Loading...
HomeMy WebLinkAboutSite Sewage Disposal System 2Y, !N1 D. *THIS IS MAXIMUM DEPTH FROM EXISTING GRADE CEXISTING GRADE FINISH GRADE TOP SOIL U EARTH BACKFILL JK d It 19=�— �'�_ UNTREATED BUILDING t PAPER N N "L COURSE WASHED GRAVEL 4' PERFORATED PVC 10 INVERT ELEVATION SHOWN ON PLAN IS AT THIS 36" POINT ABSORPTION LINE CROSS SECTIONNO SCALE Sewaoe Dlcpo�al System SpQcftl ,tlon�: i. Required absorption field systern: a. 31 wide trench (see cross section) b. 81 minimum spacing -center of the to center of tile c. 600 lin, feet of absorption line 2. 000gal. septic tank minimum with access riser 3, Soll pipe specifications: a, 4" ASTM -D 1785 Schedule 40 solid plastic Inside line, from building to tank and from tank to first distribution box. b. 4" sealed plastic pipe (ASTM -D 3034) from distribution box to distribution box and from distribution box to absorption field. C. All Hamilton County and State of Indiana Standards to apply. GENERAL NOTES: 1. After system is Installed and before backfilling, the Office of and Bruce ty Health Department (773-0t32) will lbenof-Hamilton calledforfinalnInspections. Request for "Final Inspection" will require a 24 hour notice to the above offices. 2. Construction of septic system will be done when the soils are dry. 3. System as designed and shown Is done with the intention of the system being Installed at minimum depths. 4. No clay fill material will be placed over absorption field. Natural ground line to remaln as much as possible. 5. Finish grading over absorption field will be done to obtain positive surface drainage away frcm field. Any finish grading done in area of absorption fleld will be done with light equipment. 6. No construction traffic to be allowed In area of absorption field. 7. All absorption field fingers to be placed at minimum depths to keep system in more permeable soils. 8. Existing contour lines Ihown should be verified before construction begins. Design shown is based on contours shown. SOIL TYPE IN AREA OF ADSORPTION FIELD IS BROOKS TON /CRoSBY ERTIFIED BY -- — 'F_ REVISIONS DATE /V. 8 g' 5b' 38" W `-348.30' I I o - � I / N k r \ \ 4,/. $ I i •�� \ \ 4 ' 4850 Q 01 �� p \ 0 55� J / I o /52 I \ F \ ,6 \ / I INSTALL "T" IN \ \ ' WITH STAND PIPE ANO CAP �✓��10 E tt GL 00 i �7 E�'°9 i Q W It 'v /O' IJi[CE R -------- ---------------- -- /D"OfU•E. N89°X56;38"W 257.7/' -- ---- — NOTE: INVERTS SHOWN ARE SET WITH THE INTENTION 1 \, OF BEING 1' BELOW THE ABSORPTION FIELD. It FINISH GRADE "' l 6.._®.TOPSOIL y- � L COURSE WASHED GRAVEL 0. ,I I� 4" PERFORATED PLASTIC PWF III ( RIGID) Amm SUB SURFACE DRAIN CROSS SECTION"A-q" NO SCALE dA PAUL I. CRIPE, INC,,1 CIVIL ENGINEERINGTECH. C 7172 GRAHAM ROAD LAND SURVEYING INDIANAPOLIS, INDIANA 46250 • ARCHITECTURE DFTNG. ( 13171 842-§777 • LAND PLANNING LOT /{.. 04K TREE DRAWN BY SCALE DJL /" _zo• DATE CLIENT 9-9-85 end. DRAWING TJ,TLE ��' ReSi�en�;Qi Crn Ori Sika StwQ9¢ Oz's v Imo. P 54� sys,�Q,,,f C-1 YPE FILE NUMBER SHEI JOB NUMBER }a k 1 0 9 0 0 0 3 OF 1 I