Loading...
HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO #3/7,755/Rangeline & City Center RAB – Project #16-ENG-50TO: Rieth-Riley, Inc. 1751 W. Minnesota St. Indianapolis, IN 46221 CITY OF CARMEL CONTRACT CHANGE ORDER NO.: 03 DATE: October 05, 2017 PROJECT NAME: Rangeline/City Center Roundabout CITY REQ. NO.: 16 -ENG -50 CITY PO NO.: 100273; 2016 COIT Bond CITY PO DATE: March 1_5.2017 I. You are directed to make the following changes in this Contract: Balance the over and under runs of existing items and to add new items for previously tabled claims. ITEM SCHEDULED ADJUSTMENT AMOUNT (+) OR (-) DAYS Changes to the communications hand holes previously installed per plans, per Carmel Communications request. See Attachment A. II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. No.: N/A Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,697,356.13 Contract Price will be increased/decreased by this Change Order $ 7,755.00 New Contract Price including this Change Order $ 1.705.111.13 Contract Time Prior to this Change Order July 15.2017 Open to Tran is Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order July 15, 2017 Open to Traffic This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes AreAp} oved: Recommended Accepted: A� JAmerican Structurepomt, Inc. Rieth-Riley, Inc. IQ U ENGINEER CONTRACTOR va�—e' n�i, Ma7260 Shadeland Station 1751 W. Minnesota St. (�-� Address Indianapolis, IN 46256 City/State/Zip BY; Phone: 317-547-5580 Date: 1- 8. zor6 Address Indianapolis, Phone: 317-634-5561 _ Date: /l lU Mary AXh Burke,,Member Wori �OVSatso ember e0000w2 07 Jere shman, C y_,1Ig. istine S. Pau ey, Clerk - Treasurer Date: / CHANGE ORDER SUMMARY SHEET Project No.: 16 -ENG -50 Project Name: Range Line and City Center Dr Roundabout Contractor: Rieth-Riley Contractors RPR: Caleb Edwards, CPII - American Structurepoint Bid Date: March 15, 2017 Bid Amount: $1,516,487.52 Original PO#: 100273 2016 COIT Bond C O. # Total Total Foreseen Unforeseen Amount Amount Total Change Order Amount Running Total of Change Orders Description of Change Order Date Board Approval Intermediate Calendar Days +/- Substantial Calendar Days +/- Final Calendar Days +/- New Contract Amount % Foresee n % Unforesee n 1 $69,419.74 $69,419.74 $69,419.74 Time Extension and Design Changes 05/16/17 0 14 14 $1,585,907.26 4.58% 0.00% 2 $111,448.87 $111,448.87 $180,868.61 Item Balances and Claims 0 0 0 $1.697,356.13 7.35% 0.00% 3 $7,755.00 $7,755.00 $188,623.61 Carmel Communications Request 0 0 0 $1,705,111.13 0.51%1 0.00% a-I00,bL3.Ol zi�U.vu �010?5,bZ3.b1 U 14 14 12.44% 0.00% Original Bid Amount $1,516,487.52 Total Change Orders Amount $188,623.61 Total Foreseen Change Orders 12.44% Total Unforeseen Change Orders 0.00% Total % Change from Bid Amount 12.44% rev 4/11/2016 ■ STRUCTUREPOINT .American Structurepoint, Inc. ■ Change Order Details Rangeline and City Center Way Roundabout Description: Converting the existing signalized four-way intersection at Rangeline Road and City Center Drive to a multi -lane roundabout. Change Order: 3 Date Created: 10/05/2017 Status: Draft Date Approved: Type: Changed Conditions Summary: Carmel Communications Request Change Order Description: Changes in communications hand holes on the project per final request of Carmel Communications. Awarded Project Amount: $1,516,487.52 Authorized Project Amount: $1,585,907.26 Change Order Amount: $7,755.00 Revised Project Amount: $1,593,662.26 New Items Line Number Item Unit Proposed Quantity Unit Price Dollar Amount Section: 01 - Default 1100 807-78590 EACH 1.00 $6,820.000 $6,820.00 HANDHOLE Reason: Replace Existing HH with 36" DIA HH - per request Carmel Communications 1110 809-04652 EACH 1.00 $935.000 $935.00 SERVICE POINT Reason: Re -Configure Service Point for Fiber Rack - per request Carmel Communications (2 Items) Total: +$7,755.00 Change Order Details: Rangeline and City Center Page I of 1 10/05/2017 Way Roundabout IETHIL�ILEY CONSTRUCTION Co., INC, 100% Quality • 100% Employee Owned • Over 100 Years October 4, 2017 Caleb Edwards American Structurepoint RPR/Construction Inspector RE: Rangeline Road and City Center Drive Roundabout City of Carmel Project No. 16 -ENG -50 Rieth-Riley Project No. 3200690 Mr. Edwards, SENT VIA ELECTRONIC MAIL ONLY: cedwards@structurepoint.com Per the City of Carmel Communications request, Rieth-Riley Construction Co., Inc. proposes two additional pay items be added to the job. Replace existing handhole with 36 inch Diameter hand hole 1 Lump Sum $6,820.00 Re -Configure Service Point for Fiber Rack 1 Lump Sum $935.00 Totallncrease $7,755.00 The total value of the anticipated contract adjustment is $7,755.00. Any restoration required to be performed by Rieth-Riley Construction will need to be done on a Time and Material Basis. Please call with any questions. �4-,, . 3. 64,t 2 Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. P.O. Box 276 •1751 W. Minnesota St. • Indianapolis, IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 01/11/17 Re: C.O. #3 Range Line & City Center RAB Project #16 -ENG -50 Doug, please find attached 2 originals of same change order for project #16 -ENG -50 Range Line & City Center RAB Project. Please review & initial for the next BPW Meeting. Change Order Original Contract Amount: $1,516,487.52 Increase: $7,755.00 New Contract Amount: $1,705,111.13 Thank you, Lisa Scott 0 Page 1