HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO #15/29,425.60/136th Gray Road RAB – Project #16-ENG-54CITY OF CARMEL TO: Rieth Riley Construction Co. CONTRACT CHANGE ORDER NO.: 15 1751 W. Minnesota St. DATE: January 31, 2018 Indianapolis, IN 46221 PROJECT NAME: 126`h St and Gray Road Roundabout 136`" St and Gray Road Roundabout Gray Rd Culvert Replacement. Culvert 165 CITY P.O. NO.: 100148 and 100149 CITY P.O. DATE: March 1, 2017 ot, You are directed to make the following changes in this Contract: For 16 -ENG -54, 130h St. and Gray Rd - As directed by the City of Carmel, the driveway for the Woods property at Gray Rd and Wintergreen Lane is to be relocated such that the new entrance will be off of Wintergreen Lane instead of Gray Rd at 136`h St. HMA, stone base and sod for this driveway will be paid under the base contract's unit prices. The direction for this construction is in accordance with the right-of-way acquisition terns with the property owner. Two property owners on the project requested to have their existing mailboxes reset instead of getting new ones. Item #134E reflects the cost to reset the mailboxes. On the side slope adjacent to the Woods property, Spectrum had a utility conflict identified early in this project's construction however it took nearly 4 months to get the conflict corrected. This area was planned to be seeded however as the entire project was directed to be sodded, this area had to be re -prepared for sod. This additional work is shown in Item #135E. FOR 136`h St, 16 -ENG -54 ITEM 021, Compacted Aggregate No 53 Base 027, HMA, Type C, Base, 25.0mm 033, HMA, Surface, Type B, 9.5mm 047, Mailbox Assembly, Single 059, Sodding, Nursery 1331E, Wood's Property Driveway Construction 134E, Mailbox, Reset 135E, Wood's R/W Slope Preparation for Sod UNIT QUANTITY PRICE AMOUNT (+) / (-) DAYS TON 118.2 $45.00 $5,319.00 0 TON 45.5 $62.00 52,821.00 0 TON 13.9 $110.00 S1,529.00 0 EACH <2.0> $175.00 <$350.00> 0 SYS 858.0 $3.00 $2,574.00 0 LSUM 1.0 $15,929.29 $15,929.29 0 EACH 2.0 $170.50 $341.00 0 LSUM 1.0 $1,262.31 $1,262.31 0 Chargee Order #15 TOTAL $29,425.60 I1. The following referenced documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.: N/A The changes result in the following adjustment of Contract Price and Contract Time: Contract Sum prior to this Change Order $3.620.947.30 Contract Sum will be increased/&efease� by this Change Order $29,425.60 New Contract Sum including this Change Order $3.650.372.90 Contract Time Prior to this Change Order /20/2017 Substantial Completion Date Days Net increased/decreased resulting from this Change Order Current Contract Time including this Change Order 6/20/2017 Final Completion Date Days 0 Days 5/20/2017 Substantial Completion Date Days 6/20/2017 Final Completion Date Days This Change Order is for full and final settlement of all direct, indirect, impact costs and time extension incurred at any time resulting from the performance of the changed work. The Above Changes Are Reconnnended: DLZ Indiana, LLC, Engineer 157 E. Maryland St. Indianapolis, IN 46204 Bi ltoneS/ - 3-0Zo Date / Zo. fir_ The Above Changes Are Accepted: Rieth,Riley Construction Company, Inc 1751 W. Minnesota St. Indianapolis, IN 46221 Date .� Approved: w /me Brainard, Mayor � /2 � Mary Ayfii Burke, Member ATTEST: Member PE, City City of Carmel Projects 16 -ENG -54 & 16 - ENG -16 136t" Street and Gray Road and 126t" St • Gray Rd RAB CHANGE ORDER #15 This change order, for 136`h St and Gray Rd, is for the work done to reconstruct and redirect the driveway on the Woods property as per the final right of way settlement. Additionally, 2 mailboxes on the project were reset instead of replaced at the property owner's request. The slope on the far northeast corner of the project had to be re -prepared for sod due to a lengthy delay in getting a Spectrum utility conflict resolved. Contract Price prior to this Change Order $3,620,947.30 ---------------------------------------------------------------------------------------- Contract Price ,N ill be increased by this Change Order $29,425.60 ---------------------------------------------------------------------------------------- New Contract Price including this Change Order $3,650,372.90 ----------------------------------------------------------------------- Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $3,205,200.00 $3,205,200.00 N/A CO1 $87,364.65 $3,292,564.65 2.73% CO2 $14,870.68 $3,307,435.33 3.19% CO3 <$1,235.00> $3,306,200.33 3.06% C04 $3,865.00 $3,310,065.83 3.17% C05 $7,710.42 $3,317,776.25 3.39% C06 $10,346.71 $3,328,122.96 J 3.69% C07 $6,810.30 $3,334,933.26 3.89% C08 <$4,100.00> $3,330,833.26 3.77% C09 <$1,052.48> $3,329,780.78 3.74% C010 $71,330.10 $3,401,110.88 5.76% C011 $67,784.18 $3,468,895.06 7.60% C012 $114,799.22 $3,583,694.28 11.81% C013 $12,820.50 $3,596,514.78 12.219/. CO14 $24,432.52 $3,620,947.30 12.97% CO15 $29,425.60 $3,650,372.90 13.89% PROJI'C7• NO 16 -ENG -16, 16 -ENG -54.16 -SW -107 ('ON I RACI"OK. Rieth Riley Construction Co. INSI'tAA ION CONM IL I".ANT DLZ Indiana IIID AMOUNT. 1111) IKI 1: $3,205,200.00 02/01/17 CONTRACT FORESEEN TOTAL TOTAL RUNNING DESCRIPTION OF DATE NEW % OF CHANGE % OF CHANGE CHANGE ORDER OR FORESEEN UNFORESEEN TOTAL OF CHANGE ORDER BOARD CONTRACT ORDER ORDER NUMBER UNFORESEEN AMOUNT AMOUNT CHANGE ORDERS APPROVED AMOUNT FORESEEN UNFORESEEN Owner directed changes at 001 FORESEEN $87,364.65 $87,364.65 Get_N_Go, Project 16 -SW- 05/17/17 $3,292,564,65 2,73% 107 PO# 100149 Replace 10" watermain 2 UNFORESEEN $14,870.68 $102,235.33 relocation items with 12" tems, Project 16 -ENG -54, $3,307,43533 0.46% PO# 100148 Replace 3" steel galvanized 3 FORESEEN -$1,235.00> $101,000.33 pipe for electrical with 2" $3,306,200.33 2.60% steel galvanized pipe.. UNFORESEEN $3,865.50 $104,865,83 Compensation for Undercut $3,310,065.83 057% 4 Areas $7.710.42 $112,57625 Carmel Water Utility Field $3,317,776.25 0.79% 5 UNFORESEEN Conditions and Additions $10,346.71 $122,922.96 Emergency Field Repair of $3,326,122.96 1.09% 6 UNFORESEEN 8" Sanitary Sewer Change Subgrade Treatment 7 UNFORESEEN $6,810.3D $129,733.26 from Lime to Cement, Project $3,334,933.26 1.29% 16 -ENG -54 Replace Team Inserta 8 UNFORESEEN 44,100.00- $125,633.26 Valves with EZ Valves $3,330,833.26 1.17% Project 16 -ENG -16 ----.._..--. __............------ Additional Nursery Sodding, FORESEEN -$1,052 48> $124.58038 additional sod preparation, $3,329,780.78 257% 9 Witdflower planting and final quantity adjustments Various unforeseen water BOTH $14,774.98 $56.555.12 $195,910.88 main issues and addition of $3,401,110.88 2.94% 2.82% 10 Fire Hydrant and Irrigation Tap. $67,784.18 $263,695.06 T&M for work done at 126th $3,468,895.06 4.83% 2.77% 11 FORESEEN and River Rd 12 BOTH $100,922.01 $13.877.21 $378,494.28 Trail Extension to the east $3,583,694 28 8.38% 343% and an feature foundation UNFORESEEN $12.820.50 $391,314.78 Unforeseen changes to deepsanitary $3,596,514.78 8.38% 3.83 13 sewer manhole Additional Nursery Sodding & additional sod preparation 14 BOTH $20,137.90 $4,294.62 $415,747.30 for 126th RAB. C&G turnouts $3,620,947 30 901% 396% and Blue RPMs for both projects. For 136th St - Woods Driveway Construction, 15 FORESEEN $29,425.60 $44517290 Mailbox Assembly adjustments, Sod $3,650,372.90 9.93% 3.96% preparation in late utility lowering area. $318.121.84 $127,051.06 $445,172.90 $3,650,31'1_.90 9,93% 3.96% Original Bid Amount $3,205,200.00 Total Change Order(s) Amount $445,172.90 Total Foreseen Change Orders $318,121.84 Total Unforeseen Change Orders $127,051.06 Total % Change Orders vs. Bid Amt. 1389% 1ETHj February 1, 2018 IL E Y CONSTRUCTION CO., INC, 100% Quality • 1000,o Employee Owned • Over 100 Years Mike Smith SENT VIA ELECTRONIC MAIL ONLY: DLZ Construction Observer Manager mismith@dlz.com 157 E. Maryland Street Indianapolis, IN 46204 RE: Gray Road at 136th Street RAB: City of Carmel Project No. 16 -ENG -54 Rieth-Riley Project No. 3200696 Dear Mr. Smith, Below is a summary of the Time and Material effort associated with the Woods Driveway installation as well as a breakdown of this requested contract adjustment Removed Tree stumps at Winter Green LN where the woods driveway will be going. Hand dug to find Gas Service, Telephone and TV Cable. Pot -Holing for utilities in the new woods driveway, taking shots and attempting to layout woods driveway. NOTE: Badger paid port to port plus Dump fees. Dug out to subgrade from the tree stump and went north to Wintergreen Lane. Placed 6" of stone on all subgrade that was available. (Half of drive is complete and ready for asphalt) 71.21 Ton Shot grades for driveway. Loaded out Dirt and hand dug for utilities. Cut out dirt, put stone on infor the woods driveway. 68 tons Saw Cut Driveway, dug out ramps with skid steer and left a 4" reveal. Paved drive with 3". Used 45.57 tons. Finished paving, cleaned driveway and swept road. Removing driveway and stone underneath. Replaced with dirt for seed. Removed initially with excavator, but excavator wouldn't fit through gate, so a skid steer and loader was used to remove Paved Woods Driveway 17 ton Regrade yard for sod as directed by the City. Overseeing Sod crew to assure job completed as directed. 4/24/2017 $650.69 4/25/2017 $2,305.12 4/26/2017 $4,459.90 6/21/2017 $2,611.90 6/22/2017 $3,612.02 7/14/2017 $4,476.18 8/8/2017 8/11/2017 11/29/2017 11/30/2017 Total Cost Deduct 118.18 Tons paid under existing pay item 21 @545/ton Deduct 45.5 Tons paid under existing pay item 27 @$62/Ton Deduct 13.9 Tons Paid under existing pay item 33 @ $110/Ton Total of Change Order Request $1,674.26 $1,825.28 $3,141.25 $840.79 $25,597.39 -$5,318.10 -$2,821.00 -$1,529.00 $15,929.29 Z-7-c.rr / 334 P.O. Box 276 1751 W. Minnesota St. • Indianapolis. 1N 46206 1, Phone: (317) 634-5561 • www.rieth-riley.com 1ETHj ILEY CONSTRUCTION CO., INC. 100% Quality • 100 Employee Owned • Over 100 Years The total contract value adjustment amount requested for this work is $15,929.29 All associated backup is attached on the following pages. Please call with any questions. Thanks Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Gary Davis P.O. Box 276 • 1751 W Minnesota St. • Indianapolis. IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com Equipment Dale Labor Labor MU Material Material MU Equipment MU Sub Sub MU Bond Bond MU Total CC 400-01011: Woods Drive Removed Tree stumps at Winter Green LN where the woods driveway will be going. Hand dug to find Gas Service, Telephone and TV Cable. 4/24/2017 $344.44 $68.89 $204.99 $24.60 $7.07 $0.71 $650.69 Pot -Holing for utilities in the new woods driveway, taking shots and attempting to layout woods driveway. NOTE: Badger paid port to pod plus Dump fees. 4/25/2017 $492.05 $98.41 $67.50 $8.10 $1,465.00 $146.50 $25.05 $2.51 $2,305.12 Dug out to subgrade from the tree stump and went north to Wintergreen Lane. Placed 6' of stone on all subgrade that was available. (Half of drive is complete and ready for asphalt) 71.21 Ton 4/26/2017 $1,245.17 $249.03 $1,542.54 $185.10 $571.64 $68.60 $495.00 $49.50 $48.47 $4.85 $4,459.90 Shot grades for driveway. Loaded out Dirt and hand dug for utilities. 6/21/2017 $1,016.93 $203.39 $0.00 $0.00 $654.78 $78.57 $570.00 $57.00 $28.39 $2.84 $2,611.90 Cut out dirt, put stone on intor the woods driveway. 68 tons 6/22/2017 $1,016.93 $203.39 $1,037.00 $124.44 $600.11 $72.97 $460.00 $46.00 $39.26 $3.93 $3,612.02 Saw Cut Driveway, dug out ramps with skid steer and left a 4" reveal. Paved drive with 3'. Used 45.57 tons. Finished paving, cleaned driveway and swept road. 7/14/2017 $952.61 $190.52 $2,050.65 $246.08 $764.80 $91.78 $114.75 $11.48 $48.65 $4.86 $4,476.18 Removing driveway and stone undemeath. Replaced with dirt for seed. Removed initially with excavator, but excavator wouldn't fit through gale, so a skid steer and loader was used to remove 8/0/2017 $1,047.36 $209.47 $0.00 $0.00 $354.83 $42.58 $0.00 $0.00 $18.20 $1.82 $1,674.26 Paved Woods Driveway 17 ton 8111/2017 $352.64 $70.53 $850.00 $102.00 $382.40 $45.89 $0.00 $0.00 $19.84 $1.98 $1,825.28 Regrade yard for sod as directed by the City. 11/29/2017 $1,674.12 $334.82 $0.00 $0.00 $693.12 $63.17 $289.50 $28.95 $34.14 $3.41 $3,141.25 Overseeing Sod crew to assure job completed as directed. 11/302017 $692.26 $138.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9.14 $0.91 $840.79 Total 1 $8,834.551 $1,766.911 $5,480.191 $657.621 $4,302.17 $516261 $3,394.251 $339.43T$278.211 $27.821 $29,597.391 ,�sss9T• aq �•rsK.�a33 - /529'6` _ /5/ TrnL �' IETH`KILEY CONSTRUCTION CO., INC, 100% Quality • 100% Employee Owned • Over 100 Years September 7, 2017 Mike Smith SENT VIA ELECTRONIC MAIL ONLY: D LZ Construction Observer Manager mism1th9dlz.corr- 157 E. Maryland Street Indianapolis, IN 46204 RE: Gray Road at 136`h Street RAB: City of Carmel Project No. 16 -ENG -54 Rieth-Riley Project No. 3200696 Dear Mr. Smith, Rieth-Riley Construction Co., Inc. is requesting an additional pay item for Mailbox Assembly, Single, Reset. A breakdown of this pricing is attached on the following page. Item Description Quantity I Unit I Unit Price I Extension EWA -1 IMailbox Assembly, Single, Reset 1 2.001 EA 1 $170.50 $341.00 I U I HL >:541.UU The approximate cost of this contract adjustment based on unit prices is $341.00. Please call with any questions. Thanks Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Gary Davis P.O. Box 276 • 1751 W. Minnesota St. • Indianapolis. IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com Soil Stabilization - Concrete Breaking - Guardrail - Fencing Milling - Subsurface Video Inspection - Full Depth Reclamation www.specialtiescom pany.com 9350 East 30th Street Phone: (317) 594-0291 Indianapolis, IN 46229 Fax: (317) 594-0271 24 Hour Contact Information Joe Hile: (317) 697-2774 joe.hile@speciaitiescompany.com Brad Schneider: (317) 502-6246 brad.schnelder@specialtiescompany.com Quotation: 16 -ENG -54, 136th Street, Hamilton County, IN To: RIETH-RILEY CONSTRUCTION Date: September 7, 2017 Description Item Quantity Units Tax Unit Price Total Mailbox Assembly, Single, Reset EW1 2.00 Each No $155.00 $310.00 Quotation valid for 10 days. Total S310.00 SS17082A Quotation prepared by: SPENCER STORIE Mobile: (317) 450-5407 An Equal Opportunity Employer CUEN- _ PROJECT NO. �/� "Je�''5j1 DLZPROJECT,%�tC�ST CRit J'OIfo I{ir�,�:. l3aKTSHEET NC OP N ---- ARCNITICTURI • 1WOINSIRIN6.OLANNINO SURVITINO -CONSTRUCTION SIRVICIS SUBJECT rWA,y 6& Get f;2fa7 #1-4? COMP BY DATE SIOP�t _ DATE ZC r7 pn/ vE u�R y Sc a, _SPC_ cTRrr.s�r CHECKED BY � a ;o .50 is V f i n . 1 { o A...4 _ 1 i IETHIL ICONSTRUCTION Co., INcs January 16, 2018 Mike Smith DLZ Construction Observer Manager 157 E. Maryland Street Indianapolis, IN 46204 100% Quality • 100%' Employee Owned • Over 100 Years SENT VIA ELECTRONIC MAIL ONLY: RE: Gray Road at 136th Street RAB: City of Carmel Project No. 16 -ENG -54 Rieth-Riley Project No. 3200696 Dear Mr. Smith, Below is a summary of the Time and Material effort associated with the sod r:otch prep in the area of the Spectrum Delay on the north leg of the above referenced RAB. Backup documentation is attached on the following pages. 11(29;'2017 Prepped for sod along North Gray Road leg @ Woods property where spectrum was delaying completion. $1,262.31 Total $1,262.31 The total contract value adjustment amount requested for this work is $1,262.31 Please call with any questions. Thanks Lucas S. Clark Project Manager RIETH-RILEY CONSTRUCTION CO., INC. cc: Gary Davis VA P.O. Box 276 - 1751 w. Minnesota St. • Indianapolis. IN 46206 Phone: (317) 634-5561 • www.rieth-riley.com RIETH-RILEY CONSTRUCTION EXTRA WORK AGREEMENT -"NTE: 11/29/17 Work Perfc Mred: JNTRACT: 3200696 PROJECT: 136th/Gray Rd FORCE ACCOUNT/EXTRA WORK FOR: Prepped for sod along North Gray road leg @ woods property where Spectrum was delaying completion. LABOR 109.05 (b)(1) uni Mo -9i EMPLOYEE i OvertimeDOUb"tlTe - - RATE _ .-- -Z:3N CARPENTER 0.00 0.00 $27.49 $0.00 CARPENTER PC=,=- 'AN 0.00 0.00 $28.99 $0.00 COMBINATION 0.00 0.00 $29.76 $0.00 FINISHER 0.00 0.00 $25.62 $0.00 LABORER - Chad _ 2.00 i 2.00 $23.22 $69.66 LABORER - David Morro,. 2.00 I 2.00 $23.22 $69.66 LABORER - Tim Nunn" 2.00 2.00 $23.22 S69.66 OPERATOR 103) Steven Bel: 2.00 x S34.05 S102.15 OPERATOR 103) Clint Smith 2.00 2.00 534.05 S102.15 OPERATOR OILER (103) 0.00 0.00 $30.51 $0.00 QA TECH 0.00 0.00 $23.62 $0.00 SUPERINTENDENT/PROJECT MANAGER 200 2.00 $43.10 $129.30 EAMSTER ---4 0.00 $27.911 $0.00 TOTAL LABOR $542.58 (2) FICA 7.50- % x LINE (2: 540.69 (3) ./NGES EMPLOYEE LINE (2) S25.50 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X =x'_ ,S,- ;®"`� CARPENTER 0.00 X 518.20 - $0.00 CARaEN'rER Fc_ . =.`. 0.00 x $18.201 $0.00 ',-.TION 0.00 x $14.91' _ $0,00 iNiSHER 0.00 x $13.96 =_ LABORER - Chad 2.00 x $13.96 =_ __$0.00 S27.92 _ASORER- David M"mv 2.00 x $13.�c! $27.92 -ABORER-Tim Nunnley 2.00 x $17.76 _ $35.52 JPERATOR (103) Stever. Ee . 2.00 x $17.76 = $35.52 ----RATOR (103) Clint Smith I - X $17.76 = $35.52 -=ERATOR OILER (103) 0.00 x $17.06 = $0.00 .A TECH 0.00 X $13.96 = S0.00 ==RINTENDENTIPROJECT MANj 2.00=. x $10.95 = S21.90 ',V.STER 0.00 x-1 $14.91 = $0.00 TOTAL FRINGES 5184.30 (4) WORKERS COMPENSATION 4.70 % X LINE (2) S25.50 (5) BODILY INJURY / PROPERTY DAMAGE INSURANCE 0.00 % X LINE (2) $0.00'(6) STATE UNEMPLOYMENT 3.85 % x LINE (2) $20,89 (7) FEDERAL UNEMPLOYMENT 0.40 % X LINE (2) $2.17 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (NOTE 433 S0.00 (9) TOTAL LINES 2, 3, 4, 5, 6, 7, 8 8 9 $816.13 (1o) 20 % x LINE (10) $163.23 (11) - GRAND TOTAL LABOR LINES (10) + (11) $979.36 (12) Paye 1 c'12 MATERIAL 109.05 (b)(3) MATERIALS PURCHASED MATER;ALS MANUFACTURE -- TOTAL: LINE 08) • (19) 12 % x LINE (20) GRAND TO7,---CRMATERIALS ..E;20)+(21) EQUIPMENT 109.05 (b)(4) $0.00 (18 $0.00 (19) $0.00 (20) 50.00 (21) SO.00 (22) ^w^NTR, '..' .,...-_ -..-..='.'=1.7 FH':A HOURL" R:; 1158 'a� tu< FUEL, LUBRICANTS AND TRANSPORTATION COSTS 2 00 S2 1', `:$ Cat C-38 a^e- 4a 2 -CO 5139 08 R2171324 239 Cal Sled Steer GRAND TOTAL FOR EQUIPMENT LINES ;25) + (27) 2.00 S73.10 11110 Cr. 314 -cxa;a:x 23 SC .c--^•S•ra--:--e S C{ 5_00 .r.r e - ::.C{ �.v TOTAL EQUIPMENT $239.16 (23) TOTAL TRUCKING $0.00 (24) FUEL, LUBRICANTS AND TRANSPORTATION COSTS 50.00 (25) TOTAL LINES (23) + 124) + (25) 5235.16 (28) 12 % x LINE (26) 526.70 (27) GRAND TOTAL FOR EQUIPMENT LINES ;25) + (27) S28 (28) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING $0.00 (29) 10 % x LINE (30) 53,000.00 OR LESS 50.00 (31) 7 % x UNE (30) OVER $3.000.00 $0.00 (32) GR4NO TOTAL =0R SUECCN T RACTORS: LINES (3'i + (31) • (32 $0.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES 02).(17).(22).(2S)& (33) $1,247.22 (34) 1 f' % OF BOND RATE BASED UPON UNE (34) S'113.72 (35) 10 LINE (36) S1.37 (36) TOTAL EXTRA WORK LINES: (34) • (38) + (36) S1.262.31 (37) Page 2 o 2 Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 02/05/18 Re: C.O. #15 —126th & Gray Road RAB and 136th & Gray Road RAB Project #16 -ENG -16 and #16 -ENG -54 Doug, please find attached 1 original of same change order for project #16 -ENG -16 and 16 -ENG -54 126th & Gray RAB and 136th & Gray Road RAB Projects. Please review & initial for the next BPW Meeting. Change Order #15 - Original Contract Amount: $3,205,200.00 Increase: $29,425.60 New Contract Amount $3,650,372.90 Thank you, Lisa Scott 0 Page 1