Loading...
HomeMy WebLinkAbout04741 A-4.04FINISH SYMBOLS Manufacturer AREA NOT IN CONTRACT ROOM ROOM NAME ROOM ROOM NAME 2201 ROOM NUMBER XX WALL TREATMENT XX BASE XX FLOOR TREATMENT XX ACCENT WALL TREATMENT XX SURFACE TREATMENT J CORNER GUARDS CG F TRANSITION DETAIL NUMBER 1 A-7.OX - SHEET NUMBER B3 EXTENT OF CHAIR RAIL, DALTILE REFER TO NOTE #20. ALTERNATES ® PROVIDE ADD/ALTERNATE PRICING TO PROVIDE AND INSTALL NEW RESTROOM FINISHES. ALL EXISTING PLUMBING FIXTURES, MILLWORK AND TOILET PARTITION TO REMAIN. FLOOR: "CT2" WALLS: "CTI" BASE: "B3" TOILET PARTITIONS: ELECTROSTATICALLY PAINTED "P2" FINISH SCHEDULE FINISH NOTES GENERAL: 1. THE G.C. MUST NOTIFY THE ARCHITECT WITHIN FIVE WORKING DAYS OF THE AWARD OF THE GENERAL CONTRACT OF ANY AND ALL MATERIALS AND FINISHES SPECIFIED ON THE ARCHITECT'S DRAWINGS THAT EITHER ARE DISCONTINUED BY THE MANUFACTURER OR ARE UNAVAILABLE TO THE G.C. FOR HIS USE IN TIME FOR HIM TO COMPLETE THE WORK BY THE DATE AGREED UPON BY THE TENANT AND GENERAL CONTRACTOR. 2. UNLESS OTHERWISE NOTED, ALL AREAS TO RECEIVE TYPICAL FINISHES: P1, B1 AND C1. ALL EXISTING DOOR FRAMES TO BE PAINTED "P2" AND ALL EXISTING PAINT GRADE DOORS TO BE PAINTED "P2". 3. REFER TO THE ELEVATION AND DETAIL DRAWINGS FOR ADDITIONAL INFORMATION RELATED TO THE APPLICATION AND EXTENTS OF FINISHES. 4. REFER SHEET A-5.00 FOR FINISHES OF ALL DOORS, ALL DOOR FRAMES AND ALL SIDELIGHTS. 5. ALL EXTERIOR WINDOWS SHOULD HAVE BUILDING STANDARD MINI -BLINDS. G.C. TO ENSURE THAT EVERY SET OF MINI -BLINDS IS CLEAN AND REPAIRED, AS REQUIRED, FOR A LIKE -NEW APPEARANCE. 6. CORNER GUARDS TO BE ACROVYN INTERIORS AS MANUFACTURED BY CONSTRUCTION SPECIALITIES, INC. MODEL #SSM -20 OR APPROVED EQUAL. CORNER GUARDS WILL BE MANUFACTURED FROM .076" THICK NOMINAL HIGH IMPACT VINYL/ ACRYLIC. EXTRUSIONS WILL INCLUDE A MATTE FINISH SHADOW GRAIN SURFACE IN COLOR SPECIFIED ON FINISH SCHEDULE. VINYL/ACRYLIC GUARD WILL BE SECURELY SNAPPED IN PLACE OVER THE RETAINER, YET PROVIDE SHOCK ABSORBING MOVEMENT UNDER IMPACT. CORNER GUARDS WILL BE STRAIGHT AND TRUE OVER LENGTH. LENGTH OF CORNER GUARDS WILL BE 48". MOUNTED ABOVE THE SPECIFIED BASE. FLOORING: 7. ALL CARPET, ADHESIVE AND LUXURY VINYL TILE BY MOHAWK WITHIN LIBERTY MUTUAL'S SUITE TO BE PURCHASED BY LIBERTY MUTUAL AND SUPPLIED TO THE CONTRACTOR IN THE FIELD. CONTRACTOR IS TO COORDINATE SHIPMENT OF CARPET, VERIFY QUANTITIES, AND REQUEST THE CARPET SEAMING DIAGRAM WITH LIBERTY MUTUAL'S FLOORING SUPPLIER: RYAN BURKE AT ALLEGHENY CONTRACT FLOORING: (781)497-2810. 8. UNLESS OTHERWISE NOTED, CLOSETS TO RECEIVE SAME FLOOR COVERING AS ADJACENT AREA. 9. UNLESS OTHERWISE NOTED, STRAIGHT BASE WILL BE INSTALLED AT ALL CARPETED AREAS AND COVE BASE WILL BE INSTALLED AT ALL HARD SURFACE FLOORING AREAS. 10. G.C. TO ADHERE THE CARPET DIRECTLY TO THE SUB -FLOOR USING ADHESIVES IN ACCORDANCE WITH THE CARPET MANUFACTURER'S INSTALLATION SPECIFICATIONS. 11. INTERLOCKING PVC TILE TO BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. ORDER AT WWW.FLEXITILES.COM/COINPATTERN.HTM OR CALL 866-556-6324. ALLOW 4-6 WEEK LEAD TIME. 12. G.C. TO FLASH PATCH, SCRAPE AND GRIND THE EXISTING SLAB, AS REQUIRED, TO PROVIDE A SMOOTH SURFACE, FREE OF OLD ADHESIVE, HOLES, BUMPS OR CRACKS PRIOR TO THE APPLICATION OF ANY FLOOR FINISHES, AND AS REQUIRED FOR THE PROPER INSTALLATION OF THESE FINISHES. ALL EXISTING ADHESIVE MUST REMOVED. G.C. TO APPLY SEALANT (OPTISEAL OR APPROVED EQUAL) AS REQUIRED BY THE MANUFACTURER TO ENSURE NEW FLOORCOVERINGS PROPERLY ADHERE TO THE SUBSTRATE. 13. IT IS THE G.C.'S RESPONSIBILITY TO INSPECT THE EXISTING FLOOR SLAB AND NOTIFY THE ARCHITECT OF ANY CONDITIONS, SUCH AS: CONTROL JOINTS, EXPANSION JOINTS, CRACKS, UNEVENNESS AND/OR OTHER PREEXISTING FINISHES THAT CONFLICT WITH THE INSTALLATION AND MAINTENANCE OF THE FLOOR COVERINGS DESIGNATED ON THE FINISH PLAN(S), AND AS DETAILED, DESCRIBED AND SPECIFIED IN THESE DRAWINGS. METHODS OF ADDITIONAL PREPARATION, DETAILING AND/OR ANY JOINTS REQUIRED BY THE SPECIFIED FINISHED FLOOR MUST BE REVIEWED DURING THE PRICING PHASE OF THE PROJECT, AND INCLUDED AS PART OF THE G.C.'S PRICING. PRIOR TO THE INSTALLATION, G.C. SHALL PROVIDE SHOP DRAWINGS FOR REVIEW BY ARCHITECT SHOWING THE LOCATION OF ANY AND ALL SPECIAL DETAILING AND/OR JOINTS AS REQUIRED FOR THE SPECIFIED FLOOR FINISH, AND NOT SHOWN ON THESE DRAWINGS. THIS PROCEDURE IS CAREFULLY CONSIDERED TO AVOID ANY INSTALLATION SURPRISES OR POST -INSTALLATION PROBLEMS. IF THE G.C. FAILS TO FOLLOW THIS PROCEDURE, HE DOES SO AT HIS OWN RISK WITHOUT RECOURSE FOR ADDITIONAL COMPENSATION. 14. THE GENERAL CONTRACTOR WILL PROVIDE RELATIVE HUMIDITY TESTING OF THE FLOOR SLAB A MINIMUM OF 4 WEEKS PRIOR TO THE FLOORING INSTALLATION. THE I TESTING •• DRILLING ACYLINDRICAL HOLE WITH A ROTARY HAMMER -DRILL THEN PLACING A HOLLOW SLEEVE TO LINE THE HOLE. of PERFORM (3) HOLES/ TESTS FOR HFIRST 1,000 SQUARE FEET, AND T LEAST (1) ADDITIONAL HOLE / TEST FORE EACH ADDITIONAL 1 000 SQUARE FEET. of SELECT TEST LOCATIONS TO PROVIDE INFORMATION ABOUT MOISTURE DISTRIBUTION ACROSS THE ENTIRE FLOOR SLAB, ESPECIALLY AREAS OF POTENTIAL HIGH MOISTURE. FOR SLABS ON/BELOW GRADE, INCLUDE A TEST LOCATION WITHIN 3 FEET OF EACH EXTERIOR WALL. of USE WAGNER RH PROBES. to REFER TO ASTM F2170-11 FOR ADDITIONAL SPECIFICATIONS. •• CALCIUM CHLORIDE TESTING IS NOT ACCEPTABLE. •• NOTIFY THE PROJECT ARCHITECT OF THE TESTING RESULTS A MINIMUM OF 4 WEEKS PRIOR TO FLOORING INSTALLATION. PAINTING 16. PAINTING MAY BE PERFORMED DURING NORMAL BUSINESS HOURS. 17. ALL G.W.B. CEILINGS AND SOFFITS ARE TO BE PAINTED CEILING WHITE. 18. REFER TO THE CONSTRUCTION NOTES FOR BENJAMIN MOORE ORDERING INSTRUCTIONS THROUGH LIBERTY MUTUAL'S NATIONAL ACCOUNT. 19. BENJAMIN MOORE REGAL SELECT PAINT FINISHES TO APPLIED VIA ROLLER OR BRUSH. SPRAY APPLICATIONS WILL NOT BE ACCEPTED. 20. G.C. TO PROVIDE PAINT GRADE CHAIR RAIL MOUNTED AT 2'-7" A.F.F. TO CENTERLINE. CHAIR RAIL TO BE PAINTED P2. REFER TO DETAIL 13/A-7.01. Code Material Manufacturer Style Number Color Comments 131 RUBBER BASE ROPPE PINNACLE - 4" STRAIGHT 129 DOLPHIN USED WITH CARPET, U.N.O. B2 RUBBER BASE ROPPE PINNACLE - 4" COVE 129 DOLPHIN USED WITH HARD SURFACES, U.N.O. 6x12 CERAMIC TILE WITH 1/4" LATICRETE 39 MUSHROOM GROUT B3 BASE DALTILE CLIFF POINTE C-36C9T T.B.D. OR APPROVED EQUAL. SEE ALTERNATE #4 No. Date Revision P1 PAINT BENJAMIN MOORS- EGGSHELL OC -13 SOFT CHAMOIS GENERAL WALL PAINT, U.N.O. REGAL SELECT BENJAMIN MOORS- DOOR FRAME, SIDELIGHT FRAME AND TRIM P2 PAINT REGAL SELECT SEMI -GLOSS OC -14 NATURAL CREAM PAINT, U.N.O. P3 ACCENT PAINT BENJAMIN MOORS- REGAL SELECT EGGSHELL LB -50 LIBERTY BLUE (50%) ACCENT WALL PAINT, U.N.O. P4 ACCENT PAINT BENJAMIN MOORS- EGGSHELL LGN -50 LIBERTY GREEN ACCENT WALL PAINT, U.N.O. REGAL SELECT 50% 1/8° = 1'-0° P5 ACCENT PAINT BENJAMIN MOORS- EGGSHELL LY -50 LIBERTY YELLOW ACCENT WALL PAINT, U.N.O. REGAL SELECT 50% P6 ACCENT PAINT BENJAMIN MOORS- EGGSHELL LG -50 CORPORATE GREY ACCENT WALL PAINT, U.N.O. REGAL SELECT 50% PL1 PLASTIC LAMINATE WILSONART - 50121 MAGNOLIA COUNTERTOP PL2 PLASTIC LAMINATE WILSONART - 79491 ASIAN NIGHT BASE AND WALL CABINETS C1 CARPET TILE MOHAWK VEST GT172-859 PINSTRIPE GENERAL CARPET, I TO BE INSTALLED IN AN ASHLAR PATTERN. WC1 WALLCOVERING WOLF GORDON ZENITH GOH TENDRIL WALLCOVERING TO BE INSTALLED IN HIVE 2082457 HIVE #204 BACKSPLASH. TILE SIZE 2"x2" WITH GT1 GLASS TILE DALTILE COLOR WAVE CW33 LIME GLOW LATICRETE GROUT, COLOR #44 BRIGHT WHITE. VT1 INTERLOCKING PVC I TILE FLEXIBLE INTERLOCKING COIN TOP DARK GREY 20.5" x 20.5" INTERLOCKING TILES UTILITY TILE PVC TILE PATTERN VT2 FLOATING LVT MOHAWK HOT & HEAVY - SECOYA C0009 ATWELL MILL 148 RANDOM INSTALLATION PLANK CG CORNER GUARD C.S. GROUP ACROVYN SSM -20 MISSION WHITE REFER TO NOTE #6. 12" X 12" TILE, GRID PATTERN WITH 1/8" CT1 CERAMIC TILE DALTILE CLIFF POINTE CP81 T.B.D. LATICRETE 39 MUSHROOM GROUT OR APPROVED EQUAL. SEE ALTERNATE #4 6" X 18" TILE, RUNNING BOND PATTERN WITH CT2 CERAMIC TILE DALTILE CLIFF POINTE CP81 T.B.D. 1/8" LATICRETE 39 MUSHROOM GROUT OR APPROVED EQUAL. SEE ALTERNATE #4 INICK ivu6111er Finish Plan H E L L Y E R L E W IS= OPEN OPEN TRAINING A R C H I T E C T U R E OFFICE INTERIOR DESIGN 430 431 432 P1 CHAIR RAIL TO RETURN ON ITSELF WITH A 45 P1 P1 B1 DEGREE CUT. TYP. AT DIRTT INSTALLATION. B1 81 C1 CG CG CG C1 C1 I CG P6 CG CG CG uuum uuum uum uuum uuum uuum uuum uuum uuuu.. uuuu, uuuu uuuu, uuuu, uuum w � �ImreX m��� �urr�� YpNn �u� m Illlllm m111111111 111111111 111111111 111111 111111111111 11111111 1111111:OCUS ROOM FOCUS 443 iiiiu FOCUS ROOM iiii VIII ROOM P1 P4 442 P4luli g1 444 P1 iiiiu oiiu C1 oiiu oiiii P1 P5 B1 ul C 1 P5 C1 rw' uuuu u�l' Illllulu. uuum uuum uuum uuum uuum uuum uuum uuum uuum uuulu. uuulu. uuum uuuw uuuu uuum uuum uuum uuum uuum uuum OPEN CG llllulll OFFICE 15 A-7.00 429 COAT ASC oiii CONFERENCE CLOSET CG 440 oiii ROOM 4P 1 B2 P4 oiii P4 439 OFFICE C 1 2 1 1 South 1 2 t h St. C1 P1 433 PhiIa., PA 1 91 07 81 C1 VT P1 nil uul B1 P1 C1 B1 DIRECTION OF mNwlllll ullllll C1 CARPET TILE J (TYP) CG P6 OPEN OFFICE 428 tP1 B1 C1 DIRECTION OF CARPET TILE (TYP) OPEN OFFICE 427 IP1 B1 C1 OPEN COLLAB 426 IP1 B1 C1 CG CG CG CG CO P6 CG CG CG CG SUPPLY ROOM 402 P1 B2 VTI OPEN OFFICE 425 P1 B1 C1 P5 TELECOM 403 P1 &VT1 'IPI ^P3 RECEPTION 401 ,II'��� �LL OPEN COLLAB 438 IP1 B1 C1 COAT CLOSET 404 P1 B1 C1 CG 0 P6 0CG CG OPEN OFFICE 434 IP1 B1 C1 OPEN COLLAB 435 IP1 B1 C1 SUPPLY P1 ROOM ?Vl� 405 DIRECTION OF CARPET TILE (TYP) OPEN OFFICE 436 P1 B1 C1 P5 Co CG CHAIR RAIL TO RETURN ON ITSELF WITH A 45 DEGREE CUT. TYP. AT DIRTT INSTALLATION. QUIET FOCUS FOCUS FOCUS ROOM ROOM ROOMROOM PO100 407 408 409 410 411 P1 P1 B1 oiiii B1 oiii oiiii B1 oii% oiii g1 oiiii B1 C1 C1 C1C1 C1 P4 P4 P4 P4 uu- _-llu� 111111 lyllll uuum uuum uuum uuum uuum uuuw, uuulo. uuuw, uuum uuulo. uuum 0111 IIII uuulo. uuum uuum uuum uuum uuulo. uuum uuum uuulo. uuum uuum IIIInY uuuu... uum�l, uuuu�uu- �wam� uuuur, m IIII CG OPEN OFFICE 437 P1 B1 C1 CHAIR RAIL TO RETURN ON ITSELF WITH A 45 DEGREE CUT. TYP. AT DIRTT INSTALLATION. CG � CG 0 P6 DIRECTION OF CORR. P1 CT 4 B1 B3 LVT (TYP) 447 C1 T llllll.. llllllll.. lull lull lllllllll llllll) lull.. lllllllll llllllll ll lllllllll lllllllll llllllll lllllllll lllllllll lllllllll llllllll.. llllllll lllllllll lllllllll llllllll.. llllllll.. lllllllll lllllllll lllllllll llllllll.. llllllll.. lllllllll C G P6 IP uuu uum III IIP uuu uum IIII m m u°l m P3 P3 P3 P3 P0100 MOTHERS 417 ROOM 15 A- i P1 FOCUS uiiii iiii FOCUS iiii iiii CONFERENCE uiiii 416 ASC ROOM ROOM ROOM P1 421 VT 82 oiii 420 uiiii oiii 419 oiii oiii 418 uiiii 81 u0 PL2 P1 Co C1 B1 P1 uuu uul P1 uul uul P1 uuu C1 O B1 B1 B1 PLI C1 C1 iiii Cl iluil! J I' --CG CG CLOSET CG o P6 CHAIR RAIL TO RETURN ON ITSELF WITH A 45 P6 424 Q DEGREE CUT. TYP. AT DIRTT INSTALLATION. P1 � B1 C1 OFF CE DIRECTION OF OFFICE 423 CARPET TILE 422 P1 (TYP) P1 B1 B1 C1 C1 CO ROOMNCE °°I °°° ROOM 412 F413 P1 131 81 C1 C1 P5 P5 uuuu uuuu�mC'uo. uum SEATING AREA 414B P1 B2 PL1 VT DIRECTION OF LVT (TYP) PL1 HIVE 0414A Ill�rr IIIIIIIII P1 lllllllll lllllllll ll llllll llllll llllllll.. llllllll.. lllllllllluu � B2 oiulllll l ulr lllllPlSmllllll PL2 VT PL1 GTI CONFERENCE ROOM 415 P1 P6 luiiii B1 C1 CG liiiil ll SCALE: 1/8" = V-0° THE GENERAL CONTRACTOR IS RESPONSIBLE TO VERIFY ALL DIMENSIONS ON SITE AND CONFIRM SUCH DIMENSIONS AGAINST ACTUAL SITE CONDITIONS. THE GENERAL CONTRACT- OR SHALL COORDINATE ALL WORK AND RELATED TRADES, AND SHALL NOTIFY THE ARCHITECT OF ANY INTERFERENCE OF MECHANICAL, ELECTRICAL, OR PLUMBING WORK WITH THE ARCHITECTURAL WORK AND OF ANY CONFLICTS OR DISCREPANCIES IN DIMENSIONS AGAINST ON SITE CONDITIONS PRIOR TO PROCEEDING WITH THE WORK OR PROCUREMENT OF MATERIALS. Project: Wn Liberty Mutual® INSURANCE 450 East 96th St 4th Floor Indianapolis IN 46240 Drawing: Finish Plan No. A-4.04 Drawn by: CM/SP Checked b v K S Approved by: KB_ Client Approval: Date: Issue For Bid: 01/26/18 Issue For Permit: 01/29/18 No. Date Revision Scale: 1/8° = 1'-0° Drawing: Finish Plan No. A-4.04