HomeMy WebLinkAboutRieth-Riley/Eng/CO #1/25,843.67/96th Street and Keystone ParkwayCity of Carmel Project 16 -ENG -05
96th Street and Keystone Parkway
CHANGE ORDER # 01
Additional Clearing for the Keystone Corridor Masonry Coating: TS -95 does not mention the need for project
clearing under item description. Along with this, TS -11 for clearing only mentions clearing is necessary the
"new structure."
Sidewalk Sealing at the 106th St. Bridge: Rehabilitate approximately 3000 SFT of Ashlar Pattern stamped
concrete. Extra work requested by the City of Carmel.
Contract Price prior to this Change Order $28,793,000.00
Contract Price-will-be-increased/decreased by this Change Order $25,843.67
New Contract Price including this Change Order $28,818,843.67
Amount
Adjusted Contract
Price
Cumulative % Change
from Original Contract
Original Contract
$28,793,000.00
$28,793,000.00
N/A
CO 01
$25,843.67
$28,818,843.67
0.09%
CITY OF CARMEL
TO: CONTRACT CHANGE ORDER NO.: 01
DATE: 12/7/2017
PROJECT NAME: 16 -ENG -05
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
Additional Clearing for the Keystone Corridor Masonry Coating: TS -95 does not mention the
need for project clearing under item description. Along with this, TS -11 for clearing only
mentions clearing is necessary for the "new structure."
Sidewalk Sealing at the 106th St. Bridge: Rehabilitate approximately 3000 SFT of Ashlar
Pattern stamped concrete. Extra work requested by the City of Carmel.
SCHEDULED ADJUSTMENT
ITEM AMOUNT+) OR (-) DAYS
0328 Surface Seal $17,880.00
0329 Clearing Right of Way $7,963.67
II. The following referenced Documents further describe the changes outlined in Paragraph I, and
are to be considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ 28,793,000.00
Contract Price will be increased/decreased by this Change Order $ 25,843.67
New Contract Price including this Change Order $ 28,818,843.67
Contract Time Prior to this Change Order Days 5/31/2019 Completion Date
Net increased/decreased resulting from this Change Ordej 0 Days
Current Contract Time including this Change Ord Days 5/31/2019 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are
Recommended Accepted:
American Structurepoint Inc. Rieth-Riley Construction Co, Inc
ENGINEER CONTRACTOR
7260 Shadeland Station
Address
1751 W. Minnesota St.
Address
Indianapolis, IN 4626 Indianapolis, IN 46221
City/State/Zip City/State/Zip
Version 2016-08-31 AR -6
Approved:
Engineer
Phone: 17) - 3 Phone: ( 17 1 500
stine S. Paule , Clerk -
Treasurer
Date: ��� Date: Date:
Version 2016-08-31 AR -6
O American Structurepoint, Inc.
M■ STRUCTUREPOINT p
■ Change Order Details
96th Street and Keystone Parkway
Description: 16 -ENG -05
Construction of a roundabout interchange at the
intersection of 96th Street and Keystone Parkway,
including the reconstruction of Keystone Parkway
from I-465 to 98th Street, and reconstruction of 96th
Street from Haverstick Road to Enterprise Drive.
The Project includes new construction of a twospan
bridge over 96th Street.
Change Order: 1
Status: Approved
!!— LM
Date Created:
Date Approved:
11/28/2017
Summary: Additional Clearing and Sidewalk Sealing
Change Order Description: Additional Clearing for the Keystone Corridor Masonry Coating: TS -95 does not
mention the need for project clearing under item description. Along with this,
TS -11 for clearing only mentions clearing is necessary for the "new structure."
Sidewalk Sealing at the 106th St. Bridge: Rehabilitate approximately 3000 SFT
of Ashlar Pattern stamped concrete. Extra work requested by the City of
Carmel.
Awarded Project Amount: $28,793,000.00
Authorized Project Amount: $28,793,000.00
Change Order Amount: $25,843.67
Revised Project Amount: $28,818,843.67
New Items
Line Number Item Unit
Section: 1 - 801-08400
0328 709-51821 LS
SURFACE SEAL
Reason: 106th St. Sidewalk Crack and Surface Seal
0329 201-52370 LS
CLEARING RIGHT OF WAY
Reason: Keystone Corridor Coatings
(2 Items)
Approved Quantity Unit Price Dollar Amount
1.00 $17,880.000 $17,880.00
1.00 $7,963.670 $7,963.67
Total: +$25,843.67
Change Order Details: 96th Street and Keystone Page 1 of 2 12/18/2017
Parkway
Attachments
Name
Keystone Corridor Clearing-REVISED.pdf
Keystone Corridor Clearing
Surface Seal CO attachment.pdf
106th St. Sidewalk Sealing
(2 Attachments)
Recommended for Processing:
Owner
Date
Change Order Details: 96th Street and Keystone Page 2 of 2 12/08/2017
Parkway
IETHj
TO: Tim Conarroe
ATTN: Tim Conarroe
We Are Sending:
Shop Drawings
Letter
Prints/Plans
X Change Order
Samples
Specifications
Other:
T1111,
IL E Y CONSTRUCTION CO., INC.
100% Quality • 100% Employee Owned • Over 100 Years
LETTER OF TRANSMITTAL
DATE: 10/31/17
PROJECT: 96th & Keystone
JOB #: 3200713
RE
Submitted For:
X Approval
Your Use
As Requested
Review and Comment
Sent Via: Email
Attached
Separate Cover Via:
106TH Bridge Crack and Surface
Seal
Action Taken:
Approved as Submitted
Approved as Noted
Returned After Loan
Resubmit Copies
Submit Copies
Returned
Returned for Corrections
Due Date:
Rieth Riley Construction offers the following pricing per request. The scope of the work is to
rehabilitate approximately 3000 SF of Ashlar Pattern stamped concrete on the 106th & Keystone
bridge. The scope of work includes:
Clean concrete with SCR
Hand rub/patch large cracks with Flash Patch
Apply solid color coat of Colortec Acrylic LV (solid color over everything)
Apply Eco Accent over solid color to provide antiquing effect on stamped concrete
Spray apply thin coat of clear HS20OLV sealer over everything to lock in the Eco Accent
Excludes:
Premium time, weekend or holiday work
EWA 10611 St Crack and Surface Seal 3000 SF $5.96 $17,880.00
If you have any questions regarding this proposal, feel free to contact me. Thank you.
Steve Roffigerber
Project Manager
P.O. Box 276 • 1751 W. Minnesota St. •Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 10/31/17 Work Performed: Crack repair and surface seal 106th St I
CONTRACT: 3200713 PROJECT: 96th & Keystone
FORCE ACCOUNT/EXTRA WORK FOR:
Crack and surface seal the 106th ST bridge deck flat work
LABOR 109.05 (b)(1)
uni ioc
EMPLOYEE
Regular Overtime Doubletime TOTAL
RATE
EXTENSION
CARPENTER
0.00
$27.49
$0.00
CARPENTER FOREMAN
0.00
$28.99
$0.00
COMBINATION
0.00
$29.76
$0.00
FINISHER
0.00
$25.72
$0.00
FOREMAN
0.00
$35.05
$0.00
LABORER
0.00
$24.72
$0.00
MECHANIC
0.00
$35.05
$0.00
OPERATOR (103)
0.00
$34.05
$0.00
OPERATOR (841)
0.00
$32.55
$0.00
OPERATOR OILER (103)
0.00
$29.91
$0.00
QA TECH
0.00
$24.72
$0.00
SUPERINTENDENT/PROJECT MANAGER
0.00
$44.05
$0.00
TEAMSTER
0.00
$28.411
$0.00
FRINGES
TOTAL LABOR
FICA 7.50 % x LINE (2)
$0.00 (2)
$0.00 (3)
EMPLOYEE
HOURS
% X LINE (2)
RATE
EXTENSION
CARPENTER
0.00
x
$21.25 =
$0.00
CARPENTER FOREMAN
0.00
X
$21.25 =
$0.00
COMBINATION
0.00
x
$14.91 =
$0.00
FINISHER
0.00
X
$13.96 =
$0.00
FOREMAN
0.00
X
$17.66 =
$0.00
LABORER
0.00
X
$13.96 =
$0.00
MECHANIC
0.00
X
$17.66 =
$0.00
OPERATOR 103)
0.00
X
$17.66 =
$0.00
OPERATOR (841)
0.00
X
$20.51 =
$0.00
OPERATOR OILER (103)
0.00
x
$17.66 =
$0.00
QA TECH
0.00
x
$13.96 =
$0.00
SUPERINTENDENT/PROJECT MAN
0.00
X
$17.66 =
$0.00
TEAMSTER
0.00
X
$14.911
$0.00
TOTAL FRINGES $0.00 (4)
WORKERS COMPENSATION
5.72 `
% X LINE (2)
$0.00 (5)
BODILY INJURY / PROPERTY DAMAGE INSURANCE
5.80
% X LINE (2)
$0.00 (6)
STATE UNEMPLOYMENT
3.85 -
% X LINE (2)
$0.00 (7)
FEDERAL UNEMPLOYMENT
0.40
% X LINE (2)
$0.00 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $0.00 (10)
20 % x LINE (10) $0.00 (11)
GRAND TOTAL LABOR LINES (10) + (11) $0.00 (12)
Page 1 of 2
MATERIAL 109. 05 (b)(3)
Purchased or
Manufactured Description Quantity Unit Unit Price
Extenstion
EXTENSION
Traffic Control Devices
S
S
s
a
S
s
5
s
12 % x LINE (26)
$0.00
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: UNE(18)+(19)
12 % x UNE (20)
GRAND TOTAL FOR MATERIALS: UNE (20) + (21)
EQUIPMENT 109.05 (b)(4)
$0.00 (18)
$0.00 (19)
$0.00 (20)
$0.00 (21)
$0.00 (22)
Equipment# CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE Days
EXTENSION
Traffic Control Devices
$0.00
$0.00
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
$0.00
$0.00
TOTAL LINES (23) + (24) + (25)
$0.00
$0.00
12 % x LINE (26)
$0.00
$0.00
GRAND TOTAL FOR EQUIPMENT: LINES (28) + (27)
$0.00
$0.00
$0.00
$0.00
$O.DO
$0.00
$0.00
$0.00
$0.00
$0.00
Trucking - Striaght Time
$0.00
$0.00
Truckin -Over Time
$0.00
$0.00
TruGcin - Double Time
$0.00
$0.00
TOTAL EQUIPMENT
$0.00
(23)
TOTAL TRUCKING
$0.00
(24)
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
$0.00
(25)
TOTAL LINES (23) + (24) + (25)
$0.00
(26)
12 % x LINE (26)
$0.00
(27)
GRAND TOTAL FOR EQUIPMENT: LINES (28) + (27)
$0.00
(28)
SUBCONTRACTORS 109.05 (b)(e)
TOTAL SUBCONTRACT WEEK ENDING $16,450.00 (29)
10 % x LINE (30) $3,000.00 OR LESS $300.00 (31)
7 % x LINE (30) OVER 53,000.00 $941.50 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $17,691.50 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) 8 (33) $17,691.50 (34)
% OF BOND RATE BASED UPON LINE (34) $176.92 (35)
10 % x LINE (35) $17.69 (38)
TOTAL EXTRA WORK LINES: (34) + (35) + (38) $17,886.11 (37)
Page 2 0f 2
�]F�c
Smock ]
Smock
K P t) I(
(�frrrnl l'orNf lrfl �k.11�11KCn�l'txlNr yl. n� \1., �.,,.
Quotation
DATE: 9/22/2017
TO: Steve Rothgerber, Rieth Riley
FROM: Joe Davee
REGARDING: Resurfacing of Decorative Concrete Bridge Deck on
106th St over Keystone Avenue
2910 West Minnesota Street
Indianapolis, IN 46241.4541
317.248.8371 Tel
317.244.4507 Fax
Quote # B17-0071 BR
We Propose to Provide the following Scope of Work:
Rehabilitate approximately 3,000 of Ashlar Pattern Stamped concrete on 106th St Bridge over Keystone Ave.
Base Bid: $16,450.00
INCLUDES:
Clean concrete with SCR
Hand rub/patch large cracks with Flash Patch
Apply solid color coat of Colortec Acrylic LV (solid color over everything)
Apply Eco Accent over solid color to provide antiquing effect of stamped concrete
Spray apply thin coat of clear HS200LV sealer over everything to lock in the Eco Accent
Product Data attached for cleaner, acrylic color and sealant
EXCLUDES:
Bonds, Permits or Related Fees
Premium Time for shift work, weekends or holidays.
SALES TAX No
NOTES:
Please call if you have any questions.
INCLUDES ADDENDA n/a THROUGH n/a
Thanks For The Opportunity To Serve You!
QUOTE - (LUMP SUM) 96th & Keystone Roundabout
From: Ogg, Chris
To: Conarroe. Tim
Cc: Klass, Nicole
Subject: RE: Keystone and 106th Street -- Sidewalk Sealing Proposal
Date: Tuesday, October 31, 2017 8:33:44 AM
Attachments: image001.Dna
0maae002.Dna
image003.ono
imaae004.r)no
imaae005.Dno
image006.pno
imaae007.Dno
106th St Surface Proposal letter.odf
Tim,
Please go ahead and authorize Steve to begin this work on the 106th Street bridge. Let me know if
you have any questions.
Thanks.
Chris Ogg, PE
Assistant City Engineer
arm In igineering Department
One Civic Square
Carmel IN, 46032
O: 317.571.2436
C: 317.945.7777
cogal@carmel.in.eov
sA Please consider the environment before printing this e-mail
From: Conarroe, Tim [mailto:TConarroe@structurepoint.com]
Sent: Monday, October 23, 2017 4:18 PM
To: Ogg, Chris
Subject: Keystone and 106th Street -- Sidewalk Sealing Proposal
Chris,
I was going through some emails today and realized that you were not copied on this proposal when
Steve sent the original email. I was also trying to remember if we were waiting on Rieth-Riley for
anything else regarding this proposal. For some reason, I had it in my head that we were waiting on
Steve to set up a trial/test section with Smock Fansler. Maybe I got this mixed up the trial and error
that we have experienced on the MSE wall mock up.
Let me know where we need to go with this proposal from here.
Thanks.
Timothy P. Conarroe, PE
Area Supervisor, Construction Solutions
7260 Shadeland Station
Indianapolis, IN 46256
317.547.5580 OFFICE
317.401.0263 CELL
structurepoint.com WEB
V■ STRUCTUREPOINT
Ll
DISCLAIMER: This message contains confidential information and is intended only for the
individual named. If you are not the named addressee, you should not disseminate, distribute,
utilize, or copy this e-mail. Please notify the sender immediately by e-mail if you have
received this e-mail by mistake, and delete this e-mail from your system. No design changes
or decisions made by e-mail shall be considered part of the contract documents unless
otherwise specified, and all design changes and/or decisions made by e-mail must be
submitted as an RFI or a submittal unless otherwise specified. All designs, plans,
specifications and other contract documents (including all electronic files) prepared by the
sender shall remain the property of the sender, and the sender retains all rights thereto,
including but not limited to copyright, statutory and common-law rights thereto, unless
otherwise specified by contract. E-mail transmission cannot be guaranteed to be secure or
error -free as information could be intercepted, corrupted, lost, destroyed, arrive late or
incomplete, or contain viruses. The sender therefore does not accept liability for any errors or
omissions in the contents of this message which arise as a result of e-mail transmission. If
verification is required, please request a hard -copy version. http://www.structurepoint.com/
Email secured by Check Point
FJ
TO: Tim Conarroe
ATTN: Tim Conarroe
We Are Sending:
Shop Drawings
Letter
Prints/Plans
x Change Order
Samples
Specifications
Other:
Tim,
LEY CONSTRUCTION CO., INC.
100% Quality - 100% Employee Owned - Over 100 Years
LETTER OF TRANSMITTAL
DATE:
09/08/17
PROJECT:
961h & Keystone
JOB #:
3200713
RE:
Keystone Corridor Clear CO Request
Submitted For:
x Approval... _
Your Use
As Requested
Review and Comment
Sent Via: Email
Attached
Separate Cover Via
Action Taken:
Approved as Submitted
Approved as Noted
Returned After Loan
Resubmit Copies
Submit Copies
_.. .......
Returned
Returned for Corrections
Due Date
TS -95 does not mention the need for project clearing under item description. Along with this, TS -11
for clearing only mentions clearing is necessary the "new structure." There was a lot of clearing
required to gain access to the MSE walls, and railings for the coatings contractor. This work will
cover all structures EXCEPT 136th St, in which the City of Carmel is self -performing. Rieth-Riley
would like to request a change order for the following:
EWA Keystone Corridor Clearing 1 LS
$7,963.67
I have attached necessary backup documentation regarding the clearing operations. Should you have
any question, please let me know. Thank you.
Sincerely
Steve Rothgerber
Project Manager
P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 - www.rieth-riley.com
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 9/8/17 Work Performed: Clearing of trees/brush for 106th -126th ST Bridges
CONTRACT: PROJECT: 96th & Keystone
FORCE ACCOUNT/EXTRA WORK FOR:
LABOR 109.05 (b)(1)
Hnl IRS
EMPLOYEE
Regular Overtime Doubletime TOTAL
RATE
EXTENSION
CARPENTER
0.00
$27.49
$0.00
CARPENTER FOREMAN
0.00
$28.99
$0.00
COMBINATION
8.00 1.50 9.50
$28.46
$291.75
FINISHER
0.00
$25.72
$0.00
FOREMAN
29.00 9.00 38.00
$30.14
$1,280.95
LABORER
57.00 3.00 60.00
$23.22
$1,428.03
MECHANIC
0.00
$35.05
$0.00
OPERATOR (103)
0.00
$34.05
$0.00
OPERATOR (841)
0.00
$32.55
$0.00
OPERATOR OILER (103)
0.00
$29.91
$0.00
QA TECH
0.00
$24.72
$0.00
SUPERINTENDENT/PROJECT MANAGER
0.00
$44.05
$0.00
TEAMSTER
0.00
$28.41
$0.00
FRINGES
TOTAL LABOR
FICAI, ..:,;. % x LINE (2)
$3,000.73 (2)
$225.05 (3)
EMPLOYEE
HOURS
$1,650.33 (4)
RATE
EXTENSION
CARPENTER
0.00
X
$21.25 =
$0.00
CARPENTER FOREMAN
0.00
X
$21.25 =
$0.00
COMBINATION
9.50
x
$14.91 =
$141.65
FINISHER
0.00
X
$13.96 =
$0.00
FOREMAN
38.00
X
$17.66 =
$671.08
LABORER
60.00
X
$13.96 =
$837.60
MECHANIC
0.00
X
$17.66 =
$0.00
OPERATOR 103
0.00
X
$17.66 =
$0.00
OPERATOR (841)
0.00
X
$20.51 =
$0.00
OPERATOR OILER (103)
0.00
X
$17.66 =
$0.00
QA TECH
0.00
x
$13.96 =
$0.00
SUPERINTENDENT/PROJECT MANI
0.00 1
X
1
$17.66 =
$0.00
TEAMSTER 1
0.00 1
x
$14.91 =
$0.00
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $5,349.32 (lo)
20%xLINE (10) $1,069.86 (11)
GRAND TOTAL LABOR LINES (10) + (11) $6,419.18 (12)
Page 1 of 2
TOTAL FRINGES
$1,650.33 (4)
WORKERS COMPENSATION
% X LINE (2)
$171.64 (5)
BODILY INJURY / PROPERTY DAMAGE INSURANCE _
% X LINE (2)
$174.04 (6)
STATE UNEMPLOYMENT ��_ �
% X LINE (2)
$115.53 (7)
FEDERAL UNEMPLOYMENT i
% X LINE (2)
$12.00 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $5,349.32 (lo)
20%xLINE (10) $1,069.86 (11)
GRAND TOTAL LABOR LINES (10) + (11) $6,419.18 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
Purchased or
Manufactured Description Quantity Unit Unit Price
Extenstion
Quality Tool 8 Supply 1.00 LS $
650.56 $ 650.56
Runyon 1.00 LS $
27.82 $ 27.82
$0.00
$0.00
$0.00
$700.63
$0.00
$0.00
Is
Is
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE(18)+(19)
12 % x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20) + (21)
EQUIPMENT 109.05 (b)(4)
$678.38 (18)
$0.00 (19)
$678.38 (20)
$81.41 (21)
$759.79 (22)
Equipment# CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS EXTENSION
3/4 TON CREW TRUCK
$26.34
26.60 $700.63
$0.00
$0.00
$0.00
$700.63
$0.00
$0.00
$84.08
$0.00
$0.00
$784.71
$0.00
$0.00
$O.DO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Trucking - Stria ht Time
$0.00
$0.00
Trucking - Over Time
$0.00
$0.00
Truckin _Double Time
$0.00
$0.00
SUBCONTRACTORS 109.05 (b)(6)
DESCRIPTION
TOTAL EQUIPMENT
$700.63 (23)
TOTAL TRUCKING
$0.00
(24)
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
$0.00
(25)
TOTAL LINES (23) + (24) + (25)
$700.63
(26)
12 % x LINE (26)
$84.08
(27)
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
$784.71
(28)
TOTAL SUBCONTRACT WEEK ENDING $0.00 (29)
10 %x LINE (30) $3,000.00 OR LESS $0.00 (31)
7 % x LINE (30) OVER $3,000.00 $0.00 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) & (33) $7,963.67 (34)
% OF BOND RATE BASED UPON LINE (34) $0.00 (35)
10 % x LINE (35) $0.00 (36)
TOTAL EXTRA WORK LINES: (34) + (35) + (36) $7,963.67 (37)
Page 2 of 2
09200 Ac,c,oun,t, Le,dge,r, ,IAgiAi,ry, ,,
From Date/Period ,0,4,/,0,1,/,1,7,
Account. 3,2,0,0,7,1,3,.,0,1,4,1,.,0.1,0,1,0 .Thru Date/Period b -,9-f,-0,2-,/—.1.7,
LABOR Ledger Type. . . AA
Skip to Doc/Type Subledger.
Y -T -D Period End — 4,443.37
Cumul Period End 4,443.37
0 DT
Document
Date
Explanation
Debit Credit
T2
11034
08/19/17
Payroll La ovist
1,437.89
_,
T2
11034
08/19/17
Payroll Labor
Dist
1,184,82 FRINGES
T2
11047
08/26/17
Payroll Labor
Dist
804.09
_
T2
11047
08/26/17
Payroll Labor
Dist
678.68 FRINGES
T2
11057
09/02/17
Payroll Labor
Dist
183.30
T2
11057
09/02/17
Payroll Labor
Dist
-----------------
154.59 FRINGES
-----------------
4,443.37
Ledger Total
4,443.37
Unposted Total
,Op,t,:, ,1,/,2=.O,ri,g, ,EAt,ry , ,5,=D,e,t,ai,l,s, , Fl,7,=,T,op, , ,F,1,8,=,T,o,t,a.l,s. , ,F,2,1,=,P,rt, ,14e.dg, , ,F,2,4,=Mo,r,e,
P
P
P
P
P
P
060999
P,ay,ro,1,1, :T.r,aAs,Agt,i,oA :14e,dgex, :
From Date/Period ,0,8,/,1,9,/,1,7,
Account Number
3,2,0,0,7,1,3,.,0,14,1,.,0,1,0,1,0,
Thru Date/Period -078,7-.1-,9-,7-1,7'
LABOR
Subledger . . .
('*' = All Suble gers
0 Work
Pay
Hours
Regular
Premium
P Date
Tvp
in
Worked
Rate
PaY-
Pay Employee Name
/Number
M/17/17
8.00
23.22
185.76
CARROLL JR,
752780
08/17/17
100
8.00
23.22
185.76
MEJIA MENDOZ
565870
08/17/17
100
7.50
30.14
226.05
SEARS, BRETT
692553
08/17/17
100
8.00
28.46
227.68
STANCIL, AND
708324
08/18/17
100
8.00
23.22
185.76
CARROLL JR,
752780
08/18/17
100
8.00
23.22
185.76
MEJIA MENDOZ
565870
08/18/17
100
8.00
30.14
241.12
SEARS, BRETT
692553
TOTAL
----------
55.50
-----------
1,437.89
----------
JR CARROLL- LABORER
MENDOZ MEDIA- LABORER
BRETT SEARS- FOREMAN
ANDY STANCIL- COMBO
.Op,t,:... 1=,Re,c,l,a,s,s,., D,e,t,ai,l,s. , ,F,6,=,P,e,r,f,o,rM Re,c,l,As,s,., , ,F,1,5=Togg,1,e, ,F,o,rMat. , F2,4=Xo,r,e, ,
060999
P,ay,ro,l,l, ,T,r,aAs,4gt,ipA ,L,ed,g,e,r, „
From Date/Period ,0,8,/,2,6,/,1,7,
Account Number
. . ......
3,2,0,0,7,1,3,.,0,1,4,1,.,0,1,0,1,0......
Thru Date/Period -078--j-2—,6-,7—,1.7,
,1,7,
LABOR
Subledger . . .
('*' = All Suble gers
0 Work
Pay
Hours
Regular
Premium
P Date
-6-8/21/17
Typ
Worked
Rate
Pay
Pay Employee Name /Number
100
8.00
2T.-22
185.76
CARROLL JR, 752780
08/21/17
100
5.00
23.22
116.10
MEJIA MENDOZ 565870
08/21/17
100
8.00
30.14
241.12
SEARS, BRETT 692553
08/22/17
100
4.00
23.22
92.88
CARROLL JR, 752780
08/22/17
100
4.00
23.22
92.88
MEJIA MENDOZ 565870
08/22/17
100
2.50
30.14
75.35
SEARS, BRETT 692553
TOTAL
----------
31.50
-----------
804.09
----------
,Op,t, , , ,1= Re,cIa,s.s, , D,e,t,ai,1,s. , ,F,6 =,P,e,r,f,o,rm R,e,c,l,as,s, , , F,1,5,=,T.ogg,1,e, ,Fprm4t, , ,F,2,4=Mo,r,e, ,
060999
Rzkyrpl,l, ,T,r,a S,ac,t,i3OA ke,dge,r, „
From Date/Period
Account Number
. . ......
3,2,0,0,7,1,3,.,0,1,4,1,.,0,1,0,1,0,Thru
,0,9,/,0,2,/,1,7,
Date/Period b-.9-./--0,-2-,7,-1,7,
LABOR
Subledger . . .
('*' = All Suble gers
0 Work
Pay
Hours
Regular
Premium
P Date _
n/29/17
Tff
Worked
Rate
Pay
Pay Employee Name /Number
_
100
2.00
23.22
CARROLL JR, 752780
08/29/17
100
2.00
23.22
46.44
MEJIA MENDOZ 565870
08/29/17
100
3.00
30.14
90.42
SEARS, BRETT 692553
TOTAL
----------
7.00
-----------
183.30
----------
,Op,t,:. , ,1,=,Re,c,l,as,s,., D,e,t,ai1,s. , ,F,6=P,e,r,f,o,rm ,Re,c,l,as,s,., , ,F,1,5,=,T,ogg,1,e, ,F,o.rmat, , ,F,2,4; Xo,r,e, ,
060999
P,ayr,o,1,1, ,T,r,aAs,ac,t,i,on, ,L,e,d,ge,r, ,
From Date/Period ,0,8,[1,9,j.1,7.
Account Number
. . ...... 3,2,0,0,7,1,3,.,0,1,42,.,0,1,0,1,0......
Thru Date/Period 0.8,/,1,9,[1.7,
OVERTIME LABOR
Subledger . . .
('*'
= All Suble gers
0 Work
Pay
Hours
Regular
Premium
P Date
-6-8/17/17
n�p
Worked Rate
Pay
Pay
Employee Name
/Number
101
1.00 �
23.22
11.61
CARROLL JR,
752780
08/17/17
101
1.00 34.83
23.22
11.61
MEJIA MENDOZ
565870
08/17/17
101
2.00 45.21
60.28
30.14
SEARS, BRETT
692553
08/17/17
101
1.50 42.69
42.69
21.35
STANCIL, AND
708324
_
08/18/17
101
.50 34.83
11.61
5.81
CARROLL JR,
752780
08/18/17
101
.50 34.83
11.61
5.81
MEJIA MENDOZ
565870
08/18/17
101
5.00 45.21
150.70
75.35
SEARS, BRETT
692553
TOTAL
---------- -----------
11.50
323.33
----------
161.68
JR CARROLL-LABORER
MENDOZ
MEDIA -LABORER
BRETT
SEARS -FOREMAN
ANDY
STANCIL-COMBO
Opt,:, , ,1=Re,c1as,s,., D,e,t,ai,1,s. , ,F,6=,P,e,r.f,o,= Re,c,l,As,s,., , ,F15, .T,o.ggl,e, ,F,oxmat, , F,2,4,=Xo,r,e, ,
060999
P,4yro,1,1, ,T,r,aAs,4gt,ipA ,Ike,dge,r, ,
From
Date/Period ,0,8,/,2,6,/,1,7,
Account Number
3,2,0,0,7,1,3,.,0,1,4,2,.,0,1,0,1,0,
Thru
Date/Period ,QB, ,2,6, ,1,7,
OVERTIME LABOR
Subledger
. . .
('*'
= All Suble gers
0 Work
Pay
Hours Regular
Premium
P Date
lyp
Worked Rate Pay
Pam
Employee Name /Number
08 21 17
101
.50 45.21 15.07
7.54
SEARS, BRETT 92553
08/22/17
101
1.50 45.21 45.21
22.61
SEARS, BRETT 692553
TOTAL
---------- -----------
2.00 60.28
----------
30.15
.Op,t,:, , 1=,Re,c.1,ds,s,•, D,e,t,Ai.l,s... F,6,=,Rer.f,o,rm ,Re,c.l,as,s.•, . ,F.15=,T,o,gg,1,e, .F.o.rmat.. FF,2,4=Mo.r,e, ,
09200
Ac,c,o,=t, ,L,e,dge,r, ,IAcpAi,ry
. , , ,
From Date/Period
,0,4,/,0,1,/,1,7,
Account.
32,0,0,7,1,3,.,0,1,4,2,.,0,1,0,1,0,
Thru Date/Period
-0-,97,-0-,2- ,1,7,
OVERTIME LABOR
Ledger Type. . .
AA
Skip to Doc/Type
Subledger. . .
Y-T-D Period
End
_
1,052.12
Cumul Period
End
1,052.12
0 DT Document
Date
Explanation
Debit Credit P
T$ — 1103
08/19/17
Payroll Labor Dist
485.01
p
T2 11034
08/19/17
Payroll Labor Dist
400.60RZNGEs
P
T2 11047
08/26/17
Payroll Labor Dist
90.43
P
T2 11047
08/26/17
Payroll Labor Dist
76.08 FRINGES
P
-----------------
-----------------
1,052.12
Ledger Total
1,052.12
Unposted Total