HomeMy WebLinkAbout04741 CSGENERAL NOTES
1. ALL REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
2. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL CURRENTLY APPLICABLE CODES, REGULATIONS AND
ORDINANCES OF ALL GOVERNING BODIES HAVING JURISDICTION OVER THE PROJECT.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE BUILDING RULES AND REGULATIONS OF THE BUILDING
OWNER AND/OR BUILDING MANAGEMENT. AVOID CONFLICT AND INTERFERENCE WITH NORMAL BUILDING OPERATIONS
BY ADHERING TO THE BUILDING'S REGULATIONS CONCERNING SCHEDULING AND USE OF ELEVATORS AND LOADING
DOCKS FOR DELIVERIES, HANDLING OF MATERIALS, EQUIPMENT, AND DEBRIS.
4. ALL WORK, WITHIN THE SCOPE OF THE PROJECT SHOWN AND DESCRIBED IN THESE DRAWINGS, IS BY THE
GENERAL CONTRACTOR, UNLESS NOTED OTHERWISE.
5. ALL PERMITS, LICENSES AND INSPECTIONS, NECESSARY FOR THE PROPER EXECUTION OF THE WORK AND FOR
SUBSEQUENT TENANT OR OWNER OCCUPANCY, ARE TO BE SECURED AND PAID FOR BY THE GENERAL
CONTRACTOR.
6. DURING THE PRICING PHASE, THE GENERAL CONTRACTOR SHALL VISIT THE PROJECT PREMISES TO FAMILIARIZE
THEMSELVES WITH THE EXISTING CONDITIONS, AND TO VERIFY THE SCOPE OF THE WORK, IN ORDER TO FULLY
UNDERSTAND THE REQUIREMENTS OF EXECUTING THE WORK, AS SHOWN IN THESE DRAWINGS.
7. GENERAL CONTRACTOR SHALL COORDINATE AMONG ALL TRADES TO ENSURE PROPER SEQUENCE AND EXECUTION
OF WORK.
B. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROVISION AND COORDINATION OF ANY AND ALL
ENGINEERING SERVICES, NOT ALREADY PROVIDED BY EITHER THE ARCHITECT, BUILDING OWNER, OWNER OR TENANT,
AND NECESSARY WITHIN THE SCOPE OF THE PROJECT, INCLUDING ANY AND ALL REQUIRED ENGINEERING DRAWINGS
FOR PERMITS.
9. PRODUCT SUBSTITUTIONS, AS INITIATED BY THE GENERAL CONTRACTOR, WILL BE CONSIDERED AND REVIEWED BY
THE ARCHITECT DURING THE PRICING PHASE ONLY, AND NOT AFTER THE AWARD OF THE GENERAL CONTRACT.
SUBMISSIONS OF PRODUCT SUBSTITUTIONS TO THE ARCHITECT MUST CONTAIN COMPLETE PRODUCT DATA FOR
THE PROPOSED SUBSTITUTION, AS WELL AS COMPLETE PRODUCT DATA FOR THE PRODUCT ORIGINALLY SPECIFIED
IN THE DRAWINGS.
10. ALL EXISTING FIRE -RATED ELEMENTS ARE TO BE RECONSTRUCTED, IF DISTURBED DURING CONSTRUCTION.
DISTURBANCES TO BE KEPT TO A MINIMUM.
11. THE DRAWINGS AND CONSTRUCTION SPECIFICATIONS (OR NOTES) ARE INTENDED TO BE COMPLEMENTARY. SPECIFIC
INFORMATION MAY BE FOUND IN EITHER OR BOTH. DISCREPANCIES OR CONFLICTING INFORMATION AMONG OR
WITHIN THE DRAWINGS AND/OR SPECIFICATIONS (OR NOTES) SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT DURING THE PRICING PHASE FOR CLARIFICATION. ANY DISCREPANCIES BROUGHT TO THE ARCHITECT'S
ATTENTION BY EITHER THE BUILDING OWNER, GENERAL CONTRACTOR, OWNER OR TENANT, THE ARCHITECT
HIMSELF OR ANOTHER PARTY, AFTER THE GENERAL CONTRACT HAS BEEN AWARDED, SHALL BE RESOLVED BY THE
ARCHITECT, WHO WILL DETERMINE WHICH CONFLICTING ITEM SHALL GOVERN AS THE INSTRUCTIONS TO THE
GENERAL CONTRACTOR REGARDING THE EXECUTION OF THE WORK, AT NO ADDITIONAL COST TO THE BUILDING
OWNER, OWNER OR TENANT, ARCHITECT OR ANY OF THEIR REPRESENTATIVES OR CONSULTANTS.
12. THE GENERAL CONTRACTOR MUST INSPECT THE SITE, AND TO READ AND BE THOROUGHLY FAMILIAR WITH THE
PLANS, SPECIFICATIONS AND DOCUMENTS. THE FAILURE OR OMISSION OF THE GENERAL CONTRACTOR, OR HIS
SUBCONTRACTORS, TO EXAMINE ANY FORM OF DOCUMENT SHALL IN NO WAY RELIEVE THE CONTRACTOR FROM
ANY OBLIGATION IN RESPECT TO THEIR WORK. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION
WITH THE BUILDING OWNER TO GAIN ACCESS INTO ADJACENT TENANT SPACES AS REQUIRED FOR PRICING AND
EXECUTION OF THE WORK.
13. THE GENERAL CONTRACTOR SHALL FIELD -VERIFY ALL DIMENSIONS SHOWN AND NOTIFY HL OF ANY
DISCREPANCIES PRIOR TO THE ORDERING OF MATERIALS, BEGINNING FABRICATION AND/OR STARTING
CONSTRUCTION.
14. FOR ANY CONFLICT BETWEEN THE FIELD CONDITIONS AND THE DRAWINGS OR SPECIFICATIONS, THE GENERAL
CONTRACTOR SHALL NOTIFY HL AND REQUEST CLARIFICATION OR DIRECTION PRIOR TO THE START OF WORK AND
IN SUFFICIENT TIME FOR HL TO RENDER A DECISION WITHOUT DELAYING PROGRESS.
15. UPON AWARDING CONTRACTS TO SUBCONTRACTORS, THE GENERAL CONTRACTOR SHALL SUBMIT TO HL AND THE
TENANT, A SCHEDULE FOR ALL LONG LEAD TIME ITEMS ON THE PROJECT (I.E. MATERIALS, HARDWARE, FABRICS,
ETC.) AND SHALL BE RESPONSIBLE FOR NOTIFYING HL AND THE TENANT AS TO ANY ITEM WHICH MAY CAUSE THE
PROJECT TO BE DELAYED, PRIOR TO ORDERING THAT ITEM.
16. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE WHICH MAY OCCUR DURING CONSTRUCTION TO
EXISTING EQUIPMENT, BUILDING FEATURES OR ANY OTHER RELATED PROPERTY OF THE LANDLORD, BUILDING
OWNER, THE TENANT OR OTHER TENANTS IN THE BUILDING. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
THE PROTECTION OF EXISTING FINISHES IN ALL SPACES WITHIN OR ADJACENT TO THE SCOPE OF WORK AND
THE TENANT'S SPACE. THE CONTRACTOR IS TO PATCH, REFINISH, AND REPAIR ANY DAMAGE CAUSED.
17. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATE FIRE EXTINGUISHERS IN HIS WORK SPACE TO
COMPLY WITH ALL FIRE REGULATIONS THROUGHOUT THE DURATION OF CONSTRUCTION.
18. UPON COMPLETION OF THE WORK, THE GENERAL CONTRACTOR SHALL LEAVE ALL WORK AREAS AND FINISHED
SPACES IN A CLEAN CONDITION, AND ONE FOR WHICH THE TENANT FINDS ACCEPTABLE.
19. ALL WOOD BLOCKING IN WALLS OR ABOVE CEILINGS SHALL BE FIRE -TREATED TO MEET LOCAL CODES.
DIMENSIONS FOR BLOCKING SHALL BE MEASURED TO THE CENTERLINE OF BLOCKING.
20. ALL FIRE RATED/SMOKE BARRIER WALL CONSTRUCTION SHALL BE PERMANENTLY IDENTIFIED WITH SIGNS OR
STENCILING ABOVE FINISHED CEILINGS OR IN CONCEALED SPACES, WHICH READ AS FOLLOWS: "FIRE AND SMOKE
BARRIER- PROTECT ALL OPENINGS".
21. HL HAS NOT CONDUCTED ANY INVESTIGATION AS TO THE PRESENCE OF ANY HAZARDOUS MATERIAL, INCLUDING
ASBESTOS, WITHIN THE LIMITS OF THE PROJECT. HL WILL NOT ACCEPT RESPONSIBILITY FOR THE IDENTIFICATION
AND REMOVAL OF ANY HAZARDOUS MATERIAL OR FOR ANY EFFECT FROM ITS PRESENCE. IF ANY SUCH MATERIAL
IS FOUND IN THE PROJECT, THE GENERAL CONTRACTOR SHALL NOTIFY THE BUILDING OWNER AND HL
IMMEDIATELY.
22. THE GENERAL CONTRACTOR IS TO ENSURE THAT ALL WORK MEETS THE QUALITY AND CRAFTSMANSHIP
REQUIREMENTS STATED IN THE CONTRACT DOCUMENTS. WORK THAT DOES NOT MEET THESE QUALITY
STANDARDS WILL BE REJECTED, INCLUDING DEFECTIVE WORK NOT OBSERVED BY THE ARCHITECT DURING
CONSTRUCTION, ALL REJECTED WORK DETECTED DURING APPROPRIATE TIME FRAME WILL NEED TO BE
CORRECTED TO CONFORM TO THE CONTRACT DOCUMENTS. NO PAYMENT (PARTIAL OF FULL) WILL BE ACCEPTED
AS A REMEDY FOR DEFECTIVE WORK OR DISCREPANT MATERIALS.
23. THE GENERAL CONTRACTOR IS TO REFRAIN FROM ACTIONS THAT MIGHT LEAD TO THE FILING OF CLAIMS OR LIEN
BY SUBCONTRACTORS, SUPPLIERS OR MATERIALS, LABOR, SERVICE, EQUIPMENT, OR ANY OTHER PERSON OR
COMPANY SO ENTITLED UNDER GOVERNING LAWS AND REGULATIONS, UNLESS JUST CAUSE IS SHOWN. APPROVAL
FOR PAYMENT IS DEPENDENT UPON THE CONTRACTOR'S ACQUISITION AND PROVIDING HL SIGNED RELEASES FROM
AFOREMENTIONED INDIVIDUALS OR COMPANIES.
24. DURING THE COURSE OF CONSTRUCTION, ACTUAL LOCATIONS OF CONSTRUCTION ITEMS DENOTED IN THE
CONSTRUCTION DOCUMENTS TO BE INDICATED TO SCALE IN CONTRASTING INK ON THE DRAWINGS FOR ALL RUNS
OF MECHANICAL SPRINKLER, PLUMBING, AND ELECTRICAL WORK; INCLUDING SITE UTILITIES AND ANY CONCEALED
ELEMENTS THAT DIFFER FROM THE DRAWINGS. UPON COMPLETION OF THE PROJECT, THE ARCHITECT WILL
PROVIDE THE CONTRACTOR WITH A REPRODUCIBLE SET OF ORIGINAL DOCUMENTS FOR HIS PREPARATION OF
"AS-BUILTS" DOCUMENTATION. THIS SET SHALL BE CONSPICUOUSLY MARKED "AS-BUILTS" AND DELIVERED TO HL.
25. THE GENERAL
CONTRACTOR IS
TO NOTIFY HL IN WRITING UPON COMPLETION OF THEIR WORK. THE ARCHITECT
IS TO ATTEND
PUNCH LIST WALK THROUGH OF SITE
CONDUCTED BY
THE GENERAL CONTRACTOR. THE
GENERAL
CONTRACTOR
IS RESPONSIBLE
FOR DISTRIBUTING A
LIST OF ITEMS
TO BE FINISHED OR COMPLETED
PRIOR TO
SITE WALK THROUGH.
THE GENERAL CONTRACTOR
IS RESPONSIBLE
FOR TAKING NOTES DURING WALK
THROUGH
AND ISSUING A
FINAL LIST OF
ITEMS THAT NEED TO
COMPLETED OR
CORRECTED AS RESULT OF WALK
THROUGH.
THIS FINAL PUNCH LIST IS TO
BE DISTRIBUTED IN A
TIMELY MANNER
TO THE TENANT. OWNER AND HL.
ENGINEERING DRAWINGS
26. THE GENERAL CONTRACTOR AND SUBCONTRACTORS ARE TO PURCHASE AND MAINTAIN CERTIFICATES OF INSURANCE
APPLICABLE TO WORKERS COMPENSATION, PUBLIC LIABILITY, AND PROPERTY DAMAGE FOR THE LIMITS AS REQUIRED
BY LAW, IN ADDITION TO THE TERMS OF THE OWNER'S CONTRACT, WHICHEVER IS GREATER. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR INSTITUTING, MAINTAINING, AND MANAGING ALL SAFETY PRECAUTIONS IN
CONNECTION WITH THE WORK.
INICK iv116111er
ABBREVIATIONS
ACOUS.
ACOUSTICAL
HORIZ.
HORIZONTAL
A.C.T.
ACOUSTICAL CEILING
HVAC
HEATING, VENTILATION,
ARCHITECTURAL PLAN
TILE
REFLECTED CEILING PLAN
AIR CONDITIONING
ADJ.
ADJACENT
JT.
JOINT
ADJUST.
ADJUSTABLE
INTERIOR ELEVATIONS
A-7.00
A.F.F.
ABOVE FINISHED FLOOR
MAX
MAXIMUM
BLK'G
METAL BLOCKING
M.D.F.
MEDIUM DENSITY FIBERBOARD
FURNITURE PLAN
ENGINEERING DRAWINGS
MECH.
MECHANICAL
BTWN
BETWEEN
MFR.
MANUFACTURER
CAB.
CABINET
MIN.
MINIMUM
E-5.04
CENTERLINE
MNT'D
MOUNTED
CL'G
CEILING
MTL
METAL
CLR.
CLEAR
N.
NORTH
C.M.
CONSTRUCTION MANAGER
N.I.C.
NOT IN CONTRACT
COL.
COLUMN
N.T.S.
NOT TO SCALE
CONSTR.
CONSTRUCTION
M-4.04
MECHANICAL HVAC PIPING PLAN
CONT.
CONTINUOUS
O.C.
ON CENTER
COORD.
COORDINATE
OPP.
OPPOSITE
D.
DEEP
P.LAM
PLASTIC LAMINATE
DIA.
DIAMETER
PLWD
PLYWOOD
DIM.
DIMENSION
PT.
PAINT
PT'D
PAINTED
ELEC.
ELECTRICAL
EL.
ELEVATION
R
RADIUS
ELEV.
ELEVATOR
REQ'D
REQUIRED
EQ.
EQUAL
S.C.
SOLID CORE
EQUIP.
EQUIPMENT
SIM.
SIMILAR
F.E.C.
FIRE EXTINGUISHER CABINET
ST.
STAIN
FIN.
FINISH, FINISHED
ST'D
STAINED
FL.
FLOOR
STRUCT.
STRUCTURE
FR.
FRAME
SUSP.
SUSPENDED
FT.
FEET
T.B.D.
TO BE DETERMINED
GA.
GAUGE
TEL
TELEPHONE
GL.
GLASS
THK.
THICK
G.R.G.
GLASS REINFORCED GYPSUM
TYP.
TYPICAL
G.S.P.
GRID STARTING POINT
U.N.O.
UNLESS NOTED OTHERWISE
G.W.B.
GYPSUM WALL BOARD
VERT.
VERTICAL
H.
HIGH
V.I.F.
VERIFY IN FIELD
HL
HELLYER LEWIS
HDWE
HARDWARE
W
WIDE
H.M.
HOLLOW METAL
W/
WITH
HOLD
HOLD DIMENSIONALLY
WD.
WOOD
KEY PLAN
M
N
ON/ INDICATES AREA NOT IN CONTRACT
SITE LOCATION
N
DRAWING LIST
ARCHITECTURAL DRAWINGS
CS
COVER SHEET (THIS SHEET)
X-0.04
LIFE SAFETY PLAN
D-1.04
DEMOLITION PLAN
A-1.04
ARCHITECTURAL PLAN
r nay,
REFLECTED CEILING PLAN
A-3.04
POWER, VOICE & DATA PLAN
A-4.04
FINISH PLAN
A-5.00
DOOR & HARDWARE SCHEDULES
A-6.00
INTERIOR ELEVATIONS
A-7.00
PARTITION TYPES AND DETAILS
A-7.01
DETAILS AND ENLARGED PLANS
A-8.00
CONSTRUCTION NOTES
FURNITURE
DRAWINGS (FOR REFERENCE ONLY)
F-1.04
FURNITURE PLAN
ENGINEERING DRAWINGS
n I ,'f,y IrIri
ELECTRICAL SCHEDULES, LEGEND AND NOTES
E-1.04
ELECTRICAL DEMOLITION POWER PLAN
E-2.04
ELECTRICAL DEMOLITION LIGHTING PLAN
E-3.04
ELECTRICAL POWER PLAN
E-4.04
ELECTRICAL LIGHTING PLAN
E-5.04
MECHANICAL HVAC POWER PLAN
E-6.04
ELECTRICAL PANEL BOARD SCHEDULES
E-7.04
ELECTRICAL LIGHTING CONTROL DIAGRAMS
E -B.04
pal;
FP -0.04
FIRE PROTECTION SCHEDULES, LEGENDS, AND NOTES
t!510 F`ast 916th Street
FIRE PROTECTION PLAN
M-0.04
rr,Il;f (W,"""d
M-0.14
MECHANICAL HVAC SCHEDULES
M-1.04
MECHANICAL HVAC DEMOLITION PLAN
M-2.04
IF d&''e Seas,)
M-3.04
MECHANICAL HVAC PLAN
M-4.04
MECHANICAL HVAC PIPING PLAN
.7,,
MECHANICAL SPECIFICATIONS
P-0.04
PLUMBING SCHEDULES, LEGENDS, AND NOTES
P-1.04
E, 6t ,rh
9riC l ,`"dl, G4Vf `
I N
N
DRAWING LIST
ARCHITECTURAL DRAWINGS
CS
COVER SHEET (THIS SHEET)
X-0.04
LIFE SAFETY PLAN
D-1.04
DEMOLITION PLAN
A-1.04
ARCHITECTURAL PLAN
A-2.04
REFLECTED CEILING PLAN
A-3.04
POWER, VOICE & DATA PLAN
A-4.04
FINISH PLAN
A-5.00
DOOR & HARDWARE SCHEDULES
A-6.00
INTERIOR ELEVATIONS
A-7.00
PARTITION TYPES AND DETAILS
A-7.01
DETAILS AND ENLARGED PLANS
A-8.00
CONSTRUCTION NOTES
FURNITURE
DRAWINGS (FOR REFERENCE ONLY)
F-1.04
FURNITURE PLAN
ENGINEERING DRAWINGS
E-0.04
ELECTRICAL SCHEDULES, LEGEND AND NOTES
E-1.04
ELECTRICAL DEMOLITION POWER PLAN
E-2.04
ELECTRICAL DEMOLITION LIGHTING PLAN
E-3.04
ELECTRICAL POWER PLAN
E-4.04
ELECTRICAL LIGHTING PLAN
E-5.04
MECHANICAL HVAC POWER PLAN
E-6.04
ELECTRICAL PANEL BOARD SCHEDULES
E-7.04
ELECTRICAL LIGHTING CONTROL DIAGRAMS
E -B.04
ELECTRICAL SPECIFICATIONS
FP -0.04
FIRE PROTECTION SCHEDULES, LEGENDS, AND NOTES
FP -1.04
FIRE PROTECTION PLAN
M-0.04
MECHANICAL HVAC DETAILS, LEGENDS, AND NOTES
M-0.14
MECHANICAL HVAC SCHEDULES
M-1.04
MECHANICAL HVAC DEMOLITION PLAN
M-2.04
MECHANICAL HVAC PIPING DEMOLITION PLAN
M-3.04
MECHANICAL HVAC PLAN
M-4.04
MECHANICAL HVAC PIPING PLAN
M-5.04
MECHANICAL SPECIFICATIONS
P-0.04
PLUMBING SCHEDULES, LEGENDS, AND NOTES
P-1.04
PLUMBING PLAN
PROJECT CONTACTS
ARCHITECT MEP ENGINEER
HELLYER LEWIS, INC. INTEGRATED ENGINEERING CONSULTANTS, INC.
211 S. 12TH STREET 9700 ROCKSIDE ROAD, SUITE 290
PHILADELPHIA, PA 19107 CLEVELAND, OH 44125
CONTACT: CONTACT:
SCOTT PEARSON A.J. MAZZA
T: (215) 922-7066 T: (216) 901-6711
F: (215) 922-3778
H
E
L
LYER
L
EW
Approved by:
15=
ARCHITECTURE
INTERIOR DESIGN
Opp, P
' rry l ��f pay
JAR
21 1 South 1 2th St.
Phila., PA 1 9107
21 5.922.7066
THE GENERAL CONTRACTOR IS RESPONSIBLE
TO VERIFY ALL DIMENSIONS ON SITE AND
CONFIRM SUCH DIMENSIONS AGAINST ACTUAL
SITE CONDITIONS. THE GENERAL CONTRACT-
OR SHALL COORDINATE ALL WORK AND
RELATED TRADES, AND SHALL NOTIFY THE
ARCHITECT OF ANY INTERFERENCE OF
MECHANICAL, ELECTRICAL, OR PLUMBING
WORK WITH THE ARCHITECTURAL WORK AND
OF ANY CONFLICTS OR DISCREPANCIES IN
DIMENSIONS AGAINST ON SITE CONDITIONS
PRIOR TO PROCEEDING WITH THE WORK OR
PROCUREMENT OF MATERIALS.
Project:
Liberty
Mutual®
INSURANCE
450 East 96th St
4th Floor
Indianapolis IN 46240
Drawing:
Cover Sheet
No. CS
Drawn by:
CM /SP
Checked by:
KS
Approved by:
KB_
Client Approval:
Date:
Issue For Bid:
01/26/18
Issue For Permit: 01/29/18
No.
Date
Revision
Scale:
N/A
Drawing:
Cover Sheet
No. CS