HomeMy WebLinkAboutRieth-Riley/Eng/CO #2/51,521.68/Veterans Way Construction ProjectCity of Carmel Project 17 -ENG -01 Veterans Way Construction CHANGE ORDER #2 Change order represents the installation of utilities within contaminated soils, and the disposal of contaminated soils. The approximate limits of contamination include Sta. 56+50 to 61+50, and includes balancing reconciled quantities and amounts to date. Contract Price prior to this Change Order ------------------------------------------------------------------------------------- Contract Price will be increased by this Change Order - -F------------------------------------ New Contract Price including this Change Order -------------------------------------------------------------- S6,983,661.62 $51,521.68 57,035,183.30 PO -100472 Veterans Way PO -100473 RL & 4th RAB PO -100473 4th SW West Contract Price Cumulative % Change from Original Contract Original Contract $2,797,315.57 $654,132.69 $501,298.89 $5,378,409.93 N/A Change Order 1 $1,605,251.69 $6,983,661.62 30% Change Order 2 $51,521.68 1% Adjusted Amount $4,454,088.94 $7,035,183.30 If r: Rieth Rile Construction Co. Inc. 1751 We;t Minnesota Street Indianapolis. IN 46221 Clll' OF CARNII:I_ CON I PACT Ct1ANGE ORDLR Nt l : 2 DA TF: 1 IJ6A7 PROJEC f NAME: 17 -ENG -01 CITY REQ. NO.: CH Y PO NO.: 100472 CI Il' PO DAT[_: 61'2017 t. You are directed to make the tiAlowing changes in this Contract: a O2 Wd additional items items due to modifications in the field due to .wrk k\ ithin conlxrninatcd soils. SCHEDULED ADR'S 1'MENT I im AMOUN"! (1) OR t -) DAYS " See defail of itenns and summan of changed costs in attached 1 able IT)'I';\Lt.)Fl[I:\Nl:irORUrKtTr\IS S51.521.68 U.r„ II. The fill Io%%ing referenced Documents further describe the changes outlined in Paragrahl, I and are to be considered a part ofthis Change Order: R.F.P.: _n'a W.D.C. NO.: n'a Other: _ B\ RcuuC`cst from the Cit\ O'ryicl Per Proposals included herein 1"he changes result in the i�vlloo'ine adjusunent of Contract Price and Contract Time: Contract Price prior it, this Change Order 56.983.66 L62 Contract Price \%ill be increased b} this Change Order S51.52 L68 Ne\\ Contract Price including this Chanes Order S7.035.183.30 t untract Time prior to this Change Order 150 Da_cs October 1 2017 Completion Date Net increased resulting lions this Change Order 0 Dais Current Contract Time including this Change Order October 1 2017 Completion Dale Ibis Change Order is lbr fill and final settlement of all direct. indirect. impact costs and time extensions incurred at any lime resulting from the performance ofthe changed %\ork. The Abo%e Changes Are Recommended The Above C'hangcs Are Accepted Appro%ed CROSSROAD 1.Nf'iINI:rRS ENGINEER ,417 Shemm11 DI'1\ c Address Beech Grucc. IN -16107 Cit).StateZip By% 40/J�t— phone: :17-780-1555 Iti�th-Riled C fmslruction Co. Inc CONTRACTOR 17:1 Nest Minnesota Strcct Address Indianapolis. IN 46221 Janus Brainard. N4avor Date: a Q Date: 11 G tale: Member .M 17 -ENG -01 - Veteran's Way Construction CHANGE ORDER #2 TABLE ENO. Original Original Final Description Unit Unit Price uanti Amount uantihFinal Amount Over/Under Str. 103 B Petroleum Encountered Chance Order LS S 51,5'_1.68 1 0 I S 1 S 51.521.68 S 51,521.68 TOTAL OF CHANGE ORDER ITEMS S 51 521.68 ORIGINAL CONTRACT PRICE 6,983,661.62 FINAL ClI_ANGE ORDER #I S 51.521.69 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS S 7,035.183.30 17 -ENG -01 - VETERAN'S WAY CONSTRUCTION EXHIBIT A You have been directed to make the following changes in this Contract: IItem I I Nn I Description Reason For Change 151-B Str. 103B Petroleum Encountered Change Order land contamination encountered and specialty contractor hired to remove soils I and install utilities within contaminated area. /ETH' August 28, 2017 CONSTRUCTION CO.. INC. 100% Quality • 100% Employee Owned • Over 100 Years Curtis Holcom SENT VIA ELECTRONIC MAIL ONLY: CrossRoad Engineers, PC 3417 Sherman Drive cholcom@crossroadengineers.com Beech Grove, Indiana 46107 RE: Intersection Improvements Range Line Rd & 4th Street City of Carmel Project No. 16 -ENG -31 Rieth-Riley Project No. 3200701 Dear Mr. Holcomb, Below is a breakdown of the pricing associated with the Petroleum Contamination encountered at the south end of Veteran's Way discovered on July 17th, while attempting to install structure 1038. Date ''i Value 12-1 7/17/2017 $9,726.99 7/20/2017 $722.59 7/21/2017 $289.02 7/24/20171 $28,740.30 7/25/2017 $9,216.98 8/11/2017 $2,825.80 Total $51,521.68 The total contract increase of this adjustment based on force account basis is $51,521.68. A detailed breakdown of this pricing is attached on the following pages. Please call with any questions. Thanks .4� S. 6" Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Cam Mackle Jason Tuddy P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 7/17/17 Work Performed: HIS Constructors & Rieth-Riley CONTRACT: PROJECT: 4th & Range Line - Veteran's Way South FORCE ACCOUNT/EXTRA WORK FOR: Excavation was made for STR 103B. When we dug down to 5'a strong odor was detected. The ground was then determined to be contaminated. We were instructed by Curtis (CRE) install STR 103B so the contaminated soil and water would not make its way into the storm system. HIS Constructors came to the site to work with the contamination using RR equipment. Bottom of hole was sandy and unsuitable for a Structure base. Temporarily tied existing 16" & 24" together. Excavated for HIS and installed #2 Stone and a 20' piece of ductile concreted at both ends to seal off LABOR 109.05 (b)(1) Hnl IRS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION FOREMAN (John Jones) 8.00 1.50 9.50 $29.22 $299.51 FOREMAN (Matt Vaught) $17.06 = 3.00 3.00 $34.05 $153.23 LABORER (Chad Layton) 2.00 LABORER (Wally Jr Carroll) 2.00 $24.22 $48.44 LABORER (Wally Jr Carroll) 2.00 3.00 2.00 $23.22 $46.44 LABORER (Garcia Sergio) 3.00 3.00 3.00 $24.72 $111.24 LABORER (John M Tuddy) X 3.00 3.00 $23.22 $104.49 OPERATOR (Steven Bell) 8.00 1.50 9.50 $34.05 $349.01 OPERATOR (Steven Burton) $0.00 2.00 2.00 $34.05 $102.15 OPERATOR (841) QA TECH 1 0.00 1 0.00 $31.80 $0.00 OPERATOR OILER (103) 0.00 X 0.00 $30.51 $0.00 QA TECH X $14.91 = 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $43.10 $0.00 TEAMSTER 0.00 $27.91 $0.00 FRINGES TOTALLABOR FICA pw�ioy% x LINE (2) $1,214.50 (2) $91.09 (3) EMPLOYEE HOURS WORKERS COMPENSATION % X LINE (2) RATE EXTENSION FOREMAN (John Jones) 9.50 X $13.69 = $130.06 FOREMAN (Matt Vaught) 3.00 X $17.06 = $51.18 LABORER (Chad Layton) 2.00 X $13.96 = $27.92 LABORER (Wally Jr Carroll) 2.00 X $13.96 = $27.92 LABORER (Garcia Sergio) 3.00 X $17.06 = $51.18 LABORER (John M Tuddy) 3.00 X $13.96 = $41.88 OPERATOR (Steven Bell) 9.50 X $17.06 = $162.07 OPERATOR (Steven Burton) 2.00 X $17.06 = $34.12 OPERATOR (841) 0.00 X $19.51 = $0.00 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 QA TECH 1 0.00 1 X 1 $13.961 $0.00 SUPERINTENDENT/PROJECT MAN 0.00 X $10.95 = $0.00 TEAMSTER 0.00 X $14.91 = $0.00 TOTAL FRINGES $526.33 (4) WORKERS COMPENSATION % X LINE (2) $69.47 (5) BODILY INJURY/ PROPERTY DAMAGE INSURANCE % X LINE (2) $70.44 (6) STATE UNEMPLOYMENT CIM % X LINE (2) $46.76 (7) FEDERAL UNEMPLOYMENT % X LINE (2) $4.86 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $2,023.44 (10) 20 % x LINE (10) $404.69 (11) GRAND TOTAL LABOR LINES (10) + (11) $2,428.13 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price 9.50 $125.02 Extenstion $129.19 P 20' Ductile Iron Pipe 20.00 M $ 44.95 $ 899.00 P Concrete Bag Mix 20.00 ea $ 4.15 $ 83.00 p #2 Stone 20.00 ton $ 15.90 $ 318.00 P 500 Gal Water Tank 1.00 ea $ 427.99 $ 427.99 P NO 2 Stone 19.78 ton $ 15.90 1 $ 314.50 P Sagamore Ready Mix 6.00 CY $ 96.00 1 $ 576.00 MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18) + (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $2,618.49 (18) $0.00 (19) $2,618.49 (20) $314.22 (21) $2,932.71 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 7982 3/4 Ton Truck $13.16 9.50 $125.02 11640 328 Excavator $129.19 9.50 $1,227.31 R2178027 938 Loader $71.00 9.50 $674.50 12 % x LINE (26) $0.00 $0.00 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 $0.00 (35) $0.00 $0.00 (36) $0.00 $0.00 (37) $0.00 $0.00 $0.00 $0.00 Trucking - Striaghl Time $0.00 Trucking - Over Time $0.00 0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $2,026.83 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $2,026.83 (26) 12 % x LINE (26) $243.22 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $2,270.04 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $1,799.83 (29) 10 % x LINE (30) $179.98 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $1,979.81 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) 8 (33) $9,610.70 (34) OF BOND RATE BASED UPON LINE (34) $105.72 (35) 10 % x LINE (35) $10.57 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $9,726.99 (37) Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 7/20/17 Work Performed: HIS Constructors CONTRACT: PROJECT: 4th & Range Line - Veteran's Way South FORCE ACCOUNT/EXTRA WORK FOR: Set up to work but waiting on disposal approval so moved to do work on Friday. Got frac tank delivered. LABOR 109.05 (b)(1) Hnl IRR EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION FOREMAN (John Jones) 0.00 $29.22 $0.00 FOREMAN (Matt Vaught) 0.00 $34.05 $0.00 LABORER (Chad Layton) 0.00 $24.22 $0.00 LABORER (Wally Jr Carroll) 0.00 $23.22 $0.00 LABORER (Garcia Sergio) 0.00 $24.72 $0.00 LABORER (John M Tuddy) 0.00 $23.22 $0.00 OPERATOR (Steven Bell) 0.00 $34.05 $0.00 OPERATOR (Steven Burton) 0.00 $34.05 $0.00 OPERATOR (841) 0.00 $31.80 $0.00 OPERATOR OILER (103) 0.00 $30.51 $0.00 OA TECH 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $43.10 $0.00 TEAMSTER 0.00 $27.91 $0.00 FRINGES TOTALLABOR FICA 7.50 % x LINE (2) $0.00 (2) $0.00 (3) EMPLOYEE HOURS % X LINE (2) WORKERS COMPENSATION RRO RATE EXTENSION FOREMAN (John Jones) 0.00 X $13.69 = $0.00 FOREMAN (Matt Vaught) 0.00 X $17.06 = $0.00 LABORER (Chad Layton) 0.00 X $13.96 = $0.00 LABORER (Wally Jr Carroll) 0.00 X $13.96 = $0.00 LABORER (Garcia Sergio) 0.00 X $17.06 = $0.00 LABORER (John M Tuddy) 0.00 x $13.96 = $0.00 OPERATOR (Steven Bell) 0.00 X $17.06 = $0.00 OPERATOR (Steven Burton) 0.00 X $17.06 = $0.00 OPERATOR (841) 0.00 X $19.51 = $0.00 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 CA TECH 0.00 X $13.961 $0.00 SUPERINTENDENT/PROJECT MAN 0.00 X $10.951 $0.00 TEAMSTER 1 0.00 X $14.911 $0.00 TOTAL FRINGES $0.00 (4) % X LINE (2) WORKERS COMPENSATION RRO $0.00 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT O0 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7,8 & 9 $0.00(10) 20%xLINE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price EXTENSION P $ P $ p $ ms P $ GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $ (35) $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18) + (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION TOTALTRUCKING $0.00 $0.00 FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 $0.00 TOTAL LINES (23) + (24) + (25) $0.00 $0.00 12 % x LINE (26) $0.00 $0.00 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 $0.00 (35) $0.00 $0.00 (36) $0.00 $0.00 (37) $0.00 $0.00 $0.00 $0.00 Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $0.00 (23) TOTALTRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) 0.00 (26) 12 % x LINE (26) 0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $649.05 (29) 10 % x LINE (30) $64.91 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $713.96 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $713.96 (34) OF BOND RATE BASED UPON LINE (34) $7.85 (35) 10 % x LINE (35) $0.79 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $722.59 (37) Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 7/21/17 Work Performed: HIS Constructors CONTRACT: PROJECT: 4th & Range Line - Veteran's Way South FORCE ACCOUNT/EXTRA WORK FOR: Set up to work but storms most of morning so called off to Monday. LABOR 109.05 (b)(1) EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION FOREMAN (John Jones) 0.00 $29.22 $0.00 FOREMAN (Matt Vaught) 0.00 $34.05 $0.00 LABORER (Chad Layton) 0.00 $24.22 $0.00 LABORER (Wally Jr Carroll) 0.00 $23.22 $0.00 LABORER (Garcia Sergio) 0.00 $24.72 $0.00 LABORER (John M Tuddy) 0.00 $23.22 $0.00 OPERATOR (Steven Bell) 0.00 $34.05 $0.00 OPERATOR Steven Burton) 0.00 $34.05 $0.00 OPERATOR (841) 0.00 $31.80 $0.00 OPERATOR OILER (103) 0.00 $30.51 $0.00 OA TECH 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $43.10 $0.00 TEAMSTER 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA % x LINE (2) $0.00 (3) EMPLOYEE HOURS WORKERS COMPENSATION RATE EXTENSION FOREMAN (John Jones) 0.00 X $13.69 = $0.00 FOREMAN (Matt Vaught) 0.00 X $17.06 = $0.00 LABORER (Chad Layton) 0.00 X $13.96 = $0.00 LABORER (Wally Jr Carroll) 0.00 X $13.96 = $0.00 LABORER (Garcia Sergio) 0.00 X $17.06 = $0.00 LABORER (John M Tuddy) 0.00 X $13.96 = $0.00 OPERATOR (Steven Bell) 0.00 X $17.06 = $0.00 OPERATOR (Steven Burton) 0.00 X $17.06 = $0.00 OPERATOR (841) 0.00 X $19.51 = $0.00 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 CA TECH 1 0.00 1 X 1 $13.961 $0.00 SUPERINTENDENT/PROJECT MAN 0.00 1 X 1 $10.951 $0.00 TEAMSTER 1 0.00 1 x 1 $14.91 =1 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION % X LINE (2) $0.00 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE MR4 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 8 9 $0.00 (10) 20 %x LINE (10) $0.00 (11) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109.05 (b)(3) Furchased or Manufactured Description Quantity Unit Unit Price Extenstion P $ $ P $ $ p $ $ P $ $ GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $ $ (35) $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)+(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION TOTAL TRUCKING $0.00 $0.00 FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 $0.00 TOTAL LINES (23) + (24) + (25) $0.00 $0.00 12 % x LINE (26) $0.00 $0.00 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 $0.00 (35) $0.00 $0.00 (36) $0.00 $0.00 (37) $0.00 $0.00 $0.00 Trucking - Striaghl Time $0.00 .0 Trucking - Over Time $0.00 0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $0.00 (23) TOTAL TRUCKING 0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS 0.00 (25) TOTAL LINES (23) + (24) + (25) $0.00 (26) 12 % x LINE (26) $0.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) 0.00 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $259.60 (29) 10 % x LINE (30) $25.96 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $285.56 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $285.56 (34) OF BOND RATE BASED UPON LINE (34) $3.14 (35) 10 % x LINE (35) $0.31 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $289.02 (37) Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 7/24/17 Work Performed: HIS Constrcutors & Rieth-Riley CONTRACT: PROJECT: 4th & Range Line - Veteran's Way South FORCE ACCOUNT/EXTRA WORK FOR: HIS- Laid 24" pipe from existing pipe to MH103B and out to existing pipe. Poured concrete collars around MH103B. Rieth-Riley again provided a partial crew and equipment. Pumped water from area, also overdu subgrade and place rip rap and #2 stone to stabilize area and also using #8 stone to stabilize the area. RR- Excavated and helped HIS set str 1038. Performed all top work and excavations and backfills for str 103B. Installed 25' of 24" RCP and poured conc structure 103B. LABOR 109.05 (b)(1) Hnl IRC EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION FOREMAN (John Jones) 8.00 2.00 10.00 $29.22 $321.42 FOREMAN (Matt Vaught) $17.06 = $0.00 0.00 $34.05 $0.00 LABORER (Chad Layton) 8.00 2.00 10.00 $24.22 $266.42 LABORER (Wally Jr Carroll) 8.00 2.00 10.00 $23.22 $255.42 LABORER (Garcia Sergio) 0.00 X 0.00 $24.72 $0.00 LABORER (John M Tuddy) X $17.06 = 0.00 $23.22 $0.00 OPERATOR (Steven Bell) 8.00 2.00 10.00 $34.05 $374.55 OPERATOR Rick Kinder) 8.00 2.00 10.00 $34.05 $374.55 OPERATOR (841) OA TECH 0.00 0.00 $31.80 $0.00 OPERATOR OILER (103) 0.00 X 0.00 $30.51 $0.00 OA TECH X $14.91 = 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $43.10 $0.00 TEAMSTER 0.00 $27.91 $0.00 FRINGES TOTALLABOR $1,592.36 (2) FICA k % x LINE (2) $119.43 (3) EMPLOYEE HOURS WORKERS COMPENSATION 572, % X LINE (2) RATE EXTENSION FOREMAN (John Jones) 10.00 X $13.96 = $139.60 FOREMAN (Matt Vaught) 0.00 X $17.06 = $0.00 LABORER (Chad Layton) 10.00 x $13.96 = $139.60 LABORER (Wally Jr Carroll) 10.00 x $13.96 = $139.60 LABORER (Garcia Sergio) 0.00 X $17.06 = $0.00 LABORER (John M Tuddy) 0.00 X $13.96 = $0.00 OPERATOR (Steven Bell) 10.00 X $17.06 = $170.60 OPERATOR (Rick Kinder) 10.00 x $17.06 = $170.60 OPERATOR (841) 0.00 x $19.51 = $0.00 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 OA TECH 0.00 X $13.96 = $0.00 SUPERINTENDENT/PROJECT MAN 0.00 X $10.95 = $0.00 TEAMSTER 0.00 X $14.91 = $0.00 TOTAL FRINGES $760.00 (4) WORKERS COMPENSATION 572, % X LINE (2) $91.08 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE % X LINE (2) $92.36 (6) STATE UNEMPLOYMENT % X LINE (2) $61.31 (7) FEDERAL UNEMPLOYMENT % X LINE (2) $6.37 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $2,722.90 (10) 20 %x LINE (10) $544.58 (11) GRAND TOTAL LABOR LINES (10) + (11) $3,267.48 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) PurcMased or Manufactured Description Quantity Unit Unit Price 10.00 $102.68 Extenstion $129.19 P C Manhole 1.00 EA $ 634.21 $ 634.21 P Class 'A" Concrete 6.00 cy $ 96.00 $ 576.00 P Type 10 Casting 1.00 EA $ 455.00 $ 455.00 P 24' RCP 25.00 LFT $ 22.51 $ 562.75 P $ I $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)-(19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $2,227.96 (18) $0.00 (19) $2,227.96 (20) $267.36 (21) $2,495.32 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 7982 3/4 Ton Truck $13.16 10.00 $102.68 11640 328 Excavator $129.19 10.00 $373.15 R2178027 938 Loader $71.00 10.00 $710.00 12 % x LINE (26) $0.00 $0.00 GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 $0.00 (35) $0.00 $0.00 (36) $0.00 $0.00 (37) $0.00 $0.00 $0.00 1 1 $0.00 Trucking - Striaght Time $0.00 .0 Trucking - Over Time $0.00 0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $1,185.83 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $1,185.83 (26) 12 % x LINE (26) $142.30 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $1,328.13 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $19,368.88 (29) 10%xLINE (30) $1,936.89 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $21,305.77 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $28,396.70 (34) % OF BOND RATE BASED UPON LINE (34) $312.36 (35) 10 % x LINE (35) $31.24 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $28,740.30 (37) Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 7/25/17 Work Performed: CONTRACT: PROJECT: 4th & Range Line - Veteran's Way South FORCE ACCOUNT/EXTRA WORK FOR: HIS - Laid 24" pipe from MH 1038 to 109, then laid one stick of 15" out of MH 109. Installed concrete callars around MH 109. Unhooked hoses and set 4" rental pump to be picked up and off rent. Closed up Frac Tank due to it being close to the 6000 gallon disposal option. RR - Worked with HIS on excavating and setting str 109. Did all excavation for removal of contaminated soil and set str 109 and pipe to str 109. Put in some backfill and retumed to help pour collars and fench around the structures LABOR 109.05 (b)(1) HOURS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION FOREMAN (John Jones) 8.00 8.00 $29.22 $233.76 FOREMAN (Matt Vaught) 0.00 0.00 $34.05 $0.00 LABORER (Chad Layton) 4.00 4.00 $24.22 $96.88 LABORER (Wally Jr Carroll) 4.00 4.00 $23.22 $92.88 LABORER (Garcia Sergio) 0.00 0.00 $24.72 $0.00 LABORER (John M Tuddy) 0.00 0.00 $23.22 $0.00 OPERATOR (Steven Bell) 4.00 4.00 $34.05 $136.20 OPERATOR (Rick Kinder) 4.00 4.00 $34.05 $136.20 OPERATOR (841) 0.00 0.00 $31.80 $0.00 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 CA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 1 0.00 $43.10 $0.00 TEAMSTER 0.00 1 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $695.92 (2) FICA WOW % x LINE (2) $52.19 (3) EMPLOYEE HOURS $39.81 (5) RATE EXTENSION FOREMAN (John Jones) 8.00 x $13.96 = $111.68 FOREMAN (Matt Vaught) 0.00 x $17.06 = $0.00 LABORER (Chad Layton) 4.00 x $13.96 = $55.84 LABORER (Wally Jr Carroll) 4.00 x $13.96 = $55.84 LABORER (Garcia Sergio) 0.00 X $17.06 = $0.00 LABORER (John M Tuddy) 0.00 X $13.96 = $0.00 OPERATOR (Steven Bell) 4.00 x $17.06 = $68.24 OPERATOR (Rick Kinder) 4.00 X $17.06 = $68.24 OPERATOR (841) 0.00 X $19.51 = $0.00 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 CA TECH 0.00 x $13.96 = $0.00 SUPERINTENDENT/PROJECT MAN 0.00 1 x $10.9511 $0.00 TEAMSTER 1 0.00 1 x 1 $14.9111 $0.00 TOTAL FRINGES $359.84 (4) WORKERS COMPENSATION % X LINE (2) $39.81 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE % X LINE (2) $40.36 (6) STATE UNEMPLOYMENT % X LINE (2) $26.79 (7) FEDERAL UNEMPLOYMENT % X LINE (2) $2.78 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $1,217.70 (10) 20%xLINE (10) $243.54 (11) GRAND TOTAL LABOR LINES (10) + (11) $1,461.24 (12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purcnasea or Manufactured Description Quantity Unit Unit Price Extenstion 8.00 $105.28 11640 328 Excavator $129.19 4.00 $516.76 P C4 Manhole 1.00 EA $ 634.21 $ 634.21 P 24' RCP 21.00 LFT $ 22.51 $ 472.71 P 15' RCP 15.00 LFT $ 11.62 $ 174.30 P $0.00 $0.00 $ $ $0.00 $0.00 $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)-(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $1,281.22 (18) $0.00 (19) $1,281.22 (20) $153.75 (21) $1,434.97 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 7982 3/4 Ton Truck $13.16 8.00 $105.28 11640 328 Excavator $129.19 4.00 $516.76 R2178027 938 Loader $71.00 4.00 $284.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Striaght Time $0.00 Trucking - Over Time $0.00 0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 12 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) SUBCONTRACTORS 109.05 (b)(6) $906.04 (23) $0.00 (24) 0.00 (25) 906.04 (26) $108.72 (27) $1,014.76 (28) TOTAL SUBCONTRACT WEEK ENDING $4,723.47 (29) 10 % x LINE (30) $472.35 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $5,195.82 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $9,106.79 (34) OF BOND RATE BASED UPON LINE (34) $100.17 (35) 10 % x LINE (35) $10.02 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $9,216.98 (37) Page 2 of 2 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: 7/26/2017-8/11 Work Performed: HIS Constructors CONTRACT: PROJECT: FORCE ACCOUNT/EXTRA WORK FOR: LABOR 109.05 (b)(1) Hni IRS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION FOREMAN (John Jones) 0.00 $29.22 $0.00 FOREMAN (Matt Vaught) 0.00 $34.05 $0.00 LABORER (Chad Layton) 0.00 $24.22 $0.00 LABORER (Wally Jr Carroll) 0.00 $23.22 $0.00 LABORER (Thomas Denning) 1 0.00 $24.72 $0.00 LABORER (John M Tuddy) 0.00 $23.22 $0.00 OPERATOR (Steve Bell) 0.00 $34.05 $0.00 OPERATOR (Rick Kinder) 0.00 $34.05 $0.00 OPERATOR (841) 0.00 $31.80 $0.00 OPERATOR OILER (103) 0.00 1 $30.511 $0.00 QA TECH 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $43.10 $0.00 TEAMSTER 0.00 $27.91 $0.00 FRINGES TOTAL LABOR $0.00 (2) FICA 7.50 i, x LINE (2) $0.00 (3) EMPLOYEE HOURS $0.00 (5) RATE EXTENSION FOREMAN (John Jones) 0.00 x $13.96 = $0.00 FOREMAN (Matt Vaught) 0.00 x $17.06 = $0.00 LABORER (Chad Layton) 0.00 X $13.96 = $0.00 LABORER (Wally Jr Carroll) 0.00 x $13.96 = $0.00 LABORER (Thomas Denning) 0.00 x $17.06 = $0.00 LABORER (John M Tuddy) 0.00 X $13.96 = $0.00 OPERATOR (Steve Bell) 0.00 x $17.06 = $0.00 OPERATOR (Rick Kinder) 0.00 x $17.06 = $0.00 OPERATOR (841) 0.00 x $19.51 = $0.00 OPERATOR OILER (103) 0.00 X $17.06 = $0.00 QA TECH 0.00 x $139611 $0.00 SUPERINTENDENT/PROJECT MAN 0.00 X $10.9511 $0.00 TEAMSTER 1 0.00 1 X 1 $14.9111 $0.00 TOTAL FRINGES $0.00 (4) WORKERS COMPENSATION 5.72 % X LINE (2) $0.00 (5) BODILY INJURY/ PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE (2) $0.00 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $0.00 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 8 9 $0.00 (10) 20 % x LINE (10) $0.00(11) GRAND TOTAL LABOR LINES (10) + (11) $0.00(12) Page 1 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion P $ $ P $ $ p $ $ P $ $ P $ $ $ $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)-(19) 12 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment# CONTRACTOR OWNED EQUIPMENT $0.00 FHWA HOURLY RATE HOURS EXTENSION $0.00 $ FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) $ $0.00 $0.00 12 % x LINE (26) $ (27) $0.00 0.00 $ $0.00 $ $0.00 $ $0.00 $ $0.00 $ $0.00 $ $0.00 Trucking - Striaght Time $0.00 Trucking - Over Time $0.00 0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $0.00 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $0.00 (26) 12 % x LINE (26) fO.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) 0.00 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $2,538.20 (29) 10 %x LINE (30) $253.82 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $2,792.02 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $2,792.02 (34) OF BOND RATE BASED UPON LINE (34) $30.71 (35) 10 % x LINE (35) $3.07 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $2,825.80 (37) Page 2 of 2 Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 11/28/17 Re: C.O. #2 Veterans Way Construction Project #17 -ENG -01 Doug, please find attached 1original of same change order for project #17 -ENG -01 Veterans Way Construction. Please review & initial for the next BPW Meeting. Change Order #2 - Original Contract Amount: $2,797.315.57 Increase: $51,521.68 New Contract Amount: $7,035,183.30 Thank you, Lisa Scott 0 Page 1