HomeMy WebLinkAboutMillennium Contractors/Eng/CO #3/61,163.54/Multi-Use Path along Ditch RoadCity of Carmel Project 16 -ENG -20 Multi Use Path along Ditch Road CHANGE ORDER #3 Final Quantities and Additional Milling Contract Price prior to this Change Order ------------------------------------------------------------------------------------------- Contract Price will be increased/decreased by this Change Order ------------------------------------------------------------------------------------------ New Contract Price including this Change Order ---------------------------------------------------------------------------------- $1,294,836.01 $61,163.54 $1,355,999.55 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $1,205,628.00 $1,205,628.00 N/A C01 $26,704.90 $1,232,332.90 2.22% CO2 $62,503.11 $1,294,836.01 7.40% CO3 $61,163.54 $1,355,999.55 12.47% CITY OF CARMEL ni TO: CONTRACT CI IANGE ORDER NO.: 3 Final DATE: 1l/06/2017 Millennium Contractors PROJECT NAME: Ditch Road Path 1401 South Holt Road CITY REQ. NO.: Indianapolis, IN 46241 CITY PO NO.: 100284 ATTN: Andrew Closser CITY PO DATE: April 5, 2017 I. You are directed to make the following changes in this Contract: 1. This change order will add one new item, and balance the existing items for this contract. 2. A new item was established for HMA milling due to increased quantities with a lower unit cost. 3. Additional days will be added to this contract due to unsuitable site conditions, and utility delays. The contractor is entitled to 14 additional days. SCHEDULED ADJUSTMENT ITEM AMOUNT W OR (-) DAYS 21 -94 Existing Items $49,620.33 +2 Days 96 - HMA Milling $11,543.21 + 2 Days Additional Time For Unsuitable Conditions, and utilities +10 Days II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,294.836.01 Contract Price will be increase d/deerease by this Change Order $ 61.163.54 New Contract Price including this Change Order $ 1,355,999.55 Contract Time Prior to this Change Order 164 Days 9/16/2017 Completion Date Net increased/deefeased resulting from this Change Order 14 Days Current Contract Time including this Change Order 178 Days 9/30/2017 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changcs Are Recommended USI Consultants, Inc. ENGINEER 8415 East 50 Street Indianapolis, IN 46216 City/State/Zip By: —eA&0'4.-j Phone: r/ -375/ Date: The Above Changes Are Accepted: Millennium Contractors CONTRACTOR 1401 South Holt Road Indianapolis, IN 46241 City/State/Zip ABy: c �"'o `�) Date: ( I '/) -7 Approved: Kasl an, City Engineer A 0+ Q re t' -W 0 Member Lori. on, Member T: Christine SIP/a'ule%y, C rk-Treasurer Datil: �/ �-c / �7— USI Consultants, Inc. IfIF0 Change Order Details consultants Ditch Road Path Description: City of Carmel Project No. 16 -ENG -20 Multi Use Path Along Ditch Road Change Order: 3 Date Created: 11/02/2017 Status: Pending Approval Date Approved: Type: Changed Conditions Summary: Add new milling item due to increase quantity, and balance existing items. Change Order Description: HMA Milling A new item for HMA Milling was established with a lower unit cost, due to higher quantities. Balance Existing Items This is the final change order for this contract, and items that were completed that diel not match planned quantity have been included on this change order. See the explaination for each item for further details. Awarded Project Amount: $1,205,628.00 Authorized Project Amount: $1,294,836.01 Change Order Amount: $61,163.54 Revised Project Amount: $1,355,999.55 Increases/Decreases Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount Section: 1 - Default Section 21 Ditch Rd Path 21 TON $42.340 2,475.30 $104,804.20 836.17 $35,403.44 3,311.47 $140,207.64 COMPACTED AGGREGATE NO. 53 BASE Reason: Additional aggregate base was required for undercutting of the existing subgracle. 24 Ditch Rd Path 24 SYS $13.340 289.00 $3,855.26 -289.00 -$3,855.26 0.00 $0.00 MILLING, ASPHALT, 1 1/2 IN. Reason: This item was not used. A new item was established with a lower unit cost. 25 Ditch Rd Path 25 TON $101.830 1,183.00 $120,464.89 183.74 $18,710.24 1,366.74 $139,175.13 HNIA FOR SIDEWALK Reason: The pavement section was increased to provide a more stable path. 30 Ditch Rd Path 30 TON $105.860 128.00 $13,550.08 -3.67 -$388.51 124.33 $13,161.57 HMA FOR APPROACHES, TYPE B Reason: This item was completed substantially as planned. Change Order Details: Ditch Road Path Page 1 of 3 11/06/2017 'Lhie Cuxrent Chan ange: C t'Quan Lt -,Amount' - "Aift t 1. 2A,. 12 31 Ditch Rd Path 31 SYS $48.000 532.00 $25,536.00 11.33 $543.84 543.33 $26,079.84 PCCP FOR APPROACHES, 6 IN. & 0960 Ditch Road Path 96 SYS Reason: This item was completed substantially as planned. $11.340 $11,543.21 40 Ditch Rd Path 40 SYS $3.850 4,883.00 $18,799.55 628.00 $2,417.80 5,511.00 $21,217,35 SODDING, NURSERY Reason: Addition sodding was required at yard areas. [ t p::1 47 Ditch Rd Path 47 EACH $7,150.000 1.00 $7,150.00 -1.00 -$7,150.00 0.00 $0.00 SANITARY SEWER LATERAL PIPE ADJUSTMENT Reason: This item was not required. 49 Ditch Rd Path 49 LS $6,500.000 1.00 $6,500.00 -1.00 -$6,500.00 0.00 $0.00 1.25" SHORT SIDE FORCE MAIN STUB OUT Reason: This item was not required. 53 Ditch Rd Path 53 IS $10,000.000 1.00 $10,000.00 -1.00 -$10,000.00 0.00 $0.00 12" WATER MAIN LOWERING Reason: This item was not required. 61 Ditch Rd Path 61 TON $176.000 129.00 $22,704.00 63.41 $11,160.16 192.41 $33,864.16 HMA FOR STRUCTURE INSTALLATION, TYPE C Reason: Additional patching material was required to match the existing pavement thickness. 72 Ditch Rd Path 72 EACH $2,650.000 2.00 $5,300.00 1.00 $2,650.00 3.00 $7,950.00 PIPE CATCH BASIN, 15 IN. Reason: One additional pipe catch basin was required. 89 Ditch Rd Path 89 LFT $82.500 143.00 — ---------- $11,797.50 24.00 $1,980.00 167.00 $13,777.50 PIPE, TYPE 2, CIRCULAR, 24 IN, PERFORATED Reason: This item was completed substantially as planned. 0940 Ditch Road Path 94 TONS $25.300 1,183.00 $29,929.90 183.74 $4,648.62 1,366.74 $34,578.52 Transfer Machine For HMA Placement Reason: Additional HMA was required due to increased path HMA thickness. 7717-"-�: $ b•• $4 620. 430,011;�! T-1 91j30' New Items .......... - Line . Num `:kiiiall, Quan It- ein 'bun t A: . ..... 1. 2A,. & 0960 Ditch Road Path 96 SYS 1,017.92 $11.340 $11,543.21 HMA Milling, Additional Areas Added Resulting In A Lower Price Reason; New price clue to increased quantity [ t p::1 Change Order Details: Ditch Road Path Page 2 of 3 11/06/2017 This change order is approved for construction. Dick - USI Consultants Inc. Millennium City of Carmel tractors, LLC 11106 / 7 Date ' I ! /W -/q Date Date Change Order Details: Ditch Road Path Page 3 of 3 11/06/2017