Loading...
HomeMy WebLinkAboutHuston Electric, Inc/Admin/CO #1/-758.00/Council Chambers Renovation0 1 City of Carmel 16118 council Chambers Renovation September 11, 201'1 Q�o� CITY OF CARMEL 1� \ JPd T^:IS�N c� Iu{� CONTRACT GH NGE ORDER NO.: pry J 05"l gilait' S17i C DATE: K 2: z r �� E� �� PROJECT NAME: Co U44W% VyCITY REQ. NO.: CITY PO NO.: CITY PO DATE: 20 47 You are directed to make the following changes in this Contract: (Brief Description) SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are toconsidered a art of this Change Order: R.E.P.:W.D.G. No.: Other: �W eW G�.eaw�,par ,sf i s� r,,W-+7 CMJOL 1b�L !7- d The changes result in the following adjustment of Contract Price and Gor�ract Time: Contract Price prior to this Change Order $ �/�� — Contract Price will be increasededecrease y this Change Order $ 7 8• c� New Contract Price including this Change Order $ Zi, -7q3ae-- Contract Time Prior to this Change Order &0 Days Completion Date 11I3(1Z0� T Net increased/decreased resulting from this Change Order D Days Completion Date IZJ3117400' This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Recommended cep ed: C ENGINEERN _TOR D -r c. /S -/t T fr/z z Address dress ,/ (1� f1 TF/ELD f /1- 607 7 City/5tate/Zip City/State/Zip By: B y Current Contract Time including this Change Orderer Days Phone: Phone: 3 j7 - 80 - q bbq Date: Date:iL3ll8 AR -6 Approved: y City of Carmel Council Chambers Renovation CITY OF CARMEL TO:` UJ�I N 6WM(r,I1AW CONTRACT HA it bS tA'e;,r_ L &I 9r STh.MT' DATE: 4 017-1 ufti r-vao G la PROJECT NAME: REQUEST NO.: 16115 September 11, 201-7 FROM: 46�+ Q�Nat Ccly of C 4Mf IT 15 REOUE5TED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE REFERENCED CONTRACT. 1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER CONTRACTS INVOLVED.) DL!Zti"m �* C-000 Dwt T ��2ei.n� �i6U� Low1 Tho✓ R60(M W �1oi P.14CI�,, wJGA4 peddiP(Nl p(E�u4,tul 2. REASON FOR CHANGE: ZRXLC,-t0,0 0J 9[W- 4D4:�u00p)f- 3 4 5. 6. APPROXIMATE COST CHANGE TO CONTRACT PRICE: oeISO'607 WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE THE CHANGE IN WORK SCOPE? -YES _ -NO -(GAL. DAY5) WILL THE CONTRACTOR NEE ADDITIONAL PER50NNEL TO COMPLETE THE CHANGE IN WORK SCOPE? -YES V -NO IF NO, TRADE(5): NO. OF PERSONNEL: DURATION: IDENTIFICATION OF sToa 4-u& rM DATE: wrt DATE: PREPARED REVIEWED BY:7?W_ REVIEWED BY: ATTACHMENTS: Comments and Recommendation: ENGINEER G�rl4C 4&44w4_, &p!V �rcG�i�J; TGsrc L�x�S,rrlil s�/� yr .��/ �dsz L°�h2GGt �fi �.r� ya /ilziG sy /3• Z�l 9 s Off AR -5 HHUSTON CHANGE NOTICE O CE powering innovation CCN # 1 HUSTON ELECTRIC Date: 11/14/2017 1105 E. 181ST STREET Project Name: CARMEL COUNCIL CHAMBERS WESTFIELD, IN 46074 Project Number: IC1036 Page Number: 1 SHIEL SEXTON Contact: TOM HUTSELL Work Description We reserve the right to correct this quote for errors and omissions. This quote covers direct costs only and we reserve the right to claim for impact and consequential costs. This price is good for acceptance within 10 days from the date of receipt. We request a time extension of 0 days. We will supply and install all materials, labor, and equipment as per your instructions for: ELIMINATE 1" RACEWAY PER NOTE #11 ON DRAWING E-201. Itemized Breakdown Description Qty 1" CONDUIT -EMT -109 1" CONN SS STL - EMT -2 1" COUPLING SS STL - EMT -11 1" SNAP CLOSE CLIP - BTM MNT ON 1/4" FLNG HNGR -12 1/8" POLYTWINE -109 4x 2 1/8" SQ BOX COMB KO -1 #8x 1/2 WAFER HEAD SHEET MTL SCREW -2 Totals -246 Summary MATERIAL GENERAL MATERIAL -158.74 TOTAL MATERIAL -158.74 LABOR LABOR -490.75 TOTAL LABOR -490.75 GENERAL EXPENSES SMALL TOOLS & CONSUMABLES -24.54 SAFETY -9.82 INSURANCE -4.91 ORIGINAL CHANGE NOTICE CCN # 1 Date: 11/14/2017 Project Name: CARMEL COUNCIL CHAMBERS Project Number: IC1036 Page Number: 2 Summary (Cont'd) Subtotal -688.76 MARKUP (@ 10.000 %) SUBTOTAL FINAL ADJUSTMENT FINAL AMOUNT CLIENT ACCEPTANCE CCN #: 1 Final Amount:$ -758.00 Name: Date: Signature: Change Order #: I hereby accept this quotation and authorize the contractor to complete the above described work. ORIGINAL -68.88 -757.64 -0.36 $-758.00