HomeMy WebLinkAbout322247 02/27/18 CITY OF CARMEL, INDIANA VENDOR: 370365
4:
ONE CIVIC SQUARE SJCA ENGINEERS &SURVEYORS CHECK AMOUNT: $***"2,145.00"
CARMEL, INDIANA 46032 9102 NORTH MERIDIAN ST,SUITE 200 CHECK NUMBER: 322247
INDIANAPOLIS IN 46260 CHECK DATE: 02/27/18
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
203 R4462200 34435 9365 2,145.00 ASA 1 MULTI PATH MAIN
VOUCHER NO. WARRANT NO. Prescribed by State Hoard of Accounts City Form No.201(Rev.1995)
Vendor# 370365 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
SJCA ENGINEERS &SURVEYORS IN SUM OF$ CITY OF CARMEL
9102 NORTH MERIDIAN ST, SUITE 200 An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
INDIANAPOLIS, IN 46260
Payee
$2,145.00
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
34435 9365 44-622.00 $2,145.00 1 hereby certify that the attached invoice(s),or 1/31/18 9365 Multi-Use Path Extensions-Main Street $2,145.00
2200 E'neumLered 203 2200 203
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Sunday, February 18,2018
Jeremy Kashman
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
,20—
Cost
20Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
SJCA,..
ENGINEERS
&c SURVEYORS
INVOICE iCS-rz1-tLl(e 7-200
SJCA P.C. a 3 H4-as
9102 N. Meridian Street,Suite 200
Indianapolis, IN 46260
317-566-0629
City of Carmel Invoice number 9365
Jeremy Kashman, P.E. Date 01/31/2018
Department of Engineering
One Civic Square Project 16EN022.MAIN STREET AND CAREY
Carmel, IN 46032 ROAD MULTI-USE PATH EXTENSIONS
Purchase Order No.34435
Contract Prior Current
Description Amount Billed Billed
Survey 9,620.00 9,620.00 0.00
Design
Prelim.Plans(w/ROW) 17,104.00 17,104.00 0.00
Final Plans/Tracings 11,796.00 11,796.00 0.00
Bid Plans 1,500.00 1,500.00 0.00
Subtotal 30,400.00 30,400.00 0.00
Right of Way Engineering 6,274.00 6,274.00 0.00
Construction Phase Services 0.00 1,232.00 0.00
Total 46,294.00 47,526.00 0.00
Professional Fees
Billed
Date Hours Rate Amount
Principal
Benjamin E.Deichmann
01/09/2018 2.00 195.00 390.00
01/12/2018 3.00 195.00 585.00
01/15/2018 0.50 195.00 97.50
01/18/2018 1.00 195.00 195.00
01/19/2018 1.50 195.00 292.50
01/23/2018 1.00 195.00 195.00
01/24/2018 1.00 195.00 195.00
01/30/2018 1.00 195.00 195.00
Subtotal 11.00 2,145.00
Professional Fees subtotal 11.00 2,145.00
Invoice total 2,145.00
City of Carmel Invoice number 9365 Invoice date 01/31/201 S
Page 1 of 2
City of Carmel Invoice number 9365
Project 16EN022 MAIN STREET AND CAREY ROAD MULTI-USE PATH EXTENSIONS Date 01/31/2018
Approved by:
r
Matthew S. Larrabee
Senior Project Manager
9102 North Meridian Street-Suite 200-Indianapolis, IN 46260
Office 317.566.0629-Fax 317.566.0633-Email sjca@sjcassoc.com
v
City of Carmel Invoice number 9365 Invoice date 01/31/2018
Page 2 of 2
Timesheet
SJCA P.C.-
S j C
P.C.
ENGINEERS
Sa SURVEYORS
Friday,February 02,2018
Page 1
Benjamin'E.Deichmann' - - Employee Status:Active
Timesheet date:2/3120 Total hours:,25.00
18
. . . . l
17SCO09 C.1.Permitting Principal 1.00 2.00 1.00 4.00
8EN001 Hydraulics(CL-07-003) Principal 0.50 0.50
1
18EN0011 Hydraulics CL-07-007) Principal 0.50 0.50
E14SG009
001 Replacement CL-43-027) Principal 0.50 0.50
F.3.Temporary Trailer Lateral Pump Principal 3.003.00
18017 18017 DPW RFQ 2018-1 Principal 0.50 0.50002 Utility Coordination Principal 2.00 2.00
17EN012 Utility Coordination Principal 1.00 1.00
17EN013 Utility Coordination Principal 1.00 1.00
16SCO13 Utility Coordination Services Principal 1.00 1.00
16EN022 16EN022 Utility Coordination Principal w1.00
17EN004 Street over Keystone Avenue Principal 2.00 2.00
14a005 UtilityCoordination Principal 7.00 7.00
Direct Total 0.00 8.00 8.00 8.00 0.00 0.00 0.00 24.00
Staff Meetings 1.00 1.00
Overhead Total 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00
Timesheet Total 0.00 8.00 8.001 8.00 1.00 0.00 0.00 25.00
Timesheet date:1/27/2018 Total hours 40.00
, .
.
16SCO15 Permitting Principal 0.501 0.50
18001 18017 18017 DPW RFQ 2018-1 Principal 1.00 1.00 1.00 0.50 3.50
16EN022 16EN022 Utility Coordination Principal 1 00': 1.00 2.00'
17EN012 Utility Coordination Principal 1.00 1.00
17EN013 Utility Coordination Principal 1.00 1.00
14EN002 Utility Coordination Principal 0.50 1.50 1.50 3.50
14SCO09 F.3.Tem orary Trailer Lateral Pump- Principal 0.50 2.50 0.50 1.00 4.50
14EN018 Utility Coordination Principal 0.50 0.50 0.50-- 1.50
15EN004 Utilit Coordination Principal 0.50 0.50 1.00
14EN003 Utility Coordination jPrincipal 0.50 1.701 3.50
Timesheet
SJCA P.C.
S j C
P.C.
ENGINEERS
8z. SURVEYORS
Friday,February 02,2018
Page 1
16SCO13 Utility Coordination Services Principal 1.00 2.50 0:50#P1-001
18EN001 Hydraulics(CL-07-003) Principal 1.00
18EN001 Hydraulics(CL-07-007). Principal 1.00
18EN001 Replacement(CL43-027) Principal 1.00 1.00
Direct Total 0.00 0.00 8.00 8.00 7.00 6.00 0.001 29.00
Business Development 1 1.50 1.50
Sick 8.00 8.00
Staff Meetings --EH, 1.00 0.50 1.50
Overhead Total 0.00 8.00 0.00 0.00 1.001. 2.00 0.00 11.00
Timesheet Total 0.00 8.00 8.00 8.001 8.00 8.00 0.00 40.00
Timesheet date:1/20/2018 Total hours:40.00
Project . . 0- Totall
18001 18002 INDOT RFP 1801 Principal 2.00 2.00 2.00 2.001 2.001 10.00
17EN004 Street over Keystone Avenue Principal 4.00 1.00F 5.00
16EN022 16EN022 Utility Coordination Principal 0.50 0.50
14EN002 Utility Coordination Principal 0.50 0.50 1.00 1.00 2.00 5.00
17SCO09 B.2.Final Site Engineering Plans Principal 1.00 1.00
17SC011 Permitting Principal 1.00 1.00 1.00 1.00 4.00
16SCO04 A.2.1.Final Site Engineering Plans Rev 1 Principal 1.00 1.00 1.00 3.00
16SCO15 Final Site Engineering Plan Revisions Principal 1.00 1.00
16SCO15 Permitting Principal F74
1.00 1.00 1.00 3.00
16SCO04 A.3.Permitting Principal 1.00 1.00 1.00 0.50 3.50
17SCO09 JJ-C.2.Meetings Principal 0.50 1.00 1.50
16EN022 16EN022 Utility Coordination Principal 1.00' 1.50 2.50
Direct Total 0.00 8.00 8.00 8.00 8.00 8.00 0.00 40.00
Timesheet Total 0.00 8.00 8.00 8.00 8.00 8.00 0.04_40.00
Timesheet date:1/13/2018 Total hours:40.00
Project Phase Employee Type 'Sun-07 0: 0• Wedmli]i Thu-11 Fri-12 Sat
18001 18002 INDOT RFP 1801 Principal 1.00 6.501 6.00 2.50 16.00
17EN002 Utility Coordination Principal 1.00 1.00
Timesheet
SJCA P.C.
Sj CA
P.C.
ENGINEERS
St SURVEYORS
Friday,February 02,2018
Page 1
17EN002 Permitting Principal 0.50 0.50
17EN004 Street over Keystone Avenue Principal 1.50 1.00 2.50
16EN022 16EN022 Utility Coordination Principal 2.00 3.00' TO0
17SC011 Final Site Engineering Plans Principal 1.00 1.00
14EN016 Road Design Principal 0.50 0.50
14EN002 Utility Coordination Principal 0.50 0.50
18001 Improvements Principal 1.00 1.00 2.00
17EN005 Permitting Principal 0.50 0.50
14EN012 Tracings Principal 0.50 0.50
18SC001 Princeton Park Concept Plan Principal 0.50 0.50 1.00
14EN001 Utility Coordination Principal 1.00 1.00
Direct Total 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00
Vacation 8.00 8.00
Overhead Total 0.00 8.00 0.00 . 0-0-OL-0 00 0.00 8.00
Timesheet Total0.00 8.00 8.00 8.00 8.00 8.00 0.00 40.00