HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO #9/91,297.27/Spring Mill Road Reconstruction – Project #16-ENG-52Page I of 2
CITY OF CARMEL
TO: Lucas Clark CONTRACT CHANGE ORDER NO.: 9
Rieth-Riley Construction Co., Inc. DATE: 12/19/2017
P.O. Box 276 PROJECT NAME: Spring Mill Road Reconstruction /
1751 W. Minnesota Street p
Indianapolis, IN 46221 Proiect # 16 -ENG -52
CITY REQ. NO.:
CITY PO NO.: 34297
CITY PO DATE: 9/8/2016 '
I. You are directed to make the following changes in this Contract:
*All work associated with the descriptions below as well as the below referenced Change
Proposal in Paragraph II'.
>`Time & Material' tracked work between 8/3/2017 and 11/8/2017 in which
Rieth-Riley was instructed to perform subgrade healing work atop the existing Carmel
Water Utilities 20 inch water main. This work consisted of removing all materials
excavated by Carmel Water Utilities from the site, performing fine grading around
excavated areas, backfilling excavated areas with Type 5 Backfill (Non -Removable
Flowable Fill), installing revised sub -surface drains and leveling grade to planned paving
elevations.
*The cost for all the work addressed within this Change Order totals $91,297.27
>NOTE: Carmel Water Utilities possesses an easement (see Paragraph II)
where the work performed on 8/21/2017, 8/23/2017 and 8/24/2017, which was
located in Section #4 between Station 149+00 and Station 152+00 along the east edge
of Spring Mill Road, transpired. Carmel Water Utilities does NOT possess any other
easements for the remainder of the work associated with this Change Order.
*This Change order will create one new item, ITEM 4143yy — Carmel Water Utilities
Subgrade Healing, which will be paid as a LUMP SUM in the amount of $91,297.27.
>NOTE: Compensation for all work performed on 8/3/2017, 8/4/2017,
11/7/2017 and 11/8/2017, which Carmel Water Utilities does NOT possess easements
for, will be deemed reimbursable from Carmel Water Utilities to the City of
Carmel. The cost for all reimbursable work represented within this Change Order
totals $72,046.80; The Carmel Engineering Department will request this amount to
be reimbursed by the Carmel Water Utility.
>NOTE: Compensation for all work performed on 8/21/2017, 8/23/2017 and
8/24/2017 which Carmel Water Utilities DOES possess an easement for, will be
deemed non -reimbursable. The cost for all non -reimbursable work represented
within this Change Order totals $19,250.47; the City of Carmel will be solely
responsible for this amount.
AR -1
Page 2 of 2
Il. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order:
*Change Proposal as provided by Rieth-Riley Construction Co., Inc. on 12/19/2017.
*4 21 1981 Water Easement'
*Change Order 9 QTY Adjustments Breakdown
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $_9,453,973.27
Contract Price will be increased/dee-reased by this Change Order $ 91,297.27
New Contract Price including this Change Order $ 9,545,270.54
b
Net ineFeased,ldeepeased b f+em this O
a
this Change OfdeE_ Days Geffipletien Date
This Change Order is for frill and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended:
United Consultine
ENGINEER
1625 N. Post Road
Address
Indianapolis, IN 46219
City/State/Zip
By:
Phone: 117.794 5Fga
Date: u n/2n17
The Above Changes Are
Accepted:
Rieth-Riley
CONTRACTOR
1751 W. Minnesota Street
Date: I/ /"7
Approved:
o4
s Brain , Ma
Mary -ke, tuber
Lori fatso ember
Ate' S
Christine S. P ley, Clerk -
Treasurer
Jeri' y 1 shman, P.E.
City Engineer
Date:
Pg. 1 of 5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order k9 - Quantity Adjustments
ITEM NO,
DESCRIPTION
UNIT
Original
quantity
UNIT PRICE
Original Total
Construction Construction
' h -p PI Cry, Change 42 Qtys.
New Total
Quantity
New Total Dollar
Amount
16ENG-52 QUANTITIES
1
CONSTRUCTION ENGINEERING
Paid via Item 4143
LS
1
$160,203.01
$160,203.01
0.03
1.03
$160,203.01
2
MOBILIZATION AND DEMOBILIZATION
LS
1
$211,891.55
$211,891.55
00$211,891,55
3
CLEARING RIGHT OF WAY
LS
1
$295,223.93
$295,223.93
1.00
$295,223.93
4
PAVEMENT REMOVAL
SYS
459
$14.60
$6,701.40
459.00
$6,701.40
5
CENTER CURB, CONCRETE, REMOVE
SYS
34
$42.39
$1,441.26
34.00
$1,441.26
6
CURB CONCRETE, REMOVE
LET
77
$7.82
$602.14
77.00
$602.14
7
CURB AND GUTTER, RE MOVE
LET
2,914
$6.05
$17,629.70
2,914.00
$17,629.70
8
IPIPE ABANDON GROUT AND FILL
EACH
5
$438.20
$2,191.00
5.00
$2,191.00
9
SIDEWALK CONCRETE, REMOVE
SYS
123
$16.70
$3,724.10
123.00
$3,724.10
10
INLET REMOVE
EACH
4
$607.04
$2,428.16
4.00
$2,428.16
11
FENCE, CHAIN. LINK, REMOVE
LET
492
$4.50
$2,214.00
492.00
$2,214.00
lla
GUARDRAIL, REMOVE
LET
735
$6.50
$4,777.50
735.00
$4,777.50
llb
BRIDGE RAILING, REMOVE
LFT
248
$18.50
$4,588.00
248.00
$4,588.00
12
MANHOLE REMOVE
EACH
1
$898.30
$898.30
1.00
$898.30
13
CURB TURNOUT REMOVE
EACH
1
$84.36
$84.36
1.00
$84.36
14
CONCRETE WAL REMOVE
LFT
170
$49.07
$8,341.90
170.00
$8,341.90
15
PIPE REMOVE
LET
832
$38.16
$31,749.12
832.00
$31,749.12
16
FENCE, FARM FIELD, REMOVE
LET
1,662
$2.75
$4,570.50
1,662.00
$4,570.50
17
EXCAVATION, COMMON
CYS
24,762
$5.81
$143,867.22
24,762.00
$143,867.22
18
BORROW
CYS
15,953
$0.01
$159.53
15,953.00
$159.53
19
SEDIMENT REMOVE
CYS
63
$38.62
$2,433.06
63.00
$2,433.06
20
TEMPORARYCHECKDAM, REVETMENT RIPRAP
TON
8
$57.15
$457.20
8.00
$457.20
21
TEMPORARY INLET PROTECTION
EACH
154
$65.00
$10,010.00
154.00
$10,010.00
22
TEMPORARY MULCH
TON
29
$450.00
$13,050.00
29.00
$13,050.00
23
TEMPORARY SILT FENCE
LFT
12,404
$1.95
$24,187.80
12,404.00
$24,187.80
24
NO.2 STONE
TON
400
$25.25
$10,100.00
400.00
$10,100.00
25
TEMPORARY GEOTEXTILE
SYS
940
$2.79
$2,622.60
940.00
$2,622.60
26
TEMPORARY SEED MIXTURE
LBS
1,740
$0.25
$435.00
1,740.00
$435.00
27
SUBGRADE TREATMENT, TYPE II
SYS
960
$22.67
$21,763.20
925.00
$20,969.75
28
SUBGRADE TREATMENTTYPE 18
SYS
53,215
$6.03
$320,886.45
899.00
54,114.00
$326,307.42
29
STRUCTURE BACKFILL, TYPE I
CYS
13,538
$25.66
$347,385.08
3.00
13,541.00
$347,462.06
30
1DRYINGSOILSFOR EMBANKMENT
TON
655
$125.00
$81,875.00
655.00
$81,875.00
31
COMPACTED AGGREGATE NO. 53 RASE
TON
3,062
$27.60
$84,511.20
147 Mj
3.015.00
$83,214.00
32
WIDENING WITH HMA, TYPE C
TON
11
$183.09
$2,013.99
11.00
$2,013.99
33
MILLING, ASPHALT, 11/21N.
SYS
381
$12.00
$4,571.00
381.00
$4,571.00
34
MILLING, ASPHALT
SYS
488
$12.00
$5,856.00
488.00
$5,856.00
36
HMA SURFACE, TYPE C
TONS
3,206
$58.59
$187,839.54
48.00
3.254.00
$190,651.86
37
HMA INTERMEDIATE, TYPE C
TONS
5,187
$51.56
$267,441.72
79.00
5,266.00
$271,514.96
38
HMA BASE TYPE C
TONS
14,518
$49.54
$719,221.72
272.00
14,790.00
$732,696.60
39
MMA INTERMEDIATE, OG, TYPE C
TONS
6,567
$50.09
$328,941.03
57.00
6,624.00
$331,796.16
40
HMA FOR TEMPORARY PAVEMENT, C
UNDISTRIBUTEDI1
TON
500
$103.00
1
$51,500.00
500.00
$51,500.00
41
ASPHALT FOR TACK COAT
TON
29
$0.01
$0.29
15.00
44.00
$0.44
42PCCP
711.
SYS
241
$63.87
$15,392.67
241.00
$15,392.67
43
GUARDRAIL, WOOD BEAM
LFT
725
$314.00
$227,650.00
725.00
$227,650.00
43.
GUARDRAIL, BURIED END
LET
8
$8,600.00
$68,800.00
8.00
$68,800.00
44
HMA FOR SIDEWALK
TON
2,243
$79.93
$179,282.99
2,205.00
$176,245.65
45
SIDEWALK, CONCRETE
SYS
391
$43.80
$17,125.80
391.00
$17,125.80
46CURB
RAMP CONCRETE
SYS
440
$155.70
$68,508.00
139.00
579.00
$90,150.30
47
CURB, INTEGRAI CONCRETE
LET
245
$33.04
$8,094.80
245.00
$8,094.81
48
CURB AND GUTTER, CONCRETE, TYPE It
LET
18,824
$16.04
$301,936.96
18,824.00
$301,936.96
49
CURB AND GUTTER, CONCRETE TYPE III
LET
13,729
$15.01
$205,072.29
13,666.00
$205,126.66
50
CENTER CURB, D CONCRETE
SYS
125
$181.12
$22,652.50
125.00
$22,652.50
51
CURB, TURNOUT
EACH
2
$1,183.91
$2,367.82
2.00
$2,367.82
52
CURB AND GUTTER, ROLL CURB
LET
308
$29.50
$9,086.00
308.00
$9,08T00-
53
HMA FOR APPROACHES, TYPE C
TON
681
$89.44
$60,908.64
I Iv 011
8%1.00
$71,552.00
54
PCCP FOR APPROACHES, 61N.
SYS
574
$52.72
$30,261.28
537.00
$28,310.64
55
PCCP FOR APPROACHES, 91N.
SYS
412
$64.54
$26,590.48
412.00
$26,590.48
56
MAILBOX ASSEMBLY, SINGLE RESET
EACH
13
$185.00
$2,405.00
13.00
$2,405.00
57
GEOTEXTILES
SYS
68
$118
$80.24
I1 gin. 1.00 1
80.00
$94.40
58
RIPRAP REVETMENT
TON
28
$85.06
$2,381.68
4.011 1 00
33.00
$2,806.98
59
MOBILIZATIONAND DEMOBILIZATION FORSEEDING
EACH
7
$50.00
$350.00
7.00
$350.00
60
EROSION CONTROLBLANKET
SYS
1,016
$1.17
$1,188.72
1,016.00
$1,188.72
61
IWATER
kGAL
102
$1.00
$102.00
102.00
$102.00
62
ISODDING, NURSERY
SYS
28,063
$3.25
$91,204.75
28,063.00
$91,204.75
63
IRRIGATION CONTROLLER BOX
EACH
1
$8,500.00
$8,500.00
1.00
$8,500.00
Pg. 2of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order M9 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
Quan=r.
UNIT PRICE
Original Total
Construction Constructwn
Change 41 Qtys. Chan a 42 Qtys.
New Total
QuantityAmount
New Total Dollar
64
FIELD OFFICE, B
MOS
15
.
$2,286.99
$34,304.85
15.00
$34,304.85
65
TIMBERCURB
LFT
124
$196.OD
$24,304.00
124.00
$24,304.00
66
PIPE, TYPE 2, CIRCULAR 36 IN.
LFT
1,415
$95.84
$135,613.60
16 n0
1,431.00
$137,147.04
67
PIPE, TYPE 4, CIRCULAR, 61N,
LFT
18,429
$4.35
$80,166.15
18,429.00
$80,166.15
68
PIPE, TYPE 4, CIRCULAR, 81N.
LFT
54
$8.00
$432.00
54.00
$432.00
69
PIPE TYPE 2, CIRCULAR, 121N.
LFT
4,232
$39.45
1 $166,952.40
16.00 1
4,208.00
$166,005.60--
70
PIPE, TYPE 2, CIRCULAR, 151N.
LFT 1
416
$50.95
$21,195.20
12.00
428.00
$21,806.60
71
PIPE TYPE 2 CIRCULAR 181N.
LFT
1,099
$46.37
$50,960.63
1,097.00
$50,867.89
72
PIPE, TYPE 2, CIRCULAR, 21 IN.
LFT
299
$55.18
$16,498.82
299.00
$16,498.82
73
PIPE TYPE 2 CIRCULAR, 241N.
LFT
670
$60.93
$40,823.10
669.00
$40,762.17
74
PIPE TYPE 2 CIRCULAR 271N.
LET
25
$123.09
$3,077.25
1
40.00
$4,923.60
75
PIPE TYPE 2, CIRCULAR, 301N.
LFT
195
$75.60
$14,742.00
195.00
$14,742.00
76
PIPE, TYPE 2, CIRCULAR, 421N.
LFT
355
$130.20
$46,221.00
355.00
$46,221.00
77
PIPE, TYPE 2, CIRCULAR, 481N.
LET
1,590
$151.85
$241,441.50
1,590.00
$241,441.50
77a
PIPE TYPE 2, DEFORMED MIN. AREA 3.3 SET
LET
48
$80.30
$3,854.40
21.00
$1,686.30
776
PIPE TYPE 2, DEFORMED, MIN. AREA 5.1 SFT
LFT
546
$107.60
$58,749.60
546.00
$58,749.60
78
STORMWATER TREATMENT SYSTEM 2.08 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
79
STORMWATER TREATMENT SYSTEM 2.9 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
80
STORMWATER TREATMENT SYSTEM 2.23 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
81
STORMWATER TREATMENT SYSTEM 1.12 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
82
STORMWATER TREATMENT SYSTEM, 2.76 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$11,280.78
83
STORMWATER TREATMENT SYSTEM, 1.65 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
84
VIDEO INSPECTION FOR PIPE
LFT
10,325
$1.29
$13,319.25
16.OU
10,314.00
$13,305.06
85
PIPE END SECTION, DIAMETER 121N.
EACH
3
$873.60
$2,620.80
2.00
5.n0
$4,368.00
86
PIPE END SECTION, DIAMETER 151N.
EACH
2
$917.11
$1,834.22
2.00
$1,834.12
87
PIPE END SECTION, DIAMETER 181N.
EACH
4
$971.48
$3,885.92
4.00
$3,885.92
88
OUTLET PROTECTOR, 3
EACH
2
$1,050.00
$2,100.00
2.00
$2,100.00
89
VIDEO INSPECTION FOR UNDERORAINS
LFT
3,000
$0.99
$2,970.00
3,000.00
$2,970.00
90
AGGREGATE FOR UNDERORAINS
CYS
1,659
$45.50
$75,484.50
1,659.00
$75,484.50
91
GEOTEKTILES FOR UNDERDRAIN
SYS
16,587
$1.15
$19,075.05
16,587.00
$19,075.05
92
MANHOLE, J10
EACH
6
$4,602.60
$27,615.60
TOO
7.00
$32,218.20
93
CASTING, ADJUST TO GRADE
EACH
13
$623.76
$8,108.88
13.00
$8,108.88
94
INLET 110
EACH
46
52,443.76
$112,412.96
1.00
47.00
$114,856.72
95
INLET, M10
EACH
5
$2,448.81
$12,244.05
5.00
$12,244.05
96
CATCH BASIN K10
EACH
41
$2,601.45
$106,659.45
40.00
$104,058.00
97
MANHOLE, C4
EACH
30
$2,847.34
$85,420.20
26.00
$74,030.84
98
CATCH BASIN, F7
EACH
1
$1,974.33
$1,974.33
1.00
$1,974.33
99
MANHOLE K4
EACH
17
$8,549.72
$145,345.24
6.00
23.00
$196,643.56
100
MANHOLE A
EACH
20
$5,140.48
$102,809.60
0t:'
14.00
$71,966.72
101
CATCH BASIN, M10
EACH
41
$2,617.76
$107,328.16
41.00
$107,328.16
102
DEI-ENTIONOUTFALL STRUCTURE D
EACH
5
$8,666.12
$43,330.60
4.00
$34,664.48
103
DETENTION OUTFALL STRUCTURE, E
EACH
1
$9,077.18
$9,077.18
1.00
$9,077.18
104
CONSTRUCTION SIGN, C
EACH
3
$297.00
$891.00
3.00
$891.00
105
ROAD CLOSURE SIGN ASSEMBLY
EACH
6
$507.00
$3,042.00
6.00
$3,042.00
305a
TEMPORARY PAVEMENT MARKING 41N
LFT
6,000
$0.67
$4,020.00
6,1300.00
$4,020.00
1056
TEMPORARY PAVEMENT MARKING, REMOVABLE, 41N
LFT
2,600
$1.05
$2,730.00
2,600.00
$2,730.00
106
DETOUR ROUTE MARKER ASSEMBLY
EACH
22
$152.00
$3,344.00
22.00
$3,344.00
107
CONSTRUCTION SIGN, A
EACH
14
$249.00
$3,486.00
14.00
$3,486.00
108
CONSTRUCTION SIGN, B
EACH 1
13
$104.00
$1,352.00
13.00
$1,352.00
109
MAINTAINING TRAFFIC
LS
1
$153,029.18
$153,029.18
1.00
$153,029.18
110
BARRICADE III -B
LFT
264
$30.00
$7,920.00
264.00
$7,920.00
111
STREET SIGN POST
EACH
6
$1,850.00
$11,100.00
6.00
$11,100.00
112
SIGN SHEET, AND SUPPORTS REMOVE
EACH
33
$25.00
$825.00
33.00
$825.00
113
SIGN POST, SQUARE TYPE l UNREINFORCED ANCHOR
S
LFT
425
$14.00
$5,950.00
425.00
$5,950.00
114
SIGN, SHEET WITH LEGEND, 0.080 IN.
SFT
184
$17.00
$3,128.00
38.00
222.00
$3,774.00
115
SIGN SHEET WITH LEGEND 0.100 IN.
SFT
117
$19.00
$2,223.00
72.00
189.00
$3,591.00
116
CONDUIT PVC, 2IN. SCHEDULE 40
LFT
493
$8.00
$3,944.00
493.00
$3,944.00
117
CONDUIT HDPE 21N. SCHEDULE 80
LFT
162
$12.00
$1,944.130
162.00
$1,944.00
118
ORNAMENTAL LIGHT POLE, FOUNDATION,
LUMINARIES
EACH
6
$8,900.00
$53,400.00
6.00
$53,400.00
119
HANDHOLE, FOR INTERDUCT
EACH
31
$975.00
$30,225.00
31.00
$30,225.00
120
PVC SCHEDULE 40-4"
LFT
9,502
$5.00
$47,510.00
9,502.00
$47,510.00
121
PVC SCHEDULE 40-4" INTERDUCT
LFT
9,502
$9.00
$85,518.00
1
9,502.00
$85,518.00
122
PVC SCHEDULE 80-4"
LFT
205
$7.00
$1,435.00
205.00
$1,435.00
123
PVC SCHEDULE 4" INTERDUCT
LFT
205
$20.00
$4,100.00
205.00
$4,100.00
124
HANDHOLE LIGHTING
EACH
4
1 $650.00
$2,600.00
4.00
$2,600.00
125
SERVICE POINT 11 MODIFIED
EACH
1
1 $5,500.00
$5,500.00
1.00
$5,500.00
Pg. 3of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Chane Order 89 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
Quanti
UNIT PRICE
Original Total
Construction C.,nA-tion
Chan a 41 Qtys. Change 02 Qty,.
Naw Total
Qua
Naw Tobi D.N.
A - at
126
WIRE NO.6 COPPER, IN PLASTIC DUCT 41 C
LET
162
$8.00
$1,296.00
162.00
$1,296.00
127
WIRE, NO. 6 COPPER, IN PLASTIC DUCT, IN TRENCH, 4
LFT
493
$8.00
$3,944.00
493.00
$3,944.00
128
CONNECTOR KIT UNFUSED
EACH
6
$37.00
$222.00
6.00
$222.00
129
CONNECTOR KIT FUSED
EACH
6
$35.00
$210.00
6.00
$210.00
130
MULTIPLE COMPRESSION FITTING, WATERPROOFED
EACH
17
$2L00
$357.00
17.00
$357.00
_131
INSULATION LINK,WATERPROOFED
EACH
28
$15.00
$420,00
2&00
$420.00
132
WIRE TW HW NO. 10 COPPER STRANDED
LFT
471
$1,00
$471.00
471.00
$471.00
133
TRANSVERSE MARKING, THERMOPLASTIC,
CROSSWALK LINE WHITE 241N.
LFT
928
$5.65
$5,243.20
928.00
$5,243.20
134
LINE THERMOPLASTIC, BROKEN WHITE, 41N.
LET
592
$1.95
$1,154.40
592.00
$1,154.40
135
LINE THERMOPLASTIC, SOLID WHITE 41N.
LET
2,050
$0.73
$1,496.50
3'9.00
2,399.00
$1,751.27
136
LINE THERMOPLASTIC, DOTTED, WHITE, 81N.
LET
116
$3.15
$365.40
116.00
$365.40
137
TRANSVERSE MARKING, THERMOPLASTIC, YIELD LINE,
WHITE 361N.
LET
47
$12.20
$573.40
47.00
$573.40
138
LINE THERMOPLASTIC, SOLID, YELLOW, 41N,
LET
3,449
$0.73
$2,517.77
3,724.00
$2,718.52
139
TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE,
WHITE, 241N.
LFT
117
$5.65
$661.05
118.00
$666.70
140
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
LANE INDICATION ARROW
EACH
26
$109.00
$2,834.00
8.00
34.00
$3,706.00
141
SNOWPLOWABLE RAISED PAVEMENT MARKER
EACH
155
$25.00
$3,875.00
155.00
$3,875.00
142
LINE THERMOPLASTIC, SOLID YELLOW, 81N.
LET
2,269
$190
54,311.10
55.00
2,324.00
$4,415.60
143
LINE THERMOPLASTIC SOLID YELLOW, 121N.
LFT
460
$2.85
$1,311.00
17.00
477.00
$1,359.45
143.
20" DUCTILE IRON WATER MAIN
LET
1,520
$109.72
1 $166,774.40
1,520.00
$166,774.40
143b
8' DUCTILE IRON WATER MAIN
LFT
80
$90.20
$7,216.00
80.00
$7,216.00
1430
8" GATE VALVE
EACH
1
$1,477.28
$1,477.28
LOO
$1,477.28
143d
20"X8" STAINLESS TAPPING SADDLE AND VALVE
EACH
1
$8,354.44
$8,354.44
LOO
$8,354.44
143e
8' WATER MAIN LOWERING
EACH
1
$5,599.00
$5,599.00
1.00
$5,599.00
143f
10" WATER MAIN LOWERING
EACH
1
$6,260.48
$6,260.48
LOO
$6,260.48
143S
16" WATER MAIN LOWERING
EACH
1
$10,776.14
$10,776.14
LOO
$10,776.14
143h
20" WATER MAIN LOWERING
EACH
6
$13,814.76
$82,888.56
6.00
$82,888.56
1431
8"WATER MAIN CONNECTION
EACH
2
$3,475.74
$6,951.48
2.00
$6,951.48
1431
20" WATER MAIN CONNECTION
EACH
4
$4,486.76
$17,947.04
4.00
$17,947.04
143k
LONG SIDE SERVICE
EACH
1
$3,882.93
$3,882.93
1.00
$3,882.93
1431
METER PIT RELOCATION
EACH
1
$1,327.05
$1,327.05
LOO
$1,327.05
143.
BACKFLOW RELOCATION
EACH
1
$525.38
$525.38
LOO
$525.38
143n
RELOCATE SAMPLING STATION
EACH
1
$1,518.42
$1,518.42
LOO
$1,518.42
1430
ADJUST VAVLE TO GRADE REMOVE & REPLACE
HYDRANT & ADJUST TO GRADE
EACH
17
$4,476.55
$76,10135
17.00
$76,1031.35
143p
NEW HYDRANT ASSEMBLY
EACH
5
$6,016.55
$30,082.75
5.00
$30,082.75
143q
REMOVE AND RETIRE HYDRANT
EACH
3
$626.30
$1,878.90
3.00
$1,878.90
143r
ADJUST VALVE TO GRADE
EACH
IB
$321.44
$5,785.92
18.00
$5,785.92
143s
VALVE RETIREMENT
EACH
3
$585.16
$1,755.48
3.00
$1,755.48
143t
LINE STOPS 20" UNDISTRIBUTED
EACH
4
$17,268.55
$69,074.20
4.00
$69,074.20
143u
DETENTION OUTFALL STRUCTURE, T. per Change.
Order 4t
EACH
0
58, 1.'294
$0.00
LIXJ
1.00
$8,33294
143v
SEPTIC REPLACEMENT- pet Chan e ;2
IS
0
$36 c131.'45
$0A0
100
$36,031.35
143w
DECORATIVE SOLAR FLASHER. per Change Order K3
EACH
0
$7,806.66
$0-00
6.00
6.00
$46,839.96
143.
LIGHT POLE RELOCATION -per Chagne Order k5
IS
0
$4,140.25
$0.00
0.00
100
$4,140.2S
143y
CONSTRUCTION ENGINEERING - per Change Order b3
IS
0
54,087.00
$0.00
0.00
1 CIO
$4,087.0)
143,
MOBILIZATION&DEMOBILIZATION - per Change
Order R6
LS
0
$37,456.19
$0.00
0.00
1.00
$37,456.19
143aa
MAINTENANCE OF TRAFFIC- per Change Order #6
IS
D
$20,678,06
$0.00
0.00
1.00
$20,676.66
143bb
CONCRETE WASH -OFF FACILTY- per Change Order 06
EACH
0
$43200
$0.00
0.00
1
$432.00
143cc
DORSET BLVD. SIGN WALL- per Change Order A6
EACH
t:
$58,582.27
$0.00
000
2.00
$117,164.54
143dd
DORSET BLVD, R MASONRY WALL - per Change
ordera6
EACH
0
$58,630.88
$0.00
0.00
LOO
$58,630.88
143ee
111TH STREET STONE WORK- per Change Order #6
EACH
0
$31,912.26
$0 -OU
0.00
1.00 ''
$31,912.26
143ff
PLANTING SOIL BACKFILL- per Change Order 46
0S
0
$'71.50
$0.00
Il ()O
1.158-00
$82, 797.OD
Pg. 4of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order #9 - Quantity Adjustments
ITEM NO,
DESCRIPTION
UNIT
Original
quantity
UNIT PRICE
Original Total
Construction Co-truomn
chang.#1 Cry, Chan e#2Qtys.
New Total
Quantity
New Total Dollar
amount
143gg
IRRIGATION SERVICE & CONNECTIONS - per Change
Order N6
EACH
0
$3,800.00
$0000.00
1.00
$3,500.00
143hh
IRRIGATION
RIGATION BORING&JACKING - per Change Older
LET
0
$60.50
$0.00
0.00
MOOD
$6,050,00
143n
IRRIGATION CONTROLS/BACKFLOW PREVENTERS-
per Change Order #6
EACH
0
$2,827.00
$0.00
000
1.00
$2,827-00
143jj
CONTROL VALVES, DRIP TUBING, EMITTERS - per
Chan eOrder#6
LS
0
$15,306.50
$0.00
oi)n
1.00
$75,30650
143kk
ELECTRIC SERVICE AND CONNECTIONS - per Change
Order #6
IA( 11
0
$8.814.87
$0.00
0.010
1.00
$8,814.87
14311
ELECTRIC CONDUIT BORING AND JACKING • per
Chan ,e Order #6
tH
0
$65.29
$0.00
0.00
100.00
$6,529.00
143mm SIGN WALL LIGHTING- per Change Order 96
EACH
0
$1,641.88
$0.00
0.00
2.00
$3,283.76
143nn
DORSET BLVD. WALL LIGHTING- per Change Order #f,
EACH
0
S1, 641.88
$0.00
O.W
1.00
51,641.88
14300
STREET TREES- per Change Order N6
EACH
0
$429.00
$0.00
0.00
78.00
$3.3,462.00
143pp
ORNAME NTAL TREES- per Change Order N6
tAul
0
$330.00
$0.001
0.00
104.00
$34,3200)
143gq
EVERGREEN TREES• per Change Order #6
EACH
0
$253.00
$0.00
0.00
53.00
$13,409-00
143rr
SHRUBS - per Change Order#6
EACH
0
$44.00
$0.00
0.00
79800
$35,112.00
143ss
ORNAMENTAL GRASSES- per Change Order 96
EACH
0
$33.00
269.00
$8,877.00
1431[
PERENIALS- per Change Order 96
EACI1
0
$13,20
,,i.it,
0.00
5,653.00
$74,619.60
143uu
SEDGE, PLANTS- per Change Order #6
EACH
0
$13.20
50.00
0.00
054.00
$25,792.80
143-
HARDWOOD MULCH- per Change Order 06
CVS
0
$82.50
..,..,.
0.00
222.00
$18,315.00
143ww
LANUSCAPEIMPROVEMENTS/WILLIAMS CREEK-
per Change Order 97
IS
0
$13,183.50
.-, ...
0.00
1.00
$13,183.50
143x7,
Section 5 Sanitary&Water Addtions - per Change
Order #8
tS
0
$32,465.92
$0.0X1
0.00
100
$32,465.92
143yy
Cannel Water Utilities Suhg rade Healing - per Change I
Order N9
LS0
$91,297.27
$0.00
0.00
100
$91,297.27
16 -SW -07 QUANTITIES
144
EXCAVATION, COMMON
CYS
883
$35 W
$30,905.00
883.00
$30,905.00
145
BORROW
CYS
2,782
$0.01
$27.82
2,782.00
$27.82
146
SEDIMENT REMOVE
CVS
10
$33.74
$337.40
10.00
$337.40
147
TEMPORARY INLET PROTECTION
EACH
14
$65.00
$910.00
14.00
$910.00
148
TEMPORARY SILT FENCE
LFT
2,305
$1.79
$3,767.95
2,105.00
$3,767.95
149
TEMPORARY SEED MIXTURE
LBS
48
$0.25
$12.00
48.00
$12.00
150
SUBGRADE TREATMENT TYPE II
SYS
59
$24.80
$1,463.20
59.00
$1,463.20
151
SUBGRADE TREATMENT, TYPE III
SYS
1,597
$1.83
$2,922.51
1,597.00
$2,922.51
152
SUBGRADE TREATMENT, TYPE IB
SYS 1
4,596
$6.73
$30,931.08
4,596.00
$30,931.08
153
STRUCTURE BACKFILL, TYPE 1
CYS 1
177
$25.66
$4,541.82
177.00
$4,541.82
154
STRUCTURE BACKFILL, TYPE 2
CYS
266
$92.94
$24,722.04
266.00
$24,722.04
155
STRUCTURE BACKFILL, TYPE 5
CYS
36
$73645
$2,644.20
36.00
$2,644.20
1%
COMPACTED AGGREGATE NO. 53 BASE
TON
295
$32.87
$9,696.65
295.00
$9,696.65
157
HMA SURFACE TYPE C
TON
292
$71.16
$200866.32
292.00
$20,866.32
158
HMA INTERMEDIATE TYPE C
TON
487
$56.71
$270617.77
487.00
$27,617.77
158a
HMA INTERMEDIATE OG TYPE C
TON
641
$54.13
$34,697.33
641.00
$34,697.33
159
HMA BASE TYPE C
TON
1,207
$51.90
$62,643.30
1,207.00
$62,643.30
160
ASPHALT FOR TACK COAT
TON
4
$0.01
$0.04
4.00
$0.04
161
HMA FOR SIDEWALKS
TON 1
221
$87.33
$19,299.93
221.00
$19,299.93
162
SIDEWALK, CONCRETE 4-
SYS
39
$51.81
$2,020.59
39.00
$2,020.59
163
CURB RAMP CONCRETE
SYS
25
$175.41
$4,385.25
25.00
$4,385.25
164
DETECTABLE WARNING SURFACES
SYS
5
$326.25
$1,631.25
5.00
$1,631.25
165
HANDRAIL, 481N. ITEM DELETED per CHANGE ORDER
LFT
58
$12000
$6,960.00
0.00
$0.00
166
CURBAND GUTTER, CONCRETE, TYPE 11
LFT
1,830
$19.05
$34,861.50
1,830.00
$34,861.50
167
CURB AND GUTTER, TURNOUT CONCRETE
LFT
6
$469.97
$2,819.82
6.00
$2,819.82
368CONCRETE
ROLL CURB&GUTTER
LFT
262
$48.66
$12,748.92
262.00
$12,748.92
169
PCCP FOR APPROACHES 61N.
SVS
59
$60.95
$3,596.05
59.00
$3,596.05
Pg. 5of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Chane Order #9 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
original
Quantity
UNIT PRICE
Od8lnal Total Construction Construction
Change#1 Qtys. Chan <k2 Qtys.
Naw Total
Qua
Naw Total Dolla
Amount
170
MAILBOX ASSEMBLY TRIPLE
EACH
1
$225.00
$225.00
1.00
$225.00
171
GEOTEXTILES
SYS
1,140
$0.99
$1,128.60
1,140.00
$1,128.60
172
RIPRAP CLASS 1
TON
1,070
$46.35
$49,594.50
1,070.00
$49,594.50
173
RIPRAP REVETMENT
TON
260
$23.16
$6,021.60
260.00
$6,021.60
174
RIPRAP, UNIFORM HAND LAID
TON
4
$95.96
$383.84
4.00
$383.84
175
MOBILIZATION AND DEMOBILIZATION FOR SEEDING
EACH
2
$50.00
$100.00
2.OD
$10D.00
176
EROSION CONTROL BLANKET
SYS
11375
$L17
$1,608.75
1,375.00
$1,608.75
177
WATER
M.G.
25
$1.00
$25.00
25.00
$25.00
178
TOPSOIL
CYS
1,169
$45.64
$53,353.16
1,169.00
$53,353.16
179
SODDING NURSERY
SYS
3,540
$3.25
$11,505.00
3,540.00
$11,505.00
180
CONCRETE CLASS A
CYS
17
$252.59
$4,294.03
17.00
$4,294.03
181
241N. SDR 11 HDPE WATER MAIN
LFT
176
$305.36
$53,743.36
176.00
$53,743.36
182
201N. RESTRAINED JOINT DUCTILE IRON
LET
25
$724.08
$18,102.00
25.00
$18,102.00
183
20' UNE STOP
EACH
2
$17,268.55
$34,537.10
2.00
$34,537.10
184
201N. CONNECTION
EACH
2
$6,202.22
$12,404.44
2.00
$12,404.44
185
REMOVE REPLACE AND RELOCATE FIRE HYDRANT
EACH
1
$5,261.37
$5,261.37
LOD
$5,261.37
186
ADJUST VALVE BOX TO GRADE
EACH
3
$4611
$1,405.29
3.00
$1,405.29
187
PIPE TYPE 4, CIRCULAR 61N.
LFT
2,274
$4.75
$10,801.50
2,274.00
$10,801.50
188
PIPE UNDERDRAIN OUTLET 6IN.
LFT
191
$14.50
$2,769.50
191.00
$2,769.50
189
PIPE TYPE 2, CIRCULAR 121N.
LFT
642
$42.68
$27,400.56
642.00
$27,400.56
190
PIPE, TYPE 2, CIRCULAR, 151N.
LFT
15
$235.30
$3,529.50
15.00
$3,529.50
191
VIDEOINSPECTION FOR PIPE
LFT
655
$2.39
$1,565.45
655.00
$1,565.45
192
PIPE END SECTION DIAMETER 12 IN,
EACH
1
$873.58
$873.58
LOO
$873.58
193
VIDEO INSPECTION FOR UNDERDRAINS
LFT
3,000
$0.99
$2,970.00
3,000.00
$2,970.00
194
AGGREGATE FOR UNDERDRAINS
CYS
94
$50.00
$4,700.00
94.00
$4,700.00
195
GEOTEXTILES FOR UNDERDRAIN
SYS
1,076
$2.40
$2,582.40
1,076.00
$2,582.40
196
YARD LIGHTS ADJUST TO GRADE
EACH
7
$250.00
$1,750.00
7.00
$L750.00
197
CASTING ADJUST TO GRADE
EACH
6
$866.87
$5,20L22
6.00
$5,201.22
198
INLET E7
EACH
1
$1,881.90
$1,881.90
1.00
$1,881.90
199
INLET M10
EACH
9
$2,448.81
$22,039.29
9.00
$22,039.29
200
PIPE CATCH BASIN, 181N.
EACH
1
$1,314.06
$1,314.06
LOO
$1,314.06
201
MANHOLE C4
EACH
3
$2,95L74
$8,855.22
3.00
$8,855.22
202
INLET AR
EACH
3
$2,186.40
$6,559.20
3.00
$6,559.20
203
REINFORCED CONCRETE ARCH (MIN AREA :105.0
SFT.)
LET
64
$3,216.76
$205,872.64
64.00
$205,872.64
204
DETOUR ROUTE MARKER ASSEMBLY
EACH
19
$146.00
$2,774.00
19.00
$2,774.00
205
CONSTRUCTION SIGN A
EACH
17
$244.00
$4,148.00
17.00
$4,148.00
206
CONSTRUCTION SIN B
EACH
2
$105.00
$210.00
2.00
$210.00
207
BARRICADE III -B
LFT
50
$30.00
$L500.00
50.00
$1,500.00
208
SIGNPOST, SQUARE TYPE I REINFORCED ANCHOR
BASE
LET
81
$14.00
$3,134.00
8L00
$1,134.011
209
SIGN GROUND MOUNTED RESET
EACH
8
$20.00
$160.00
8.00
$160.00
210
UNE THERMOPLASTIC, SOLID WHITE 41N.
LFT
209
$0.73
$152.57
209.00
$152.57
211
LINE THERMOPLASTIC SOLID YELLOW 41N.
LFT
2,073
$0.73
$3,513.29
1,073.00
$3,513.29
212
TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE,
WHEN, 241N.
LIFT
15
$5.65
$84.75
15.00
$84.75
213
TRANSVERSE MARKING, THERMOPLASTIC,
CROSSWALK LINE, WHITE, 61N.
LFT
103
$L40
$144.20
103.00
$144.20
214
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
LANE INDICATION ARROW
EACH
I
$109A0
$109.00
LOO
$109.00
215
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
ONLY
EACH
1
$1470D
$147.00
LOD
$147.00
216
REVISED PEDESTRIAN HANDRAIL • per Change Order
d4
LET
0
$312,95
$000
58.00
$18,1''.1.10
717
CANCELLATION CHARGE (Original Handrail )esign)-
per Change Order #4
LS
0
$465.00
$0.00
1.00
$465SX)
=Adjusted Quantities las o f this Change Order)
New Items
ORIGINAL TOTAL=
$8,592,091.16
NEW TOTAL=
$9,545,270.54
H ,1 E Y CONS TRUC TION Ca., INC.
bw 111116W 100% Quality • 100% Employee Owned • Over 100 Years
December 19, 2017
Bret Smiley SENT VIA ELECTRONIC MAIL ONLY:
United Consulting
Construction Manager Bret.Smiley@ucindy.com
1625 N. Post Road
Indianapolis, IN 46219
RE: Spring Mill Road Improvements
City of Carmel Project No. 16 -ENG -27 & 16 -SW -07
Rieth-Riley Project No. 3200671
Dear Mr. Smiley,
Below is a summary of the T&M work performed by Rieth-Riley in coordination with Carmel Water
Utility. This work included disposing of Carmel Water Utility generated spoils and backfilling the
excavation with flowable fill. The total amount being requested by Rieth-Riley Construction for this
work is $91,297.27.
Date
Total
8/3/2017
$26,058.85
8/4/2017
$18,942.45
8/21/2017
$11,610.57
8/23/2017
$6,774.86
8/24/2017
$865.04
11/7/2017
$7,258.78
11/8/2017
$19, 786.72
Total
$91,297.27
Supporting documentation is included on the following pages. Please call with any questions.
Thanks
Lucas S. Clark
Project Manager
RIETH-RILEY CONSTRUCTION CO., INC.
cc: Eric Holmes
John Tuddy
P.O. Box 276 -1751 W Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com
Foreman
Watermain
Justin Finley
Justin Finley
Matt Bruce
Matt Bruce
Justin Finley
Matt Bruce
Matt Bruce
Equipment
Date Labor Labor MU Material Material MU Equipment MU Sub Sub MU Bond Bond MU Total
Flowable CY
135.00
151.00
126.00
86.00
11.00
8/3/2017
$1,225.94
$245.19
$9,588.60
$1,150.63
$122.50
$14.70 $12,441.00
$960.87
$281.30
$28.13 $26,058.85
8/4/2017
$1,586.63
$317.33
$9,977.72
$1,197.33
$94.50
$11.34
$5,092.00
$446.44
$199.25
$19.92 $18,942.45
8/21/2017
$1,166.04
$233.21
$8,190.00
$982.80
$803.32
$96.40
$0.00
$0.00
$126.19
$12.62 $11,610.57
8/23/2017
$329.39
$65.88
$5,590.00
$670.80
$33.75
$4.05
$0.00
$0.00
$73.63
$7.36 $6,774.86
8/24/2017
$38.62
$7.72
$715.00
$85.80
$6.75
$0.81
$0.00
$0.00
$9.40
$0.94 $865.04
11/7/2017
$1,953.94
$390.79
$0.00
$0.00
$1,347.58
$161.71
$3,016.80
$301.18
$78.89
$7.89 $7,258.78
11/8/2017
$1,791.93
$358.39
$13,464.00
$1,615.68
$975.51
$117.06
$1,116.00
$111.60
$215.05
$21.51 $19,786.72
$8,092.491 $1,618.501 $47,525.321
$5,703.041
$3,383.911
$406.071 $21,665.801 $1,820.091
$983.711
$98.37 $91,297.29 Total Flow Fill
153.00
662.00
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 8/3/17 Work Performed:
CONTRACT: 3200671 PROJECT:
FORCE ACCOUNT/EXTRA WORK FOR: Installed flowable fill on water main that carmel dug out. Started at station 164+00.
Poured to sta 160+00. Poured 135 CYS. Installed 6" underdrain from STA 164+00to STA 160+40. Used Geotextile to cover pipe
3"360 ft.
LABOR 109.05 (b)(1)
HOURS
EMPLOYEE
Regular
Overtime Doubletime TOTAL
RATE
EXTENSION
CARPENTER
0.00
0.00
$27.49
$0.00
CARPENTER FOREMAN
0.00
0.00
$28.99
$0.00
COMBINATION
0.00
0.00
$29.76
$0.00
FINISHER
0.00
0.00
$25.62
$0.00
FOREMAN - Justin Finley
3.00
3.50 6.50
$34.05
$280.91
LABORER -James Bilsson
2.00
3.00 5.00
$23.22
$150.93
LABORER - Wally Carroll
2.00
3.00 5.00
$23.22
$150.93
OPERATOR (103) Bill Wilkerson
000
0.00
$34.05
$0.00
OPERATOR (103) Steve Burton
0.50
0.50
$34.05
$17.03
OPERATOR OILER (103)
0.00
0.00
$30.51
$0.00
OA TECH
0.00
0.00
$23.62
$0.00
SUPERINTENDENT/PROJECT MANAGER
400
4.00
$43.10
$172.40
TEAMSTER
0.00
0.00
$27.91
$0.00
FRINGES
TOTAL LABOR $772.20 (2)
FICA 7.50 x LINE (2) $57.91 (3)
EMPLOYEE
HOURS
$36.29 (5)
RATE
EXTENSION
CARPENTER
0.00
x
$18.20 =
$0.00
CARPENTER FOREMAN
0.00
x
$18.20 =
$0.00
COMBINATION
0.00
x
$14.91 =
$0.00
FINISHER
0.00
X
$13.96 =
$0.00
FOREMAN - Justin Finley
6.50
x
$17.76 =
$115.44
LABORER -James Bilsson
5.00
X
$13.96 =
$69.80
LABORER - Wally Carroll
5.00
x
$17.76 =
$88.80
OPERATOR (103) Bill Wilkerson
000
x
$17.76 =
$0.00
OPERATOR 103) Steve Burton
0.50
X
$17.76 =
$8.88
OPERATOR OILER (103)
0.00
X
$17.06 =
$0.00
CIA TECH
0.00
x
$13.96 =
$0.00
SUPERINTENDENT/PROJECT MAN
4.00
x
$10.95 =
$43.80
TEAMSTER
0.00
x
$14.91 =
$0.00
TOTAL FRINGES $326.72 (4)
WORKERS COMPENSATION 4.70 % X
LINE (2)
$36.29 (5)
BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X
LINE (2)
$0.00 (6)
STATE UNEMPLOYMENT 3.85 % X
LINE (2)
$29.73 (7)
FEDERAL UNEMPLOYMENT 0.40 % x
LINE (2)
$3.09 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3)
$0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9
$1,225.94 (10)
20 % x LINE (10)
$245.19 (11)
GRAND TOTAL LABOR LINES (10) + (11)
$1,471.13 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
Purcriasea or
Manufactured Description
Quantity
Unit
Unit Price
Extenstion
P Flowable Fill
135.00
c
$
65.00 $ 8,775.00
P Geotextile
120.00
SY
$
0.78 $ 93.60
P 6" underdrain pipe
360.00
FT
$
2.00 $ 720.00
$1,396.00
Badger Truck 691 7/31/17 11 HRS @
210/HR & 2 Disposal/Water fees 115.00
$2,540.00
Badger -Truck 1076 7/31/17 9.5HRS
@ 210/HR & 1 Dis osal.Waterfee @ 115.00
$2,110.00
$
$
Trucking - Striaght Time
$0.00
$0.00
$
$
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE (18)+(19)
12 % x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20) + (21)
EQUIPMENT 109.05 (b)(4)
$9,588.60 (18)
$0.00 (19)
$9,588.60 (20)
$1,150.63 (21)
$10,739.23 (22)
Equipment # CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS EXTENSION
7987 3/4 Ton truck
$13.50
6.50 $87.75
11117 Cat 938 Loader
$69.49
0.50 $34.75
Badger Truck 899 7/28/17 14HRS @
210/HR 3 Dump fees @ 116 & 1 Water Charge @ $20
$0.00
Badger Truck 1076 7/28/17 6.5HRS
@ 210/HR1Dump fees @ 116
$0.00
Badger Truck 1076 7/29/17 7HRS @
210/HR 1 Dump fees @ 116 & 1 Water Charge @ $20
$1,606.00
Badger Truck 691 7/29/17 6HRS @
210/HR 1 Dump fee @116 & 1 Water Charge @ $20
$1,396.00
Badger Truck 691 7/31/17 11 HRS @
210/HR & 2 Disposal/Water fees 115.00
$2,540.00
Badger -Truck 1076 7/31/17 9.5HRS
@ 210/HR & 1 Dis osal.Waterfee @ 115.00
$2,110.00
Trucking - Striaght Time
$0.00
$0.00
Trucking - Over Time
$0.00
$0.00
Trucking - Double Time
$0.00
TOTAL EQUIPMENT
TOTAL TRUCKING
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
TOTAL LINES (23) + (24) + (25)
12 % x LINE (26)
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
SUBCONTRACTORS 109.05 (b)(6)
$122.50 (23)
$0.00 (24)
0.00 (25)
122.50 (26)
14.70 (27)
137.19 (28)
TOTAL SUBCONTRACT WEEK ENDING $12,441.00 (29)
10 % x LINE (30) $3,000.00 OR LESS $300.00 (31)
7 % x LINE (30) OVER $3,000.00 $660.87 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+(31)+(32) $13,401.87 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) & (33)
% BOND RATE BASED UPON LINE (34)
10 % x LINE (35)
TOTAL EXTRA WORK LINES: (34) + (35) + (36)
Page 2 of 2
$25,572.36 (34)
$281.30 (35)
$28.13 (36)
$25,881.79 (37)
DESCRIPTION
AMOUNT
Flowable
Pipe
Badger Truck 899 7/28/17 14HRS @
210/HR 3 Dump fees @ 116 & 1 Water Charge @ $20
$3,308.00
Badger Truck 1076 7/28/17 6.5HRS
@ 210/HR1Dump fees @ 116
$1,481.00
Badger Truck 1076 7/29/17 7HRS @
210/HR 1 Dump fees @ 116 & 1 Water Charge @ $20
$1,606.00
Badger Truck 691 7/29/17 6HRS @
210/HR 1 Dump fee @116 & 1 Water Charge @ $20
$1,396.00
Badger Truck 691 7/31/17 11 HRS @
210/HR & 2 Disposal/Water fees 115.00
$2,540.00
Badger -Truck 1076 7/31/17 9.5HRS
@ 210/HR & 1 Dis osal.Waterfee @ 115.00
$2,110.00
TOTAL SUBCONTRACT WEEK ENDING $12,441.00 (29)
10 % x LINE (30) $3,000.00 OR LESS $300.00 (31)
7 % x LINE (30) OVER $3,000.00 $660.87 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+(31)+(32) $13,401.87 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) & (33)
% BOND RATE BASED UPON LINE (34)
10 % x LINE (35)
TOTAL EXTRA WORK LINES: (34) + (35) + (36)
Page 2 of 2
$25,572.36 (34)
$281.30 (35)
$28.13 (36)
$25,881.79 (37)
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 8/4/17 Work Performed:
CONTRACT: 3200671 PROJECT:
FORCE ACCOUNT/EXTRA WORK FOR: Installed Flowable Fill from STA 157+25 to 16040 and from sta 164+00 to station
164+75 at STR 206. Fill 2 under cuts over water main at mallard ct. Installed 6" underdrain 72' into STR 206. The into STR 203.
Also used geotextile around pipe 3x72'.
LABOR 109.05 (b)(1)
HOURS
EMPLOYEE
Regular
Overtime Doubletime
TOTAL
RATE
EXTENSION
CARPENTER
x
$18.20 =
0.00
$27.49
$0.00
CARPENTER FOREMAN
$18.20 =
$0.00
0.00
$28.99
$0.00
COMBINATION
$0.00
FINISHER
0.00
$29.76
$0.00
FINISHER
FOREMAN - Justin Finley7.00
0.00
$25.62
$0.00
FOREMAN - Justin Finley
4.00
3.00
7.00
$34.05
$289.43
LABORER -James Bilsson
2.50
2.50
5.00
$23.22
$145.13
LABORER - Wally Carroll
2.50
2.50
5.00
$23.22
$145.13
OPERATOR (103) Bill Wilkerson
2.00
1.00
3.00
$34.05
$119.18
OPERATOR (103) Steve Burton
2,00
1.00
3.00
$34.05
$119.18
OPERATOR OILER (103)
4.00
x
0.00
$30.51
$0.00
CA TECH
x
$14.91 =
0.00
$23.62
$0.00
SUPERINTENDENT/PROJECT MANAGER
400
4.00
$43.10
$172.40
TEAMSTER
0.00
$27.91
$0.00
FRINGES
TOTAL LABOR $990.43 (2)
FICA 7.50 % x LINE (2) $74.28 (3)
EMPLOYEE
HOURS
RATE
EXTENSION
CARPENTER
0.00
x
$18.20 =
$0.00
CARPENTER FOREMAN
0.00
x
$18.20 =
$0.00
COMBINATION
0.00
x
$14.91 =
$0.00
FINISHER
0.00
X
$13.96 =
$0.00
FOREMAN - Justin Finley7.00
x
$17.76 =
$124,32
LABORER -James Bilsson
5.00
X
$13.96 =
$69.80
LABORER - Wally Carroll
5.00
x
$17.76 =
$88.80
OPERATOR (103) Bill Wilkerson
3.00
x
$17.76 =
$53.28
OPERATOR (103) Steve Burton
3.00
X
$17.76 =
$53.28
OPERATOR OILER (103)
0.00
x
$17.06 =
$0.00
CA TECH
0.00
x
$13.96 =
$0.00
SUPERINTENDENT/PROJECT MAN
4.00
x
$10.95 =
$43.80
TEAMSTER
0.00
x
$14.91 =
$0.00
TOTAL FRINGES $433.28 (4)
WORKERS COMPENSATION % X LINE (2) $46.55 (5)
BODILY INJURY/ PROPERTY DAMAGE INSURANCE % X LINE (2) $0.00 (6)
STATE UNEMPLOYMENT % x LINE (2) $38.13 (7)
FEDERAL UNEMPLOYMENT % X LINE (2) $3.96 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 8 9 $1,586.63 (10)
20 % x LINE (10) $317.33 (11)
GRAND TOTAL LABOR LINES (10) + (11) $1,903.96 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
Purchased or
Manufactured Description
Quantity
Unit
Unit Price
Extenstion
P Flowable Fill
151.00
c
$
65.00 $ 9,815.00
P 6" Underdrain pipe
72.00
LFT
$
2.00 $ 144.00
P 3x72 SYS Fabric
24.00
SYS
$
0.78 $ 18.72
$
S
$
$
Trucking - Striaght Time
$0.00
$0.00
$
$
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE (18)+(19)
12 % x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20) + (21)
EQUIPMENT 109.05 (b)(4)
$9,977.72 (18)
$0.00 (19)
$9,977.72 (20)
$1,197.33 (21)
$11,175.05 (22)
Equipment # CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS EXTENSION
7987 314 Ton truck
$13.50
7.00 $94.50
Bader Truck 141 8/1 2 disposal @ 116 EA & 10.50 hrs @ 210/HR & 2 water 20EA
$2,477.00
$0.00
$0.00
$0.00
Trucking - Striaght Time
$0.00
$0.00
Trucking - Over Time
$0.00
0.00
Trucking - Double Time
$0.00
zlium
TOTAL EQUIPMENT
TOTAL TRUCKING
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
TOTAL LINES (23) + (24) + (25)
12 % x LINE (26)
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
SUBCONTRACTORS 109.05 (b)(6)
$94.50 (23)
$0.00 (24)
0.00 (25)
94.50 (26)
11.34 (27)
105.84 (28)
DESCRIPTION
AMOUNT
Badger truck 821 8/3 1 disposal @ $100 & 4.5 hours 210/HR
$1,045.00
Badger truck 821 8/4 1 disposal @ $100 & 7 hours @210/HR
$1,570.00
Bader Truck 141 8/1 2 disposal @ 116 EA & 10.50 hrs @ 210/HR & 2 water 20EA
$2,477.00
TOTAL SUBCONTRACT WEEK ENDING $5,092.00 (29)
10 % x LINE (30) $3,000.00 OR LESS $300.00 (31)
7 %x LINE (30) OVER $3,000.00 $146.44 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+(31)+(32) $5,538.44 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) & (33) $18,113.39 (34)
�h
% BOND RATE BASED UPON LINE (34) $199.25 (35)
10 % x LINE (35) $19.92 (36)
TOTAL EXTRA WORK LINES: (34) + (35) + (36) $18,332.56 (37)
Page 2 of 2
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 8/21/17 Work Performed:
CONTRACT: 3200671 PROJECT: Spring Mill Section 4
FORCE ACCOUNT/EXTRA WORK FOR: Cleaned up spoils from undercut over watermain in section 4 left by Carmel Water
Placed flowfill in undercuts
LABOR 109.05 (b)(1)
HOt IRS
EMPLOYEE
Regular
Overtime Doubletime TOTAL
RATE
EXTENSION
CARPENTER
0.00
0.00
$27.49
$0.00
CARPENTER FOREMAN
0.00
0.00
$28.99
$0.00
COMBINATION -
0.00
0.00
$29.01
$0.00
FINISHER
0.00
0.00
$25.62
$0.00
FOREMAN - Matt Bruce
8.00
2.50 1 10.50
$34.05
$400.09
LABORER Garret Blair
0.50
2.00 2.50
$23.22
$81.27
MECHANIC
0.00
0.00
$33.15
$0.00
OPERATOR (103) Don Blair
4.00
2.00 6.00
$34.05
$238.35
OPERATOR (841) Randy Dowell
0.00
0.00
$31.80
$0.00
OPERATOR OILER (103)
0.00
0.00
$30.51
$0.00
QA TECH
0.00
0.00
$23.62
$0.00
SUPERINTENDENT/PROJECT MANAGER
0.00
0.00
$43.10
$0.00
TEAMSTER
0.00 1
0.00
$27.91
$0.00
FRINGES
TOTAL LABOR $719.71 (2)
FICA 7.50 % x LINE (2) $53.98 (3)
EMPLOYEE
HOURS
$33.83 (5)
RATE
EXTENSION
CARPENTER
0.00
X
$18.20 =
$0.00
CARPENTER FOREMAN
0.00
x
$18.20 =
$0.00
COMBINATION -
0.00
X
$14.91 =
$0.00
FINISHER
0.00
X
$13.96 =
$0.00
FOREMAN - Matt Bruce
10.50
x
$17.76 =
$186.48
LABORER Garret Blair
2.50
x
$13.96 =
$34.90
MECHANIC
0.00
X
$17.76 =
$0.00
OPERATOR (103) Don Blair
6.00
x
$17.76 =
$106.56
OPERATOR 841) Randy Dowell
0.00
X
$19.51 =
$0.00
OPERATOR OILER (103)
0.00
X
$17.06 =
$0.00
QA TECH
0.00
x
$13.96 =
$0.00
SUPERINTENDENT/PROJECT MAN
0.00
x 1
$10.951
$0.00
TEAMSTER
0.00 1
x 1
$14,911
$0.00
TOTAL FRINGES $327.94 (4)
WORKERS COMPENSATION LIM % X
LINE (2)
$33.83 (5)
BODILY INJURY / PROPERTY DAMAGE INSURANCE `;O.0 % X
LINE (2)
$0.00 (6)
STATE UNEMPLOYMENT _ % X
LINE (2)
$27.71 (7)
FEDERAL UNEMPLOYMENT 06.461' % X
LINE (2)
$2.88 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9 $1,166.04 (10)
20 % x LINE (10) $233.21 (11)
GRAND TOTAL LABOR LINES (10) + (11) $1,399.25 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
Purchased or
Manufactured Description Quantity Unit Unit Price
Extenstion
P Flowable Fill 126.00 CY $
65.00 $ 81190.00
11564 3/4 Ton truck
$13.50
b
$
$
$
$
$
Is
$
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE (18)+(19)
12 %x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20) + (21)
EQUIPMENT 109.05 (b)(4)
$8,190.00 (18)
$0.00 (19)
$8,190.00 (20)
$982.80 (21)
$9,172.80 (22)
Equipment # CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS
EXTENSION
11564 3/4 Ton truck
$13.50
10.50
$141.75
314 Excavator
$70.20
4.00
$280.80
11062 D5 Dozer
$60.51
5.00
$302.55
R2171104 420 Backhoe
$39.11
2.00
$78.22
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Trucking - Striaght Time
$0.00
0.00
Trucking - Over Time
$0.00
0.00
Trucking - Double Time
$0.00
TOTAL EQUIPMENT
$803.32 (23)
TOTAL TRUCKING
0.00 (24)
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
0.00 (25)
TOTAL LINES (23) + (24) + (25)
$803.32 (26)
12 % x LINE (26)
7W6.40 (27)
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
$899.72 (28)
SUBCONTRACTORS 109.05 (b)(6)
TOTAL SUBCONTRACT WEEK ENDING
$0.00 (29)
10 % x LINE (30) $3,000.00 OR LESS
$0.00 (31)
7 % x LINE (30) OVER $3,000.00
$0.00 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+(31)+(32)
$0.00 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) & (33)
$11,471.77 (34)
_ % OF BOND RATE BASED UPON LINE (34)
$126.19 (35)
10 % x LINE (35)
$12.62 (36)
TOTAL EXTRA WORK LINES: (34) + (35) + (36)
$11,610.57 (37)
Page 2 of 2
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 8/23/17 Work Performed:
CONTRACT: 3200671 PROJECT: Spring Mill Section 4
FORCE ACCOUNT/EXTRA WORK FOR: Place flowable fill over watermain where Carmel Water undercut
Placed flowfill in undercuts
LABOR 109.05 (b)(1)
Hni ias
EMPLOYEE
Reaular Overtime Doubletime TOTAL
RATE
EXTENSION
CARPENTER
0.00
$27.49
$0.00
CARPENTER FOREMAN
0.00
$28.99
$0.00
COMBINATION -
0.00
$29.01
$0.00
FINISHER
0.00
$25.62
$0.00
FOREMAN - Matt Bruce
2.50 2.50
$34.05
$127.69
LABORER Garret Blair
2.50 2.50
$23.22
$87.08
MECHANIC
0.00
$33.15
$0.00
OPERATOR (103) Don Blair
0.00
$34.05
$0.00
OPERATOR (841) Randy Dowell
0.00
$31.80
$0.00
OPERATOR OILER (103)
0.00
$30.51
$0.00
QA TECH
0.00
$23.62
$0.00
SUPERINTENDENT/PROJECT MANAGER
0.00
$43.10
$0.00
TEAMSTER
0.00
$27.91
$0.00
FRINGES
TOTAL LABOR $214.76 (2)
FICA 7.50 x LINE (2) $16.11 (3)
EMPLOYEE
HOURS
$10.09 (5)
RATE
EXTENSION
CARPENTER
0.00
X
$18.20 =
$0.00
CARPENTER FOREMAN
0.00
X
$18.20 =
$0.00
COMBINATION -
0.00
x
$14.91 =
$0.00
FINISHER
0.00
X
$13.96 =
$0.00
FOREMAN - Matt Bruce
2.50
x
$17.76 =
$44.40
LABORER Garret Blair
2.50
x
$13.96 =
$34.90
MECHANIC
0.00
X
$17.76 =
$0.00
OPERATOR (103) Don Blair
0.00
X
$17.76 =
$0.00
OPERATOR (841) Randy Dowell
0.00
X
$19.51 =
$0.00
OPERATOR OILER (103)
0.00
X
$17.06 =
$0.00
QA TECH
0.00
X
$13.96 =
$0.00
SUPERINTENDENT/PROJECT MAN
0.00
X
$10.95 =
$0.00
TEAMSTER
0.00
X
$14.91 =
$0.00
TOTAL FRINGES
$79.30 (4)
WORKERS COMPENSATION % X
LINE (2)
$10.09 (5)
BODILY INJURY/ PROPERTY DAMAGE INSURANCE % X
LINE (2)
$0.00 (6)
STATE UNEMPLOYMENT % X
LINE (2)
$8.27 (7)
FEDERAL UNEMPLOYMENT % X
LINE (2)
$0.86 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3)
$0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9
$329.39 (1o)
20 % x LINE (10)
$65.88 (11)
GRAND TOTAL LABOR LINES (10) + (11)
$395.27 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
Purchased or
Manufactured Description Quantity Unit Unit Price
Extenstion
P Flowable Fill 86.00 CY $
65.00 $ 5,590.00
$13.50
2.50 $33.75
314 Excavator
$70.20
$0.00
11062 D5 Dozer
$
$
$
$
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE (18)+(19)
12 % x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20) + (21)
EQUIPMENT 109.05 (b)(4)
$5,590.00 (18)
$0.00 (19)
$5,590.00 (2o)
$670.80 (21)
$6,260.80 (22)
Equipment# CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS EXTENSION
11564 3/4 Ton truck
$13.50
2.50 $33.75
314 Excavator
$70.20
$0.00
11062 D5 Dozer
$60.51
$0.00
R2171104 420 Backhoe
$39.11
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Trucking - Striaght Time
$0.00
0. 0
Trucking - Over Time
$0.00
$0.00
Trucking - Double Time
$0.00
TOTAL EQUIPMENT
TOTAL TRUCKING
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
TOTAL LINES (23) + (24) + (25)
12 % x LINE (26)
GRAND TOTAL FOR EQUIPMENT: LINES (26) +(27)
SUBCONTRACTORS 109.05 (b)(6)
$33.75 (23)
$0.00 (24)
0.00 (25)
33.75 (26)
4.05 (27)
37.80 (28)
TOTAL SUBCONTRACT WEEK ENDING $0.00 (29)
10 % x LINE (30) $3,000.00 OR LESS $0.00 (31)
7 % x LINE (30) OVER $3,000.00 $0.00 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) 8 (33) $6,693.87 (34)
% OF BOND RATE BASED UPON LINE (34) $73.63 (35)
10 % x LINE (35) $7.36 (36)
TOTAL EXTRA WORK LINES: (34) + (35) + (36) $6,774.86 (37)
Page 2 of 2
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 8/24/17 Work Performed:
CONTRACT: 3200671 PROJECT: Spring Mill Section 4
FORCE ACCOUNT/EXTRA WORK FOR: Placed 11 yards of flowable fill to fill up water main around STIR 168 & 166 in section
four where Carmel duo over water main.
LABOR 109.05 (b)(1)
uni iRc
EMPLOYEE
Regular Overtime Doubletime TOTAL
RATE
EXTENSION
CARPENTER
0.00
$27.49
$0.00
CARPENTER FOREMAN
0.00
$28.99
$0.00
COMBINATION -
0.00
$29.01
$0.00
FINISHER
0.00
$25.62
$0.00
FOREMAN - Matt Bruce
0 50 0.50
$34.05
$25.54
LABORER Garret Blair
0.00
$23.22
$0.00
MECHANIC
0.00
$33.15
$0.00
OPERATOR (103) Don Blair
0.00
$34.05
$0.00
OPERATOR (841) Randy Dowell
0.00
$31.80
$0.00
OPERATOR OILER (103)
0.00
$30.51
$0.00
CA TECH
0.00
$23.62
$0.00
SUPERINTENDENT/PROJECT MANAGER
0.00
$43.10
$0.00
TEAMSTER
0.00
$27.91
$0.00
FRINGES
TOTAL LABOR $25.54 (2)
FICA 7.50 % x LINE (2) $1.92 (3)
EMPLOYEE
HOURS
$1.20 (5)
RATE
EXTENSION
CARPENTER
0.00
x
$18.20 =
$0.00
CARPENTER FOREMAN
0.00
x
$18.20 =
$0.00
COMBINATION -
0.00
x
$14.91 =
$0.00
FINISHER
0.00
x
$13.96 =
$0.00
FOREMAN - Matt Bruce
0.50
x
$17.76 =
$8.88
LABORER Garret Blair
0.00
x
$13.96 =
$0.00
MECHANIC
0.00
x
$17.76 =
$0.00
OPERATOR (103) Don Blair
0.00
x
$17.76 =
$0.00
OPERATOR (841) Randy Dowell
0.00
x
$19.51 =
$0.00
OPERATOR OILER (103)
0.00
x
$17.06 =
$0.00
CA TECH
0.00
x
$13.96 =
$0.00
SUPERINTENDENT/PROJECT MAN
0.00
X
$10.95 =
$0.00
TEAMSTER
0.00
x
$14.91 =
$0.00
TOTAL FRINGES $8.88 (4)
WORKERS COMPENSATION 4.70 % x
LINE (2)
$1.20 (5)
BODILY INJURY/ PROPERTY DAMAGE INSURANCE 0.00 % x
LINE (2)
$0.00 (6)
STATE UNEMPLOYMENT 3.85 % x
LINE (2)
$0.98 (7)
FEDERAL UNEMPLOYMENT 0.40 % x
LINE (2)
$0.10 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3)
$0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9
$38.62 (10)
20 % x LINE (10)
$7.72 (11)
GRAND TOTAL LABOR LINES (10) + (11)
$46.34(12)
Page 1 of 2
MATERIAL 109.05 (6)(3)
Flurctiased or
Manufactured Description Quantity Unit Unit Price
Extenstion
P Flowable Fill 11.00 CY $
65.00 $ 715.00
$13.50
0.50 $6.75
314 Excavator
$70.20
$0.00
11062 D5 Dozer
$
$
Is
$
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE (18)+(19)
12 % x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20) + (21)
EQUIPMENT 109.05 (b)(41
$715.00 (18)
$0.00 (19)
$715.00 (20)
$85.80 (21)
$800.80 (22)
Equipment # CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS EXTENSION
11564 314 Ton truck
$13.50
0.50 $6.75
314 Excavator
$70.20
$0.00
11062 D5 Dozer
$60.51
$0.00
82171104 420 Backhoe
$39.11
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Trucking - Striaght Time
$0.00
Trucking -Over Time
$0.00
0.00
Trucking - Double Time
$0.00
TOTAL EQUIPMENT
$6.75 (23)
TOTAL TRUCKING
0.00 (24)
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
$0.00 (25)
TOTAL LINES (23) + (24) + (25)
6.75 (26)
12 % x LINE (26)
0.81 (27)
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
7.56 (28)
SUBCONTRACTORS 109.05 (b)(6)
TOTAL SUBCONTRACT WEEK ENDING $0.00 (29)
10 % x LINE (30) $3,000.00 OR LESS $0.00 (31)
7 % x LINE (30) OVER $3,000.00 $0.00 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $0.00 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) 8 (33) $854.70 (34)
a�=% OF BOND RATE BASED UPON LINE (34) $9.40 (35)
10 % x LINE (35) $0.94 (36)
TOTAL EXTRA WORK LINES: (34) + (35) + (36) $865.04 (37)
Page 2 of 2
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 11/7/17 Work Performed:
CONTRACT: 3200671 PROJECT: Spring Mill Section 2
FORCE ACCOUNT/EXTRA WORK FOR: Clean up and haul off dirt spoils from Carmel water excavation over watermain secton
2 in preparation for flowable fill.
LABOR 109.05 (b)(1)
EMPLOYEE
Regular
Overtime Doubletime
TOTAL
RATE
EXTENSION
CARPENTER
X
$18.20 =
0.00
$27.49
$0.00
CARPENTER FOREMAN
$18.20 =
$0.00
0.00
$28.99
$0.00
COMBINATION -
$0.00
FINISHER
0.00
$29.01
$0.00
FINISHER
FOREMAN - Matt Bruce
9.50
0.00
$25.62
$0.00
FOREMAN - Matt Bruce
8.00
1.50
9.50
$34.051
$349.01
LABORER Garret Blair
8.00
1.00
9.00
$23.22
$220.59
LABORER - Justin Connoway
8.00
1.00
9.00
$23.22
$220.59
OPERATOR (103) Dave Connoway
8.00
2.00
10.00
$34.05
$374.55
OPERATOR (841) Randy Dowell
QA TECH
0.00
0.00
$31.80
$0.00
OPERATOR OILER (103)
0.00
X
0.00
$30.51
$0.00
CA TECH
X
1
0.00
$23.621
$0.00
SUPERINTENDENT/PROJECT MANAGER
1
0.00
$43.101
$0.00
TEAMSTER
1
0.00
$27.911
$0.00
FRINGES
TOTALLABOR $1,164.74 (2)
FICA PIN iia yk % x LINE (2) $87.36 (3)
EMPLOYEE
HOURS
RATE
EXTENSION
CARPENTER
0.00
X
$18.20 =
$0.00
CARPENTER FOREMAN
0.00
X
$18.20 =
$0.00
COMBINATION -
0.00
X
$14.91 =
$0.00
FINISHER
0.00
X
$13.96 =
$0.00
FOREMAN - Matt Bruce
9.50
X
$17.76 =
$168.72
LABORER Garret Blair
9.00
x
$13.96 =
$125.64
LABORER - Justin Connoway
9.00
x
$13.96 =
$125.64
OPERATOR (103) Dave Connoway
10.00
X
$17.76 =
$177.60
OPERATOR 841) Randy Dowell
0.00
X
$19.51 =
$0.00
OPERATOR OILER (103)
0.00
X
$17.06 =
$0.00
QA TECH
0.00
x 1
$13.961
$0.00
SUPERINTENDENT/PROJECT MAN
0.00
X
$10.9511
$0.00
TEAMSTER
0.00
X
$14.9111
$0.00
TOTAL FRINGES
$597.60 (4)
WORKERS COMPENSATION % X LINE (2) $54.74 (5)
BODILY INJURY / PROPERTY DAMAGE INSURANCE % X LINE (2) $0.00 (6)
STATE UNEMPLOYMENT % X LINE (2) $44.84 (7)
FEDERAL UNEMPLOYMENT % X LINE (2) $4.66 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 R 9 $1,953.94 (1o)
20 % x LINE (10) $390.79 (11)
GRAND TOTAL LABOR LINES (10) + (11) $2,344.73 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
Purchased or
Manufactured Description Quantity Unit Unit Price
Extenstion
CY
$
11579 3/4 Ton truck
$13.50
$
$
$
$
$
$
$
$
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE (18)+(19)
12 % x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20)+(21)
EQUIPMENT 109.05 (b)(4)
$0.00 (18)
$0.00 (19)
$0.00 (20)
$0.00 (21)
$0.00 (22)
Equipment # CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS
EXTENSION
11579 3/4 Ton truck
$13.50
9.50
$128.25
11117 Loader
$69.49
7.00
$486.43
11631 D5 Dozer
$60.51
10.00
$605.10
R2171148 Skid Loader
$42.60
3.00
$127.80
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Trucking - Striaght Time
$0.00
-Fr -0-0-01
Trucking - Over Time
$0.00
0.00
Trucking - Double Time
$0.00
SUBCONTRACTORS 109.05 (b)(6)
CJ Truck 658
CJ Truck 615
TOTAL EQUIPMENT
$1,347.58 (23)
TOTALTRUCKING
$0.00 (24)
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
0.00 (25)
TOTAL LINES (23)+(24)+(25)
$1,347.58 (26)
12 % x LINE (26)
$161.71 (27)
GRAND TOTAL FOR EQUIPMENT: LINES (26)+(27)
$1,509.29 (28)
TOTAL SUBCONTRACT WEEK ENDING $3,016.80 (29)
10 % x LINE (30) $3,000.00 OR LESS $300.00 (31)
7 % x LINE (30) OVER $3,000.00 $1.18 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+(31)+(32) $3,317.98 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) & (33) $7,172.00 (34)
% OF BOND RATE BASED UPON LINE (34) $78.89 (35)
10 % x LINE (35) $7.89 (36)
TOTAL EXTRA WORK LINES: (34) + (35) + (36) $7,258.78 (37)
Page 2 of 2
RIETH-RILEY CONSTRUCTION
EXTRA WORK AGREEMENT
DATE: 11/8/17 Work Performed:
CONTRACT: 3200671 PROJECT: Spring Mill Section 2
FORCE ACCOUNT/EXTRA WORK FOR: Cleaned up excavation from Carmel Water Trench. Placed Flowable Fill in trench
for subgrade treatment.
LABOR 109.05 (b)(1)
EMPLOYEE
Regular
Overtime Doubletime TOTAL
RATE
EXTENSION
CARPENTER
0.00
0.00
$27.49
$0.00
CARPENTER FOREMAN
0.00
0.00
$28.99
$0.00
COMBINATION -
0.00
0.00
$29.01
$0.00
FINISHER
0.00
0.00
$25.62
$0.00
FOREMAN - Matt Bruce
8.00
2.00 10.00
$34.05
$374.55
LABORER Garret Blair
8.00
2.00 10.00
$23.22
$255.42
LABORER - Justin Connoway
0.00
0.00
$23.22
$0.00
OPERATOR (103) Dave Connoway
7.00
7.00
$34.05
$238.35
OPERATOR (841) Dave Puglisi
6.00
6.00
$31.80
$190.80
OPERATOR OILER (103)
0.00
0.00
$30.51
$0.00
QA TECH
0.00
0.00
$23.62
$0.00
SUPERINTENDENT/PROJECT MANAGER
0.00
0.00
$43.10
$0.00
TEAMSTER
0.00
0.00
$27.91
$0.00
FRINGES
TOTAL LABOR $1,059.12 (2)
FICA 7.50 % x LINE (2) $79.43 (3)
EMPLOYEE
HOURS
$49.78 (5)
RATE
EXTENSION
CARPENTER
0.00
x
$18.20 =
$0.00
CARPENTER FOREMAN
0.00
x
$18.20 =
$0.00
COMBINATION -
0.00
x
$14.91 =
$0.00
FINISHER
0.00
x
$13.96 =
$0.00
FOREMAN - Matt Bruce
10.00
x
$17.76 =
$177.60
LABORER Garret Blair
10.00
x
$13.96 =
$139.60
LABORER - Justin Connoway
0.00
x
$13.96 =
$0.00
OPERATOR (103) Dave Connoway
7.00
x
$17.76 =
$124.32
OPERATOR (841) Dave Puglisi
6.00
x
$19.51 =
$117.06
OPERATOR OILER (103)
0.00
x
$17.06 =
$0.00
QA TECH
0.00
x
$13.96 =
$0.00
SUPERINTENDENT/PROJECT MAN
0.00
x
1
$10.95 =
$0.00
TEAMSTER
0.00
x
$14.91 =
$0.00
TOTAL FRINGES $558.58 (4)
WORKERS COMPENSATION 4.70 ` % x
LINE (2)
$49.78 (5)
BODILY INJURY/ PROPERTY DAMAGE INSURANCE O`.00,1 % X
LINE (2)
$0.00 (6)
STATE UNEMPLOYMENT 3.86 % x
LINE (2)
$40.78 (7)
FEDERAL UNEMPLOYMENT 0 40 % x
LINE (2)
$4.24 (8)
TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3)
$0.00 (9)
TOTAL LINES 2, 3, 4, 5, 6, 7, 8 & 9
$1,791.93 (1o)
20 % x LINE (10)
$358.39 (11)
GRAND TOTAL LABOR LINES (10) + (11)
$2,150.31 (12)
Page 1 of 2
MATERIAL 109.05 (b)(3)
Purchased or
Manufactured Description Quantity Unit Unit Price
Extenstion
P Flow Fill 153.00 CY $
88.00 $ 13,464.00
$13.50
10.00 $135.00
S
$
S
$
S
$
82171148 Skid Loader
$42.60
MATERIALS PURCHASED
MATERIALS MANUFACTURED
TOTAL: LINE (18)+(19)
12 % x LINE (20)
GRAND TOTAL FOR MATERIALS: LINE (20) + (21)
EQUIPMENT 109.05 (b)(4)
$13,464.00 (18)
$0.00 (19)
$13,464.00 (2o)
$1,615.68 (21)
$15,079.68 (22)
Equipment# CONTRACTOR OWNED EQUIPMENT
FHWA HOURLY RATE
HOURS EXTENSION
11579 314 Ton truck
$13.50
10.00 $135.00
11117 Loader
$69.49
6.00 $416.94
11631 D5 Dozer
$60.51
7.00 $423.57
82171148 Skid Loader
$42.60
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Trucking - Striaght Time
$0.00
0.00
Trucking - Over Time
$0.00
0.00
Trucking - Double Time
$0.00
SUBCONTRACTORS 109.05 (b)(6)
Truck
TOTAL EQUIPMENT
$975.51 (23)
TOTALTRUCKING
0.00 (24)
FUEL, LUBRICANTS AND TRANSPORTATION COSTS
0.00 (25)
TOTAL LINES (23) + (24) + (25)
$975.51 (26)
12 % x LINE (26)
$117.06 (27)
GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27)
$1,092.57 (28)
TOTAL SUBCONTRACT WEEK ENDING $1,116.00 (29)
10 % x LINE (30) $3,000.00 OR LESS $111.60 (31)
7 % x LINE (30) OVER $3,000.00 $0.00 (32)
GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $1,227.60 (33)
TOTAL OF WORK COMPLETED FOR THE WEEK
TOTAL LINES (12), (17), (22), (28) 8 (33) $19,550.16 (34)
% OF BOND RATE BASED UPON LINE (34) $215.05 (35)
10 % x LINE (35) $21.51 (36)
TOTAL EXTRA WORK LINES: (34) + (35) + (36) $19,786.72 (37)
Page 2 of 2
IF Vir
! TH- ILEY
ww�a ,riethrrle y.cvna
Job Number:
3 O0 7j
Field Work Order
Date Issued: a `
Owner Job Number: Address:
ta.
Job Name: '!'lnr)
1
Rietthh-Riley is hereby authorized
�to� perform the following described work and charge to the above mentioned owner:
161 -do ra•►40 1.4 160, POWrtiL /3S CY3- 4","1 411--,14
Prow. so 16y �a> yv fm-MFI�--SC',4- - Gco -felc o % cow,- P%Pp - 3)(360H.
Trade Reg Hrs OT Hrs
orm eA Zw -AA CI VV &y
•
U1 atl V
yr lz-n `s)f
Qw
Equipment Quantity Hours Used Hours Idle
>xJ • 7f97
fo Ems• -7
• S
Material/Sub Oty
N twtov- jaL, e. -; j 1
135c -
Co 4*x P�t 1 - 360
la Q
ya .0% --
F
�u1
GO o
This work shall be on a time and material basis to which will be added all applicable taxes, insurance, fringe benetits, travel pay
(per diem), expendable item charge, overhead and profit.
Work Supervised By:
Rieth-Riley Construction
Signedby: —.__ .............................._..__..
Title:
Work Ordered By:
Owner/Owner's Rep
Signed by:
Title: _
..—.
I TH , ILEY
w3vw.repLh; rt�y.t'i�ns
Field Work Order
Job Number:
Owner Job Number:
Job Name: _f _t'' `"' Yir„v1-
Date Issued: q- g-1
Address:
Rieth-Riley is hereby/Jauthorized to perform the following described work and charge to the above mentioned owner:
11 A /ic- _r �t 11I -/ &- . 11, ` J /v 1 f�ii.
FN,,A 5/% /'%pts Jo SCK. j 75 �i..'0�0C..:__
- -
1u�
1�1404'd �t` K0de " do�4..�- �c,�' ►r.-��a
Trade Reg Hrs OT Hrs
r
-'
..31
Equipment Quantity Hours Used Hours Idle
-7
r`a, I
Material/Sub oty
h -ti10 y1vL„r j t
icz,
This work shall be on a time and material basis to which will be added all applicable taxes, insurance, fringe benefits, travel pay
(per diem), expendable item charge, overhead and profit.
Work Supervised By: _
Rieth-Riley Construction
Signed by:
Title: 7
....
—
Work Ordered By:
Owner/Owner's Re
Signed by:
Title:__._._.....___.... _ _.
TH-TILEY
Job Number: 320047 1
Field Work Order
Date Issued
Owner Job Number: Address:
Job Name:
3-Z3- /-7
Rieth-Riley is hereby authorized to perform the following described work and charge to the above mentioned owner:
br 4'1-te- i Lu A &x -l? 0/4 r e- &I "i -q_('4 0 1 t .--- .. . .. . .......... . ........ . .....
Trade Reg Hrs OT Hrs
/
2.
Equipment Quantity Hours Used Hours Idle
Material/Sub Qty
S1146 j 13Y Flo
1� C �e
I
I
This work shall be on a time and material basis to which will be added all applicable taxes, insurance, fringe benefits, travel pay
(per diem), expendable item charge, overhead and profit.
Work Supervised By:
Rieth-Riley Construction 01
Signed by:
Title: rOe-If + Al
. .................... --- ....... ........ ---- ------- - -
Work Ordered By:
Owner/Owner's Rep
Signed by:
Title:
i
t i
S
4a
t
ILI
i
t i
S
t
W it
21 TE- ILEA"
wwtm.rrethriley,t>rre
Job Number:
3ZO06-7I
Owner Job Number:
Job Name:
Field Work Order
Date Issued: / % ` 7— /-7
Address:
Rieth-Riley is hereby authorized to perform the following described work and charge to the above mentioned owner:
C I E to m t t p %,) b (4 6.L s2_ v fCT S,�� e- 064,-
v
v alt-
Trade Reg Hrs OT Hrs
L >4 6 rQ 2 (-I of f � 13/+4 /,x..
8'
/
4 JV51161 C'or+"oUI
B
�
ce) P�srt,t fo (7wx- 00 A 10A"
Z,
Equipment ('quantity Hours Used Hours Idle
o it QeYL 117
(
7
514,0 le,4pLqZ- /22/7INk
3
!7 / g n-- / l 6 3
/0
Material/Sub Qty
This work shall be on a time and material basis to which will be added all applicable taxes, insurance, fringe benefits, travel pay
(per diem), expendable item charge, overhead and profit.
Work Supervised By:
Rieth-Riley Construction
Signed by:
Title: ;F0 r 'L'' ` I
Work Ordered By:
Owner/Owner's Rep—' .r
Signed by: -----
Title: -- ----- ---
21 THI 1LEY
urvvs,iiethrittrY.cvm
Field Work Order
Job Number: 3 2 o 0 6 "7 I
Owner Job Number:
Job Name: 5 r' N q ,M l
Date Issued:
Address:
Riethh-'Riley is hereby authorized to perform the following described work and charge to the above mentioned owner:
._-ir,_._-! ry :tit hit ^�
Trade Reg Hrs OT Hrs
M A -T* -r (ZU
LA `loom Gkr-r111114 5 UA
Equipment Quantity Hours Used Hours Idle
Lk-
i
to
LQ A, t l
)
1 6 3
t
`7
Material/Sub Qty
-i 2
2461 row rr
� —3
This work shall be on a time and material basis to which will be added all applicable taxes, insurance, tnnge oenents, travel pay
(per diem), expendable item charge, overhead and profit.
Work Supervised
Rieth-Riley ConstructioG��
Signed by:
Title: _ ,)I^A 41
Work Ordered By:
Owner/Owner's Rep
Signed by:
Title:__ _�i�
room 625
AnciuVE3 FILE
INDIANAPOLIS WATER CO.
MEMORANDUM
FROM L. Kenneth Blackwell SUBJECT: Easement from Dr. John N. Pittman
on Spring Mill Road from W. 111th
Street to W. 116th Street and
TO H. V. Starks to a point on 116th St. 684' East.
DATE: May 1, 1981
Please place the attached recorded easement in the archives.
pv
Y�-L
L. Kenneth Blackwell
M 04 ENT
22179 BOOK a, 2 cJ PAGE ._.
THIS INDEN'T'URE, made this 21st day of April , 1981 , by and
between John N. Pittman , of the County
10f Hamilton State of Indiana , hereinafter called Grantors, and
INDIANAPOLIS WATER COMPANY, a corporation organized under the laws of the
State of Indiana, with the offices located at Indianapolis, Indiana,
?Hereinafter called Grantee:
WITNESSETH, That for and in consideration of the sum of One Dollar
($1.00) and other valuable considerations in hand paid by Grantee to
Grantors, receipt whereof is hereby acknowledged, Grantors, their grantees,
successors and assigns do hereby grant, bargain, sell, convey and warrant
unto the Grantee, its grantees, successors and assigns, forever a
right-of-way and easement with the right, privilege and authority in Grantee,
its grantees, successors and assigns, to erect, construct, install,
reconstruct, renew, operate, maintain, patrol, replace and repair a water
main and its necessary appurtenances therein, under, upon, over and across
the following described real estate owned by Grantors and situated in the
County of"Hamilton State of Indiana, all as shown on the easement sketch
bearing ur; wiug Ne:" D-6075 entitled
parallel and ariacent to Sorinamill Road from 111th Street to 116th Street:
and parallel and adjacent to 116th Street from E. 1l/W line of Sp�ing ',-till
Road east 664.181'
which sketch is attached hereto and made a part hereof:
SAID right-of-way and easement being shown on the above mentioned Attached
Drawing:,` and b4&g more particularly described as follows:
a,..._ ..a. �...."
See attached "Exhibit A"
%d a-11
This instrument Recorded
19$1
MARY L. CLARK, RECORDER, H NILTON COUNTY, IND
Ell ocK3_.25__ 7 4
gether with the right and privilege (1) of int: a and egress for the employees,
agents and representatives of Grantee, its grantees, successors and assigns to, from
and over said real estate, (2) to do all acts and things requisite and necessary for
the'full enjoyment of the right-of-way and easement hereby granted.
The easement hereby granted shall include, specifically, the right of nearby
property owners to connect their premises by water service pipe to any water main
installed by Grantee, provided that such owners restore any area disturbed by their
work. Grantee covenants that, in the installation, maintenance or operation of its
water main and appurtenances under, upon, over and across said tract of land in which
easement is hereby granted, it will restore the area disturbed by its work to as near
fthe original condition as is practicable, but it shall have no duty to restore an area
disturbed by a nearby property owner in installing a connecting water service pipe.
Grantors herein covenant for themselves, their grantees, successors and assigns
.that they will not erect or maintain any building or other structure -or obstruction on
or over said water main and appurtenances under said tract of land in- which right-of-
way and easement is hereby granted.
Grantors represent and warrant that they are the owners in fee simple of said real
estate, are lawfully seized therof and have a good right to grant and convey the fore-
going easements therein; that they guarantee the quiet possession thereof; and said
real estate is free from any and all encumbrances except the following;
1. Current taxes.
2. Mortgacte Record 287, Page 155 1975
(Give Mortgage Record, Page, and County.)
Grantors will warrant and defend Grantee's title to said easement against all
lawful claims.
IN WITNESS WHEREOF, the Grantors have hereunto set their rtspective hands and
seals the day and year first above written.
STATE OF Indiana )
)SS
COUNTY OF mon
On this 21st day of April , 1981 , before the undersigned, a Notary
Public in and for said County and State, personally appeared the above named
John N. Pittman
and acknowledges the execution of them of the above and foregoing instrument to be the
Voluntary act and deed of them and of each of them.
Wit as my hand a Hofer al seal
(
)N,!9Pky Public
My Co is ion expires
• ;�� „`
7i3X
Water Main Easement 5
BOOK
On Spring Mill Road and 116th Street
"Exhibit A"
Description
A part of the Northwest Quarter of Section 2, Township 17 North,
Range East in Hamilton County, Indiana, more particularly described
as follows:
The perpetual easement is a 15 foot wide strip of land adjacent to,
East of and parallel to the East right-of-way line of Spring Mill
Road, as now established and adiacent to, South of and parallel to
the South right-of-way line of West 116th Street, as now established,
extending Northerly from the North right-of-way line of West 111th
Street, as now established, to said South right-of-way line of
West 116th along Spring Mill Road and extending Easterly along West
116th Street from said East right-of-way line of Spring Mill Road
to a point 801.54 feet East of the Northwest Corner of said Northwest
Quarter of Section 2; the temporary construction easement is a 25
foot wide strip of land extending the length of the perpetual easement,
adjacent to, East of and parallel to the perpetual easement along
Spring Mill Road and adjacent to, South of and parallel to the
perpetual easement along West 116th Street; as shown on the attached
print of Indianapolis Water Company Drawing Number D-6075.
A
Al 89'11 'S8'E
//7.53'
N.E coa. Nf i¢
SEc. 3, T/7A/, 1e3E,
Lo
SouTN L/NE of THE
of 5,f c. 2, T/7.V, R3E.
f
BOOK �PAGE 749
W .ST.
E Cc,Q. 5f �'4 of Stec. 34, T/8A1r23E. i
�AC a8'90'l7 "E. �
(o8�.ort' "� ./PPARFNT R/N
N
/l/ORTN L/NE of TNff ��/¢
oP SEc. 2, 717N, R3f.
f / \rt/. l./CoR. A/ A/ t/4
1s
Se--. 2, T /7N, re 3 E
,
t
' c
t
25 25'
Z�
`Vt
I
� / 25
51✓ C./� OR. of THE NW �¢
of SEc. 2, 7'/7AI, R 3 E. �/Z'
h/.
W
m
0
0
X
2
Tex CT "C
/5 r PEk'PETt1AL fwsemeA17-
+7-- MPoRARY CoWs;wuCTlod EASEMENT
This Instrument Recorded��j,,,��,�,Q �t981
MARY L. CLARK, RECORDER, AMILTON GOUNTY, IND.
N
� fh
ST
Ty1S EASEMEAT /5 A fq,¢'r aF rNE AOW%4
.o,- SEcT o Al 2, TGW^/SN1P / 7 Vo erA/, ,efxt*F 3
EAST 1n/ H.4M/GTON COUNTY, 1,V044,V4.
r.qE L`A5EMEn1T CoAlr4o /S 48, 92 9.96 Scp. F7,
wN1CN f4u41-5 /. /Z i/CRES /%o RE OR LE55.
INDIANAPOLIS WATER COMPANY
DISTRIBUTION SYSTEM��
/5 ' l✓.9TER /`%/A/ EAsEME.V7'
P.tRALLEL 1Wo./AcENT r- SPRIMs MizL 07 ERoH ///'�
4M9 1%twLEL ro 7/6 *S7 FRoi
f elAl Zlwe of j'r,C/N6 Alla >fp. & s r 6 6 4. /8/ .`
DR. BYD.'4.W. DATE2-/2-B/ SCALE A/0 SCALE
CH. BY �RDRAWING NUMBER
"k j ¢. ;. µ D - 6D 75
City of Carmel Project 16 -ENG -52
Spring Mill Road Reconstruction
CHANGE ORDER #9
Carmel Water Utilities Subgrade Healing
Contract Price prior to this Change Order $9,453,973.27
Contract Price will be increased by this Change Order $91,297.27
New Contract Price including this Change Order $9,545,270.54
Amount
Adjusted Contract
Price
Cumulative % Change
from Original Contract
Original Contract
$8,592,091.16
$8,592,091.16
N/A
CO1
(-333.18)
$8,591,757.98
-0.004%
CO2
$36,031.35
$8,627,789.33
0.42%
CO3
$123,808.23
$8,751,597.56
1.86%
C04
$11,656.00
$8,763,253.66
1.99°x6
C05
$4,140.25
$8,767,393.91
2.04%
C06
$640,929,94
$9,408,323.85
9.50%
C07
$13,183.50
$9,421,507.35
9.65%
C08
$32,465.92
$9,453,973.27
10.03%
C09
$91,297.27
$9,545,270.54
11.09%