HomeMy WebLinkAboutReceipt Conn, Angelina V
From: Conn, Angelina V
Sent: Wednesday, September 13, 2017 2:08 PM
To: Keesling, Rachel M; Barnes, David R; Blanchard, Jim E; Chavez, Nathan; Crediford,
Maggie; Haney, Douglas C; Hollibaugh, Mike P; 'Ilko, Greg'; 'John Molitor';Jordan, Alex;
Kashman, Jeremy M; Kass,Joslyn; Keeling, Adrienne M; Krueskamp, Theresa A; Littlejohn,
David W; Lopez,Alexia K; Lux, Pamela K; Maki, Sue; Martin, Candy; McCoy, David W;
Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Pauley, Christine; Pietrzak, Ross; Speth,
Nichole M; Stewart, Lisa M;Thomas, John G;Worrell,Jeff
Cc: BSchrage@structurepoint.com; afetahagic@structurepoint.com; 'dlazas@atapco.com';
'eevans@structurepoint.com'
Subject: Docket No.Assignment: Replat, Carmel Science &Tech Park, Block 13 (#17090008 SP)
Attachments: Replat, Sheets 2 and 3.pdf
I have issued the docket number for Replat, Carmel Science & Tech Park, Block 13 (SP-Replat). It is the following:
Docket No. 17090008 SP: Replat, Carmel Science and Technology Park, Block 13, Lot 1A.
The applicant seeks administrative approval to split Lot 1A into two parcels and add easements. The new
parcel is for Lakeside Shops, the northeast corner of Carmel Dr. & Guilford Rd. The site is located at 640 W.
Carmel Dr. It is zoned Atapco Redevelopment PUD/Planned Unit Development (Z-581-13). Filed by Brad
Schrage of American Structurepoint, Inc., on behalf of Atapco Properties, Inc.
Brad Schrage,project engineer, can be contacted at 317-547-5580 or BSchrage@a,structurepoint.com.
FILING FEE: Replat $344.00
Total Due: $344.00
Petitioner,please note the following:
1. This item will not be on a meeting agenda of the Technical Advisory Committee (TAC). However,the Petitioner
is required to work with TAC Members individually via email and/or mail to gain review comments and
approvals. (Petitioner,if you have not done so already,please email and/or mail the re-plat to all TAC members
for their review/input,as soon as possible.The updated TAC members list is online at this link.)
2. Mailed and published public notice does not need to occur.
3. This item will be reviewed administratively by this Dept.and TAC,but the final plat also needs approval by
the BPW(Board of Public Works&Safety). Please work with Dave Barnes in the City Engineering Dept.to get
on a BPW meeting agenda, which has a filing deadline.His number is 571-2441,and his email address is
dbarnes@carmel.in.gov.
4. The filing fee is due prior to the Planning Director's approval (signature on the final secondary plat). Checks
can be made out to The City of Carmel.
5. Please refer to the application/checklist for more detail.
6. Review comments from the Planning/Zoning Dept.will be issued in a few weeks. (In the meantime,please
email me digital copies of the re-plat and plans.)
Sincerely,
Angie Conn, AICP I Planning Administrator
City of Carmel Planning &Zoning Dept.
1 Civic Square, 3rd Flr., Carmel, IN 46032
0: 317-571-2417 I F: 317-571-2426 I W: www.carmeldocs.com