.2.WHERE EXISTING PAVEMENT MARKINGS ARE INDICATED ON CONSTRUCTION DRAWINGS TO BE
REMOVED OR WOULD INTERFERE WITH ADHESION OF NEW PAINT, A MOTORIZED ABRASIVE
DEVICE SHALL BE USED TO REMOVE THE MARKINGS. EQUIPMENT EMPLOYED SHALL NOT
DAMAGE EXISTING PAVING OR CREATE SURFACES HAZARDOUS TO VEHICLE OR PEDESTRIAN
TRAFFIC. WITHIN PUBLIC RIGHTS-OF-WAY, APPROPRIATE GOVERNING AUTHORITY SHALL
APPROVE METHOD OF MARKING REMOVAL.
3.B.3.NEW PAVEMENT SURFACES SHALL BE ALLOWED TO CURE FOR NOT LESS THAN 30 DAYS BEFORE
APPLICATION OF MARKING MATERIALS.
3.C.APPLICATION
3.C.1.APPLY TWO COATS OF SAME COLOR OF PAINT AS SPECIFIED BELOW, AT MANUFACTURER'S
RECOMMENDED RATE, WITHOUT ADDITION OF THINNER, WITH MAXIMUM OF 100 SQUARE FEET
PER GALLON OR AS REQUIRED TO PROVIDE A MINIMUM WET FILM THICKNESS OF 15 MILS AND
DRY FILM THICKNESS OF 7 ½ MILS PER COAT. PAINT SHALL BE APPLIED FOR A TOTAL DRY FILM
THICKNESS OF 15 MILS. APPLY WITH MECHANICAL EQUIPMENT TO PRODUCE UNIFORM STRAIGHT
EDGES. AT SIDEWALK CURBS AND CROSSWALKS, USE STRAIGHTEDGE TO ENSURE UNIFORM,
CLEAN, AND STRAIGHT STRIPE.
3.C.2.INSTALL PAVEMENT MARKINGS ACCORDING TO MANUFACTURER'S RECOMMENDED PROCEDURES
FOR THE SPECIFIED MATERIAL.
3.C.3.FOLLOWING ITEMS SHALL BE PAINTED WITH COLORS NOTED BELOW:
3.C.3.a.PEDESTRIAN CROSSWALKS: WHITE
3.C.3.b.EXTERIOR SIDEWALK CURBS AND GUARD POSTS: YELLOW
3.C.3.c.FIRE LANES: RED OR PER LOCAL CODE
3.C.3.d.LANE STRIPING WHERE SEPARATING TRAFFIC MOVING IN OPPOSITE DIRECTIONS: YELLOW
3.C.3.e.LANE STRIPING WHERE SEPARATING TRAFFIC MOVING IN THE SAME DIRECTION: WHITE
3.C.3.f.ADA SYMBOLS: BLUE OR PER LOCAL CODE
3.C.3.g.ADA PARKING SPACE MARKINGS AS SHOWN ON THE DRAWINGS.
3.C.3.h.PARKING STALL STRIPING: WHITE, UNLESS OTHERWISE NOTED ON CONSTRUCTION
DRAWINGS
3.C.4.APPLY GLASS BEADS AT PEDESTRIAN CROSSWALK STRIPING AND AT LANE STRIPING AND
ARROWS AT DRIVEWAYS CONNECTING TO PUBLIC STREETS. BROADCAST GLASS BEADS
UNIFORMLY INTO WET MARKINGS AT A RATE OF 6 LB/GAL.
3.D.FIELD QUALITY CONTROL
3.D.1.INSPECTION: AFTER THE PAINT HAS THOROUGHLY DRIED, VISUALLY INSPECT THE ENTIRE
APPLICATION AND TOUCH UP AS REQUIRED TO PROVIDE CLEAN, STRAIGHT LINES AND SURFACES
THROUGHOUT.
3.D.2.TESTING: TESTING OF WET FILM THICKNESS SHALL BE PERFORMED A MINIMUM OF TWO TIMES
ON EACH PARKING ROW (INCLUDING STRIPED ISLANDS) AND PEDESTRIAN CROSS WALKS, AND A
MINIMUM OF ONE TEST ON EACH LANE/ALIGNMENT STRIPING. AT LEAST ONE TEST SHALL BE
PERFORMED AFTER REFILLING PAINT STRIPING MACHINE, CHANGING OPERATORS OF STRIPING
MACHINE, AND CHANGING PAINT TYPES, BRANDS, ETC. THIS SHALL BE PERFORMED IN ADDITION
TO THE TESTING STATED ABOVE. THESE TESTS SHALL BE PERFORMED ON EACH COAT APPLIED.
TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM D4414.
3.E.CLEANING
3.E.1.WASTE MATERIALS SHALL BE REMOVED AT THE END OF EACH WORKDAY. UPON COMPLETION OF
THE WORK, ALL CONTAINERS AND DEBRIS SHALL BE REMOVED FROM THE SITE. PAINT SPOTS
UPON ADJACENT SURFACES SHALL BE CAREFULLY REMOVED BY APPROVED PROCEDURES THAT
WILL NOT DAMAGE THE SURFACES AND THE ENTIRE JOB LEFT CLEAN AND ACCEPTABLE.
-NOTE-
PAVING IN THE RIGHT-OF-WAY TO CONFORM TO THE CITY
SPECIFICATIONS. ALL CURBS MUST CONFORM TO CITY'S CURBING
SPECIFICATIONS.
C900
PR
O
J
E
C
T
S
P
E
C
I
F
I
C
A
T
I
O
N
S
w1
5
0
4
8
3
-
C
9
0
0
s
p
e
c
RE
V
I
S
I
O
N
S
A
N
D
I
S
S
U
E
S
Pa
r
t
o
f
t
h
e
S
E
/
4
o
f
S
e
c
t
i
o
n
2
3
,
T
o
w
n
s
h
i
p
1
8
N
o
r
t
h
,
R
a
n
g
e
3
E
a
s
t
,
C
l
a
y
T
o
w
n
s
h
i
p
,
H
a
m
i
l
t
o
n
C
o
u
n
t
y
,
I
n
d
i
a
n
a
W15.0483
PR
E
P
A
R
E
D
F
O
R
:
12
4
2
W
E
S
T
1
3
6
T
H
S
T
R
E
E
T
,
C
A
R
M
E
L
,
I
N
4
6
0
3
2
PROJECT NO.
SHEET NO.
CH
E
C
K
E
D
B
Y
:
DR
A
W
N
B
Y
:
RL
W
DE
S
I
G
N
E
D
B
Y
:
DW
G
N
A
M
E
:
PR
O
J
E
C
T
N
O
.
:
W1
5
.
0
4
8
3
DA
T
E
BY
05
.
1
9
.
2
0
1
6
SS
R
DA
T
E
:
RL
W
EN
G
I
N
E
E
R
S
31
7
|
8
4
6
-
6
6
1
1
80
0
|
4
5
2
-
6
4
0
8
31
7
|
8
4
3
-
0
5
4
6
fa
x
W E I H E
La
n
d
S
u
r
v
e
y
i
n
g
|
C
i
v
i
l
E
n
g
i
n
e
e
r
i
n
g
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
AL
L
A
N
H
.
W
E
I
H
E
,
P
.
E
.
,
L
.
S
.
-
F
O
U
N
D
E
R
10
5
0
5
N
.
C
o
l
l
e
g
e
A
v
e
n
u
e
In
d
i
a
n
a
p
o
l
i
s
,
I
n
d
i
a
n
a
4
6
2
8
0
we
i
h
e
.
n
e
t
Know what's below.
before you dig.Call
R
TR
A
D
E
R
'
S
P
O
I
N
T
C
H
U
R
C
H
O
F
C
A
R
M
E
L
SU
B
M
I
T
T
E
D
F
O
R
I
N
I
T
I
A
L
R
E
V
I
E
W
12
.
1
8
.
2
0
1
5
ML
T
THE SITE DOES NOT LIE IN A SPECIAL FLOOD
HAZARD AREA AS ESTABLISHED BY THE FEDERAL
EMERGENCY MANAGEMENT AGENCY - NATIONAL
FLOOD INSURANCE PROGRAM, WHEN PLOTTED
BY SCALE ON FLOOD INSURANCE RATE
#18057C207G, DATED NOVEMBER 19, 2014
FLOOD STATEMENT
STEVEN SCOTT RUCKER P.E. 11300279
SU
B
M
I
T
T
E
D
F
O
R
T
A
C
R
E
V
I
S
I
O
N
S
03
.
1
4
.
2
0
1
6
ML
T
NO EARTH DISTURBING
ACTIVITY MAY TAKE
PLACE WITHOUT AN
APPROVED STORM
WATER MANAGEMENT
PERMIT
NOTE
SU
B
M
I
T
T
E
D
F
O
R
D
R
A
I
N
A
G
E
A
P
P
R
O
V
A
L
04
.
2
0
.
2
0
1
6
ML
T
RE
V
I
S
E
D
F
O
R
D
R
A
I
N
A
G
E
A
P
P
R
O
V
A
L
05
.
1
2
.
2
0
1
6
ML
T
FI
N
A
L
C
O
N
S
T
R
U
C
T
I
O
N
P
L
A
N
S
05
.
1
9
.
2
0
1
6
ML
T