Loading...
HomeMy WebLinkAboutRieth Riley Construction Co/Eng/CO #11/67,784.18/136th Street and Gray Road and 126th St and Gray Rd RABCity of Carmel Projects 16 -ENG -54 & 16 - ENG -16 136t" Street and Gray Road and 126t" St and Gray Rd RAB CHANGE ORDER #11 Time and Material construction at 126`h St and River Rd Contract Price prior to this Change Order $3,401,110.88 Contract Price will be increased by this Change Order $67,784.18 New Contract Price including this Change Order $3,468,895.06 ----------------------------------------------------------------------------- Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $3,205,200.00 $3,205,200.00 N/A C01 $87,364.65 $3,292,564.65 2.73% CO2 $14,870.68 $3,307,435.33 3.19% CO3 <$1,235.00> $3,306,200.33 3.06% C04 $3,865.00 $3,310,065.83 3.17% C05 $7,710.42 $3,317,776.25 3.39% C06 $10,346.71 $3,328,122.96 3.69% C07 $6,810.30 $3,334,933.26 3.89% C08 <$4,100.00> $3,330,833.26 3.77% C09 <$1,052.48> $3,329,780.78 3.74% C010 $71,330.10 $3,401,110.88 5.76% C011 $67,784.18 $3,468,895.06 7.60% TO: Rieth Riley Construction Co. 1751 W. Minnesota St. Indianapolis, IN 46221 CITY OF CARMEL CONTRACT CHANGE ORDER NO.: 11 DATE: October 30.2017 UR PROJECT NAME: 126'Oi St and Gra v Road Roundabout 136'1' St and Grav Road Roundabout Gray Rd Culvert Replacement Culvert 165 CITY P.O. NO.: 100148 and 100149 CITY P.O. DATE: March 1, 2017 I. You are directed to make the following changes in this Contract: By direction of the Cannel Engineering Department, Time and Material work is to be constructed at 126t1i St and River Rd as described in Attachment `A' and compensated for in this contract. ITEM #145E Added Turn Lanes at 126t1i Street and River Road UNIT QUANTITY PRICE LSUM 1.0 $67,784.18 AMOUNT $67,784.18 H / (-) DAYS U II. The following referenced documents tiu-ther describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.: N'A The changes result in the following adjustment of Contract Price and Contract Time: Contract Sum prior to this Change Order $3.401.110.88 Contract Sum will be increased/deemased by this Change Order $67 784 18 New Contract Sum including this Change Order $3.468.895.06 Contract Time Prior to this Change Order 5/20/1017 Substantial C I Net increased/decreased resulting from this Change Order Current Contract Time including this Change Order op ehon Date Days 6/201017 Final Completion Date Days 0 Days 5/20/2017 Substantial Completion Date Days 6/20/2017 Final Completion Date Days This Change Order is for full and final settlement of all direct, indirect, impact costs and time extension incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended: Accepted: DLZ Indiana, LLC, Engineer 157 E. Maryland St. Indianapolis, IN 46204 Dati���/ Riede -Riley Construction Company, Inc 1751 W. Minnesota St. Indianapolis, IN 46221 Date /D l Jzme Brainar �Iavor MaryA4h Burke, Wember Lyre \NA on, Member Je4ngineer y Itashm n, PE, City ATTEST: Aifistineley, Clerk Treasurer �y Date:—/Iff�L / PROJECT NO 16 -ENG -16, 16 -ENG -54,16 -SW -107 CONTRACTOR: Rieth Riley Construction Co. INSPECTION CONSULTANT: DLZ Indiana 1110 AMOUNT: 53.205.200.00 BID DATE, 02/01!17 CONTRACT FORESEEN TOTAL TOTAL RUNNING DESCRIPTION OF DATE NEW % OF CHANGE % OF CHANGE CI-IANGE ORDER OR FORESEEN UNFORESEEN TOTAL OF CHANGE ORDER BOARD CONTRACT ORDER ORDER NUMBER UNFORESEEN AMOUNT AMOUNT CHANGE ORDERS APPROVED AMOUNT FORESEEN UNFORESEEN 001 FORESEEN $87,364.65 $87.364.65 Owner directed changes at Get_N_Go, Project 16 -SW- 05/17/17 $3,292,564.65 2.73% 107 PO# 100149 Replace 10" watermain 2 UNFORESEEN $14,870.68 $102,235.33 relocation items with 12" $3,307,435.33 hems. Project 16 -ENG -54, 0 46 PO# 100148 Replace 3" steel galvanized 3 FORESEEN <$1,235.00> $101,000.33 pipe for electrical with 2" $3,306,200.33 2.60% steel galvanized pipe. 4 UNFORESEEN $3,865.50 $104,B6583 Compensation for Undercut Areas $3,310,O65.B3 0 57% 5 UNFORESEEN $7,710.42 $112,576.25 Carmel Water Utility Field Conditions and Additions $3,317,776.25 p.7g% 6 UNFORESEEN $10,346.71 $122,922.96 Emer Field of S ary eRepair $3,328,122.96 1.09% Change Subgrade Treatment 7 UNFORESEEN $6,810.30 $129,733.26 from Line to Cement, Project $3,334.933.26 1,29% 16 -ENG -54 Replace Team Inserts 8 UNFORESEEN <$4,100.00> $125,633.26 Valves with EZ Valves $3,330,833.26 1,17% Project 16 -ENG -16 Additional Nursery Sodding, 9 FORESEEN <$1,052A8> $124,580.78 additional sod preparation, $3.329.780.78 2.57% Wildflower planting and final quantity adjustments Various unforeseen water 10 BOTH $14,774.98 $56,555.12 $195,910.88 main issues and addition of $3,401,110.88 2.94% Fire Hydrant and Irrigation 2.82% Tap. 11 FORESEEN $67,784.18 T&M for work done at 126th and River Rd $3,468,895.06 4.83% 2.77 4187 A�...- $3,468,895.06 4.83% 277% Original Bid Amount $3,205,200.00 Total Change Order(s) Amount $263,695.06 Total Foreseen Change Orders $167,636.33 Total Unforeseen Change Orders $96,058.73 Total % Change Orders vs. Bid Amt. 7,60% 1ETHj July 12, 2017 Jeremy Kashman City of Carmel City Engineer 1�17r,AC4,V e - 7-A ' ILEV CONSTRUCTION CO., INC. 100% Quality • 100 Employee Owned • Over 100 Years RE: Added Turn Lanes at 126th Street and River Road Mr. Kashman, SENT VIA ELECTRONIC MAIL ONLY: JkashmanCcDcarmel.in.sov Below is a summary of the Time and Material work performed on the above referenced project. A detailed breakdown of these values is included on the following pages Date Description Total 6/12/2017 Mobilization $1,173.01 6/13/2017 Layout, removal and subgrade treatment $9,954.30 6/14/2017 Further mobilization, continued removal and subgrade treatment $6,977.75 6/15/2017 Final removal and prep for paving $2,264.54 6/16/2017 Final prep and paving, demobilize paving equipment $38,977.16 6/19/2017 Finish grade and seed/straw south side $3,032.96 6/20/2017 Finish grade and seed/straw north side, striping $5,404.45 67 784.18 The total value of the requested contract adjustment is $67,784.18. Please call with any questions. Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. P.O. Box 276 • 1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com