HomeMy WebLinkAboutRieth-Riley Construction Co., Inc./Eng/CO #1/1,605,251.69/Project # 17-ENG-01 Veteran’s Way ConstructionCity of Carmel Project 17 -ENG -01 Veterans Way Construction CHANGE ORDER #1 Change order represents the installation of utilities within contaminated soils, and the disposal of contaminated soils. The approximate limits of contamination include Sta. 56+50 to 61+50, and includes balancing reconciled quantities and amounts to date. Contract Price prior to this Change Order -------------------------------------`------------------------------------------------- Contract Price will be increased by this Change Order ----------------------------------------------------------------------------------------- New Contract Price including this Change Order ------------------------------------------------------------------------------------------- 55.378.409.93 51,605,251.69 56,983,661.62 PO Amount Adjusted Contract Cumulative % Price Change from Original Contract Original Contract $5,378,409.93 N/A Change Order 1 100472 $1,605,251.69 $6,983,661.62 30% CITY OF CARMEL TO: Rieth Riley Construction Co, Inc. CONTRACT CHANGE ORDER NO.: 1 1751 West Minnesota Street DATE: I U07l17 Indianapolis, IN 46221 PROJECT NAME: 17 -ENG -01 CITY REQ. NO.: CITY PO NO.: 100472 CITY PO DATE: 6`12017 I. You are directed to make the following changes in this Contract: I *♦Y Add additional items items due to modifications in the field and requests trom Carmel Utility Departments. SCHEDULED ADJUSTMENT ITEM AMOUNT t-1 OR t - ) DAYS • See detail of items and summary of changed costs in attached Table TOTAL OF CHANGE ORDER ITEMS 1 $1,605 51.69 0 Days II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered apart of this Change Order. R.F.P.:r1_W.D.C. NO.: nia Other. _ By Request from the City of Cannel per proposals included herein The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $5.378,409.93 Contract Price will be increased by this Change Order S 1.605.251.69 New Contract Price including this Change Order 56.983.661.62 Contract Time prior to this Change Order 150 Days October 1 2017 Completion Date Net increased resulting,�jgin this Change Order 0 Days Current Contract Time including this Change Order October l 2017 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended The Above Changes Are Accepted Approved CROSSROAD ENGINEERS ENGINEER 3417 Sherman Drive Address Beech Grove, IN 46107 City%State Zip By: _ X� Phone: 317-780-1555 Date: 11/%! .;�Di7 Rieth-Riley Construction Co. Inc. CONTRACTOR 1751 West Minnesota Street Address Indianapolis, IN 46221 CitytState(Zip By: hoe 74- 518 Date: 1.1 17/1,r 17 -ENG -01 - Veteran's Way Construction CHANGE ORDER #1 TABLE Item No Description lioi[ LnitPrice Original Quantih' Original .Amount Final QuantitN Final Amount Ocer.Cnder 14 Structural Backfill,T-,I LFr S 16.31 1096 1 S 13.423.76 523 S 9,791.63 5 (9,632.13) 44 Pipe, Tspe 2, Circular, 12" LFr S 53.42 912 S 48,719.04 339 S 18,109.33 S (30,609.66) 57 Inlet, 1-10 EA S 2.113.71 8 S 20.709.68 3 S 7,766.13 S (12,943 55) 581 Inlet, \I-10 EA S 2.546.14 8 S 20,369,12 4 S 10,184.6 IS (10,184.561 59 Inlet, J with castintt R -3290-A EA S 2,716.64 2 S 5,433.28 1 S 2,716.64 1 5 (2,' 16.64 60 Inlet. M with casting R -3290-A EA S 2,677.59 1 S 2,677.59 0 S S (2.677•:91 61 Inlet, E tcith Castin • R4215 -C EA S 2,139.13 1 S 2,139.13 0 S S (2,139.131 63 Manhole, C4 EA S 4.378.83 6 1 S 2972.98 4 S 19,515.32 S (9,757.661 88 4'x4'x4', Split Communications Wix EA I S 6,000.00 4 S 24,000.00 2 S 12,000.00 S 12.0000)) 89 Communication Duct Bank LFT IS 105.00 1290 S 135,450.00 890 S 93,450.00 S (42000.00) 109 SanitarvSe%-er Manholc, T)pe I EA I S 10.280.33 6 S 61,681.99 3 S 30.840.99 S (30,840.99) 110 15" PVC - SDR -26 San itanv Alain Lrr I S 83.14 it44 S 95,112.16 584 S 48,553.76 IS (46,558.40) 111 Compacted Aggregate Backfill, Sanitan Alain LFr I S 39.57 1144 S 4:,268.08 584 S 23,1 n8.88 IS (2'• 159.20) 113 Core Existing Manhole EA I S 1,469.91 2 S 2.939.82 1 S 1,469.91 IS (1,469.91) 118 12- D.I. Water Main LFr I S 90.22 1408 5 12-.029.76 786 S '1),912.92 IS (56.116.34) 119 Cum acted Aggregate Backlill. Watermain LFr I S 18.74 1408 S 26 385.92 786 S 14,729.64 S (11,656.28) 120 Complete Fire Hydrant Assembly EA IS 5,483,65 5 S 27.443.24; 3 S 16,463.95 S (10,977.30) 123 12"Gate Valve EA I S 3,055.10 9 S 27,495.90 2 S 611020 S (21,335.70) 126 12' Connections EA S 3.505.35 2 S 7,011.70 1 S 3,505.85 S (3.505.85) 140 IMtrant Retirement EA S 1.149.72 3 S 3,449.16 2 S 2.299.44 S (1,149.72) 143 Duke Enernw'Transmission Duct Bank LFr S 424.34 507 S 215,140.33 0 5 S (215,140.38 144 12'x 6' x -,'Electric 1(anhole Vault EA S 33,465.72 9 S 301,191.48 5 S 167,328.60 S (133,862.88) 145 Duke Enerz% Distribtuion Duet Bank LFT S 343.22 1608 S 551,897.76 929.22 S 318 926.89 S (232 970.87) 150 Manhole. C-10 EA S 3.460.73 2 S 6,92156 0 S S (6921.56) 152 (Sm. 56.50 to 61-50) Contaminated Change Order 1 LS IS 693,715.73 0 5 I S 698,715.73 S 698,715.'3 154 (Sta. 56.50 to 61-50) Contaminated Change Order 2 LS S 1 ) 3.733.94 0 S 1 S 1,318 733.94 S 1,318 733.94 ISS (Stn. 56 50 to 61 X50) Contaminated Change Otdcr 3 LS I S 517,178.82 0 S 1 S 51 7,178.82 S 517,178.82 TOTAL OF CHANGE ORDER ITEMS $ 1,605,251,69 ORIGINAL CONTRACT PRICE S 5,378,409.93 FINAL CHANGE ORDER kl S 1,605,351.69 NEW CONTRACT AMOUNT INCLUDINGAPPROVED CHANGE ORDERS S 6,9S3,661.62 17-ENG-01 - VETERAN'S WAY CONSTRUCTION' EXHIBIT A You have been directed to make the following changes in this Contract: Item No. Description Reason For Change 14 Structural Backfill. Type I adjusted to balance original quantities that were installed in contaminated area. 44 Pipe, Tym 2. Circular, 12" adjusted to balance original quantities that were installed in contaminated area. 57 Inlet, J-10 adjusted to balance original quantities that were installed in contaminated area. 58 Inlet. M-10 adjusted to balance original quantities that were installed in contaminated area. 591 Inlet. J with casting R-3290-A adjusted to balance original quantities that were installed in contaminated area. 60 Inlet. M with casting R-3290-A adjusted to balance original quantities that were installed in contaminated area. 61 Inlet. E with Casting R-4215-C adjusted to balance original quantities that were installed in contaminated area. 63 Manhole. C4 adjusted to balance original quantities that were installed in contaminated area. 88 4'x4'x4', Split Communications Box adjusted to balance original quantities that were installed in contaminated area. 89 Communication Duct Bank adjusted to balance original quantities that were installed in contaminated area. 109 Sanitary Sewer Manhole. Type I adjusted to balance original quantities that were installed in contaminated area. 110 15" PVC - SDR-26 Sanitary Main adjusted to balance original quantities that were installed in contaminated area. I 1 I Cotn acted Aggregate Backfill, Sanitary Main adjusted to balance original quantities that were installed in contaminated area. 113 Core Existing Manhole adjusted to balance original quantities that were installed in contaminated area. 118 12" D.I. Water Main adjusted to balance original quantities that were installed in contaminated area. 119 Compacted Aggro ate Backfill. Watenmain adjusted to balance original quantities that were installed in contaminated area. 120 Complete Fire Hydrant A:scmbly adjusted to balance original quantities that were installed in contaminated area. 123 12" Gate Valve adjusted to balance original quantities that were installed in contaminated area. 126112" Connections adjusted to balance original quantities that were installed in contaminated area. 140 Hydrant Retirement adjusted to balance original quantities that were installed in contaminated area. 143 Duke Energy Transmission Duct Bank adjusted to balance original quantities that were installed in contaminated area. 144 12'x 6' x T Electric Manhole Vault adjusted to balance original quantities that were installed in contaminated area. 145 Dukc Energy Distribtuion Duct Bank adjusted to balance original quantities that were installed in contaminated area. 150 Manhole. C-10 adjusted to balance original quantities that were installed in contaminated area. 152 (Sta. 56-50 to 6I+50) Contaminated Change Order I Change order added for installation of utilities within contaminated area. 154 (Sta. 56>50 to 61+50) Contaminated Change Order 2 Change order added for installation of utilities within contaminated area. 155 (Sta. 56-50 to 61+50) Contaminated Change Order 3 Change order added for installation of utilities within contaminated area. IETH! October 41 2017 IL E Y CONSTRUCTION CO., INC. 100% Quality • 100% Employee Owned • Over 100 Years Curtis Holcom SENT VIA ELECTRONIC MAIL ONLY: CrossRoad Engineers, PC 3417 Sherman Drive cholcom@crossroadengineers.com Beech Grove, Indiana 46107 RE: Intersection Improvements Range Line Rd & 4th Street City of Carmel Project No. 16 -ENG -31 Rieth-Riley Project No. 3200701 Dear Mr. Holcomb, Below is a breakdown of the pricing associated with the TCE Contamination encountered on Veteran's Way for the month of August. Line Item Unit Price Aug Total QTY Aug Total $ No. 1 HIS Crew Days EA $ 9,300.00 13.5 $ 125,550.00 2 Non -Hazardous Waste Disposal TON $ 42.00 1942.72 $ 81,594.24 3 Hazardous Waste Disposal TON $ 380.00 77.77 $ 29,552.60 4 16" MJ FKM Gasket EA $ 1,574.90 0 $ 5 16" Tyton Gasket EA $ - 0 $ 6 12" MJ FKM Gasket EA $ 407.10 31 $ 12,620.10 7 12" Tyton Gasket EA $ 759.35 28 $ 21,261.80 8 6" MJ FKM Gasket EA $ 198.40 5 $ 992.00 9 6" Tyton Gasket EA $ 282.22 6 $ 1,693.32 10 8" MJ FKM Gasket EA $ 289.80 2 $ 579.60 P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com IETHII�ILEY CoNsmucnoN Co., INc. 100% Quality • 100% Employee Owned • Over 100 Years 11 12" MJ Sleeve EA $ 237.08 1 $ 237.08 12 8" MJ Sleeve EA $ - 0 $ 13 8" M1 Cap EA $ 64.21 0 $ 14 6" MJ Sleeve EA $ 120.33 1 $ 120.33 15 16" Polywrap LFT $ 1.33 0 $ 16 12" Polywrap LFT $ 1.23 811 $ 997.53 17 6" Polywrap LFT $ 1.05 0 $ 18 16" DIP LFT $ 46.75 0 $ 19 12" DIP LFT $ 23.50 566 $ 13,301.00 20 8" DIP LFT $ 14.00 0 $ 21 6" DIP LFT $ 12.00 2.5 $ 30.00 22 4" DIP LFT $ 17.50 0 $ 23 2" Blow Off Assembly EA $ 780.60 2 $ 1,561.20 24 Structural Backfill TON $ 13.15 1523.65 $ 20,036.00 25 12x12x6 Tee EA $ 395.00 2 $ 790.00 26 12x12x8 Tee EA $ 392.25 1 $ 392.25 27 12x12x12 Tee EA $ 495.00 2 $ 990.00 28 12" Gate Valve EA $ 1,990.00 7 $ 13,930.00 29 8" Gate Valve EA $ 895.00 1 $ 895.00 30 6" Gate Valve EA $ 599.00 2 $ 1,198.00 31 12" Megalug EA $ 99.00 33 $ 3,267.00 P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 RD Phone: (317) 634-5561 • www.rieth-riley.com /ETH"��/LEY CONS TRUC TION Co., INC. 100% Quality • 100% Employee Owned • Over 100 Years 32 8" Megalug EA $ 52.00 4 $ 208.00 33 6" Megalug EA $ 39.45 2 $ 78.90 34 4" Megalug EA $ 33.00 0 $ 35 12" Bell Restraints EA $ 175.00 4 $ 700.00 36 Hydrant Assembly EA $ 2,390.00 2 $ 4,780.00 37 Valve Box EA $ 132.46 4 $ 529.84 38 6" MJ Anchor Coupling 2' EA $ 175.00 2 $ 350.00 39 6" MJ Anchor Coupling 1' EA $ 175.00 1 $ 175.00 40 6" MJ 45* Bend EA $ 112.02 2 $ 224.04 41 No. 8 Stone TON $ 18.40 0 $ 42 Curb Stop Stem EA $ - 2 $ 43 1" Corp Stop EA $ 59.61 2 $ 119.22 44 1" Curb Stop EA $ - 2 $ 45 HDPE 3" Pipe Sleeve LFT $ 2.63 31 $ 81.53 46 HDPE 2" Pipe Sleeve LFT $ - 0 $ 47 1" Copper Pipe LFT $ 395.00 31 $ 12,245.00 P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 MAT Tota 1 $351,080.58 MAT Markup $ 35,108.06 Bond �$ 38,618.86 Bond Markup $ 3,861.89 August Total $428,669.39 Phone: (317) 634-5561 • www.rieth-riley.com IETH! ILEY CONSTRUCTION CO., INC. 100% Quality • 100% Employee Owned • Over 100 Years Along with the month of August — Rieth-Riley also requests to be paid for September's waste disposal. Below is a breakdown of pricing: Item Price/Unit Quantity Price Non -Hazardous Waste Disposal (Twin Bridges) $ 42.00 1463.51 $61 , 467.42 Non -Hazardous Waste Disposal (Southside) $ 57.00 869.6 $ 49,567.20 Non -Hazardous Waste Disposal (Southside - Saturday Rate) $ 60.50 763.11 $ 46,168.16 Hazardous Waste Disposal $ 380.00 168.33 $ 63,965.40 Disposal Total Price $221,168.18 Disposal Markup $ 22,116.82 Bond $ 24,328.50 Bond Markup $ 2,432.85 September Total Disposal $270,046.34 A detailed breakdown of this pricing can be provided at your request. Please call with any questions. .4.,,.v, s cep. Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Cam Mackle Jason Tuddy P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com JETHj November 6, 2017 LEY CONSTRUCTION CO., INC. 100% Quality • 100% Employee Owned • Over 100 Years Curtis Holcom SENT VIA ELECTRONIC MAIL ONLY: CrossRoad Engineers, PC 3417 Sherman Drive cholcom@crossroadengineers.com Beech Grove, Indiana 46107 RE: Intersection Improvements Range Line Rd & 4 t Street City of Carmel Project No. 16 -ENG -31 Rieth-Riley Project No. 3200701 Dear Mr. Holcomb, Below is a breakdown of the pricing associated with the TCE Contamination encountered on Veteran's Way for the month of September (Excluding Disposal). Line Month Unit No. Item Unit Price Total Month Total $ 1 HIS Crew Days EA 9,300.00 16.5 153,450.00 2 HIS Crew Days (Weekend Rate) EA 10,433.00 1 10,433.00 3 16" MJ FKM Gasket EA 1,574.90 10 15,749.00 4 16" Tyton Gasket EA 545.50 20 10,910.00 5 12" MJ FKM Gasket EA 407.10 4 1,628.40 6 6" MJ FKM Gasket EA 198.40 6 1,190.40 7 6" Tyton Gasket EA 282.22 1 282.22 8 8" MJ FKM Gasket EA 289.80 7 2,028.60 9 12" MJ Sleeve EA 237.08 2 474.16 10 8" MJ Sleeve EA 120.00 1 120.00 11 8" MJ Cap EA 64.21 1 1 64.21 1 12 16" Polywrap LFT 1.33 904.5 1,202.99 P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com iIJ ETH " ,,LEY CoNsmucnoN Co., INC. 100% Quality • 100% Employee Owned • Over 100 Years 13 12" Polywrap LFT 1.23 9 I 1.07 P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, 1N 46206 Phone: (317) 634-5561 • www.rieth-riley.com 14 6" Polywrap LFT 1.05 36 37.80 15 16" DIP LFT 46.75 556.5 26,016.38 16 12" DIP LFT 23.50 2.5 58.75 17 8" DIP LFT 14.00 20 280.00 18 6" DIP LFT 12.00 47 564.00 19 16" Gland Pack EA 180.00 10 1,800.00 TO $ $ 20 Structural Backfill N 13.15 1808.47 23,781.38 21 6x6x6 Tee EA 29.00 1 29.00 22 16x6 MJ WYE EA 1,195.00 5 5,975.00 23 12" Megalug EA 99.00 8 792.00 24 8" Megalug EA 52.00 8 416.00 25 6" Megalug EA 39.45 6 236.70 26 8" MJ 45* Bend EA 119.95 2 239.90 27 6" MJ 45* Bend EA 112.02 1 112.02 28 6" 22.5* Bend EA 21.16 1 21.16 TO $ $ 29 No. 8 Stone N 18.40 528.73 9,728.63 30 HDPE 3" Pipe Sleeve LFT 2.63 51 134.13 31 1" Copper Pipe LFT 3.95 51 201.45 32 3/4" Tapping EA 78.00 1 78.00 33 3/4" Corp Stop EA 48.37 1 48.37 P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, 1N 46206 Phone: (317) 634-5561 • www.rieth-riley.com THII&EY CONSTRUCTION CO., INC. 100% Quality • 100% Employee Owned • Over 100 Years P.O. Box 276 -1751 W. Minnesota St. • Indianapolis, IN 46206 MAT Tota I $ 386, 345.30 S $ S 34 3/4" Curb Stop EA 124.33 1 124.33 Grand Total $ 471,727.61 35 1" Coupling EA 25.45 1 25.45 36 1" Angle Valve EA 24.81 1 24.81 37 1" to 3/4" Reducer EA 23.77 1 23.77 38 6" Fernco EA 17.26 4 69.04 39 8" Fernco EA 30.00 1 30.00 40 6" SDR35 Pipe LFT 2.00 10 20.00 41 6" PVC Plug EA 4.63 1 4.63 S $ 42 6" PVC Cleanout Cap EA 7.84 1 7.84 43 Sanitary Manhole EA 1,410.00 2 2,820.00 44 16" Rubber Boot Fitting EA 768.40 2 1,536.80 45 8" Rubber Boot Fitting EA 452.72 1 452.72 46 HIS Mobilization EA 98,876.00 1 98,876.00 47 Performance Bond EA 8,700.00 1 8,700.00 48 ABC INV 9/27 EA 558.00 1 558.00 49 GLS INV 10/4 EA 4,977.20 1 4,977.20 P.O. Box 276 -1751 W. Minnesota St. • Indianapolis, IN 46206 MAT Tota I $ 386, 345.30 MAT MU $ 38,634.53 Bond �$ 42,497.98 Bond MU $ 4,249.80 Grand Total $ 471,727.61 Phone: (317) 634-5561 • www.rieth-riley.com 'ETH4]{ILEY CONSTRUCTION CO., INC. 100% Quality • 100% Employee Owned • Over 100 Years Along with the month of September — Rieth-Riley also requests payment for Labor, Material and Waste Disposal for the TCE Contamination encountered on Veteran's Way. Below is a breakdown of pricing: P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com OCT Unit Item Unit Price Total OCT $ Total 1 HIS Crew Days EA 9,300.00 31 288,300.00 2 HIS Crew Days (Weekend Rate) EA 10,433.00 5 52,165.00 3 12" MJ FKM Gasket EA 407.10 1 407.10 4 12" Tyton Gasket EA 759.35 2 1,518.70 5 6" MJ FKM Gasket EA 198.40 1 198.40 6 12" Polywrap LFT 1.23 44 54.12 7 12" DIP LFT 23.50 55 1,292.50 8 6" DIP LFT 12.00 6 72.00 9 6" Accessories/Gland Pack EA 40.00 1 40.00 10 Structural Backfill TON 13.15 3416.01 44,920.53 11 No 8 Stone TON 15.00 123.57 1,853.55 12 Sanitary Manhole Type I EA 1,160.00 1 1,160.00 13 12" Bell Restraints EA 175.00 3 525.00 14 6" Fernco EA 17.26 1 17.26 15 12" SDR35 LFT 7.00 11 77.00 16 Concrete - C3530 CY 96.00 226.5 21,744.00 17 Concrete - C3520 CY 96.00 10 960.00 18 6" Conduit & Spacers LFT 21.88 2716 59,426.08 P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com IETH AWI XEY CONSTRUCTION CO., INC. 100% Quality • 100% Employee Owned • Over 100 Years P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 MATTotal $693,698.87 MAT MU S Bond $ 19 Blowoff Assembly EA 780.60 1 780.60 20 Distribution Vault EA 10,219.08 4 40,876.32 21 Copper Ground Wire LFT 1.40 1647 2,305.80 22 12" RCP LFT 8.82 469.5 4,140.99 23 15" RCP LFT 11.62 10.5 122.01 24 #5 Rebar LFT 0.47 1438 675.86 25 Freight Charges (Ductile Iron Pipe Delivery for HIS) EA 2,160.18 1 2,160.18 26 J10 Inlet w/ Casting EA 1,089.21 2 2,178.42 27 M10 Inlet w/ Casting EA 800.00 4 3,200.00 28 J Inlet w/ 3290A Casting EA 967.31 0 - 29 M Inlet w/ 3290A Casting EA 920.00 1 920.00 30 E Inlet w/ 3290A Casting EA 675.00 1 675.00 31 C4 Manhole w/ Casting EA 859.21 1 859.21 32 C10 Manhole w/ Casting EA 1,089.21 2 2,178.42 33 Non -Hazardous Waste (Southside) TON 1 57.00 2080.96 118,614.72 34 Non -Hazardous Waste (SS) (Weekend Rate) TON 60.50 616.2 37,280.10 35 Hazardous Waste Disposal TON 380.00 0 - 36 Geotherm Testing EA 1 1,000.00 2 2,000.00 P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 MATTotal $693,698.87 MAT MU $ 69,369.89 Bond �$ 76,306.88 Bond MU $ 7,630.69 Grand Total $847,006.32 Phone: (317) 634-5561 • www.rieth-riley.com �K/LEY CONSTRUCTION CO.. INC. 100% Quality • 100% Employee Owned • Over 100 Years These two months of work increase the contract amount by $1,318,733.94. A detailed breakdown of this pricing can be provided at your request. Please call with any questions. .4-1.14. S 66" Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Cam Mackle Jason Tuddy P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 11/3/17 Work Performed: CONTRACT: 16 -ENG -01 PROJECT: Veteran's Way FORCE ACCOUNT/EXTRA WORK FOR: HIS Constructors - Duke Transmission Installation LABOR 109.05 (b)(1) 3000 # Hr)[ lac EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 $28.99 $0.00 COMBINATION 0.00 $29.76 $0.00 FINISHER 0.00 $25.72 $0.00 FOREMAN 0.00 $35.05 $0.00 LABORER 0.00 $24.72 $0.00 MECHANIC 0.00 $35.05 $0.00 OPERATOR (103) 0.00 $34.05 $0.00 OPERATOR (841) 0.00 $32.55 $0.00 OPERATOR OILER (103) 0.00 $29.91 $0.00 QA TECH 0.00 $24.72 $0.00 SUPERINTENDENTIPROJECT MANAGER 0.00 $44.05 $0.00 TEAMSTER 0.00 $28.41 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.50 % x LINE (2) $0.00 (3) EMPLOYEE HOURS $0.00 (5) RATE EXTENSION CARPENTER 0.00 X $21.25 = $0.00 CARPENTER FOREMAN 0.00 x $21.25 = $0.00 COMBINATION 0.90 X $14.91 = $0.00 FINISHER 0.00 X $13.96 = $0.00 FOREMAN 0.00 X $17.66 = $0.00 LABORER 0.00 X $13.96 = $0.00 MECHANIC 0.00 X $17.66 = $0.00 OPERATOR (103) 0.00 X $17.66 = $0.00 OPERATOR (841) 0.00 X $20.51 = $0.00 OPERATOR OILER (103) 0.00 X $17.661 $0.00 QA TECH 0.00 X $13.96 = $0.00 SUPERINTENDENTIPROJECT MA 0.00 X $17.66 = $0.00 TEAMSTER 0.00 X $14.91 =1 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5.72 ` % X LINE (2) $0.00 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 385 . % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE 93) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $0.00(10) 20 %x LINE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109.05 (b)(3) or Manufacbred Description Quentdy Unit Lkrl Price $0.00 E)denstion $0.00 P Southside LarMfl+H A Novazanious Waste Dis 2,600.00 TON $ 57.00 $ 148,200.00 P FP Hazardous Waste Disposal250.00 TON $ 380.00 $ 95,000.00 P Concrete 200.00 CY $ 96.00 $ 19,200.00 P Structural Backfill 3,000.00 TON $ 13.15 $ 39,450.00 CorKkjd & Spacers 303.00 LFT$ 21.88 $ 6,629.64 P $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL UNE (18)+ (19) 12 % x UNE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(41 $308,479.64 (18) $0.00 (19) $308,479.64 (2o) $37,017.56 (21) $345,497.20 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $000 $0.00 Tnrcldng - Stnaght Time $0.00 $0.00 Tnrddng - Over Time $0.00 $0.00 Tnx:ldng - Double Time $0.00 TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 12 % x UNE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) SUBCONTRACTORS 109.05 (b)(6) $0.00 (23) $0.00 (24) $0.00 (25) $0.00 (26) $0.00 (27) $0.00 (28) DESCRIPTION A UNT HIS Crew Da - 15 EA @ $9,300 $139,500.00 HIS Crew Da Weekend - 2 EA qD $10,433 $20,866.00 TOTAL SUBCONTRACT WEEK ENDING $160,366.00 (29) 10 % x LINE (30) $3,000.00 OR LESS $300.00 (31) 7 %x LINE (30) OVER $3,000.00 $11,015.62 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $171,681.62 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) % OF BOND RATE BASED UPON LINE (34) 10 %x LINE (35) TOTAL EXTRA WORK LINES: (34) + (35) + (36) Page 2 of 2 $517,178.82 (34) $0.00 (35) $0.00 (36) $517,178.82 (37)