HomeMy WebLinkAboutCrider & Crider/Eng/CO #1 Final/-278,335.72/4th Street SW – 1st Avenue SW to Monon – Project #16-ENG-31ACity of Carmel Project 16 -ENG -31A
4th Street SW — 1St Avenue SW to Monon
Boulevard - Construction
FINAL CHANGE ORDER
Change order adjusts final quantities for the contract.
Contract Price prior to this Change Order $1,467.000.00
Contract Price will be decreased by this Change Order $278,335.72
-------------------------------------------------------------------------------------
New Contract Price including this Change Order $1,188,664.28
Contract Price
Cumulative % Change from
Original Contract
Original Contract
$1,467,000.00
N/A
Final Change Order
$278,335.72
Decrease by 19%
Adjusted Amount
$1,188,664.28
Page 1 of 5
CITY OF CARMEL
TO Crider and Crider
4806 W. 86th Street
Indianapolis, IN 46268
1. You are directed to make the following changes in this Contract:
CONTRACT CHANGE ORDER NO.: Final
DATE: 12/11/2017
PROJECT NAME:
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
4th Street SW
34307
10/5/2016
Add additional items and adjust/balance existing items due to modifications in the field and requests from Carmel t'rilin
Departments. Changed subgrade treatment type to accommodate soil type.
SCHEDULED ADJUSTMENT
ITEM AMOUNT tll OR f -) DAYS
• See detail of items and summary of changed costs in attached exhibit.
TOTAL OF CIIANGE ORDER ITEMS
II. l'he following referenced Documents further describe the changes outlined in Paragraph I.
and are to be considered a pan of this Change Order: R.F.P.: n/a W.D.C. NO.: n/a
Other By Request from the City of Carmel per Progress mectir(g minutes and proposals included herein
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $1.467.000.00
Contract Price will be decreased by this Change Order tS278 335]21
New Contract Price including this Change Order $1,188.664.28
Contract Time prior to this Change Order 192 Days 4/1512017 Completion Date
Net increased resulting from this Change Order 181 Days
Current Contract Time including this Change Order 181 10/13/2017 Completion Date
• 331 days is completion date of October 13, 2017 for Landscape and Final Completion.
This Change Order is for full and final settlement of all direct, indirect. impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are Recommended The Above Changes Are Accepted
OSSROAD ENGINEERS
ENGINEER
3417 Sherman Drive
Address
Beech Grove. IN 46107
City Statr'7,ip
By: (2 L- yYe�.ehZ
Phone: 317-780-1555
Date: 12/1112017
Crider and Crider
CONTRACTOR
4806 W. 86th Street
Address
Indianapolis, IN 46268
City/State/Zi p
By:
P ne: 3 R
Date: I L 13 li
I IF
Approved
CFFY OF CARNLEL.
4th Street SVS'
CHANGE ORDER FINAL TABLE
hem
Number
Deicnpnon
Unit
Unit Price
Original
Ouantity
Original
Amount
Final
QuanotV
Fatal Amount
Over/Under
3
C.mmonE-atme
CYS
$25.00
1450
$36,250.00
2000
550.000.00
513.750.00
4
Tmporarytrier pmtc_m-
EA
SIS0.00
12
51,800.00
0
$0.00
(5180000)
s2
EA
1100.00
2
$200-00
1
$100.00
($t00.00;
5.bs1.de Treat -i. Typt 18
SYS
$15.00
808
512.120-00
0
50.00
(S12.120.00)
F
Snvttutat BackrKI, 1
CYS
$35.00
1630
$57.050.00
577.1
520.198.50
(536851 501
C-WedAggrrgac ,%, -:3 Rase
TON
$40.00
482
$19,280.00
764.53
S30.581.20
$11,301-20
Mdiinit ASp1141t Li IN.
SYS
$8.00
167
$1,336.00
0
50.00
S1.336 00)
HMA 2.?O.Sunace_9.S mm
TON
$79.00
67
S5,293.00
61.06
S4 823 74 E
- 5460 25)
,H+da. 270, Ietermtmate. 19.0 mm
TON
S64A0
89
55.696.00
80,62
55,159.68
_-
H+dA26t,Rase. 2S.Gmm
TON
556.00
135
57,560.00
120.87
$6.7b8]2
-
14
Bikelt .kConcMePads-
SYS
550.00
55
$3.300.00
56.3
$3.378.00
$78.00
75
Bike0.xis
EA
i500.00
24
$12,000.00
16
$8.000.00
(Sz'.__'" "
16
SubgradeTreawent Type P
SYS
SIS OO
55
S825.00
0
$0.00
;S-
17
Si4eualk Conmett 4'
SYS
$42.00
1083
545,486.00
453.61
$19,051.62
(S26 434 :"8'.
19
Curb PL p,Centrete
SYS
5135.00
57
$7,695.00
15.7
$2.119.50
f5$.575.50)
Cktembie Wxning5urfatts
SYS
$125.00
1:
$1,500.00
0
50.00
(51.500.00)
21
CurbandGutw,Coernte,Tvpeil
LFT
$20.00 1
625
$12,500.00
550
$11,000.00
($1 Soo 00)
22
CombintilDepressedCurb and Gutter
LFT
121.00
96
$2.016.00
0
$0.00
52,016.00)
23
CorrreteCommemi 00-Approa:=.
SYS
$70.00
83
$5,810.00
80.84
S6,658.80
5151.20)
24
Mobiliiatien aid tiemobRltat+e-':,r
LS
SSMOO
i
5$00.00
0
$0.00
S'1 -v'.00)
25
Amtnded landw-A v SeR rn.' • *' -; '"
CYS
530.00
300
59,000.00
0
$0.00
'- 00)
26
Water
kGAL
$250.00
2
$500.00
0
$0.00
=" 00)
27
3'Detid-%T'ee
EA
$415,00 !
9
S3,735.00
0
50.00
110 0)
28
Oetid.o Sh ub
EA
$70.00
99
$6,930.00
0
$0.00
56 9330 00)
29
Perennial
EA
$18-00
140
$2.620.00
0
$0.00
(52.520.00)
3u
orrumentatGraasez
EA
$30,00
1$
51,440.00
0
$0.00
(S1440.00)
31
H-J-dhtukh
LYS
575.00.
83
$6,22500
0
$0.00
055.225.00)
32
WWashedRiuw;t-k
t'YS 1
1100.00 1
21
$2.100.00
27.3
$2,730.00
$630.00
33
V-it`RiackSteelEdpi g-1i,12`stakes
LFT
$30.00
251
0
(5750 00)
34
Gentesadt Under Washed River R -k
SYS
52.50
200
$500"00
1 164.24
$410,60
(589.40)
37
9,PvCSaniarymain
LFT
$40.00
465
$18,600.00
456
518,640.00
540.00
38
Compacted AggregateRatk(8i-Se-,Main Ttenth
LFT
$40.00
465
$18.600.00
466
$18,640.00
$40.00
39
Sanitary 0-aoutT)W2
EA
$600.00
2
S1,200.00
3
51,800.00
5600.00
41
6'PVCSanitary Ut ra)Pgte
1,Fr
$35.00
90
$3.150.00
93
$3,255.00
$105.00
42
Campacted Aggregate Baddill - se.,<r tn.-.;; - . - -
1,1717 1
MAO
90
$3,150.00
93
53,25500
$105.00
44
12'DIWaterMann
LFT
18000 1
465
$37,200.00
444
535520.00
(51,680.00)
45
CompxtedAggregatefl akilq - Water Mair:--=--:=
LFT
$25.00
465
$11,625.00
444
$11,100.00
(5525.001
47
trx6-ArtchorTe. -1h,I'Gatetiaiv°
FA
13,500.00
2
57,000.00
3
S10,500A0
$3.500.00
49
F-HydrantAssemb;r
EA
S13CA00
2
59000.00
1
54.500,00
($-A.500 00)
50
6'P)FireMain
LFT
$45.00
90
$4.050.00
76.5
$3442.50
(55077.50)
51
Compacted Aggregate 8ack'iD-Fire MainTmrth
LFT
520.00
90
$1,800.60
76.5
$1,530.00
k$27000)
52
rtV-Semettr-e
LFT
SSO.00
30
$1.500. GO
35
$1.750"00
5250.00
53
Postird"orvalve .F-ProwtionFA
51500.00
2
53.060.00
1
51,500.00
151500.00)
Si
Cableinterdurt
LFr
525.00
640
$15 000 00
0
$0.00
(516,000.001
56
lViChedulf80PVC Condait
LFT
515.00 1
630
$945000
595
$8,925.00
1552500)
57
EiiMkatConnettwntoCiryP-er
EA
12300.+`4 i
1
$2,500.00
0
$0.00
1:25"0.001
58
S-1-PmLType it- Modi(red
EA
16,900.10
1
$6.900.00
0
$0.00
(c -C 00)
S9
Handwe,C hong
EA
$1.200.00
4
54,800.00
0
$0.00
c Oi
60
tight Standard, Pole. Fbetureand Bast,Otmntke
EA
58.100.00
41
S32.4C^C':
0
$0.00
fs-" "
61
Light standard, Foundation
EA
S1,4C0.00
4
$5.50-0.00
0
$0.00
62
Coaduit.SteeLGarvanued,4•
LFT
139.00
1330
$51,870.00
40
$1,550.00
63
Wire.Nw3Opper.VCinPlaate0uctin7nneb
LFT
$32.00
750
$24,000.00
0
$0.00
64
IT-- Therm gyas[n:, Sint, tine, 241N,
LFI
$50.00
24
$1,200.00
0
$0.00
($1.200.00)
65
TraosverseMarking. Thermaptastu.Cratt.tatIcLines.121K
1.171'
125.00
25
$625-00
12.5
$312.50
(5312'_01
66
1 LFT
$7.50
625
$4,687.50
449
$3,367.50
(St320.00)
CITY OF CARMEL
4th Strut SW
CHANGE ORDER FINAL TABLE
Item
%uTner
0ascnpkbr.
Unit
Unit Price
Original
Ouantity
Original
Amount
Final
Quanity
Final Amount
Over/Under
NoasrevrnFill, FabrxImU•nderdmin
SYS
51.00
455
$455.00
313.23
$313.23
($14177)
68
apprepat.Backfill for Underdrain
CYS
$45.00
115
SS•175.00
37.62
$1,692.90
1$3482.10)
69
1, acP pm
LFT
535.00
95
$3.325.00
82
$2.870.00
($455001
70
te_ RCP Pipe
LFT
$40.00
126
$5,040.00
124.5
$4.980.00
t56000j
71
1 lot-RCPPipr
LFT
$45.00 1
175
$7,875.00
173.5
$7,807.50
±567.50)
72
Z3'RCPPips
LFT
555.00
187
$10.285.00
175.5
S9152.50
;5632.501
�?
24'RCP Pip.
LFT
560.00
33
$1.980.00
29
51.740.00
15240.00)
71
30"RCPPpe
LFT
570.00
10
$700.00
6.5
$455.00
5245.001
12' SPR PVC rl- P.P.
LFT
S31S.00
200
$7,000.00
23.75
$831.25
S6 168.75)
76
Storm ScherCieaneuts.Typ.2
EA
5850.00
6
$5.100.00
0
50.00
155.10000;
78
1VTid.M.Ch.ckVINsinIS'Pip.
EA
$2.000.00
1
52,000.00
0
$0.00
;52.000.00}
89
GranulacFill Over Onde mMretentionBssin
LYS 1
$35.00
1200
542.000.00
400
$14.000.00
(S28.000.00)
90
c-eteSaddie.waters-rcrassinp
EA
5350.00
6
52,100.00
2
$700.00
(51,400.001
91
Temporary Pipe. 15' HDPE
LFT
$10.00
140
$1400.00
0
50.00
'Sl 400,001
92
Tempararystarmstru tore
EA
$3,000.00
2
52 000.00
50,00
S200000)
95
jr mt bani,-ai Pips Ptug
EA
SIS0.00
1
$150.00
0
S000
+5150,001
98
Sitnagr.Prd.srrianCrossingSip Posta-,,f daao-.
EA
51.500.04 1
2
$3.000.00
0
50.00
S, DOD 00)
99
Type 4SvbpradeStAxIlzatmn
SYS
$22.50
0
$0,00
615.22
$13,842.45
513.842.45
100.
1-vmrtronFrxe75tornTr:-
LFT
S3.1S
0
$000
500
$1.575.00
$1,575.00
H31
F-44ydra tm".b; ::
FA
$4.806.09
0
$0.00
1
$A 806,C9
$4.806.09
102
Or. er Eauipmenc
IS
SH 230 ,00
5^ 0S
$8.230.00
$8.230.00
TOTAL OF CHANGE ORDER ITEMS
-5278.335.72
ORIGINAL CONTRACT PRICE
S1,467,000,00
CHANGE ORDER #1 -$278.335.72
NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS 51 188 664,28
CITY OF CARMEL
4th Street SW
Exhibit A
You have been directed to make the following ch;I11'.eN in thi. ('ontracr:
ITEM
F
NO
DESCRIPTION
REASON FOR CHANGE
3
Common Excavation
added quantities due to sols shaven up on-site between r!d and NTP.
4
Temporary inlet Protection
adjusted to balance original quantities versus actual quantities used for or -nal items
5
Concrete Washout Area
adjusted to balance original quantities versus actual qu anw,ies used for or mal items
7
Subgrade Treatment, Type IB
eliminated the Oce 113 and replaced with Type IV due to u" conflicts
8
Structural Backfill. 1
adjusted to balance orignal quantities versus actual quantities used for original items
9
Compacted Aggregate, No. 53, Base
adjusted to balance oncimai quantities versus actual quantifies used for original items
10
Milling, Asphalt. LS 1%"
milting asphalt was eliminated from this contract
11
HMA, 2, 70, Surface, 9.S mm
adjusted to balance orgrial quantities versus actual quantities used for original items
12
HMA, 2.70. Intermediate, 14.0 men
adjusted to balance original quantities versus actual quantities used for orlilmal items
13
AVIA, 2, 64, Base, 25.0 men
adjusted to balance original quantities versus actual quantities used for taiapnai items
14
Bike Back Concrete Pads, 6'
adjusted to balance orkprial quantities versus actual quantities used for original items
15
Bike Racks
adjusted to balance original quantities versus actual quantities used for orgmai Nems
16
Subgrade Treatment. Type It
adjusted to balance original quantities versus actaal quantities used for oNnal gems
17
Sidewalk, Concrete, 4"
adjusted to balance original quantities versus actual quantities used for original items
19
Curb Ramp. Concrete
adjusted to balance 069,nal quantities versus actual quantities used for original items
20
IDetectable Warning Surfaces
adjusted to balance original quantities versus actual quantities used for ongmai hems
21
Curb and Gutter, Concrete. Type 11
adjusted to balance original quantities versus actual quantities used for original de -s_
22
Combined Depressed Curb and Gutter
adjusted to balance original quantities versus actual quantiles used for original gems
23
Concrete Commercial Drive Approach
adjusted to balance ongmai quantities versus actual quantities used for original Nems
24
Mobilization and DemobNization fortandsapirg
landscaping was eliminated from the contract
25
Amended Undscape Soil for Planting Beds
landscaping was eliminated from the contract
26
Water
landscaping was eliminated from the contract
27
3" Deciduous Tree
landscaping was eliminated from iha rantna
28
Deciduous Shrub
landscaping was eliminated from the contract
29
Perennial
landscaping was eliminated from the contract
30
Ornamental Grasses
landscaping was eliminated from the contract
31
hardwood Mulch
landscaping was eliminated from the contract
32
N' Washed River Rock
adjusted to balance original quantlies versus actual quantities used for original Nems
33
4' - A. Black Steel Edging with 12* stakes
ad;usied to balance ongmai quantities versus actual quantities used for onpnai items
34
Geatexale Under Washed River Rock
adjusted to balance original quantities versus actual quantities used for original lams
37
8'PVC Sanitary Main
adjusted to balance original quantities versus actual quantities used for original gems
38
Compacted Aggregate Backfill -Sewer blain Trench
adjusted to balance onginai quantities versus actual quantities used for original items
39
Sanitary Cleanout. Type 2
adjusted to balance original quantities versus actual uantit�es a seo for original items
41
6" PVC Sanitary Lateral Pipe
adjusted to balance original quantities versus actual quantines used for orginal items
42
Compacted Aggregate Backfill - Sewer lateral Trench
adjusted to balance original quantities versus actual quantities used for ongrnal items
44
12" DI Water Main
adjusted to balance original quantities versus actual quantities used for original lams
45
Compacted Aggregate Backfill - Water Main Trench
adjusted to balance original quantities versus actual quantifies used for original Mems
47
12-x 6'AnchorTee with 60 Gate Valve
adjusted to balance "mal quantities versus actual quantities used for original Nems
49
Fire Hydrant Assembly
adjusted to balance original quantities versus actual quantities used for "nalitems
50
6" DI Fire Main
adjusted to balance original quantl�es versus actual quantities used for original items
51
Compacted Aggregate Backfill - Fire Main Trench
adjusted to balance original quantities versus actual quantities used for original Nems
Paoe 4
CITY OF CARMEL
4th Street SW
Exhibit A
%'on have been directed to make the following changes in this Contract:
ITEM
No
DESCRIPTION
REASON FOR CHANGE
S2
!' water Se«
adjusted to balance original quantities versus actual quantities used for original gems
53
Post Indicator t'ahe. Fire Proteccic-
z _:osted to balance ongtrial quantities versus actual quantities used for original gems
5S
Cable Interduct
adjusted to balance"trial quantities versus actual uentries; used for original gems
S6
4 -Schedule 80 PVC Conduit
adjusted to balance onginal quantites versus actual quantiles used for ong7ral items
57
Electrical Connection to City Powe-
eor haled from the cratracc
58
Service Point, Type It, Modified
etmtnated from the contract
59
Handhole, Lighting
et=minated from the contract
60
Lighr Standard, Pel«, F;rture:rd Ra, :'
eliminated from the contract
61
1 Light Standard.Fr.0-,t ::-:
eiminatedfrom the cort�act
62
Conduit. Steel, Galvanized, 4'
adjusted to balance original quantities versus actual quantities used for original gems
63
Wire, No. 3 Copper, t JC in Plastic GrIr, 1,
eliminated from the contract
64
Transverse Marking. Thermoplastic. Stop line. 24IN.
eliminated from the contract
65
Transverse Marking, Thermoplastic, Crosswalk Lines, I %
J.djusted to balance oa xiai quantities versus actual quantities used for original gems
66
b" Curb Underdnin
adjusted to balance iinggial Quantities versus actual quantities used for onVal gems
67
Nonwoven Filter Fabric for Und-rdrain
adjusted to balance original quantities versus actual quan<tit es used for original gems
68
Aggregate Backfill for Underd-a -
adjusted to balance original quantities versus actual quantities used for o " al gems
69
U- RCP Pipe
adjusted to balance original quantities versus actual quantities used for o " al items
70
IS- RCP Npe
adjusted to balance onoal quantities versus actual quantities used for ` ' al gems
71
1R" RCP Pipe
adjusted to balance original quantities versus actual quantities used for original gems
72
21- RCP Pipe
adjusted to balance original quantities versus actual quantities used for o ' ' al items
73
24" RCP Npc
adjusted to balance original quantities versus actual quantities used for original items
74
30" RCP Pipe
adjusted to balance original quantities versus actual quantities used for odglnal items
7S
12- SDR PVC Drain Pipe
adjusted to balance ontimai quantities versus actual quantities used for original gems
76
Storm Sewer Cleanouts, Type 2
adjusted to balance or: !nal quantit es versus actual quantities used for ori nal gems
78
15" TideFlex Check Valve in 1 S" Pipe
adjusted to balarce original quantities versus actual quantities used for original items
$9
Granular Fill Over Underground Detenunn ba<i-
adjusted to balance original quantities versus actual quantities used for original gems
90
Concrete Saddle, Water Sesser Gassim¢
adjusted to balance original quantities versus actual quantities used for original gems
91
Temporary Pipe, 15"HC1F.
I aan sled to balance original quantities versus actual
g quantities used for o' nal gems
92
Temporary Storm Structure
adjusted to balance original quantities vers•.is actual quantities used for original gems
95
12" Mechanical Pipe Plug
adjusted to balance original quantities versus actual quantifies used for original items
9$
Isignage. Pedestrian Crossing, Sipe Post and Foundation
adjusted to balance "trial quantities versus actual quantities used for original gems
99
Type 4 Subgrade Stabilization
adjusted to balance original quantities versus actual quantities used for original hems
100
Construction Fence(StormTrap
added to the contract due to contract being extended through 2017,
101
6' Fre Hydrant Assembly/18' Extension
added to replace inilal ire hydrant due to conflict with storm sewer
102
Office Equipment
added to the contrail.
Page 5