HomeMy WebLinkAbout 04030235 Sewer/Water Permit/sCITY OF CARMEL
Item 1 €f 1
PERMIT RECEIPT
Sec: Twp: Rng: Sub:A43 Blk: Lot:425
PARCEL ID ........: ZA43425
DATE ISSUED.......: 03/30/2004
RECEIPT #.... .... 13799
REFERENCE ID # ••• 04030233
OPERATOR: vdolan
COPY # : 1
SITE ADDRESS .....: 14323 CHARIOTS WHISPER DR
SUBDIVISION ......: SADDLE CREEK
CITY .............. WESTFIELD
IMPACT AREA ......
OWNER ............: PULTE HOMES
ADDRESS ..........: 11590 N MERIDIAN ST #530
CITY/STATE/ZIP ...: CARMEL, IN 46032
RECEIVED FROM ....: PULTE HOMES
CONTRACTOR .......: LIC # XHELEXC
COMPANY ..........: HELLYER EXCAVATION
ADDRESS ..........: 5781 THUNDERBIRD RD.
CITY/STATE/ZIP ...: INDIANAPOLIS, IN 46236
TELEPHONE ........: (317) 823-2231
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
-------------------------------------------------------------------------
USFWATCONN FLAT RATE 1.00 1310.00 0.00 1310.00 0.00
----------------------------------------
TOTAL PERMIT 1310.00 0.00 1310.00 0.00
METHOD OF PAYMENT AMOUNT NUMBER
----------------- ------------ ------------------
CHECK 1310.00 21960
TOTAL RECEIPT 1310.00
CITY OF CARMEL / CLAY TOWNSHIP Permit #: 04030233
r WATER / SEWER PERMIT / RECEIPT Date: 03/30/2004
1NbIANP-
PARCEL ID #: ZA43425
LOT & SUBDIVISION: 425 SADDLE CREEK
ADDRESS OF CONSTRUCTION: 14323 CHARIOTS WHISPER DR WESTFIELD, IN 46074
PAYMENT RECEIVED FROM:
Name: PULTE HOMES
CHECK #: 21960
EXCAVATOR INFORMATION:
Name: HELLYER EXCAVATION
Ph. #: (317) 823-2231 Fax #: Email:
Street Address: 5781 THUNDERBIRD RD. INDIANAPOLIS, IN 46236
Bond Expiration:
PERMIT TYPE: USEWRWATR ; SEWERNVATER PERMIT
Special Notes/Conditions:
LOT 425 SADDLE CREEK, WATER PERMIT ' NO NOTES "
The building & Sewer Shall be pvc sewer pipe meeting ASTM specifications 3034 SDR 35 of latest revision; or vitrified clay
pipe, meeting ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are hereby
permitted in writing. The sewer shall be installed in accordance with ASTM 2321 for pvc pipe and the Uniform Plumbing Code
for the State of Indiana. All installations shall be in strict compliance with pertinent City of Carmel ordinances. Back Water
check valves shall be installed in accordance with City Code Section 9-122(a), and sections P3008.1 and .2 of the International
Residential Code. All building sewers shall be 6" diameter.
All installations shall be "open trench" inspected and approved by the Carmel Sewer Department before any backfilling is done.
Non-compliance may result in digging up the sewer installation and/or denial of future sewer permits and/or denial of water
connections.
No footing or foundation drains or other sources of ground water or storm water shall be permitted to enter the public sewer.
Sewer inspections should be requested at (317) 571-2648 one to four hours in advance.
No inspections or installations will be made on Saturday or Sunday or holidays unless arrangements are made at least 24 hours in
advance. All plumbers or contractors installing sewer (or water) lines shall have a plumbers bond posted with the CITY
ENGINEER'S OFFICE. If any street must be cut, a separate street cut permit shall be obtained.
I have read the conditions to which I must adhere, and agree to accept the responsibility for all work done under this
permit.
Signed
Owner or Authorized Agent
APPLICANT NAME: LINDA KELCH
PAYMENT RECEIVED BY:
FEES:
$1,310.00
Garage Finish Floor Gar. FFE = 915.3 STERLING - ELEV 4C
1.5 feet above curb 1st Flr FFE = 917.3 RIGHT HAND - Partial Brick
at center of drive. Bsmt FFE = 907.6 PARTIAL BSMT - 9' Walls
Drive Slope = 4.0% 3 CAR - Front Entry
4' Fam Rm Ext
Ls. MLu[n' if )d MOO lr G
&c(%UoT°=001
Note:
Minimum Front yard - Vei
Minimum Side Yard - 5
Minimum Aggregate-1V
Minimum Rear Yard - 20'
LOT # 425
±10,407 SF
PAD 915.0 PER PLAN
Flood Hazard Note:
Lot Number 425 lies within that Special Flood Hazard
Zone 'X' per the scaled location on the Flood
Insurance Rate Maps for Hamilton County, Indiana
(Community Panel #18057CO205F, dated February 19,
2003).
Note:
This drawing is based upon construction plans and/or record drawings
prepared by others and is not based upon a field survey. COOR
Consulting & Land Services, Corp. does not warrant the correctness or
integrity of this information. The contractor/owner should verify existing
conditions prior to construction. Any varying field conditions or any
discrepancy with the information contained hereon should be
immediately reported to COOR Consulting & Land Services, Corp.;
failure to do so would result in the contractodowners assumption of
liability.
ooro
303 WEST MAIN STREET KNIGHTSTOWN. INDIANA
(888) 593-2667 (765) 345-5943 FAX#: (765) 345-5692
DATE: 03/19/04 JOB #2000-500.425 REVISIONS:
Note:
The proposed construction a de a jased upon
information, proposed an tours, n the approved
construction plans pa is subdl Ision. Unless stated hereon,
no information pe ini but not limited o, fluctuating water table
elevations, soil type r conditions within twflding area of said lot
has been provid r roferenced on said p ns. With the construction of
e basement, it i ecommended that the to est floor elevation be
constructed et est two (2) feet above an adjoining bodies of water
unless a stu of facts reveals otherwis Should any ground water be
witnessed d 'ng the excavation of sal stntctirre, the lowest floor
elevation sit uld be raised at least (2) feet above the ground water
level and ad tional construction hniques should be incorporated to
alleviate futu lems.
SADDLE CREEK
SECTION 12
PC 3, SLIDE 308
INSTR #200300122041
LOT # 425
4323 CHARIOTS WHISPER
WESTFIELD, IN 46074
PLOT PLAN
Prepared For.
Pulte Homes of Indiana
d1r-
Zt-
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SANITARY SEWER PERMIT
[ ] Conditional Permit [ X ] Final Permit
INDIVIDUAL LOTS/EXISTING BUILDINGS
Project Title: Clay Waste West
Location: Saddle Creek sec 12
Owner/Builder: Pulte
Lot# 425 Street address: 14323 Chariots Whisper Dr
City: Westfield Zip:46074 County: Hamilton
Interceptor Charges Paid: PRI: LOC: EDU Fee: 1,200.00 Application fee: 75.00
PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Township
Regional Waste District (see reverse) and any conditions noted below. All installations shall be inspected by District
personnel during "open trench" phase and before backfilling with sand or stone to six inches above the pipe. NO
footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter the District's
sanitary sewer system. The District will assume no liability for drains which are below the grade level of the
nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks The
permit holder (property owner, developer or builder) will be responsible for damages to the District's sewer system.
This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the
building site which is the subject of this permit.
Inspections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200
24 hours in advance. All new construction will be placed on billing six months after connection has been made or
when water is connected, whichever comes first.
District will inspect all sump pump connections 30 to 60 days after the lateral inspection has been
'completed.
have received a copy of Ordinance No. 9-13-99 and agree to follow all District standards. Building
as [ ] crawl space [ ] slab or [ ] basement that [ ]will be finished, [ ]rough -in plumbing with rig nder
pump installed during construction, [ X ] rough -in plumbing only and grinder pump will not be installed
during construction, [ ] no plumbing in the basement. (Please check appropriate box.) Builder will notify
the District office when the grinder pump installation is completed
Conditional Permit Terms:
[ ] NO CONNECTION to the sewer until further notification.
[ ] Certificate of Insurance must be on file with CTRWD listed as certificate holder.
[ ] 48 hours notice before work starts on manhole core drilling or cuts of active lines
and District inspector must inspect all work before covered.
[ ] All District fees will be paid in full.
[ ] Approval pending Districts review of plans.
[ ] Copies of approved permits from appropriate county or city agencies for work in
the right-of-way road cuts or are required.
[ ] No occupancy until further notification
All Conditions have been met and final permit issued
2004.
By signing below, I attest that I am familiar with the District's specifications and agree to accept responsibility for all
work done under this permit.
575-2350
Builder/ caner Signature Phone
Printed Name
Permit issued this 301h day of March, 2004.
Permit is valid for ON R from the date issued.
'-:::Candy J. Feltner
Manager of Administration
sv
yes 2 site plans submitted
Permit valid only with CTRWD seal in red ink.
CTRWD
RFG10NW
Permit-rev.01 /03/akn
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SUMMARY OF LATERAL INSTALLATION REQUIREMENTS
1. All houses, buildings, etc., shall connect to the District's sanitary sewer system within 90 days of notice providing a sewer is within 300 feet
for Hamilton County or 100 feet for Boone County of the property line. Only one building may connect to the sewer main per lateral unless
otherwise approved by the District.
2. No foundation or other storm water drains shall be interconnected to the sewer lateral installed and connected to the District's sanitary
sewer.
3. The existing sewer line from the building to the septic tank may only be used if it is located under a building addition, patio, porch or paved
driveway. Air test is required to show if acceptable for re -use. The property owner shall bear the cost of all testing. The District inspector
must be onsite for the duration of the air test.
4. The owner or contractor shall notify the District prior to covering the installed lateral so that the District can make an inspection to determine
compliance with the District's sewer use ordinance. Such notification shall be made 24 hours prior to the need for the inspection. If the
inspection fails and a second inspection is required, or contractor is not on site for scheduled inspection, or fails to cancel inspection, an
additional fee of $75.00 will be due. This must be paid prior to the time of the follow up inspection.
5. Property owners are hereby advised that the County Board of Health regulates the operation and maintenance of private sewage disposal
(septic) systems'. The County Ordinance provides in part that, upon connection to a public sewer, a septic tank "...shall be abandoned and
filled with earthen material in a safe and sanitary manner." Please contact the appropriate County Board of Health for further information.
6. Acceptable Pipe Materials:
7. Bedding:
PVC PIPE: SDR 35, ASTM D-3034, SIX INCH PIPE
PVC PIPE: SDR 21, ASTM D-241, SIX INCH PIPE
GASKETS JOINTS ASTM D 3212
GASKETS ASTM F-477
FITTINGS - SDR-26
DUCTILE IRON MECHANICAL COUPLING WITH PROPER FITTINGS.
CLEAN OUTS TO BE LOCATED THREE FEET WITHIN THE FOUNDATION AND NO MORE THAN
300 FEET APART.
Use fill sand or Number 8, 9 or 11 stone
Fill material is to be placed from 6 inches below to 6 inches above the pipe
The trench should be a minimum of 18 inches wide
8. Laterals shall be installed no closer than 20 feet from water wells unless PVC pressure grade pipe is used meeting SDR 21 and ASTM D-
2241. Any proposed installation requiring pressure pipe shall be reviewed and accepted by the District and the District's engineer prior to
installation.
9. Where a transition is made between SDR 35 pipe and pressure grade SDR 21 pipe, a ductile iron gasketed mechanical coupling shall be
used.
10. Laterals shall terminate within 3 feet of the building unless the conditions in item #3 above are met. No glued pipe shall be installed outside
of building foundation walls.
11. Additional information on District standards and specifications maybe obtained from the District's office during business hours of 8:00a.m.
to 4:30 p.m. Monday through Friday: All District standards can be located on our web site at http://www.ctrwd.org/.
Clay Township Regional Waste District
10701 North College Suite A.
Indianapolis, Indiana 46280
Phone: 844-9200 Fax: 844-9203
12. Septic effluent shall not be pumped out into the sanitary sewer system.
13. The District shall inspect ALL laterals. Please call the District office at 844.9200 24 hours prior to time of inspection
14. Contractors shall lay 14 gauge -stranded wire the entire length of the lateral. Wire is to be placed on top of the lateral. The District
inspector will verify placement of the wire. After inspection, bedding is to be placed on top.
15. Call before you dig. IUPPS 1-800-382-5544, 48 hours prior to digging_
Lateral-rev.04-01 cf