Loading...
HomeMy WebLinkAbout04030099 Building Plans0 6" FASCIA I 1X6 FRIEZE 6" GUTTER I 6" CORNER HARDI-PLAT AS SPECIFIE BRICK SOU BRICK VENT BRICK SILL TOP OF PLATE • ENTRY TOP OF PLAT � LIBRARY �'-1---- co v �'� `•`�pW MOLD ON HARDI-GTUCC.O BD, FRONT ELEVATION W1 KEYSTONE_vW BCALEs 1140 ■ P -0s -TOP OF PLATE FINISHED FLOOR TOP OF PLATE FINISHED FLOOR TOP OF FOUNDATION 4 TOP OF FOOTING VN%gON1 d1149NM01 AV13 I -3Wdb3 d0 ,Uj3 .,Sc jo 603 DI ;g NC3i.i ja :iu,.:.yw► .�, u� iidblt�3l �i r o c ° 0-0 N O C +• C -C p a C C w° 30c: a�+— rnrn °Q�v�v L a) C L -v41 p t ° w to O t �0vNp c a4, _ - �ooa)ca vo+mmU _0) ° 4-1vas'�� o ov• U v- C 41 U) v U •N ao� acn o ocn U L O w O v�� o a m c „.- c ,� p = °+ L O - O o -O CL M-0 +J OO 0 U o N U F—Ui,� O j 00 (V W � N M C.� w .t C 4 4 u w N H cd CA 00 CD U v � � M a 00 0 0o v� 00 � •T M M M all r� Q a r� r� 4---s O O ao U O � WU DATE: 04-24-01 DRAWN 5Y: J.NOLLEY SCALE: AS swowr REVISIONS: 05-12-01: PREVIEW PLANS 10-01-01: 2ND REVIEW PLAN 10-25-03: 3RD REVIEW PLAN 11 -04 -03 -.4TH REVIEW PLAN 01-05-04: PRELIMINARY PLAN 0I-22-04: FINAL PLAN 4 4p TOP OF PLATE FINISHED FLOOR TOP OF PLATE FINISHED FLOOR TOP OF FOUNDATION WOOD DECK, RAILING 4 SCREEN PORCH MATERIALS AS SPECIFIED, VARIFY STEPS TO GRADE BASED ON FINAL ELEVATION. RAILING HAS BEEN SHOWN PARTIAL FOR CLARITY, TOP OF FOOTING t --- TOP OF FLUE MUST BE 2W ABOVE ANY ROOF SURFACE WITF'HN A b' HORIZONTAL DISTANCE , E.V.S. AS SPECIPi6�.-.�- ON C141ASE FT -�•--- C 1--_•-'L-- � �---- '� 1---i 1-r-•-- -- i -+- - '"'. i-....__i---i-L.,,.,,__.-,:-i_-a,,,,_.,._�--i _.d -�-:-- �. —_ - - - -•.-:_ _ice i_ -' - - - r ' �--�- i—�-J- T- r -- 77777771 -- - - - - - - - - - - j - BCALIL U4' � I'-0' -r-•-`- -� -�._i-;-'�•7-tet- � '--� �. 12 i 12 I , -- - T f ,.�-T- L: TOP OF PL. 0 GRT. RM. di TOP OF PL • _ LIBR.4R`t' - __ 711 -�--T_~ - _ ����'t---w--'-_^--_ y., _L - - _+ _� •..+..1- f'. � �-rtµ _ _ - _ �.._ __^-_�-_.__---^- - ti - T REAR ELEVATION SCAM V40 - r-00 WOOD DECK. RAILING t SCREEN PORC" - MATERIALS AS SPECIFIED, VARIFY STEPS TO GRADE BASED ON FINAL ELEVATION. RAILING HAS BEEN OMITTED FOR CLARITY. _1 RAFTERS TO BEAR AT THIS a ADDITIONAL LOCATION ON TOP OF FIN. SECOND FLOOR 4 1p ---� _ 6' GUTTER BOARD --- `-- - ---- _ _ ^ Ucb FRIEZE BOARD UUa CORNER BOARD -__^ --_-r-`- "RD[ -PLANK SIDING = - AS SPECIFIED — - - - - _ BRICK SOLDIER BRICK VENEER BRICK SILL --rte-1-"- '__'-.-.- -• _ -� ol _1 hh 1- 1 C\ . O ct � U O 4.� cd U n oo w 4.4N� �Irt/ O 00M r� r r- o v c 4) � � N ++ N N I= - O C++ CL 0 v c c U N ND O 7 N c U - rnrn +� U C, oQcc�� � Mr- O:E � � O C Q~—+, a D 0 O q)c ti.0 a3 m>, m E +� N -p p c C Q N w O U — C y a N ao� >a +•- + O 0 `a 4) 0) 0 a Nrn l � ' L 0.- O s a� -w , s a N , ' N a�5,E m a3 � �UoEcoi� 00 H N v t M M ,Q A cd C40 00 ?�► Ll ..� W cd c�•>I V� C1 V 00 r.., O v 44- t e --t � M a � !V O U ^' t, �1 rl rl off so U as r --f o n O C) p� U DATE: 04-24-01 DRAWN 5Y: J,HOLLEY SCALE: AS SHOW REV(8(ONB: 05-12-01s PREViEW PLANS 10-01-0I: 2ND REVIEW PLAN 10-25-03: 3RD REVIEW PLAN II -04-03: 4TH REVIEW PLAN 0I-05-04: PRELIMINARY PLAN 0I-22-04: FINAL PLAN 8HEET 2 a I m 0 I ;_--�_, �- ------�- - -'---•-'-ri-?_.•.-,--1-.---t r -+ -• r •-L.-.1-•=. t-^;-y�7-'`�r�-rs--r--;-J-r-+•-r•1• '-• , -.,r.-:-..---- �-----^-,-�.-.,--,- __i_�-".j�,y f-�r-`-r"_ - � - � ._a- - t-....- -i.✓-. - -, �-.j'-r I-+-�--'--r-i-�_.-T-�--r-t-•-.l-i-�--_i-l- ''-.- � � '-�-rt' r %�( � -'r�-`- -'T' �-`- . - --t- '-'-K_ - ,-_^_�-L f�"'� _ � -•--"Y__' " -T--�- -L ..-ter__ ._ ._� ,__l -_.i ._.i-_r-i�..�--C--� _-�-.a.�- ' _ �_-�_ : �..-..rJ--., .r+-i_.�'T{ �j`�. 1,-��-a�� i --�._•�.. ' •-___S-- S_! -i cel-�YY1-1 t_ !_-f-.L.,i .�-�--__,__�__L } � 1 - __ 711 -�--T_~ - _ ����'t---w--'-_^--_ y., _L - - _+ _� •..+..1- f'. � �-rtµ _ _ - _ �.._ __^-_�-_.__---^- - ti - T REAR ELEVATION SCAM V40 - r-00 WOOD DECK. RAILING t SCREEN PORC" - MATERIALS AS SPECIFIED, VARIFY STEPS TO GRADE BASED ON FINAL ELEVATION. RAILING HAS BEEN OMITTED FOR CLARITY. _1 RAFTERS TO BEAR AT THIS a ADDITIONAL LOCATION ON TOP OF FIN. SECOND FLOOR 4 1p ---� _ 6' GUTTER BOARD --- `-- - ---- _ _ ^ Ucb FRIEZE BOARD UUa CORNER BOARD -__^ --_-r-`- "RD[ -PLANK SIDING = - AS SPECIFIED — - - - - _ BRICK SOLDIER BRICK VENEER BRICK SILL --rte-1-"- '__'-.-.- -• _ -� ol _1 hh 1- 1 C\ . O ct � U O 4.� cd U n oo w 4.4N� �Irt/ O 00M r� r r- o v c 4) � � N ++ N N I= - O C++ CL 0 v c c U N ND O 7 N c U - rnrn +� U C, oQcc�� � Mr- O:E � � O C Q~—+, a D 0 O q)c ti.0 a3 m>, m E +� N -p p c C Q N w O U — C y a N ao� >a +•- + O 0 `a 4) 0) 0 a Nrn l � ' L 0.- O s a� -w , s a N , ' N a�5,E m a3 � �UoEcoi� 00 H N v t M M ,Q A cd C40 00 ?�► Ll ..� W cd c�•>I V� C1 V 00 r.., O v 44- t e --t � M a � !V O U ^' t, �1 rl rl off so U as r --f o n O C) p� U DATE: 04-24-01 DRAWN 5Y: J,HOLLEY SCALE: AS SHOW REV(8(ONB: 05-12-01s PREViEW PLANS 10-01-0I: 2ND REVIEW PLAN 10-25-03: 3RD REVIEW PLAN II -04-03: 4TH REVIEW PLAN 0I-05-04: PRELIMINARY PLAN 0I-22-04: FINAL PLAN 8HEET 2 a I m 0 I 9 I' a 0 I I I FIN. BASEMENT PLAN SCALE: 1/4" : V -d' 1606 S.F. FIN. BRICK I/N WOOD GARAGE OPENING TRIM DROP 8' AT OPENING, POUR SLAB THROUC*4 W/ I• WATER STOP DROP ' o° o� 0 C.M.U. FOUNDATION WALL FOUNDATION DETAIL 0 GARAGE OPENING SCALE: 1/2" ■ 1'-0" 46 CONC. SLAB ON 40 MIN. PEA FILL, THICKEN EDGE 80 CONCRETE BLOCK FOUNDATION WALL 8•X16• CONTINUOUS REINFORCED o CONCRETE FOOTING top of floor "athing top of foundation r top of fill top of footing TYPICAL SLAB SECTION SCALE; 1/2" - V-0" deNERAL FOUNDATION NOTES: U ALL SOIL IS BASED 7,1.1 2800 P.S.F., AND CONCRETE IS BAS® ON 3000 P.S.I. • 28 DAYS, FOOTERS ARE. 160 WIDE AND S• DEEP UNLESS NOTED OTHERWISE ON PLANS. 2) BASEMENT WALL HEIGHT AS NOTED ON PLANS, W/ SHORT WALLS • CRAWL SPACE OR SLAB BELOW FROST LINE AS REQUIRED. 3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND JUDGE FOR THEMSELVES, THE SUITABILITY OF THE PLANS IN RELATIONSHIP TO THE BUILDING SITE, AND EXISTING GRADES. 41 THESE DRAWINGS SERVE AS A GUIDE TO THE CONSTRUCTION OF THE BUILDING, DUE TO VARIATIONS IN DIFFERENT GEOGRAPHICAL AREAS, THEY CAN ONLY BE A GUIDE, AND IN NO WAY DICTATE ANY OF THE LOCAL AND/ OR STATE BUILDING CODES. IT IS THE CONTRACTORS FULL RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCURACY AND CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ERRORS IN DESIGN, DIMENSIONS OR OMISSIONS. 5) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEW, AND MAY CHANGE AT ANY TIME, IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ACTUAL NEED AND SIZES IF NOT SHOWN. 6) ALL WALLS W/ BRICK ARE 1-1/2•, ALL OTHERS TO BE 3-1/2• UNLESS NOTED OTHERWISE ON PLANS. 'U ALL CEILINGS ARE V MAIN LEVEL AND 8' UPPER LEVEL OR AS NOTED ON PLAN FOR INDIVIDUAL AREAS. 8) ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR IMMEDIATELY BEFORE CONSTRUCTION 16 TO RESUME, TO INSURE PROPER STEPS ARE TAKEN. D 8"X16• C.M.U. OR POURED CONC. AS SPECIFIED 8• CONC. LINTEL D FOR SHORT WALL LINTEL DETAIL FOR BASEMENT SCALE: 1/4" u 1'-0" v 0-0 N ++ O N L- j- -v -0 p p v c am 0 ai c .0.�' U O V C O�•a1 a 40) 76 (nom, c L per, •p .O O v N ��' 0 p:E +' V O O E as _ Q p O c �Va34)>+ -0 ca a� � c�v�'L co 0 1-- 0 cn --O—N C ,-'T- o. - m p N O LO cs ` v•a, Q• - O+ O N E 0V) O d m c ' vo°� o � rn.0 w +5 o 0 E0°a3 CL F- 0 = v j 00 O 00 O� .00 M V as o 0 n Q d' d' 1~�1 U DATE: 04-24-01 DRAWN 5Y: J.HOLLEY SCALE: AS SH0LU 05-12-0I: PREVIEW PLANS 10-01-0is 2ND REVIEW PLAN 10-25-03: 31RD REVIEW PLAN 11-04-03: 4tH REVIEW PLAN 01-05-04: PRELIMINARY PLAN 01-22-04s FINAL PLAN SHEET I r I r r I IN r-------------------- MAIN FLOOR PLAN SCALE: 1/4' s 1'-O" 2086 S.F. MANTLE AS SF 2-2X12 HEADER DOUBLE J016T CHIMNEY CAP AS REQ'G ROVED FLUE PIPE ZWT) i2AMINCs AS RE&D RABLE METAL DAMPER AL FIREPLACE BOX FIREPLACE SECTION NO SCALE GEPIERAL PLAN NOTES: V THE CONTRACTOR SMALL VERIFY ALL CONDITIONS AND JUDGE FOR THEMSELVES, THE SUITABLITY OF THE PLANS IN RELATIONSHIP TO THE BUILDING SITE, AND EXISTING GRADES. 2) THESE DRAWINGS SERVE AS A GUIDE TO THE CONSTRUCTION OF TME BUILDING, DUE TO VARIATIONS IN DIFFERENT AREAS, THEY CAN ONLY BE A GUIDE, AND IN NO WAY DICTATE ANY OF THE LOCAL AND/ OR STATE BUILDING CODES. IT IS THE CONTRACTORS FULL RESPONSIBILITY TO REVIEW ALL FLANS FOR ACCURACY AND CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ERRORS IN DESIGN, DIMENSIONS OR OMISSIONS. 3) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEED, AND MAY CHANGE AT ANY TIME, IT IS TME CONTRACTORS RESPONSIBILITY TO VERIFY ACTUAL NEED AND SIZES IF NOT SHOWN. 4) ALL WINDOW SIZES LISTED ARE BASED ON UNIT "VETTER* SIZES AND MAY VARY BASED ON SUPPLIER, ALL FINISHES AND ROUGH OPENINGS MUST BE VERIFIED BY OWNER/ CONTRACTOR. 5) ALL WALLS W/ BRICK ARE 1-1/20, ALL OTHERS TO BE 3-V1" UNLESS NOTED OTHERWISE ON PLANS. b) ALL CEILINGS ARE 9' MAIN LEVEL AND 8' UPPER LEVEL OR AS NOTED ON PLAN FOR GIVEN AREA. v ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF TME CONTRACTOR/ DESIGNER IMMEDIATELY BEFORE CONSTRUCTION IS TO RESUME, TO INSURE PROPER STEPS ARE TAKEN. 4\ .0 U vmvol U (u 4� _ 00 cc3 � NN O00 Z � M 00 O QD O� V/ 00 M O � � as o a � O V O � p� U DATE: 04-24-01 DRAWN 15Y: J,HOLLEY 1 SCALE: AS SHOWNI REVISIONS: 05-12-0I: PREVIEW PLANS 10-01-01: 2ND REVIEW PLAN 10-25.03: 3RD REVIEW PLAN 11-04-030 4TH REVIEW PLAN 01-05-04: PRELIMINARY PLAN 01-22-040 FINAL PLAN SHEET UP a I 0 I I 00 H N 00 N V� vP.N "~ A M r--� M ..� 05 M -.1- CD A A cn 00 co C cd U N o0 N � M 00 O QD O� V/ 00 M O � � as o a � O V O � p� U DATE: 04-24-01 DRAWN 15Y: J,HOLLEY 1 SCALE: AS SHOWNI REVISIONS: 05-12-0I: PREVIEW PLANS 10-01-01: 2ND REVIEW PLAN 10-25.03: 3RD REVIEW PLAN 11-04-030 4TH REVIEW PLAN 01-05-04: PRELIMINARY PLAN 01-22-040 FINAL PLAN SHEET UP a I 0 I I a I I I I I I I a