Loading...
HomeMy WebLinkAboutMinutes TAC 03-24-93 TECHNICAL ADVISORY COMMITTEE MINUTES March 24, 1993 Committee Members Present: Rick Brandau, Mike Hollibaugh, and Dave Cunningham, DOCD; Randy Powell and Dick Hill, City Engineer's Office; John Duffy, Carmel Utilities; Jeff Autry, Indiana Gas Co.; LuAnne Stephens, Carmel-Clay Communications Center; John South,Hamilton County Soil & Water Conservation Department; and Jerry Liston, Hamilton County Surveyors. WILLIAMS CREEK POINT SECONDARY PLAT - SECTIONS 1, 2, 3, & 4 the Jeff Kennelly of Dart Development II and Bruce Hagan oPoint MSiss on the west appeared side of Sprin mill mittee and gave a brief overview of the project. Williams Creek Road between 146th and 141st Streets. The petitioner is kasking for Tf plans ovalre of ftantitio the 1 through 4 which is primarily everything east of Williams Csame as the primary plat with the minor change in the reduction of lots from 166 to 164. COMMENTS: - City Engineer's Office, Randy Powell, No Comment. - Utilities, John Duffy, No Comment. - Communication, LuAnne Stephens stated that the project name would have to be changed as well as the names of Willowview and uWis alike nameschase ewith Williams Crek e of f4 `' Ponds West would be OK. There are too many sound-alike from 116th to Springmill Road. This direction came from a joint discussion among the Sheriffs dept., Fire dept., and Communications Center. ` - Carmel Fire Department, Stan Puckett, No Comment. - Soil & Water, John South stated that no revised plans have been received. Comments made in South's letter of 2-19 have not been addressed--when done so, South will respond. In regard to roadside swale & subsurface drain, a filter p asin outis lett needs mended next to Williams Creek. It should be seeded in the spring. Detention to be covered. Inlet discharges directly into Williams Creek--needs some kind of protection. - Hamilton County Surveyor, Jerry Liston stated that there are some minor things that need to be shown on plans. The County is aware of negative drain--it will be taken care of. - DOCD, Dave Cunningham stated whighNeed away letter from the school system in regard a letter of six items of major concern that need to be addressed. for passingblister. to the cul-de-sac size. Variance was approved i 1 that it is set fairly deep in SL0` d from 124; concern n status; gra line_ structure lot detail• etitioner needs regulated drat Need detail g line--need more stated P ropem' Jerry ton lipo to P County Survey°r, _ Hamilton lans• cul-de-sac lengths. otherwise, no Problem h questioned °�e� David Cunning - DOCD, ROOK SECONDLY " SEC�ON 1 VILLAGE AT MILLS t a total of 41 lots on 15.4 acres of land Plat) to Pla Filed by Estridge Group. approval (Secondary stone Avenue. The petitioner is seeking PP just west of Key located on the north side of 98th Street, Overview of Section 1 project given by Richard Henderson. COMMENTS: Highway - Henderson stated that comments had been r bel a droved. Comlments have not been Department today. All street names should PP addressed. Tans. - Soil & Water Conservation & Surveyor now have revised p - City Engineer, Randy Powell stated that all concerns have been addressed. County Surveyor needs to say whether or not they want jurisdiction over drains--no concern to City Engineer because it is discharging into regulated drain. - Utilities, John Duffy stated he would talk with his coordinator to review. - Communications, LuAnne Stephens had No Comments. - Carmel Fire Department, Stan Puckett stated plans do not show water mains or fire hydrants. Letter to petitioner went out yesterday expressing concerns. - Soil & Water Conservation, John South stated he has received revised plans but has not had a chance to review; aesthetics need work, meets current ordinance. Henderson says project falls within DNR requirements. South says will approve, but wants restriction on lake outlet to provide for sediment basin; requests temporary restriction on lake until erosion control established. - Hamilton County Surveyor, Jerry Liston stated Section I calculations found--need to show pond cross-section; safety ledge recommended; needs size of culvert at Carmel Creek on Keystone. - City Engineer, Randy Powell stated all concerns have been addressed with exception of authority over approval of drainage facilities. - State Highway Dept., refer to letter with points until annexation. Henderson to meet with Les Locke re annexation. - DOCD, Dave Cunningham expressed concern regarding lots 7 & 8, no minimum lot width established; need covenants addressing street lighting, fencing, common area, etc. Subdivider agreement forms to be submitted. Landscape & signage need to be reviewed by the Dept. Henderson to furnish set of landscape plans for Mike Hollibaugh's review. 3 Kroger responded that typical ies. plans. Dave questioned 40" versus 30" light fixture• of 30' p wattage for even amount of light. Dave is requesting research o approval. Signagenied tob set for May ht in--right al. to be done at lateredate.rTiming Concern on entrance m median in frontht out; Construction to commence later anthger ne. There will be a of concern with first entrance off R 5 for Kroger making a left turn impossible. resent plan to BPW on May - Jim Nelson stated Kroger would like top reasoning, informational purposes only. suggested going to BPW to present plans, give - City Engineer, Randy Powell input,then return to Board for approval of curb cuts, ts, dedicationl n of reqay uest to and get BPW ionplans to be given to Jim Nelson e signalization. Conceptual put on BPW agenda for 4m started that planfor review s show trash area uncovered; cart fined. Front -DOCD,Dave Cunningham needs to be to be landscaped, outside storage om for seasonal sales products sign needs to be set back Cri e Engineers, Dave Callaba stated that the B-8 zoning has no landscaping - Paul p , requirement. plant material taken out does not o equh Staff has - DOCD, Concern of staff is that the �Of addressed an alternative plant what it being put back in new landscaping. parking spaces petitioner in regard to landscaping,the result of which is the loss of a few p so and suggested trees be retained along and the gain of much needed trees. Staff a roadwneeds to be addressed. Mike east edges. Perimeter treatment of trees along Hollibaugh suggested that street trees be included along ROW of Rangeline--who would maintain, City or Kroger? Mike and Dave both agreed a a»ed would ouldty very de needed nitely be an issue on this proposed project and would likely b landscaping. - City Engineer's Office, Randy Powell stated that there is presently a code in existence for street trees. Kroger will return to TAC on 4-28-93. CAITO POND The petitioner is seeking approval (Special Use) to construct a pond located on the east side of West Road, north of 121st Street, Clay Township. Filed by Jim Caito. COMMENTS: - No Comment from City/County Agencies - DOCD, Tac approves as submitted. The well will be used as auxiliary for irrigation system. A conceptual landscape plan will be formulated and presented at the hearing; the 5 shown on site plan (part of file) only the 10X20' stand will be constructed at this time. Special use approval will need to be obtained for the 20X20' temporary greenhouses..signage permit will need to be submitted to DOCD. CARMEL CHURCH OF CHRIST - SCIENTIST The petitioner is seeking approval (Special Use) to construct phase I of a church facility located on the south west corner of 116th and Haverstick. Filed by Virginia Kerr. Fred Parker, Virginia Kerr, and Wendel Tucker appeared before the committee on behalf of the Church. All TAC members have not received copies of the plans--this will be a preliminary review; petitioner will need to appear at the next TAC meeting of April 26. COMMENTS: - DOCD, questioned the lot lines. Depending on the record of the property, this may be a subdivision which would require plan commission's approval. - City Engineer, concern regarding sewer access within the Haverstick ROW, also the lateral will need to be placed within a 15' easement (if adjacent to the ROW). Board of Public Works approval required for two commercial curb cuts along Haverstick as well as sewer and water availability. Approval can be in form of letter from BPW to City Engineer's office. Water service line needs to be placed with a 15' easement from 116th Street to the property in question. Randy Powell requested copy of storm calculations and recommended that PVC not be used within the conveyance system--show depth of 100 year storage within the basin on the plan. Permission will be needed to tie storm sewer into the school's system. - Soil & Water Conservation, John South stated more erosion control needs to be shown; need to protect inlets; need to show stabilized construction entrance on the plan; sprinkler will be needed for the basement if over 1500 sf. SPRINGMILL LAKE Appearing for Springmill Lake were Don, Elmer & Denny Botammiller; Mike Little and Mike Terry, ASLA, and Jim Nelson, attorney. Springmill Lake project will be located at 12121 Springmill Road. Both existing and future homes will be maintained and incorporated into the project which will include 44 single family homesites on 25 acres; two road cuts required and 2 variances 6.3.3 length of cul-de-sac and stub street requirement. COMMENT: 7