Loading...
HomeMy WebLinkAboutMinutes Subdivision Committee 08-07-90 '1'ECHNICAL ADVISORY COMMITTEE MINUTES JULY 19, 1990 Committee Members Present: Wes Bucher, Rick Brandau, Dave Cunningham, Terry Jones, DOCD; Randy Powell, City Engineer's Office; Joe Hall, County Highway; John South, SCS; Kent Ward, County Surveyor's Office; Stan Puckett, Cannel Fire Dept.; Jim Buckhorn, Tanny Triplett I-Bell; Tony Taylor, PSI. Marathon an 116th • Committee to consider Docket No. SU-67-90 and V-68-90 a Special Use and Developmental Standards Variance Application for the Marathon Oil Company and their approximate one acre site located on the northeast corner of 116th St. and Range Line Rd., common address being 1708 East 116th St., Cannel. Petitioners are requesting Special Use approval, to raze and re-construct a new Marathon Service Station which will contain a Food Center and Car Wash. Additionally, the petitioners are requesting variances from the following sections of the Carmel/Clay Zoning Ordinance: 14.3.2 - Minimum Front Yard reduction from 60 feet to 22 feet from Range Line Rd. and 56 feet from 116th. 25.7.04-1a,ii - Number and Type to allow building wall signs which state "Food Center", "Service Center", "Car Wash-Entrance", and"Car Wash-Exit", six (6) canopy shroud signs, and six (6) dispenser valence. 25.7.04-la,iii - Maximum Sign Area to allow two (2) ground identification signs with an area of 39.6 square feet. 25.7.04-la,iv - Maximum Height of Ground Sign to allow two (2) ground identification signs to be six (6) feet five (5) inches tall. 25.7.04-1a,v - Location to allow two (2) ground identification signs to be zero (0) feet setback from Right-of-ways.. Petitioners present: Phil Nicely, Shawn Lyons, Steve Grartnner Comments: 1) Petitioner will need to reappear before the CBPW for additional sewer and water capacity for the car wash facility 2) Sand trap needs to be added to the details of the car wash 3) City Engineer requests drainage easements be added to the north and east property lines - 15' and 8' respectively 4) Facility will have internal tire storage racks - no need for outside storage 5) DOCD requests a construction fence be implemented during the construction phase of this project for trash and debris control page 2 6) SCS requests additional erosion control be added around the surface inlets during construction 7) DOCD requests a commitment of the mechanical equipment screening from the petitioner - to be screened per DOCD approval 8) DOCD has a concern with internal site circulation regarding the car wash facility 9) Fire Dept has approved of the plans as submitted 10) DOCD noted that petitioner should meet with utilities regard the installation of the underground tanks Lawhead Lot Width Committee to consider Docket No. V-64-90 a Developmental Standards Variance Application for Lawrence E. Lawhead and a 5.57 acre tract of land located at 13199 Ditch Rd., Carmel. Petitioner is the contract purchaser and is requesting a variance • from section 5.4.6 of the Carmel/Clay Zoning Ordinance to reduce the minimum lot • width from 120 feet to 50 feet. Parcel is zoned S-1. Filed by Lawrence E. Lawhead Petitioners present: None Comments: 1) SCS and Surveyor question need for 20' access easement across Alman Legal Drain 2) Petitioner will need to meet with the utilities for easement locations 3) County Highway, County Surveyor and SCS need plans submitted for review and approval - comments forthcoming Cannel High School Special Use Committee to consider the Special Use application for a proposed 6,000 seat stadium and several athletic practice fields on the north side of 136th Street just west of Keystone Ave. In addition, the petitioner is requesting approval a 450 space parking lot at the southeast corner of 131st Street and 4th Ave. S.E. Parcels are zoned R-1 and R-2 respectively. Filed by Tim Stevens for the Carmel\Clay School Corporation Petitioners'present: Roger Harper, Doug Floyd, Deb Farmer, Bernie Snyder, Laura Miles, Don Courteau, Daryl Hoffman, Tom Ford, Mike Wright, Ralph Power Comments: 1) Kent Ward requests the petitioner to meet with adjoining property owners regarding the realignment of the offsite drainage 2) SCS requests erosion control measures be implemented around the surface inlets and requests 20' D & U easement be added to the north property line 3) Carmel Fire Dept. needs updated plans submitted for review regarding new waterline route page 3 4) County Highway needs primary road details submitted for review - plans on file look good 5) Petitioner will need to contact DNR for approval and permit to work within the floodway for offsite improvements 6) Roadway improvements were discussed and there is some question as to what they should be at this time 7) Petitioner will need to contact utilities regarding the relocation of easements, ROW, poles and other facilities that will be affected 8) Site lighting plans were shown and .1 ft. candle will be for'parking lot lighting - field lighting will be done with 6 varying height poles - ft.candle limits will be forthcoming - approx. will be 2.5 ft. candle at property lines Ashmore Trace Primary Plat Committee to consider Docket No. 54-90 PP,'a primary plat application for .Ashmore Trace subdivision. The primary plat consists of 42 lots on 36.05 acres of land located on the south side of 146th Street just west of Cherry Tree Avenue. Site is zoned S-1 residence district. Petitioner requests approval to subdivide the property into 42 single- family residential lots. The petitioner is requesting the following Subdivision Regulations variance: 6.3.14 -- frontage road is required to prevent direct access Filed by Richard L. Fisher for Safco Development Company Petitioners present: Stan Neal, Jennifer Shea Public present: Gail McKinley, Barbara McGraph Comments: 1) SCS requests offsite water shed be delineated and submit for review 2) Carmel Fire Dept. has approved of plans as submitted 3) County Surveyor requests a 15° easement be added to storm pipes in side or rear yards from centerline of the pipe - 30' total easement 4) County Surveyor requests a pipe be added at the main entrance for roadside drainage and offsite sanitary sewer plans be submitted for review 5) Surveyor requests all drives on north side of 146th.Street be indicated and details of drainage area and calcs be submitted for review 6) TAC recommends a common drive for lots 40 - 42 and recommends an alignment with an existing drive on the north 7) DOCD request a non-opposition to annexation be on file and added to the covenants 8) DOCD request signage plans be added to this submittal for Plan Commission review or petitioner will need to return at a later date for signage approval from Plan Commission - ADLS review 9) County Highway submitted a letter of 8 items of concern - refer to below: a. Provide an enlargement of 1:=20 feet of entrance, existing pavement, side ditch, and future right of way fifty feet. page 4 b. Show existing bridge (width & length) and distance from proposed centerline of entrance. c. Show location of Scarborough Lane entrances off of 146th Street to the north with distance indicated from entrance and bridge. d. Provide drainage pipe 18 inches or larger under entrance for new side ditch along south line of 146th Street. e. Remove all trees in road right of way except the few trees at the Kirkendall Creek at this time. f. Show drive entrance for residence at 612 E. 146th Street. -g. Show drive entrance for M-K Akins, Inc. Landscape on print and indicate distance from entrance. h. The driveways for lots 40, 41 and 42 will need to be approved by the Hamilton Co. Hwy. Dept. later and shown on the primary plat after the location of Scarborough Lane is shown on the print. All entrances and driveway on the 146th Street must obtain Hamilton County Highway approval and driveway permits prior to any construction on road right of way. i. A letter will be given for approval or changes of Primary Plat after items (a) through (i) have been provided. 10) DOCD requests that construction traffic be routed around existing residential areas to avoid traffic conflicts and for public safety 11) DOCD requests that construction fences be installed during the subdivision construction for trash and construction debris control 12) DOCD requests that all possible measures be taken to protect any existing wooded areas in this plat - (fencing, etc.) 13) DOCD requests that the covenants address the following items; ability of the homeowner's assoc. to assess fees\fines, maintenance of common areas, homeowner's assoc. ability to enforce covenants • College Baptist Church Committee to consider Docket Nos. SU 65-90 and V 66-90 ' a Special Use and Developmental Standards Variance for the College Baptist Church, Inc. and their property located on the northwest corner of 96th Street and Towne Road. Petitioners are requesting Special Use approval to construct a 19,600 square foot church and a developmental standards variance requesting a waiver of one year time limit for a special use to allow the project to be built in phases. Parcel is zoned S-1. Filed by Jim Nelson for the College Baptist Church, Inc. Petitioners present: Jim Nelson, David Watt, Tim Brattain, Dale Shaw Comments: 1) Cannel Fire Dept. approves as submitted 2) Petitioner will meet with utilities for easement locations 3) Sanitary sewer will be provided by Clay West Sewer District page 5 4) Surveyor requests that the north and west 20' setbacks also incorporate a 20' D & U easement 5) SCS requests an erosion control plan be implemented during the construction phase of this project - plan to be approved by the SCS 6) DOCI) requests a parking summary be submitted both for each phase and total number 7) Lighting plan must conform to the .1 ft. candle limit at the property line and plans be amended to show this 8) County Highway Dept. requests entrance culverts to be a min. of 18" and details of the entrances and road width be added to the plans 9) County Highway requests improvements to 96th and Towne Road be coordinated with their office , 10) DOCD requests that construction fences be installed during the subdivision construction for trash'and construction debris control 11) Sign setback needs to be indicated and landscaping details need to be added to the signage plans 12) DOCD requests additional landscaping be added around the trash enclosure Enclave Of Carmel Primary Plat Committee to consider Docket No. 23-90 PP, a primary plat application for the Enclave of Cannel subdivision. The primary plat consists of 50 lots on 10.9 acres of land located on the north side of 126th Street just west of Keystone Avenue. Site is zoned R-2 residence district. Petitioner requests approval to subdivide the property into 50 single-family residential lots. The petitioner is requesting the following Subdivision Regulations variances: 6.3..1 -- street jogs less than 150' 6.3,.15 -- curvature of streets less than 150' 6.3,16 -- min. distance between reversed street curves 6.5.1 -- min. frontage of lots at right-of-way of_50' 6.5.2 -- irregular shaped lots 6.5.3 -- planting strip of 20' for lots that back onto major streets 8.9 -- sidewalks on both sides of the street within the subdivision and along adjoining streets Filed by E Davis Coots for Eaton & Lauth Community Development Company Petitioners present: Sheila Marshall, Bob Mezyklowski Comments: 1) Carmel Fire Dept. has approved of revised plans 2) County Surveyor has approved of revised plans 3) Revisedplans were disseminated to TAC members 4) PSI may request additional easements at the secondary plat stage, otherwise sees no problem with submittal page 6 5) SCS requests an erosion plan be submitted for review and add flood routing to the plans 6) In-Bell approves of plans as submitted 7) City Engineer request easement between lots 2, 3 & 33, 34 & 45, 46; better defined 8) DOCD requests petitioner respond to the letter dated 7-16-90 by July 31, 1990 9) DOCD requests that construction traffic be routed around existing residential areas to avoid traffic conflicts and for public safety 10) DOCD requests that construction fences be installed during the subdivision construction for trash and construction debris control 11) DOCD requests that all possible measures be taken to protect any existing wooded areas in this plat - (fencing, etc.) 12) DOCD requests that the covenants address the following items; ability of the homeowner's assoc. to assess fees\fines, maintenance of common • areas, homeowner's assoc. ability to enforce covenants Ashton Secondary Committee to consider Docket No. 57-90 SP, a secondary plat application for Ashton subdivision, section 2. The secondary plat consists of 47 lots on 26.3 acres of land located on the west side of Hazeldale Road, approx. one quarter of a mile south of 146th Street. Site is zoned S-1 residence district. Petitioner request secondary plat approval to subdivide the property into 47 single-family residential lots. Filed by Safco Development Company Petitioners present: Jennifer Shea, Stan Neal Comments: 1) Carmel Fire Dept. approves of plans as submitted 2) TAC requests that the out parcel (Callahan's) dedicate the requested ROW per Carmel Specs. 3) SCS requests storm sewer inlet be added to corner of 20, 22, 23 4) Sign will require County Commissioners or BPW approval to be located with the ROW 5) DOCD requests final landscape plans be submitted for review - plans should include all supporting info 6) DOCD requests variable Building Lines be dimension 7) Certificate of acceptance needs to be added to plat - either BPW or Commissioners 8) DOCD requests that construction traffic be routed around existing residential areas to avoid traffic conflicts and for public safety 9) DOCD requests that construction fences be installed during the subdivision construction for trash and construction debris control page 7 10) DOCD requests that all possible measures be taken to protect any existing wooded areas in this plat - (fencing, etc.) 11) DOCD requests that the covenants address the following items; ability of the homeowner's assoc. to assess fees\fines, maintenance of common areas, homeowner's assoc. ability to enforce covenants 12) PSI may require additional easements along Hazeldale Road for power access 13) Petitioner has agreed to improve Hazeldale Road 15' pavement, 3' chip and seal shoulder their half and overall the remaining road, County or City will need to other half- petitioner is willing to meet with the County or City for additional improvements 14) County Highway requests a set plans be submitted of section 1 for review Timber Crest Bend Secondary Committee to consider Docket No. 58-90 SP, a secondary plat application for Timber Crest Bend subdivision. The secondary plat consists of 5 lots on 5.89 acres of.land located on the north side of 126th Street, approx. one half mile east of Cray Road. Site is zoned S-1 residence district. Petitioner request secondary plat approval to subdivide the property into 5 single-family residential lots. Filed by Thomas C. Barnes Petitioners present: Stan Neal, Mr. Barnes Comments: 1) Certificate of Approval (Wes Bucher) and Certificate of Acceptance from BPW needs to be added to plat 2) Road improvements and tree removal along 126th Street needs to be approved by the Carmel BPW 3) DOCD requests 2 copies of the subdivider agreement (signed) form be submitted 4) Final Signage plans need to be submitted 5) SCS requests drainage along 126th Street and lots .1 & 2 be addressed and submitted for review 6) SCS recommends min. lot pad elevations or recommended finished floor be shown on construction drawings 7) DOCD requests that construction traffic be routed around existing residential areas to avoid traffic conflicts and for public safety 8) DOCD requests that construction fences be installed during the subdivision construction for trash and construction debris control 9) DOCD requests that all possible measures be taken to protect any existing wooded areas in this plat - (fencing, etc.) 10) DOCD requests that the covenants address the following items; ability of the homeowner's assoc. to assess fees\fines, maintenance of common areas, homeowner's assoc. ability to enforce covenants page 8 Sutton Place Secdon 1 Secondary Committee to consider Docket No. 59-90 SP, a secondary plat application for Sutton Place subdivision, section 1. The secondary plat consists of 77 lots on 51.1 acres of land located on the southeast corner of 116th Street and Towne Road. Site is zoned S-1 residence district. Petitioner request secondary plat approval to subdivide the property into 77 single-family residential lots. Filed by Land Innovators Co. Petitioners present: Bill Grout, Dave Compton Comments: 1) DOCD requests a copy of the Covenants be submitted and 2 copies of the subdivider agreement form 2) SCS requests rear yard flow arrows be added, drainage of Towne Road needs to be detailed including mounds and ditches 3) SCS and Surveyor's office requests that the offsite drainage improved and details of this submitted for review 4) Carmel Fire Dept. needs water line and hydrant plans submitted for • review - comments forthcoming 5) County Highway requests ROW be indicated on plans, entrance details need side ditch details, slopes and x-sections • 6) Petitioner to work with County Highway on Towne Road Improvements 7) DOCD requests that construction traffic be routed around existing residential areas to avoid traffic conflicts and for public safety 8) DOCD requests that construction fences be installed during the subdivision construction for trash and construction debris control 9) DOCD requests that all possible measures be taken to protect any - existing wooded areas in this plat - (fencing, etc.) 10) DOCD requests that the covenants address the following items; ability of the homeowner's assoc.. to assess fees\fines, maintenance of common areas, homeowner's assoc. ability to enforce covenants 301 Cannel Drive Committee to consider Docket No. 18-90 ADLS , an Architectural Design, Signage and Lighting application for 301 East Carmel Drive. Petitioner seeks approval for an additional parking located west of the proposed buildings 5 & 6. The Industrial and Commercial committee has already reviewed and approved this additional parking area contingent on TAC approval. Filed by Mark Boyce for C. P. Morgan Development Petitioners present: Bill Grout Comments: • TAC approves as submitted page 9 Carwinlan Phase 1 Secondary Committee to consider Docket No. 60-90 SP, a secondary plat application for Carwinion subdivision, Phase 1. The secondary plat consists of 46 lots on 25 acres of land located on the west side of Shelbourne Road approx. one half mile south of 106th Street. Site is zoned S-1 residence district. Petitioner request secondary plat approval to subdivide the property into 46 single-family residential lots. Filed by Brenwick Development Co. Petitioners present: Dennis Grump, Ursel Cox Comments: 1) SCS requests the following; - flood routing be shown on plans - Erosion control along Shelbourne needs to be beefed up - swale along lot 6 needs to be lowered - check grades between lots 34 & 35 - recommend side yards be lowered a min. of .5' 2) Carmel Fire Dept. needs plans submitted for review - comments forthcoming 3) In-Bell requests a 15' S & U to run parallel with all public ROW 4) DOCD requests that construction traffic be routed around existing residential areas to avoid traffic conflicts and for public safety 5) DOCI) requests that construction fences be installed during the subdivision construction for trash and construction debris control 6) DOCD requests that all possible measures be taken to protect any existing wooded areas in this plat - (fencing, etc.) 7) DOCD requests that the covenants address the following items; ability of the homeowner's assoc. to assess fees\fines, maintenance of common areas, homeowner's assoc. ability to enforce covenants 8) County Highway needs revised plans submitted 9) County Highway requests swale detail to show 4 to 1 slopes