HomeMy WebLinkAboutSmock Fansler/Eng/CO #2/No Increase/ Hazel Dell & Keystone RAB Landscape Design – Project #16-ENG-15CITY OF CARMEL TO: Smock Fansler CONTRACT CHANGE ORDER NO.: 2 2910 W. Minnesota St. DATE: 9/29/17 Indianapolis, IN 46241 PROJECT NAME: 16 -ENG -15 CITY REQ. NO.: 2 CITY PO NO.: 100272 CITY PO DATE: 4/5/17 Q � I. You are hereby directed to make the following changes in this contract: Contract stipulated that turf zone irrigation heads were to be drip heads. This Cha Q Order directs the contractor to change heads to Spray as directed by plan revisions. This is a no cost Change Order Il. The following referenced documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Request made from Carmel Street Department The changes result in the following adjustment of Contract Price and Contract Time: Contract Sum prior to this Change Order $ 3,065,346.50 Contract Sum will be increased/deereased by this Change Order $ 0 New Contract Sum including this Change Order $ 3,065,346.50 Contract Time Prior to this Change Order 10/28/2017 Substantial Completion Date 11/15/2017 Final Completion Date Net Increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 10/28/2017 Substantial Completion Date 11/15/2017 Final Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended: Lochmueller Grow Inc. Engineer 3502 Woodview Trace, Suite 150 Address Indianapolis. IN 46268 City/State/Zip The Above Changes Are Accepted: Smock Fansler Contractor 2910 W. Minnesota St. Address Indianauolis. IN 46241 City/State/Zip By: I"' -- B Phone: 317-695-1474 Phone: 317-248-8371 Date: 9/29/2017 Date: 10/16/2017 Approved: J ainard, yor Mary A •ke tuber Lori tat (ember Jerem as m n, PE' City Eng iiffier risty S. Pauley, 1 rk- re urer Date: Appendix A Page 2 Change Order 2 16 -ENG -15 CITY OF CARMEL TO: CONTRACT CHANGE REQUEST NO.: 0 0 2 DATE: 9Z 6/ 2 0 17 PROJECTNAME: Hazel Dell, Keystone RAB' s FROM: IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE REFERENCED CONTRACT. 1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER CONTRACTS INVOLVED.) Irrigation - change turf zones from drip line to spray heads. 2. REASON FOR CHANGE: Chancre was requested by Carmel Street Department to facilitate ease of maintenance and reduce seasonal damage. 3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: $0.0o - no cost 4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE THE CHANGE IN WORK SCOPE? -YES X -NO -(CALENDAR DAYS) 5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE THE CHANGE IN WORK SCOPE? -YES X -NO IF NO, TRADE(S): NO. OF PERSONNEL: DURATION: 6. IDENTIFICATION OF ATTACHMENTS: Letter attached from Irrigation sub describing change in detail. Updated irrigation design drawings are pending from Landtech. DATE: DATE: PREPARED REVIEWED BY: REVIEWED BY: ENGINEER Comments and Recommendation: AR -5 Version 2016-08-31 Page 3 Joe, Per our discussion this morning regarding the sprays vs. drip for all turf areas of the Carmel RAB's, I wanted to send out an email with a recap. changing the drip to sprays: • is an on site design improvement and is NOT a change order that would increase irrigation installation or material costs • will improve the overall speed at which dirt work, irrigation and landscaping can be completed • is something that the city of Carmel will prefer as the end user in relation to future maintenance • will allow the sodded areas to be "watered in" and established quicker • is something that Jim Davis with Landtech has suggested and agreed to if all parties concur • is something that the City of Carmel Street Dept. (Mike Kalogeros) has suggested and agreed to if all parties concur • Landtech has agreed to change the plans to take out the drip and add sprays in all turf areas in all locations when approval has been established. I think this change in design is the best route for Carmel. I don't think it's too late in the game to make this change and it will not affect our team's planning or performance in respect to mobilization. We'll assume this will be acceptable to your client but will wait to hear back from you for clarification. Thanks, Ken not adversely affect the removal and re -compaction of soil Iryr BARTHULY IM IRRIGATION, INC. C4. •m F c...Q"tuy j 44t,,! Ken Barthuly 10720 Andrade Drive Zionsville, IN 46077 office: 317-873.-3700 direct: 317-733-2668 Fax: 317-873-3718 www.barthulyirrigation.com