HomeMy WebLinkAboutE-6.04CKT DESCRIPTION
LTG EQPT HVAC
XFMR C/B
C/B
XFMR HVAC EQPT
LTG
DESCRIPTION
LTG
CKT
1 CORE LIGHTING
0.36
20/1
A 20/1
HEAT PUMP - SOUTH
0.90
LIGHTING
A 20/1
2
3
2
20/1
B 20/1
4
2.25
LIGHTING
HEAT PUMP - SOUTH
4
5
B 20/1
20/1
C 20/1
NEMA L6 -20R
2.40
LIGHTING
7 A
6
7
HEAT PUMP - SOUTH
20/1
A 20/1
C 20/1
1.90
LIGHTING
1.50
8
9
20/1
B20 1
HEAT PUMP - SOUTH
1.20
LIGHTING
A 25/1
10
11
20/2
20/1
C 20/1
1.44
0.45
LIGHTING
HEAT PUMP - SOUTH
12
13
B 25/1
20/1
A 20/1
1.44
0.85
LIGHTING
0.54
14
15
HEAT PUMP - SOUTH
20/1
B 15/1
2.45
3.50
WSHP-46
21 J -BOX TO TERMINAL BLOCK
16
17
B
20/1
C 20/1
3.00
3.50
IH -1
A 25/1
18
19
1 2.50 1
20/1
A 20/1
23 5.00 C
14
15
HEAT PUMP - SOUTHEAST
20
21
B 25/1
20/1
B 20/1
=
HEAT PUMP
- NORTHWEST
ALL CB'S SHALL BE SWD/HID & HACR
22
23
HEAT PUMP - EAST
20/1
C 20/1
C 20/1
3.50
0.54
RATED. PROVIDE THE FOLLOWING WHERE
24
25 SPACE
Total kVA -LTG:
18
A
HEAT PUMP - EAST
3.50
20/1
A 25/1
26
27 SPACE
Total kVA -HVAC:
HEAT PUMP
B 15/3
=
20
21
HEAT PUMP - SOUTHEAST
28
29 SPACE
B 20/1
3.50
C
=
HEAT PUMP
- NORTHWEST
"H" = CB CLIP
30
31 SPACE
HEAT PUMP - SOUTHEAST
3.50
A
C 25/1
4.40
SPACE
"A" = ARC FAULT CB
32
33 SPACE
1st 10KVA REC:
24
B
HEAT PUMP - TOILET ROOMS
3.50
SPACE
A 25/1
34
35 SPACE
BALANCE OF REC:
HEAT PUMP
C
=
26
SPACE
HEAT PUMP - TOILET ROOMS EAST
36
37 SPACE
1 B 25/1
4.40
A
TOTAL kVAD:
HEAT PUMP
SPACE
kVAD
A
38
39 SPACE
HEAT PUMP - SOUTHEAST
5.30
B
C 15/1
2.45
SPACE
VOLTAGE: 208Y/12OV, 30, 4W
40
41 NIGHT LIGHT CIRCUIT
0.18
20/1
C
WSHP-4-31
2.45
SPACE
A 15/1
42
REMARKS:
PHASE TOTALS:
WSHP-4-32
LOAD SUMMARY:
kVAC x
D.F.
=
kVAD
1.47
ALL CB'S SHALL BE SWD/HID & HACR
PHASE A.
3.65
0.18
20/1
WSHP-4-34
FURNITURE SYSTEMS
0.90
34
RATED. PROVIDE THE FOLLOWING WHERE
PHASE B:
5.90
Total kVA -LTG:
9.95 x
1.25
=
12.44
WSHP-4-36
INDICATED:
PHASE C:
5.85
Total kVA -HVAC:
2.45 x
1.00
=
2.45
2.45
"G" = GFCI CB
0.54
15.40 kVAC
Total kVA-XFMR:
0.00 x
1.00
=
0.00
1.30
"H" = CB CLIP
B 15/1
1.33
Total kVA-EQPT:
3.00 x
1.00
=
3.00
40
"A" = ARC FAULT CB
WSW -4-41
2.45
15/1
C 15/1
2.45
D.F.
1.25
1.00
1.00
1.00
0.50
"G" = GFCI CB
WSHP-4-42
"S" = SHUNT TRIP CB
Total kVA-MISC:
42
REMARKS:
ALL CB'S SHALL BE SWD/HID & HACR
RATED. PROVIDE THE FOLLOWING WHERE
INDICATED:
"G" = GFCI CB
"H" = CB CLIP
"A" = ARC FAULT CB
"S" = SHUNT TRIP CB
PHASE TOTALS:
PHASE A.
PHASE B:
PHASE C:
48.40
47.70
43.85
139.95 kVAC
LOAD SUMMARY:
Total kVA -LTG:
Total kVA -HVAC:
Total kVA-XFMR:
Total kVA-EQPT:
kVAC
0.00
139.95
0.00
0.00
x
x
x
x
x
D.F.
1.25
1.00
1.00
1.00
=
=
=
=
=
TOTAL kVAD:
FEEDER DEMAND:
kVAD
0.00
139.95
0.00
0.00
139.95
168.41
kVAD
A
VOLTAGE: 4BOV277V, 30, 4W
AMPS: 225
EXISTING PANEL: H4
TOTAL kVAD:
17.89
kVAD
"A" = ARC FAULT CB
1st 10KVA REC:
10.00
x
FEEDER DEMAND:
21.53
A
VOLTAGE: 480Y/277V, 36, 4W
"S" = SHUNT TRIP CB
MAIN C/B
XX
ISOLATED GROUND BAR
6.48
x
0.50
=
AMPS: 175
MAIN LUGS ONLY
200% NEUTRAL
TOTAL kVAD:
13.24
SURFACE MOUNTED
DOUBLE LUGS
FEEDER DEMAND:
RECESSED MOUNTED
A
FEED THRU LUGS
MAIN C/B
XX
ISOLATED
EXISTING PANEL L4
kAIC
SUB FEED C B's
AMPS: 400
MAIN LUGS ONLY
CKT
DESCRIPTION
LTG EQPT HVAC
XFMR C/B
C/B
XFMR HVAC
EQPT
LTG
DESCRIPTION
1 QUAD
0.36
CKT
1
HEAT PUMP - SOUTH
3.50
20/1
A 20/1
3.50
3
2
HEAT PUMP
- SOUTHWEST
4
2
3
HEAT PUMP - SOUTH
3.50
20/1
B 20/1
3.50
C 20/1
NEMA L6 -20R
HEAT PUMP
- SOUTHWEST
7 A
4
5
HEAT PUMP - SOUTH
3.50
20/1
C 20/1
20/2
COPIER
1.50
SPARE
NEMA L6 -20R
6
7
HEAT PUMP - SOUTH
3.50
20/1
A 25/1
4.40
A
20/2
HEAT PUMP
- WEST
1.44
8
9
HEAT PUMP - SOUTH
3.50
1 20/1
B 25/1
4.40
A 20/1
1.44
HEAT PUMP
- WEST
0.54
10
11
HEAT PUMP - SOUTH
3.50
20/1
C 20/1
3.50
1 20
21 J -BOX TO TERMINAL BLOCK
HEAT PUMP
- NORTHWEST
B
12
13
HEAT PUMP - SOUTHEAST
3.50
20/1
A 25/1
4.40
19 SIGNAGE
1 2.50 1
HEAT PUMP
- NORTHWEST
23 5.00 C
14
15
HEAT PUMP - SOUTHEAST
3.50
20/1
B 25/1
4.40
D.F.
=
HEAT PUMP
- NORTHWEST
ALL CB'S SHALL BE SWD/HID & HACR
16
17
HEAT PUMP - EAST
4.40
25/1
C 20/1
3.50
0.54
RATED. PROVIDE THE FOLLOWING WHERE
HEAT PUMP
- NORTHWEST
Total kVA -LTG:
18
19
HEAT PUMP - EAST
3.50
20/1
A 25/1
4.40
12.00
Total kVA -HVAC:
HEAT PUMP
- NORTHWEST
=
20
21
HEAT PUMP - SOUTHEAST
4.40
25/1
B 20/1
3.50
1.00
=
HEAT PUMP
- NORTHWEST
"H" = CB CLIP
22
23
HEAT PUMP - SOUTHEAST
3.50
20/1
C 25/1
4.40
37 SPACE
"A" = ARC FAULT CB
HEAT PUMP
- NORTHWEST
1st 10KVA REC:
24
25
HEAT PUMP - TOILET ROOMS
3.50
20/1
A 25/1
4.40
B 20/1
BALANCE OF REC:
HEAT PUMP
- NORTH
=
26
27
HEAT PUMP - TOILET ROOMS EAST
3.50
20/1
1 B 25/1
4.40
kVAC x
0.00 x
0.00 x
0.00 x
9.72
9.72 x
0.00 x
TOTAL kVAD:
HEAT PUMP
- NORTH
kVAD
A
28
29
HEAT PUMP - SOUTHEAST
5.30
30/1
C 15/1
2.45
A
VOLTAGE: 208Y/12OV, 30, 4W
WSHP-4-30
MAIN C/B
0.18
30
31
WSHP-4-31
2.45
15/1
A 15/1
2.45
MAIN LUGS ONLY
XXX
WSHP-4-32
20/1
B 20/10
0 10.90
32
33
WSHP-4-33
1.47
15/1
B 25/1
5.00
0.18
20/1
WSHP-4-34
FURNITURE SYSTEMS
0.90
34
35
WSHP-4-35
2.45
1 15/1
C 15/1
2.45
LOAD SUMMARY:
NEW PANEL: CR
WSHP-4-36
kAIC
=
36
37
WSHP-4-37
2.45
1 15/1
A 15/1
2.45
0.54
WSHP-4-38
FURNITURE SYSTEMS
38
39
WSHP-4-39
1.30
15/1
B 15/1
1.33
=
0.00
WSHP-4-40
INDICATED:
PHASE C:
40
41
WSW -4-41
2.45
15/1
C 15/1
2.45
D.F.
1.25
1.00
1.00
1.00
0.50
"G" = GFCI CB
WSHP-4-42
16.48 kVAC
Total kVA-MISC:
42
REMARKS:
ALL CB'S SHALL BE SWD/HID & HACR
RATED. PROVIDE THE FOLLOWING WHERE
INDICATED:
"G" = GFCI CB
"H" = CB CLIP
"A" = ARC FAULT CB
"S" = SHUNT TRIP CB
PHASE TOTALS:
PHASE A.
PHASE B:
PHASE C:
48.40
47.70
43.85
139.95 kVAC
LOAD SUMMARY:
Total kVA -LTG:
Total kVA -HVAC:
Total kVA-XFMR:
Total kVA-EQPT:
kVAC
0.00
139.95
0.00
0.00
x
x
x
x
x
D.F.
1.25
1.00
1.00
1.00
=
=
=
=
=
TOTAL kVAD:
FEEDER DEMAND:
kVAD
0.00
139.95
0.00
0.00
139.95
168.41
kVAD
A
VOLTAGE: 4BOV277V, 30, 4W
AMPS: 225
EXISTING PANEL: H4
MAIN C/B
MAIN LUGS ONLY
SURFACE MOUNTED
RECESSED MOUNTED
kAIC
XX
ISOLATED GROUND BAR
200% NEUTRAL
DOUBLE LUGS
FEED THRU LUGS
SUB FEED C B's
"A" = ARC FAULT CB
1st 10KVA REC:
10.00
CKT DESCRIPTION
LTG REC HVAC
MISC. C/B
C/B MISC.
HVAC REC
LTG
DESCRIPTION
of State and Uncal Endes
CKT
1 QUAD
0.36
20/1
A
20/2
1
1.50
20/1
NEMA L6 -20R
3
2
3 QUAD 0.36 20/1 B
1.50
4
5
FOCUS ROOMS
FURNITURE SYSTEMS
C
20/2
20/1
1.50
C 20/1
NEMA L6 -20R
20/1
6
7 A
1.50
8
9
20/1
A 20/1
B
20/2
COPIER
1.50
8
NEMA L6 -20R
10
11 C
1.50
12
13
20/1
10
A
20/2
20/1
1.50
1.44
NEMA L6 -20R
TRAINING ROOM
14
15 B
1.50
16
17
A 20/1
1.44
C
20/2
0.54
1.50
15
NEMA L6 -20R
20/1
18
19 A
11.50
1 20
21 J -BOX TO TERMINAL BLOCK
5.00
60/2
B
30/2
C 20/1
1 1 2.50 1
FURNITURE SYSTEMS
NEMA L14 -R
16
22
19 SIGNAGE
1 2.50 1
20/1
24
23 5.00 C
14
1
REMARKS:
PHASE TOTALS:
21
LOAD SUMMARY:
kVAC x
D.F.
=
kVAD
OPEN COLLAB 426
ALL CB'S SHALL BE SWD/HID & HACR
PHASE A.
6.36
21 VENDING
20/1
C 20/1
B 20/1
C 20/1
0.54
RATED. PROVIDE THE FOLLOWING WHERE
PHASE B:
12.36
Total kVA -LTG:
0.00 x
1.25
=
0.00
20/1
INDICATED:
PHASE C:
12.00
Total kVA -HVAC:
0.00 x
1.00
=
0.00
0.18
"G" = GFCI CB
GENERATOR RECEPTACLE
30.72 kVAC
Total kVA-MISC:
0.00 x
1.00
=
0.00
20/1
"H" = CB CLIP
22
0.54
Total kVA-REC:
30.72
34
C 20/1
36
37 SPACE
"A" = ARC FAULT CB
C 20/1
A 20/1
1st 10KVA REC:
10.00 x
1.00
=
10.00
39 SPARE
41
"S" = SHUNT TRIP CB
40/2
B 20/1
BALANCE OF REC:
20.72 x
0.50
=
10.36
C 20/1 0.36 TIME WARNER
42
REMARKS:
ALL CB'S SHALL BE SWD/HID & HACR
RATED. PROVIDE THE FOLLOWING WHERE
INDICATED:
"G" = GFCI CB
"H" = CB CLIP
"A" = ARC FAULT CB
"S" = SHUNT TRIP CB
PHASE TOTALS:
PHASE A:
PHASE B:
PHASE C:
2.88
4.14
2.70
9.72 kVAC
LOAD SUMMARY:
Total kVA -LTG:
Total kVA -HVAC:
Total kVA-MISC:
Total kVA-REC:
1 st 1 OKVA REC:
BALANCE OF REC:
kVAC x
0.00 x
0.00 x
0.00 x
9.72
9.72 x
0.00 x
TOTAL kVAD:
20.36
kVAD
kVAD
A
VOLTAGE: 208Y/12OV, 30, 4W
AMPS: 250
EXISTING PANEL: P4C
0.18
MAIN C/B
MAIN LUGS ONLY
SURFACE MOUNTED
RECESSED MOUNTED
kAIC
XX
ISOLATED GROUND BAR
200% NEUTRAL
DOUBLE LUGS
FEED THRU LUGS
SUB FEED C B's
FEEDER DEMAND:
56.56
A
VOLTAGE: 208Y/12OV, 30, 4W
36
MAIN C/B
0.18
ISOLATED GROUND BAR
A 20/1
FURNITURE SYSTEMS
0.90
20/1
AMPS: 100
A 20/1
MAIN LUGS ONLY
XXX
200% NEUTRAL
20/1
B 20/10
0 10.90
32
-90
FURNITURE SYSTEMS
CONFERENCE 418
SURFACE MOUNTED
40
DOUBLE LUGS
0.18
20/1
C 20/1
FURNITURE SYSTEMS
0.90
34
RECESSED MOUNTED
FURNITURE SYSTEMS
FEED THRU LUGS
REMARKS:
PHASE TOTALS:
C 2D/1
LOAD SUMMARY:
NEW PANEL: CR
x
kAIC
=
SUB FEED C B's
37
ALL CB'S SHALL BE SWD/HID & HACR
PHASE A:
5.04
CKT DESCRIPTION
LTG REC HVAC
MISC. C/B
C/B MISC.
HVAC REC
LTG
DESCRIPTION
of State and Uncal Endes
CKT
1
ntro
20/1
A 20/1
0.90
1
OPEN OFFICE 431
20/1
2
3
2
20/1
B 20/1
1.08
B 20/1
FOCUS ROOMS
FURNITURE SYSTEMS
4
5
20/1
20/1
C 20/1
0.18
20/1
COPIER
6
7
FIRE ALARM PANEL
20/1
A 20/1
0.18
0.54
COPIER
A
8
9
20/1
B 20/1
1.44
9 FURNITURE SYSTEMS
TRAINING ROOM
20/1
10
11
0.54
20/1
C 20/1
1.44
11 FURNITURE SYSTEMS
TRAINING ROOM
20/1
12
13
20/1
20/1
A 20/1
1.44
12
TRAINING ROOM
0.54
14
15
FURNITURE SYSTEMS
20/1
B 20/1
0.54
C 20/1
MOTHER'S ROOM
15 FURNITURE SYSTEMS
16
17
B 20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
MOTHER'S ROOM
16
18
19 SIGNAGE
20/1
20/1
A 20/1
1 0.36
14
BROAD BAND
FURNITURE SYSTEMS
20
21
0.18
20/1
B 20/1
1.08
0.54
OPEN COLLAB 426
FURNITURE SYSTEMS
22
23
21 VENDING
20/1
C 20/1
B 20/1
C 20/1
0.54
0.54
24
25 5TH FLOOR COPIER
27
22
20/2
A 20/1
20/1
C 20/1
20/1
0.54
26
B 20/1
28
29
25 REFRIGERATOR
20/1
C 20/1
0.18
FURNITURE SYSTEMS
GENERATOR RECEPTACLE
20/1
30
31
33 SPARE
35
26
100/3
A 20/1
20/1
B 20/1
22
0.54
32
B 20/1
34
C 20/1
36
37 SPACE
20/1
C 20/1
A 20/1
0.54
24
FURNITURE SYSTEMS
FURNITURE SYSTEMS
38
39 SPARE
41
0.18
40/2
B 20/1
0.54
0.54
FURNITURE SYSTEMS
FURNITURE SYSTEMS
40
C 20/1 0.36 TIME WARNER
42
REMARKS:
ALL CB'S SHALL BE SWD/HID & HACR
RATED. PROVIDE THE FOLLOWING WHERE
INDICATED:
"G" = GFCI CB
"H" = CB CLIP
"A" = ARC FAULT CB
"S" = SHUNT TRIP CB
PHASE TOTALS:
PHASE A:
PHASE B:
PHASE C:
2.88
4.14
2.70
9.72 kVAC
LOAD SUMMARY:
Total kVA -LTG:
Total kVA -HVAC:
Total kVA-MISC:
Total kVA-REC:
1 st 1 OKVA REC:
BALANCE OF REC:
kVAC x
0.00 x
0.00 x
0.00 x
9.72
9.72 x
0.00 x
D.F.
1.25
1.00
1.00
1.00
0.50
=
=
=
=
=
=
TOTAL kVAD:
FEEDER DEMAND:
kVAD
0.00
0.00
0.00
9.72
0.00
9.72
27.00
kVAD
A
VOLTAGE: 208Y/12OV, 30, 4W
AMPS: 250
EXISTING PANEL: P4C
0.18
MAIN C/B
MAIN LUGS ONLY
SURFACE MOUNTED
RECESSED MOUNTED
kAIC
XX
ISOLATED GROUND BAR
200% NEUTRAL
DOUBLE LUGS
FEED THRU LUGS
SUB FEED C B's
0.54
C 20/1
FURNITURE SYSTEMS
0.54
I
I
I
I
NI
I
I
I
I
I
I
I
I
I
I
I
CKT DESCRIPTION
RELEASED FOR CONSTRUCTION
MISC. C/B
C/B MISC.
HVAC
Suubjecktio aompdiianme with ®III regofatimms
LTG
of State and Uncal Endes
LTG
ICltp at Caimal
ntro
DATE: 02/23/18
20/1
Nick Mishler
I
I
I
I
NI
I
I
I
I
I
I
I
I
I
I
I
CKT DESCRIPTION
LTG REC HVAC
MISC. C/B
C/B MISC.
HVAC
REC
LTG
DESCRIPTION
LTG
CKT
1 EWC
0.18
20/1
A 20/1
1
20/1
20/1
A 20/1
2
3 FURNITURE SYSTEMS
0.54
20/1
B 20/1
3
FURNITURE SYSTEMS
0.54
20/1
20/1
4
5 FURNITURE SYSTEMS
0.54
20/1
C 20/1
0.10
5
FIRE ALARM PANEL
0.54
6
7 FURNITURE SYSTEMS
0.54
20/1
A
FURNITURE SYSTEMS
6
7
8
9 FURNITURE SYSTEMS
0.54
20/1
B 100/3
0.54
COMPUTER ROOM PANEL "CR"
10
1
11 FURNITURE SYSTEMS
0.54
20/1
C
20/1
20/1
B 20/1
0.54
12
13 FURNITURE SYSTEMS
0.54
20/1
A 2D/1
FURNITURE SYSTEMS
0.54
20/1
FURNITURE SYSTEMS
C 20/1
14
15 FURNITURE SYSTEMS
0.54
20/1
B 20/1
12
0.54
FURNITURE SYSTEMS
FURNITURE SYSTEMS
20/1
16
17 FURNITURE SYSTEMS
0.54
20/1
C 20/1
FURNITURE SYSTEMS
0.54
14
FURNITURE SYSTEMS
FURNITURE SYSTEMS
18
19 VENDING
0.18
20/1
A 20/1
0.54
0.54
FURNITURE SYSTEMS
FURNITURE SYSTEMS
16
20
21 VENDING
0.18
20/1
B 20/1
C 20/1
0.54
0.54
FURNITURE SYSTEMS
FURNITURE SYSTEMS
22
23 HIVE
0.72
20/1
C 20/1
20/1
0.54
1 A 20/1
FURNITURE SYSTEMS
0.54
24
25 REFRIGERATOR
0.18
20/1
A 20/1
FURNITURE SYSTEMS
0.54
20/1
FURNITURE SYSTEMS
B 2D/1
26
27 COFFEE MAKER
0.18
20/1
B 20/1
22
0.54
FURNITURE SYSTEMS
FURNITURE SYSTEMS
20/1
28
29 COUNTER TOP
0.18
20/1
C 20/1
FURNITURE SYSTEMS
0.54
24
FURNITURE SYSTEMS
FURNITURE SYSTEMS
30
31 MECHANICAL ROOM
0.18
20/1
A 20/1
0.54
0.54
FURNITURE SYSTEMS
FURNITURE SYSTEMS
26
32
33 COUNTER TOP
0.18
20/1
B 20/1
B 20/1
0.54
0.54
FURNITURE SYSTEMS
FURNITURE SYSTEMS
34
35 COUNTER TOP
0.18
20/1
C 20/1
20/1
0.54
C 20/1
FURNITURE SYSTEMS
0.54
36
37 MICROWAVE
0.18
20/1
A 20/1
FURNITURE SYSTEMS
0.90
20/1
CONFERENCE 412
A 20/1
38
39 MICROWAVE
0.18
20/1
B 20/10
0 10.90
32
-90
FURNITURE SYSTEMS
CONFERENCE 418
20/1
40
41 REFRIGERATOR
0.18
20/1
C 20/1
FURNITURE SYSTEMS
0.90
34
CONFERENCE 439
FURNITURE SYSTEMS
1 42
REMARKS:
PHASE TOTALS:
C 2D/1
LOAD SUMMARY:
kVAC
x
D.F.
=
kVAD
37
ALL CB'S SHALL BE SWD/HID & HACR
PHASE A:
5.04
20/1
A 20/1
0.54
FURNITURE SYSTEMS
RATED. PROVIDE THE FOLLOWING WHERE
PHASE B:
5.40
Total kVA -LTG:
0.00
x
1.25
=
0.00
INDICATED:
PHASE C:
6.04
Total kVA -HVAC:
0.00
x
1.00
=
0.00
D.F.
1.25
1.00
1.00
1.00
0.50
"G" = GFCI CB
kVAD
0.00
0.60
2.00
10.00
5.98
18.58
51.61
16.48 kVAC
Total kVA-MISC:
0.00
x
1.00
=
0.00
kVAC
0.00
0.00
0.00
19.62
10.00
9.62
"H" = CB CLIP
D.F.
1.25
1.00
1.00
1.00
0.50
=
=
=
=
=
=
TOTAL kVAD:
FEEDER DEMAND:
Total kVA-REC:
16.48
VOLTAGE: 208Y/12OV, 30, 4W
AMPS: 400
EXISTING PANEL: P4A
MAIN C/B
MAIN LUGS ONLY
SURFACE MOUNTED
RECESSED MOUNTED
kAIC
XX
ISOLATED GROUND BAR
200% NEUTRAL
DOUBLE LUGS
FEED THRU LUGS
SUB FEED C B's
"A" = ARC FAULT CB
1st 10KVA REC:
10.00
x
1.00
=
10.00
"S" = SHUNT TRIP CB
BALANCE OF REC:
6.48
x
0.50
=
3.24
TOTAL kVAD:
13.24
kVAD
FEEDER DEMAND:
36.78
A
VOLTAGE: 208Y/12OV, 30, 4W
MAIN C/B
XX
ISOLATED
GROUND BAR
AMPS: 400
MAIN LUGS ONLY
200% NEUTRAL
SURFACE MOUNTED
DOUBLE LUGS
XX
RECESSED MOUNTED
FEED THRU LUGS
EXISTING PANEL P4
kAIC
SUB
FEED C B's
CKT
DESCRIPTION
LTG REC HVAC
MISC,
C/B
C/B MISC.
HVAC
REC
LTG
DESCRIPTION
Client Approval:
CKT
1
FURNITURE SYSTEMS
1
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
2
3
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
01 /26/18
FURNITURE SYSTEMS
4
5
FURNITURE SYSTEMS
0.54
20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
6
7
TELEPHONE BACK BOARD
0.18
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
8
9
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
FURNITURE SYSTEMS
10
11
FURNITURE SYSTEMS
0.54
20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
12
13
FURNITURE SYSTEMS
0.54
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
14
15
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
FURNITURE SYSTEMS
16
17
FURNITURE SYSTEMS
0.54
20L1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
18
19
FURNITURE SYSTEMS
0.54 1
20/1
20/1
1 A 20/1
0.54
FURNITURE SYSTEMS
20
21
FURNITURE SYSTEMS
0.54
20/1
20/1
B 2D/1
0.54
FURNITURE SYSTEMS
22
23
FURNITURE SYSTEMS
0.54
20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
24
25
FURNITURE SYSTEMS
0.54
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
26
27
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
FURNITURE SYSTEMS
28
29
FURNITURE SYSTEMS
0.54
20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
30
31
FURNITURE SYSTEMS
0.54
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
32
33
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
FURNITURE SYSTEMS
34
35
FURNITURE SYSTEMS
0.54
20/1
20/1
C 2D/1
0.54
FURNITURE SYSTEMS
36
37
FURNITURE SYSTEMS
0.54
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
38
39
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.60
0.54
FURNITURE SYSTEMS
40
41
SPARE
7.56
9.74
7.26
24.56 kVAC
20/1
20/1
C 20/1
D.F.
1.25
1.00
1.00
1.00
0.50
1
kVAD
0.00
0.60
2.00
10.00
5.98
18.58
51.61
ISPARE
VOLTAGE: 208Y/12OV, 30, 4W
AMPS: 225
EXISTING PANEL: P413
42
REMARKS:
ALL CB'S SHALL BE SWD/HID & HACR
RATED. PROVIDE THE FOLLOWING WHERE
INDICATED:
"G" = GFCI CB
"H" = CB CLIP
"A" = ARC FAULT CB
"S" = SHUNT TRIP CB
PHASE TOTALS:
PHASE A:
PHASE B:
PHASE C:
6.66
7.02
5.94
19.62 kVAC
LOAD SUMMARY:
Total kVA -LTG:
Total kVA -HVAC:
Total kVA-MISC:
Total kVA-REC:
1st 10KVA REC:
BALANCE OF REC:
kVAC
0.00
0.00
0.00
19.62
10.00
9.62
x
x
x
x
x
x
D.F.
1.25
1.00
1.00
1.00
0.50
=
=
=
=
=
=
TOTAL kVAD:
FEEDER DEMAND:
kVAD
0.00
0.00
0.00
10.00
4.81
14.81
41.14
kVAD
A
VOLTAGE: 208Y/12OV, 30, 4W
AMPS: 400
EXISTING PANEL: P4A
MAIN C/B
MAIN LUGS ONLY
SURFACE MOUNTED
RECESSED MOUNTED
kAIC
XX
ISOLATED GROUND BAR
200% NEUTRAL
DOUBLE LUGS
FEED THRU LUGS
SUB FEED C B's
CKT
DESCRIPTION
LTG REC HVAC
MISC.
C/B
C/B MISC.
HVAC
REC
LTG
DESCRIPTION
Client Approval:
CKT
1
FURNITURE SYSTEMS
0.54
20L1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
2
3
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
01 /26/18
FURNITURE SYSTEMS
4
5
FURNITURE SYSTEMS
0.54
20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
6
7
FURNITURE SYSTEMS
0.54
20/1
20/1
A 2D/1
0.54
FURNITURE SYSTEMS
8
9
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
FURNITURE SYSTEMS
10
11
FURNITURE SYSTEMS
0.54
20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
12
13
FURNITURE SYSTEMS
0.54
20L1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
14
15
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
FURNITURE SYSTEMS
16
17
FURNITURE SYSTEMS
0.54
20/1
20/1
C 1 20/1
0.54
FURNITURE SYSTEMS
18
19
FURNITURE SYSTEMS
0.54
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
20
21
FURNITURE SYSTEMS
0.54
20L1
20/1
B 20/1
0.54
FURNITURE SYSTEMS
22
23
FURNITURE SYSTEMS
0.54
20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
24
25
FURNITURE SYSTEMS
0.54
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
26
27
FURNITURE SYSTEMS
0.54
20/1
20/1
B 20/1
0.54
FURNITURE SYSTEMS
28
29
FURNITURE SYSTEMS
0.54
20/1
20/1
C 20/1
0.54
FURNITURE SYSTEMS
30
31
FURNITURE SYSTEMS
0.54
20/1
20/1
A 20/1
0.54
FURNITURE SYSTEMS
32
33
FOCUS ROOMS
1.08
20/1
20/1
B 20/1
1.26
FOCUS ROOM 409
34
35
COPIER
0.18
20/1
20/1
C 20/1
1.08
FOCUS ROOM 408
36
37
COPIER
0.18
20/1
20/1
A 20/1
0.90
RECEPTION 401
38
39
41
CU -4-1
25/2
20/1
20/1
B 20/1 2.00
C 20/1
0.60
WATER HEATER
CONDENSATE PUMP
40
42
REMARKS:
ALL CB'S SHALL BE SWD/HID & HACR
RATED. PROVIDE THE FOLLOWING WHERE
INDICATED:
"G" = GFCI CB
"H" = CB CLIP
"A" = ARC FAULT CB
"S" = SHUNT TRIP CB
PHASE TOTALS:
PHASE A:
PHASE B:
PHASE C:
7.56
9.74
7.26
24.56 kVAC
LOAD SUMMARY:
Total kVA -LTG:
Total kVA -HVAC:
Total kVA-MISC:
Total kVA-REC:
1st 10KVA REC:
BALANCE OF REC:
kVAC
0.00
0.60
2.00
21.96
10.00
11.96
x
x
x
x
x
x
D.F.
1.25
1.00
1.00
1.00
0.50
=
=
=
=
=
=
TOTAL kVAD:
FEEDER DEMAND:
kVAD
0.00
0.60
2.00
10.00
5.98
18.58
51.61
kVAD
A
VOLTAGE: 208Y/12OV, 30, 4W
AMPS: 225
EXISTING PANEL: P413
I
MAIN C/B
MAIN LUGS ONLY
SURFACE MOUNTED
RECESSED MOUNTED
kAIC
XX
ISOLATED GROUND BAR
200% NEUTRAL
DOUBLE LUGS
FEED THRU LUGS
SUB FEED C B's
XX
PANELBOARD NOTES:
1. PROVIDE 2 -POLE HANDLE TIES FOR COMMON DISCONNECTING MEANS OF MULTI -WIRE, COMMON NEUTRAL, BRANCH CIRCUITS. CONFIRM AVAILABILITY OF HANDLE TIES
WITH MANUFACTURER. PROVIDE 20A/2P CIRCUIT BREAKERS (TYPE AND kAIC RATING TO MATCH PANELBOARD) AS REQUIRED IF HANDLE TIES CAN NOT BE FITTED TO
EXISTING CIRCUIT BREAKERS.
• Integrated
l� Engineering
Consultants, Inc.
9700 ROCKSIDE RD. SUITE #290
CLEVELAND, OH 44125
(P): 216.901.6711
(F): 216.901.6712
www.iec-inc.cc
SEE NOTE 1
(TYPICAL)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SEE NOTE 1
(TYPICAL)
I
,`,���A 13
nrrenrrpp�
No.11400468 -
'a STATE OF
0.o'",SND NP
H
E
L
L Y E R
LEW
AN
Approved by:
IS=
ARCH ITECTU RE
INTERIOR DESIGN
2 1 1 South 12th St.
Phila., PA 1 9107
21 5.922.7066
THE GENERAL CONTRACTOR IS RESPONSIBLE
TO VERIFY ALL DIMENSIONS ON SITE AND
CONFIRM SUCH DIMENSIONS AGAINST ACTUAL
SITE CONDITIONS. THE GENERAL CONTRACT-
OR SHALL COORDINATE ALL WORK AND
RELATED TRADES, AND SHALL NOTIFY THE
ARCHITECT OF ANY INTERFERENCE OF
MECHANICAL, ELECTRICAL, OR PLUMBING
WORK WITH THE ARCHITECTURAL WORK AND
OF ANY CONFLICTS OR DISCREPANCIES IN
DIMENSIONS AGAINST ON SITE CONDITIONS
PRIOR TO PROCEEDING WITH THEW RK OR
PROCUREMENT OF MATERIALS.
Project:
Liberty
Mutual.
INSURANCE
450 East 96th St
4th Floor
Indianapolis IN 46240
Project No: 047.41
Drawing:
Electrical
Panelboard
Schedules
No. E-6.04
Drawn by:
M E B
Checked by:
AN
Approved by:
AN
Client Approval:
Date:
Issue Date:
01 /26/18
Issue For Permit: 01 /29/18
No.
Date
Revision
Scale:
Drawing:
Electrical
Panelboard
Schedules
No. E-6.04