Loading...
HomeMy WebLinkAboutA013.0Products PlotID Length Product Plies Net Qty FJ1 32-00-00 11-7/8" BCI® 5000s-1.8 1 8 FJ2 20-00-00 11-7/8" BCI® 5000s-1.8 1 9 FJ3 14-00-00 11-7/8" BCI® 5000s-1.8 1 1 FJ4 4-00-00 11-7/8" BCI® 5000s-1.8 1 4 BM1 22-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM2 20-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM3 16-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 3 3 BM4 14-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM5 6-00-00 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 BM6 6-00-00 11-7/8" BCI® 5000s-1.8 1 2 BM7 4-00-00 11-7/8" BCI® 5000s-1.8 1 2 BM8 2-00-00 11-7/8" BCI® 5000s-1.8 1 1 BBO1 8-00-00 3-08 x 1-00-00 Generic Material 1 1 Ca1 12-00-00 1" x 11-7/8" BC RIM BOARD OSB 1 7 Bk1 1-00-00 11-7/8" BCI® 5000s-1.8 1 11 Connector Summary PlotID Qty Manuf Product Hu1 8 USP THF20112 Hu2 10 USP THF20112 Hu3 8 USP THF20112 Hu4 1 USP THF35112BBO1 BM3BM4BM2 BM5 BM6 BM7BM6BM7 BM8Ca1 Ca1 Ca1 Ca1Ca1Ca1 FJ3 Hu1Hu2Hu1 Hu4 Hu1Hu2 Hu1 1 1 2 7 Hu2Hu1Hu3Hu1FJ4FJ4FJ2FJ1 FJ2 Bk1 1-00-02 1-07-03 1-02-02 11-02 1-03-15 1-01-03 1-07-03 1-02-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-07-03 1-05-03 5-05 1-00-02 1-07-03 1-02-02 Sheet: 1/1 DWG: Order #: By: 2/7/2018 Date: Scale: NTS BC FRAMER18010178 20ATheGrove SecondFloor NOTE:ALLMEASUREMENTSTOBEVERIFIED INTHEFIELD. Revisions: BY: cut, notch or drill flanges DO NOT DN01 above to bearing below. Solid block all posts from F08 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 NOTE: REFER TO CURRENT BOISE CASCADE INSTALLATION GUIDE FOR DETAILS NOT SHOWN All I- Joists and Versa-Lam Beams Must Be Installed per The Boise Cascade Installation Guide! ----------------------------- Todo yo- los Rayos de Viguetas y Versa-Huída Deben Ser Instalados por La Guía de la Instalación de Cascada de Boise! FOR MULTIPLE PLY BEAM CONNECTION SEE THE "CONNECTION DIAGRAM" SUPPLIED WITH JOB PACKAGE BM1 is Garage HDR. Not shown on Layout 02/12/18 Adam Schriner