HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO #7/13,183.50/Spring Mill Road Reconstruction – Project #16-ENG-52Page l of 2
TO: Lucas Clark
Rieth-Riley Construction Co., Inc.
P.o, Box 276
1751 W. Minnesota Street
Indianapolis, IN 46221
CITY OF CARMEL
CONTRACT CHANGE ORDER NO.: 7
DATE: 12/1/2017
PROJECT NAME: Spring Mil l Road Reconstruction /
Proiect #16 -ENG -52
CITY REQ. NO.:
CITY PO NO.: 34297
CITY PO DATE: 9/8/2016
I. You are directed to make the following changes in this Contract:
*Tree and seed replacement, per the below referenced Change Proposal, around the
Williams Creek area south of 106`s Street and east of Spring Mill Road.
o The Williams Creek area was cleared of all vegetation to allow for the
planned grade work associated with this contract. The replacement items
added via this Change Order will allow for the area to return to the
previously existing condition.
*This Change order will create one new item, ITEM #143ww — Landscape
Improvements/Williams Creek, which will be paid as a LUMP SUM in the amount of
$13,183.50.
II. The following referenced Documents further describe the changes outlined in Paragraph 1,
and are to be considered a part of this Change Order:
*Change Proposal as provided by Rieth-Riley Construction Co., Inc. on 11/10/2017.
*Change Order 7 QTY Adjustments Breakdown
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order
$ 9,408,323.85
Contract Price will be increased/desfeased by this Change Order $ 13,183.50
New Contract Price including this Change Order $ 9,421,507.35
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
AR -1
e
Page 2 of 2
The Above Changes Are
Recommended:
United Consulting
ENGINEER
1625 N. Post Road
Address
Indianapolis, IN 46219
City/State/Zip
By:
r3zot D. �St,u'
Phone: 317 724-rs82&1'
Date: 12H/2n17
The Above Changes Are
Accepted:
Rieth-Riley
CONTRACTOR
1751 W. Minnesota Street
Address
Indianapolis, IN 46206 _
�
/State/Z_—
By.
- 1
Date: %
Approved:
Mary
Lori 1Wat W Member
S.
Treasurer
--2 Z=--
JeKyvEyrngineer Kashman, P.E.
Ci
Date: 12Im i11
IETH5111LEY
CONSTRUCTION
CO,
INC,
100% Quality • 100% Employee Owned • Over 100 Years
November 10, 2017
Bret Smiley SENT VIA ELECTRONIC MAIL ONLY:
United Consulting
Construction Manager Bret.Smiley@ucindy.com
1625 N. Post Road
Indianapolis, IN 46219
RE: Spring Mill Road Improvements - RFP # 003 Landscape Improvements — Spring Mill Road
City of Carmel Project No. 16 -ENG -27 & 16 -SW -07
Rieth-Riley Project No. 3200671
Dear Mr. Smiley,
Per your request, Rieth-Riley Construction proposes the following pay item pricing be added the project.
The total contract adjustment amount for this proposal based on anticipated quantities is is $13,183.50.
An itemized proposal is below.
Item Description
1 Small Tree 2.5"
2 Large Tree 2.5"
3 Native See with Mulch
Total
Please call with any questions.
Thanks
.4.,.-,-& S. bila ek,
Lucas S. Clark
Project Manager
RIETH-RILEY CONSTRUCTION CO., INC.
cc: Eric Holmes
John Tuddy
Unit Price Unit Qty Total
$511.50 EA 10 $5,115.00
$533.50 LS 9 $4,801.50
$2.70 EA 1210 $3,267.00
$13,183.50
P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com
oudebush Grading, Inc
P17155 Harger Court_ Noblesville, r 46060 Phone: 317-770-9970 • Fax: 317-770-6636
Proposal Submitted To: Job Name Spring Mill Rd. Reconst. C.O. 1
Rieth-Riley Location Carmel
Phone Date 11/9/17
Fax Plan Date No Plans Provided
Attention Lucas Clark Estimated By: GreggLecher 317-710-8777
Line Item
Description
Quantity
Unit
Unit Price
Total
1
Small Tree, 2.5"
10
EA
$ 465.00
$ 4,650.00
2
Large Tree, 2.5"
9
EA
$ 485.00
$ 4,365.00
3
Native Seed with Mulch
1210
SYS
$ 2.45
$ 2,964.50
TOTAL $11,979.50
ectal uonaitlons
1 Seed and sod prices exclude finish grading, sod notching, debris removal, and soil preparation.
2 Proposal includes 1 mobilization.
3 Topsoil and topsoil placement has been excluded from this proposal.
4 Erosion control reporting, maintenance, and removal has been excluded from proposal.
5 Proposal based on work being performed within a standard Monday through Friday work week.
6 Lawn maintenance including watering, mowing, spraying, and post fertilization has been excluded from this proposal.
7 Soil testing, organic, and inorganic soil amendments have been excluded from this proposal.
8 Traffic Control has been excluded from this proposal.
9 Quantities were provided. Invoicing shall be based on actual installed quantities at the unit price shown.
10 Proposal excludes all bonding and railroad protective liability insurance.
11 Proposal is bid as a complete package. Pricing is subject to change if line items are deleted from this proposal.
12 This proposal excludes sales tax.
Acceptance Of Proposal
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are
authorized to do the work as specified. This proposal may be withdrawn if not accepted within 30 days.
Authorized Agent Signature and Printed Name Date
Pg. 1 of 5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order R7 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
Quantity
UNIT PRICE
Original Total
Construction Constmaion
Chan e41Q s. Change #2 Qt s.
New Total
Quanti
New Total Dollar
Amount
16 -ENG -52 QUANTITIES
1
CONSTRUCTION ENGINEERING
Paid via Item 4143
LS
1
$160,203.01
$160,203.01
0.03
1.03
$160,203.01
2
MOBILIZATION AND DEMOBILIZATION
LS
I
$211,891.55
$211,891.55
1.00
$211,891.55
3
CLEARING RIGHT OF WAY
IS
1
$295,223.93
$295,223.93
LOO
$295,223.93
4
PAVEMENT REMOVAL
M
459
$14.60
$6,701.40
459.OD
$6,701.40
5
CENTER CURB CONCRETE REMOVE
SYS
34
$42.39
$1,441.26
34.00
$1,44L26
6
CURB CONCRETE REMOVE
LFT
77
$7.82
$602.14
77.00
$602.14
7
CURB AND GUTTER REMOVE
LFT
2,914
$6.05
$17,629.70
2914.00
$17,629.70
8
PIPE ABANDON GROUT AND FILL
EACH
5
$438.20
$2,191.00
5.00
$2,191.00
9
SIDEWALK CONCRETE REMOVE
SYS
223
$16.70
$3,724.10
223.00
$3,724.10
30
INLET REMOVE
EACH
4
$607.04
$2,428.16
4.OD
$2,428.16
11
FENCE CHAIN. LINK REMOVE
LFT
492
$4.50
$2,214.00
492.00
$2,214.00
11aGUARDRAIL
REMOVE
LFT
735
$6.50
$4,777.50
735.00$4,777.50
lib
BRIDGE RAILING, REMOVE
LFT
248
$18.50
$4,598.00
248.00
$4,588.00
12
MANHOLE REMOVE
EACH
1
$898.30
$898.30
L00
$898.30
13
ICURB TURNOUT REMOVE
EACH
1
$84.36
$84.36
L00
$84.36
14
CONCRETE WALL, REMOVE
LFT
170
$49.07
$8,341.90
170.00
$8,341.90
15
PIPE REMOVE
LFT
$32
$38.16
$31,749.12
832.00
$31,749.12
16
FENCE FARM FIELD REMOVE
UT
1,662
$2.75
$4,570.50
1,662.00
$4,570.50
17
EXCAVATION COMMON
CYS
24,762
$5.81
$143,867.22
24,762.00
$143,867.22
18
BORROW
CYS
15,953
$0.01
$159.53
15,953.00
$159.53
19SEDIMENT
REM E
CYS
63
$38.62
$2,433.06
63.00
$2,433.06
20
TEMPORARY CHECK DAM REVETMENT RIPRAP
TON
8
$57.15
$457.20
11.00
$4S7.20
21
TEMPORARY INLET PROTECTION
EACH
154
$65.00
$1,O10A0
154.00
$10,010.00
22
TEMPORARY MULCH
TON
29
$13,050.00
29.00
$131050.00
23
TEMPORARY SILT FENCE
LFT
12,404$24,187.80
11,404.00
$24,187.80
24
NO.2 STONE
TON
400$10,100.00
400.00
$10,100.00
25
TEMPORARY GEOTEXTILE
SYS
940$2,622.60
ES22.67
940.00
$2,622.60
26
TEMPORARY SEED MIXTURE
LBS
1,740$435.00
1,740.00
$435.00
27
SUBGRADE TREATMENT TYPE II
SYS
960$21,763.20
925.00
$20,%9.75
28
SUBGRADE TREATMENT TYPE IB
SYS
53,215$320,886.45
6J9W
54,114.00
$326,307.42
29
STRUCTURE BACKFILL, TYPE I
CYS
13,538$347,385.08
3.00
13,541.00
$347,462.06
30
DRYING SOILS FOR EMBANKMENT
TON
655
$125.00
$81,875.00
655.00
$81,875.00
31
COMPACTED AGGREGATE NO. 53 BASE
TON
3,062
$27.60
$84,51120
3,015.01
$83,214.00
32
WIDENING WITH HMA, TYPE C
TON
11
$183.09
$2,013.99
11.00
$2,013.99
33
MILLING ASPHALT 11/2 IN.
SYS
381
$12.00
$4,572.01)
381.00
$4,572.00
34
MILLING, ASPHALT
SYS
488
$12.00
$5,856.00
488.00
$5,856.00
36
HMA SURFACE, TYPE C
TONS
3,206
$58.59
$187,839.54
48.00
3,254.00
$190,651.86
37
HMA INTERMEDIATE, TYPE C
TONS
5,187
$51.56
$267,441.72
79.00
5,266.00
$271,514.%
38
HMA BASE TYPE C
TONS
14,518
$49.54
$719,221.72
272.00
14,790.00
$732,696.60
39
MMA INTERMEDIATE OG TYPE C
TONS
61567
$50.09
$328,941.03
57.00
6,624.00
$331,796.16
40
MMA FOR TEMPORARY PAVEMENT, C
UNDISTRIBUTED
TON
500
$103.00
$51,500.00
500.00
$51,500.00
41
ASPHALT FOR TACK COAT
TON
29
$0.01
$0.29
15.00
44.00
$0.44
42
PCCP 71N.
SYS
241
$63.87
$15,392.67
241.00
$15,392.67
43
GUARDRAIL WOOD BEAM
LFT
725
$314.00
$227,650.00
725.00
$227,650.00
43a
GUARDRAIL BURIED END
LFT
8
$8,600.00
$68,800.00
8.00
$68,800.00
44
MMA FOR SIDEWALK
TON
2,243
$79.93
$179,282.99
=. <xii
2,205.00
$176,245.65
45
SIDEWALK CONCRETE
SYS
391
$43.80
$17,125.80
391.00
$17,125.80
46
CURB RAMP CONCRETE
SYS
440
$155.70
$68,508.00
139[x)
579.00
$90,150.30
47
CURB INTEGRAL CONCRETE
LFT
245
$33.04
$8,094.80
245.00
$8,094.80
48
CURB AND GUTTER CONCRETE TYPE II
LFT
18,824
$16.04
$301,936.96
18,824.00
$301,936.%
49
CURB AND GUTTER, CONCRETE, TYPE III
UT
13,729
$15.01
$206,072.29
13,666.00
$205,126.66
50
CENTER CURB DCONCRETE
SYS
125
$181.22
$22,652.50
125.00
$22,652.50
51
CURB TURNOUT
EACH
2
$1,183.91
$2,367.82
2.00
$2,367.82
52
CURB AND GUTTER, ROLL CURB
LFT
308
$29.50
$9,086.00
308.00
$9,086.00
53
HMA FOR APPROACHES TYPE C
TON
681
$89.44
$6,908.64
119.(x)
800.00
$71,552.00
54
PCCP FOR APPROACHES 61N.
SYS
574
$52.72
$30,261.28
537.00
$28,310.64
55
PCCP FOR APPROACHES, 9 IN.
SYS
412
$64.54
$26,590.48
412.00
$26,590.48
56
MAILBOX ASSEMBLY SINGLE RESET
EACH
13
$185.00
$2,405.00
13.00
$2,405.00
57
GEOTEXTILES
SYS
68
$1.18
$80.24
11.00 I ix)
80.00
$94.40
58
RIPRAP REVETMENT
TON
28
$85.06
$2,381.68
4.W 1 i.)
33.00
$2,806.98
59
MOBILIZATIONAND DEMOBILIZATION FORSEEDING
EACH
7
$50.00
$350.00
7.00
$350.00
60
EROSION CONTROL BLANKET
SYS
1,016
$L17
$1,188.72
1,016.00
$1,188.72
61
IWATER
kGAL
102
$1.00
$102.00
102.00
$102.00
62
SODDING NURSERY
SYS
28,063
$3.25
$91,204.75
28,063.00
$91,204.75
63
JIRRIGATION CONTROLLER BOX
EACH
1
$80500.00
$8,SOO.OD
1.00
$81500.00
Pg. 2of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order R7- Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
Quantity
UNIT PRICE
Original Total
Constmat"Construct,,,
Chan a 41 Gt s. Chan a K2 Ot s
New Total
Qua
Naw Total Dollar
Amount
64
FIELD OFFICE B
MOS
15
$2,286.99
$34,304.85
15.00
$34,304.85
65
TIMBER CURB
LFT
124
$196.00
$24,304.00
124.00
$24,304.00
66
PIPE TYPE 2, CIRCULAR, 361N.
LFT
1,415
$95.84
$135,613.60
16.00
1,431.00
$137,147.04
67
PIPE TYPE 4, CIRCULAR, 61N.
LFT
18,429
$4.35
$80,166.15
18,429.00
$80,166.15
68
PIPE, TYPE 4, CIRCULAR, 81N.
LFT
54
$8.00
$432.00
54.00
$432.00
69
1 PIPE, TYPE 2, CIRCULAR, 121N.
LFT
4,232
$39.45
$166,952.40
16.00 40W)
4,208.00
$166,005.60
70
PIPE TYPE 2 CIRCULAR, 151N.
LFT 1
416
$50.95
1 $21,195.20
12.00
428.00
$21,806.60
71
PIPE TYPE 2 CIRCULAR 181N.
LFT
1,099
$46.37
$50,960.63
7 001
1,097.00
$50,867.89
72
PIPE TYPE 2, CIRCULAR, 211N.
LFT
299
$55.18
$16,498.82
299.00
$16,498.82
73
PIPE TYPE 2 CIRCULAR, 241N.
LFT
670
$60.93
$40,823.10
1.001
669.00
$40,762.17
74
PIPE TYPE 2 CIRCULAR, 271N.
LFT
25
$123.09
$3,077.25
15.00
40.00
$4,923.60
75
PIPE TYPE 2 CIRCULAR, 301N.
LFT
195
$75.60
$14,742.00
195.00
$14,742.00
76
PIPE, TYPE 2, CIRCULAR, 421N.
LFT
355
$130.20
$46,221.00
355.00
$46,221.00
77
PIPE TYPE 2 CIRCULAR, 481N.
LFT
1,590
$151.85
$241,441.50
1,590.00
$241,441.50
77a
PIPE TYPE 2, DEFORMED MIN. AREA 3.3 SFT
LFT
48
$80.30
$3,854.40
27.00
2L00
$1,686.30
77b
PIPE TYPE 2 DEFORMED MIN. AREA 5.1 SFT
LFT
546
$107.60
$58,749.60
546.00
$58,749.60
78
STORMWATER TREATMENT SYSTEM 2.08 CFS
EACH
1
$21,280.78
$2L280.78
LOO
$21,280.78
79
STORMWATER TREATMENT SYSTEM 2.9 CFS
EACH
1
$21,280.78
$21,280.78
LOO
$21,280.78
BO
STORMWATER TREATMENT SYSTEM 2.23 CFS
EACH
1
$21,280.78
$21,280.78
LOO
$21,280.78
81
STORMWATER TREATMENT SYSTEM L12 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
82
STORMWATER TREATMENT SYSTEM 2.76 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
83
STORMWATER TREATMENT SYSTEM 1.65 CFS
EACH
1
$21,280.78
$21,280.78
1.00
$21,280.78
84
VIDEO INSPECTION FOR PIPE
LFT
10,325
$L29
$13,319.25
16.00 (27001
10,314.00
$13,305.06
85
PIPE END SECTION DIAMETER 121N.
EACH
3
$873.60
$2,620.80
2000
5.00
$4,368.00
86
PIPE END SECTION DIAMETER 151N.
EACH
2
$917.11
$1,834.22
2.00
$1,834.22
87
PIPE END SECTION DIAMETER 181N.
EACH
4
$971.48
$3,885.92
4.00
$3,885.92
Be
OUTLET PROTECTOR 3
EACH
2
$L050.00
$2,100.00
2.00
$2,100.00
89
VIDEO INSPECTION FOR UNDERDRAINS
LFT
3,000
$0.99
$2,970.00
3,000.00
$2,970.00
90
AGGREGATE FORUNDERDRAINS
CYS
1,659
$45.50
$75,484.50
1,659.01)
$75,484.50
91
GEOTEXTILES FOR UNDERDRAIN
SYS
16,587
$1.15
$19,075.05
16,587.00
$19,075.05
92
MANHOLE JIO
EACH
6
$4,602.60
$27,615.60
1.00
7.00
$32,218.20
93
CASTING ADJUST TO GRADE
EACH
13
$623.76
$8,108.88
13.00
$8,108.88
94
INLET JIO
EACH
46
$2,443.76
$112,412.96
1.00
47.00
$114,856.72
95
INLET, M10
EACH
5
$2,448.81
$12,244.05
5.00
$12,244.05
96
CATCH BASIN K10
EACH
41
$2,601.45
$106,659.45
40.00
$304,058.00
97
MANHOLE C4
EACH
30
$2,847.34
$85,420.20
26.00
$74,030.84
98
CATCH BASIN F7
EACH
1
$1,974.33
$1,974.33
1.00
$1,974.33
99
MANHOLE K4
EACH
17
$8,549.72
$145,345.24
r,.uo
23.00
$196,643.56
100
IMANHOLE, A
EACH
20
$5,140.48
$102,809.60
14.00
$71,966.72
101
CATCH BASIN, M10
EACH
41
$2,617.76
$107,328.16
41.00
$107,328.16
102
DETENTION OUTFALL STRUCTURE D
EACH
5
$8,666.12
$43,330.60
1 all
4.00
$34,664.48
103
DETENTION OUTFALL STRUCTURE E
EACH
1
$9,077.18
$9,077.18
LOO
$9,077.18
104
CONSTRUCTION SIGN, C
EACH
3
$297.00
$891.00
3.00
$891.00
105
ROAD CLOSURE SIGN ASSEMBLY
EACH
6
$507.00
$3,042.00
6.00
$3,042.00
105.
TEMPORARY PAVEMENT MARKING 41N
LFT
6,000
$0.67
$4,020.00
6,000.00
$4,020.00
1051,
TEMPORARY PAVEMENT MARKING, REMOVABLE, 41N
LFT
2,600
$1.05
$2,730.00
2,600.00
$2,730.00
106
DETOUR ROUTE MARKER ASSEMBLY
EACH
22
$152.00
$3,344.00
22.00
$3,344.00
107
CONSTRUCTION SIGN A
EACH
14
$249.00
$3,486.00
14.00
$3,486.00
108
CONSTRUCTION SIGN B
EACH
13
$104.00
$3,352.00
13.00
$1,352.00
109
MAINTAINING TRAFFIC
LS
1
$153,029.18
$153,029.18
LOO
$153,029.18
110
BARRICADE III -B
LFT
264
$30.00
$7,920.00
264.00
$7920.00
111
STREET SIGN POST
EACH
6
$1,850.00
$11,100.00
6.00
$11,100.00
112
SIGN SHEET AND SUPPORTS REMOVE
EACH
33
$25.00
$825.00
33.00
$825.00
113
SIGN POST, SQUARE TYPE 1 UNREINFORCED ANCHOR
BASE
L�
425
$14.00
$5,950.00
425.00
$5,950.00
114
SIGN SHEET WITH LEGEND 0.080 IN.
SFT
184
$17.00
$3,128.00
3n 1Ri
222.00
$3,774.00
115
SIGN SHEET WITH LEGEND 0.100IN.
SFT
117
$19.00
$2,223.00
7t :xi
189.00
$3,59L00
116
CONDUIT PVC 21N. SCHEDULE 40
LFT
493
$8.00
$3,944.00
493.00
$3,9".00
117
CONDUIT HDPE 21N. SCHEDULE 80
LFT
162
$12.00
$1,944.00
162.00
$1,944.00
118
ORNAMENTAL LIGHT POLE, FOUNDATION,
LUMINARIES
EACH
6
$8,900.00
$53,400.00
6.00
$53,400.00
119
HANDHOLE FOR INTERDUCT
EACH
31
$975.00
$30,225.00
3L00
$30,225.00
120
PVC SCHEDULE 40-48
LFT
9,502
$5.00
$47,510.00
9,502.00
$47,510.00
121
PVC SCHEDULE 00-4"INTERDUCT
LFT
91502
$9.00
$85,518.00
9,502.00
$85,518.00
PVC SCHEDULE 8o-4"
LFT
205
$7.00
$3,435.0[1
205.00
$3,435.00
PVC SCHEDULE 80-4"INTERDUCT
LFT
205
$20.00
$1,100.00
205.0[1
$4,100.00
ff12!
HANDHOLE LI iHTING
FAC.4
$650.00
52,600.00
4.00
$2600.00
SERVICE POINT 11 MODIFIED
EACH
1
$5,500.00
$5,500.00
LOO
I $5 500.00
Pg. 3 of 5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order 87- Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
Quant
UNIT PRICE
OryMal Tobl
ConstmCion Construction
ch.,,,. Cs. Chan eR2 s.
New Total
Quantl
Naw Total Dollar
Amount
126
WIRE NO. 6 COPPER IN PLASTIC DUCT 4 11C
LFT
162
$&00
$1,296.00
162.00
$1296.00
127
WIRE, NO. 6 COPPER, IN PLASTIC DUCT, IN TRENCH, 4
C
LFT
493
$8.00
$3,944.00
493.00
$3,944.00
128
CONNECTOR KIT UNFUSED
EACH
6
$37,00
$222.00
6.00
$222.00
129
CONNECTOR KEE FUSED
EACH
6
$35.00
$210.00
6.00
$210.00
130
MULTIPLE COMPRESSION FITTING, WATERPROOFED
EACH
17
$21.00
$357.00
17.00
$357.00
131
INSULATION LINK,WATERPROOFED
EACH
28
$15.00
$420.00
28.00
$420.00
132
WIRE TW HW NO. 10 COPPER STRANDED
LFT
471
$L00
$471.00
471.00
$471.00
133
TRANSVERSE MARKING, THERMOPLASTIC,
CROSSWALK LINE WHITE 241N.
LFT
928
$5.65
$5,243.20
928.00
$5,243.20
134
LINE THERMOPLASTIC, BROKEN WHITE 41N.
LET
592
$1.95
$1,154.40
592.00
$1,154.40
135
LINE, THERMOPLASTIC, SOLID, WHITE, 41N.
LET
2,050
$0.73
$1,496.50
349.00
2,399.00
$1,751.27
136
LINE, THERMOPLASTIC, DOTTED WHITE 8 IN.
LET
116
$3.15
$365.40
116.00
$365.40
137
TRANSVERSE MARKING, THERMOPLASTIC, YIELD LINE,
WHITE 361N.
LFT
47
$12.20
$573.40
47.00
$573.40
138
LINE THERMOPLASTIC, SOLID YELLOW, 41N.
LFT
3,449
$0.73
$2,517.77
275.00
3,724.00
$2,718.52
139
TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE,
WHITE, 24 IN.
LFT
117
$5.65
$661.05
1.00
118.00
$666.70
140
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
LANE INDICATION ARROW
EACH
26
$109.00
$2,834.00
8.00
34.00
$3,706.00
141
ISNOWPLOWABLE RAISED PAVEMENT MARKER
EACH
155
$25.00
$3,875.00
155.00
$3,875.00
142
LINE THERMOPLASTIC, SOLID, YELLOW BIN.
LFT
2,269
$1.90
$4,311.10
1 55.00
2,324.00
$4,415.60
143
LINE THERMOPLASTIC SOLID, YELLOW 121N.
LFT
460
$2.85
$1,312.00
17.00
477.00
$1,359.45
143a
20" DUCTILE IRON WATER MAIN
LFT 1
1,520
$109.72
1 $166,774.40
1,520.00
$166,774.40
143b
8" DUCNLE IRON WATER MAIN
LFT
80
$90.20
$7,216.00
80.00
$7,216.00
14k
8" GATE VALVE
EACH
1
$L477.28
$L4T7.28
LOO
$1,477.28
143d
20" K B" STAINLESS TAPPING SADDLE AND VALVE
EACH
1
$3,354.44
$8,354.44
LOD
$8,354.44
143e
8" WATER MAIN LOWERING
EACH
I
$5,599.00
$5,599.00
LOD
$5,599.00
143f
10" WATER MAIN LOWERING
EACH
1
$6,260.48
$6,260.48
LOD
$6,260.48
1439
16' WATER MAIN LOWERING
EACH
1
$10,776.14
$10,776.14
LOD
$10,776.14
143h
20'WATER MAIN LOWERING
EACH
6
$13,814.76
$82,888.56
6.00
$82,888.56
1431
8" WATER MAIN CONNECTION
EACH
2
$3,475.74
$6,951.48
2.00
$6,95148
143
20" WATER MAIN CONNECTION
EACH
4
$4,486.76
$17,947.04
4.00
$17,947.64
143k
LONG SIDE SERVICE
EACH
1
$3,882.93
$3,882.93
LOD
$3,882.93
1431
METER PIT RELOCATION
EACH
I
$L327.05
$1,327.05
LOD
$1,327.05
143.
BACKFLOW RELOCATION
EACH
1
$525.38
$525.38
1.00
$525.38
143n
RELOCATE SAMPLING STATION
EACH
1
$1,518.42
$1,518.42
LOD
$1,518.42
143o
ADJUST VAVLE TO GRADE REMOVE & REPLACE
HYDRANT & ADJUST TO GRADE
EACH
17
$4,476.55
$76,101.35
17.00
$76,1OL35
143p
NEW HYDRANT ASSEMBLY
EACH
5
$6,016.55
_
$30,082.75
5.00
$30,082.75
143q
REMOVE AND RETIRE HYDRANT
EACH
3
$626.30
$1,878.90
3.00
$1,878.90
143r
ADJUST VALVE TO GRADE
EACH
18
$321.44
$5,785.92
18.00
$5,785.92
143,
VALVE RETIREMENT
EACH
3
$585.16
$1,755.48
3.00
$1,755.48
143t
LINE STOPS 20" UNDISTRIBUTED
EACH
4
$17,268.55
$69,074.20
4.00
$69,074.20
143u
DETENTION OUTFALL STRUCTURE, T - per Change
Order al
EACH
0
$8,332.94
$0.00
1.D0
58,332.94
143v
SEPTIC REPLACEMENT- per Chane Order P2
LS
0
$36,031.35
$0.00
LOO
$36,031.35
143.
DECORATIVE SOLAR FLASHER- per Change Order p3
EACH
0
$7,806.66
$0.00
6.00
6.00
$46,839.96
143x
LIGHT POLE RELOCATION- per Chagne Order PS
LS
0
54,140.25
$0.00
000
1.D0
$4,140.25
143y
CONSTRUCTION ENGINEERING- per Change Order 43
LS
0
$4,087.00
$0.00
0.00
LOT)
$4,087.00
143,
MOBILIZATION & DEMOBILIZATION - per Change
Ordera6
LS
0
$37,456.19
$0.00
000
1.00
$37,456.19
143aa
MAINTENANCE OF TRAFFIC- per Change Order N6
IS
0
$20,676.66
50.00
0.00
1.00
$20,676.66
143bb
CONCRETE WASH -OFF FACILTY - per Change Order 46
EACH
0
$43200
"'o"
0.001.00
$432.00
143cc
DORSET BLVD. SIGN WALL per Change Order k6
EACH
0
$5&582.27
50.00
000
2,00
$117,164.54
143dd
DORSET BLVD. RAB MASONRY WALL - per Change
Order 06
EACH
0
$58,630.88
$0.00
0.00
1.00
$58,630.88
143ee
111TH STREET STONE WORK- per Change Order 46
EACH
0
$31,911.26
$0.00
0.00
1.D0
$31,912.26
14311
$71.50
$0.00
0.00
1,158.00
$82,797.00
Pg. 4 of 5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Change Order #7 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Original
Quantity
UNIT
UNIT PRICE
Original To[al
Construction Constmaion
Change#20tys.
New Total
Quart"
New Total Dollar
Amount
143gg
IRRIGATION SERVICE&CONNECTIONS -per Change
Order#6
EACH
0
$3,500.00
$0.00
0.00
1.00
$3,500.00
143hh
IRRIGATION BORING&JACKING-per Change Order
#6
LFT
0
$60.50
$0.00
0.00
100.00
$6,050.00
143ii
IRRIGATION CONTROLS/BACKFLOW PREVENTERS-
per Change Order #6
EACH
0
$2,827.00
$0.00
0.00
1.00
$2,827.00
143jj
CONTROL VALVES, DRIP TUBING, EMITTERS - per
Change Order #6
LS
0
$15,306.50
$O. DO
0.D0
1.00
$15,306.50
1431,k
ELECTRIC SE RVICE AN D CONNECT IONS - per Change
Order #6
EACH
0
$8,814.87
$0.00
0.00
1.00
$8,814.87
14311
ELECTRIC CONDUIT BORING AND JACKING - per
Change Order #6
LFT
0
$65.29
$0.00
0.00
100,00
$6,529.00
143mm
SIGN WALL LIGHTING- per Change Order #6
EACH
0
$1,641.88
$0.00
0.00
2.00
$3,283.76
143nn
DORSET BLVD. WALL LIGHTING- per Change Order 06
EACH
0
$1,641.88
$0.00
0.00
1.00
$1,641.88
143oo
STREET TREES - per Change Order#6
EACH
0
$429.00
$0.00
0.00
78.00
$33,462.00
143pp
ORNAMENTAL TREES - per Change Order 46
EACH
0
$330.00
$0.00
0.00
104.00
$34,320.00
143gq
EVERGREEN TREES - per Change Order#6
EACH
0
$253.00
$0.00
0.00
53.00
$13,409.00
143rr
SHRUBS - per Change Order#6
EACH
0
$44.00
$0.00
0.00
798.00
$35,112.00
143ss
ORNAMENTAL GRASSES- per Change Order 46
EACH
0
$33.00
$0.00
0.00
269.00
$8,877,00
143D
PERENIALS- per Change 00cr nb
EACH
0
$13.20
$0,00
0.00
5,653.00
$74,619.60
143uu
SEDGE, PLANTS - per Change Order #6
EACH
0
$13.20
$0.00
0.00
1,954.00
$25,792.80
143vv
HARDWOOD MULCH - per Change Order 06
CYS
0
$82.50
$0.00
0.00
222.00
$18,315.00
143ww
I LANDSCAPE IMPROVEMENTS/WILLIAMS CREEK -
per Change Order 17
LS
0
$13,183.50
50.(X)
0.00
1.00
$13,183.50
16 -SW -07 QUANTITIES
144
EXCAVATION, COMMON
CYS
883
$35.00
$30,905.00
883.00
$30,905.00
145
BORROW
CYS
2,782
$0.01
$27.82
2,782.00
$27.82
146
SEDIMENT, REMOVE
CYS
10
$33.74
$337.40
10.00
$337.40
147
TEMPORARY INLET PROTECTION
EACH
14
$65.00
$910.00
14.00
$910.00
148
TEMPORARY SILT FENCE
LET
2,105
$1.79
$3,767.95
2,105.00
$3,767.95
149
TEMPORARY SEED MIXTURE
LBS
48
$0.25
$12.00
48.00
$12.00
150
SUBGRADE TREATMENT TYPE II
SYS
59
$24.80
$1,463.20
59.00
$1,463.20
151
SUBGRADE TREATMENT, TYPE III
SYS
1,597
$1.83
$2,922.51
1,597.00
$2,922.51
152
SUBGRADE TREATMENT, TYPE IB
SYS
4,596
$6.73
$30,931.08
4,596.00
$30,931.08
153
STRUCTURE BACKFILL,TYPE 1
CYS
177
$25.66
$4,541.82
177.00
$4,541.82
154
STRUCTURE BACKFILL, TYPE 2
CYS
266
$92.94
$24,722.04
266.00
$24,722.04
155
STRUCTURE BACKFILL, TYPE 5
CYS
36
$73.45
$2,644.20
36.00
$2,644.20
156
COMPACTED AGGREGATE NO. 53 BASE
TON
295
$32.87
$9,696.65
295.00
$90696.65
157
HMA SURFACE, TYPE C
TON
292
$71.46
$20,866.32
292.00
$20,866.32
158
HMA INTERMEDIATE, TYPE C
TON
487
$56.71
$27,617.77
487.00
$27,617.77
158a
HMA INTERMEDIATE OG TYPE C
TON
641
$54.13
$34,697.33
641.00
$34,697.33
159
HMA BASE, TYPE C
TON
1,207
$51.90
$62,643.30
1,207.00
$61,643.30
160
ASPHALT FOR TACK COAT
TON
4
$0.01
1 $0.04
4.00
$0.04
161
HMA FOR SIDEWALKS
TON
221
$87.33
$19,299.93
221.00
$19,299.93
162
SIDEWALK, CONCRETE, 4"
SYS
39
$51.81
$2,020.59
39.00
$2,020.59
163
CURB RAMP, CONCRETE
SYS
25
$175.41
$4,385.25
25.00
$4,385.25
164
DETECTABLE WARNING SURFACES
SYS
5
$326.25
$1,631.25
5.00
$1,631.25
165
HANDRAIL, 481N. ITEM DELETED per CHANGE ORDER
#4
LFT
58
$120.00
$6,960.00
000
$0.00
166
CURB AND GUTTER CONCRETE TYPE 11
LET
1,830
$19.05
$34,861.50
1,830.00
$34,861.50
167
CURB AND GUTTER TURNOUT CONCRETE
LET
6
$469.97
$2,819.82
6.00
$2,819.82
168
CONCRETE ROLL CURB &GUTTER
LET262
$48.66
$12,748.92
262.00
$12,748.92
169
PCCP FOR APPROACHES, 61N.
SYS
59
$60.95
$3,596.05
59.00
$3,596.05
170
MAILBOX ASSEMBLY, TRIPLE
EACH
1
$225.00
$225.00
1.00
$225.00
171
GEOTEXTILES
SYS
1,140
$0.99
$1,128.60
1,140.00
$1,128.60
172
RIPRAP CLASS 1
TON
1,070
$46.35
$49,594.50
1,070.00
$49,594.50
173
RIPRAD REVETMENT
TON
260
$23.16
$6,021.60
260.00
$6,021.60
Pg. 5of5
SPRING MILL ROAD RECONSTRUCTION
CARMEL PROJECTS 16 -ENG -52 AND 16 -SW -07
Chane Order #7 - Quantity Adjustments
ITEM NO.
DESCRIPTION
UNIT
Od{Ina)
QuantityChan
UNIT PRICE
Construction Construction
Od�lnal Total
a #1 Q s. Chan a #2 q s.
New Total
Quant)
New Total Dollar
Amount
174
RIPRAP UNIFORM HAND LAID
TON
4
$95.96
$383.84
4.00
$383.84
175
MOBILIZATION AND DEMOBILIZATION FOR SEEDING
EACH
2
$50.00
$100.00
2.00
$100.00
176
EROSION CONTROL BLANKET
SYS
1,375
$1.17
$1,608.75
1,375.00
$1,608.75
177
WATER
M.G.
25
$1.00
$25.00
25.00
$25.00
178
TOPSOIL
CYS
1,169
$45.64
$53,353.16
1,169.0)
$53,353.16
179
SODDING NURSERY
SYS
3,540
$3.25
$11,505.00
3,540.0)
$11,505.00
180
CONCRETE CLASS A
CYS
17
$252.59
$4,294.03
17.00
$4,294.03
181
241N. SDR 11 HDPE WATER MAIN
LFT
176
$305.36
$53,743.36
176.00
$53,743.36
182
201N. RESTRAINED JOINT DUCTILE IRON
LFT
25
$724.08
$18,102.00
25.0)
$18,102.00
183
20" LINE STOP
EACH
2
$17,268.55
$34,537.10
2.00
$34,537.10
184
201N. CONNECTION
EACH
2
$6,202.22
$12,404.44
2.00
$12,404.44
185
REMOVE, REPLACE AND RELOCATE FIRE HYDRANT
EACH
1
$5,261.37
$5,261.37
1.00
$5,261.37
186
ADJUST VALVE BOX TO GRADE
EACH
3
$468.43
$1,405.29
3.0)
$1,405.29
187
PIPE, TYPE 4, CIRCULAR, 61N.
LFT
2,274
$4.75
$10,801.50
2,274.00
$10,801.50
188
PIPE UNDERDRAIN, OUTLET 6 IN.
LFT
191
$14.50
$2,769.50
191.00
$2,769.50
189
PIPE, TYPE 2 CIRCULAR, 12 IN,
LFT
642
$42.68
$27,400.56
642.00
$27,400.56
190
PIPE, TYPE 2, CIRCULAR, 151N.
LFT
15
$235.30
$3,529.50
15.00
$3,529.50
191
VIDEO INSPECTION FOR PIPE
LFT
655
$2.39
$1,565.45
655.0)
$1,565.45
192
PIPE END SECTION DIAMETER 121N.
EACH
1
$873.58
$873.58
1.00
$873.58
193
VIDEO INSPECTION FOR UNDERORAINS
LFT
3,000
$0.99
$2,970.00
3,000.00
$2,970.00
194
AGGREGATE FOR UNDERDRAINS
CYS
94
$50.00
$4,700.00
94.00
$4,700.00
195
GEOTEXTILES FOR UNDERDRAIN
SYS
1,076
$2.40
$2,582.40
1,076.00
$2,582.40
1%
YARD LIGHTS, ADJUST TO GRADE
EACH 1
7
$250.00
$1,750.00
7.00
$1,750.0)
197
CASTING ADJUST TO GRADE
EACH
6
$866.87
$5,201.22
6.00
$5,201.22
198
INLET E7
EACH
1
$1,881.90
$1,881.90
1.00
$1,881.90
199
INLET M10
EACH
9
52,448.81
$22,039.29
9.00
$22,039.29
200
PIPE CATCH BASIN, 181N,
EACH
1
$1,314.06
$1,314.06
1.00
$1,314.06
201
MANHOLE, C4
EACH
3
$2,951.74
$8,855.22
3.00
$8,855.22
202
INLET, All
EACH
3
$2,186.40
$6,559.20
3.00
$6,559.20
203
REINFORCED CONCRETE ARCH (MIN AREA 105.0
SFT.(
LFT
64
$3,216.76
$205,872.64
64.00
$205,872.64
204
DETOUR ROUTE MARKER ASSEMBLY
EACH 1
19
$146.00
$2,774.00
19.00
$2,774.00
205
CONSTRUCTION SIGN, A
EACH 1
17
$244.00
$4,148.00
17.00
$4,148.00
206
CONSTRUCTION SIGN 8
EACH
2
$105.00
$210.00
2.00
$210.00
207
BARRICADE, III -8
LFT
50
$30.00
$10500.00
50.00
$1,500.00
208
BASE POST, SQUARE TYPE I REINFORCED ANCHOR
LFT
81
$14.00
$1,134.00
81.00
$1,134.00
209
SIGN GROUND MOUNTED RESET
EACH
8
$20.00
$160.00
8.00
$160.00
210
LINE, THERMOPLASTIC, SOLID, WHITE 4 IN.
LFT
209
$0.73
$152.57
209.00
$152.57
211
LINE, THERMOPLASTIC SOLID YELLOW 41N.
LFT
2,073
$0.73
$1,513.29
2,073.00
$1,513.29
212
TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE,
WHITE, 241N.
LFT
15
$5.65
$84.75
15.00
$84.75
213
TRANSVERSE MARKING, THERMOPLASTIC,
CROSSWALK LINE, WHITE, 61N.
LFT
103
$1.40
$144.20
103.00
$144.20
214
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
LANE INDICATION ARROW
EACH
1
$109.00
$109.00
1.00
$109.00
215
PAVEMENT MESSAGE MARKING, THERMOPLASTIC
ONLY
EACH
1
$147.00
$147.00
1.00
$147.00
216
REVISED PEDESTRIAN HANDRAIL - per Change Order
#4
LFT
0
$312.95
$0.00
58.00
$18,151.10
217
CANCELLATION CHARGE (Original Handrail Design)-
Per Change Order #4
IS
0
$465.00
$0.00
1.00
$465.00
= Adjusted Quantities (as of this Change Order)
= New Items
ORIGINALTOTAL=
$8,592,091.16
NFW TOTAL=
$9,421,507.35
City of Carmel Project 16 -ENG -52
Spring Mill Road Reconstruction
CHANGE ORDER #7
Landscaping Improvements/Williams Creek
Contract Price prior to this Change Order $9,408,323.85
Contract Price will be increased by this Change Order $13,183.50
New Contract Price including this Change Order $9,421,507.35
Amount
Adjusted Contract
Price
Cumulative % Change
from Original Contract
Original Contract
$8,592,091.16
$8,592,091.16
N/A
C01
(-333.18)
$8,591,757.98
-0.004%
CO2
$36,031.35
$8,627,789.33
0.42%
CO3
$123,808.23
$8,751,597.56
1.86%
C04
$11,656.00
$8,763,253.66
1.99%
C05
$4,140.25
$8,767,393.91
2.04%
C06
$640,929,94
$9,408,323.85
9.S0%
C07
$13,183.50
$9,421,507.35
9.65%