Loading...
HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO#8/32,465.92/Spring Mill Road Reconstruction – Project #16-ENG-52Page I of 2 CITY OF CARMEL TO: Lucas Clark CONTRACT CHANGE ORDER NO.; 8 Rieth-Riley Construction Co., Inc. DATE: 12/8/2017 Box Minnesota Street 1751 W MinPROJECT NAME: Spring Mill Road Reconstruction / 175 Indianapolis, IN 46221 Project #16 -ENG -52 �gRoi o CITY REQ. NO.: CITY PO NO.: 34297 CITY PO DATE: 9/8/2016 1. You are directed to make the following changes in this Contract: *All work associated with the descriptions below as well as the below referenced Change Proposal in Paragraph It'. >'Time & Material' tracked work ($5,669.18) allowing for the adjustment of a CTRWD manhole located at approximately Station 126+00. *NOTE: This manhole is located in an existing easement resulting in the responsibility for adjustment being that of the City of Carmel. >'Time & Material' tracked work ($18,591.20) allowing for installation of a sanitary lateral stub to the property located at -11090 Spring Mill Road, Carmel, IN 46032-. *NOTE: This work is being performed in conjunction with the ROW acquisition associated with the aforementioned property. >'Time & Material' tracked work ($8,205.54) allowing for the installation of an irrigation service tap/connection to the Carmel Water facilities, located at the SE corner of the planned 111 °' Street round -a -bout, per request of the Carmel Street Dept. *NOTE: Please see the below referenced email request for said work, dated 10/27/2017. *This Change order will create one new item, ITEM 9143xx — Section 5 Sanitary & Water Additions, which will be paid as a LUMP SUM in the amount of $32,465.92. [l. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: *Change Proposal as provided by Rieth-Riley Construction Co.. Inc. on 11/28/2017. *Request for Additional Work email (dated 10/27/2017) *Change Order 8 QTY Adjustments Breakdown The changes result in the following adjustment of Contract Price and Contract "Time: Contract Price prior to this Change Order $ 9,421,507.35 Contract Price will be increased/tkaeFeatied by this Change Order $ 32,465.92 New Contract Price including this Change Order $ 9,453,973.27 AR -1 Page 2 of 2 This Change Order is for full and final settlement of all direct, indirect. impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Recommended: Accepted: United Consulting Rieth-Rilev ENGINEER CONTRACTOR 1625 N. Post Road 1751 W. Minnesota Street Address Indianapolis, IN 46219 City/State/Zip By: Phone:. 317_Z2g Date:— 12J8/20.17., Address Indianapolis, IN 46206 CitL//S.tate/Zi Rhone: , 4 Date: Approved: s Brains , May Mary A 'Bt ke,,Kembo Lori W4qefiAlember / CLQ Christine S. PauJey, Clerk - Treasurer Jer K hman, P.E. City Engineer Date_ 1l-11911:1 IETH-' November 28, 2017 Bret Smiley United Consulting Construction Manager 1625 N. Post Road Indianapolis, IN 46219 LEY CoNsmucnm Co,, INC. 100° Quality • 100% Employee Owned • Over 100 Years RE: Spring Mill Road Improvements City of Carmel Project No. 16 -ENG -27 & 16 -SW -07 Rieth-Riley Project No. 3200671 Dear Mr. Smiley, SENT VIA ELECTRONIC MAIL ONLY: Bret.Smiley@ucindy.com Below is the breakdown for the recently completed T&M raised sanitary manhole, sanitary lateralwork, and Irrigation Tap: • T&M Raise Existing Sanitary Manhole -$5,669.18 • T&M Install 6" Sanitary Lateral - $18,591.20 • T&M 111`h St. Irrigation Tap- $8,205.54 This work consisted of raising the existing sanitary manhole in the middle of the 111"St. roundabout. As well as installing a 6" sanitary lateral across grade at app. 126+00, this tied into the stub left byGradex. Also included is the Irrigation Tap which includes the labor and material to install tap as described in October 27", 2017 email chain. All waste material was excavated and replaced with non -removable flowable fill. A detailed breakdown of this pricing is attached on the following pages. Please call with any questions. Thanks Tyler Joseph Project Engineer RIETH-RILEY CONSTRUCTION CO., INC. cc: Eric Holmes Lucas Clark P.O. Box 276 • 1751 W. Minnesota St • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com Z OZ w LL w v / Z Q 0 U 01-1 w 3:'j 1 f 0'-- I 2 � X �W w, LL U W n O d. ti CD O O N Cl) W-4 U) O N c� w O O O O (P) O m m .- In t� 0 0 0 J O O O O V t-- CO 00 N V N Cl (V O x O O O O (D w O (D (f) O to 0 (D O 0 tf1 to to tH O ti M co co O 00 (A 00 Vfl Z oO� v Cl) C-) Cl) ch IT (h EA LD FA V3 Vi t�9 EH EA fA N Z W I- x X W (3) 0) (D N (n (n N N to Ln Ln N C. II .-- 'It O n (D O O N N O O O (D O O r a0 O to V' V M M V v -% c -)m O r - W " N N" t!) M M N NCO to (h c N IT N H 611 tH to ER to to to to to to tfi to V> Q X x x x x x x x x x x x x x In Q O O O O O O O O O O O O co O H CD (D 0 0(D 0 (n Lo (n (f) O to O O O O O O O O (o c) 0) O a) CD O O N O N v Z E r n C c c 0 C C U 0 3 Y In U W Q N H C > j v_i c0 i W S IL S � � S I- > OZ cc ai Ci Qi ai co of W O -3j N 7 f3 � W w �; 0 0 0 0 0 0 tY 0 0 0 0 0 0 Z O OQ W W W 22 tY K U IY N W W m m W W ~ W Q w c� v v° E°° g g 0 0 0 0 Q t - W Z Q W 3 z O o o c ~ J T ` r c U a �o x m U W Z a_Ti Occ 0 a: 2 4. w (+ (n U m in O t M N E; o RR p I't O ? -' W I W N N c� w H Z j F- W Z z Lij � O p a J a w LJ 0 Z J ZLli Q 0 W (n (i O O O O CD W N ti ti (D t� O O O J O O O O 6) 00 (D n P- 0) O O O O x O O O O (n •- N 1` t-- to N O O 0 tH (1131 to tf) O (D m O (D O (D to N t/ -A I oO� v o C-) o O Ffl 6F? to ER EA 69 N Z W I- x W 11 O 11 O 11 II (D 11 (D II W It (D II (D 11 (D 11 (o It (D II (Du 11 ) II .-- N N O 0) (D (D 0) (D to (D O O O O QO 00 M t` �2 Ci O V' W to to to t!) tR to to to to to en to v) to H X x x x x x x x x x x x x x In W o o 0 0 0 0 0 0 0 0 0 0 0 0 D o 0 0 0 0 In to Un v) o Ln (D 0 0 O O O O O to m 0) 0) 0) O O O N O Z r C c c 0 C C U 3 Y In U W Q N H C > j v_i c0 i W m IL m U m (n I- OZ C c (h 0 (h O ('7 O W W -3j N 7 W w �; tY LU tY Z O OQ W W W 22 tY K U IY N W W m m W W ~ Q w QW. v v° E°° g g 0 0 0 0 n t - H Z j F- W Z z Lij � O p a J a w LJ 0 Z J ZLli Q 0 W (n (i W W W W Z Z Z Z J J J J W Z x x x x c LL J t- o 0 0 0 O CD C) LO Cl I oO� v o C-) o H Z j F- W Z z Lij � O p a J a w LJ 0 Z J ZLli Q 0 W (n (i I Description Quantity Unit Unit Price 4 Ton Truck Extenstion 6.00 SDR 35 6"Pie 47.50 LFT $ 2.10 $ 99.75 SDR 26 45' 1.00 EA $ 21.16 $ 21.16 SDR 26 22' 1.00 EA $ 23.65 $ 23.65 SDR 35 Cap 1.001 EA I $ 7.50 $ 7.50 #8 Stone 45.47 TON $ 17.05 $ 775.26 on -Remove Flowable Fill (Shelby w/venter charge) 54.00 CY S 75.00 $ 4,050.00 MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18) +(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) +(21) sura $4,977.32 (18) $0.00 (19) $4.977.32 (20) $597.28 (21) $5,574.60 (22) CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 4 Ton Truck $13.50 6.00 $81.00 4 Ton Truck $13.50 3.50 $47.25 16 Excavator $146.51 9.50 $1,391.85 18 Loader 569.49 6.00 $416.94 5 Dozer $60.51 9.50 $574.85 x12' Road Plate($55.00/Day) $55,00 1.00 $55.00 x 8'x 4' Tap Box($345.68/Da) 5345.68 1.00 $345.68 Yd stone Box (5193.00/Day) $193.00 1.00 $193.00 ucking - Striaght Time $0.00 0.00 $0.001 ucking - Over Time 50.00 $0.00 'ucking - Double Time 50.00 TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 12 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) 'S 109.05(b)(6) $3,105.56 (23) $0.00 (24) $0.00 (25) $3,105.56 (26) $372.67 (27) $3,478.23 (28) DESCRIPTION AMOUNT Tri -Axle Trucking 16hrs $93.00/hr $1,488.00 Bad er Potholin $2,592.00 RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT 10/30/17 Work Performed: Raise Existing Sanitary ACT: 3200671 PROJECT: Springmill Rd. ACCOUNT/EXTRA WORK FOR: E -Existing sanitary manhole. At 111th st. in center of roundabout. Use 1 5' barrel section, and 3 cans of butyl. Backfilled everything 109.05 (b)(1) HOURS EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION rER x $18.20 = 0.00 $27.49 $0.00 rER FOREMAN $18.20 = $0.00 0.00 $28.99 $0.00 TION $0.00 FINISHER 0.00 $29.76 $0.00 $0.00 FOREMAN - Justin Finley 3.00 0.00 $25.62 $0.00 v - Justin Finley 0.00 3.00 3.00 $34.05 $153.23 t -James Bilsson 0.00 3.00 3.00 $23.22 $104.49 t - Aaron Fredrick 0.00 3.00 3.00 $23.22 $104.49 )R (103) Bill Wilkerson 0.00 1 3.00 3.00 $34.05 $153.23 )R (103) Steve Burton 0.00 3.00 3.00 $34.05 $153.23 )R 2.00 x 0.00 $34.05 $0.00 0.00 x $14.91 = 0.00 $23.62 $0.00 TENDENT/PROJECT MANAGER 2.00 2.00 1 $43.101 $86.20 :R 0.00 1 $27.911 $0.00 ?S TOTAL LABOR FICA 7.50 % x LINE (2) $754.86 (2) $56.61 (3) EMPLOYEE HOURS RATE EXTENSION CARPENTER 0.00 x $18.20 = $0.00 CARPENTER FOREMAN 0.00 x $18.20 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN - Justin Finley 3.00 x $17.66 = $52.98 LABORER -James Bilsson 3.00 x $13.96 = $41.88 LABORER - Aaron Fredrick 3.00 x $17.66 = $52.98 OPERATOR (103) Bill Wilkerson 3.00 x $17.66 = $52.98 OPERATOR (103) Steve Burton 3.00 x $17.66 = $52.98 OPERATOR 0.00 x $17.06 = $0.00 QA TECH 0.00 x $13.96 = $0.00 SUPERINTENDENT/PROJECTMAN 2.00 x $10.95 = $21.90 TEAMSTER 0.00 x $14.91 = $0.00 TOTAL FRINGES WORKERS COMPENSATION 4,70 % X LINE (2) BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) STATE UNEMPLOYMENT 3.85 % X LINE (2) FEDERALUNEMPLOYMENT 0,40 % X LINE (2) $275.70 (4) $35.48 (5) $0.00 (6) $29.06 (7) $3.02 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE #3) $0.00 (9) (b)(3) Description Quantity Unit Unit Price Extenstion Structural Backfill 179.81 TONS S 11.81 $ 2,123.56 Butyl 3.00 EA S 172.00 $ 516.00 64" Barrel Section 1.00 EA S 405.00 S 405.00 $0.00 S $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL. LINE (18) + (19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) 15 (b)(4) $3,044.56 (18) $0.00 (19) $3,044.56 (20) $365.35 (21) $3,409.90 (22) CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 3/4 Ton truck 512.08 3.00 $36.24 336 Excavator $146.51 3.00 $439.53 938 Loader 569.49 3.00 $208.47 314 Excavator $70.50 0.50 $35.25 $0.00 Trucking - Striaght Time $0.00 0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 TOTAL EQUIPMENT $719.49 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES (23) + (24) + (25) $719.49 (26) 12 % x LINE (26) $86.34 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $805.83 (28) RS 109.05 (4)(6) EMPLOYEE RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT DATE: Work Performed: CONTRACT: PROJECT: FORCE ACCOUNT/EXTRA WORK FOR: 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 LABOR 109.05 (b)(1) Hni iac EMPLOYEE Regular Overtime Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER FOREMAN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.72 $0.00 FOREMAN 8.00 8.00 $35.051 $280.40 LABORER 12.00 12.00 $24.72 $296.64 MECHANIC 0.00 0.00 $35.05 $0.00 OPERATOR (103) 12.00 12.00 $34.05 $408.60 OPERATOR (841) 0.00 0.00 $32.55 $0.00 OPERATOR OILER (103) 0.00 0.00 $29.91 $0.00 OA TECH 0.00 11x 0.00 $24.72 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 1 0.00 $44.05 $0.00 TEAMSTER 0.00 1 0.00 $28.41 $0.00 FRINGES TOTALLABOR FICA 7.50 % x LINE (2) $985.64 (2) $73.92 (3) EMPLOYEE HOURS $56.38 (5) RATE EXTENSION CARPENTER 0.00 x $21.25 = $0.00 CARPENTER FOREMAN 0.00 X $21.25 = $0.00 COMBINATION 0.00 x $14.91 = $0.00 FINISHER 0.00 x $13.96 = $0.00 FOREMAN 8.00 x $17.66 = $141.28 LABORER 12.00 x $13.96 = $167.52 MECHANIC 0.00 x $17.66 = $0.00 OPERATOR (103) 12.00 x $17.66 = $211.92 OPERATOR 841 0.00 x $20.51 = $0.00 OPERATOR OILER (103) 0.00 x $17.66 = $0.00 QA TECH 0.00 11x $13.96 = $0.00 SUPERINTENDENT/PROJECT MANI 0.00 1 x $17.66 = $0.00 TEAMSTER 1 0.00 1 x $14.91 = $0.00 TOTAL FRINGES $520.72 (4) WORKERS COMPENSATION 5.72 % x LINE (2) $56.38 (5) BODILY INJURY/ PROPERTY DAMAGE INSURANCE 5.80 % X LINE (2) $57.17 (6) STATE UNEMPLOYMENT 3,85 % x LINE (2) $37.95 (7) FEDERAL UNEMPLOYMENT 0.40 % x LINE (2) $3.94 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE p3) $0.00 (9) TOTAL LINES 2, 3, 4, 5. 6, 7, 8 8 9 $1,735.72 (10) 20%xLINE (10) $347.14 (11) GRAND TOTAL LABOR LINES (10) + (11) $2,082.86 (12) Page 1 of 2 MATERIAL 109. 05 (b)(3) PurchasedPurchmed w Manufactured Desapbon Quantity Una Una Pnce Extensuon P Fbwable FW 20.00 cy $ 75.00 $ 1.500.00 P Meter Rt Parts and Pieces 1.00 LS S 2.000.CO $ 2.000.00 $ $ S S S S S S MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL, LiNE(18)+(19) 12 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $3.500.00 (18) $0.00 (19) $3.500.00 (2o) $420.00 (21) $3.920.00 (22) Equipment r CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION 336 Excaysta 5146.51 8.00 $1,172.08 938 S68A9 4.00 $273.96 314ton Truck $12.08 8.00 $96.64 50.00 $0.00 50.00 $0.00 SO.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 Trucking - Stnagtu Time 51060 4.00 4.0 0 Trucking -Over Time $0.00 0,00 Trucking • Dcuble Time $0.00 SUM TOTAL EQUIPMENT $1,542.68 (23) TOTAL TRUCKING $424.00 (24) FUEL. LUBRICANTS AND TRANSPORTATION COSTS $0.00 (25) TOTAL LINES(23)+(24)+(25) $1.966.68 (26) 12 % x LINE (28) $236.00 (27) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) 2,202.68 (28) SUBCONTRACTORS 109.05 (b)(5) TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 % x LINE (30) $3.000.00 OR LESS $0.00 (31) 7 % x LINE (30) OVER 53,000.00 $0.00 (32) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31)+ (32) $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17). (22). (28) 8 (33) $8.205.54 (34) '% OF BOND RATE BASED UPON LINE (34) $0.00 (35) 10 % x LINE (35) $0.00 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $8.205.54 (37) Page 2 of 2 RE: Spring Mill Road - Additional Utility work Page 1 of 2 RE: Spring Mill Road - Additional Utility work Smiley, Bret Sent: Friday, October 27, 2017 9:12 AM To: Lucas Clark (Iciark@rleth-riley.com) Cc: Eric Holmes (eholmes@rieth-rlley.com]; Ogg, Chris (cogg@carmel.in.gov] Attachments: Pages from Roundabout Desi—l.pdf (303 KB) Lucas, Our contract for Spring Mill Road contains the items necessary to install all conduit and a controller box per the attached Carmel Standard at the planned 111th Street RAS. These Items were planned for'future use' therefore no 'service connection' (tap) item was requested or provided. Carmel Street Dept. has requested this irrigation/water be tapped as a part of our contract and the City has agreed to have this work performed at this time. Please provide pricing for all work necessary to provide the tap and service connection for this irrigation system at the planned 111th Street RAS. (We have a service connection item for the RAS at Dorset Blvd. included in our new Landscaping plan. Perhaps we could find a way to use this item.?.) Please contact me if you require any further information. Respectfully, Bret D. Smiley Construction Manager Construction Engineering Department UNITED CONSULTING 1625 N. Post Road Indianapolis, IN 46219-1995 Bus. (317) 895-2585 Fax (317) 895-2596 Cell (317) 724-5582 bret.smiley@uclndy.com From: Lucas Clark [Iclark@rieth-riley.com] Sent: Thursday, October 26, 2017 4:23 PM To: Smiley, Bret Cc: Eric Holmes; Ogg, Chris Subject: Spring Mill Road - Additional Utility work Bret, Eric tells me that there is some additional utility work that needs done at the 111th RAB. (irrigation tap and https://webmail.ucindy.conilowa/?ae=Item&t=IPM.Note&id=RgAAAAASnetZwSudRo9... 12/16/2017 RE: Spring Mill Road - Additional Utility work Page 2 of 2 sanitary lateral?) Please send us documentation on what is needed here so we can price this accordingly. At this point I do not believe any of this is in our contract. Thanks METH'RILEY CoNsmucrlou Co.. W. c ! Lucas Clark I 46221 ;317 6244-5561 ax: 21207 1'317-,775 j t 1111 1 11 1100111 pill Cell: 317-775-8426 (METH LEY 100% Employee Owned This e-mail and any attachments thereto, are intended only for use by the addressee(s) named herein and may contain legally privileged and/or confidential information. If you are not the intended recipient of this e-mail (or the person responsible for delivering this document to the intended recipient), you are hereby notified that any dissemination, distribution, printing or copying of this e-mail, and any attachment thereto, is strictly prohibited. If you have received this e-mail in error, please respond to the individual sending the message, and permanently delete the original and any copy of any e-mail and printout thereof. https://webmail. uc indy. com/owa/?ae=I tem&t=IPM.Note& id=RgAAAAASnetZwStidRo9... 12/16/2017 Pg. 1 of 5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROTER8 - qCTS 16 -ENG-" AND 16 -SW -07 Chan c Ckdsr uanH Ad stmrnts ITEM NO. DESCRIPTION UNIT ONaaui Quanti UNIT MICE 0r141na1 Total �� Constnsctbn Chu eel . Chin R2 New total Quant o New Total Doc.-.1". Amount 16 -ENG -52 QUANTITIES 1 CONSTRUCTION ENGINIFRING Paid Via Item 414] 1 t3 1 5160,703,01 SI60,203.01 003 I )I SIf.*103.01 2 MOWUZATION AND DEMOBILIZATION LS L $211,891.55 $211,891.55 I Gi 5211.991.55 3 CLEARING RIGHT OF WAY IS 1 $295,223.93 $M,22313 1.00 5295,223.93 4 PAVEMENT REMOVAL M 459 $14.60 56.701.40 45900 $6.701.40 5 CENTER CURB. CONCRETE, REMOVE SYS m $42.39 SLN1.26 34.00 51'141.26 4CUR8 CONCRETE REMOVE LFT 77 $7.82 $602.4 17.00 560214 1 CURB AND GUTTLA, REMOVE LFT 2,914 56.05 $17629.70 2.91400 $174629.70 8 PIPE ABANDON GROUT AND FILL EACH 5 5438.20 52.19100 5.00 $2,191.00 9 SIDEWALK CONCRETE, REMOVE SYS 223 $16.70 $3,724.10 717.00 $3,724.10 10 INLET, REMOVE EACH 4 $607.04 $2,428.16 4.00 $2,424.16 11 FENCE, CHAIN. LINK. REMOVE LFT 492 S4S0 5214.00 492.00 $2.24.00 IT, GUARDRAIL, REMOVE LFT 735 $6.50 $4,777.50 735.00 $4.777.50 ]lb BRIDGE RAILING, REMOVE LFT 248 SULSO $4'$"G0 248.00 SA.S88.00 12 MANHOLE. REMOVE EACH 1 $898.30 $898.30 1.00 $898.30 13 CURB TURNOUT REMOVE EACH 1 $81.36 584.36 LOD 184.36 14 CONCRETE WALL, REMOVE LFT 170 $49.07 58,341.90 170.00 $3.341 SU IS PIPE REMOVE LFT $32 $38.16 $31,749.12 932,013 531,71912 16 FENCE, FARM FIELD, REMOVE LFT L"2 $2.75 $4,570.50 1,662.00 54,570.50 17 EXCAVATION. COMMON CYS 24,762 $581 $143,867.22 21 76200 $43,467.22 18 BORROW CYS 15.953 $0.01 5159.53 15,953.00 1 5159.53 19SEDIMENT REMOVE CYS 63 $3162 $2,433.06 63.00 52,43306 10 11.10 AM CHECXDA REVETMENT RIPMP TON 8 SS7.15 $45720 100 $457.20 21 TEMPORARY INLET PROTECTION EACH 1'54 $65.00 530,010.00 15100 $10,010.00 22 TEMPORARY MULCH TON 29 5450.00 $13050.00 29.00 $13,050.00 11 TEMPORARY SILT FENCE LFT 12,404 $1.95 $24,187.40 1140.00 $24,187.80 24 40.2 STONE TON ADD $25.25 $10.103.00 400.00 $10,10000 25 TEMPORARYGEOTEXTLE SYS "0 $2.79 52,622.60 1 94000 $2.622.60 26 TEMPORARY SEED MIXTURE LBS L740 50.25 $43500 1.740.00 $135.00 27 SUBGRAOE TILEATMENT TYPI N SYS 960 522.67 52 763.10 35.00 92103 $20,9".75 28 SUBGRADI TREATMENT TYPE I8 M 53,215 $6.03 $320.886.15 8!9.00 H 14.00 5328,307.42 29 STRUCTURE BACKFILL TYPE 1 CYS 13,538 525.66 $347,355.08 3.00 13,541.00 $347,462,06 30 DRYING SOILS FOR EMBANKMENT TON 655 $12500 $41,875.00 655.00 581.87500 31 COMPACTED AGQREGATE NO. 3 BASE TON 3,062 577.50 $81,311.20 47 00 1.01$.00 583.214.OD 32 WIDFNING WITHHMATYPE C TON it $183.09 $7013.M 11.00 $2,013.99 31 MILLING. ASPHALT 11 21N. SYS 381 $12.00 $4.572.00 381.00 54.572.00 J4 MILLING. ASPHALT SYS 188 $12.00 $5.856.00 4911OU $5,856-00 36 IFMA SURFACE TYPE TONS 3,206 $54.59 $187839.54 4100 J,254.00 190,651.56 37 HMA INTERMEOLATE TYPE TONS 5,187 $51.56 5267,441.12 74- 5,266.00 271,514.96 38 HMA BASE, TYPE TONS 17518 $49,54 $]15,121.)2 J11 +•I 14,790.00 5733,6%.60 39 HMA INTERMEDIATE, OG TYPE TONS 6.1W $50.09 5328,941113 S: '.•' 6.62100 $331196.16 40 HMA FOR TEMPORARY PAVEMENT, C VNDISTRBUTED TON 500 $10300 $51,50000 50000 $515+),1.01 41 ASPXAIi FOR TACK COAT TON 29 ;001 511.29 44.07 k 42 PCCP, 71N. SYS 241 563.87 $15.342.61 141.00 515,392.61 43 GUARDRAI W000 IMAM LFT 725 $31400 5227.650.00 725." 522 ASO OU 434 Gl1ARDMIL BURIED [NO LFT 8 58,600.00 568,80000 8.00 581B00.013 44 HMA FOR SIDEWALK TON 2,243 $79.93 $119,28299 220500 5 176.24565 45 SIDEWALK CONCRETE SYS 391 $43.80 $17,125.80 J910U $11.125.80 46 CURB RAMP, CONCRETE SYS 440 $155.70 $6/50800 579." $90AS0,10 47 CURB INTEGRAL CONCRETE LFT 245 533.0 $8.094.80 NS.00 $8.094.80 48 CVRtl ANO GVTfEA. CONCRETE TYPE 11 LFT 15,824 $16.0 $30L936.96 18,82400 5301.936.96 49 CURB AND GUTTER, CONCRET TYPE 111 111 13,729 $15.01 SMA72.29 13.66600 $20511.26 tib 50 CENTER CURB, D CONCRETE SYS 125 5111.22 522652.50 12500 $22.652.50 51CURB TURNOUT EACH 2 $1.313.91 $2,367.92 200 $2,367.82 52 CURB ANDGLJ TFR. ROIL CURB LFT 308 $29,50 $9,04600 30100 59.086.00 53 HMA FOR APPROACHES TYPE TON 661 $89,44 $60,11M.64 wu 00 1 571LSSL0O 54 PCCP FOR APPROACHES, 614. SYS SN $$2.72 1 $30,261.24 $1200 U8,310.64 55 PCCP FOR APPROACHES 91N. SYS 412 W.S4 26 590.48 11201 $26,590.48 56 MAILBOX ASSEMBLY, SINGLE RESET tACH 13 $185.00 $2.405.00 1300 52,105.00 57 GEOTEXTILES SYS 68 $1.18 SM24 1100 !10 RDW $S4.40 58 pI REVETMENT TON 29 585.06 52.381.68 400 33.03 $1806.96 59 MOBILIZATION AND DEMOBILWTION FOR SEEDING EACH 7 $50.00 $350.00 7.00 $350.00 60 EROSION CONTROL BLANKET SYS 1.016 51.17 51.18172 1016.00 $L748.72 61 WATER LGAL 102 51.00 $102.00 1 =.Do $102." 62 SODDING NURSERY SYS 28.063 1 $3.25 $91. 75 1 2106300$9L20 . 15 63 IRRIGATION CONTROLLER BOX EACH 1 $5,500." SB,SO0.00 1'00 $B.Sm tw Pg. 2 of 5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07 Chan eOrder 48- Quantity Adjustments REM NO. DESCRIPTION UNIT On�nalCenrtruRbn QuantHy 111147 MICE OH/YW &2041 CmatruRbn G eel QLYa. Chan •82 Hew Tdal OuantRv New lMad Dnllar Anwrnt W HELD OFFICE B MOS 15 $2,286.99 $340304.85 1520 534,31.14.85 65 TIMBER CURB LFT 124 SL96.00 $24,304.00 124.00 $24.304.00 66 PIPE,TYPE2. CIRCULAR 36 N. LFT 1,415 595.84 S135,613.60 16.00 1.431.00 $137,t4704 67 PIPE TYPE 4, CIRCULAR,61N. LFT 13429 $6.35 $80.166.15 18,429.00 $80,36615 68 PIPE, TYPE 4. CIRCULAR, 81N. LFT 54 SLDO $132.00 5100 $432.00 69 PIPE TYPE 2 CIRCULAR 221N. Ur 4,232 $3915 5166,952.40 16400 4.2000 $166005.60 70 PIPE TYPE 2, CIRCULAR 151N, LFT 416 $50.95 $21,195.20 12.00 42300 $21.80660 71 PIPE TYPE 2 CIRCULAR 10 IN. WE L099 546.37 $50,960.63 ,OO LO97.D0 $50.867.89 72 IRCD 21 N. PIP[ TYPE 2 CIRCULAR, LFT 2" $55.18 $16,491.82 29900 $16,49682 73 PIPE TYPE 2. CIRCULAR 241N. LFt 670 $60,93 $10823.10 I ml 66900 $40762.17 74 PIPF,TYPF 2.CIRCULAR 2711. W 25 S12i.09 $3,077.25 15.00 40.00 $4.923960 75 PIPE,TYPE 2, CIRCULAR 30 N. LFT 195 $75.60 $14,742.00 195.00 $14,74100 76 PIPE, TYPE 2, CIRCULAR 42 N. LFT 355 $130.20 $46,221.00 355.00 $46,221.00 77 PIPE. TYPE 2. CIRCULAR, 4811. LFT 1,590 $151.85 $141.44130 L590.00 $241.441.50 77a PIPE TYPE 2, DEFORMED, MIN. AREA 3.35FT LFT 48 $10.30 $3,854.40 (27001 21.00 $1,6m.30 77b PI PE, TYPE 2, DE FORME D. MIN. AREA S. I SFT LFT $46 5107.60 $51,749.60 546.00 $54,749.60 78 STORMWATER TREATMENT SYSTEM, 2A4 CFS EACH 1 $21,280.78 S24230.78 1.00 $21,29073 79 STORMWATER TREATMENT MTEM 2.9CFS EACH 1 $21,280,78 SI 280.78 1.00 $2328078 20 STORMWATER TREATMENT SYSTEM, 2,23 CFS EACH 1 $21.280.78 $11,21078 1.00 S2L28078 11 STORMWATEA TREAT ME NT SYSTEM, L 12 CFS EACH 1 $210280.78 5210281178 1.00 52),280,78 92 STORM WATE R TREATME NT SYSTEM. 2.76 CFS EACH 1 $2L220.74 $2L28078 LAD $2LI8074 83 STORMWATER TREATMENT SYSTEM 1.65 CFS EACH 1 $2 24078 $2L240.74 LOO $2L28M78 84 VID10 IN5PfCTION FOR PIPE LFT 10,325 51.29 $131319.25 10,314.00 $13.306.06 85 P IPE END SECTK)N, DIAMETER 121N. EACH 3 $871w $2620.20 S.00 $4,WOO 86 PIPE ENDSECTION, DIAMETER IS IN. EACH 2 $917.11 $3/3122 200 51,2022 87 PIPE END SECTR)N DIAMETER 13 IN. EACH 4 $971.44 $3.41&92 4.00 $3,88&92 88 OUTLET PROTECTOR 3 EACH 2 $LO5(UR) $2,100.OD 2AD S2,100.00 89 VIDEO INSPECTION FOR UNDFRDRAINS LFT 3,000 $0." $2,970.00 3,00000 $297000 90 AGGREGATE FORUNDERDRAINS CYS L659 $45.SO $7S,4".50 1,659,00 75,486.50 91 GEOTEKTRFS FOR UNDFRDRAN SYS 16.547 $LIS 519,075.05 16X7.00 $19.075-05 92 MANHOLE J10 EACH 6 $6,602.60 7615,60 3+*• 7.00 ,21310 93 CASTING ADJUST TO GRADE EACH 13 $623.16 SL 101.88 13.00 $LI08,88 94 I ET, ll0 EACH 46 R,441n $112,412,1016 100 47.00 1 4 .72 YS INLET, MIO EACH 5 $2444.41 513244.05 SAO 511-24105 96 CATCH BASIN, KID EACH 41 $260115 $106.659.45 40,00 $10115600 97 MANHOLE C4 EACH 30 $2,447,34 $11S.420,20 1 26.00 $74,030,84 98 CATCH BASIN, F7 EACH 1 $1,974.33 $1,974.33 1.00 SL974.33 99 MANHOLE K4 EACH 17 $B,SN.72 $14S.34S,74 2100 $196,611154 100 MANHOLE 14 EACH 20 $5,14048 $102,10960 14.00 71.966-72 101 CATCH BASIN. MIO EACH 41 $2,617.76 SIO7,320.IG 41.00 5107,320.16 102 DETENTION OUTTAIL STRUCTURE D EACH 5 66&12 W300,60 400 $34.664.44 103 DETENTION OUTFALL STRUCTURE. E EACH 1 $9,077.18 $9177.18 l OD $9,077.18 104 CONSTRUCTION SIGN, CEACH 3 $297.00 $811100 3.00 $8111-00 105 ROAD CLOSURE SI GN ASSEMBLY EACH 6 $507.00 $3042.00 6.00 $3,042.00 1054 TEMPORARY PAVEMENT MARKING 41N LFT 6,000 $0.67 $4,020.00 6,00000 $4,020.00 1051, TEMPORARY PAVEMENT MARKING, REMOVABLE, 41N LFT 2,600 $105 $2,730.00 2,60000 S2,730.00 106 DETOUR ROUTE MARKER ASSEMBLY EACH 22 SIS2.00 $3.3".00 2200 $3.344,00 107 CONSTRUCTION SIGN A EACH 14 $249.00 $3,486.00 14,00 $3.436.00 104 CONST RUCTION SIGN B EACH 13 5104.00 $3352.00 13.00 $1.352.00 109 MAINTAINING TRAFFIC LS 1 $153,029.18 $153.029914 1.00 S1S3,029.13 110 BARRICADE IR -8 LFT 264 $30.00 $7920.00 264.00 $7,920.00 III STREET SIGN POST EACH 6 $1,450.00 $11,100.00 6.00 $II'Iw.00 112 SIGN SHEET AND SUPPORTS, REMOVE EACH 33 $25.00 $82500 33.00 542570 113 SIGN POST, SQUARE TYPE 1 UNRFINFORCED ANCHOR BASE LET 425 $14.00 $5,950.00 425.00 $5.950.00 114 SIGN, SNEFT WITH LEGEND 0.0201N, SFT 164 $37.00 $7,128.44 227,00 5317410 IIS SIGN, SHEET. WITH LEGEND 0.1001N. SFT 117 $19.00 $7,273.44 14900 $1591.00 116 CONDUIT. PVC, 2 N, SCHEDULE 40 LIT 493 S8.00 53,944.00 493.00 $3,94410 117 CONOWT, HOP[ 21N. SCHEDULE 80 LFT 162 $12.00 SL944.00 16200 $1,94400 118 ORNAMENTAL LIGHT POLE, MUNDATION, LUMINARIES EACH 6 $390000 $53,400.00 600 $53.400.00 119 JHANDHOIF, FOR INTERDUCT EACH 31 $975.20 $30225,00 31.20 $30225.00 IID PVCSCHEDULE464. LR 9,501 $5.00 $47,510.00 91021.90 $47,51000 121 PVCSCHEDVLE 40.4' INTERDUCT LFT 9,502 $9.00 $85.5!4.00 9.102.00 SAS51100 122 PVC SCHEDULE 804' LFT 205 7-00 S1,435.00 :05.00 $1435.00 123 PVC SCHEDULE 80/' INTERWCT UT 205 $N,00 W100,00 1 105.00 SA, IOl100 124 HANDHOLE LIGHTING EACH 4 $650.00 $260000 4.07 $2,600.00 125 SERVICE POINT 11 MODIFIED EACH 1 $5,50000 $3500.00 '- W SS,StIe m Pg.3of5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROJECTS 16.ETIG-52 AND 16 -SW -07 Clmnge Order NB - Quanti Adjustments ITEM NO. DESCRIPTION UNIT O.g.-I DuamaV UNIT PRICE OdBKlal Total C...%-- Con". kh, Change At (lt7s. ch - a a2 01- New 1-1 0.4mity New Total Dollar AmotiM 126 WIRE NO.6 COPPER WPLASTIC DUCT,41/C tfT 162 $8.00 5102%.W 162.00 $1,2%.00 127 WIRE, NO.6 COPPER, W PEASTIC DUCT, IN TRENCH, 4 1/C LET 493 58.00 S3,94400 49300 S3,944 00 128 COHNEROP KITVNFUSED EACH 6 $37.00 $22200 6.00 CONNECTOR KIT, FUSED EACH 6 535.00 5210 00 600 130 MULTIPLE COMPRESSION FITTING, WATERPROOFED EACH 17 $2100 535700 17.00 131 INSULATION LINK WATERPROOFED IACH 28 $1500 $42000 2800 q122129 132 WIRE TW HW 440. 113 COPPED"RAN0Ui 171 SLW 5471.00 471.00 133 TRANSVERSE NUIRKING,TH[0.MOPIASTICLET CROSSWALK LINE W24 IN.1.00 928 S5.6S SS,243.20 92800 LINE. TNERMOPIA5TIC, BROKEN, WHITLIIN. LFT 592 $195 $1,154.40 59200 135 1111E TIIERMUPlASTK, SOLD, 1H1E4IN LET 2.050 $0.73 1 .50 i4viO 1E99W 175.21 136 LINE, THERMOPUSTIC. DOTTED. WHITE 8144, JET 116 $3.15 $365.40 116.00 $365.40 137 TRANSVERSE MARKING, THERMOPLASTIC, YIELD LINE, WHITE, 361N. LET 47 $1220 $573.40 47.00 5573.40 138 LINE THEAM0PLA$T 50110 YELLOW. 4IN. LET 3,449 $0.73 $2.511.77 .'sm 3,724.00 52.718.52 135 TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 241N. LFT 117 $5.65 $661.05 100 118.00 $888170 140 PAVEMENT MESSAGE MARKING. THERMOPLASTIC LANE INDICATION ARROW EACH 26 $109.00 $2,R}I.W N(O 14.00 SI,7D100 141 SNOWPLOWABLE RAISED PAVEMENT MARKER EACH 155 525.00 $3,875.00 15500 $3,875-00 142 LINE! THERMOPLASTIC SOUO 1E110W, 1IN. LET 2,269 S190 $4,311.19 5500 2.32100 54,115,60 113 LINE TMfRMOP1ASTIC, SOLID TELLOW. 12 TN. LFT 460 S2 55 $131100 1700 Ii7.00 $1.359..5 143. 20' DUCTILE IRON WATER MAIN LET LS)0 SIOI.72 $166,771.40 LS20.00 $166,77440 143b 8 DUCTILE IRON WATER MAW LET 80 590.20 $70216.00 8000 $7,216.00 143c CGATE VALVE EACH 1 $1,477.23 $1.477.28 100 $1.477.28 143d 20' K 8' STAINLESS TAPPING SADDLE AND VALVE EACH 1 S8,354.M 58,354.44 LW A354.44 143e r WATER MAIN LOWERING EACH 1 $5,59900 $5,599.00 IAD SS,599.00 1437 1P WATER MAIN LOWERING EACH 1 $6,260118 $6,260.46 1.00 $6260.43 143 16' WATER MAIN IOWtRING EACH 1 510.776.14 S1Q776.14 I W $10,776.14 143h20' WATER MAIN LOWERING EACH 6 513,814.76 88156 600 $82.886.56 1431 8' WATER MAIN CONNECTION EACH 2 $3.475.74 $6951.48 2.00 S6.9SL48 1431 20' WATER MAIN CONNECTION EACH 4 $4.486.76 $17,947.04 4.00 $17947.04 143E LONG SIDE SERVICE EACH 1 53,882.93 $1.882.93 1 00 $3,..2.93 1431 METER PH RELOCATION EACH 1 S1.327.05 51.327.05 1900 SL337.05 143m BACKFLOW RELOCATION EACH 1 $525.38 $525.36 LW $WS.38 143. RELOCATE SAMPLING STATION EACH 1 SL519942 $1.518,42 vu SLSLI-42 143o ADJUST VAVLE TO GRADE REMOVE 6 REPLACE HYDRANT 1 ADJUST TO GRADE EACH 17 $4.47695$76,101.351.35 17.00 $76,101.35 143p NEW HYDRANT ASSEMBLY EACH 5 56,01635 $30.082.75 5.00 $30,08275 1439 REMOVE AND RETIRE HYDRANT EACH 3 $626.30 $2.87190 3.00 $1,878.90 143r JADJUSTVALVITO GRADE EACH 18 $32144 SS.785.92 7100 $1.785.92 143s VALVE RETIREMENT EACH 3 SSES.16 51,7%5.16 3.00 $1.755.48 113,IINt STOPS IO' UNDISTRIOUT[U EACH 4 $17,268.55 $69,07420 4.00 $69,074.20 143u UEIENIIONOUTfALI STNUCIIINE, IVe, C.anR, Order a 1 FnCH U 58.337 h1 5000 lin; 1.00 56,332.94 113Y 5fricnPIACEMENT-„Chan eOrdet Mt !.'. 11U i`r $O Ou I'- 143w OCCORATNE50ULR FLASHER-Ve,Change Otder P3 iACH L' '-..;,441x.61, SOLO 600 6,[! 546.839.96 71 i� I IGHT POLE RELOCATKIN Ver Ch-nr Order PS LS 0 CA 1111 :5 5000 ODD l ;Y` 54.140.25 1311 CONSTRUCTION F14GINEERIN4-;-change Lh-Ri 11 0 `'.1 HR: !Y; So (KI UW I- $4.03700 1411 MO8ItI7.ATIONADf-VQL'ATN1N-Vr, Changs Ord,, 06 IS 0 537.456.1) SD00 0(D I- $37,4%6.19 143aa MAINTI NAW F tx ]1!Af; K hx+g, O,dr, e6 11 0 $211,676,66 saw 0.00 1.00 520,676.66 141bh CONCRETE WASH -OFF FACILTY- Pe, Clunae Order 46 fAM 0 $432. M1 5O IDn DW 100 5432 no 143c, DORSET RIVD. SKIN WAtt Ix, Chance Old., 46 EACH 0 $58,582:-+ $000 11.00 2.00 $117;('.1 IILO DORS E i BLVU NAA MASONRY WAI I Per Change Ord,, a6 EACH 0 $58.630.88 5000 OW too $58.63:"�++ OJ 111TH STREET SION[WORK - pr Change Chde, w EACH Ll $31.91226 So Do 000 i:it $31,91126 1 tHI C!..WTINC, SOLI. RACKFR1 Ve+ Chang, Order 40 I CYS 0 $11.50 SOA? 0100 1.1.58.00 $82,791 OD Pg. 4 of 5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROIECT516-ENG-52AND 16 -SW -07 e Order k8-quanti Ad' stmmts ITEM NO. DESCRIPTION UNIT Onginal QoantitY UNIT PRICE Oric-al Total C-,-i--C-1-i- Chanee el OlYs. Chanje 2120", N -Total QV4nhty m-ToW 0.41.1 A,nourd 143Rg IRRKATIONS!I,NWCTIONS,-per Changr Order 96 IACN 0 $3,sou .00 $0.00 000 1 143hh IRRIGATION Rt i,r,. II-, tho, R6 111, 0 56040 $GAO it1�IXs ".L LL.d��K: 14366 IRRIGATION CON (R)I '..I..1. rl LOW ENE VENTERS per Chen eOrder PL TACIT 0 $2.8.'7 t\' $000 Otw- 1.90 4. $2,82(%t 1430 CONTROL VALVES, DRIP IIIBING, EMITTERS -per Chane .A K6 Iti 0 $15,306.50 $0.00 ... ,Y 1.00 $15.30650 143Eh ELECTRIC SERVICE ANDCONNECTIONS - per Change OrdW 86 1x1:11 II 58.814.87 00.00 •>.s 1TK.I $8,814.87 14311 TLECTRI CONDUIT DURING AND JACKING � Per Change Order K6 I[T U $65.29 SO DO 0.00 300.0) $6,52900 143mm SIGNWAILLIGHTING Per Change Order R6 TACH 0 $1,641.98 $0.00 OCC 20D $3,283.76 143nn DOR5ETBIVU.1VAll IKH1ING perfMnl!r l)rtlr,%I• EMIT 0 51 b41.88 $0,00 0 D LOT $1.641.88 143on STR([TT'REES prr Change Order 86 (ACM 0 5419.00 $000 I, TO 7RNi $33,462.00 14Ipp ORNAM[NTALTREES per Change Order 06 EACH (1 $330.00 SAW II+V, 1041.) $34.320 CCI 1439n [VEIIGRECN TREES- per Change Order Rh EACH 1 $253.00 $000 I•.! `the: $13. a", 141rr SIIRURS pn CRange Urd<r a6 FACM •' ,.14 Yt <n 1ti i, .. Ia i.) .11: 'w. 143:s ORNAMENTAL GRASS(S- per Change Order 46 IACII U ':11(11 «'1%) n13' 269.11(1 $8,877.00 1.1111 PI III FVALS- Ile, Change Order 06 IAC" 0 $13.20 . 1 x 5.653.01 $74,619.60 lA Tuu SEDGE. PLANTS- prr Change Coder P6 IACN I. $13.20 "o Ix. Ow 1,954,00 5.5, 192. BE, 143YY ttARDWOOD MULCH Ix•r Change 0111-6 crS 0 $8250 io;+, 000 222.00 $18,31500 14I_ IANOSCAPI. IMPROVINIINTSIWItINM%CPIIw IH9 Clang, Order X I (� $13,183.50 :I`i>'� UIXI lD) 513.1834! 143x% Section 5 S nmta,y & Warer Addhons - per Change Order 88 • S U $31.465.92 IG SW 07 QUANTITIES 144 EXCAVATION COMMON CYS 983 $35.00 $30.9175.00 883.00 $30,905.00 145 0ORROW CYS 2,782 $001 $27A2 2,712.00 $27.82 146 SEDIMENT, REMOVE CYS 10 $33.74 $331.40 10.00 5337.40 147 TEMPORARY INLET PROTECTION EACH 14 $65.00 $91000 14.00 $910,00 148 TEMPORARY SILT FENCE LET 2.105 $1.79 $3,767.95 y105.00 $3,767.95 149 TEMPORARY MIXTURE LOS 48 $0.25 $12,00 40.00 S1100 150 -SEED SUBGRADE TREATMENT TYPE II M 59 $24.80 $1463.20 59.00 $1.463,20 ESE SUBGRADE TREATMENT TYPE III M 1.597 $1.63 $2,922.51 1,597.00 52.922.51 152 SUBGRADE TREATMENTTYPE 16 M 4,596 $6.73 $30.931.08 4,596.00 $30,931.01 153 STRUCTURE BACKFILL ME I CYS 177 $25.66 $4,54482 177.00 $4,54182 154 STRUCTURE 8ACXFILt, TYPE CYS 266 $92.94 $24722.04 266.00 $21722.04 155 STRUCTURE RACKFILL T"t 5 CYS 36 $73.45 $2,644.20 36.00 52.644,20 156 COMPACTEO AGGREGATE NO. S3 RASE TON 295 $32.87 59.696.65 295.00 59,696.65 157 HMA SURFACE, TYPE C TON 292 $71.46 $20,866.32 292.00 $20,166.32 158 MMA INTERMEDIATE TYPE TON 487 $56.71 $27.617.77 487.00 $27677-77 15U MMA INTERMEDIATE CIG TYPE C TON 641 $54.13 534,697,33 641DO $34,697.33 159 HMA BASE TYPE C TON 1,207 $51.90 562,643.30 1,107,00 $62,643.30 160 ASPHALT EOR TACK COAL TON 4 50.01 SQ04 4.00 $0.04 161 HMA FOR SIDEWALKS TON 221 $87.33 519,299.93 221.00 519.299.93 161 SIDEWALK, CONCRETE. V M 39 $51-81 $2102OS9 39.00 $2,020.59 163 CURB RAMP CONCRETE SYS 25 $175.41 $4,M.25 25,00 54,385,75 164 DETECTABLE WARNINGSU RFACE5 SYS 5 $326.25 $1.63125 5.00 51.63125 165HANDRAIL ORDER 49 IN. ITEM DELETED per CHANGEb 84 LET 5X 51 00 $696000 000 $000 166 CURRANDGUTTER CONCRETE Type II LET ).830 $19.05 534,86450 1830.00 $34,861.50 167 CURB AND GUTTER, TURNOUT CONCRETE LET 6 $469.97 $2,819,U 6.00 $ 119.82 168 CONCRETE ROLL CURB &GUTTER LFT 162 $40.66 $12,740.92 262,00 SI 740.92 169 PCCPFORAPPROACHES,61N. SYS 59 $60.95 $3590.05 59.(00 596.05 170 MAILBOX ASSEMBLY TRIPLE EACH I $225.00 5225.00 1.00 $225,00 171 IGEOTEXTILES SYS 1,140 $099 $4120.60 1,14000 SE.12IT60 Pg 5of5 SPRING MILL ROAD RECONSTRUCTION CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07 Ch-" Ch der A8 - Q-Mlty AAIuSTments ITEM NO. DESCRIPTION UNIT Olin" qsN UNH MICE 0'*" 7R 1 G... bR C- 4- CM a 81 ch-revmys, New T.A Quama v - T -d Do114a Amount 172 BIPMP ClAii l TON 1.070 546.35 $49.54.50 070.00 5+9,59150 173 PIPMP, REVETMENT TON 260 $23.16 56,021.60 70000 56,011.60 174 RIPMP, UNIFORM (HAND IAIOj TON 4 $95.96 $383.4 1100 $383.4 175 MOBILIZATION AND DEMOBILIZATION FOR SEEDING EACH 2 55000 $100.00 2.DD $100341 176 EROSION CONTROL BLANKET SYS 1.375 $117 SL608.75 1.375.00 S3.601I 177 WATER M -G. 25 $1.00 2500 25.00 $2500 178 TOPSOIL CYS 1.169 $45.64 $53,353.16 1,169.00 $53,351.16 17950DOING NURSERY SK 3,540 $3.25 $11150500 3,50.00 $IL505.00 180 CONCRETE, I., A CVS 17 $252.59 $6,291.03 17.00 $4,294.03 181 241N. SDR 11 HDPE WATER MAIN LFT 176 $305.36 $53,74336 17600 $53,743.36 182 201N. RESTRAINED JOINT DUCTILE IRON LET 25 $724.08 $11.102.00 25 OD $18.10200 183 20' LINE STOP EACH 2 $17,26&55 $34.537.30 2.00 $3037.10 14 MIN. CONNECTION EACH 2 $6,202.22 $12.404-44 2.00 $ 404.4 185 Ft EMOV REPLACE AND RELOCATE FIRE HYDRANT EACH 1 $5,261.37 SS 137 14.00 $5,261.37 186 ADJIKi VALVE BO%TOGRADE EACH 3 $468.43 $1.405.29 3.80 $40529 187 PIPE TYPE 4. CIRCULAR 61N. LET 2.774 $4,75 $14807.50 2,274.00 $10,801.50 188 PIP( UNDEROZ14 OUTLET6IN. LFT 191 $14.50 $ 769.50 191.00 $2,769.50 189 PIPE, TYPE 2, C10.CU LAR 121N. LFT 42 $4L68 $2740456 42-0) 527,400.56 190 PIPE. TYPE 2 CMCUt 11, 151N. LET 15 $23530 $3.529.50 L5.80 $3,529.50 191 VIOFO INSPECTION EOR PI PE LET 655 5239 5136SAS 65S.OD $L565-45 192 PIPE END SECTION, DIAMETER 12 IN, EACH 1 $873.51 $87338 1.00 $873.58 193 VIDEO INSPECTION FOR UNDERDRAINS LFT 3,000 $0.99 $2.970.00 3,000.00 $2.970.00 194 AGGREGATE FOR UNDERDRAINS CYS 94 550DO 54.700.00 94.00 54,700.00 195 GEOTEKTRES FOR UNDERDRAIN M 1,076 $2.0 $2,562.0 1016.80 S2,S82.0 196 YARD LIGHTS &0641ST TO GRADE EACH 7 5250,00 $1.75400 7.00 $1,750.00 197 CASTING ADIUST TO GRADE EACH 6 5866.67 $5,201.22 6.OD 55,201.22 196 INLET, NLET E7 EACH 1 $1,881.90 $1,Bst.90 1.00 $1.41.90 199 INLEI 410 EACH 9 $2,448.81 $22039.29 9.00 522.039.29 200 PIPE CATCH BASNI 1814. EACH I 51.311X. $1.314.06 1.00 $1.314.06 201 MANHOLE C4 EACH 3 $2.951.74 $&85522 3.00 58.85512 202 INLET M EACH 3 $2,1311 56.559.20 3.00 $6,559.20 203 RO/ITORCED CONCRETE ARCH IMII AREA IDSA SFT.) LET 64 $3=216.76 $205,872.4 "OD $203,872.64 220 DETOUR ROUTE MARKER ASSEMBLY EACH 19 $146.00 $2774.00 19.00 $2,774.00 205 CONSTRUCTION SIGN, A EACH 11 $220&0 $4,146-00 1700 54,14400 206 CONSTRUCTION SIGN. B EACH 2 $WS.00 $210.00 2.00 $210.00 207BARRKMF IN -B DT 50 $30.00 $1.50400 5000 $1.50400 208 SIGNPOST,TOUME TYPE I REINFORCED ANCHOR BASE $1 $1.00 SL136.00 8100 SL134-00 709 SIGN GROUNO MOUNTED RESET EACH 8 SM.OD 5160.07 &00 5160.01) 210 LINE, THERMOPLASM SOLID WHFFE, 41N. LET 209 $473 $152.57 209.00 SM2.57 211 LIN E. THERMOPLASTIC, SOLID YELLOW. 414. LET 2.073 $0.73 SL513.29 2.07300 $1513.29 212 TRANSVERSE MARKING, THERMOPLASTIC,STOPLINL WHITE, 2414. LET 15 SSAS $4.75 15.00 $4.75 213 TRANSVERSE MARKING, THERMOPLASTIC- CROSSWALK LINE, WHITE. 61N. LET 103 $1.0 $144.20 103.00 $14410 214 PAVEMENT MESSAGE MARKING, THERMOPLASTIC LANE INDICATION ARROW EACH I 5109.00 $10900 1.00 $10940 715 PAVEMENT MESSAGE MARKING, THERMOPLASTIC ONLY EACH 1 $147.00 5147.00 1.00 514700 21h Rt VISTOPIP(51RIANHANDRAIL-Per Ch-geUder xA LFT 0 $312.95 sow SA /Kl SIA. ISS.1iI 11) CANCII IA110 CHARGE (01191-1 H -d -I Dellgu) Per change Ordcr x4 IS 0 5AG5 an $000 I t» K.1f r. tYT AAjusteA OuanLaies Las of Lha CAangeOder) • Naw It- ORIGINAI IOIAI. $8592,091.16 NEWTOTAI 19.4139/31/ City of Carmel Project 16 -ENG -52 Spring Mill Road Reconstruction CHANGE ORDER #8 Section 5 Sanitary & Water Additions Contract Price prior to this Change Order $9,421,507.35 Contract Price will be increased by this Change Order $32,465.92 New Contract Price including this Change Order $9,453,973.27 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $8,592,091.16 $8,592,091.16 N/A C01 (-333.18) $8,591,757.98 -0.004% CO2 $36,031.35 $8,627,789.33 0.42% CO3 $123,808.23 $8,751,597.56 1.86% C04 $11,656.00 $8,763,253.66 1.99% C05 $4,140.25 $8,767,393.91 2.04% C06 $640,929,94 $9,408,323.85 9.50% C07 $13,183.50 $9,421,507.35 9.65% C08 $32,465.92 $9,453,973.27 10.03%