Loading...
HomeMy WebLinkAbout 04030235 Sewer/Water Permit/sCITY OF CARMEL Item 1 €f 1 PERMIT RECEIPT Sec: Twp: Rng: Sub:A43 Blk: Lot:425 PARCEL ID ........: ZA43425 DATE ISSUED.......: 03/30/2004 RECEIPT #.... .... 13799 REFERENCE ID # ••• 04030233 OPERATOR: vdolan COPY # : 1 SITE ADDRESS .....: 14323 CHARIOTS WHISPER DR SUBDIVISION ......: SADDLE CREEK CITY .............. WESTFIELD IMPACT AREA ...... OWNER ............: PULTE HOMES ADDRESS ..........: 11590 N MERIDIAN ST #530 CITY/STATE/ZIP ...: CARMEL, IN 46032 RECEIVED FROM ....: PULTE HOMES CONTRACTOR .......: LIC # XHELEXC COMPANY ..........: HELLYER EXCAVATION ADDRESS ..........: 5781 THUNDERBIRD RD. CITY/STATE/ZIP ...: INDIANAPOLIS, IN 46236 TELEPHONE ........: (317) 823-2231 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ------------------------------------------------------------------------- USFWATCONN FLAT RATE 1.00 1310.00 0.00 1310.00 0.00 ---------------------------------------- TOTAL PERMIT 1310.00 0.00 1310.00 0.00 METHOD OF PAYMENT AMOUNT NUMBER ----------------- ------------ ------------------ CHECK 1310.00 21960 TOTAL RECEIPT 1310.00 CITY OF CARMEL / CLAY TOWNSHIP Permit #: 04030233 r WATER / SEWER PERMIT / RECEIPT Date: 03/30/2004 1NbIANP- PARCEL ID #: ZA43425 LOT & SUBDIVISION: 425 SADDLE CREEK ADDRESS OF CONSTRUCTION: 14323 CHARIOTS WHISPER DR WESTFIELD, IN 46074 PAYMENT RECEIVED FROM: Name: PULTE HOMES CHECK #: 21960 EXCAVATOR INFORMATION: Name: HELLYER EXCAVATION Ph. #: (317) 823-2231 Fax #: Email: Street Address: 5781 THUNDERBIRD RD. INDIANAPOLIS, IN 46236 Bond Expiration: PERMIT TYPE: USEWRWATR ; SEWERNVATER PERMIT Special Notes/Conditions: LOT 425 SADDLE CREEK, WATER PERMIT ' NO NOTES " The building & Sewer Shall be pvc sewer pipe meeting ASTM specifications 3034 SDR 35 of latest revision; or vitrified clay pipe, meeting ASTM specifications C-700 for extra strength clay pipe of latest revision unless other materials are hereby permitted in writing. The sewer shall be installed in accordance with ASTM 2321 for pvc pipe and the Uniform Plumbing Code for the State of Indiana. All installations shall be in strict compliance with pertinent City of Carmel ordinances. Back Water check valves shall be installed in accordance with City Code Section 9-122(a), and sections P3008.1 and .2 of the International Residential Code. All building sewers shall be 6" diameter. All installations shall be "open trench" inspected and approved by the Carmel Sewer Department before any backfilling is done. Non-compliance may result in digging up the sewer installation and/or denial of future sewer permits and/or denial of water connections. No footing or foundation drains or other sources of ground water or storm water shall be permitted to enter the public sewer. Sewer inspections should be requested at (317) 571-2648 one to four hours in advance. No inspections or installations will be made on Saturday or Sunday or holidays unless arrangements are made at least 24 hours in advance. All plumbers or contractors installing sewer (or water) lines shall have a plumbers bond posted with the CITY ENGINEER'S OFFICE. If any street must be cut, a separate street cut permit shall be obtained. I have read the conditions to which I must adhere, and agree to accept the responsibility for all work done under this permit. Signed Owner or Authorized Agent APPLICANT NAME: LINDA KELCH PAYMENT RECEIVED BY: FEES: $1,310.00 Garage Finish Floor Gar. FFE = 915.3 STERLING - ELEV 4C 1.5 feet above curb 1st Flr FFE = 917.3 RIGHT HAND - Partial Brick at center of drive. Bsmt FFE = 907.6 PARTIAL BSMT - 9' Walls Drive Slope = 4.0% 3 CAR - Front Entry 4' Fam Rm Ext Ls. MLu[n' if )d MOO lr G &c(%UoT°=001 Note: Minimum Front yard - Vei Minimum Side Yard - 5 Minimum Aggregate-1V Minimum Rear Yard - 20' LOT # 425 ±10,407 SF PAD 915.0 PER PLAN Flood Hazard Note: Lot Number 425 lies within that Special Flood Hazard Zone 'X' per the scaled location on the Flood Insurance Rate Maps for Hamilton County, Indiana (Community Panel #18057CO205F, dated February 19, 2003). Note: This drawing is based upon construction plans and/or record drawings prepared by others and is not based upon a field survey. COOR Consulting & Land Services, Corp. does not warrant the correctness or integrity of this information. The contractor/owner should verify existing conditions prior to construction. Any varying field conditions or any discrepancy with the information contained hereon should be immediately reported to COOR Consulting & Land Services, Corp.; failure to do so would result in the contractodowners assumption of liability. ooro 303 WEST MAIN STREET KNIGHTSTOWN. INDIANA (888) 593-2667 (765) 345-5943 FAX#: (765) 345-5692 DATE: 03/19/04 JOB #2000-500.425 REVISIONS: Note: The proposed construction a de a jased upon information, proposed an tours, n the approved construction plans pa is subdl Ision. Unless stated hereon, no information pe ini but not limited o, fluctuating water table elevations, soil type r conditions within twflding area of said lot has been provid r roferenced on said p ns. With the construction of e basement, it i ecommended that the to est floor elevation be constructed et est two (2) feet above an adjoining bodies of water unless a stu of facts reveals otherwis Should any ground water be witnessed d 'ng the excavation of sal stntctirre, the lowest floor elevation sit uld be raised at least (2) feet above the ground water level and ad tional construction hniques should be incorporated to alleviate futu lems. SADDLE CREEK SECTION 12 PC 3, SLIDE 308 INSTR #200300122041 LOT # 425 4323 CHARIOTS WHISPER WESTFIELD, IN 46074 PLOT PLAN Prepared For. Pulte Homes of Indiana d1r- Zt- CLAY TOWNSHIP REGIONAL WASTE DISTRICT SANITARY SEWER PERMIT [ ] Conditional Permit [ X ] Final Permit INDIVIDUAL LOTS/EXISTING BUILDINGS Project Title: Clay Waste West Location: Saddle Creek sec 12 Owner/Builder: Pulte Lot# 425 Street address: 14323 Chariots Whisper Dr City: Westfield Zip:46074 County: Hamilton Interceptor Charges Paid: PRI: LOC: EDU Fee: 1,200.00 Application fee: 75.00 PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Township Regional Waste District (see reverse) and any conditions noted below. All installations shall be inspected by District personnel during "open trench" phase and before backfilling with sand or stone to six inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter the District's sanitary sewer system. The District will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks The permit holder (property owner, developer or builder) will be responsible for damages to the District's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200 24 hours in advance. All new construction will be placed on billing six months after connection has been made or when water is connected, whichever comes first. District will inspect all sump pump connections 30 to 60 days after the lateral inspection has been 'completed. have received a copy of Ordinance No. 9-13-99 and agree to follow all District standards. Building as [ ] crawl space [ ] slab or [ ] basement that [ ]will be finished, [ ]rough -in plumbing with rig nder pump installed during construction, [ X ] rough -in plumbing only and grinder pump will not be installed during construction, [ ] no plumbing in the basement. (Please check appropriate box.) Builder will notify the District office when the grinder pump installation is completed Conditional Permit Terms: [ ] NO CONNECTION to the sewer until further notification. [ ] Certificate of Insurance must be on file with CTRWD listed as certificate holder. [ ] 48 hours notice before work starts on manhole core drilling or cuts of active lines and District inspector must inspect all work before covered. [ ] All District fees will be paid in full. [ ] Approval pending Districts review of plans. [ ] Copies of approved permits from appropriate county or city agencies for work in the right-of-way road cuts or are required. [ ] No occupancy until further notification All Conditions have been met and final permit issued 2004. By signing below, I attest that I am familiar with the District's specifications and agree to accept responsibility for all work done under this permit. 575-2350 Builder/ caner Signature Phone Printed Name Permit issued this 301h day of March, 2004. Permit is valid for ON R from the date issued. '-:::Candy J. Feltner Manager of Administration sv yes 2 site plans submitted Permit valid only with CTRWD seal in red ink. CTRWD RFG10NW Permit-rev.01 /03/akn CLAY TOWNSHIP REGIONAL WASTE DISTRICT SUMMARY OF LATERAL INSTALLATION REQUIREMENTS 1. All houses, buildings, etc., shall connect to the District's sanitary sewer system within 90 days of notice providing a sewer is within 300 feet for Hamilton County or 100 feet for Boone County of the property line. Only one building may connect to the sewer main per lateral unless otherwise approved by the District. 2. No foundation or other storm water drains shall be interconnected to the sewer lateral installed and connected to the District's sanitary sewer. 3. The existing sewer line from the building to the septic tank may only be used if it is located under a building addition, patio, porch or paved driveway. Air test is required to show if acceptable for re -use. The property owner shall bear the cost of all testing. The District inspector must be onsite for the duration of the air test. 4. The owner or contractor shall notify the District prior to covering the installed lateral so that the District can make an inspection to determine compliance with the District's sewer use ordinance. Such notification shall be made 24 hours prior to the need for the inspection. If the inspection fails and a second inspection is required, or contractor is not on site for scheduled inspection, or fails to cancel inspection, an additional fee of $75.00 will be due. This must be paid prior to the time of the follow up inspection. 5. Property owners are hereby advised that the County Board of Health regulates the operation and maintenance of private sewage disposal (septic) systems'. The County Ordinance provides in part that, upon connection to a public sewer, a septic tank "...shall be abandoned and filled with earthen material in a safe and sanitary manner." Please contact the appropriate County Board of Health for further information. 6. Acceptable Pipe Materials: 7. Bedding: PVC PIPE: SDR 35, ASTM D-3034, SIX INCH PIPE PVC PIPE: SDR 21, ASTM D-241, SIX INCH PIPE GASKETS JOINTS ASTM D 3212 GASKETS ASTM F-477 FITTINGS - SDR-26 DUCTILE IRON MECHANICAL COUPLING WITH PROPER FITTINGS. CLEAN OUTS TO BE LOCATED THREE FEET WITHIN THE FOUNDATION AND NO MORE THAN 300 FEET APART. Use fill sand or Number 8, 9 or 11 stone Fill material is to be placed from 6 inches below to 6 inches above the pipe The trench should be a minimum of 18 inches wide 8. Laterals shall be installed no closer than 20 feet from water wells unless PVC pressure grade pipe is used meeting SDR 21 and ASTM D- 2241. Any proposed installation requiring pressure pipe shall be reviewed and accepted by the District and the District's engineer prior to installation. 9. Where a transition is made between SDR 35 pipe and pressure grade SDR 21 pipe, a ductile iron gasketed mechanical coupling shall be used. 10. Laterals shall terminate within 3 feet of the building unless the conditions in item #3 above are met. No glued pipe shall be installed outside of building foundation walls. 11. Additional information on District standards and specifications maybe obtained from the District's office during business hours of 8:00a.m. to 4:30 p.m. Monday through Friday: All District standards can be located on our web site at http://www.ctrwd.org/. Clay Township Regional Waste District 10701 North College Suite A. Indianapolis, Indiana 46280 Phone: 844-9200 Fax: 844-9203 12. Septic effluent shall not be pumped out into the sanitary sewer system. 13. The District shall inspect ALL laterals. Please call the District office at 844.9200 24 hours prior to time of inspection 14. Contractors shall lay 14 gauge -stranded wire the entire length of the lateral. Wire is to be placed on top of the lateral. The District inspector will verify placement of the wire. After inspection, bedding is to be placed on top. 15. Call before you dig. IUPPS 1-800-382-5544, 48 hours prior to digging_ Lateral-rev.04-01 cf