Loading...
HomeMy WebLinkAboutM-1.04MECHANICAL HVAC DEMOLITION PLAN GENERAL NOTES: 1. MECHANICAL HVAC CONTRACTOR SHALL COORDINATE ANY NECESSARY SHUTDOWNS WITH BUILDING/MANAGEMENT. 2. MECHANICAL HVAC CONTRACTOR SHALL PERFORM A FIELD SURVEY PRIOR TO COMMENCING WITH DEMOLITION. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOUND FOR DIRECTION PRIOR TO COMMENCING WITH DEMOLITION. 3. ANY EXISTING SYSTEMS AND/OR EQUIPMENT NOTED AS EXISTING TO REMAIN SHALL BE FIELD VERIFIED FOR DEFICIENCIES. NOTIFY ARCHITECT AND ENGINEER OF ANY DEFICIENCIES DISCOVERED. 4. EXISTING EQUIPMENT TO BE RELOCATED SHALL BE INSPECTED PRIOR TO RELOCATION. NOTIFY ARCHITECT AND ENGINEER OF ANY DEFICIENCIES DISCOVERED. 5. PROJECT SCOPE INVOLVES REMOVAL AND MODIFICATION TO CONDENSER WATER PIPING SYSTEM. CONTRACTOR SHALL ISOLATE/SHUTOFF SYSTEM AND DRAIN (AND PROPERLY DISPOSE) TO ACCOMMODATE SCOPE OF WORK. 6. MECHANICAL HVAC CONTRACTOR SHALL REFER TO ALL SHEETS CONTAINED IN DRAWING SET FOR COMPLETE SCOPE OF WORK. TYPICAL DETAILS, INSTALLATION REQUIREMENTS AND GENERAL BUILDING STANDARDS ARE REFERENCED AND APPLICABLE TO THESE CONTRACT DOCUMENTS. 7. CODED NOTE NUMBERS USED/NOT USED FOR CONSISTENCY BETWEEN SHEETS. 8. IT IS THE INTENT TO REUSE DUCTWORK WHERE PRACTICAL. CONTRACTOR MAY REUSE DUCT TAPS OF EQUAL SIZE. ANY EXISTING CONDITIONS THAT VARY SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER PRIOR TO FABRICATION OR INSTALLATION OF NEW HVAC SYSTEMS. RELEASED IFCR CONSTRUCTION Suubjecktio aompdiianme with ®III regofatimms of State and Uncal Endes ICltp at Caimal ntro DATE: 02/23/18 • � Integrated l� Engineering Consultants, Inc. 9700 ROCKSIDE RD. SUITE #290 CLEVELAND, OH 44125 (P): 216.901.6711 (F): 216.901.6712 www.iec-inc.cc s No. 11400468 = •� '• Mechanical HVAC Demolition Plan SCALE: ,/$„ : MECHANICAL HVAC DEMOLITION PLAN CODED NOTES: XX 0 REMOVE AND DISCARD EXISTING HEAT PUMP COMPLETE. 0 EXISTING HEAT PUMP TO BE RELOCATED. REMOVE AND DISCARD EXISTING DUCTWORK. REMOVE AND DISCARD EXISTING PIPING BACK TO MAIN AND CAP. O REMOVE AND DISCARD EXISTING ABANDONED DUCTWORK ABOVE CEILING. ® REMOVE AND DISCARD EXISTING DIFFUSER. MAINTAIN DUCTWORK FOR CONNECTION TO NEW. O5 REMOVE AND DISCARD EXISTING DIFFUSER. CAP DUCTWORK AT CONNECTION TO MAIN. © REMOVE AND DISCARD EXISTING DIFFUSER AND DUCTWORK TO POINT INDICATED. CAP AT POINT INDICATED. 0 REMOVE AND DISCARD EXISTING RETURN GRILLE. TYPICAL ALL. ® EXISTING BUILDING SENSOR TO REMAIN. O9 REMOVE AND DISCARD EXISTING DUCTWORK TO POINT INDICATED. MAINTAIN FOR CONNECTION TO NEW. 10 REMOVE AND DISCARD EXISTING DUCTWORK BACK TO MAIN AND CAP. N H E M E B L L Y E R LEW Client Approval: IS= ARCH ITECTU RE INTERIOR DESIGN 2 1 1 South 12th St. Phila., PA 1 9107 21 5.922.7066 THE GENERAL CONTRACTOR IS RESPONSIBLE TO VERIFY ALL DIMENSIONS ON SITE AND CONFIRM SUCH DIMENSIONS AGAINST ACTUAL SITE CONDITIONS. THE GENERAL CONTRACT— OR SHALL COORDINATE ALL WORK AND RELATED TRADES, AND SHALL NOTIFY THE ARCHITECT OF ANY INTERFERENCE OF MECHANICAL, ELECTRICAL, OR PLUMBING WORK WITH THE ARCHITECTURAL WORK AND OF ANY CONFLICTS OR DISCREPANCIES IN DIMENSIONS AGAINST ON SITE CONDITIONS PRIOR TO PROCEEDING WITH THE WORK OR PROCUREMENT OF MATERIALS. Project: Liberty Mutual. INSURANCE 450 East 96th St 4th Floor Indianapolis IN 46240 Project No: 047.41 Drawing: Mechanical HVAC Demolition Planl No. M-1.04 Drawn by: M E B Checked by: AJM Approved by: AJM Client Approval: Date: Issue Date: 01 /26/18 Issue For Permit: 01 /29/18 No. Date Revision Scale: 1/8" = 1'-0" Drawing: Mechanical HVAC Demolition Planl No. M-1.04