HomeMy WebLinkAboutHuston Electric, Inc/Admin/CO #1/-758.00/Council Chambers Renovation0
1
City of Carmel 16118
council Chambers Renovation September 11, 201'1 Q�o�
CITY OF CARMEL 1�
\ JPd
T^:IS�N c� Iu{� CONTRACT GH NGE ORDER NO.: pry J
05"l gilait' S17i C DATE: K 2: z
r �� E� �� PROJECT NAME: Co U44W%
VyCITY REQ. NO.:
CITY PO NO.:
CITY PO DATE: 20 47
You are directed to make the following changes in this Contract:
(Brief Description)
SCHEDULED ADJUSTMENT
ITEM AMOUNT (+) OR (-) DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I, and
are toconsidered a art of this Change Order: R.E.P.:W.D.G. No.:
Other: �W
eW G�.eaw�,par ,sf i s� r,,W-+7 CMJOL 1b�L !7-
d
The changes result in the following adjustment of Contract Price and Gor�ract Time:
Contract Price prior to this Change Order $ �/�� —
Contract Price will be increasededecrease y this Change Order $ 7 8• c�
New Contract Price including this Change Order $ Zi, -7q3ae--
Contract Time Prior to this Change Order &0 Days Completion Date 11I3(1Z0� T
Net increased/decreased resulting from this Change Order D Days
Completion Date IZJ3117400'
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are
Recommended cep ed:
C
ENGINEERN _TOR
D -r c. /S -/t T fr/z
z
Address dress ,/
(1� f1 TF/ELD f /1- 607 7
City/5tate/Zip City/State/Zip
By: B
y
Current Contract Time including this Change Orderer Days
Phone: Phone: 3 j7 - 80 - q bbq
Date: Date:iL3ll8
AR -6
Approved:
y City of Carmel
Council Chambers Renovation
CITY OF CARMEL
TO:` UJ�I N 6WM(r,I1AW CONTRACT HA
it bS tA'e;,r_ L &I 9r STh.MT' DATE: 4 017-1
ufti r-vao G la PROJECT NAME:
REQUEST NO.:
16115
September 11, 201-7
FROM: 46�+ Q�Nat
Ccly of C 4Mf
IT 15 REOUE5TED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE REFERENCED CONTRACT.
1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER CONTRACTS
INVOLVED.) DL!Zti"m �* C-000 Dwt T ��2ei.n� �i6U� Low1 Tho✓ R60(M W �1oi
P.14CI�,, wJGA4 peddiP(Nl p(E�u4,tul
2. REASON FOR CHANGE: ZRXLC,-t0,0 0J 9[W- 4D4:�u00p)f-
3
4
5.
6.
APPROXIMATE COST CHANGE TO CONTRACT PRICE: oeISO'607
WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE THE CHANGE IN
WORK SCOPE? -YES _ -NO -(GAL. DAY5)
WILL THE CONTRACTOR NEE ADDITIONAL PER50NNEL TO COMPLETE THE CHANGE IN
WORK SCOPE? -YES V -NO
IF NO, TRADE(5):
NO. OF PERSONNEL:
DURATION:
IDENTIFICATION OF
sToa 4-u& rM
DATE: wrt DATE:
PREPARED
REVIEWED BY:7?W_ REVIEWED BY:
ATTACHMENTS:
Comments and Recommendation: ENGINEER G�rl4C
4&44w4_, &p!V �rcG�i�J; TGsrc L�x�S,rrlil s�/� yr .��/ �dsz L°�h2GGt �fi
�.r� ya /ilziG sy /3• Z�l 9 s Off
AR -5
HHUSTON CHANGE NOTICE
O CE
powering innovation
CCN #
1
HUSTON ELECTRIC Date:
11/14/2017
1105 E. 181ST STREET Project Name:
CARMEL COUNCIL CHAMBERS
WESTFIELD, IN 46074 Project Number:
IC1036
Page Number:
1
SHIEL SEXTON
Contact: TOM HUTSELL
Work Description
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 0 days.
We will supply and install all materials, labor, and equipment as per your instructions for:
ELIMINATE 1" RACEWAY PER NOTE #11 ON DRAWING E-201.
Itemized Breakdown
Description
Qty
1" CONDUIT -EMT
-109
1" CONN SS STL - EMT
-2
1" COUPLING SS STL - EMT
-11
1" SNAP CLOSE CLIP - BTM MNT ON 1/4" FLNG HNGR
-12
1/8" POLYTWINE
-109
4x 2 1/8" SQ BOX COMB KO
-1
#8x 1/2 WAFER HEAD SHEET MTL SCREW
-2
Totals
-246
Summary
MATERIAL
GENERAL MATERIAL
-158.74
TOTAL MATERIAL
-158.74
LABOR
LABOR
-490.75
TOTAL LABOR
-490.75
GENERAL EXPENSES
SMALL TOOLS & CONSUMABLES
-24.54
SAFETY
-9.82
INSURANCE
-4.91
ORIGINAL
CHANGE NOTICE
CCN #
1
Date:
11/14/2017
Project Name:
CARMEL COUNCIL CHAMBERS
Project Number:
IC1036
Page Number:
2
Summary (Cont'd)
Subtotal
-688.76
MARKUP (@ 10.000 %)
SUBTOTAL
FINAL ADJUSTMENT
FINAL AMOUNT
CLIENT ACCEPTANCE
CCN #: 1
Final Amount:$ -758.00
Name:
Date:
Signature:
Change Order #:
I hereby accept this quotation and authorize the contractor to complete the above described work.
ORIGINAL
-68.88
-757.64
-0.36
$-758.00