Loading...
HomeMy WebLinkAboutE-6.04CKT DESCRIPTION LTG EQPT HVAC XFMR C/B C/B XFMR HVAC EQPT LTG DESCRIPTION LTG CKT 1 CORE LIGHTING 0.36 20/1 A 20/1 HEAT PUMP - SOUTH 0.90 LIGHTING A 20/1 2 3 2 20/1 B 20/1 4 2.25 LIGHTING HEAT PUMP - SOUTH 4 5 B 20/1 20/1 C 20/1 NEMA L6 -20R 2.40 LIGHTING 7 A 6 7 HEAT PUMP - SOUTH 20/1 A 20/1 C 20/1 1.90 LIGHTING 1.50 8 9 20/1 B20 1 HEAT PUMP - SOUTH 1.20 LIGHTING A 25/1 10 11 20/2 20/1 C 20/1 1.44 0.45 LIGHTING HEAT PUMP - SOUTH 12 13 B 25/1 20/1 A 20/1 1.44 0.85 LIGHTING 0.54 14 15 HEAT PUMP - SOUTH 20/1 B 15/1 2.45 3.50 WSHP-46 21 J -BOX TO TERMINAL BLOCK 16 17 B 20/1 C 20/1 3.00 3.50 IH -1 A 25/1 18 19 1 2.50 1 20/1 A 20/1 23 5.00 C 14 15 HEAT PUMP - SOUTHEAST 20 21 B 25/1 20/1 B 20/1 = HEAT PUMP - NORTHWEST ALL CB'S SHALL BE SWD/HID & HACR 22 23 HEAT PUMP - EAST 20/1 C 20/1 C 20/1 3.50 0.54 RATED. PROVIDE THE FOLLOWING WHERE 24 25 SPACE Total kVA -LTG: 18 A HEAT PUMP - EAST 3.50 20/1 A 25/1 26 27 SPACE Total kVA -HVAC: HEAT PUMP B 15/3 = 20 21 HEAT PUMP - SOUTHEAST 28 29 SPACE B 20/1 3.50 C = HEAT PUMP - NORTHWEST "H" = CB CLIP 30 31 SPACE HEAT PUMP - SOUTHEAST 3.50 A C 25/1 4.40 SPACE "A" = ARC FAULT CB 32 33 SPACE 1st 10KVA REC: 24 B HEAT PUMP - TOILET ROOMS 3.50 SPACE A 25/1 34 35 SPACE BALANCE OF REC: HEAT PUMP C = 26 SPACE HEAT PUMP - TOILET ROOMS EAST 36 37 SPACE 1 B 25/1 4.40 A TOTAL kVAD: HEAT PUMP SPACE kVAD A 38 39 SPACE HEAT PUMP - SOUTHEAST 5.30 B C 15/1 2.45 SPACE VOLTAGE: 208Y/12OV, 30, 4W 40 41 NIGHT LIGHT CIRCUIT 0.18 20/1 C WSHP-4-31 2.45 SPACE A 15/1 42 REMARKS: PHASE TOTALS: WSHP-4-32 LOAD SUMMARY: kVAC x D.F. = kVAD 1.47 ALL CB'S SHALL BE SWD/HID & HACR PHASE A. 3.65 0.18 20/1 WSHP-4-34 FURNITURE SYSTEMS 0.90 34 RATED. PROVIDE THE FOLLOWING WHERE PHASE B: 5.90 Total kVA -LTG: 9.95 x 1.25 = 12.44 WSHP-4-36 INDICATED: PHASE C: 5.85 Total kVA -HVAC: 2.45 x 1.00 = 2.45 2.45 "G" = GFCI CB 0.54 15.40 kVAC Total kVA-XFMR: 0.00 x 1.00 = 0.00 1.30 "H" = CB CLIP B 15/1 1.33 Total kVA-EQPT: 3.00 x 1.00 = 3.00 40 "A" = ARC FAULT CB WSW -4-41 2.45 15/1 C 15/1 2.45 D.F. 1.25 1.00 1.00 1.00 0.50 "G" = GFCI CB WSHP-4-42 "S" = SHUNT TRIP CB Total kVA-MISC: 42 REMARKS: ALL CB'S SHALL BE SWD/HID & HACR RATED. PROVIDE THE FOLLOWING WHERE INDICATED: "G" = GFCI CB "H" = CB CLIP "A" = ARC FAULT CB "S" = SHUNT TRIP CB PHASE TOTALS: PHASE A. PHASE B: PHASE C: 48.40 47.70 43.85 139.95 kVAC LOAD SUMMARY: Total kVA -LTG: Total kVA -HVAC: Total kVA-XFMR: Total kVA-EQPT: kVAC 0.00 139.95 0.00 0.00 x x x x x D.F. 1.25 1.00 1.00 1.00 = = = = = TOTAL kVAD: FEEDER DEMAND: kVAD 0.00 139.95 0.00 0.00 139.95 168.41 kVAD A VOLTAGE: 4BOV277V, 30, 4W AMPS: 225 EXISTING PANEL: H4 TOTAL kVAD: 17.89 kVAD "A" = ARC FAULT CB 1st 10KVA REC: 10.00 x FEEDER DEMAND: 21.53 A VOLTAGE: 480Y/277V, 36, 4W "S" = SHUNT TRIP CB MAIN C/B XX ISOLATED GROUND BAR 6.48 x 0.50 = AMPS: 175 MAIN LUGS ONLY 200% NEUTRAL TOTAL kVAD: 13.24 SURFACE MOUNTED DOUBLE LUGS FEEDER DEMAND: RECESSED MOUNTED A FEED THRU LUGS MAIN C/B XX ISOLATED EXISTING PANEL L4 kAIC SUB FEED C B's AMPS: 400 MAIN LUGS ONLY CKT DESCRIPTION LTG EQPT HVAC XFMR C/B C/B XFMR HVAC EQPT LTG DESCRIPTION 1 QUAD 0.36 CKT 1 HEAT PUMP - SOUTH 3.50 20/1 A 20/1 3.50 3 2 HEAT PUMP - SOUTHWEST 4 2 3 HEAT PUMP - SOUTH 3.50 20/1 B 20/1 3.50 C 20/1 NEMA L6 -20R HEAT PUMP - SOUTHWEST 7 A 4 5 HEAT PUMP - SOUTH 3.50 20/1 C 20/1 20/2 COPIER 1.50 SPARE NEMA L6 -20R 6 7 HEAT PUMP - SOUTH 3.50 20/1 A 25/1 4.40 A 20/2 HEAT PUMP - WEST 1.44 8 9 HEAT PUMP - SOUTH 3.50 1 20/1 B 25/1 4.40 A 20/1 1.44 HEAT PUMP - WEST 0.54 10 11 HEAT PUMP - SOUTH 3.50 20/1 C 20/1 3.50 1 20 21 J -BOX TO TERMINAL BLOCK HEAT PUMP - NORTHWEST B 12 13 HEAT PUMP - SOUTHEAST 3.50 20/1 A 25/1 4.40 19 SIGNAGE 1 2.50 1 HEAT PUMP - NORTHWEST 23 5.00 C 14 15 HEAT PUMP - SOUTHEAST 3.50 20/1 B 25/1 4.40 D.F. = HEAT PUMP - NORTHWEST ALL CB'S SHALL BE SWD/HID & HACR 16 17 HEAT PUMP - EAST 4.40 25/1 C 20/1 3.50 0.54 RATED. PROVIDE THE FOLLOWING WHERE HEAT PUMP - NORTHWEST Total kVA -LTG: 18 19 HEAT PUMP - EAST 3.50 20/1 A 25/1 4.40 12.00 Total kVA -HVAC: HEAT PUMP - NORTHWEST = 20 21 HEAT PUMP - SOUTHEAST 4.40 25/1 B 20/1 3.50 1.00 = HEAT PUMP - NORTHWEST "H" = CB CLIP 22 23 HEAT PUMP - SOUTHEAST 3.50 20/1 C 25/1 4.40 37 SPACE "A" = ARC FAULT CB HEAT PUMP - NORTHWEST 1st 10KVA REC: 24 25 HEAT PUMP - TOILET ROOMS 3.50 20/1 A 25/1 4.40 B 20/1 BALANCE OF REC: HEAT PUMP - NORTH = 26 27 HEAT PUMP - TOILET ROOMS EAST 3.50 20/1 1 B 25/1 4.40 kVAC x 0.00 x 0.00 x 0.00 x 9.72 9.72 x 0.00 x TOTAL kVAD: HEAT PUMP - NORTH kVAD A 28 29 HEAT PUMP - SOUTHEAST 5.30 30/1 C 15/1 2.45 A VOLTAGE: 208Y/12OV, 30, 4W WSHP-4-30 MAIN C/B 0.18 30 31 WSHP-4-31 2.45 15/1 A 15/1 2.45 MAIN LUGS ONLY XXX WSHP-4-32 20/1 B 20/10 0 10.90 32 33 WSHP-4-33 1.47 15/1 B 25/1 5.00 0.18 20/1 WSHP-4-34 FURNITURE SYSTEMS 0.90 34 35 WSHP-4-35 2.45 1 15/1 C 15/1 2.45 LOAD SUMMARY: NEW PANEL: CR WSHP-4-36 kAIC = 36 37 WSHP-4-37 2.45 1 15/1 A 15/1 2.45 0.54 WSHP-4-38 FURNITURE SYSTEMS 38 39 WSHP-4-39 1.30 15/1 B 15/1 1.33 = 0.00 WSHP-4-40 INDICATED: PHASE C: 40 41 WSW -4-41 2.45 15/1 C 15/1 2.45 D.F. 1.25 1.00 1.00 1.00 0.50 "G" = GFCI CB WSHP-4-42 16.48 kVAC Total kVA-MISC: 42 REMARKS: ALL CB'S SHALL BE SWD/HID & HACR RATED. PROVIDE THE FOLLOWING WHERE INDICATED: "G" = GFCI CB "H" = CB CLIP "A" = ARC FAULT CB "S" = SHUNT TRIP CB PHASE TOTALS: PHASE A. PHASE B: PHASE C: 48.40 47.70 43.85 139.95 kVAC LOAD SUMMARY: Total kVA -LTG: Total kVA -HVAC: Total kVA-XFMR: Total kVA-EQPT: kVAC 0.00 139.95 0.00 0.00 x x x x x D.F. 1.25 1.00 1.00 1.00 = = = = = TOTAL kVAD: FEEDER DEMAND: kVAD 0.00 139.95 0.00 0.00 139.95 168.41 kVAD A VOLTAGE: 4BOV277V, 30, 4W AMPS: 225 EXISTING PANEL: H4 MAIN C/B MAIN LUGS ONLY SURFACE MOUNTED RECESSED MOUNTED kAIC XX ISOLATED GROUND BAR 200% NEUTRAL DOUBLE LUGS FEED THRU LUGS SUB FEED C B's "A" = ARC FAULT CB 1st 10KVA REC: 10.00 CKT DESCRIPTION LTG REC HVAC MISC. C/B C/B MISC. HVAC REC LTG DESCRIPTION of State and Uncal Endes CKT 1 QUAD 0.36 20/1 A 20/2 1 1.50 20/1 NEMA L6 -20R 3 2 3 QUAD 0.36 20/1 B 1.50 4 5 FOCUS ROOMS FURNITURE SYSTEMS C 20/2 20/1 1.50 C 20/1 NEMA L6 -20R 20/1 6 7 A 1.50 8 9 20/1 A 20/1 B 20/2 COPIER 1.50 8 NEMA L6 -20R 10 11 C 1.50 12 13 20/1 10 A 20/2 20/1 1.50 1.44 NEMA L6 -20R TRAINING ROOM 14 15 B 1.50 16 17 A 20/1 1.44 C 20/2 0.54 1.50 15 NEMA L6 -20R 20/1 18 19 A 11.50 1 20 21 J -BOX TO TERMINAL BLOCK 5.00 60/2 B 30/2 C 20/1 1 1 2.50 1 FURNITURE SYSTEMS NEMA L14 -R 16 22 19 SIGNAGE 1 2.50 1 20/1 24 23 5.00 C 14 1 REMARKS: PHASE TOTALS: 21 LOAD SUMMARY: kVAC x D.F. = kVAD OPEN COLLAB 426 ALL CB'S SHALL BE SWD/HID & HACR PHASE A. 6.36 21 VENDING 20/1 C 20/1 B 20/1 C 20/1 0.54 RATED. PROVIDE THE FOLLOWING WHERE PHASE B: 12.36 Total kVA -LTG: 0.00 x 1.25 = 0.00 20/1 INDICATED: PHASE C: 12.00 Total kVA -HVAC: 0.00 x 1.00 = 0.00 0.18 "G" = GFCI CB GENERATOR RECEPTACLE 30.72 kVAC Total kVA-MISC: 0.00 x 1.00 = 0.00 20/1 "H" = CB CLIP 22 0.54 Total kVA-REC: 30.72 34 C 20/1 36 37 SPACE "A" = ARC FAULT CB C 20/1 A 20/1 1st 10KVA REC: 10.00 x 1.00 = 10.00 39 SPARE 41 "S" = SHUNT TRIP CB 40/2 B 20/1 BALANCE OF REC: 20.72 x 0.50 = 10.36 C 20/1 0.36 TIME WARNER 42 REMARKS: ALL CB'S SHALL BE SWD/HID & HACR RATED. PROVIDE THE FOLLOWING WHERE INDICATED: "G" = GFCI CB "H" = CB CLIP "A" = ARC FAULT CB "S" = SHUNT TRIP CB PHASE TOTALS: PHASE A: PHASE B: PHASE C: 2.88 4.14 2.70 9.72 kVAC LOAD SUMMARY: Total kVA -LTG: Total kVA -HVAC: Total kVA-MISC: Total kVA-REC: 1 st 1 OKVA REC: BALANCE OF REC: kVAC x 0.00 x 0.00 x 0.00 x 9.72 9.72 x 0.00 x TOTAL kVAD: 20.36 kVAD kVAD A VOLTAGE: 208Y/12OV, 30, 4W AMPS: 250 EXISTING PANEL: P4C 0.18 MAIN C/B MAIN LUGS ONLY SURFACE MOUNTED RECESSED MOUNTED kAIC XX ISOLATED GROUND BAR 200% NEUTRAL DOUBLE LUGS FEED THRU LUGS SUB FEED C B's FEEDER DEMAND: 56.56 A VOLTAGE: 208Y/12OV, 30, 4W 36 MAIN C/B 0.18 ISOLATED GROUND BAR A 20/1 FURNITURE SYSTEMS 0.90 20/1 AMPS: 100 A 20/1 MAIN LUGS ONLY XXX 200% NEUTRAL 20/1 B 20/10 0 10.90 32 -90 FURNITURE SYSTEMS CONFERENCE 418 SURFACE MOUNTED 40 DOUBLE LUGS 0.18 20/1 C 20/1 FURNITURE SYSTEMS 0.90 34 RECESSED MOUNTED FURNITURE SYSTEMS FEED THRU LUGS REMARKS: PHASE TOTALS: C 2D/1 LOAD SUMMARY: NEW PANEL: CR x kAIC = SUB FEED C B's 37 ALL CB'S SHALL BE SWD/HID & HACR PHASE A: 5.04 CKT DESCRIPTION LTG REC HVAC MISC. C/B C/B MISC. HVAC REC LTG DESCRIPTION of State and Uncal Endes CKT 1 ntro 20/1 A 20/1 0.90 1 OPEN OFFICE 431 20/1 2 3 2 20/1 B 20/1 1.08 B 20/1 FOCUS ROOMS FURNITURE SYSTEMS 4 5 20/1 20/1 C 20/1 0.18 20/1 COPIER 6 7 FIRE ALARM PANEL 20/1 A 20/1 0.18 0.54 COPIER A 8 9 20/1 B 20/1 1.44 9 FURNITURE SYSTEMS TRAINING ROOM 20/1 10 11 0.54 20/1 C 20/1 1.44 11 FURNITURE SYSTEMS TRAINING ROOM 20/1 12 13 20/1 20/1 A 20/1 1.44 12 TRAINING ROOM 0.54 14 15 FURNITURE SYSTEMS 20/1 B 20/1 0.54 C 20/1 MOTHER'S ROOM 15 FURNITURE SYSTEMS 16 17 B 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS MOTHER'S ROOM 16 18 19 SIGNAGE 20/1 20/1 A 20/1 1 0.36 14 BROAD BAND FURNITURE SYSTEMS 20 21 0.18 20/1 B 20/1 1.08 0.54 OPEN COLLAB 426 FURNITURE SYSTEMS 22 23 21 VENDING 20/1 C 20/1 B 20/1 C 20/1 0.54 0.54 24 25 5TH FLOOR COPIER 27 22 20/2 A 20/1 20/1 C 20/1 20/1 0.54 26 B 20/1 28 29 25 REFRIGERATOR 20/1 C 20/1 0.18 FURNITURE SYSTEMS GENERATOR RECEPTACLE 20/1 30 31 33 SPARE 35 26 100/3 A 20/1 20/1 B 20/1 22 0.54 32 B 20/1 34 C 20/1 36 37 SPACE 20/1 C 20/1 A 20/1 0.54 24 FURNITURE SYSTEMS FURNITURE SYSTEMS 38 39 SPARE 41 0.18 40/2 B 20/1 0.54 0.54 FURNITURE SYSTEMS FURNITURE SYSTEMS 40 C 20/1 0.36 TIME WARNER 42 REMARKS: ALL CB'S SHALL BE SWD/HID & HACR RATED. PROVIDE THE FOLLOWING WHERE INDICATED: "G" = GFCI CB "H" = CB CLIP "A" = ARC FAULT CB "S" = SHUNT TRIP CB PHASE TOTALS: PHASE A: PHASE B: PHASE C: 2.88 4.14 2.70 9.72 kVAC LOAD SUMMARY: Total kVA -LTG: Total kVA -HVAC: Total kVA-MISC: Total kVA-REC: 1 st 1 OKVA REC: BALANCE OF REC: kVAC x 0.00 x 0.00 x 0.00 x 9.72 9.72 x 0.00 x D.F. 1.25 1.00 1.00 1.00 0.50 = = = = = = TOTAL kVAD: FEEDER DEMAND: kVAD 0.00 0.00 0.00 9.72 0.00 9.72 27.00 kVAD A VOLTAGE: 208Y/12OV, 30, 4W AMPS: 250 EXISTING PANEL: P4C 0.18 MAIN C/B MAIN LUGS ONLY SURFACE MOUNTED RECESSED MOUNTED kAIC XX ISOLATED GROUND BAR 200% NEUTRAL DOUBLE LUGS FEED THRU LUGS SUB FEED C B's 0.54 C 20/1 FURNITURE SYSTEMS 0.54 I I I I NI I I I I I I I I I I I CKT DESCRIPTION RELEASED FOR CONSTRUCTION MISC. C/B C/B MISC. HVAC Suubjecktio aompdiianme with ®III regofatimms LTG of State and Uncal Endes LTG ICltp at Caimal ntro DATE: 02/23/18 20/1 Nick Mishler I I I I NI I I I I I I I I I I I CKT DESCRIPTION LTG REC HVAC MISC. C/B C/B MISC. HVAC REC LTG DESCRIPTION LTG CKT 1 EWC 0.18 20/1 A 20/1 1 20/1 20/1 A 20/1 2 3 FURNITURE SYSTEMS 0.54 20/1 B 20/1 3 FURNITURE SYSTEMS 0.54 20/1 20/1 4 5 FURNITURE SYSTEMS 0.54 20/1 C 20/1 0.10 5 FIRE ALARM PANEL 0.54 6 7 FURNITURE SYSTEMS 0.54 20/1 A FURNITURE SYSTEMS 6 7 8 9 FURNITURE SYSTEMS 0.54 20/1 B 100/3 0.54 COMPUTER ROOM PANEL "CR" 10 1 11 FURNITURE SYSTEMS 0.54 20/1 C 20/1 20/1 B 20/1 0.54 12 13 FURNITURE SYSTEMS 0.54 20/1 A 2D/1 FURNITURE SYSTEMS 0.54 20/1 FURNITURE SYSTEMS C 20/1 14 15 FURNITURE SYSTEMS 0.54 20/1 B 20/1 12 0.54 FURNITURE SYSTEMS FURNITURE SYSTEMS 20/1 16 17 FURNITURE SYSTEMS 0.54 20/1 C 20/1 FURNITURE SYSTEMS 0.54 14 FURNITURE SYSTEMS FURNITURE SYSTEMS 18 19 VENDING 0.18 20/1 A 20/1 0.54 0.54 FURNITURE SYSTEMS FURNITURE SYSTEMS 16 20 21 VENDING 0.18 20/1 B 20/1 C 20/1 0.54 0.54 FURNITURE SYSTEMS FURNITURE SYSTEMS 22 23 HIVE 0.72 20/1 C 20/1 20/1 0.54 1 A 20/1 FURNITURE SYSTEMS 0.54 24 25 REFRIGERATOR 0.18 20/1 A 20/1 FURNITURE SYSTEMS 0.54 20/1 FURNITURE SYSTEMS B 2D/1 26 27 COFFEE MAKER 0.18 20/1 B 20/1 22 0.54 FURNITURE SYSTEMS FURNITURE SYSTEMS 20/1 28 29 COUNTER TOP 0.18 20/1 C 20/1 FURNITURE SYSTEMS 0.54 24 FURNITURE SYSTEMS FURNITURE SYSTEMS 30 31 MECHANICAL ROOM 0.18 20/1 A 20/1 0.54 0.54 FURNITURE SYSTEMS FURNITURE SYSTEMS 26 32 33 COUNTER TOP 0.18 20/1 B 20/1 B 20/1 0.54 0.54 FURNITURE SYSTEMS FURNITURE SYSTEMS 34 35 COUNTER TOP 0.18 20/1 C 20/1 20/1 0.54 C 20/1 FURNITURE SYSTEMS 0.54 36 37 MICROWAVE 0.18 20/1 A 20/1 FURNITURE SYSTEMS 0.90 20/1 CONFERENCE 412 A 20/1 38 39 MICROWAVE 0.18 20/1 B 20/10 0 10.90 32 -90 FURNITURE SYSTEMS CONFERENCE 418 20/1 40 41 REFRIGERATOR 0.18 20/1 C 20/1 FURNITURE SYSTEMS 0.90 34 CONFERENCE 439 FURNITURE SYSTEMS 1 42 REMARKS: PHASE TOTALS: C 2D/1 LOAD SUMMARY: kVAC x D.F. = kVAD 37 ALL CB'S SHALL BE SWD/HID & HACR PHASE A: 5.04 20/1 A 20/1 0.54 FURNITURE SYSTEMS RATED. PROVIDE THE FOLLOWING WHERE PHASE B: 5.40 Total kVA -LTG: 0.00 x 1.25 = 0.00 INDICATED: PHASE C: 6.04 Total kVA -HVAC: 0.00 x 1.00 = 0.00 D.F. 1.25 1.00 1.00 1.00 0.50 "G" = GFCI CB kVAD 0.00 0.60 2.00 10.00 5.98 18.58 51.61 16.48 kVAC Total kVA-MISC: 0.00 x 1.00 = 0.00 kVAC 0.00 0.00 0.00 19.62 10.00 9.62 "H" = CB CLIP D.F. 1.25 1.00 1.00 1.00 0.50 = = = = = = TOTAL kVAD: FEEDER DEMAND: Total kVA-REC: 16.48 VOLTAGE: 208Y/12OV, 30, 4W AMPS: 400 EXISTING PANEL: P4A MAIN C/B MAIN LUGS ONLY SURFACE MOUNTED RECESSED MOUNTED kAIC XX ISOLATED GROUND BAR 200% NEUTRAL DOUBLE LUGS FEED THRU LUGS SUB FEED C B's "A" = ARC FAULT CB 1st 10KVA REC: 10.00 x 1.00 = 10.00 "S" = SHUNT TRIP CB BALANCE OF REC: 6.48 x 0.50 = 3.24 TOTAL kVAD: 13.24 kVAD FEEDER DEMAND: 36.78 A VOLTAGE: 208Y/12OV, 30, 4W MAIN C/B XX ISOLATED GROUND BAR AMPS: 400 MAIN LUGS ONLY 200% NEUTRAL SURFACE MOUNTED DOUBLE LUGS XX RECESSED MOUNTED FEED THRU LUGS EXISTING PANEL P4 kAIC SUB FEED C B's CKT DESCRIPTION LTG REC HVAC MISC, C/B C/B MISC. HVAC REC LTG DESCRIPTION Client Approval: CKT 1 FURNITURE SYSTEMS 1 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 2 3 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 01 /26/18 FURNITURE SYSTEMS 4 5 FURNITURE SYSTEMS 0.54 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 6 7 TELEPHONE BACK BOARD 0.18 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 8 9 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 FURNITURE SYSTEMS 10 11 FURNITURE SYSTEMS 0.54 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 12 13 FURNITURE SYSTEMS 0.54 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 14 15 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 FURNITURE SYSTEMS 16 17 FURNITURE SYSTEMS 0.54 20L1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 18 19 FURNITURE SYSTEMS 0.54 1 20/1 20/1 1 A 20/1 0.54 FURNITURE SYSTEMS 20 21 FURNITURE SYSTEMS 0.54 20/1 20/1 B 2D/1 0.54 FURNITURE SYSTEMS 22 23 FURNITURE SYSTEMS 0.54 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 24 25 FURNITURE SYSTEMS 0.54 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 26 27 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 FURNITURE SYSTEMS 28 29 FURNITURE SYSTEMS 0.54 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 30 31 FURNITURE SYSTEMS 0.54 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 32 33 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 FURNITURE SYSTEMS 34 35 FURNITURE SYSTEMS 0.54 20/1 20/1 C 2D/1 0.54 FURNITURE SYSTEMS 36 37 FURNITURE SYSTEMS 0.54 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 38 39 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.60 0.54 FURNITURE SYSTEMS 40 41 SPARE 7.56 9.74 7.26 24.56 kVAC 20/1 20/1 C 20/1 D.F. 1.25 1.00 1.00 1.00 0.50 1 kVAD 0.00 0.60 2.00 10.00 5.98 18.58 51.61 ISPARE VOLTAGE: 208Y/12OV, 30, 4W AMPS: 225 EXISTING PANEL: P413 42 REMARKS: ALL CB'S SHALL BE SWD/HID & HACR RATED. PROVIDE THE FOLLOWING WHERE INDICATED: "G" = GFCI CB "H" = CB CLIP "A" = ARC FAULT CB "S" = SHUNT TRIP CB PHASE TOTALS: PHASE A: PHASE B: PHASE C: 6.66 7.02 5.94 19.62 kVAC LOAD SUMMARY: Total kVA -LTG: Total kVA -HVAC: Total kVA-MISC: Total kVA-REC: 1st 10KVA REC: BALANCE OF REC: kVAC 0.00 0.00 0.00 19.62 10.00 9.62 x x x x x x D.F. 1.25 1.00 1.00 1.00 0.50 = = = = = = TOTAL kVAD: FEEDER DEMAND: kVAD 0.00 0.00 0.00 10.00 4.81 14.81 41.14 kVAD A VOLTAGE: 208Y/12OV, 30, 4W AMPS: 400 EXISTING PANEL: P4A MAIN C/B MAIN LUGS ONLY SURFACE MOUNTED RECESSED MOUNTED kAIC XX ISOLATED GROUND BAR 200% NEUTRAL DOUBLE LUGS FEED THRU LUGS SUB FEED C B's CKT DESCRIPTION LTG REC HVAC MISC. C/B C/B MISC. HVAC REC LTG DESCRIPTION Client Approval: CKT 1 FURNITURE SYSTEMS 0.54 20L1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 2 3 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 01 /26/18 FURNITURE SYSTEMS 4 5 FURNITURE SYSTEMS 0.54 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 6 7 FURNITURE SYSTEMS 0.54 20/1 20/1 A 2D/1 0.54 FURNITURE SYSTEMS 8 9 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 FURNITURE SYSTEMS 10 11 FURNITURE SYSTEMS 0.54 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 12 13 FURNITURE SYSTEMS 0.54 20L1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 14 15 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 FURNITURE SYSTEMS 16 17 FURNITURE SYSTEMS 0.54 20/1 20/1 C 1 20/1 0.54 FURNITURE SYSTEMS 18 19 FURNITURE SYSTEMS 0.54 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 20 21 FURNITURE SYSTEMS 0.54 20L1 20/1 B 20/1 0.54 FURNITURE SYSTEMS 22 23 FURNITURE SYSTEMS 0.54 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 24 25 FURNITURE SYSTEMS 0.54 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 26 27 FURNITURE SYSTEMS 0.54 20/1 20/1 B 20/1 0.54 FURNITURE SYSTEMS 28 29 FURNITURE SYSTEMS 0.54 20/1 20/1 C 20/1 0.54 FURNITURE SYSTEMS 30 31 FURNITURE SYSTEMS 0.54 20/1 20/1 A 20/1 0.54 FURNITURE SYSTEMS 32 33 FOCUS ROOMS 1.08 20/1 20/1 B 20/1 1.26 FOCUS ROOM 409 34 35 COPIER 0.18 20/1 20/1 C 20/1 1.08 FOCUS ROOM 408 36 37 COPIER 0.18 20/1 20/1 A 20/1 0.90 RECEPTION 401 38 39 41 CU -4-1 25/2 20/1 20/1 B 20/1 2.00 C 20/1 0.60 WATER HEATER CONDENSATE PUMP 40 42 REMARKS: ALL CB'S SHALL BE SWD/HID & HACR RATED. PROVIDE THE FOLLOWING WHERE INDICATED: "G" = GFCI CB "H" = CB CLIP "A" = ARC FAULT CB "S" = SHUNT TRIP CB PHASE TOTALS: PHASE A: PHASE B: PHASE C: 7.56 9.74 7.26 24.56 kVAC LOAD SUMMARY: Total kVA -LTG: Total kVA -HVAC: Total kVA-MISC: Total kVA-REC: 1st 10KVA REC: BALANCE OF REC: kVAC 0.00 0.60 2.00 21.96 10.00 11.96 x x x x x x D.F. 1.25 1.00 1.00 1.00 0.50 = = = = = = TOTAL kVAD: FEEDER DEMAND: kVAD 0.00 0.60 2.00 10.00 5.98 18.58 51.61 kVAD A VOLTAGE: 208Y/12OV, 30, 4W AMPS: 225 EXISTING PANEL: P413 I MAIN C/B MAIN LUGS ONLY SURFACE MOUNTED RECESSED MOUNTED kAIC XX ISOLATED GROUND BAR 200% NEUTRAL DOUBLE LUGS FEED THRU LUGS SUB FEED C B's XX PANELBOARD NOTES: 1. PROVIDE 2 -POLE HANDLE TIES FOR COMMON DISCONNECTING MEANS OF MULTI -WIRE, COMMON NEUTRAL, BRANCH CIRCUITS. CONFIRM AVAILABILITY OF HANDLE TIES WITH MANUFACTURER. PROVIDE 20A/2P CIRCUIT BREAKERS (TYPE AND kAIC RATING TO MATCH PANELBOARD) AS REQUIRED IF HANDLE TIES CAN NOT BE FITTED TO EXISTING CIRCUIT BREAKERS. • Integrated l� Engineering Consultants, Inc. 9700 ROCKSIDE RD. SUITE #290 CLEVELAND, OH 44125 (P): 216.901.6711 (F): 216.901.6712 www.iec-inc.cc SEE NOTE 1 (TYPICAL) I I I I I I I I I I I I I I I I I SEE NOTE 1 (TYPICAL) I ,`,���A 13 nrrenrrpp� No.11400468 - 'a STATE OF 0.o'",SND NP H E L L Y E R LEW AN Approved by: IS= ARCH ITECTU RE INTERIOR DESIGN 2 1 1 South 12th St. Phila., PA 1 9107 21 5.922.7066 THE GENERAL CONTRACTOR IS RESPONSIBLE TO VERIFY ALL DIMENSIONS ON SITE AND CONFIRM SUCH DIMENSIONS AGAINST ACTUAL SITE CONDITIONS. THE GENERAL CONTRACT- OR SHALL COORDINATE ALL WORK AND RELATED TRADES, AND SHALL NOTIFY THE ARCHITECT OF ANY INTERFERENCE OF MECHANICAL, ELECTRICAL, OR PLUMBING WORK WITH THE ARCHITECTURAL WORK AND OF ANY CONFLICTS OR DISCREPANCIES IN DIMENSIONS AGAINST ON SITE CONDITIONS PRIOR TO PROCEEDING WITH THEW RK OR PROCUREMENT OF MATERIALS. Project: Liberty Mutual. INSURANCE 450 East 96th St 4th Floor Indianapolis IN 46240 Project No: 047.41 Drawing: Electrical Panelboard Schedules No. E-6.04 Drawn by: M E B Checked by: AN Approved by: AN Client Approval: Date: Issue Date: 01 /26/18 Issue For Permit: 01 /29/18 No. Date Revision Scale: Drawing: Electrical Panelboard Schedules No. E-6.04