Loading...
HomeMy WebLinkAboutClark Dietz, Inc/Eng/Adl Serv #12/23,630/Jumper Lane Culvert Replacement – Construction InspectionClark Dietz, Inc. Engineering Department - 2013 Appropriation # 2016 Storm Water Bond. P.O. #101313 Contract Not To Exceed $23,630.00 ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement") entered into by and between the City of Carmel and Clark Dietz, Inc. (the "Professional'), as City Contract dated May 4, 2016 shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA by and through its Board of Public Works and Safety By: �W James Brainard, Presiding Officer Date; Mary An1}�Burke, Date; / Lori S. Watso E Date: A istine Pauley, CleF/7r/?"/ Date: 1cr:,,��n.vA.r.s..I.t c: d. S.:.LL�gm+i.Fl: IK hLL MI) MA 81ld.-1!`NN11811 11 A\f) Clark Dietz, Inc. By: Authorized Signature / Atn t -T1e' Kra c;r� Printed Name ,57r. V u Fr -e '.le r,�- Title FID�TIN: 37— 121,,20-51 Last Four of SSN if Sole Proprietor: Date: O/ 1,9/,;20 It.-sw- -49 ClarloDietz Engineering Quality of Life" January 19, 2018 PROJECT DESCRIPTION: Construction Inspection of Jumper Lane Culvert Replacement SCOPE: The scope for this project is to perform construction inspection of a culvert replacement on Jumper Lane, located in Clay Township at coordinates 39.93943, -86.17211. The work to be performed is further described in the attached "Scope of Work" and "Compensation to Engineer". The not to exceed amount for this work is $23,630. Exhibit (6�y Clark Dietz, Inc. 8900 Keystone Crossing, Suite 900 Indianapolis, Indiana 46240 T: 317.844.8900 F: 317.844.9158 SCOPE OF WORK SERVICES TO BE FURNISHED BY CONSULTANT: The CONSULTANT shall be responsible for perfonning the following activities: A. EnzineerinQ Personnel The CONSULT ANT will provide a Resident Project Representative and inspectors for a period of time necessary to complete the construction project and final construction report. The Resident Project Representative will coordinate project activities with the City's Engineering Department. B. Description of Services 1. Construction Schedule: Review the construction schedule prepared by the Contractor for compliance with the Contract. 2. Conferences: Attend pre -construction conferences and arrange a schedule of progress meetings, as required for the timely and acceptable conduct of the job, including minutes of such meetings. 3. Liaision: Serve as the City's liaison with the contractor, working principally through the Contractor's field superintendent. The fulltime Resident Project Representative shall be thoroughly familiar with the plans and specifications applicable to the project to insure that all provisions therein are complied with. Provide periodic status reports on project progress to the City. 4. Assist the City in obtaining from the Contractor additional details or information when needed at the job site for proper execution of work 5. Equipment - Furnish all equipment necessary to sample and test materials and perform tests in accordance with City procedures. 6. Shop Drawings - Receive shop drawings and check for completeness 7. Inspection and Tests: Conduct on-site inspections and acceptance testing of materials in accordance with current City practices to determine that the project is proceeding in accordance with the Contract Documents. 8. Modifications: Evaluate the Contractor's suggested modifications to the drawings or specifications and offer recommendations to the City. 9. Records: Maintain files of correspondence, shop drawings, contract documents, change orders, and daily reports documenting hours worked, weather, general observations, daily pay quantities, and specific test results. 10. Prepare as -built drawings detailing authorized changes. 11. Prepare progress estimates for partial payments to the Contractor . 12. Hold a pre -final inspection with the City and the Contractor and prepare a final construction record and final estimate within 45 days of the pre -final. Exhibit z `� SCHEDULE No work under this Contract shall be performed by the CONSULTANT until the CONSULTANT receives a written notice to proceed from the City The CONSULTANT will be prepared to begin the work under this Agreement within five days after a letter of notification to proceed is received from the City. The CONSULTANT shall conform to the below listed items: l) Pre -Construction Minutes written and distributed for concurrence, five days after the Pre - Construction Meeting is held 2) Final Construction Records within forty-five days after the pre -final inspection has been held Exlvbit—A— 34'� COMPENSATION TO ENGINEER Construction Inspection - Jumper Lane Culvert Replacement Clark Dietz, Inc. 8898 Keystone Crossing, Suite 900 Indianapolis, Indiana 46240 TASK PM RPR Inspector CAD TECH TOTAL Employee Name(s) Kevin Hetrick Jason Buck 112 $125.00 $14,000.00 Project Management 2 0 0 0 2 Preconstruction Project Startup 0 12 0 0 12 Field Inspection / Measure / Material Records / Pay 0 80 100 0 180 Punch List Completion 0 12 0 0 12 Final Construction Record 0 8 0 0 8 TOTALS 2 112 100 0 214 PRIME CONSULTANT # HOURS / MILES Hourly / Mileage Rate COST Project Manager 2 $180.00 $360.00 RPR PE/S) 112 $125.00 $14,000.00 Constr. Inspector 1 100 $90.00 $9,000.00 CAD Tech III 1 0 $105.00 $0.00 SUBTOTAL: $23,360.00 [Mileage 500 $0.54 $270.00 TOTAL: $23,630.00, TOTAL COMPENSATION NOT TO EXCEED: $23,630.00 Project is 45 calendar days. Assume 30 days of work at 6 hours per day, including office work (estimates, change orders) Exhibit LIoT City (� Carmel INDIANA RETAIL TAX EXEMPT oCERTIFICATE NO. 003120155 002 0 JL FEDERAL EXCISE TAX EXEMPT ONE CIVIC SQUARE 35-6000972 CARMEL, INDIANA 46032-2584 FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997 PURCHASE ORDER DATE I DATE REQUIRED I REQUISITION NO. VENDOR NO. 1/24/2018_ J 060650 CLARK DIETZ, INC VENDOR 8900 KEYSTONE CROSSING #900 Page 1 of 1 PURCHASE ORDER NUMBER 101318 THIS NUMBER MUST APPEAR ON INVOICES, A/P VOUCHER, DELIVERY MEMO, PACKING SLIPS, SHIPPING LABELS AND ANY CORRESPONDENCE `DESCRIPTION Project 16 -SW -79; Contract Date 05.04.16 City Engineering's Office SHIP 1 Civic Square TO Carmel, IN 46032 - INDIANAPOLIS, IN 46240 - Kate Lustig PURCHASE ID BLANKET CONTRACT PAYMENT TERMS 22869 QUANTITY UNIT OF MEASURE 1 DESCRIPTION Department: 2200 Fund: 0 2016 Storm Water Bond Account: 94-650.04 1 Each ASA 12 - Jumper Lane Culvert Replacement - Inspection Send Invoice To: Jill Newport CrossRoad Engineers, P.C. 3417 Sherman Drive Beech Grove, IN 46107 G.O./Storm DEPARTMENT FREIGHT UNIT PRICE EXTENSION $23,630.00 $23,630.00 Sub Total $23,630.00 PLEASE INVOICE IN DUPLICATE ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT PAYMENT $23,630.00 SHIPPING INSTRUCTIONS ' Ar VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN 'SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLI GATED BALANCE IN 'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. 'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL 'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945 x�� AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY -- [%- -- -- -- — - Jeremy Kashman James Crider TITLE Director Administration CONTROL NO. 101318 CLERK -TREASURER