HomeMy WebLinkAboutSmock Fansler/Eng/ CO #1/85,345/RAB Landscape Improvements 96th to 106thCity of Carmel Project 16 -ENG -13 RAB Landscape Improvements d CHANGE ORDER #1 ° Correction to original PO amount; Manhole adjustment at 96th St and Towne Rd; Additional boring for irrigation and lighting Contract Price prior to this Change Order Contract Price will be increased/decreased by this Change Order New Contract Price including this Change Order -------------•-•--------.......................... ...................................... $1,277,762.00 $85,345.00 $1,363,107.00 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $1,277,762.00 N/A N/A CO1 $85,345.00 $1,363,107.00 6.7% CITY OF CARMEL TO: Jarrod Huff CONTRACT CHANGE ORDER NO.: 1 DATE: 10-26-17 PROJECT NAME: 16 -ENG -13 Landscape Improvements CITY REQ. NO.: CITY PO NO.: 34327 CITY PO DATE: 10/26/16 You are directed to make the following changes in this Contract: a. Correct the original bid amount due to errors found in bid tabs b. Add 3' Sanitary Manhole adjustment at the 96`x' St and Towne Rd Roundabout c. Add an additional 1255 LFT of boring for irrigations throughout the five roundabouts d. Add an additional 140 LFT of electrical boring throughout the five roundabouts SCHEDULED ADJUSTMENT ITEM AMOUNT H OR (-) DAYS Bid Tab Correction $18,310.00 N/A Sanitary Manhole Adjustment $4960.00/EA ($4960.00) N/A *Irrigation Boring/Jacking $45.00/LFT ($56,475.00) N/A *Electrical Boring/Jacking $40.00/LFT ($5600.00) N/A *Item is in contract but have significant overruns. Amounts are additional costs that need to be added to contract. II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Change Order 1 The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,277,762.00 Contract Price will be increased/decreased by this Change Order $ 85,345.00 New Contract Price including this Change Order $ 1,363,107.88 Contract Time Prior to this Change Order Days 9/20/17 Completion Date Net increased/decreased resulting from this Change Order_ Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended Jason M. Buck ENGINEER 8900 Keystone Crossing Address Suite 900 Indianapolis, IN 46240 City/State/Zip By: Jason Buck Phone: 574-210-2471 The Above Changes Are Accepted: Joe Davee CONTRACTOR Smock Fansler Corporation Address 2910 West Minnesota St Indianapolis, IN 46241 City/State/Zip By:Joe Davee, Vice President Phone: (317)248-8371 Approved: -PPI Lorbn, Member JeJ� y I ashman, PE, City Engineer 04SaLuley, hristinClerk Treasurer PART 3 CONTRACTITEMS AND UNIT PRICES [This Part to be used only for Bidding on Unit Price Cattracts for the Contract Items shown] 7arAa' BID -4 Vensim 2016-08-31 Prices In Figures Contract Description/ Estimated Unit Total Price Item No. Unit Price [in Words] Quantity Price for Item 1 Mobilization & Demobilization 5, Each $10,750.00 $53,750.00 2 Maintenance of Traffic 5, Each $ 7,500.00 $37, S00. 00 3 Construction Engineering 5, Each $ 3050.00 $15,250.00 4 Erosion Control Fence 1,488, LFt. $ 7.00 $10,416.00 5 Concrete Wash -off Facility 5, Each $ 2,375.00 $11,875.0 6 Inlet Protection 3, Each $ 170.00 $ 510.00 7 Masonry Sign Wall 1, Each $111,200.00 $111,200.00 8 Masonry Wall, 2 wings 2, Each $ 67.250.00 $134,500.00 9 Masonry Wall, 4 wings 2, Each $ 85, 900.00 $171,800.00 10 Removal and Disposal, excess 1,159, CYd. $ 46.00 $53,314.00 fill 1 I Excavation & Backfill Balanced 606, CYd. $ 40.00 $24,240.00 Quantities 12 Planting Soil Backfill 1,15 }. CYd. $ 51.00 $59,109.00 13 Irrigation Service & Connections 5, Each $ 5,650.00 $28,250.00 14 Irrigation Boring / Jacking 40, LFt, $ 45.00 $ 1.800.00 15 Irrigation Controls / Backflow 5, Each $ 1169$.00 $ 8,475.00 Preventers 16 Control Valves, Drip Tubing, 5, Each $10,735.00 $53,675.00 Emitters 17 Electric Service & Connections 5. Each $ 7,797.00 S38,985.00 18 Electric Conduit Boring / 305, LFt. $ 40.00 $12,200.00 Jacking 19 Sign Wall Lighting 1, Each $25,990.00 $25,990.00 20 Masonry Pier Lighting 4, Each $28,250.00 $141,250.00 21 Street Trees 14, Each $ 368.00 $ 5,152.00 22 Ornamental Trees 21, Each $ 345.00 $ 7,245.00 23 Shrubs 120, Each $ 46.00 $ 5,S20.00 24 Ornamental Grasses 1,185, Each ` 90.00 s 640.0o 25 Perennials 13,615, Each $ 16.20 $220,563.00 26 Turf, Seeding 87, Lbs. $ 34.00 $ 2,958.00 27 Hardwood Mulch 487, CYd. $ 85.00 $41,395.00 7arAa' BID -4 Vensim 2016-08-31 F� 2910 West Minnesota Street Indianapolis, IN 46241.4541 Smock lFansler 317.248.8371 Tel „ K ,, „ k A , , „ h 317.244.4507 Fax /iam�l/mlrwlw, tFnKinrcn �lmvutwn Nu_"' Quotation DATE: 5/8/2016 Quote # 1316-011 OSS TO: Jason Buck, Clark -Dietz FROM: Joe Davee REGARDING: 16 -ENG -13 Carmel Roundabout Landscape Improvements Sanitary Structure Adiustment at 96th & Towne Road We Propose to Provide the followina Scope of Work Provide and install Tx 48" dia. Barrel section to raise existina manhole castina to new finish arade. Base Bid: $ 4,960.00 INCLUDES: Excavate around structure to separate existing barrel section, eccentric cone section, 2 EA 6" risers and Castin Provide and install 1 EA 36" tall x 48" diameter barrel section, with steps, coat with butyl mastic and seal to existing cone and risers per CTRWD standards. Backfill and grade area per latest landscape drawings as issued for 16 -ENG -13. EXCLUDES: Bonds, Permits or Related Fees Premium Time for shift work, weekends or holidays. SALES TAX No INCLUDES ADDENDA n/a THROUGH n/a NOTES: Please call if you have anv auestions. Thanks For The Opportunity To Serve You! QUOTE - Sanitary Structure Adj Carmel RAB Landscape Unit Prices ClarloDietz Engineering Quality of Life October 26, 2017 Mr. Jarrod Huff Carmel Engineering Department One Civic Square Carmel, IN 46032 Re: Project No. 16 -ENG -13 Roundabout Landscape Improvements Dear Mr. Huff: 2 - Smock Fansler has submitted costs for additional work that was needed on the above mentioned contract. There is also a correction that needs to made original contract amount. When the project was bid Smock Fansler submitted bid at $1,277,762.00. After reviewing the bid tabs there appeared to be an error in the total amount. Two contract items were calculated wrong which threw the total amount off. Item 20 and 24 had errors that caused the original bid to be low. Attached is a sheet with the correct amounts and total. An additional $18,310.00 needs to be added to correct the original PO amount. Smock Fansler encountered an issue with an existing Sanitary Manhole Structure at the 96th St and Towne Rd Roundabout. During the design phase it was not anticipated that this structure would need an adjustment due to grades. At the beginning of construction, the landscape wall was laid out by their surveyor and it was noticed that the wall would be in conflict with existing utilities. The wall was rotated by the designer to avoid any conflict during construction. With the wall rotation the grading around the wall changed as well. This changed the grading around the existing manhole which is cause for the change. Smock needs to add a 3' barrel section to the manhole to bring it to finish grade. The price submitted by Smock Fansler is a unit price of $4960.00 EA. The work included in this item is all excavation to separate the existing structure, 3' barrel section with steps, all sealing and coating required by CTRWD, and backfill per landscape plans. Smock Fanslers subcontractor for the irrigation and electric service submitted conduit quantities that were significantly higher than what the plans showed. The contractor overran the irrigation boring/jacking item by 1255 LFT. A Considerable portion of that irrigation overrun can be attributed to moving POC and backflow to roadway edges from the RAB. Total price for this overrun is $56,475.00. The electrical boring/jacking item overran by 140 LFT. This was an 8900 Keystone Crossing, Suite 900 / Indianapolis, IN 46240 / 317.844.8900 / clarkdietz.com 16 -ENG -13 October 25, 2017 Page 2 average of 28 LFT per roundabout. The extra conduit may have been needed depending on actual locations of all components and possibly utility conflicts. The total overrun for this item totals $5600.00. The total amount for all items in this change order is $85,345.00 amounting to 6.7% of the original contract bid. If you have any questions feel free to contact me. Sincerely, -�'- L13J Jason Buck Residential Project Representative Clark Dietz, Inc. Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 11/28/17 Re: C.O. #1 RAB Landscape Improvements Project #16 -ENG -13 Doug, please find attached 1original of same change order for project #16 -ENG -13 RAB Landscape Improvements. Please review & initial for the next BPW Meeting. Change Order #1 - Original Contract Amount: $1,277,762.00 Increase: $85,345.00 New Contract Amount: $1,363,107.00 Thank you, Lisa Scott 0 Page 1