Loading...
HomeMy WebLinkAboutCombined DrawingsCARMEL - CLAY PARKS & RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL, INDIANA 46032 G1.0 ISSUED FOR BID SITE LOCATION 30 JUNE 2017 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 (708) 236-0300 HILLSIDE, ILLINOIS 60162 FAX: (708) 236-0330 30 N. WOLF ROAD ELARA ENGINEERING MECHANICAL / PLUMBING STRUCTURAL ENGINEER FAX: (630) 653-9060 (630) 653-9059 JOHNSON WILBUR ADAMS, INC. 175 NORTH WASHINGTON STREET FAX: (630) 221-1220 (630) 221-1212 ITASCA, ILLINOIS 60143 500 PARK BOULEVARD, SUITE 800 WILLIAMS ARCHITECTS ARCHITECT CONSULTANTS LOCATION MAP CERTIFICATION WHEATON, ILLINOIS 60187 2ND FLOOR INTERIOR DESIGN WILLIAMS INTERIORS 500 PARK BOULEVARD, SUITE 800 ITASCA, ILLINOIS 60143 (630) 221-1212 FAX: (630) 221-1220 I HEREBY CERTIFY THAT THESE PLANS WERE PREPARED BY ME OR UNDER MY SUPERVISION AND TO THE BEST OF MY KNOWLEDGE COMPLY WITH ALL APPLICABLE CODES, INCLUDING PUBLIC LAW 101-336 'AMERICANS WITH DISABILITIES ACT OF 1990' AND MEET ALL OF THE REQUIREMENTS SET FORTH IN THE FEDERAL REGISTER PART III DEPARTMENT OF JUSTICE, ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES AND THE INDIANA ACCESSIBILITY CODE. FIRE PROTECTION / ELECTRICAL TITLE SHEETS ALTERNATES 1. PROVIDE PRICING FOR MOISTURE MITIGATION SYSTEM UNDER ALL RESILIENT ATHLETIC FLOORING AND BAMBOO FLOORING. SEE SPECIFICATIONS. G1.1 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 SYMBOLS & CALLOUTS ABBREVIATIONS MATERIAL DESIGNATION CLAY BACKFILL A 102A 101 A 95 90 1 A A1.1 A1.1 1 SHEET INDEX ABBREVIATIONS, SYMBOLS, LEGENDS, & SHEET INDEX APPLICABLE CODES INTERIOR DESIGN LEGENDS WALL TYPES INTERIOR GENERAL NOTES 1. SEE ALL PLAN DRAWINGS (ID SERIES) FOR DIMENSIONS, LOCATION ISSUES, ENLARGED PLANS, ELEVATION TARGETS, DETAIL TARGETS, ETC. 2. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION FOR ALL PARTS OF THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE CONDITION. 3. ALL WORK SHALL CONFORM TO THE APPLICABLE INDUSTRY AND MANUFACTURER'S PUBLISHED STANDARDS. 4. NO SUBSTITUTIONS FOR ITEMS SPECIFIED WILL BE ACCEPTED WITHOUT PRIOR WRITTEN ACCEPTANCE FROM THE ARCHITECT, DESIGNER AND OWNER. 5. THE CONTRACTOR SHALL PROTECT EXISTING WORK AND OTHER NEW WORK BY OTHER CONTRACTORS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING WORK OR WORK BY OTHERS INCURRED WHILE FULFILLING THE OBLIGATIONS OF THE CONTRACT. 6. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SHALL VERIFY ALL NEW CONDITIONS SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND DESIGNER OF ANY DISCREPANCIES. OMISSIONS AND/OR CONFICTS BEFORE COMMENCEMENT OF WORK. COMMENCEMENT OF WORK SHALL CONSTITUTE ACCEPTANCE OF ALL NEW OR EXISTING CONDITIONS. 7. WHERE DESIGN INTENT CANNOT BE DETERMINED FROM THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT AND DESIGNER PRIOR TO PROCEEDING WITH THE WORK IN QUESTION. 8. SUBMITTALS OF ALL FINISH MATERIALS REQUIRED TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING OR INSTALLING TO INSURE ACCURACY OF SPECIFIED PRODUCT WITH INSTALLED MATERIAL. 9. LEAD TIMES FOR ALL SPECIFIED MATERIALS VARY. PURCHASING CONTRACTOR AND/OR SUPPLIER ASSUMES RESPONSIBILITY FOR VERIFYING LEAD TIME WITH MANUFACTURER AND ORDERING MATERIAL IN ACCORDANCE WITH PROJECT SCHEDULE AND COMPLETION DATE. 10. PROVIDE TRANSITION STRIPS AT ALL LOCATIONS OF DIFFERING MATERIAL. LEGEND: RB RUBBER BASE CPT CARPET 16 17 20 21 J J.7 W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) W14X30 (E) HPC (50 LBS) HPC (50 LBS) HPC (50 LBS) HPC (50 LBS) ERU (400 LBS) CU (700 LBS) L6X6 (-7" VIF) TYP 16'-8 1/2" 100'-0" 17'-5" 17'-0" P1001 HSS HSS P1001 P1000 NS FS HSS HSS HSS HSS HSS - 2 - 2 SIM - HPC NOTES: 1. ALL HSS TO BE HSS3-1/2X3-1/2X1/4 P1001 P1000 P1001 P1000 P1001 P1000 P1001 P1000 P1001 P1000 P1001 P1000 STRUCTURAL GENERAL NOTES BUILDING CODE INDIANA BUILDING CODE (IBC 2012) STRUCTURAL LOADING DATA - TENANT STRUCTURAL IMPROVEMENTS MECHANICAL UNITS CU - 700 LBS ERU - 400 LBS HPC - 50 LBS ROOF LOADS A0.1 FLOOR PLAN / FIRST FLOOR KEY PLAN SCALE: 1" = 20'-0" 5 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 FIRST FLOOR KEY PLAN MULTI A1.1 MULTI A1.2 A&B A0.2 5 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 FLOOR PLAN / SECOND FLOOR KEY PLAN SCALE: 1" = 20'-0" SECOND FLOOR KEY PLAN MULTI A2.1 MULTI A2.2 MULTI A2,2 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 19 A1.1A REFLECTED CEILING PLAN / DEMOLITION SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" 9 FIRST FLOOR WEST BLDG ENTRY SCALE: 1/8" = 1'-0" 7 RENOVATION FLOOR PLAN / FIRST FLOOR - WEST BUILDING FLOOR PLAN / FIRST FLOOR - WEST BUILDING DEMOLITION SCALE: 1/8" = 1'-0" 17 FIRST FLOOR - WEST BUILDING REFLECTED CEILING PLAN / RENOVATION FIRST FLOOR - WEST BUILDING RENOVATION KEYNOTES 4 6 A1.1B A1.1B 21 7 A1.1B A1.1B 8 DETAIL/ SCALE: 1-1/2" = 1'-0" 10 NEW FEATURE WALL SOFFIT COVE DETAIL A1.1A 10 EL= +9'-0" B/ SOFFIT EL= +9'-4" B/ SUS. CLG EL= +8'-4" B/ SUS. CLG. DEMOLITION KEYNOTES 2 16 A1.1B A1.1B 14 D16 D11 D3 TYP D1 D15 A13 A22 A18 A18 A19 A13 A12 FRONT AND BACK D8 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 24 15 A1.1B SCALE: 1/4" = 1'-0" 9 ELEVATION / SECTION / AT DECORATIVE HANDRAIL WEST BUILDING FRONT ENTRANCE SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" 5 FIRST FLOOR WEST BLDG ENTRY SCALE: 1/4" = 1'-0" 17 SCALE: 1/4" = 1'-0" 7 RENOVATION KEYNOTES 4 ELEVATION / DESK PRIVACY GATE SCALE: 1" = 1'-0" WEST BUILDING FRONT ENTRANCE INTERIOR ELEVATION / NEW RECEPTION DESK AND NEW GATES WEST BUILDING FRONT ENTRANCE INTERIOR ELEVATION / NEW RECEPTION DESK AND NEW GATES WEST BUILDING FRONT ENTRANCE SCALE: 1/4" = 1'-0" 6 SCALE: 1/4" = 1'-0" 8 INTERIOR ELEVATION / NEW RECEPTION DESK, NEW GATES, AND NEW STOREFRONT VESTIBULE SCALE: 1/4" = 1'-0" 21 SCALE: 1/4" = 1'-0" 16 WEST BUILDING FRONT ENTRANCE DEMOLITION KEYNOTES 2 ELEVATION / SECTION / TYPICAL GATE WEST BUILDING FRONT ENTRANCE INT ELEV / RECEPTION DESK FROM RAMP WEST BUILDING FRONT ENTRANCE SCALE: 1/4" = 1'-0" 14 INT ELEV / NEW FEATURE WALL WEST BUILDING ELEVATOR LOBBY A19 A14 INT. ELEV / WAITING AREA WEST BUILDING FRONT ENTRANCE D4 A14 A13 A20 A12 A12 A20 A13 A12 A13 A20 A26 A26 A26 BEYOND A26 BEYOND A20 24 15 10 14 A1.2 SCALE: 1/8" = 1'-0" 4 DETAIL / SCALE: 1" = 1'-0" GATE AND DOUBLE POST ELEVATION DETAIL / SCALE: 1" = 1'-0" EAST BUILDING LOBBY DESK PRIVACY GATE EAST BUILDING LOBBY INTERIOR ELEVATION / ENTRY NORTH ELEVATION EAST BUILDING PLAN DETAIL / SCALE: 1/4" = 1'-0" LAYOUT GUARDRAIL AND GATES SCALE: 1" = 1'-0" 5 GUARDRAIL AND GATE SECTION DETAIL / EAST BUILDING LOBBY williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 FIRST FLOOR EAST BLDG ENTRY PLAN FLOOR PLAN / FIRST FLOOR - EAST BUILDING SCALE: 1/8" = 1'-0" RENOVATION REFLECTED CEILING/ 9 7 DETAIL/ SCALE: 1-1/2" = 1'-0" 19 SOFFIT DETAIL SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" 12 18 17 FIRST FLOOR - EAST BUILDING RENOVATION FLOOR PLAN / FIRST FLOOR - EAST BUILDING SCALE: 1/8" = 1'-0" DEMOLITION REFLECTED CEILING/ FIRST FLOOR - EAST SCALE: BUILDING 1/8" = 1'-0" DEMOLITION SCALE: 1/4" = 1'-0" 16 18 A1.2 A1.2 17 A1.2 16 RENOVATION KEYNOTES INTERIOR ELEVATION / ENTRY WEST ELEVATION EAST BUILDING INTERIOR ELEVATION / ENTRY SOUTH ELEVATION EAST BUILDING 10 A2.1 7 9 SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" PARTIAL BLDG SECTION / NEW MECHANICAL SCREENING PEDESTRIAN BRIDGE FLOOR PLAN / williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 SECOND FLOOR BRIDGE FLOOR PLAN / PEDESTRIAN BRIDGE SCALE: 1/8" = 1'-0" 6 DEMOLITION PEDESTRIAN BRIDGE RENOVATION REFLECTED CEILING PLAN / PEDESTRIAN BRIDGE DEMOLITION REFLECTED CEILING PLAN / PEDESTRIAN BRIDGE RENOVATION 23 SCALE: 1/8" = 1'-0" 8 INTERIOR ELEVATION / SCALE: 1/4" = 1'-0" 22 BRIDGE NORTH TOWEL DISP. INTERIOR ELEVATION / SCALE: 1/4" = 1'-0" 21 BRIDGE EAST BLDG RENOVATION KEYNOTES 4 21 A2.1 NEW MECHANICAL EQUIPMENT SCREENING - SEE MECHANICAL DRAWINGS. T T INTERIOR ELEVATION / BRIDGE SOUTH TOWEL DISP. SCALE: 1/4" = 1'-0" 22 A2.1 A2.1 23 DEMOLITION KEYNOTES 2 T A1 D17 2,560 SF T T T T T T D9 D3 TYP 20 19 17 A2.2 7 9 SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" INTERIOR ELEVATION / FITNESS ENTRANCE & OPEN TRACK ENTRANCE WEST BUILDING FLOOR PLAN / FITNESS CENTER AND TRACK ENTRANCE DEMOLITION SCALE: 1/4" = 1'-0" DETAIL/ SCALE: 3" = 1'-0" FRAMED HEADER SCALE: 1/4" = 1'-0" 5 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 FLOOR PLAN / TRACK EXIT DEMOLITION SECOND FLOOR FITNESS PLAN (MULTI-) FLOOR PLAN / FITNESS CENTER AND TRACK ENTRANCE SCALE: 1/8" = 1'-0" RENOVATION 6 REFLECTED CEILING PLAN / FITNESS CENTER AND TRACK ENTRANCE SCALE: 1/8" = 1'-0" 8 DEMOLITION REFLECTED CEILING PLAN / FITNESS CENTER AND TRACK ENTRANCE RENOVATION SCALE: 1/8" = 1'-0" FLOOR PLAN / TRACK EXIT SCALE: 1/8" = 1'-0" RENOVATION RCP / TRACK EXIT RENOVATION INT. ELEVATION / FITNESS / TRACK ENTRANCE WEST BLDG 18 16 NOTE AD5 5 A2.2 A2.2 19 RENOVATION KEYNOTES 4 5 A2.2 VENDING T (E) T (E) L PRINTER CABINET. PLASTIC LAMINATE.(PL-1). PVC EDGE BAND TO MATCH. CASH DRAWER. BY OWNER. 2'-0" 5" ADA COUNTER. 1'-5" 10 A8.0 8 A8.0 3 A8.0 FILE CABINET. PLASTIC LAMINATE. (PL-1). PVC EDGE BAND TO MATCH. 4 A8.0 TRANSACTION COUNTER. WOOD, QUARTZ. (QZ-1). COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). SUPPORT PANEL. PLASTIC LAMINATE. (PL-1). 3 FORM. 5/8" 1'-4" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. A8.0 9 FIN. FLR. COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). ADA COUNTER 5'-0" MAX 2'-10" 3'-6" TRANSACTION COUNTER. 3'-6" QUARTZ. BEHIND. (QZ-1). FIN. FLR. 2X BLOCKING AS REQUIRED. 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. SUPPORT WALL. MDF. 3/4" PAINT. (PT-6) ON SIDE OF 3 FORM. 5" 7" PLASTIC LAMINATE ATTACHED TO 3/4" BASE. (PL-1). HOLD PLASTIC LAMINATE 1/2" FROM EDGE FOR REVEAL. ROUTE REVEAL 1/4" DEEP. PAINT. (PT-6) CAP. SOLID SURFACE. (SSF-1). 3'-4" 1/2" 1 1/2" 1 1/2" 3/4" 3/4" 3/4" INSET WOOD SUPPORT/ TOP. SOLID SURFACE OR QUARTZ. 1/4" BULLNOSE. 1/16" 3/4" 1/16" PLASTIC LAMINATE. HOLD 2" DOOR. PLASTIC LAMINATE MAX 1/4" SIDE PANEL BEYOND. ALIGN WITH RUBBER BASE. TOE KICK. RUBBER BASE. (RB-X). BASE. PLASTIC LAMINATE OR MELAMINE. HOLD 4" FIN. FLR. PAINT OR SEAL UNDERSIDE OF TOE KICK. PROVIDE SLIGHT OVERHAND FOR TOLERANCE. COUNTERTOP. SOLID SURFACE. (SSF-1). 1/2" REVEAL. PAINT. (PT-6). 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. STANCHION BY 3 FORM. ALIGN. 1/2" 1 1/2" SUPPORT WALL. MDF. 3/4" PAINT. (PT-6) ON SIDE OF 3 FORM. 2" 3" MAX 1/2" A9.1 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 DOOR SCHEDULE DOOR TYPES 1 2 3 4 SEE DOOR SCHEDULE SEE DOOR SCHEDULE 7 1/2" 5'-10 1/2" 6" EQ. EQ. 6" 6" 6" 6" 2'-10" MINIMUM 1'-2" 5'-4" 6" SEE DOOR SCHEDULE EQ. EQ. 6" 6" 6" 6" SEE DOOR SCHEDULE SEE DOOR SCHEDULE 4" A B C D FRAME TYPES 8" 2'-2" 2" 2'-2" 2" 1'-9" 2" 7'-2" 2" 2'-0" 2" 6'-0" 2" 2'-0" 2" 10'-8" 8" 2'-1 1/2" 2" 2'-2" 2" 1'-9" 2" 7'-2" 2" 1'-2" 2" 6'-0" 2" 1'-2" 2" 8'-11 1/2" 1'-0" 2" 1'-8 1/2" 2" 1'-8 1/2" 2" 1'-8 1/2" 2" 6 1/2" 7'-4" 7'-0" 4" 2" 6'-0" 2" 3'-8" 2" 6'-4" 3'-10" 10'-2" 7 1/2" 2" 8" 2" 8'-0" - VIF 12'-0" - VIF 4'-0" 4'-0" 4'-0" 20'-0" - VIF 2'-2" 2" 2'-2" 2" 2" 1'-10 1/2" 2" 1'-10 1/2" 2" 1'-10 1/2" 2" 8" 2'-2" 2" 2'-3" 2" 7'-0" 7" 2'-3" 2" DOOR AND WINDOW SCHEDULES AND DETAILS williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 ID1.0 INTERIOR FIRST FLOOR - FINISH PLAN RENOVATION INTERIOR FINISH PLAN / FIRST FLOOR - WEST BUILDING SCALE: 1/8" = 1'-0" 10 INTERIOR FINISHES 5 WD-1 CPT-2 CPT-2 WD-1 WD-1 EXISTING TERRAZZO FLOOR TO REMAIN EXISTING SLATE FLOOR TO REMAIN INTERIOR FINISH NOTES 1 ST-1 ST-1 EXISTING TERRAZZO FLOOR TO REMAIN EXISTING TERRAZZO FLOOR TO REMAIN NOT USED 7 PT-2 PT-3 PT-4 EXISTING TO REMAIN EXISTING TO REMAIN EXISTING TO REMAIN EXISTING TO REMAIN EXISTING TO REMAIN MATCH EXISTING MURAL NEW FLOORING EXISTING FLOORING ID2.0 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 INTERIOR SECOND FLOOR - FINISH PLAN RF-3 RF-1 RF-1 RF-2 RF-3 RF-1 RF-2 RENOVATION INTERIOR FINISH PLAN / SECOND FLOOR- PEDESTRIAN TERRACE INTERIOR FINISHES 5 SCALE: 1/8" = 1'-0" 10 7 INTERIOR FINISH NOTES RENOVATION INTERIOR FINISH PLAN / SECOND FLOOR- WEST BUILDING SCALE: 1/8" = 1'-0" PT-1 CPT-1 CPT-3 CPT-1 CPT-2 NEW FLOORING EXISTING FLOORING 34'-3 1/2" 8'-0" 12'-0 1/2" 90'-0" R91'-4" EXISTING FLOORING NEW FLOORING 8'-0" 36'-3 1/2" NEW FLOORING EXISTING FLOORING INTERIOR FINISH PLAN / ADD TACTILE WARNING STRIP RF-2 15 CPT-2 HEADER F&B 3'-0" EXISTING FLOORING NEW FLOORING FUTURE N.I.C. PT-1 THIS SIDE “  PT-1 PT-1 MONON COMMUNITY CENTER 1235 CENTRAL PARK DRIVE EAST CARMEL, IN 46032 LOBBY & BRIDGE RENOVATION SCALE: 1 LOCATION NO SCALE MAP MECHANICAL SYMBOLS GENERAL PIPING NEW PIPING EXISTING PIPING TO REMAIN EXISTING PIPING TO BE DEMOLISHED CHWR CHILLED WATER RETURN PIPING CWR CONDENSER WATER RETURN PIPING CWS CONDENSER WATER SUPPLY PIPING D DRAIN PIPING (CONDENSATE) HWR HOT WATER RETURN PIPING (SECONDARY) HWS HOT WATER SUPPLY PIPING (SECONDARY) CW COLD/CITY WATER PIPING (DOMESTIC) DHWR DOMESTIC HOT WATER RETURN PIPING G NATURAL GAS PIPING V RELIEF VENT PIPING BACKFLOW PREVENTER BALL VALVE BUTTERFLY VALVE CHECK VALVE CIRCUIT SETTER BALANCING VALVE DIRECTION OF FLOW DIRECTION OF PIPE PITCH, DOWN DRAIN VALVE WITH 3/4" THREADED HOSE ADAPTOR ECCENTRIC PIPE REDUCER FLEXIBLE PIPE CONNECTOR (OR CONNECTION) FLOW SWITCH GAS COCK GAS SOLENOID VALVE GATE VALVE GLOBE VALVE THERMOSTATIC MIXING VALVE MANUAL AIR VENT MANUAL THREE-WAY, TWO-POSITION VALVE NEEDLE VALVE NEW PIPE CONNECTION ORIFICE PIPE UNION PIPE ALIGNMENT GUIDE PIPE ANCHOR PIPE CAP PIPE DROP/RISE 3,3((/%2:r+25,=217$/ 3,3((/%2:r+25,=217$/ PIPE ELBOW, TURNED DOWN PIPE ELBOW, TURNED UP PIPE EXPANSION JOINT EJ PIPE REDUCER/INCREASER PIPE SLEEVE 3,3(7((%27720&211(&7,21r25r(/%2: PIPE TEE, DOWN PIPE TEE, HORIZONTAL 3,3(7((723&211(&7,21r25r(/%2: PIPE TEE, UP TB-R1006 TB-R1007 TB-R1005 14x10 18x10 10x10 12x6 SG6-500 ෘ SD1-210 T SD1-210 14x12 ෘ RG-1 SD2-190 SD2-190 18x10 SG2-500 TO REMAIN ෘ 24x18 T SD2-195 TB-R901 24x18 SD2-300 12x10 8x10 ෘ 14x22 SUPPLY DUCT UP TO 2ND FLOOR 36x18 RETURN DUCT UP TO 2ND FLOOR RG-1 1 3 2 NIC NIC NIC DN LOBBY STAIR 54x12 SG-155 (TYP. OF 32) ෘ 7<32) SD3-320 ෘ TB-R1101-FP AC-R1 TB-R1100-FP) 20x10 20x10 3 (x 32) NIC 3 3 3 4 NIC NIC 3 3 NIC TB-R1006 TB-R1007 TB-R1005 HWR HWS CUH-R4 HWR HWS HWR HWS HWR HWS TB-R901 TB-R900 DEMOLISH EXISTING HWR/S PIPING BACK TO TAKEOFF AS SHOWN. 2" 1 3/4" 3/4" NIC NIC NIC 1" DN LOBBY STAIR CWR EXISTING FTR TO REMAIN HWR CWS HWS EXISTING CHW/HW PIPING TO REMAIN 3 4" CONTINUE TO REST OF BLDG EXISTING FTR TO REMAIN EXISTING FTR TO REMAIN EXISTING FTR TO REMAIN EXISTING CHW/HW PIPING TO REMAIN 2 TB-R1100FP TB-R1101FP 3 3 T NIC NIC NIC 4 SCALE: 1 PIPING 1/8" = 1'-0" DEMO - WEST LOBBY SCALE: 3 PIPING 1/8' = 1'-0" DEMO - BRIDGE A. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. B. ALL DEMOLITION OF THE HVAC SYSTEM AS CALLED FOR ON THE DEMOLITION DRAWINGS SHALL BE UNDER THIS ELEV. LOBBY ELEV. EQUIP. ELEV. TELE. CHECK-IN COUNTER LOBBY VESTIBULE OBSERVATION RAMP CORR. TB-R1007 TB-R1005 14x10 TB-R1007 10x10 12x6 ෘ SD1-210 T SD1-210 14x12 ෘ RG-1 SD2-190 SD2-190 18x10 EXISTING SG2-500 ෘ 24x18 T SD2-195 TB-R901 24x18 12x10 8x10 ෘ 14x22 SUPPLY DUCT UP TO 2ND FLOOR 36x18 RETURN DUCT UP TO 2ND FLOOR 3 1 2 12x10 1 12x10 12x10 5 4 NIC NIC NIC 7 8 8 8 ෘ SG6A-400 DN LOBBY STAIR ෘ 7 ෘ 4 ෘ 5 6 6 6 CAP DUCTWORK SERVING REMOVED TERMINAL BOX ෘ ෘ ෘ 9 NIC NIC NIC 10x12 10x12 10 ෘ ෘ 5 ෘ 10 ෘ 5 ෘ 10 ෘ 5 ෘ 10 13 13 13 14 14 2 3 FRESH AIR INTAKE 500 CFM 1 3 8 EXHAUST DUCT 700 CFM 18x22 18x22 NIC NIC NIC ENVISOR SCREEN TO ENCOMPASS ROOF EQUIPMENT AND DUCTWORK. FINAL LAYOUT OF SCREEN TO BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. MIN. 15' 12 11 12' - 0" MIN. 24' - 0" 6' - 0" SCALE: 2 DUCTWORK 1/8" = 1'-0" NEW WORK - PEDESTRIAN BRIDGE SCALE: 1 DUCTWORK 1/8" = 1'-0" NEW WORK - BRIDGE ROOFTOP A. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE ELEV. LOBBY ELEV. EQUIP. ELEV. TELE. CHECK-IN COUNTER LOBBY VESTIBULE OBSERVATION CAFE KITCHEN CAFE STORAGE RAMP CORR. TB-R1005 TB-R1006 TB-R1007 HWR HWS HWR HWS HWR HWS HWR TB-R901 TB-R900 1 3 T 9 GPM 1 1 4" 16 GPM 1 1 4" 7 GPM 1 1 4" T 4 5 2 2 NIC 2 NIC NIC NIC 6 16.75 GPM 1 1 4" 7 GPM 1 1 4" NIC 8 VEST. LOBBY CHECK-IN COUNTER LAN / IT ELEV MENS DN LOBBY STAIR CWR EXISTING FTR TO REMAIN. EXISTING FTR TO REMAIN. EXISTING FTR TO REMAIN. HWR CWS HWS EXISTING HW/CHW PIPING TO REMAIN. 3 4" 3 3 3 3 EXISTING FTR TO REMAIN. EXISTING HW/CHW PIPING TO REMAIN. COND. DRAIN PIPE 4 7 2 2 0.8 GPM 3/4" T T NIC NIC 3/8" LIQUID REFRIGERANT 5/8" GAS REFRIGERANT 4 4 8 10 9 COND. DRAIN PIPE 3/8" LIQUID REFRIGERANT 5/8" GAS REFRIGERANT 3 8" LIQUID REFRIGERANT 5 8" GAS REFRIGERANT 1 6 NIC NIC NIC NIC 12 SCALE: 2 PIPING 1/8' = 1'-0" NEW WORK - PEDESTRIAN BRIDGE SCALE: 1 PIPING 1/8" - 1'-0" NEW WORK - BRIDGE ROOFTOP GENERAL NEW PIPING CONSTRUCTION NOTES A. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. B. ALL DEMOLITION OF THE HVAC SYSTEM AS CALLED FOR ON THE DEMOLITION DRAWINGS SHALL BE 7' 11' 17.5' FRONT ENTRANCE LOBBY DOORS HIGH WALL SUPPLY DIFF. DOWNBLAST HORIZONTAL DISTANCE FROM HIGH WALL TO DOORS ป $/,*1('',67$1&( LINEAR SLOT DIFFUSER ANGLED DOWN TOWARDS TOP OF LOBBY DOORS SCALE: NO SCALE LINEAR SLOT DIFFUSER IN LOBBY HIGH WALL 8 VERTICAL DISTANCE FROM FLOOR TO LINEAR SLOT DIFFUSER SCALE: NO SCALE VAV BOX W/ HOT WATER REHEAT COIL RIGID DUCT CONNECTION WITH A MINIMUM OF 3' STRAIGHT DUCT INTO BOX. MATCH SIZE OF INLET. LINED LOW VELOCITY SUPPLY DUCTWORK HOT WATER REHEAT COIL VAV BOX CONTROL PANEL, VERIFY SIDE FOR ACCESS STEEL HANGER ROD SUPPORTS. MIN. 4 PER UNIT HOT WATER SUPPLY HOT WATER RETURN MANUAL AIR VENT RETURN PIPING TRIM BALL VALVE BALANCING VALVE MOD. TEMPERATURE CONTROL VALVE PIPE REDUCER UNION SUPPLY PIPING TRIM BALL VALVE PIPE REDUCER UNION BALL VALVE 3/4" MIN. DRAIN VALVE NOTE: MODULATING CONTROL VALVE FURNISHED BY BAS CONTRACTOR, INSTALLED BY PIPING CONTRACTOR 4 5 8" GAS PIPE CONNECTION 3 SCALE: NO SCALE DUCT ROOF PENETRATION DETAIL 3 A SEE PLANS FOR DUCT SIZE. 1-1/2" STANDING SEAM RIVETED OR BOLTED ON 12" CENTERS COUNTER FLASHING WITH WELDED CORNER SEAMS PRE-FABRICATED CURB BASE FLASHING DUCT WOOD NAILER DUCT 10 GAUGE STEEL SLEEVE MAX. 12" PROVIDE ADDITIONAL SUPPORTS TO ROOF AS NEEDED. NOTE: 1. ALL DUCT JOINTS TO BE SEALED WATERTIGHT WITH ALUMINASTIC SCALE: NO SCALE TYPICAL TRAPEZE PIPE HANGER DETAIL STEEL SUPPORT ROD MOUNTED FROM JOIST OR BEAM U-BOLT r0(7$/3,3(&29(5$7 U-BOLTS AND U-CLAMPS LOCKING NUT EACH SIDE OF CHANNEL INSTALL PIPE ROLLER ON HOT PIPING THAT WILL EXPAND HIGH DENSITY PIPE INSULATION OR WOOD SADDLE U-BOLT r0(7$/3,3(&29(5$7 U-BOLTS AND U-CLAMPS PIPE INSULATION PIPE SIZE LENGTH "L" GA. UP TO MIN. 3/4" 8" 20 1" TO 2" 12" 18 2-1/2" TO 4" 12" 16 5" TO 6" 18" 16 8" AND UP 24" 14 CONDENSING UNIT SCHEDULE (CU) EQUIP. TAG GENERAL DATA DIMENSIONAL DATA (INCHES) PERFORMANCE DATA ELECTRICAL DATA NOTES SERVICE LOCATION MFR MODEL SHIPPING WEIGHT (LBS) OPERATING WEIGHT (LBS) W H D # OF CIRCUITS COMP. TYPE COOLING CAPACITY (MBH) HEATING CAPACITY (MBH) EER REFRIG. TYPE SUCTION LINE SIZE (IN) LIQUID LINE SIZE (IN) FLA VOLTS HZ PHASE BRIDGE CASSETTES BRIDGE ROOF SAMSUNG AM144 699 657 51 66.75 30.125 2 SSC SCROLL 144 162 11.70 R410A 1.125 0.5 1.5 460 60 3 SEE BELOW NOTES: CU B1 1. MOUNT ON EQUIPMENT SUPPORTS. REFER TO DETAILS SHEETS. 2. REFRIGERANT LIQUID AND SUCTION PIPING TO MATCH CONNECTION SIZE OF CONDENSING UNIT. FOLLOW ALL MFG RECOMMENDATIONS. 3. VERTICAL DISCHARGE. 4. UL LISTED. 5. PROVIDE WITH CODE REQUIRED RELIEF VALVE AS NEEDED 6. ADDITIONAL ACCEPTABLE MANUFACTURERS: CARRIER, YORK, DAIKIN, LG, MITSUBISHSI, LENNOX. *MFG TO BE SAME AS CASSETTE MFG. 7. PROVIDE WITH DISCONNECT. 8. ARCHITECTURAL SCREENING TO BE ATTACHED TO UNIT. GRILLES, REGISTERS, AND DIFFUSERS SCHEDULE EQUIP TAG. MFR MODEL TYPE SERVICE CFM/SF MATERIAL MAX. NC NOTES SG6A-400 TITUS ML-39 3-SLOT WITH SUPPLY PLENUM LOBBY 100 ALUMINUM 30 SEE BELOW I. GENERAL NOTES A. THIS CONTRACTOR SHALL REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS, INCLUDING, BUT NOT LIMITED TO, ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS, AS WELL AS ALL SPECIFICATIONS AND INSTRUCTIONS TO BIDDERS. THIS CONTRACTOR SHALL VISIT THE SITE AND MAKE A DETAILED INSPECTION OF THE SPECIFIED WORK TO DEVELOP KNOWLEDGE OF ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS WORK WITH THE WORK PERFORMED BY OTHER TRADES AND/OR CONTRACTORS, AND SHALL MAKE SUCH FIELD ADJUSTMENTS AS ARE REQUIRED TO ACCOMMODATE FIELD CONDITIONS. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK AT NO ADDITIONAL COST TO OWNER. B. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM, THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND THOSE REPRESENTED IN THE DRAWINGS, OR CONFLICTS BETWEEN HIS WORK AND THAT OF OTHER TRADES, OR BE IN DOUBT AS TO THE MEANING OF ANY CONTRACT DOCUMENTS, THIS CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THE ENGINEER IN WRITING, AND SHALL OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS THIS CONTRACTOR'S REPRESENTATION THAT NO DISCREPANCIES OR CONFLICTS EXIST. ADDITIONAL COMPENSATION WILL NOT BE GRANTED AFTER AWARD OF CONTRACT FOR ANY WORK REQUIRED TO COMPLY WITH THIS REQUIREMENT. C. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, REQUIREMENTS FOR, AND LOCATION OF, THE WORK INCLUDED UNDER THIS CONTRACT. ALL WORK REQUIRED TO EFFECT THE INDICATED DESIGN, INCLUDING DETAILS NOT SHOWN BUT WHOSE INCLUSION WOULD BE DEEMED A REQUIREMENT BY A KNOWLEDGEABLE TRADESMAN, ENGINEER OR TECHNICIAN, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. D. IT IS THE INTENT OF THESE DOCUMENTS THAT THE CONTRACTOR PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS FOR THE COMPLETE INSTALLATION OF ALL WORK SHOWN ON THE PLANS AND/OR DESCRIBED HEREIN, INCLUDING ALL DEVICES, CONTROLS AND APPURTENANCES REQUIRED TO SET THE NEW SYSTEMS INTO OPERATION, UNLESS OTHERWISE NOTED. E. THIS CONTRACTOR SHALL VERIFY ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN. ANY MENTION OF A SPECIFIC MOUNTING ARRANGEMENT, WEIGHT OR LOCATION SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO VERIFY SPECIFIC REQUIREMENTS AND BASE HIS WORK ON THEM. THE SAME CARE SHALL BE TAKEN WITH RESPECT TO INFORMATION FURNISHED BY THIS CONTRACTOR TO HIS SUBCONTRACTORS OR TO OTHER CONTRACTORS EMPLOYED BY THE OWNER ON THIS PROJECT. THIS CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR ANY CHANGE ORDERS NECESSITATED BY INACCURATE OR INCORRECT INFORMATION FURNISHED TO OTHER CONTRACTORS. NO ADDITIONS TO THE CONTRACT AMOUNT WILL BE PERMITTED FOR ITEMS INSTALLED IN WRONG LOCATIONS OR IN CONFLICT WITH OTHER WORK. F. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING FOR AND OBTAINING ALL APPLICABLE PERMITS. THIS CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE FEES AND INSPECTIONS APPLICABLE TO HIS WORK, AND SUCH COSTS SHALL BE INCLUDED IN HIS BASE BID UNLESS OTHERWISE NOTED. THIS CONTRACTOR SHALL ALSO INCLUDE IN HIS BID ALL FEES ASSOCIATED WITH THE SERVICES OF A PERMIT EXPEDITER AS MAY BE REQUIRED TO MEET THE PROJECT SCHEDULE. G. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF THE WORKMEN IN ALL PHASES OF WORK, AND SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL SAFETY LAWS, INCLUDING THE REQUIREMENTS OF OSHA. HE SHALL ALSO PROVIDE ALL NECESSARY SIGNS, LIGHTS AND BARRICADES REQUIRED FOR THE SAFETY OF ALL OTHER PERSONS WHO MIGHT COME IN CONTACT WITH THE CONSTRUCTION BEING PERFORMED UNDER THIS CONTRACT. H. ALL PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED AND REPLACED BY THIS CONTRACTOR, TO THE SATISFACTION OF REGULATIONS AND AUTHORITIES HAVING JURISDICTION. I. THE MECHANICAL CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH THE BUILDING OWNER'S REPRESENTATIVE REGARDING BUILDING RULES AND REGULATIONS, INCLUDING WORKING HOURS, REFUSE DISPOSAL, DUMPSTER LOCATION, SECURITY, INTERRUPTIONS OF BUILDING UTILITIES OR FUNCTIONS, OWNERSHIP OF SALVAGED MATERIALS, AND ANY OTHER ITEMS DEEMED TO BE OF MUTUAL INTEREST. J. IT SHALL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO STORE HIS MATERIALS IN A MANNER THAT WILL MAINTAIN AN ORDERLY CLEAN APPEARANCE. IF STORED ON SITE IN OPEN OR 4. WHERE INSULATED PIPE IS SUPPORTED, PROVIDE SADDLES, BLOCKS OR OTHER METHOD APPROVED BY ENGINEER TO PROTECT INSULATION FROM BEING CRUSHED. REFER TO DETAILS. 5. SUPPORT SHALL NOT BE FROM DUCTWORK, CONDUIT, OR OTHER PIPING BUT FROM THE PERMANENT BUILDING STRUCTURE OR EQUIPMENT SUPPORTS. 6. HANGER RODS SHALL BE FULL-DIAMETER STEEL WITH THREADED ENDS FOR FIELD CUTTING AND THREAD EXTENDING AS REQUIRED. WHERE THREADED ROD IS SHORTER THAN 6", IT SHALL BE DIPPED IN RUST RESISTANT PAINT PRIOR TO INSTALLATION. AT THE CONTRACTOR'S OPTION, HANGER RODS MAY BE CONTINUOUS THREADED STEEL WITH GALVANIZED FINISH. 7. HANGER RODS SHALL NOT BE BENT OR ALTERED IN ANY MATTER AND SHALL BE INSTALLED PLUMB AND TRUE. THE ROD SUPPORTING THE HANGER SHALL BE NO LONGER THAN 1/2" BELOW THE LOWER NUT. 8. ACCEPTABLE HANGER MANUFACTURER'S: a. FEE AND MASON, ELCEN, CRAWFORD P. PIPE LABELING 1. FURNISH AND INSTALL IDENTIFICATION LABELS AND LABELING MATERIALS FOR ALL NEW PIPING AS SHOWN ON THE DRAWINGS. LABELS SHALL IDENTIFY THE DIRECTION OF FLOW AND THE TYPE OF SERVICE. 2. PROVIDE PIPE LABELS AT LOCATIONS BELOW: a. EACH SHUTOFF VALVE. b. BOTH SIDES OF EACH FULL HEIGHT WALL PENETRATION. c. EVERY 20'-0" OF RUN MINIMUM. d. CHANGE IN PIPING DIRECTION. 3. CONTRACTOR SHALL SUBMIT FOR APPROVAL, PRIOR TO INSTALLATION, THREE (3) SAMPLES OF EACH PIPE LABEL AND PIPE LABELING MATERIALS. 4. LABELS SHALL BE SUITABLE FOR APPLICATIONS. 5. LABEL WIDTH SHALL NOT BE LESS THAN 2". Q. VALVE IDENTIFICATION 1. FURNISH AND INSTALL TAGS FOR ALL NEW AND EXISTING CONTROL VALVES RELATED TO THE MECHANICAL SYSTEM SPECIFIED HEREIN AND AS SHOWN ON ACCOMPANYING DRAWINGS. 2. VALVE TAGS SHALL HAVE UNIQUE #'S AND SHALL BE COORDINATED WITH THESE DRAWINGS, THE ENGINEER, AND OWNER. 3. VALVE TAGS SHALL BE BRASS MATERIAL AND SHALL BE FASTENED WITH A STURDY CHAIN. 4. CONTRACTOR SHALL SUBMIT FOR APPROVAL, PRIOR TO INSTALLATION, A LIST OF TAG#'S ALONG WITH A SAMPLE OF VALVE TAG. 5. VALVE TAG NUMBERS SHALL BE INDICATED ON THE AS-BUILT DRAWINGS. R. PIPE PENETRATIONS 1. PROVIDE ALL HOLES, SLEEVES, CUTTING, PATCHING, AND CAULKING FOR INSTALLATION OF PIPING WORK. CAULKING SHALL CONFORM TO THE FIRE RATING OF THE WALLS. SEAL ALL PENETRATIONS THROUGH BLOCK WALLS. 2. FIRE SEAL a. SEAL PENETRATIONS OF FIRE RATED WALL, FLOORS, AND CEILINGS FOR COMPLIANCE WITH NEC. b. FILL VOID AROUND RACEWAYS. c. SLEEVES: HEAVY WALL SCHEDULE 40 STEEL PIPE, ANCHORED TO BUILDING CONSTRUCTION, AND FINISHED PLUMB WITH WALL, CEILING, AND FLOOR LINES. 3. THERMAL SEAL a. SEAL PENETRATIONS OF THERMALLY INSULATED EQUIPMENT, WALLS, OR ROOMS TO PREVENT HEAT TRANSFER. b. FILL INTERIOR OF PENETRATION WITH FIBERGLASS OR OTHER MATERIAL COMPATIBLE TO EQUIPMENT OR ROOM AND APPROVED BY ARCHITECT / ENGINEER. c. SEAL WITH DUCT SEALING COMPOUND. 4. WATER SEAL a. SEAL PENETRATIONS OF PERIMETER WALLS OR FLOORS BELOW GRADE TO PREVENT ENTRY OF WATER. USE MATERIALS COMPATIBLE WITH WALL OR FLOOR CONSTRUCTION AND APPROVED BY ARCHITECT / ENGINEER. b. SEAL PENETRATIONS OF ROOF WITH FLASHINGS COMPATIBLE WITH ROOF DESIGN AND APPROVED BY ROOFING SYSTEM MANUFACTURER AND ARCHITECT / ENGINEER. S. PIPE SLEEVES 1. PROVIDE ALL PIPE OPENINGS THROUGH WALLS, PARTITIONS, AND SLABS WITH SLEEVES HAVING AN INTERNAL DIAMETER AT LEAST 1" LARGER THAN THE OUTSIDE DIAMETER OF THE DOWN LIGHT PENDENT LIGHT FIXTURE 1. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE ENTIRE SET OF CONTRACT DOCUMENTS AND VISIT THE SITE OF WORK, AND FULLY INFORM HIMSELF AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE ENGINEER AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF NOTIFICATION SHALL BE INTERPRETED TO INDICATE NO DISCREPANCIES OR CONFLICTS EXIST. ADDITIONAL COMPENSATION WILL NOT BE GRANTED AFTER AWARD OF CONTRACT FOR ANY WORK REQUIRED TO COMPLY WITH THESE REQUIREMENTS AND INTENT. 2. THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL ELECTRICAL COMPONENTS, SYSTEMS, OR AS MAY BE REQUIRED OR DESCRIBED HEREIN. ALL EQUIPMENT AND DEVICES FURNISHED, OR REQUIRED WILL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR. IT WILL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PURCHASE ALL EQUIPMENT AND FURNISH LABOR AND EQUIPMENT FOR A COMPLETE CODE COMPLIANT OPERATING ELECTRICAL SYSTEM. 3. SPECIFIC VOLTAGE AND CURRENT REQUIREMENTS ON THE ELECTRICAL DRAWINGS SHALL NOT RELIEVE THIS CONTRACTOR OF THE RESPONSIBILITY TO VERIFY THE VOLTAGE PRIOR TO PURCHASING OR ROUGH-IN WORK. THIS CONTRACTOR SHALL REVIEW ALL DEVICES FURNISHED BY HIS CONTRACT AND DEVICES FURNISHED BY OTHER CONTRACTORS ARE IN AGREEMENT WITH THE DATA SHOWN ON THE DRAWINGS. THE E.C. SHALL PROVIDE FEEDERS, CABLE AND DEVICES THAT ARE IN ACCORD WITH CODE. 4. THIS CONTRACTOR SHALL VERIFY ALL EQUIPMENT AND DEVICE MOUNTING ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN. ANY MENTION OF A SPECIFIC MOUNTING ARRANGEMENT, HEIGHT OR LOCATION SHALL NOT RELIEVE THIS CONTRACTOR OF THE RESPONSIBILITY TO VERIFY THE SPECIFIC REQUIREMENT WITH THE EQUIPMENT FURNISHED BY THE OTHER TRADES IN THE SAME AREA. NO ADDITION TO THE CONTRACT SUM WILL BE PERMITTED FOR WRONG LOCATIONS, IN CONFLICT WITH OTHER WORK, ETC. THE OWNER RESERVES THE RIGHT TO RELOCATE ANY DEVICE 10' - 0" PRIOR TO ROUGH-IN WITHOUT ANY ADDITIONAL CHARGE BY THIS CONTRACTOR. THIS CONTRACTOR SHALL FULLY COORDINATE ELECTRICAL WORK WITH THE INSTALLATION OF WORK BY ALL OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE ELECTRICAL INSTALLATION. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK AT NO ADDITIONAL COST TO THE OWNER. 5. ALL INSTRUMENTS, APPARATUS AND EQUIPMENT SHALL BE TESTED AND PROVED TO BE ELECTRICALLY AND MECHANICALLY WITHOUT DEFECTS. THE ELECTRICAL SYSTEM SHALL BE TESTED FOR GROUNDS OR SHORTS. IF THE TROUBLE IS WITHIN THE CIRCUIT WIRING, ALL SHORTED OR GROUNDED WIRES SHALL BE REPLACED AND THEN RE-TESTED. ALL METERS, CABLES, EQUIPMENT OR APPARATUS NECESSARY FOR MAKING ALL TESTS SHALL BE FURNISHED AND PROVIDED BY THIS CONTRACTOR. ANY TESTING OR EQUIPMENT MUST CONFORM TO OSHA REQUIREMENTS. 6. THE ENGINEER WILL MAKE PERIODIC VISITS TO THE JOBSITE TO OBSERVE THE PROGRESS OF THE WORK AND TO OBSERVE WHETHER OR NOT IT IS BEING PERFORMED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THIS DOES NOT IN ANY WAY MEAN THAT THE ENGINEER IS A GUARANTOR OF THE CONTRACTOR'S WORK, OR RESPONSIBLE FOR SAFETY IN, ON, OR ABOUT THE JOBSITE, IN CONTROL OF THE SAFETY OR ADEQUACY OF ANY SHIPMENT, BUILDING, SCAFFOLDING, FORMS OR OTHER WORK AIDS, OR FOR SUPERINTENDING, DIRECTION OR HAVING CHARGE AT THE ERECTION AND/OR CONSTRUCTION OF THE WORK. 7. ANY AND ALL WORK UNDER THIS CONTRACT SHALL BE DONE IN STRICT ACCORD WITH CITY ELECTRICAL, BUILDING, AND FIRE CODES. ANY AND ALL PERMITS, LICENSE, INSPECTION FEES, AND TAX THAT MAY RESULT FROM WORK UNDER THIS CONTRACT SHALL BE INCLUDED IN THE BASE BID. 8. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING FROM DAMAGE, VANDALISM, THEFT OR WEATHER DURING CONSTRUCTION ALL NEW EQUIPMENT FURNISHED BY THIS CONTRACTOR. THIS SHALL ALSO APPLY TO ITEMS FURNISHED BY THE OWNER TO THE ELECTRICAL CONTRACTOR. THIS CONTRACTOR SHALL COORDINATE THE DELIVERY TO MEET THE PROJECT COMPLETION DATES AS ESTABLISHED BY THE OWNER. 1101 LOBBY 1100 VESTIBULE 1107 1105 RAMP 1180 ELEV. EQUIP. 1183 CAFE KITCHEN 1103 WORKROOM 1102 CHECK-IN COUNTER 1106 CORR. 1108 OBSERVATION 1104 STOR. 1181 ELEV. 1179 TELE 1195 ELEV. LOBBY EL. = 9'-8" A.F.F. BOTT. SOFFIT EL. = 9'-0" A.F.F. BOTT. CEILING EL. = 9'-0" A.F.F. SEE NOTE 7 BOTT. SOFFIT EL. = 12'-0" A.F.F. EL. = 12'-0" A.F.F. BOTT. SOFFIT EL. = 9'-0" A.F.F. BOTT. CEILING EL. = 9'-0" A.F.F. BOTT. CEILING EL. = 10'-0" A.F.F. BOTT. SOFFIT EL. = 9'-8" A.F.F. BOTT. SOFFIT EL. = 11'-4" A.F.F. BOTT. SOFFIT J J J J AREA OF WORK AREAS OF SCOPE AREA OF WORK 5 ACT-1 EL. = 8'-0" A.F.F. ACT-1 BOTT. CEILING EL. = 7'-4" A.F.F. BOTT. SOFFIT 2200 PEDESTRIAN TERRACE 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 1 2 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 1. DISCONNECT AND REMOVE ALL CEILING LIGHT FIXTURES. EXISTING LIGHTING BRANCH CIRCUIT SHALL REMAIN FROM THE PANELBOARD. REMOVE CONDUIT AND WIRES BETWEEN THE LIGHT FIXTURES. 1101 LOBBY 1100 VESTIBULE 1105 RAMP 1180 ELEV. EQUIP. KITCHEN 1103 WORKROOM 1102 CHECK-IN COUNTER 1106 CORR. OBSERVATION 1104 STOR. 1181 ELEV. 1179 TELE 1195 ELEV. LOBBY EL. = 9'-8" A.F.F. BOTT. SOFFIT SEE NOTE 7 BOTT. SOFFIT EL. = 12'-0" A.F.F. EL. = 12'-0" A.F.F. BOTT. SOFFIT EL. = 9'-0" A.F.F. BOTT. CEILING EL. = 9'-0" A.F.F. BOTT. CEILING EL. = 10'-0" A.F.F. BOTT. SOFFIT EL. = 9'-8" A.F.F. BOTT. SOFFIT 1 4 1 1 1 1 2 5 3 3 1 1 F1 F1 F1 F1 F1 F1 7 F4 F5 1 1 1 F5 7 F4 7 F4 7 F4 7 F4 7 F4 7 F4 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 F5 1 TO EMERG PANEL 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 R-1LRE1-7 3 R-2LRN1 LUTRON ACT-1 EL. = 8'-0" A.F.F. ACT-1 BOTT. CEILING ELEV. LOBBY ELEV. EQUIP. ELEV. TELE. CHECK-IN COUNTER LOBBY VESTIBULE OBSERVATION CAFE KITCHEN CAFE STORAGE RAMP CONCESSION DECK CORR. R-1LN7:28 & 30 1 4 4 3 5 R-1LN7 EXISTING DATA RACK J 12 2 J J J J 9 9 9 9 9 10 10 10 R-1LN7:9 R-1LN7:9 R-1LN7:9 R-1LN7:7 R-1LN7:7 AREA OF SCOPE AREAS OF SCOPE 14 R-1LN7:7 R-1LN7:7 R-1LN7:7 VEST. LOBBY CHECK-IN COUNTER LAN / IT ELEV DN LOBBY STAIR J J R-2LN7-20, 22, 24, 26, 28, 30 R-2LN7-32, 34, 36, 38, 40, 42 1 1 1 4 4 4 4 4 4 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 8 8 8 9 9 20 32 20 22 22 24 24 26 26 28 28 30 32 34 34 36 36 38 38 40 40 42 10 10 CASSETTE CASSETTE CASSETTE CASSETTE J J J J R-2LN7 R-2HND EXISTING DATA RACK R-2LN7-21 R-2LN7-23 R-2LN7-21 R-2LN7-23 R-2LN7-29 ELEV. 8'-0"AFF R-2LN7-31 ELEV. 8'-0"AFF R-2LN7-31 ELEV. 8'-0"AFF R-2LN7-29 ELEV. 8'-0"AFF 8 8 GENERAL FIRE PROTECTION CONSTRUCTION NOTES: 1) ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. 2) ALL UTILITY AND/OR SHUTDOWNS SHALL BE COORDINATED WITH OWNER AND ENGINEER. NO SHUTDOWNS CAN OCCUR WITHOUT PRIOR PERMISSION FROM THE OWNER. 3) THE FIRE PROTECTION CONTRACTOR (FPC) SHALL PROVIDE FIRE PROTECTION SPRINKLER SYSTEM FROM EXISTING FIRE PROTECTION MAIN PER NFPA 13. SYSTEM SHALL COMPLY WITH ALL REQUIREMENTS OF LOCAL, STATE AND FEDERAL AUTHORITIES. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE THE LOCAL, STATE, AND FEDERAL CODES, INCLUDING ILLINOIS STATE SCHOOL CODE. 4) ALL WORK SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THE LOCAL FIRE PROTECTION DISTRICT AND WATER DEPARTMENT. 5) ALL AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED AT LEAST THREE WORKING DAYS PRIOR TO COMMENCEMENT OF WORK. 6) WORK SHALL BE PERFORMED BY AN APPROVED AUTOMATIC FIRE PROTECTION SPRINKLER CONTRACTOR. SHOP DRAWINGS, PRODUCT DATA, AND HYDRAULIC CALCULATIONS SHALL BE PREPARED BY A REGISTERED PROFESSIONAL ENGINEER. APPROVED CONTRACTOR AND THE CONTRACTOR'S REGISTERED PROFESSIONAL ENGINEER SHALL BE LICENSED WITH THE PROPER AUTHORITIES FOR LOCATION OF THIS PROJECT. 7) THE FPC SHALL PROVIDE AN AUTOMATIC WET PIPE SPRINKLER SYSTEM INCLUDING PIPING, HANGERS, VALVES, ALARMS, SUPPORTS, AND SPRINKLER HEADS, NECESSARY AND AS REQUIRED FOR INSTALLATION OF COMPLETE AND APPROVED FIRE PROTECTION SYSTEM. 8) ALL NEW PIPING WILL BE IN COMPLIANCE WITH ASTM A-135, STEEL SCHEDULE 40 PIPE, AND IN COMPLIANCE WITH REQUIREMENTS OF LOCAL AUTHORITIES HAVING JURISDICTION. 9) A HYDROSTATIC TEST WILL BE PERFORMED ON ALL NEW PIPING AT 200 PSI OR 50 PSI ABOVE THE NORMAL SYSTEM STATIC, WHICH EVER IS GREATER, FOR A MINIMUM OF 2 HOURS IN ACCORDANCE WITH NFPA 13. 10) LOCATE SPRINKLER AT SUFFICIENT HEIGHT ABOVE OBSTRUCTIONS SO AS TO MINIMIZE THE IMPACT OF OBSTRUCTIONS TO THE SPRINKLER HEAD DISCHARGE; OBSERVE ALL RULES OF REQUIRED VERTICAL AND/OR HORIZONTAL DISTANCES AWAY FROM OBSTRUCTIONS, COORDINATE WITH OTHER TRADES SUCH AS MECHANICAL, ELECTRICAL, STRUCTURAL, ARCHITECTURAL, ETC.; COORDINATE WITH GC REGARDING RECOMMENDED RELOCATION OF OBSTRUCTIONS AS POSSIBLE/ACCEPTABLE. RELOCATION OF SPRINKLER HEADS IS PREFERRED IN LIEU OF ADDED ADDITIONAL SPRINKLER HEADS TO COMPENSATE FOR OBSTRUCTIONS. 11) ROUTE PIPING TO ACCOUNT FOR SLOPES OF CEILINGS, STRUCTURAL BEAMS, JOISTS, ETC. ABOVE. PROVIDE OFFSETS AND FITTINGS AS NECESSARY. 12) PER NFPA 13, WHEN REQUIRED, ALIGN DEFLECTS PARALLEL SLOPES OF CEILING, STRUCTURAL BEAMS, JOISTS, ETC. ABOVE. 13) THE FPC SHALL RUN PIPING HORIZONTALLY AND AT RIGHT ANGLES TO WALLS AND CEILINGS, CENTER SPRINKLER HEADS IN BOTH HORIZONTAL DIRECTIONS WITH RESPECT TO CEILING COMPONENTS, SUCH AS CEILING GRID, LIGHT FIXTURES, HVAC AIR DEVICES, AND SPEAKERS OR AS DIRECTED BY ARCHITECT. 14) THE FPC SHALL FIELD VERIFY EXACT REQUIREMENTS FOR BUILDING REGARDING PIPE SIZES, ADEQUATE PRESSURES, SERVICE LOCATIONS, AND SUBMIT SHOP DRAWINGS TO THE AUTHORITIES FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION OF FIRE PROTECTION WATER SERVICE AND/OR SYSTEMS. OBTAIN RECENT WATER FLOW DATA, DATA DETERMINED WITHIN PAST 6 MONTHS. 15) ALL AUTOMATIC SPRINKLERS SHALL BE IN COMPLIANCE WITH NFPA, INSURANCE UNDERWRITER, LOCAL AND STATE FIRE PROTECTION BUREAUS. 16) ALL PIPING SHALL BE ROUTED IN THE SUSPENDED CEILING SPACE UNLESS OTHERWISE INDICATED. ALL PIPING EXPOSED TO VIEW SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO THE UNDERSIDE OF STRUCTURE AND OTHER OBSTRUCTIONS. 17) FIRE PROTECTION PIPING SHALL BE SUPPORTED INDEPENDENTLY FROM OTHER DUCT/PIPE SUPPORTS. FOR PIPING SUSPENDED FROM OTHER SUPPORTS FOR OTHER DUCTS AND/OR PIPES, THE FPC SHALL PROVIDE STRUCTURAL CALCULATIONS INDICATING NON-INDEPENDENT ATTACHMENT IS ACCEPTABLE. 18) THE FPC SHALL REFER TO ARCHITECTURAL DRAWINGS OR CONSULT ARCHITECT FOR EXACT LOCATION OF FIXTURES, EQUIPMENT, ETC. AND FINAL FINISHED ELEVATIONS PRIOR TO ANY INSTALLATION WORK. 19) CORE-DRILL EXISTING FLOOR SLABS, WALLS, ROOFS, ETC. AS REQUIRED FOR PIPING AND FIRE-STOP OPENING AROUND PIPE. RATING OF MATERIAL SHALL MEET OR EXCEED WALL FIRE RATING. VERIFY LOCATION OF STRUCTURAL BEAMS, JOISTS, ETC. BEFORE DRILLING AND NOTIFY ARCHITECT OF ANY DISCREPANCIES. 20) PROVIDE PIPE SLEEVES AT ALL WALL PENETRATIONS. SLEEVES SHALL BE SCHEDULE 40 STEEL PIPING 1101 LOBBY 1100 VESTIBULE 1105 RAMP 1180 ELEV. EQUIP. STORAGE 1183 CAFE KITCHEN 1103 WORKROOM 1102 CHECK-IN COUNTER 1106 CORR. 1108 OBSERVATION 1104 STOR. 1181 ELEV. 1179 TELE 1195 ELEV. LOBBY FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(D) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) 3 1 NIC NIC NIC 1254 STAIR 2200 PEDESTRIAN TERRACE 4 FP(D) FP(D) FP(D) EL. = 9'-8" A.F.F. BOTT. SOFFIT EL. = 9'-0" A.F.F. BOTT. CEILING SEE NOTE 7 BOTT. SOFFIT EL. = 12'-0" A.F.F. EL. = 12'-0" A.F.F. BOTT. SOFFIT EL. = 9'-0" A.F.F. BOTT. CEILING EL. = 9'-0" A.F.F. BOTT. CEILING EL. = 10'-0" A.F.F. BOTT. SOFFIT EL. = 9'-8" A.F.F. BOTT. SOFFIT EL. = 11'-4" A.F.F. BOTT. SOFFIT FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(N) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) 4 1 FP(N) 1 2 2 FP(N) FP(N) FP(E) NEW GATE NEW GATE NEW GATE NIC NIC NIC 1254 STAIR 2200 PEDESTRIAN TERRACE 5 FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) FP(N) NIC NIC EL. = 10'-0" A.F.F. BOTT. CEILING EL. = 10'-0" A.F.F. BOTT. CEILING BOTT. SOFFIT EL. = 9'-8" A.F.F. EL. = 8'-8" A.F.F. BOTT. CEILING BOTT. PENDANT EL. = 8'-6" A.F.F. EL. = 9'-6" A.F.F. BOTT. SOFFIT EL. = 8'-6" A.F.F. BOTT. SOFFIT FP(N) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) 4 3 NEW GATE NEW GATE NIC NIC NIC SCALE: FIRE PROTECTION NEW WORK PLAN - 1 FIRST 1/8" = 1'-0" FLOOR WEST LOBBY SCALE: 3 FIRE 1/8" = 1'-PROTECTION 0" NEW WORK PLAN - SECOND FLOOR BRIDGE SCALE: FIRE PROTECTION NEW WORK PLAN - 2 FIRST 1/8" = 1'-0" FLOOR EAST LOBBY KEYED FIRE PROTECTION NEW WORK SHEET NOTES 1. FIRE PROTECTION CONTRACTOR (FPC) SHALL PROVIDE NEW SPRINKLER COVERAGE WHERE NEW CEILING IS TO BE INSTALLED ABOVE NEW CLOUD CEILING ABOVE NEW WEST LOBBY AREA. 2. FPC SHALL PROVIDE NEW SPRINKLER COVERAGE AT NEW CEILING CLOUD ABOVE NEW WEST LOBBY AREA. 3. FPC SHALL PROVIDE NEW SPRINKLER COVERAGE AT NEW CEILING ABOVE NEW EAST LOBBY AREA. 4. FPC SHALL PROVIDE MODIFICATION OF SPRINKLER HEADS, RECONFIGURATION OF SPRINKLER HEADS AND NEW SPRINKLER HEADS AS NECESSARY TO PROVIDE FULL COVERAGE IN NEW EAST AND WEST LOBBY AREAS. 5. FPC SHALL PROVIDE NEW COVERAGE, NEW PIPING IN NEW WORK OUT AREA ROOM WHERE SPACE IS TO BE OPEN TO THE BOTTOM OF ROOF DECK. ROUTE PIPING AS HIGH AS POSSIBLE. PROVIDE COVERAGE ABOVE AND BELOW OBSTRUCTIONS AT CEILING LEVEL. PROVIDE GUARDS TO PREVENT DAMAGE TO SPRINKLER HEADS BELOW. PROVIDE SHIELDS ON SPRINKLER HEADS BELOW TO PREVENT SPRAY FROM SPRINKLER HEADS ABOVE. # williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 FP1.01 A. FIRE PROTECTION CONTRACTOR (FPC) SHALL DETERMINE EXACT PIPE ROUTING OF MAINS AND BRANCHES PER CONTRACTOR'S VERIFIED FIELD CONDITIONS AND PER REQUIREMENTS OF NFPA 13. REROUTE, OFFSET, RISE/DROP, ETC. PIPING AS NECESSARY. CONSIDER ASPECTS SUCH AS STRUCTURAL AND ITS AFFECT ON HANGER INSTALLATION. TYPICAL THROUGHOUT THE EXISTING BUILDING. PROVIDE ADDITIONAL DRAIN DOWNS WHERE AS NECESSARY. B. HEADS AT OPEN CEILING NEED A PROTECTIVE SHEILD (COLOR/FINISH BY ARCHITECT) TO PREVENT HEADS ABOVE 'WETTING' HEADS BELOW. REFERENCE ARCHITECTURAL CEILING PLANS, SECTIONS, ELEVATIONS, AND DETAILS. C. ALL PIPING SHALL BE PAINTED. COLOR TO BE BY ARCHITECT. D. IMPORTANT!!! SECOND FLOOR BRIDGE AREA IS TO BE AN OPEN SPACE TO BOTTOM OF ROOF DECK. TIGHTLY COMPACT PIPING AND CONDUIT EXIST TIGHT TO STRUCTURE PER SITE INVESTIGATION. NEW WORK INCLUDES NEW DUCTWORK, NEW PIPING AND NEW LIGHTING IN ADDITION TO EXISTING CONDITIONS. PROVIDE SPRINKLER COVERAGE ABOVE AND BELOW OBSTRUCTIONS. E. SEE SHEET FP0.01 FOR ABBREVIATIONS AND SYMBOLS. GENERAL FIRE PROTECTION CONSTRUCTION NOTES FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) FP(D) NIC NIC 2101 LOBBY 2100 VEST 2115 VEST 2105 CHECK-IN COUNTER 2109 LAN/ IT 2116 ELEC/ MECH 2114 ELEV MACH 2159 ELEV FP(D) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) FP(E) 3 2 NIC NIC NIC SCALE: FIRE PROTECTION DEMOLITION PLAN - 1 FIRST 1/8" = 1'-0" FLOOR WEST LOBBY SCALE: 3 FIRE 1/8" = 1'-PROTECTION 0" DEMOLITION PLAN - SECOND FLOOR BRIDGE SCALE: FIRE PROTECTION DEMOLITION PLAN - 2 FIRST 1/8" = 1'-0" FLOOR EAST LOBBY GENERAL FIRE PROTECTION DEMOLITION NOTES KEYED FIRE PROTECTION DEMOLITION SHEET NOTES 1. FIRE PROTECTION CONTRACTOR (FPC) SHALL DEMOLISH SPRINKLER HEAD WHERE NEW CEILING GRID AND CLOUD CEILING ARE TO BE INSTALLED. 2. FPC SHALL DEMOLISH SPRINKLER HEAD WHERE NEW CEILING IS TO BE INSTALLED. 3. FPC SHALL PROVIDE MODIFICATION OF EXISTING SPRINKLER HEADS, RECONFIGURATION OF EXISTING SPRINKLER HEADS AND PROVIDE NEW SPRINKLER HEADS AS NECESSARY TO PROVIDE FULL COVERAGE PER NEW ARCHITECTURAL LAYOUT. 4. FPC SHALL DEMOLISH SPRINKLER HEADS IN BRIDGE AREA WHERE CEILING IS TO BE DEMOLISHED. PROVIDE DEMOLITION OF SPRINKLER PIPING IN BRIDGE AREA WHERE NEW LAYOUT WILL BE OPEN SPACE TO BOTTOM OF ROOF DECK AND NEW PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE. A. FIRE PROTECTION CONTRACTOR (FPC) SHALL DETERMINE EXACT PIPE ROUTING OF MAINS AND BRANCHES PER CONTRACTOR'S VERIFIED FIELD CONDITIONS AND PER REQUIREMENTS OF NFPA 13. REROUTE, OFFSET, RISE/DROP, ETC. PIPING AS NECESSARY. FIELD VERIFY PRIOR TO PROVIDING A BID TO ENSURE NO CHANGES TO PRICE DUE TO PIPING ROUTING ALTERATIONS. B. PROVIDE DEMOLITION WORK AS NECESSARY PER REVISED CEILING PLAN. C. PROVIDE DEMOLITION OF HANGERS AND ACCESSORIES FOR DEMOLITION WORK. D. SEE NEW WORK SCOPE PLANS FOR ADDITIONAL INFORMATION. E. SEE SHEET FP0.1 FOR ADDITIONAL INFORMATION. F. SEE ARCHITECTURAL PLANS AND SECTIONS FOR ADDITIONAL INFORMATION ON HEIGHT OF WALLS, CEILING HEIGHTS, AND HEIGHT OF EXISTING DUCTWORK. # williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 FPD1.01 WHICH SHALL EXTEND MINIMUM 1" PAST WALL ON BOTH SIDES OF WALL. PIPE-INSULATION (WHERE REQUIRED) SHALL BE CONTINUOUS THROUGH WALL PENETRATION. FURNISH AND INSTALL FIRE SEALING BETWEEN SLEEVE AND PIPE / PIPE-INSULATION. 21) THE LOCATION OF HEADS IS OF CRITICAL IMPORTANCE IN MISSING LIGHTS, AIR DEVICES, AND IN FURNISHING A COORDINATED CEILING PATTERN CONSISTENT WITH THE TILE AND OTHER ARCHITECTURAL FEATURES. HEADS LOCATED IN ACOUSTIC TILE SHALL BE CENTERED IN THE TILE. PIPING RETURN BEND (ARM-OVER) SHALL BE USED TO ACCOMPLISH CENTERING THE OF SPRINKLER HEADS IN CEILING TILES. SPRINKLER LOCATIONS SHALL BE VERIFIED BEFORE INSTALLING, USING ARCHITECTURAL REFLECTED CEILING PLANS, MECHANICAL PLANS, STRUCTURAL PLANS, ELECTRICAL PLANS. ADDITIONAL SPRINKLER HEADS, PIPING, ALARMS, VALVES, ETC. WHICH MAY BE REQUIRED FOR A COORDINATED CEILING PATTERN SHALL BE FURNISHED WITHOUT ADDED COST EVEN THOUGH THE NUMBER OF HEADS AND RELATED PIPING MAY EXCEED MINIMUM REQUIREMENTS. 22) THE FPC SHALL IDENTIFY ALL CEILINGS, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, ETC. ELEMENTS/OBSTRUCTIONS THROUGHOUT THE PROJECT; PROVIDE REQUIRED COVERAGE ABOVE, BELOW, AND/OR ADJACENT TO ELEMENTS/OBSTRUCTIONS. ADDITIONAL SPRINKLER HEADS, PIPING, ALARMS, VALVES, ETC. WHICH MAY BE REQUIRED DUE TO ELEMENTS/OBSTRUCTIONS SHALL BE FURNISHED WITHOUT ADDED COST EVEN THOUGH THE NUMBER OF HEADS AND RELATED PIPING MAY EXCEED MINIMUM REQUIREMENTS. 23) THE FPC IS RESPONSIBLE FOR PROVIDING SPRINKLER HEAD COVERAGE THROUGHOUT ALL AREAS AS INDICATED ON PLANS, WHETHER OR NOT SPRINKLER HEAD LOCATIONS ARE SHOWN ON THE PLANS. FOR CRITICAL AREAS, PORTIONS OF SPRINKLER HEAD LAYOUT MAYBE SHOWN FOR REFERENCE PURPOSES ON INTENDED LAYOUT. IN AREAS WHERE SPRINKLER HEAD LOCATIONS ARE NOT REPRESENTED ON THE PLANS, THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE TO DETERMINE LAYOUT. 24) NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR CONDITIONS WHETHER THEY ARE REPEATED OR NOT. 25) CONTRACTOR SHALL PAINT ALL NEW EXPOSED PIPING, CONDUIT, AND ASSOCIATED COMPONENTS; COLOR AS SELECTED/APPROVED BY ARCHITECT. 26) PROVIDE ACCESS PANELS IN WALLS AND/OR CEILINGS AT ALL VALVING AND EQUIPMENT INSTALLED WITHIN INACCESSIBLE AREAS. 27) THE DRAWINGS AND DETAILS SHALL BE TAKEN AS A DIAGRAMMATIC MEANS OF PROVIDING PIPING AND EQUIPMENT. THEY DO NOT SHOW EVERY FITTING AND OFFSET, NOR EVERY STRUCTURAL, ELECTRICAL, PIPING, OR DUCTWORK CONFLICT THAT MAY BE ENCOUNTERED DURING THE INSTALLATION OF THE WORK. 28) DO NOT SCALE DRAWINGS, USE FIELD MEASUREMENTS. 29) THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND PROVIDE ANY MODIFICATIONS TO THE WORK INCLUDING, BUT NOT NECESSARILY LIMITED TO, DUCTWORK, PIPING, ELECTRICAL, PLUMBING, STRUCTURAL, LIGHTING, OUTLETS, AND ARCHITECTURAL FEATURES SUCH AS CEILINGS, DOORS AND FRAMES, CASEWORK, ETC. REQUIRED TO PROPERLY PROVIDE EQUIPMENT OTHER THAN THAT INDICATED ON THE DRAWINGS. 30) THE DIAGRAMS SHOW THE RELATIONSHIP OF MAJOR COMPONENTS OF THE FIRE PROTECTION SYSTEM. PROVIDE COMPLETE TRIM AS REQUIRED TO MEET NFPA AND CODE REQUIREMENTS, AND AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. 31) PROVIDE FIRE DEPARTMENT TEST CONNECTION FROM THE MOST HYDRAULICALLY REMOTE LOCATION FOR EACH ZONE. PROVIDE VALVE LOCATED AT 5'-0'' ABOVE FINISHED FLOOR FOR EACH TEST CONNECTIONS. COORDINATE LOCATION WITH THE ARCHITECT AND LOCAL AUTHORITIES HAVING JURISDICTION. PROVIDE ACCESS PANEL(S) AS REQUIRED. 32) PROVIDE DRAIN DOWN LINES FOR ALL SYSTEM LOW POINTS. EXTEND DRAIN LINES AS REQUIRED TO TERMINATE TO OUTSIDE OF BUILDING, AT FLOOR DRAIN, OR IN MOP SINK. 33) EXTEND SYSTEM, MAIN, AND SECTIONAL DRAINS AS REQUIRED TO TERMINATE OUTSIDE ON GRADE OR TO A FLOOR DRAIN CAPABLE OF ACCEPTING FULL DISCHARGE OF DRAIN. 34) ALL VALVING AND EQUIPMENT SHALL BE FULL LINE SIZE UNLESS NOTED OTHERWISE. 35) COORDINATE SPRINKLER HEAD LOCATION AND ALL LENGTHS OF PIPING WITH OTHER TRADES IN FIELD PRIOR TO INSTALLATION. 36) THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ANY ADDITIONAL HEADS REQUIRED BY THE LOCAL AUTHORITIES HAVING JURISDICTION AT NO ADDITIONAL COST. 37) THE CONTRACTOR SHALL PROVIDE A WIRE GUARD FOR ALL EXPOSED SPRINKLER HEADS LOCATED IN ALL MECHANICAL SPACES, STORAGE ROOMS, CLOSETS, AND ALL OTHER LOCATIONS WHERE HEADS MAY BE READILY DAMAGED. 38) ALL SPRINKLER HEADS SHOWN ARE STANDARD COVERAGE UNLESS NOTED OTHERWISE. EXTEND COVERAGE HEADS WILL NOT BE ACCEPTED IN ANY AREAS OTHER THAN THOSE AREAS NOTED; UNLESS ACCEPTABLE/APPROVED BY THE AUTHORITIES HAVING JURISDICTION. 39) THE SPRINKLER SYSTEM SHALL BE DESIGNED FOR THE FOLLOWING SPRINKLER OCCUPANCY HAZARD CLASSIFICATIONS: A. BUILDING SERVICE AREAS: ORDINARY HAZARD, GROUP 1. B. ELECTRICAL EQUIPMENT ROOMS: ORDINARY HAZARD, GROUP 1. C. GENERAL STORAGE AREAS: ORDINARY HAZARD, GROUP 1. D. MECHANICAL EQUIPMENT ROOMS: ORDINARY HAZARD, GROUP 1. E. OFFICE AND PUBLIC AREAS: LIGHT HAZARD. F. CORRIDORS: LIGHT HAZARD. G. TOILET ROOMS: LIGHT HAZARD. 40) THE SPRINKLER SYSTEM SHALL BE CAPABLE OF PROVIDING THE FOLLOWING MINIMUM DENSITIES FOR THE FOLLOWING SPRINKLER OCCUPANCY HAZARDS: A. LIGHT HAZARD: 0.10 GPM/SF OVER 1500 SF. B. ORDINARY HAZARD, GROUP 1: 0.15 GPM/SF OVER 1500 SF. C. ORDINARY HAZARD, GROUP 2: 0.20 GPM/SF OVER 1500 SF. D. SPECIAL OCCUPANCY HAZARD: AS DETERMINED BY AUTHORITIES HAVING JURISDICTION. E. COMMODITY STORAGE AREAS SHALL BE CAPABLE OF PROVIDE DENSITY COVERAGE PER NFPA 13. F. PROVIDE INCREASED, OR DECREASED, COVERAGE AREAS AS REQUIRED, OR ALLOWED, PER NFPA 13. G. VERIFY WATER FLOW AND PRESSURES IN FIELD. 41) THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HYDRAULIC CALCULATIONS FOR ALL SYSTEMS MODIFIED OR INSTALLED AS PART OF THIS CONTRACT FOR FINAL PIPE SIZING. 42) PROVIDE 10% SAFETY FACTOR FOR ALL FIRE ZONES. IF LOCAL AUTHORITIES HAVING JURISDICTION REQUIRE A MORE STRINGENT SAFETY FACTOR, REQUIREMENTS OF LOCAL AUTHORITIES SHALL BE MET. 43) NO PIPING SHALL BE INSTALLED IN ELECTRICAL ROOMS, ELEVATOR MACHINE ROOMS, ELEVATOR HOISTWAYS, AND ALL OTHER SIMILAR AREAS. ONLY PIPING FEEDING DEVICES IN THESE AREAS SHALL BE ALLOWED TO BE INSTALLED IN THESE AREAS. 44) NO PIPING SHALL BE INSTALLED ABOVE ANY ELECTRICAL EQUIPMENT, THIS INCLUDES BUT IS NOT LIMITED TO PANELS, TRANSFORMERS, STARTERS, DISCONNECTS, ETC. 45) THE FPC SHALL BE RESPONSIBLE FOR THE FINAL COORDINATION OF ALL ELECTRICAL REQUIREMENTS FOR ALL EQUIPMENT AND/OR FIRE PROTECTION DEVICES/COMPONENTS. THE FPC SHALL PROVIDE TO THE ELECTRICAL CONTRACTOR PERFORMING WIRING THE MANUFACTURER'S WRITTEN DATA FOR ANY FIRE PROTECTION EQUIPMENT AND DEVICE/COMPONENT REQUIRING ELECTRICAL CONNECTION, PROVIDE DATA PRIOR TO SUBMITTAL OF ANY EQUIPMENT AND DEVICE/COMPONENT FOR REVIEW. 46) PRIOR TO FINAL SYSTEM ACCEPTANCE THE CONTRACTOR SHALL: A. PERFORM ALL REQUIRED ACCEPTANCE TESTS AS REQUIRED BY NFPA 13. B. SUBMIT FOR REVIEW - COMPLETED AND SIGNED APPROPRIATE CONTRACTOR'S MATERIAL AND TEST CERTIFICATES INCLUDING BUT NOT LIMITED TO CERTIFICATES FOR ABOVEGROUND AND UNDERGROUND PIPING. C. NOTIFY THE AUTHORITIES HAVING JURISDICTION AND THE OWNER'S REPRESENTATIVE OF THE TIME AND DATE TESTING WILL BE PERFORMED. SCOPE OF WORK DESIGN, FABRICATE AND INSTALL NEW AUTOMATIC SPRINKLER SYSTEM FOR THE AREAS AS INDICATED TO COMPLY WITH LOCAL BUILDING CODES, REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION AND APPLICABLE NFPA STANDARDS. DESIGN CRITERIA 1) THE SPRINKLER SYSTEM SHALL BE DESIGNED PER REQUIREMENTS OF LOCAL BUILDING CODES, REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION AND NFPA 13. 2) PROVIDE HYDRAULIC CALCULATIONS. SCALE: 1 CENTERLINE NONE OF CEILING TILE DETAIL BRANCHLINE ARM-OVER PIPING CEILING TILE SCORE CONCEALED SPRINKLER HEAD (SEE REFLECTED CEILING PLAN FOR APPROXIMATE LOCATION) BRANCHLINE FITTING BRANCHLINE PENDENT SPRINKLER HEAD BRASS UPRIGHT SPRINKLER HEAD QUICK RESPONSE QUICK RESPONSE PENDENT & SCALE: 4 UPRIGHT NONE SPRINKLERS NOTE: EXISTING FIRE PROTECTION PIPING NEW FIRE PROTECTION PIPING (N) NEW PIPE/CONNECTION DP DRAINAGE PIPING SYMBOL LIST FSR FIRE SPRINKLER RISER DP SPR STAND-PIPE RISER FD FLOOR DRAIN EC ELECTRICAL CONTRACTOR GC GENERAL CONTRACTOR MC MECHANICAL CONTRACTOR PC PLUMBING CONTRACTOR SC SITE UTILITY CONTRACTOR OSD OPEN SITE DRAIN N.T.S. NOT TO SCALE (E) EXISTING TO REMAIN BFP BACKFLOW PREVENTER (D) DEMOLISHED/DISCONNECTED PIPE FS ITV INSPECTOR TEST VALVE VM/TS VALVE WITH MONITOR / TAMPER SWITCH FS FLOW SWITCH HV HOSE VALVE CAP/BLIND FLANGE HVVC HOSE VALVE WITH VALVE CABINET PG PRESSURE GAUGE FPC FIRE PROTECTION CONTRACTOR FDC FIRE DEPARTMENT CONNECTION CR COMBINATION RISER AKA ALSO KNOWN AS FP(E) FP FP(E) FP SOME SYMBOLS LISTED IN THIS SCHEDULE MAY NOT APPEAR ON DRAWINGS. NIC NOT IN CONTRACT FCA FLOOR CONTROL ASSEMBLY DEMOLISHED SPRINKLER HEAD NIC NOT IN CONTRACT BRANCHLINE FITTING BRANCHLINE BRASS UPRIGHT SPRINKLER HEAD BRASS UPRIGHT SPRINKLER HEAD SYMBOL ON PLAN SCALE: 2 UPRIGHT NONE SPRINKLERS BRANCHLINE FITTING BRANCHLINE SUSPENDED CEILING WHITE CONCEALED SPRINKLER HEAD ESCUTCHEON PLATE PENDENT SYMBOL ON PLAN SCALE: 3 CONCEALED NONE PENDENT SPRINKLERS SYMBOL ON PLAN SHIELD williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 FP0.01 8 8 11 11 11 11 S S S S S S S S 5 S 5 5 5 5 5 5 5 5 R-2LN7-33 12 R-2LN7-33 13 DANCE STORAGE LAUNDRY 7 FITNESS MANAGER 6 1. FURNISH AND INSTALL NEW FIRE ALARM AUDIO-VISUAL DEVICE. FURNISH AND INSTALL NEW FIRE ALARM WIRE ON J-HOOKS/CABLE TRAY FROM NEAREST NOTIFICATION CIRCUIT. THE NEW DEVICE SHALL BE PENDANT MOUNTED. FURNISH AND INSTALL STEM AS REQUIRED TO MATCH DEVICE AT BOTTOM OF THE LIGHT FIXTURE ELEVATION. FURNISH AND INSTALL NEW NAC PANEL AS REQUIRED. 2. FURNISH AND INSTALL LEGRAND 4000 SERIES DUAL CHAMBER METAL WIREWAY OR EQUAL. MOUNT ON FLOOR. 3. FURNISH AND INSTALL NEW GFCI RECEPTACLE AND BRANCH CIRCUIT AS SHOWN. INSTALL NEW RECEPTACLE ON ONE SIDE OF THE CHANNEL ONLY. THE OTHER SIDE OF THE CHANNEL SHALL REMAIN EMPTY FOR THE FULL LENGTH OF THE CHANNEL. 4. RE-INSTALL EXISTING SALVAGED SMOKE DETECTORS ON EXISTING CEILING. FURNISH AND INSTALL NEW FIRE ALARM WIRE ON J-HOOKS/CABLE TRAY TO EACH SMOKE DETECTOR FROM NEAREST FIRE ALARM DETECTION CIRCUIT. 5. INSTALL OWNER PROVIDED SPEAKERS WITH NEW BACK BOX AND STEM. FURNISH AND INSTALL NEW SPEAKER WIRE WITH J-HOOKS/CABLETRAY. COORDINATE WITH OWNER FOR FINAL LOCATIONS AND FINAL CONNECTION. SPEAKER ELEVATION SHALL BE DETERMINED ON SITE. 6. RELOCATE EXISTING PRESET SWITCH AND GATE CALL SPEAKER TO OTHER SIDE OF COLUMN AS SHOWN. EXTEND EXISTING CONDUIT AND WIRES. 7. 5(/2&$7((;,67,1*5(&(37$&/(r$5281'&2/801$66+2:1(;7(1'(;,67,1*&21'8,7$1' WIRES. 8. EXISTING DEVICES TO REMAIN. 9. MAGNETIC DOOR HOLD DEVICE SHALL BE FURNISHED AND INSTALLED BY OTHERS. FURNISH AND INSALL NEW FIRE ALARM MONITOR MODULE. FURNISH AND INSTALL NEW BRANCH CIRCUIT FROM NOTED PANELBOARD VIA MONITOR MODULE. FURNISH AND INSTALL NEW FIRE ALARM WIRE IN CONDUIT/J-HOOKS/CABLE TRAY FROM NEW MONITOR MODULE TO EXISTING FACP. 10. RE-INSTALL EXISTING SALVAGED CAMERAS. CO-ORDINATE FINAL LOCATIONS WITH OWNER. FURNISH AND INSTALL NEW CAMERA CABLE AS REQUIRED BY OWNER WITH J-HOOKS/CABLE TRAY. 11. FURNISH AND INSTALL SQUARE-D 2510, 20A, 1P OR EQUAL AS LOCAL DISCONNECT SWITCH WITH NEW BRANCH CIRCUIT FROM NOTED PANELBOARD. 12. UPON REMOVAL OF CEILING AND EXACT DUCT WORK LAYOUT, CONTRACTOR SHALL FIELD VERIFY EXISTING CONDUIT, WIRING AND CABLING FOR DUCTWORK INTERFERENCES AND RELOCATE AS REQUIRED. GENERAL CONTRACTOR SHALL CARRY A CONTINGENCY FOR THIS SCOPE OF WORK. 13. FURNISH AND INSTALL NEW SOLID BOTTOM CABLE TRAY FOR ALL NEW AND EXISTING LOW VOLTAGE CABLES IN BRIDGE CEILING. ROUTE THE NEW CABLE TRAY BETWEEN THE EAST AND WEST SIDES OF THE ACCESSORY CEILING. SIZE CABLE TRAY TO ACCOMODATE ALL CABLES WITHIN A 40% FILL RATIO OR LESS. MOUNT CABLE TRAY ABOVE THE LIGHT FIXTURES AND HVAC EQUIPMENT. KEYED ELECTRICAL NOTES # R-2LN7 R-2HND EXISTING DATA RACK R-2LN7-25 R-2HND-25, 27, 29 J WP NEMA-3R 30 AMP, 3P WP-GFCI R-2LN7-27 SCALE: 1 POWER 1/8"=1'-0" NEW WORK - WEST LOBBY CORRIDOR SCALE: 2 POWER 1/8"=1'-0" NEW WORK - GYM ENTRANCE SCALE: 3 POWER 1/8"=1'-0" NEW WORK - PEDESTRIAN BRIDGE SCALE: 4 POWER 1/8"=1'-0" NEW WORK - PEDESTRIAN BRIDGE ROOF williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 E2.02 MENS CHASE ELEV. MECH R-1LN1-36 R-1LN1:38 7 8 10 R-1LN1 EXISTING DATA RACK 11 11 J 11 12 J J J J 13 13 13 13 13 10 R-1LN1:5 R-1LN1:5 R-1LN1:5 6 2 AREAS OF SCOPE AREA OF SCOPE R-1LN1:40 1. RELOCATE EXISTING RECEPTACLE FROM OTHER SIDE OF THE COLUMN TO THIS SIDE OF THE COLUMN AS SHOWN. EXTEND EXISTING CONDUIT AND WIRES. 2. EXISTING PANEL BOARD SHALL REMAIN. USE EXISTING SPARE CIRCUIT BREAKERS FOR NEW BRANCH CIRCUITS. 3. INSTALL GATE RELEASE BUTTON FROM OLD COUNTER, BUTTON SHALL CONTROL S.E. DESK GATE AND RAMP GATE. VERIFY LOCATION WITH CLIENT. 4. INSTALL (2) NEW DEDICATED OUTLETS FOR EMPLOYEE PLUG-IN HEATERS, VERIFY LOCATIONS WITH CLIENT. PROVIDE LABEL ON OUTLET TITLED "HEATER". 5. EXTEND EXISTING CUH BRANCH CIRCUIT TO NEW CUH. LOCAL DISCONNECT SWITCH IS INTEGRAL WITH THE EQUIPMENT. 6. FURNISH AND INSTALL NEW DOOR RELEASE BUTTON. PROVIDE COMPLETE WIRING IN CONDUIT AS REQUIRED. COORDINATE LOCATION WITH ARCHITECT. 7. FURNISH AND INSTALL NEW BRANCH CIRCUIT FROM NOTED PANEL BOARD. LOCAL DISCONNECT SWITCH IS INTEGRAL WITH THE EQUIPMENT. 8. INSTALL (1) NEW DEDICATED OUTLET FOR EMPLOYEE PLUG-IN HEATER, VERIFY LOCATION WITH CLIENT. PROVIDE LABEL ON OUTLET TITLED "HEATER". 9. INSTALL EXISTING CARD READER WITH NEW CONDUIT AND WIRES TO EXISTING SECURITY SYSTEM. FURNISH AND INSTALL NEW POWER WIRING FROM EXISTING PANEL BOARD. THE ELECTRICAL CONTRACTOR SHALL REUSE EXISTING DEMOED CIRCUITS FOR NEW LOCATION. FURNISH AND INSTALL CONDUIT AND WIRES FROM TURNSTILE DOOR TO DOOR RELEASE BUTTON AS SHOWN IN KEYNOTE #3. PROVIDE COMPLETE WIRING AS REQUIRED BY MANUFACTURER. 10. FURNISH AND INSTALL TELECOMMUNICATION OUTLET WITH CAT 6 CABLE IN CONDUIT FROM EACH OUTLET TO EXISTING DATA RACK. PROVIDE COMPLETE TERMINATION AND LABELING AS REQUIRED BY BUILDING DEPARTMENT. COORDINATE WITH IT DEPARTMENT FOR OUTLET AND CABLE COLOR. 11. EXISTING WALL OUTLETS TO REMAIN. 12. EXISTING DATA RACK SHALL REMAIN. TERMINATE NEW CAT 6 CABLE TO EXISTING PATCH PANEL. COORDINATE WITH OWNER IT DEPARTMENT BEFORE INSTALLATION. PROVIDE AND MEET ALL REQUIREMENTS AS REQUIRED BY BUILDING IT DEPARTMENT. 13. FURNISH AND INSTALL NEW CARD READER WITH NEW CONDUIT AND WIRES TO EXISTING SECURITY SYSTEM. FURNISH AND INSTALL NEW POWER WIRING FROM NOTED PANEL BOARD. FURNISH AND INSTALL CONDUIT AND WIRES FROM TURNSTILE DOORS TO DOOR RELEASE BUTTON AS SHOWN IN KEYNOTE #6. PROVIDE COMPLETE WIRING AS REQUIRED BY MANUFACTURER. 14. RELOCATE (3) EXISTING POWER CONDUITS AS REQUIRED TO ACCOMMODATE NEW DUCT ROUTING ABOVE CEILING. KEYED ELECTRICAL NOTES # SCALE: 2 POWER 1/8"=1'-0" NEW WORK - EAST LOBBY SCALE: 1 POWER 1/8"=1'-0" NEW WORK - WEST LOBBY williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 E2.01 EL. = 7'-4" A.F.F. BOTT. SOFFIT 2200 PEDESTRIAN TERRACE 4 4 1. FURNISH AND INSTALL NEW PENDANT MOUNTED DAYLIGHT SENSOR FOR BRIDGE LIGHTING HARVESTING SYSTEM. THE DAYLIGHT SENSOR MOUNTING HEIGHT ELEVATION SHALL BE THE SAME AS THE BOTTOM OF THE LIGHT FIXTURES. FURNISH AND INSTALL CONTROL WIRING IN CONDUIT TO EXISTING LUTRON SYSTEM. PROVIDE ADDITIONAL MODULES AS REQUIRED. PROVIDE COMPLETE PROGRAMMING AS REQUIRED. 2. USE EXISTING LIGHTING CIRCUITS AS SHOWN FROM EXISTING PANELBOARD R-2LRN1. 3. USE EXISTING EMERGENCY CIRCUIT, SEE KEYNOTE #5, DRAWING NO. ED1.02 4. EXISTING EXIT SIGN SHALL REMAIN. KEYED ELECTRICAL NOTES # SCALE: # LIGHTING NO SCALE NEW WORK - PEDESTRIAN BRIDGE williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 E1.02 F2 F2 AREA OF SCOPE 1 F2 1 F2 1 F2 1 F2 F3 1 1 F3 1 F3 EM 2117 MEN'S 2102 COMPUTER CLASSROOM 2101 LOBBY 2100 VEST 2105 CHECK-IN COUNTER 2109 LAN/ IT 2116 ELEC/ MECH 2118 CHASE 2114 ELEV MACH EL. = 10'-0" A.F.F. BOTT. CEILING 2159 ELEV EL. = 10'-0" A.F.F. BOTT. CEILING BOTT. SOFFIT EL. = 9'-8" A.F.F. 4'-0" 2'-11" 7'-0" R = 140' - 6 1/4" 1'-11" EL. = 8'-8" A.F.F. BOTT. CEILING SEE NOTE 7 ABOVE CEILING 2'-2" 2'-11" 1'-0" BOTT. PENDANT EL. = 8'-6" A.F.F. EL. = 9'-6" A.F.F. BOTT. SOFFIT 1'-3" 1'-3" 2'-0" 5'-10" 5'-10" 3'-2" 6'-0" 2'-9" EL. = 8'-6" A.F.F. BOTT. SOFFIT 1'-0" 1 1 1 1 1 1 4 1 F1 F1 F1 F1 F1 F1 F1 F1 AREA OF SCOPE EM 1. FURNISH AND INSTALL NEW LIGHT FIXTURE AS DESIGNATED ON SCHEDULE. EXTEND EXISTING LIGHTING BRANCH CIRCUITS. FURNISH AND INSTALL NEW CONDUIT AND WIRES FROM EXISTING LOBBY LIGHTING BRANCH CIRCUIT. 2. INSTALL USED LIGHT FIXTURE PREVIOUSLY REMOVED FROM DEMO PLAN DRAWING NO. ED1.01. FURNISH AND INSTALL NEW CONDUIT AND WIRES FROM EXISTING LOBBY LIGHTING BRANCH CIRCUIT. 3. RELOCATE (2) LIGHT FIXTURES FROM ADJACENT GRID LOCATIONS. EXTEND EXISTING LIGHTING BRANCH CIRCUIT. 4. FURNISH AND INSTALL NEW LIGHT FIXTURE AS DESIGNATED ON SCHEDULE. EXTEND EXISTING EMERGENCY LIGHTING BRANCH CIRCUIT FROM NEARBY EMERGENCY LIGHT FIXTURE. 5. INSTALL (1) REUSED LIGHT FIXTURE PREVIOUSLY REMOVED FROM DEMO PLAN DRAWING ED1.01. FURNISH AND INSTALL NEW CONDUIT AND WIRES FROM EXISTING LOBBY EMERGENCY LIGHT FIXTURE. KEYED ELECTRICAL NOTES # SCALE: SCALE: 2 LIGHTING 1/8"=1'-0" NEW WORK - EAST LOBBY 1 LIGHTING 1/8"=1'-0" NEW WORK - WEST LOBBY williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 E1.01 2. DISCONNECT AND REMOVE CAMERAS. CAMERAS SHALL BE HANDED OVER TO OWNER. EXISTING CABLES SHALL REMAIN. 3. DISCONNECT AND REMOVE ALL SMOKE DETECTORS, OCCUPANCY SENSORS AND SPEAKERS AND SAVE FOR SALVAGE. EXISTING FIRE ALARM AND SPEAKER WIRES SHALL REMAIN. 4. EXISTING WIRE AND CONDUIT LEFT OVER FROM REMOVED DEVICES SHALL REMAIN. 5. DISCONNECT AND REMOVE ALL ABANDONED WIRE AND RACEWAY. KEYED ELECTRICAL NOTES # SCALE: 1 LIGHTING 1/8"=1'-0" DEMOLITION - PEDESTRIAN BRIDGE williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 5 5 5 5 5 4 4 4 4 1 1 1 1 1 3 3 3 3 3 3 3 3 J 8 3 3 9 9 9 10 2117 MEN'S 2102 COMPUTER CLASSROOM 2101 LOBBY 2100 VEST 2105 CHECK-IN COUNTER 2109 LAN/ IT 2116 ELEC/ MECH 2118 CHASE 2114 ELEV MACH EL. = 10'-0" A.F.F. BOTT. CEILING 2159 ELEV EL. = 10'-0" A.F.F. BOTT. CEILING BOTT. SOFFIT EL. = 9'-8" A.F.F. 4'-0" 2'-11" 7'-0" R = 140' - 6 1/4" 1'-11" EL. = 8'-8" A.F.F. BOTT. CEILING SEE NOTE 7 ABOVE CEILING 2'-2" 2'-11" 1'-0" BOTT. PENDANT EL. = 8'-6" A.F.F. EL. = 9'-6" A.F.F. BOTT. SOFFIT 1'-3" 1'-3" 2'-0" 5'-10" 5'-10" 2'-9" 6'-0" 3'-2" EL. = 9'-4" A.F.F. BOTT. SOFFIT EL. = 8'-0" A.F.F. BOTT. METAL SOFFIT EL. = 8'-6" A.F.F. BOTT. SOFFIT 1'-0" 2 AREAS OF SCOPE 1 1 1 1 1 1 1 1 6 6 6 7 1. DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE. EXISTING LIGHTING BRANCH CIRCUIT TO REMAIN. 2. DISCONNECT AND REMOVE EXISTING CEILING MOUNTED OCCUPANCY SENSOR. 3. DISCONNECT AND REMOVE ALL LIGHTING AND ELECTRICAL DEVICES ASSOCIATED WITH EXISTING FEATURE WALL. 4. DISCONNECT, REMOVE AND RELOCATE ALL ELECTRICAL AND CARD READERS FROM EXISTING TURNSTILES. 5. DISCONNECT AND REMOVE ALL RECEPTACLES, DATA PORTS, GATE RELEASE BUTTONS AND ANY OTHER ELECTRICAL DEVICES FROM EXISTING WEST LOBBY CHECK-IN COUNTER. 6. DISCONNECT AND REMOVE ALL RECEPTACLES, DATA PORTS, AND ANY OTHER ELECTRICAL DEVICES FROM EXISTING EAST LOBBY CHECK-IN COUNTER. EXISTING POWER BRANCH CIRCUITS TO REMAIN. 7. DISCONNECT AND REMOVE EXISTING DUPLEX RECEPTACLE WITH CONDUIT AND WIRES COMPLETELY. 8. DISCONNECT POWER FROM EXISTING CUH. EXISTING BRANCH CIRCUIT SHALL REMAIN. 9. REMOVE AND RE-INSTALL LIGHTING AS REQUIRED TO ACCOMMODATE NEW DUCT ROUTING. 10. DISCONNECT AND REMOVE ALL CEILING DEVICES(SPEAKER, OCCUPANCY SENSOR, ETC.) FOR RE-INSTALLATION INTO NEW CEILING. COORDINATE LOCATIONS WITH ARCHITECT. KEYED ELECTRICAL NOTES # SCALE: SCALE: 2 LIGHTING 1/8"=1'-0" DEMOLITION - EAST LOBBY 1 LIGHTING 1/8"=1'-0" DEMOLITION - WEST LOBBY williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 9. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF THE WORKMEN IN ALL PHASES OF WORK, COMPLYING WITH THE APPLICABLE PROVISIONS OF ALL CITY, STATE AND FEDERAL SAFETY LAWS (OSHA). THIS SHALL INCLUDE "LOCK-OUT/TAG-OUT" AND REQUIRED GROUNDING. WORK UNDER THIS CONTRACT SHALL NOT BE DONE ON ENERGIZED CIRCUITS. 10. ALL WIRE AND CABLE SHALL BE COPPER, 600 VOLT INSULATION WITH "TYPES" AS FOLLOWS: a. "THHN"-FEEDER AND BRANCH CIRCUIT WIRING ABOVE FINISHED FLOORS AND AREAS NOT SUBJECT TO MOISTURE. b. "THWN"-FEEDER AND BRANCH CIRCUIT WIRING UNDER THE FINISHED SLAB OR "XHHW"-AREAS SUBJECT TO MOISTURE, AND VFD DRIVE "T" LEADS. c. "XHHW"-UNDERGROUND FEEDER AND BRANCH CIRCUIT WIRING. (ONLY). d. MINIMUM BRANCH WIRE SIZE SHALL BE SIZE #12 AWG STANDARD COPPER (WITH THE EXCEPTION OF CONTROL WIRING AND FIXTURE WHIPS MAY BE SIZE #14 AWG). 11. ALL CONDUIT UNLESS NOTED SHALL BE TYPE "EMT" WITH STEEL GLAND OR COMPRESSION COUPLINGS AND CONNECTORS ONLY. ALL CONDUIT UNLESS NOTED SHALL BE SUPPORTED ON UNISTRUT OR KINDORF CHANNEL WITH TWO PIECE CONDUIT STRAPS. CONDUIT MOUNTED ON EQUIPMENT FRAMES MAY BE MOUNTED WITH "MINNIE" TYPE CONDUIT STRAPS. ONE HOLE STRAPS ARE NOT ALLOWED. ALL CONDUIT IN OUTDOOR EXPOSED AREAS SHALL BE TYPE "IMC" WITH SEALTITE FINAL CONNECTIONS. SPRING TYPE (CADDY OR EQUAL) SHALL NOT BE ALLOWED. USE OF "ONE-HOLE" STRAPS SHALL NOT BE ALLOWED. 12. CONDUIT AND EMT FITTINGS SHALL BE MADE OF STEEL OR MALLEABLE IRON. DIE- CAST FITTINGS OF POT METAL WILL NOT BE ACCEPTABLE. SET-SCREW OR INDENTER TYPE FITTINGS SHALL NOT BE USED. 13. THIS CONTRACTOR SHALL INSTALL SIZE OF CONDUIT CALLED FOR ON DRAWINGS AND AS SCHEDULED ABOVE AND SHALL NOT REDUCE SIZE OF CONDUITS TO SUIT WIRE FILL CAPACITY. MINIMUM SIZE OF CONDUIT SHALL BE 1/2" UNLESS OTHERWISE NOTED. THIS CONTRACTOR SHALL LEAVE A WIRE PULLING LINE IN ALL CONDUITS WHICH ARE NOT FILLED TO CAPACITY. THE E.C. SHALL VERIFY ALL CONDUIT SIZE PRIOR TO INSTALLATION. NOTIFY THE ENGINEER IMMEDIATELY OF ANY CONFLICT. 14. WIREWAY OR TROUGH ARE PERMITTED AS REQUIRED PER THE ELECTRICAL DRAWINGS FOR A SPECIFIC USE. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL PROPERLY SIZED JUNCTION OR PULL BOXES AS MAY BE REQUIRED. 15. THIS CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS FOR A PERIOD OF ONE FULL YEAR AFTER FINAL ACCEPTANCE BY THE OWNER. 16. THIS CONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS TO THE ENGINEER BEFORE FINAL PAYMENT WILL BE ISSUED. THE AS-BUILD DRAWINGS SHALL DIAGRAMMATICALLY INDICATE THE INSTALLED CONDITION, CIRCUIT NUMBERS, AND LOCATION OF THE DEVICES FOR ALL WORK. THESE DRAWINGS SHALL BE CONSIDERED CONTRACT RECORD DOCUMENTS AND SHALL ACCURATELY REFLECT THE ACTUAL INSTALLATION OF THE ELECTRICAL COMPONENTS AND CONDUITS. 17. FINAL CONNECTION TO MOVABLE DEVICES, OR DEVICES THAT MAY TRANSMIT VIBRATION SHALL BE CONNECTED WITH FLEXIBLE METALLIC CONDUIT (GREENFIELD) OR LIQUID-TIGHT FLEXIBLE CONDUIT. (MOTORS, TRANSFORMERS, DUCT MOUNTED DEVICES, ETC.) 18. ALL CONDUITS SHALL BE RIGIDLY SUPPORTED BY MEANS OF APPROVED CONDUIT HANGERS OR CLAMPS FIRMLY ANCHORED IN PLACE AND SPACED AT INTERVALS NOT TO EXCEED 7'-0". ALL EXPOSED CONDUIT SHALL BE RACKED AND PARALLEL OR PERPENDICULAR TO WALLS AND 6758&785$/0(0%(56:,7+r%(1'6:+(5(5(48,5('38//$1'-81&7,21%2;(66+$// BE HELD TO A MINIMUM. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL RODS, ANGLES, RAILS, STRUTS, BRACE PLATES, PLATFORMS, ETC.. REQUIRED FOR SUSPENSION OR SUPPORT OF CONDUIT AND EQUIPMENT AND ALL STRAPS, CLAMPS, THREADED RODS, TURNBUCKLES, ANCHORS, ETC., AND MISCELLANEOUS SPECIALTIES FOR THE ATTACHMENT OF HANGERS AND SUPPORTS TO THE STRUCTURE. ALL CONDUIT FASTENERS, STRAPS, SUPPORTS AND ETC., MUST BE "BOLT-ON" GALVANIZED STEEL ON EXPOSED CONSTRUCTION. SINGLE CONDUIT SUPPORTS SHALL BE MINNERALIC OR EQUAL. SPRING TYPE CLAMPS ARE NOT ALLOWED. 19. LIGHT FIXTURES SHALL BE CHAIN OR ROD SUPPORTED FROM THE STRUCTURE. 20. ENDS OF ALL METALLIC CONDUITS SHALL BE EQUIPPED WITH INSULATED GROUNDING BUSHINGS. ENDS OF ALL CONDUITS SHALL BE TEMPORARILY CAPPED PRIOR TO INSTALLATION AND DURING CONSTRUCTION TO EXCLUDE FOREIGN MATERIAL. UPON THE COMPLETION OF CONSTRUCTION THE OPEN END OF CONDUITS OR SLEEVES SHALL BE SEALED WATERTIGHT. 21. THE DRAWINGS MAY NOT SHOW COMPLETE OR ACCURATE DETAILS OF THE EXISTING FACILITY IN EVERY RESPECT. EXACT LOCATIONS AND RELATIONS ARE TO BE DETERMINED IN THE FIELD AND SHALL BE TO THE SATISFACTION OF THE OWNER. THIS CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL FIELD MEASUREMENTS AND EXACT EQUIPMENT LOCATIONS. 22. ALL NON-ELECTRICAL WORK (IE. CORING, PAINTING, ETC.) SHALL BE PERFORMED BY A COMPETENT MECHANIC SKILLED IN HIS PARTICULAR FIELD OR TRADE IN A NEAT AND WORKMANSHIP-LIKE MANNER. THESE COSTS SHALL BE INCLUDED IN THE CONTRACTOR'S BASE BID THOUGH WORK SHALL BE PERFORMED BY OTHERS. 23. ACCESS TO WORK AREAS, INCLUDING WORK SCHEDULED THEREIN, MUST HAVE PRIOR APPROVAL OF THE OWNER. ALL WORK AREAS WILL BE KEPT CLEAN BY THIS CONTRACTOR WITH THOROUGH CLEAN UP AT END OF EACH DAY'S WORK. ALL EXISTING ELECTRIC SERVICE EQUIPMENT IS TO REMAIN OPERATIONAL DURING THE CONSTRUCTION PERIOD. ANY TEMPORARY WIRING OR REROUTING OF CIRCUITRY TO ACHIEVE THIS IS BY THE ELECTRICAL CONTRACTOR. ANY SHUTDOWN OF SYSTEMS, OR POWER DOWN SHALL BE SCHEDULED AND APPROVED IN WRITING BY THE BUILDING OWNER. 24. PROVIDE NECESSARY START-UP AND INSTRUCTION FOR ALL EQUIPMENT AND SYSTEMS TO OWNERSHIPS DESIGNATED EMPLOYEES. ALSO SUBMIT OPERATING INSTRUCTIONS, MAINTENANCE SCHEDULES AND PART LISTS FOR ALL EQUIPMENT AND SYSTEMS TO OWNERSHIP TO ENABLE MAINTENANCE/SUPERVISORY PERSONNEL TO INSTALL, REPAIR AND MAINTAIN THE EQUIPMENT PROPERLY. 25. UPON COMPLETION OF THE DENOTED WORK, THE ELECTRICAL ENGINEER WILL PERFORM A PUNCH LIST IN ORDER TO VERIFY COMPLIANCE TO ALL PLANS, DETAILS AND SPECIFICATIONS. A WRITTEN REPORT WILL BE PREPARED BY THE ENGINEER AND ISSUED TO THE OWNER DESCRIBING ALL DISCREPANCIES. THE OWNER WILL ISSUE THIS REPORT TO THE ELECTRICAL CONTRACTOR FOR HIS IMMEDIATE CORRECTION. UPON COMPLETION OF ALL PUNCH LIST ITEMS, THE ELECTRICAL CONTRACTOR WILL NOTIFY THE OWNER WHO WILL THEN CONTACT THE ENGINEER FOR A FINAL WALK-THROUGH. 26. MATERIALS AND EQUIPMENT SHALL BE NEW AND LISTED AND/OR LABELED BY U.L., OR CITY APPROVED TESTING LAB. 27. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER IN WRITING OF ANY EXISTING MATERIALS OR APPARATUS BELIEVED TO BE INADEQUATE, UNSUITABLE IN VIOLATION OF LAWS, ORDINANCES RULES OR REGULATIONS OF AUTHORITIES HAVING JURISDICTION. 28. THE CONTRACTOR SHALL INCLUDE IN HIS BID ELECTRICAL UNIT PRICES (U.P.) TO PROVIDE ADDITIONAL DEVICES INCLUDING CONDUIT AND WIRE AS SCHEDULED. PROVIDE A UNIT PRICE FOR QUANTITY ADJUSTMENT OF EACH DEVICE. THE U.P. SHALL INCLUDE ALL GENERAL CONDITIONS ASSOCIATED COSTS TO INSTALL DEVICES WITHIN CEILING SYSTEMS INSTALLED. 29. ALL MATERIALS AND EQUIPMENT SHALL BE ERECTED, INSTALLED, TOOLED, CONNECTED, CLEANED, ADJUSTED, TESTED, CONDITIONED, AND PLACED IN SERVICE IN ACCORDANCE WITH THE MANUFACTURER'S DIRECTIONS AND RECOMMENDATIONS. 30. THE CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS, WHICH ARE REQUIRED FOR THEIR APPROVAL. 31. SHOP DRAWINGS SHALL INCLUDE MANUFACTURER'S NAMES, CATALOG NUMBER, CUTS, DIAGRAMS AND OTHER SUCH DESCRIPTIVE DATA AS MAY BE REQUIRED TO IDENTIFY AND REVIEW THE EQUIPMENT. PARTIAL SUBMITTALS WILL NOT BE REVIEWED. 32. FLEXIBLE CONDUIT CONNECTIONS TO RECESSED LIGHTING FIXTURES SHALL BE MADE WITH FLEXIBLE STEEL CONDUIT, 3/8 INCH MINIMUM. 33. E.C SHALL PROVIDE ADDITIONAL EXIT AND EMERGENCY LIGHT FIXTURES AS MAY REQUIRED BY THE ELECTRICAL INSPECTOR AT NO COST TO OWNER. 34. THE CONTRACTOR SHALL VERIFY THE CEILING CONSTRUCTION TYPE BEFORE ORDERING LIGHTING FIXTURES WITH ARCHITECTURAL DETAILS TO CONFIRM PROPER MOUNTING. 35. EACH LIGHT, RECEPTACLE OR OTHER MISCELLANEOUS DEVICE SHALL BE PROVIDED WITH A GALVANIZED OR SHERARDIZED PRESSED STEEL OUTLET BOX OF THE KNOCKOUT TYPE, OR NOT LESS THAN NO. 14 U.S. GAUGE STEEL. CONDUITS SHALL BE FASTENED WITH LOCK NUTS AND BUSHINGS AND ALL UNUSED KNOCKOUTS MUST BE LEFT SEALED. THERE MUST BE SUFFICIENT ROOM FOR WIRES AND BUSHINGS AND DEEP BOXES SHALL BE INSTALLED WHERE REQUIRED. BOXES SHALL BE SECURELY AND ADEQUATELY SUPPORTED. 36. IN SUSPENDED CEILINGS, SUPPORT CONDUIT AND JUNCTION BOXES DIRECT FROM THE STRUCTURAL SLAB, DECK, OR FRAMING PROVIDED FOR THAT PURPOSE, LIGHTING BRANCH CIRCUIT CONDUITS SHALL NOT BE CLIPPED TO THE CEILING SUPPORT WIRES OR SPLICE UNLESS THE CEILING SYSTEM HAS BEEN SPECIFICALLY DESIGNED FOR THAT PURPOSE AND APPROVAL GRANTED BY ARCHITECT. 37. WHERE FLOOR FITTINGS REQUIRE PENETRATION OF THE FLOOR SLAB, THERE SHALL BE A STANDARD DEVICE LISTED BY UL FOR THE PURPOSE AND HAVE A UL FIRE RATING EQUAL TO THE FLOOR RATING. ALL CORE SIZES AND LOCATIONS SHALL BE SUBMITTED TO ARCHITECT FOR APPROVAL AND SUBMISSION TO STRUCTURAL ENGINEER PRIOR TO CORING. 38. NUMBERED CIRCUITS SHOWN ON PLAN ARE FOR THE CONVEYANCE OF DESIGN ONLY, ACTUAL FIELD CONDITIONS WILL AFFECT CIRCUITING. INDICATE THE ACTUAL CIRCUIT NUMBER INSTALLED ON THE "AS-BUILT" DRAWINGS. 39. ALL CONDUIT RACEWAYS AND BOXES FOR ALL SYSTEMS SHALL BE INSTALLED WHERE REQUIRED, TIGHT-UP TO BOTTOM OF STRUCTURAL BEAMS AND SUPPORTED FROM CONCENTRATE FLOOR DECK ABOVE. 40. ALL CONDUIT RUNS SHALL BE INSTALLED ABOVE AND OVER TOP OF ALL NEW DUCTWORK PIPING, CONDUITS, PULL BOXES, ETC. WITH PROVISION FOR ALL NECESSARY ACCESSIBLE PULL BOXES AND CONDUIT BENDS NOT TO EXCEED CODE REQUIREMENTS FOR NUMBER OF BENDS. 41. CONDUIT RUNS OR PULL BOXES SHALL NOT BLOCK OR PREVENT FULL COMPLETE ACCESS AND/OR OPERATION OF HVAC EQUIPMENT, ACCESS DOORS, PIPING VALVES, JUNCTION BOXES, MAIN RETURN AIR DUCTS, PULL BOXES, CLEAN OUTS, ETC. 42. ALL BUILDING STANDARD EQUIPMENT, DEVICES AND MATERIALS SHALL BE EQUAL TO OR GREATER IN QUALITY WITH APPROVED BUILDING STANDARD MATERIALS, AND BE SUBJECT TO APPROVAL BY ENGINEER. 43. VERIFY CODE CLEARANCES FOR ALL NEW ELECTRICAL WORK BEFORE PROCEEDING WITH CONSTRUCTION. COORDINATE USAGE OF AVAILABLE SPACE WITH ALL TRADES. IN THE EVENT OF CONFLICTS, NOTIFY THE ENGINEER BEFORE PROCEEDING WITH THE WORK. 44. PROVIDE PERMANENT IDENTIFICATION MARKINGS AND NAMEPLATES FOR WIRING AND EACH ITEM OF ELECTRICAL APPARATUS AND ASSOCIATED CONTROLLED EQUIPMENT, WITH THE SAME DESCRIPTIONS AS SHOWN ON THE DRAWINGS, OR AS DIRECTED, CLEARLY AND NEATLY APPLIED. 45. PROVIDE A TYPEWRITTEN DIRECTORY OF CIRCUITS IN PANEL AND PROVIDE PANEL IDENTIFICATION IN BLACK ALKYD PAINT STENCILED INSCRIPTIONS ON THE INSIDE OF THE DOOR, DIRECTLY ABOVE THE CENTERLINE OF DIRECTORY FRAME, OR ON VERTICAL AND HORIZONTAL CENTERLINE OF DOORS WITHOUT DIRECTORY FRAMES. 46. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL NON-ACCESSIBLE SYSTEM DEVICES, PULL BOXES AND EQUIPMENT, ETC. TO ACCESSIBLE CEILING AREAS. E.C. SHALL INCLUDE ALL COMPLETE COSTS FOR RELOCATION AND VERIFY SUCH CONDITIONS WITH ARCHITECTURAL CEILING PLANS PRIOR TO FINAL BID. 47. ALL LIGHT FIXTURES SHOWN ON DRAWINGS TO BE WIRED TO 20 AMP CIRCUIT BREAKERS UNLESS OTHERWISE NOTED. PROVIDE LIGHT FIXTURE INTERNAL FUSING OR IN-LINE FUSE IN THE JUNCTION BOX. 48. ALL COMMUNICATION CABLING INSTALLED IN PLENUM AIR SPACES SHALL BE IN CONDUIT, WITHOUT ANY EXCEPTIONS. 49. FOR EXACT LOCATION OF LIGHTING FIXTURES, AND ELEVATION REFER TO ARCHITECTURAL REFLECTED CEILING PLAN OR COORDINATED WITH ARCHITECT. 50. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR FOR EXACT LOCATION OF HVAC EQUIPMENT TO BE WIRED. 51. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH ARCHITECT/OWNER FOR EXACT LOCATION OF LIGHT SWITCHES. 52. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF WORK, CLEAN EQUIPMENT AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE OWNER'S PROPERTY, LEAVING THE WORK IN A NEAT AND CLEAN ORDER AND IN COMPLETE WORKING CONDITION. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ANY SPOILS, DEBRIS, ETC., FOR EQUIPMENT INSTALLED BY THIS CONTRACTOR OR FURNISHED BY SUBCONTRACTOR'S. 53. THE OWNERS TENANTS DESERVE THE HIGHEST RESPECT AND THE EC EMPLOYEES AND AND SUBCONTRACTOR'S SHALL AT ALL TIME CONDUCT THEMSELVES IN A PROFESSIONAL MANNER. FOUL LANGUAGE AND HORSEPLAY WILL NOT BE TOLERATED. 54. THE EC SHALL REVIEW AND BE FAMILIAR WITH THE MECHANICAL DRAWINGS AND SCHEDULES FOR FINAL EQUIPMENT SELECTION. THE EC SHALL VERIFY HORSEPOWER, VOLTAGE, AND SPECIAL MOUNTING BEFORE SUBMITTING HIS BID. ANY SPECIAL CONDITIONS OR CONFLICTS MUST BE INDICATED IN WRITING TO THE ENGINEER PRIOR TO OR AT THE TIME OF BID. 55. COORDINATE ALL HVAC DEMOLITION WITH MECHANICAL CONTRACTOR FOR REMOVE EXISTING ELECTRICAL POWER. MECHANICAL CONTRACTOR SHALL NOT START DEMOLITION UNTIL ALL ELECTRICAL POWER HAS BEEN SAFELY DISCONNECTED FROM EQUIPMENT TO BE DEMOLISHED. 56. BEFORE STARTING ANY DEMOLITION ON HVAC EQUIPMENT WHICH HAS AN ELECTRICAL CONNECTION.THE MECHANICAL CONTRACTOR SHALL MEET WITH THE ELECTRICAL CONTRACTOR TO IDENTIFY ALL SUCH EQUIPMENT. THE ELECTRICAL CONTRACTOR WILL DISCONNECT THE POWER TO EACH UNIT, REMOVE CONDUIT, WIRING, DISCONNECT SWITCHES, AND STARTERS UNDER HIS CONTRACT. MECHANICAL CONTRACTOR WILL REMOVE ALL EQUIPMENT, ELECTRICAL TEMPERATURE CONTROL AND WIRING UNDER HIS CONTRACT. 57. THE ELECTRICAL CONTRACTOR SHALL USE ONLY TRAINED AND AUTHORIZED PROFESSIONAL ELECTRICAL CRAFT PERSONS. THE E.C. SHALL FURNISH ANY PERSONNEL SAFETY EQUIPMENT, LADDERS, MAN-LIFTS, AND POWERED HAND TOOLS THAT MAY BE REQUIRED. ALL POWERED TOOLS SHALL BE IN GOOD CONDITION WITH ALL GROUND CONDUCTOR IN PROPER OPERATION. 58. ELECTRICAL CONTRACTOR SHALL PROVIDE U.L. LISTED FIRE STOPPING IN WALL, FLOOR, OR CEILING WHEN PENETRATED. MAINTAIN EXISTING FIRE RESISTANCE RATING. 59. ELECTRICAL CONTRACTOR SHALL SUBMIT FOUR (4) SETS OF EQUIPMENT PRODUCT DATA FOR ENGINEERING REVIEW PRIOR TO ORDERING EQUIPMENT. 60. ANY SURFACE RACEWAY USED ON A FINISHED SURFACE MUST BE METALLIC RACEWAY, WIREMOLD OR EQUAL. IF RACEWAY USED FOR POWER AND DATA, THEN MUST BE DUAL CHANNEL WITH PARTITION. SUBMIT FOR APPROVAL BY ARCHITECT AND ENGINEER PRIOR TO INSTALLATION. 61. REMOVE ALL UNUSED AND ABANDONED WIRING, INCLUDING LOW VOLTAGE, COMPLETELY BACK TO SOURCE UNLESS OTHERWISE NOTED. 62. ALL FIRE ALARM CABLE RUN IN FREE AIR SHALL BE LISTED FOR FREE AIR RUNS AND RED IN COLOR. WHEN CONDUIT AND BOXES ARE INSTALLED, THEY SHALL ALSO BE RED IN COLOR. GENERAL NOTES GENERAL NOTES (CONTINUED) GENERAL NOTES (CONTINUED) 1. WIRE DEVICES SHALL BE AS FOLLOWS OR EQUAL. 1.a. DUPLEX RECEPTACLE - LEVITON # BR20. 1.b. GFCI RECEPTACLE - LEVITON # X7899. 2. ALL OUTDOOR RECEPTACLES SHALL HAVE LOCKABLE COVERS AS MANUFACTURED BY TAYMAC OR APPROVED EQUAL. 3. ALL DEVICES MOUNTED EXPOSED TO WEATHER SHALL BE MOUNTED IN CAST ALUMINUM OR HIGH IMPACT ENCLOSURES THAT ARE NEMA RATED 3R OR 4. 4. ALL FUSED (FD) AND NON-FUSED (NF) DISCONNECTS SHALL BE SQUARE D COMPANY, 3-POLE HEAVY DUTY TYPE ONLY. AC ALTERNATING CURRENT ACL ACROSS THE LINE AFF ABOVE FINISHED FLOOR AIC AMPERES INTERRUPTING CAPACITY AL ALUMINUM ALM ALARM AMP AMPERE ANN ANNUNCIATOR ATS AUTOMATIC TRANSFER SWITCH BAL BALLAST BGB BUILDING GROUND BOX BASC BUILDING AUTOMATION SYSTEM CONTRACTOR C CONDUIT CAB CABINET CATV CABLE TELEVISION C.B. CIRCUIT BREAKER CCT CIRCUIT CCTV CLOSED CIRCUIT TELEVISION cd CANDELA CECO COMMONWEALTH EDISON COMPANY CLO CLOSET COAX COAXIAL CT CURRENT TRANSFORMER CU COPPER C.U. COEFFICIENT OF UTILIZATION CUH CABINET UNIT HEATER DC DIRECT CURRENT DO DRAW OUT DPDT DOUBLE POLE DOUBLE THROW DPST DOUBLE POLE SINGLE THROW DS DISCONNECT SWITCH DT DUST TIGHT ELEC ELECTRIC EM EMERGENCY EMT ELECTRIC METALLIC TUBING (THIN WALL CONDUIT) EP EXPLOSION PROOF EQ EQUIPMENT ER EXISTING TO BE REMOVED ERL EXISTING TO BE RELOCATED EUH ELECTRIC UNIT HEATER EWC ELECTRIC WATER COOLER EWH ELECTRIC WALL HEATER EX EXISTING F FUSE FA FIRE ALARM FB FLOOR BOX FDC FIRE DEPARTMENT CONNECTION FLUOR FLUORESCENT FPB FAN POWERED BOX F.S. FUSED SWITCH FVNR FULL VOLTAGE NON-REVERSING FVR FULL VOLTAGE REVERSING GEN GENERATOR GFCI GROUND FAULT CIRCUIT INTERRUPTER GHW GALVANIZED HEAVY WALL STEEL CONDUIT GRD GROUND HP HORSEPOWER HV HIGH VOLTAGE HZ HERTZ (CYCLES/SECOND) INC INCANDESCENT IC INTERRUPTING CAPACITY IG ISOLATED GROUND IMC INTERMEDIATE GRADE CONDUIT JB JUNCTION BOX KO KNOCKOUT KVA KILOVOLT-AMPERE KW KILOWATT KWH KILOWATT-HOUR LS LOUD SPEAKER LTG LIGHTING LV LOW VOLTAGE MAG MAGNETIC MAN MANUAL MCA MINIMUM CIRCUIT AMPS MCC MOTOR CONTROL CENTER MFR MANUFACTURER MH METAL HALIDE MOCP MAXIMUM OVER CURRENT PROTECTION MTD MOUNTED MTR MOTOR MV MERCURY VAPOR NC NORMALLY CLOSED NEC NATIONAL ELECTRICAL CODE NEUT NEUTRAL NIC NOT IN CONTRACT NO NORMALLY OPENED NTS NOT TO SCALE OCP OVER CURRENT PROTECTION PA PUBLIC ADDRESS PB PULL BOX PCU PACKAGED CONTROL UNIT PH PHASE PNL PANEL PRI PRIMARY PROT. PROTECTION OR PROTECTIVE PT POTENTIAL TRANSFORMER PWR POWER R RESISTANCE RECP RECEPTACLE RC REMOTE CONTROL RT RAIN TIGHT RVNR REDUCED VOLTAGE NON-REVERSING RVR REDUCED VOLTAGE REVERSING S SWITCH SC SHORT CIRCUIT SEC SECONDARY SP SINGLE POLE SPC SINGLE POINT CONNECTION SPDT SINGLE POLE DOUBLE THROW SPEC SPECIFICATION SPKR SPEAKER SPST SINGLE POLE SINGLE THROW SS STAINLESS STEEL STA STATION SWBD SWITCHBOARD SWGR SWITCHGEAR SYM SYMMETRICAL SYS SYSTEM T TRIP TC TERMINAL CABINET TEL TELEPHONE TEL.CL. TELEPHONE CLOSET TERM. TERMINAL TL TWIST LOCK TTC TELEPHONE TERMINAL CABINET TV TELEVISION TVSS TRANSIENT VOLTAGE SURGE SUPPRESSION UH UNIT HEATER UL UNDERWRITER'S LABORATORIES UNG UNGROUNDED UNO UNLESS NOTED OTHERWISE V VOLT VA VOLT-AMPERE VFD VARIABLE FREQUENCY DRIVE VP VAPOR PROOF VT VAPOR TIGHT W WATT WG WIRE GUARD WP WEATHERPROOF WT WATER TIGHT XFMR TRANSFORMER ABBREVIATIONS POWER SYMBOLS DUPLEX RECEPTACLE METAL RACEWAY MOUNTED DUPLEX RECEPTACLE PANELBOARD LIGHTING SYMBOLS FIRE ALARM SYMBOLS J JUNCTION BOX J JUNCTION BOX WITH SWITCH AUDIO-VISUAL DEVICE EQUIPMENT NOTES 2 X 2 RECESSED LIGHT FIXTURE OCCUPANCY SENSOR WALL SCONCE PENDENT EMERGENCY LIGHT FIXTURE TELEPHONE OUTLET CAMERA LOW VOLTAGE SYMBOLS DATA OUTLET CARD READER SPEAKER SD SMOKE DETECTOR MAGNETIC DOOR HOLD DEVICE S S williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 E0.01 PIPE FOR UNINSULATED LINES, OR OF THE THICKNESS OF THE INSULATION FOR INSULATED SERVICES. 2. INSTALL SLEEVES THROUGH INTERIOR WALLS AND PARTITIONS FLUSH WITH FINISHED SERVICES; SLEEVES THROUGH OUTSIDE WALLS ARE TO PROJECT 1/2" ON OUTSIDE OF THE FINISHED WALL. FLOOR SLEEVES ARE TO PROJECT 2" ABOVE FINISHED FLOORS. 3. SET SLEEVES IN PLACE BEFORE POURING CONCRETE OR SECURELY FASTEN AND GROUT IN WITH CEMENT. 4. SLEEVE CONSTRUCTION: a. INTERIOR PARTITION: NO. 22 GAUGE GALVANIZED SHEET STEEL WITH SOLDERED JOINT. b. INTERIOR MASONRY WALLS AND FLOORS: SCHEDULE 40 GALVANIZED STEEL PIPE. 5. INTERIOR WALLS: FILL THE SPACE BETWEEN THE OUTSIDE OF PIPE OR INSULATION AND THE INSIDE OF THE SLEEVE OR FRAMED OPENING WITH FIBERGLASS. 6. EXTERIOR WALLS: PACK WITH OAKUM, SEAL WITH LEAD AND WATERTIGHT MASTIC OR ASPHALT. 7. PROVIDE ESCUTCHEONS ON BOTH SIDES OF THE PENETRATION THROUGH THE STRUCTURE FOR ALL PIPES EXPOSED TO VIEW PASSING THROUGH WALLS, FLOORS, CEILINGS, AND PARTITIONS, WHETHER OR NOT INSULATED FOR PIPES PASSING THROUGH FLOORS, ESCUTCHEONS SHALL FIT OVER THE SLEEVES. 8. FIRE STOPPING SHALL BE PROVIDED AT ALL OPENINGS TO INCLUDE THE ANNULAR SPACE AROUND DUCTS, PIPING, CONDUITS, ETC. AND SHALL BE UL RATED MATERIALS AND METHODS PER THE ARCHITECTURAL SPECIFICATIONS SECTIONS. XI. DUCTWORK A. GENERAL 1. IN GENERAL, THE COMPLETE SHEET METAL DUCTWORK SYSTEMS FURNISHED UNDER THIS CONTRACT, SHALL BE CONSTRUCTED AND INSTALLED IN STRICT CONFORMANCE WITH THE STANDARDS AS SET FORTH IN THE "DUCT MANUAL AND SHEET METAL CONSTRUCTION FOR VENTILATING AND AIR-CONDITIONING SYSTEMS" AS PUBLISHED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION, INC. (SMACNA). ALL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEETS OF MILD STEEL. 2. ACCESS DOORS SHALL BE PROVIDED WHERE INDICATED ON THE DRAWINGS AND DETAILS, OR WHERE REQUIRED BY THE INSTALLATION, TO FACILITATE PROPER ACCESS, MAINTENANCE AND INSPECTION OF THE SYSTEM. ALL DUCT ACCESS DOORS SHALL BE HINGED, GASKETED, AND PROVIDED WITH SASH TYPE LOCKING DEVICES. 3. ELBOWS SHALL BE CONSTRUCTED WITH THE INSIDE RADIUS NOT LESS THEN 1/2 THE DUCT WIDTH IN THE SAME PLANE. WHERE STANDARD RADIUS ELBOWS CANNOT BE INSTALLED DUE TO SPACE CONSTRAINTS, SQUARE ELBOWS WITH DOUBLE THICKNESS TURNING VANES SHALL BE INSTALLED. CROSS BRAKE OR BEAD SURFACES WIDER THAN 18" FOR RIGIDITY. 4. DUCTWORK PENETRATIONS THROUGH RATED SEPARATIONS SHALL MAINTAIN THE FIRE AND SMOKE CONSTRUCTION OF THE WALL AND/OR FLOOR IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS. FURNISH AND INSTALL FIRE AND/OR SMOKE DAMPERS WHERE REQUIRED. ACCESS DOORS SHALL BE PROVIDED AT ALL FIRE AND SMOKE DAMPERS. 5. ALL DUCT SIZES SHOWN ON PLANS SHALL BE INSIDE CLEAR DIMENSIONS. 6. UPON COMPLETION OF THE INSTALLATION OF DUCTWORK, CLEAN ENTIRE SYSTEM OF RUBBISH, PLASTER, DIRT, ETC. 7. PROTECT DUCTWORK FROM THE ELEMENTS AND FOREIGN MATERIAL, AND COMPLY WITH INTERMEDIATE DUCT CLEANLINESS LEVEL IN ACCORDANCE WITH SMACNA'S "DUCT CLEANLINESS FOR NEW CONSTRUCTION GUIDELINES" B. DUCTWORK MATERIAL 1. NON-COMBUSTIBLE OR CONFORMING TO REQUIREMENTS FOR CLASS 1 AIR DUCT MATERIALS OR UL 181 2. STEEL DUCTS SHALL MEET ASTM A525 OR ASTM A527 GALVANIZED STEEL SHEET, LOCK-FORMING QUALITY, HAVING ZING COATING OF 12.5 OZ. PER SQUARE FOOT, FOR EACH SIDE IN CONFORMANCE WITH ASTM A90. 3. METAL GAUGES FOR USE IN DUCTWORK SHALL CONFORM TO THE FOLLOWING MAXIMUM DUCT SIZE METAL GAUGE (U.S. STD.): a. 0" THROUGH 29" 24 GA b. 30" THROUGH 54" 22 GA c. 55" THROUGH 84" 20 GA d. 85" AND OVER 18 GA 4. NEW DUCTWORK SHALL BE CONSTRUCTED TO THE FOLLOWING PRESSURE CLASS SCHEDULE: a. SUPPLY DUCTS: +3 INCH WG b. SUPPLY DUCTS DOWNSTREAM OF VAV BOXES: +2 INCH WG c. SUPPLY DUCTS FOR FCU'S: +1 INCH WG d. SUPPLY DUCTS FOR VRF UNITS: +1 INCH WG e. RETURN DUCTS UPSTREAM OF RETURN FANS: -2 INCH WG f. RETURN DUCTS DOWNSTREAM OF RETURN FANS: +2 INCH WG g. RETURN DUCTS FOR FCU'S: -1 INCH WG h. RETURN DUCTS FOR VRF UNITS: -1 INCH WG i. EXHAUST DUCTS UPSTREAM OF EXHAUST FANS: -2 INCH WG j. EXHAUST DUCTS DOWNSTREAM OF EXHAUST FANS: +2 INCH WG k. OUTDOOR AIR INTAKE DUCTS: -2 INCH WG 5. FABRICATE AND SUPPORT IN ACCORDANCE WITH SMACNA MEDIUM PRESSURE DUCT CONSTRUCTION STANDARDS AND ASHRAE HANDBOOKS, EXCEPT AS INDICATED. PROVIDE DUCT MATERIAL, GAUGES, REINFORCING, AND SEALING FOR OPERATING PRESSURES INDICATED. 6. TRANSFORM DUCT SIZES GRADUALLY, NOT EXCEEDING 15 DEGREES DIVERGENCE AND 30 DEGREES CONVERGENCE. 7. PROVIDE STANDARD 45 DEGREE LATERAL WYE TAKEOFF UNLESS OTHERWISE INDICATED WHERE 90 DEGREE CONICAL TEE CONNECTIONS MAY BE USED. C. DUCTWORK SUPPORTS AND CONNECTIONS 1. DUCT SECTION CONNECTIONS AND INTERMEDIATE REINFORCING SHALL CONFORM TO THE ABOVE-NOTED MANUAL. 2. SEAL DUCTS TO THE FOLLOWING SEAL CLASSES ACCORDING TO THE "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE" AS PUBLISHED BY SMACNA. a. SUPPLY AIR DUCTS: SEAL CLASS B b. RETURN AIR DUCTS: SEAL CLASS B c. EXHAUST AIR DUCTS: SEAL CLASS C d. OUTDOOR AIR DUCTS: SEAL CLASS C 3. ALL JOINT, LONGITUDINAL AND TRANSVERSE SEAMS, AND CONNECTIONS IN DUCTWORK, SHALL BE SECURELY FASTENED AND SEALED, MEET SMACNA SEAL CLASS A WITH WELDS, GASKETS, MASTICS (ADHESIVES), OR MASTIC-PLUS-EMBEDDED-FABRIC SYSTEMS. MASTICS USED TO SEAL DUCTWORK SHALL BE LISTED AND LABELED IN ACCORDANCE WITH UL 181A OR UL 181B. DUCT CONNECTIONS TO FLANGES OF AIR DISTRIBUTION SYSTEM EQUIPMENT SHALL BE SEALED AND MECHANICALLY FASTENED. DUCT TAPE IS NOT PERMITTED AS A SEALANT ON ANY METAL DUCTS. 4. THIS CONTRACTOR SHALL INSTALL FLEXIBLE DUCT CONNECTIONS BETWEEN EACH PIECE OF EQUIPMENT HAVING A FAN, AND ITS SUPPLY, RETURN, AND EXHAUST DUCTWORK. CONNECTIONS WHEN COMPLETED SHALL BE AIRTIGHT, AND SHALL BE INSTALLED IN AN APPROVED MANNER. FLEXIBLE CONNECTIONS SHALL BE NEOPRENE MATERIAL, TO INSURE AGAINST TRANSMISSION OF VIBRATION FROM THE FAN TO THE DUCTWORK. D. DUCTWORK INSULATION 1. ALL SUPPLY, RETURN, AND OUTDOOR AIR DUCTWORK INSTALLED ABOVE CEILINGS, WITHIN SHAFTS, AND WITHIN UNCONDITIONED SPACES SHALL BE PROVIDED WITH ONE OF THE FOLLOWING SPECIFICATIONS: a. R-6 MINERAL FIBER BLANKET INSULATION, 1-1/2 INCHES THICK, 0.75 LB/CU FT DENSITY b. R-6 MINERAL FIBER BOARD, 1-1/2 INCHES THICK, 1.6 LB/CU FT DENSITY. 2. ALL SUPPLY, RETURN, AND OUTDOOR AIR DUCTWORK INSTALLED WITHIN MECHANICAL ROOMS SHALL BE PROVIDED WITH THE FOLLOWING SPECIFICATIONS: a. R-6 MINERAL FIBER BOARD, 1-1/2 INCHES THICK, 1.6 LB/CU FT DENSITY. 3. ALL SUPPLY AND RETURN DUCTWORK INSTALLED EXTERIOR TO THE BUILDING SHALL BE PROVIDED WITH THE FOLLOWING SPECIFICATIONS: a. R-8 MINERAL FIBER BOARD, 2 INCHES THICK, 2.0 LB/CU FT DENSITY. b. BUILD UP INSULATION TO FROM 1/4 INCH PITCH ON TOP OF DUCTWORK. c. SEAL EXTERIOR DUCT INSULATION WITH '3M VENTURE CLAD PLUS 1579 SERIES' MULTI-LAYERED ALUMINUM LAMINATE, SELF ADHESIVE, JACKETING SYSTEM. PROVIDE WITH EMBOSSED FINISH AND STANDARD COLOR SELECTED BY OWNER. 4. ALL INSULATION AND RELATED MATERIALS SHALL HAVE A FLAME-SPREAD INDEX OF 25 OR LESS, AND A SMOKE DEVELOPED INDEX OF 50 OR LESS, AS DETERMINED BY TESTING IDENTICAL PRODUCTS PER ASTM E 84, BY A TESTING AND INSPECTING AGENCY ACCEPTABLE TO THE AUTHORITIES HAVING JURISDICTION. FACTORY LABEL PRODUCT WITH APPROPRIATE MARKINGS OF APPLICABLE TESTING AND INSPECTING AGENCY. 5. USE DUCT LINER AS INDICATED ON THE DRAWINGS. DUCT LINER MATERIAL SHALL BE GLASS FIBER WITH A MINIMUM TWO (2) POUND DENSITY THROUGHOUT THE FULL THICKNESS, NO "LAMINATED" OR "DUAL DENSITY" DUCT LINER WILL BE ACCEPTED. DUCT LINER INSULATION SHALL BE CERTAINTEED #200 "ULTRALITE" OR EQUIVALENT APPROVED MATERIAL OF ARMSTRONG OR OWENS-CORNING. 6. ALL INTERIOR DUCT LINER SHALL BE INSTALLED WITH VINYL SPRAY COATING ON THE AIR STREAM SIDE, AND SHALL BE ATTACHED TO THE SHEET METAL DUCTWORK WITH BOTH MASTIC AND MECHANICAL FASTENERS TO PROVIDE ADHESION ALONG THE COMPLETE SURFACE. INSTALLATION SHALL BE IN STRICT COMPLIANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. DUCT DIMENSIONS SHOWN ON DRAWINGS INDICATE INTERIOR AREA. 7. ALL DUCT WRAP SHALL BE INSTALLED WITH VAPOR BARRIER JACKET, KRAFT PAPER REINFORCED WITH GLASS FIBER YARN AND BONDED TO ALUMINIZED FILM. SECURE WITH PRESSURE SENSITIVE TAPE. 8. SUBMIT ELECTRONIC COPIES OF THE MANUFACTURER'S SUBMITTALS FOR ALL INSULATION. E. DUCTWORK ACCESSORIES 1. ALL SUPPLY, RETURN AND EXHAUST AIR REGISTERS, DIFFUSERS, TROFFERS, GRILLES, ETC. SHALL BE OF MODELS INDICATED, OR APPROVED EQUIVALENT UNITS. 2. EACH SHEET METAL DUCT TEE AND BRANCH TAKE OFF FITTING SHALL BE EQUIPPED WITH A LOCKING TYPE MANUAL VOLUME DAMPER SUITABLE FOR PROPER BALANCING. EACH SUPPLY, RETURN AND EXHAUST AIR REGISTER, DIFFUSER, TROFFER, GRILLE, ETC. SHALL BE DIRECTLY SERVED BY DUCTWORK WHICH INCLUDES A LOCKING TYPE MANUAL VOLUME DAMPER SUITABLE FOR PROPER BALANCING. MANUAL VOLUME DAMPER SHALL BE "RUSKIN" OR APPROVED EQUIVALENT WITH MINIMUM 20 GAUGE GALVANIZED STEEL BLADES AND FRAME AND SYNTHETIC BEARINGS. 3. FLEXIBLE DUCTWORK SHALL BE INSULATED, MEET THE REQUIREMENTS OF UL 181 AND NFPA 90A, SHALL BE SUITABLE FOR DUCT STATIC PRESSURES OF A MINIMUM OF +1.0" W.C. LENGTHS SHALL NOT EXCEED 5'-0". 4. PROVIDE FLEXIBLE AIR DUCTS FOR CONNECTIONS BETWEEN BRANCH LOW PRESSURE DUCTWORK AND DIFFUSERS, GRILLES, AND REGISTERS. INSTALL WITH A GALVANIZED STEEL STRAP, CADMIUM PLATED, AND FASTENED WITH A SLOTTED BOLT. 5. ACCEPTABLE FLEXIBLE DUCT MANUFACTURERS x THERMAFLEX, FLEXMASTER F. ACCESS DOORS 1. PROVIDE ACCESS PANELS IN ALL DUCTS ADJACENT TO AUTOMATIC DAMPERS, AT FIRE DAMPERS, AT SMOKE DAMPERS, AND AT REHEAT COILS. 2. ACCESS PANELS IN DUCTWORK SHALL BE OF 22 GAUGE GALVANIZED SHEET METAL WITH NEOPRENE GASKETS. PANELS IN INSULATED DUCTWORK, SHALL HAVE 1" THICK FIBERGLASS INSULATION BETWEEN TWO THICKNESS OF SHEET METAL. THE AIRSIDE SHEET METAL ON INSULATED PANELS SHALL BE WELDED OR MECHANICALLY LOCKED POSITION. 3. PANELS UP TO 15" SHALL BE PROVIDE WITH TWO CAM LATCHES, ONE ON EACH SIDE. 4. 5. PANEL OVER 15" SHALL BE PROVIDE WITH FOUR CAM LATCHES, TWO ON EACH SIDE. 6. ALL PANELS SHALL BE OF SUFFICIENT SIZE FOR EASY ACCESS TO AND THE SERVICING OF DAMPERS, DAMPER MOTORS, COILS, ETC. G. EXTERIOR DUCTWORK SYSTEM: ENDURADUCT XVI. ELECTRICAL WORK A. ALL LOW VOLTAGE AND LINE VOLTAGE ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES, ELECTRICAL DRAWINGS, AND SPECIFICATIONS HEREIN. B. SEE ELECTRICAL SPECIFICATIONS AND DRAWINGS FOR ELECTRICAL WORK. XVII. SYSTEM START-UP, TESTING, ADJUSTING AND BALANCING A. UPON COMPLETION OF THE SYSTEMS INSTALLATION, AND PRIOR TO ACCEPTANCE BY THE ENGINEER AND OWNER, THIS CONTRACTOR SHALL MAKE GENERAL OPERATING TESTS TO DEMONSTRATE THAT ALL EQUIPMENT AND SYSTEMS ARE IN PROPER WORKING ORDER, AND ARE FUNCTIONING IN CONFORMANCE WITH THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. B. PRIOR TO TESTING, ALL EQUIPMENT SHALL BE PROPERLY LUBRICATED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. ONE SET OF TOOLS NECESSARY FOR LUBRICATION SHALL BE DELIVERED TO OWNER. AFTER PROPER LUBRICATING, ALL UNITS SHALL BE STARTED AND SUCCESSFULLY OPERATED BY THE CONTRACTOR IN THE PRESENCE OF THE ARCHITECT AND/OR ENGINEER. C. EXCEPT FOR SMALL ELECTRICAL MOTORS WHICH UNDER NEMA STANDARDS ARE EQUIPPED WITH LIFETIME LUBRICATION, ALL BEARINGS ON LARGE MOTORS AND MECHANICAL EQUIPMENT SHALL BE EQUIPPED WITH LUBRICATOR FITTINGS EXTENDED TO THE EXTERIOR OF THE HOUSING D. BEFORE OPERATING ANY ROTATING EQUIPMENT, THE ROTATION AND LUBRICATION SHALL BE CHECKED AND THE PROPER QUANTITIES OF OIL AND GREASE SHALL BE ADDED AS REQUIRED FOR CORRECT OPERATION. EACH PART OF THE SYSTEM SHALL BE ADJUSTED TO INSURE PROPER FUNCTIONING OF ALL CONTROLS, PROPER AIR DISTRIBUTION, ELIMINATION OF DRAFTS, NOISE AND VIBRATION, AND THE ENTIRE SYSTEM SHALL BE LEFT IN FIRST-CLASS OPERATING CONDITION. E. THIS CONTRACTOR SHALL FURNISH ALL EQUIPMENT AND PERSONNEL REQUIRED FOR THE COMPLETE AND COMPREHENSIVE TESTING, ADJUSTING, AND BALANCING OF THE SYSTEMS INSTALLED UNDER THIS CONTRACT AND TO THE EXTENT REQUIRED BY THE SEQUENCE OF OPERATION. THE OWNER AND ENGINEER SHALL BE NOTIFIED WHEN THE TESTS ARE TO TAKE PLACE, IN ORDER THAT HE OR HIS AUTHORIZED REPRESENTATIVE MAY BE IN ATTENDANCE IF DEEMED NECESSARY. F. THIS CONTRACTOR TO RETURN EXISTING HEATING/COOLING SYSTEM TO EXISTING OPERATING CONDITION INCLUDING BUT NOT LIMITED TO THE REFILL AND PURGE OF ALL AIR AS PART OF HEATING/COOLING SYSTEM START-UP. G. A CERTIFIED TEST AND BALANCE CONTRACTOR (TABC) SHALL BE RESPONSIBLE FOR BALANCING ALL NEW HEATING AND COOLING SYSTEMS TO THE EXTENT REQUIRED BY THESE DRAWINGS HEREIN AND AS RELATED TO THE SPECIFIED WORK. SUCH BALANCING SHALL BE PERFORMED BY A MEMBER OF THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB), WHO SHALL SUBMIT AN ELECTRONIC COPY OF THEIR NEBB CERTIFICATE PRIOR TO BALANCING AND THE BALANCING REPORT TO THE ENGINEER FOR APPROVAL. ALL BALANCING WORK SHALL CONFORM TO NEBB STANDARDS AND SHALL BE REPORTED ON NEBB STANDARD FORMS. H. THE SCOPE OF WORK FOR THE TABC SHALL INCLUDE ALL FLOW AND PRESSURE MEASUREMENT DEVICES, FANS, SUPPLY, RETURN, AND EXHAUST VOLUME DAMPERS ON MAINS AND BRANCH LINES, TERMINAL UNITS, DIFFUSERS, PUMPS, ALL CIRCUIT SETTERS ON SUPPLY AND RETURN WATER MAINS AND BRANCH LINES, COILS, AND HEAT EXCHANGERS INSTALLED AS PART OF THIS CONTRACT. I. THE BALANCING CONTRACTOR SHALL IDENTIFY EACH AIR AND WATER DEVICE BY LOCATION, TYPE AND SIZE, AND SHALL TEST AND ADJUST EACH AIR AND WATER DEVICE TO WITHIN 10% OF DESIGN. THE SCOPE OF WORK FOR THE TABC IS DESCRIBED IN THE FOLLOWING PARAGRAPHS. J. THE TABC CONTRACTOR SHALL BE KEPT INFORMED DURING THE CONSTRUCTION OF THE PROJECT OF ANY MAJOR CHANGES MADE TO THE HVAC SYSTEM. TABC CONTRACTOR SHALL BE PROVIDED WITH ONE (1) SET OF SHOP DRAWINGS ON ALL EQUIPMENT WHICH THEY WILL BE REQUIRED TO WORK ON WHEN BALANCING THE HVAC SYSTEM. K. THE BALANCING CONTRACTOR SHALL COORDINATE WITH THE CONTROLS CONTRACTOR AS REQUIRED TO DETERMINE CONTROL SETPOINTS AS REQUIRED FRO PROPER OPERATION OF THE SYSTEM. L. THE TABC CONTRACTOR SHALL BE REQUIRED TO WORK CLOSELY WITH THE MC, BASC, AND ENGINEER IN ORDER TO ENSURE A PROPER INSTALLATION. M. THIS CONTRACTOR SHALL PROVIDE COMPETENT PERSONNEL, TO INSTRUCT THE OWNER OR HIS REPRESENTATIVE, IN THE PROPER OPERATION OF THE SYSTEMS INSTALLED UNDER THIS CONTRACT, FOR ONE FULL DAY DURING THE HEATING SEASON AND ONE FULL DAY DURING THE COOLING SEASON, AS APPLICABLE. N. THIS CONTRACTOR SHALL COORDINATE WITH ENGINEER FOR FUNCTIONAL TESTING OF EQUIPMENT AND CONTROLS INSTALLED AS PART OF THIS PROJECT. THIS CONTRACTOR SHALL CORRECT DEFICIENCIES FOUND DURING FUNCTIONAL TESTING TO THE ACCEPTANCE OF THE ENGINEER. O. THE FINAL TEST RESULTS SHALL BE TABULATED AND FOUR (4) CERTIFIED COPIES SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. TWO (2) CERTIFIED COPIES SHALL BE SUBMITTED TO THE BUILDING OWNER'S REPRESENTATIVE NO LATER THAN THIRTY (30) DAYS AFTER TENANT MOVE-IN. ALL EQUIPMENT SHOWN IN BALANCING REPORT SHALL HAVE AN EQUIPMENT ID TAG WHICH SHALL CORRESPOND TO TAG SHOWN ON MECHANICAL AS-BUILT DRAWINGS. P. SPECIAL NOTES FOR CONTROLS COORDINATION: 1. CRITICAL DIFFERENTIAL PRESSURE SETPOINTS SHALL BE DETERMINED FOR EACH DPT AS SHOWN IN THE MECHANICAL DRAWINGS. AS INDICATED IN THE SEQUENCE OF OPERATION, AND IN COORDINATION WITH THE SUCCESSFUL BUILDING AUTOMATION CONTRACTOR (BASC). THE SETPOINT SHALL BE DETERMINED USING THE PRESSURE DROP AND FLOW REQUIREMENTS OF EACH SITUATION. XVIII. AUTOMATIC TEMPERATURE CONTROL SYSTEM A. THE BUILDING AUTOMATED SYSTEMS CONTRACTOR SHALL BE CERTIFIED TO WORK ON AUTOMATED LOGIC CONTROL SYSTEMS. B. THE EXISTING AUTOMATED LOGIC BUILDING AUTOMATION SYSTEM CONTROLS SHALL BE EXTENDED FOR ALL NEW EQUIPMENT INSTALLED. THIS INCLUDES CONTROL OF THE NEW VAV BOXES AND REAHEAT COILS, NEW THERMOSTATS, NEW ENERGY RECOVERY UNIT, NEW HEAT PUMP AND CASSETTES AND EXISTING BASEBOARD CONTROL VALVES IN THE BRIDGE. ALL GRAPHICS AND ALARMS SHALL BE SHOWN AND ANNUNCIATED THROUGH THE BAS. C. EXISTING MECHANICAL EQUIPMENT DEMOLISHED DURING THIS PROJECT SHALL BE REMOVED FROM THE EXISTING BUILDING AUTOMATION SYSTEM. D. THE BUILDING AUTOMATION SYSTEM CONTRACTOR (BASC) SHALL COORDINATE WITH THE ENGINEER FOR FUNCTIONAL TESTING OF ALL NEW MECHANICAL SYSTEMS INSTALLED AS PART OF THIS PROJECT. E. THE BASC SHALL IMPLEMENT CONTROLS OF NEW MECHANICAL EQUIPMENT AS FOLLOWS: 1. ERV-1: a. SHALL MAINTAIN CONSTANT SPECIFIED OUTSIDE AIRFLOW (500 CFM) AND EXHAUST AIRFLOW (700 CFM) DURING OCCUPIED TIMES DETERMINED BY THE BUILDING OWNER. ABILITY TO ADJUST SET POINTS AND SCHEDULES THROUGH FRONT END. 2. CU-B1: a. OUTDOOR CONDENSING UNIT TO RUN CONTINUOUSLY. EQUIPMENT OCCUPANCY SCHEDULE DETERMINED BY BUILDING OWNER AND ENGINEER. ADJUSTABLE THROUGH BAS. 3. C-B1 - B4: a. CASSETTE FLOW 4. TB-R14 & TB-R15: a. SHALL HAVE USER ADJUSTABLE OCCUPIED AND UNOCCUPIED HEATING AND COOLING. OCCUPANCY SCHEDULES THAT SHALL BE COORDINATED BY THE BUILDING OWNER AND ENGINEER. b. INITIAL SETPOINTS ARE AS FOLLOWS: x 2&&+($7,1*6(732,17r) $'- x 2&&&22/,1*6(732,17r $'- x 812&&+($7,1*6(732,17r) $'- x 812&&&22/,1*6(732,17r) $'- c. VAV BOX DAMPER WILL CONTROL TO MAINTAIN THE ACTIVE AIRFLOW SETPOINT DETERMINED BY THE HIGHEST BETWEEN ACTIVE COOLING/HEATING AIRFLOW SETPOINTS. 5. CUH-R11 & CUH-R12: SETPOINTS. 5. CUH-R11 & CUH-R12: a. CABINET UNIT HEATERS SHALL HAVE USER ADJUSTABLE OCCUPIED AND UNOCCUPIED HEATING. SCHEDULES TO BE COORDINATED WITH BUILDING OWNER AND ENGINEER. b. DURING OCCUPIED HOURS, HEATERS SHALL ACT AS A SOURCE OF SUPPLEMENTARY HEAT. c. FRONT END - ADJUSTABLE AIRFLOW SETPOINT 6. BRIDGE BASEBOARD: c. BASC TO TIE EXISTING BASEBOARD HEATING INTO BAS. BASEBOARD HEATING TO TAKE PRECEDENCE OVER OUTDOOR CONDENSING UNIT DURING HEATING SEASON. williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M5.02 UNPROTECTED AREAS, ALL EQUIPMENT AND MATERIAL SHALL BE KEPT OFF THE GROUND BY MEANS OF PALLETS OR RACKS, AND COVERED WITH TARPAULINS. EQUIPMENT AND MATERIAL, IF LEFT OUT IN THE OPEN AND DAMAGED, SHALL BE REPAINTED OR OTHERWISE REFURBISHED AT THE DISCRETION OF THE BUILDING OWNER'S REPRESENTATIVE. EQUIPMENT AND MATERIAL IS SUBJECT TO REJECTION AND REPLACEMENT IF, IN THE OPINION OF THE ENGINEER OR MANUFACTURER, THE EQUIPMENT HAS DETERIORATED OR BEEN DAMAGED TO THE EXTENT THAT ITS IMMEDIATE USE IS QUESTIONABLE, OR THAT ITS NORMAL LIFE EXPECTANCY HAS BEEN CURTAILED. K. PROVIDE ALL HOLES, SLEEVES, CUTTING, PATCHING, AND CAULKING FOR INSTALLATION OF THIS WORK. CAULKING SHALL CONFORM TO THE FIRE RATING OF THE WALLS. SEAL ALL PENETRATIONS THROUGH BLOCK WALLS. L. ALL ROOFING WORK SHALL BE BY BUILDING APPROVED ROOFING CONTRACTOR TO MAINTAIN ROOF WARRANTY. THE PLUMBING CONTRACTOR SHALL COORDINATE ALL WORK WITH THE ROOFING CONTRACTOR TO ENSURE WEATHER TIGHT CONSTRUCTION AND TIMELY COMPLETION OF ALL WORK M. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL CHECK THE ENTIRE WORK AREA, AND SHALL CLEAN CONSTRUCTION DUST AND DEBRIS OFF ALL SURFACES, EQUIPMENT AND DEVICES. THIS CONTRACTOR SHALL REMOVE SURPLUS AND DEMOLISHED MATERIALS AND RUBBISH FROM THE PROPERTY AND LEAVE THE WORK AREA IN A NEAT AND CLEAN CONDITION. CONTRACTORS SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, PACKING MATERIALS DEBRIS, AND SO ON, THAT HAVE BEEN BROUGHT TO THE SITE UNDER THIS CONTRACT. THIS REQUIREMENT APPLIES BOTH TO DEBRIS FROM EQUIPMENT AND WORK PROVIDED BY THIS CONTRACTOR AND TO DEBRIS ASSOCIATED WITH EQUIPMENT FURNISHED BY THE OWNER FOR INSTALLATION UNDER THIS CONTRACT. N. EXISTING SYSTEMS TO BE SHUT DOWN A MINIMUM AMOUNT OF TIME. SHUTDOWN TO BE COORDINATED ON THE JOB SITE. O. THIS CONTRACTOR SHALL BE PROPERLY LICENSED, BONDED AND INSURED AND CAPABLE OF PERFORMING QUALITY WORKMANSHIP ON THIS PROJECT. P. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, AND SAFETY TO THE PUBLIC AND TO PROPERTY, BOTH PRIVATE AND PUBLIC. Q. REFER TO MECHANICAL COVER PAGE FOR ADDITIONAL GENERAL AND DEMOLITION NOTES. II. SHOP DRAWINGS, SUBMITTALS, AND AS-BUILTS A. SHOP DRAWINGS, PRODUCT DATA, AND/OR SAMPLES SHALL BE SUBMITTED FOR ALL EQUIPMENT AS SPECIFIED OR SCHEDULED. SHOP DRAWING PLANS SHALL BE 1/4" SCALE AND SHALL INDICATE LAYOUT OF ALL EQUIPMENT, DUCTS, DIFFUSERS, BOXES, PIPING, THERMOSTATS, AND ANY OTHER RELATED MECHANICAL ITEMS. SHOP DRAWING PLANS SHALL INCLUDE ALL DUCT AND PIPE SIZES, CFM, ETC. B. SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS, OR IF CONDUIT OR PIPING CAN BE RUN TO BETTER ADVANTAGE, THIS CONTRACTOR SHALL PREPARE AND SUBMIT FOR APPROVAL SHOP DRAWINGS SHOWING SUCH CHANGES BEFORE PROCEEDING WITH THE WORK C. THE CONTRACTOR SHALL, UPON BEING AWARDED THE CONTRACT, SUBMIT ELECTRONIC COPIES OF THE MANUFACTURER'S SUBMITTALS FOR ALL EQUIPMENT AND ACCESSORIES TO BE FURNISHED UNDER THIS CONTRACT. THE CONTRACTOR SHALL PROCEED WITH THE PROCUREMENT AND INSTALLATION OF EQUIPMENT ONLY AFTER RECEIVING APPROVED SUBMITTALS RELATIVE TO EACH ITEM. D. THE CONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS TO THE ENGINEER & OWNER BEFORE FINAL PAYMENT WILL BE ISSUED. THE AS-BUILT DRAWINGS SHALL BE SUBMITTED IN REPRODUCIBLE FORM, AND AS AN ELECTRONIC FILE ON DISK (AUTOCAD 2004 OR LATER), AND AS THREE BLUELINE COPIES. E. THIS CONTRACTOR SHALL, DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILE A COMPLETE BROCHURE OF ALL EQUIPMENT FURNISHED AND INSTALLED ON THIS PROJECT. THIS BROCHURE SHALL INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, PARTS LISTS, SUBMITTALS AND DESCRIPTIVE LITERATURE, ALL AS FURNISHED BY THE EQUIPMENT MANUFACTURER. CONTRACTOR SHALL FURNISH OWNER WITH THREE INSTRUCTION MANUALS IN BOUND FORM CONTAINING THIS DATA FOR ALL EQUIPMENT AND APPARATUS. MANUALS SHALL BE EDITED TO BE PRODUCT SPECIFIC FOR PRODUCTS ACTUALLY INSTALLED ON THE PROJECT. III. REGULATIONS AND CODES A. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN CONFORMANCE WITH ALL GOVERNING NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. B. AT THE TIME OF PRODUCTION FOR THESE DESIGN DRAWINGS, THE CURRENT CODES FOR [INSERT CITY NAME] WERE AS FOLLOWS: x BUILDING CODE: ASHRAE 90.1-2007 WITH AMMENDMENTS x ACCESSIBILITY: INDIANA ACCESSIBILITY CODE x LIFE SAFETY: IN LIFE SAFETY CODE (LSC) x FIRE PREVENTION: 2014 INDIANA FIRE CODE x FUEL GAS: 2014 INDIANA FUEL GAS CODE x MECHANICAL: 2014 INDIANA MECHANICAL CODE x ELECTRICAL: 2009 INDIANA ELECTRICAL CODE x ENERGY: 2010 INDIANA ENERGY CONSERVATION CODE x PLUMBING 2012 INDIANA PLUMBING CODE C. FOLLOW ALL LOCAL AMENDMENTS TO CODES LISTED ABOVE. D. ALL EQUIPMENT FURNISHED, AND ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), THE AMERICAN GAS ASSOCIATION (AGA), THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), THE AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR CONDITIONING ENGINEERS (ASHRAE), SHEET METAL AND AIR-CONDITIONING CONTRACTORS NATIONAL ASSOCIATION, INC. (SMACNA), AND OTHER NATIONAL STANDARDS WHERE APPLICABLE. E. ALL AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED AT LEAST THREE WORKING DAYS PRIOR TO COMMENCEMENT OF WORK III. REGULATIONS AND CODES A. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN CONFORMANCE WITH ALL GOVERNING NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. B. AT THE TIME OF PRODUCTION FOR THESE DESIGN DRAWINGS, THE CURRENT CODES FOR [INSERT CITY NAME] WERE AS FOLLOWS: x BUILDING CODE: ASHRAE 90.1-2007 WITH AMMENDMENTS x ACCESSIBILITY: INDIANA ACCESSIBILITY CODE x LIFE SAFETY: IN LIFE SAFETY CODE (LSC) x FIRE PREVENTION: 2014 INDIANA FIRE CODE x FUEL GAS: 2014 INDIANA FUEL GAS CODE x MECHANICAL: 2014 INDIANA MECHANICAL CODE x ELECTRICAL: 2009 INDIANA ELECTRICAL CODE x ENERGY: 2010 INDIANA ENERGY CONSERVATION CODE x PLUMBING 2012 INDIANA PLUMBING CODE C. FOLLOW ALL LOCAL AMENDMENTS TO CODES LISTED ABOVE. D. ALL EQUIPMENT FURNISHED, AND ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), THE AMERICAN GAS ASSOCIATION (AGA), THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), THE AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR CONDITIONING ENGINEERS (ASHRAE), SHEET METAL AND AIR-CONDITIONING CONTRACTORS NATIONAL ASSOCIATION, INC. (SMACNA), AND OTHER NATIONAL STANDARDS WHERE APPLICABLE. E. ALL AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED AT LEAST THREE WORKING DAYS PRIOR TO COMMENCEMENT OF WORK IV. MATERIALS AND EQUIPMENT A. ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT SHALL BE NEW, UNLESS OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. B. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATION. C. THIS CONTRACTOR IS REQUIRED TO BID AS SPECIFIED. NO MATERIAL OR EQUIPMENT SUBSTITUTIONS WILL BE CONSIDERED AFTER THE AWARD OF CONTRACT. THIS CONTRACTOR SHALL, IF HE DESIRES TO SUBSTITUTE OTHER THAN SPECIFIED MATERIAL OR EQUIPMENT, SUBMIT IN ALTERNATE PROPOSAL FORM WITH HIS BID, A LIST OF SUCH ITEMS INDICATING ITEM, MANUFACTURER, MODEL NUMBER AND THAT AMOUNT TO BE ADDED TO OR DEDUCTED FROM THE BASE BID. EACH SUCH MATERIAL OR EQUIPMENT SUBSTITUTION ITEM SHALL BE LISTED SEPARATELY IN ORDER THAT PROPER CONSIDERATION MAY BE GIVEN. IN ANY EVENT, SPECIFIED MATERIALS ONLY SHALL BE PROPOSED UNDER THE BASE BID. D. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE AND PROTECTING OF ALL NEW EQUIPMENT FURNISHED BY HIM OR TO HIM BY THE OWNER, AND SHALL SECURE SUCH EQUIPMENT FROM DAMAGE BY VANDALISM AND WEATHER DURING CONSTRUCTION AND UNTIL TIME OF FINAL ACCEPTANCE BY THE OWNER. E. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL STRUCTURAL STEEL MEMBERS, SLEEVES AND SHIMS REQUIRED TO LEVEL AND SUPPORT EQUIPMENT AND EQUIPMENT SUPPORTS. F. ALL EQUIPMENT NOISE LEVELS SHALL NOT EXCEED 55 DB AT THE LOT LINE. G. ALL EQUIPMENT PROVIDED UNDER THESE SPECIFICATIONS SHALL PERFORM WITH THE LEAST POSSIBLE NOISE AND VIBRATION CONSISTENT WITH ITS DUTY. QUIETNESS OF OPERATION OF ALL EQUIPMENT IS A REQUIREMENT. ANY EQUIPMENT, AS DETERMINED BY THE BUILDING OWNER'S REPRESENTATIVE OR ENGINEER TO BE PRODUCING OBJECTIONABLE NOISE OR TRANSMITTING NOISE OR VIBRATION TO THE BUILDING SHALL BE REPAIRED OR REMOVED AND REPLACED. H. MECHANICAL CONTRACTOR SHALL VERIFY VOLTAGES FOR ALL EQUIPMENT PRIOR TO ORDERING. I. FURNISH AND INSTALL IDENTIFICATION LABELS ON ALL EQUIPMENT INSTALLED AS PART OF THIS PROJECT. IDENTIFICATION LABELS SHALL BE FASTENED TO EQUIPMENT CLEARLY VISIBLE. LABELS SHALL BE ENGRAVED WITH THE EQUIPMENT TAGS, MANUFACTURER'S NAME, ADDRESS, MODEL NUMBER, AND RATING. COORDINATE WITH ELECTRICAL PANEL LABELING. J. CODE RATINGS, LABELS, OR OTHER DATA WHICH ARE DIE-STAMPED OR OTHERWISE AFFIXED TO THE SURFACE OF THE EQUIPMENT SHALL BE IN A VISIBLE LOCATION. K. REPLACE FILTERS ON ALL EQUIPMENT (WITHIN SCOPE) HAVING THEM AT PROJECT COMPLETION PRIOR TO TURNOVER. V. EXISTING BUILDING MODIFICATIONS A. THIS CONTRACTOR SHALL NOT REMOVE OR RELOCATE ANY EXISTING ITEMS OF OWNER'S EQUIPMENT, FOUND TO BE IN THE PATH OF NEW SYSTEMS TO BE INSTALLED, WITHOUT PRIOR APPROVAL BY THE OWNER, EXCEPT AS SPECIFICALLY INDICATED ON THE DRAWINGS. IF EXISTING EQUIPMENT IS FOUND TO BE IN THE WAY OF PROPOSED PIPE ROUTING, ETC., THE OWNER'S REPRESENTATIVE SHOULD BE ADVISED, AND HE SHALL MAKE THE DECISION AS TO WHETHER OR NOT THE SPECIFIC ITEM IS TO BE REMOVED AND RETAINED, REMOVED AND DISPOSED OF, OR REMOVED AND RELOCATED. B. ALL CUTTING, DRILLING AND PATCHING REQUIRED FOR THE INSTALLATION OF SYSTEMS HEREIN DESCRIBED, SHALL BE PROVIDED BY THIS CONTRACTOR. STRUCTURAL MEMBERS SHALL NOT BE DISTURBED WITHOUT PRIOR APPROVAL OF THE ENGINEER. ALL AREAS DISTURBED BY WORK PERFORMED UNDER THIS CONTRACT SHALL BE NEATLY REPAIRED AND REFINISHED TO THE CONDITION OF ADJOINING SURFACES IN A MANNER SUITABLE TO THE ENGINEER. ROOF AND EXTERIOR WALLS TO REMAIN WEATHER TIGHT. MAINTAIN REQUIRED FIRE RATING OF ALL WALL, ROOF, AND FLOOR ASSEMBLIES INCLUDING REPAIRS AS MAY BE REQUIRED TO FIRE PROOFING ON STRUCTURAL MEMBERS. VI. SCOPE AND GUARANTEE A. THE WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL INCLUDE THE INSTALLATION OF THE HEATING, VENTILATING, AIR CONDITIONING, CONTROL, AND ELECTRICAL SYSTEMS AND COMPONENTS AS INDICATED ON THE DRAWINGS AND SPECIFIED HEREIN. B. BY SIGNING THE CONTRACT, THIS CONTRACTOR ACKNOWLEDGES THAT HE HAS VISITED THE SITE AND ACQUAINTED HIMSELF WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED, AND HE AGREES THAT HE WILL COMPLY WITH THE REQUIREMENTS AND INTENT OF ALL PERTINENT DOCUMENTS IN THE PERFORMANCE OF THE WORK. C. THIS CONTRACTOR SHALL GUARANTEE THAT THE COMPLETE SYSTEMS AS INSTALLED UNDER THIS CONTRACT SHALL BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF JOB ACCEPTANCE BY THE OWNER. THIS SHALL INCLUDE A GUARANTEE OF FREE CIRCULATION OF AIR AND WATER THROUGH-OUT THEIR RESPECTIVE SYSTEMS, WITHOUT LEAKS, BLOCKAGES, OR UNDUE NOISE. IF DEFECTS OCCUR DURING THE ONE YEAR GUARANTEE PERIOD, THIS CONTRACTOR SHALL REPAIR OR REPLACE WITH NEW EQUIPMENT, SUCH DEFECTS, AT NO EXPENSE TO THE OWNER AND TO THE SATISFACTION OF THE ENGINEER. D. THIS CONTRACTOR SHALL INCLUDE ANNUAL, SEMI-ANNUAL, AND QUARTERLY PREVENTATIVE MAINTENANCE FOR ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF JOB ACCEPTANCE BY THE OWNER. THIS SHALL INCLUDE ALL MAINTENANCE AS RECOMMENDED BY THE MANUFACTURER ON THEIR OPERATION AND MAINTENANCE MANUALS OR MAINTENANCE CHECKLISTS. VII. PIPING A. GENERAL 1. COMPLY WITH PROVISIONS OF ASME B31 SERIES "CODE FOR PRESSURE PIPING." 2. SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF MECHANICAL MATERIALS AND EQUIPMENT FOR EFFICIENT FLOW OF THE WORK. COORDINATE INSTALLATION OF LARGE EQUIPMENT WITH RELATED TRADES. 3. SYSTEM COMPONENTS WHICH REQUIRE OBSERVATION, OPERATION, OR MAINTENANCE; SUCH AS VALVES, GAUGES, CONTROLS, STRAINERS, DIRT POCKETS, CLEANOUTS, UNIONS, AND FLANGES, ETC. SHALL BE LOCATED WHENEVER POSSIBLE AS TO BE READILY ACCESSIBLE. THEY SHALL NOT BE CONCEALED IN CHASES OR ABOVE CEILINGS WITHOUT PROVISION FOR ACCESS. VALVES WHICH REQUIRE FREQUENT OPERATION, OR WHICH MAY REQUIRE EMERGENCY OPERATION, AND WHICH ARE NOT ACCESSIBLE FROM NORMAL WORKING LEVEL, SHALL BE INSTALLED WITH APPROPRIATE PROVISIONS SUCH AS CHAIN WHEELS OR EXTENSION STERNS. 4. INSTALL DRAIN PIPING AT A SLOPE DOWNWARDS TOWARDS DRAIN VALVE LOCATIONS LOCATED WITHIN BUILDING TO PERMIT COMPLETE SYSTEM DRAINING IF NECESSARY. 5. ALL PIPE SHALL BE CUT TO EXACT MEASURE. FULL LENGTHS OF PIPE SHALL BE USED. SHORT LENGTHS OF PIPE WITH COUPLINGS WILL NOT BE ACCEPTED. 6. INSTALL COMPONENTS HAVING PRESSURE RATING EQUAL TO OR GREATER THAN SYSTEM OPERATING PRESSURE. 7. INSTALL INTERIOR AND EXTERIOR PIPING AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE PROHIBITED, EXCEPT WHERE INDICATED. 8. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION PLUS 1-INCH CLEARANCE AROUND INSULATION. B. PRESSURE TESTING 1. SUBJECT ALL NEW HYDRONIC PIPING TO HYDROSTATIC PRESSURE TESTS THAT IS NOT LESS THAN 50 PSIG AND 1.5 TIMES THE SYSTEM'S WORKING PRESSURE FOR A MINIMUM OF 4 HOURS OR AS SPECIFICALLY INDICATED. TEST PRESSURE SHALL NOT EXCEED MAXIMUM PRESSURE FOR ANY VESSEL, PUMP, VALVE, OR OTHER COMPONENT IN SYSTEM UNDER TEST. SUBMIT REPORT TO ENGINEER INDICATING TEST DATE, TEST PRESSURE, AND DURATION, AS WELL AS CERTIFICATION OF SUCCESSFUL TEST. 2. SUBJECT ALL NEW REFRIGERANT PIPING (SUCTION AND LIQUID) IN ACCORDANCE TO ASHRAE STANDARDS FOR APPLICABLE REFRIGERANT BEING UTILIZED. 3. WHEN TESTING INDICATED MATERIALS OR WORKMANSHIP IS DEFICIENT, REPLACE OR REPAIR AS REQUIRED, AND REPEAT TEST UNTIL STANDARDS ARE ACHIEVED. 4. PIPING SHALL NOT BE BACKFILLED OR INSULATED UNTIL PRESSURE TESTED. C. HYDRONIC CONDITIONING PIPING ABOVE GRADE 1. ALL NEW CHILLED WATER, CONDENSER WATER, DUAL TEMPERATURE, GLYCOL WATER, HEATING HYDRONIC WATER, AND HYDRONIC CONDITIONING PIPING SHALL BE IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS: 2. FOR 2" AND SMALLER SIZES, ALL NEW HYDRONIC CONDITIONING PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH 150 LB. MALLEABLE IRON SCREWED FITTINGS OR TYPE L COPPER WITH BRAZED JOINTS 3. FOR 2-1/2" AND LARGER SIZES, ALL NEW HYDRONIC WATER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH WELDED PIPE AND FITTINGS. 4. MECHANICAL FITTINGS WILL NOT BE ALLOWED. MECHANICAL FITTINGS MAY BE BID AS AN ALTERNATE WHERE EXPOSED AND ACCESSIBLE IN MECHANICAL ROOMS. 5. PIPE AND FITTINGS SHALL BE SUITABLE FOR 150 PSI WORKING PRESSURE AND SHALL MEET RELEVANT ASTM STANDARDS. D. COOLING CONDENSATE DRAIN PIPING 1. ALL NEW COOLING CONDENSATE DRAIN PIPING SHALL BE TYPE 'M' HARD COPPER TUBING WITH SOLDERED JOINTS. PITCH TOWARDS DRAIN 1 8" :1. E. STEAM PIPING 1. FOR 2" AND SMALLER SIZES, NEW STEAM PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH 125 LB. CAST IRON SCREWED FITTINGS. 2. FOR 2-1/2" AND LARGER SIZES, NEW STEAM PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH WELDED PIPE AND FITTINGS. F. STEAM CONDENSATE RETURN PIPING 1. FOR 2" AND SMALLER SIZES, NEW CONDENSATE RETURN PIPING SHALL BE SCHEDULE 80 BLACK STEEL PIPE WITH 125 LB CAST IRON SCREWED FITTINGS. 2. FOR 2-1/2" AND LARGER SIZES, NEW CONDENSATE RETURN PIPING SHALL BE SCHEDULE 80 BLACK STEEL PIPE WITH WELDED PIPE AND FITTINGS G. BOILER FEED WATER PIPING 1. FOR 2" AND SMALLER SIZES, NEW BOILER FEED WATER PIPING SHALL BE SCHEDULE 80 BLACK STEEL PIPE WITH 125 LB CAST IRON SCREWED FITTINGS. 2. FOR 2-1/2" AND LARGER SIZES, NEW BOILER FEED WATER PIPING SHALL BE SCHEDULE 80 BLACK STEEL PIPE WITH WELDED PIPE AND FITTINGS H. REFRIGERANT PIPING 1. PIPING: COPPER TUBING TO 7/8 INCH OD: ANSI/ASTM 280, TYPE K, ANNEALED 2. FITTINGS: ASME B16.22 WROUGHT COPPER / ASME B16.26 CAST COPPER 3. JOINTS: FLARED 4. JOINTS: BRAZE, AWS A5.8 BCUP SILVER/PHOSPORUS/COPPER ALLOY WITH MELTING RANGE 72r) 5. UNIONS, FLANGES, AND COUPLING (2 INCHES AND SMALLER) a. FERROUS PIING: 150 PSIG MALLEABLE IRON, THREADED b. COPPER PIPE: BRONZE, SOLDERED JOINTS. 6. MOISTURE AND LIQUID INDICATORS: SINGLE PORT TYPE, UL LISTED, WITH COPPER OR BRASS BODY, FLARED OR SOLDER ENDS, SIGHT GLASS, COLOR CODED PAPER MOISTURE INDICATOR WITH REMOVABLE ELEMENT CARTRIDGE AND PLASTIC CAP; FOR MAXIMUM WORKING PRESSURE OF 500 PSIG AND MAXIMUM TEMPERATURE OF 200 DEGREES F. 7. VALVES: UL LISTED, GLOBE OR ANGLE PATTERN, FORGED BRASS BODY AND BONNET, PHSOPHOR BRONZE AND STAINLESS STEEL DIAPHRAGMS, RISING STEM AND HANDWHEEL. STAINLESS STEEL SPRING, NYLON SEAT DISC, SOLDER OR FLARED ENDS, WITH POSITIVE BACKSEATING, FOR MAXIMUM WORKING PRESSURE OF 500 PSIG AND MAXIMUM TEMPERATURE OF 275 DEGREES F. 8. PACKED ANGLE VALVES: FORGED, BRASS, OR NICKEL PLATED FORGED STEEL, FORGED BRASS SEAL CAPS WITH COPPER GASKET, RISING STEM, AND SEAT WITH BACKSEATING, MOLDED STEM PACKING, SOLDER OR FLARED ENDS, FOR MAXIMUM WORKING PRESSURE OF 500 PSIG AND MAXIMUM TEMPERATURE OF 275 DEGREES F. 9. SERVICE VALVES: FORGED BRASS BODY WITH COPPER STUBS, BRASS CAPS, REMOVABLE VALVE CORE, INTEGRAL BALL CHECK VALVE, FLARED OR SOLDER ENDS, FOR MAXIMUM WORKING PRESSURE OF 500 PSIG. 10. FILTER DRIERS: REPLACEABLE CARTRIDGE ANGLE TYPE, SHELL: ARI 710, UL LISTED, BRASS, REMOVABLE CAP, FOR MAXIMUM WORKING PRESSURE OF 350 PSIG. 11. SOLENOID VALVES: AIR 760, PILOT OPERATED, COPPER OR BRASS BODY AND INTERNAL PARTS, SYNTHETIC SEAT, STAINLESS STEEL STEM AND PLUNGER ASSEMBLY, WITH FLARED SOLDER, OR THREADED ENDS, FOR MAXIMUM WORKING PRESSURE OF 500 PSIG. STEM SHALL PERMIT MANUAL OPERATION IN CASE OF COIL FAILURE. 12. COIL ASSEMBLY: UL LISTED, REPLACEABLE WITH MOLDED ELECTROMAGNETIC COIL, MOISTURE AND FUNGUS PROOF, WITH SURGE PROTECTOR AND COLOR CODED LEAD WIRES, INTEGRAL JUNCTION BOX. 13. VERTICAL SUPPORTS: STEEL RISER CLAMP. I. REFRIGERANT RELIEF PIPING 14. RELIEF PIPING SHALL BE SCHEDULE 40 BLACK STEEL WITH WELDED JOINTS OR TYPE L COPPER WITH BRAZED JOINTS. 15. INSTALL WITH PITCH TOWARDS SAFETY RELIEF DEVICE. 16. RELIEF PIPING SIZE, INSTALLATION, AND TERMINATION SHALL BE IN ACCORDANCE WITH ASHRAE 15. 17. FOR RELIEF PIPING CONNECTED TO A COMMON HEADER, INSTALL A DIFFUSER AT THE HEADER TERMINATION TO MIX REFRIGERANT WITH AIR. PROTECT TERMINATION FRO WEATHER WITH RAIN CAP OR OTHER MEANS. J. HYDRONIC PIPING INSULATION 1. FURNISH AND INSTALL ALL NEW PIPING (LISTED BELOW) WITH FIBERGLASS MOLDED PIPE INSULATION APPLIED WITH AN ALL-SERVICE VAPOR BARRIER JACKET, STAPLED, AND THE SEAMS, JOINTS, AND STAPLES PAINTED WITH VAPOR PROOF MASTIC. 2. ALL DAMAGED INSULATION (RESULTING FROM IMPLEMENTATION OF THIS PROJECT) ON EXISTING PIPING TO REMAIN SHALL BE REPAIRED. PROVIDE INSULATION ON EXISTING PIPING AS INDICATED IN THE MECHANICAL DOCUMENTS. 3. MINIMUM INSULATION THICKNESSES SHALL BE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: a. DOMESTIC COLD WATER PIPING: 1/2" b. DOMESTIC HOT WATER PIPING (1.25 NPS AND SMALLER): 1" c. DOMESTIC HOT WATER PIPING (1.5 NPS AND LARGER): 1-1/2" d. HEATING HOT WATER PIPING (1.25 NPS AND SMALLER): 1-1/2" e. HEATING HOT WATER PIPING (1.5 NPS AND LARGER): 2" f. CHILLED WATER PIPING (1.5 NPS AND SMALLER): 1" g. CHILLED WATER PIPING (2 NPS AND LARGER): 1-1/2" h. HOT / CHILLED (DUAL TEMPERATURE) WATER PIPING (1.5 NPS AND SMALLER): 1" i. HOT / CHILLED (DUAL TEMPERATURE) WATER PIPING (2 NPS AND LARGER): 1-1/2" j. STEAM PIPING (1.5 NPS AND SMALLER): 2-1/2" k. STEAM PIPING (2 NPS AND LARGER): 3" l. CONDENSATE RETURN PIPING (1.25 NPS AND SMALLER): 1-1/2" m. CONDENSATE RETURN PIPING (1.5 NPS AND LARGER): 2" n. BOILER FEED WATER PIPING: 1-1/2" o. CONDENSER WATER PIPING (GENERAL): NONE REQUIRED p. CONDENSER WATER PIPING (WITH HEAT TRACING): 1" q. CONDENSATE DRAIN PIPING: 1" 4. VAPOR BARRIER JACKET SHALL HAVE FACTORY APPLIED VAPOR RETARDER COMPOSED OF A WHITE DRAFT FACING OUT REINFORCED WITH GLASS FIBER YARN AND BONDED TO ALUMINIZED FILM. LAP ADHESIVE SHALL BE COMPATIBLE WITH INSULATION. 5. FURNISH AND INSTALL PVC COVERS FOR ALL VALVES AND ALL PIPE FITTINGS. 6. SUBMIT ELECTRONIC COPIES OF THE MANUFACTURER'S SUBMITTALS FOR ALL INSULATION. K. REFRIGERANT SUCTION PIPING INSULATION 1. INSULATION SHALL BE A FLEXIBLE, CLOSED-CELL ELASTOMERIC PIPE INSULATION: AP ARMAFLEX, AC ACCOFLEX. ADHESIVE SHALL BE ARMAFLEX 520, 520 BLACK, OR 520 BLV ADHESIVE. THE INSULATION MUST CONFORM TO ASTM C534 GRADE 1 TYPE. 2. INSULATION MATERIALS SHALL HAVE A CLOSED CELL STRUCTURE TO PREVENT MOISTURE FROM WICKING WHICH MAKES IT AN EFFICIENT INSULATION. 3. INSULATION MATERIALS SHALL BE MANUFACTURED WITHOUT THE USE OF CFC'S, HFC'S, OR HCFC'S. IT IS ALSO FORMALDEHYDE FREE, LOW VOCS, FIBER FREE, DUST FREE, AND RESISTS MOLD AND MILDEW. 4. INSULATION MATERIALS SHALL HAVE A FLAME-SPREAD INDEX OF LESS THAN 25 AND A SMOKE-DEVELOPED INDEX OF LESS THAN 50 AS TESTED IN ACCORDANCE WITH ASTM E 84. IN ADDITION, THE PRODUCTS, WHEN TESTED, SHALL NOT MELT OR DRIP FLAMING PARTICLES AND THE FLAME SHALL NOT BE PROGRESSIVE. THE FLAME SHALL NOT BE PROGRESSIVE. 5. INSULATION MATERIALS SHALL HAVE A MAXIMUM THERMAL CONDUCTIVITY OF 0.27 %78,1+)7tr)$7$r)0($17(03(5$785($67(67(',1$&&25'$1&(:,7+$670& OR ASTM C 518. 6. INSULATION MATERIALS SHALL HAVE A MAXIMUM WATER VAPOR TRANSMISSION OF 0.08 PERM-INCHES WHEN TESTED IN ACCORDANCE WITH ASTM E 96. 7. SADDLES SHALL BE INSTALLED UNDER ALL INSULATED LINES AT UNI-STRUT CLAMPS, CLEVIS HANGERS, OR LOCATIONS WHERE INSULATION MAY BE COMPRESSED. 8. ALL INSULATION EXPOSED TO SUNLIGHT OR INSTALLED OUTDOORS SHALL BE PROTECTED WITH TWO COATS OF WB ARMAFLEX FINISH OR WEATHER RESISTANT COATING. L. PIPE EXPANSION 1. SPECIAL ATTENTION SHALL BE GIVEN TO THE INSTALLATION OF HOT AND COLD LINES WHICH HAVE HAVE AN APPRECIABLE MOVEMENT SO THAT THEY WILL NOT HIT OTHER PIPES, STRUCTURAL MEMBERS, AND THE LIKE WHEN THEY HEAT UP OR COOL. 2. INSTALL ANCHORS WHERE SHOWN ON THE DRAWINGS AND WHERE REQUIRED. 3. GUIDES ARE TO BE FURNISHED ON EACH SIDE OF ALL EXPANSION LOOPS, OFFSETS, SWING JOINTS, AND EXPANSION JOINTS, WHETHER OR NOT DETAILED ON THE DRAWINGS. 4. COLD SPRINGING WHERE REQUIRED SHALL BE DONE WITH ANCHORS, HANGERS, AND SLIDING SUPPORTS IN PLACE. M. PIPING VALVES 1. VALVES SHALL BE LOCATED FOR CONVENIENT ACCESS FOR OPERATION AND MAINTENANCE. 2. INSTALL ALL VALVES WITH STEMS IN EITHER AN UPRIGHT (PREFERRED) OR HORIZONTAL POSITION. CONTROL VALVES SHALL BE INSTALLED WITH ACTUATOR UPWARD UNLESS NOTED OTHERWISE 3. PROVIDE THE FOLLOWING TYPES OF VALVES FOR HVAC APPLICATIONS, UNLESS NOTED OTHERWISE FOR SPECIFIC SYSTEMS: 4. ISOLATION VALVES SHALL BE "BUBBLE-TIGHT", RATED FOR 300 PSI. 5. BALL VALVES (UP TO AND INCLUDING 2") a. 2 PIECE BRONZE BODY 600# WOG RATED, FULL PORT b. CHROME PLATED BRONZE BALL c. 2-1/4" VALVE EXTENSION d. TEFLON SEAT AND STUFFING BOX RING e. LEVER HANDLE WITH BALANCE STOPS f. ACCEPTABLE MANUFACTURERS: x APOLLO, NIBCO, MILWAUKEE 6. SWING CHECK VALVE (UP TO AND INCLUDING 2") a. BRONZE BODY, BRONZE TRIM, BRONZE ROTATING SWING DISC b. COMPOSITION DISC c. TREADED ENDS d. ACCEPTABLE MANUFACTURERS: x APOLLO, NIBCO, MILWAUKEE 9. BALANCING VALVES (UP TO AND INCLUDING 2") a. BRASS COPPER ALLOY OR BRONZE BODY/BRASS BALL CONSTRUCTION b. GLASS AND CARBON FILLED TFE SEAT RINGS c. ACCEPTABLE MANUFACTURERS: x BELL AND GOSSETT, TACO, ARMSTRONG 10. BALANCING VALVES SHALL BE DESIGNED TO PRESET BALANCE POINTS FOR PROPORTIONAL SYSTEM BALANCE PRIOR TO SYSTEM START UP. VALVES TO HAVE MEMORY STOP FEATURE TO ALLOW VALVE TO BE CLOSED FOR SERVICE AND THEN RE-OPENED TO SET POINT WITHOUT DISTURBING THE BALANCE POSITION. N. PIPING ACCESSORIES 1. PROVIDE THE FOLLOWING TYPES OF ACCESSORIES FOR HVAC APPLICATIONS, UNLESS NOTED OTHERWISE FOR SPECIFIC SYSTEMS: 2. STRAINERS (UP TO AND INCLUDING 2") a. SCREWED BRASS OR IRON BODY FOR 175 PSIG WORKING PRESSURE b. Y PATTERN WITH 1/32" STAINLESS STEEL PERFORATED SCREEN c. ACCEPTABLE MANUFACTURERS: x KECKLEY, WATTS, APOLLO, NIBCO, MILWAUKEE 3. THERMOMETERS a. FURNISH AND INSTALL AS REQUIRED FOR PROPER SYSTEM MONITORING AND ADJUSTMENT b. SELECT INSTRUMENT RANGE SO THE ORDINARY OPERATING CONDITION IS IN THE MIDDLE AREA OF THE INSTRUMENT SCALE c. STRAIGHT STEM TYPE IN SEPARABLE WELLS d. SWIVEL MOUNTING SET WITH POSITIVE LOCKING DEVICE, TO BE EASILY READ FROM THE FLOOR e. SIZE: 9" SCALE f. ACCEPTABLE MANUFACTURERS: x TRERICE, WEISS 6. PRESSURE GAUGES a. FURNISH AND INSTALL AS REQUIRED FOR PROPER SYSTEM MONITORING AND ADJUSTMENT b. SELECT INSTRUMENT RANGE SO THE ORDINARY OPERATING CONDITION IS IN THE MIDDLE AREA OF THE INSTRUMENT SCALE c. 3-1/2" DIAMETER, LIQUID FILLED, DIAL TYPE, PSI SCALE d. FRONT RE-CALIBRATION ADJUSTMENT e. MID SCALE ACCURACY: TWO PERCENT f. BLACK SCALE ON WHITE BACKGROUND g. ACCEPTABLE MANUFACTURERS: x TRERICE, WEISS, ASHCRAFT 7. PRESSURE GAUGE TAPPINGS a. GAGE COCK: TEE OR LEVER HANDLE, BRASS FOR MAXIMUM 150 PSIG. b. BALL VALVE: BRASS, 1/4" NPT FOR MINIMUM 150 PSIG. c. PULSATION DAMPER: PRESSURE SNUBBER, BRASS WITH 1/4" CONNECTIONS d. SYPHON: STEEL, SCHEDULE 40, 1/4" ANGLE OR STRAIGHT PATTERN. e. ACCEPTABLE MANUFACTURERS: x TRERICE, WEISS, ASHCRAFT 8. AIR VENTS a. MANUAL TYPE: SHORT VERTICAL SECTIONS OF 2" DIAMETER PIPE TO FROM AIR CHAMBER, WITH 1/8" BRASS NEEDLE VALVE AT TOP OF CHAMBER b. FLOAT TYPE: BRASS OR SEMI-STEEL BODY, COPPER, STAINLESS STEEL VALVE AND VALVE SEAT; SUITABLE FOR SYSTEM OPERATING TEMPERATURE AND PRESSURE; WITH ISOLATING VALVE c. WASHER TYPE: BRASS WITH HYDROSCOPIC FIBER DISCS, VENT PORTS, ADJUSTABLE CAP FOR MANUAL SHUT-OFF, AND INTEGRAL SPRING LOADED BALL CHECK VALVE. d. ACCEPTABLE MANUFACTURERS: x BELL AND GOSSETT, TACO, ARMSTRONG 9. REDUCERS a. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, INSTALL ALL SUPPLY PIPING TO COILS, PUMPS, AND OTHER EQUIPMENT INCLUDING VALVES AND STRAINERS THEREIN, AT LINE SIZE. IF A REDUCTION IS REQUIRED AT A PUMP, COIL, CONTROL VALVE, ETC. THE REDUCER SHALL BE INSTALLED ABUTTING THE INLET AND/OR OUTLET OF THE DEVICE. b. USE ECCENTRIC REDUCING FITTINGS OR ECCENTRIC REDUCING COUPLINGS WHERE REQUIRED TO PREVENT POCKETING OF LIQUID. c. WHERE ECCENTRIC REDUCERS ARE USED, THE STRAIGHT SIDE SHOULD BE INSTALLED ON TOP FOR PUMP SUCTION AND ON THE BOTTOM FOR ALL OTHER LINES. 10. INSTALL AIR VENTS AT HIGH POINTS IN MAINS, RISERS, BRANCH LINES, AND ELSEWHERE AS REQUIRED FOR SYSTEM VENTING. 11. INSTALL DRAIN VALVES AT LOW POINTS IN MAINS, RISERS, BRANCH LINES, AND ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE. DRAINS SHALL NOT BE LESS THAN 3/4". 12. RELIEF VALVES SHALL BE OF ASME CODE CONSTRUCTION AND MEET OR EXCEED LOCAL CODES AND ORDINANCES. 13. INSTALL UNIONS IN PIPING 2 INCHES AND SMALLER ADJACENT TO EACH VALVE AND AT FINAL CONNECTION TO EACH PIECE OF EQUIPMENT HAVING A 2-INCH OR SMALLER THREADED PIPE CONNECTION. 14. INSTALL FLANGES IN PIPING 2-1/2 INCHES AND LARGER ADJACENT TO FLANGED VALVES AND AT FINAL CONNECTION TO EACH PIECE OF EQUIPMENT HAVING FLANGED PIPE CONNECTION. 15. INSTALL DI-ELECTRIC WATERWAY FITTINGS TO CONNECT PIPING MATERIALS OF DISSIMILAR METALS. 16. INSTALL NONMETALLIC NON-SHRINK GROUT FOR MECHANICAL EQUIPMENT BASE BEARING SURFACES, PUMP AND OTHER EQUIPMENT BASE PLATES, AND ANCHORS. 17. PROVIDE CLEANING PORTS WITH VALVES AT CONVENIENT LOCATIONS TO FACILITATE CLEANING OF ALL NEW PIPING. O. PIPE HANGERS AND SUPPORTS 1. PROVIDE THE NECESSARY HANGERS AND ACCESSORIES FOR THE PROPER SUPPORT OF THE NEW PIPING, EQUIPMENT, ETC. ALL PIPING AND EQUIPMENT SHALL BE SUPPORTED FROM TOP CHORD OF ROOF/FLOOR JOISTS, OR PROVIDE STRUCTURAL CALCULATIONS INDICATING BOTTOM CHORD ATTACHMENT IS ACCEPTABLE. 2. ALL NEW HORIZONTAL PIPING SHALL BE SUPPORTED BY SPRING TYPE STEEL CLEVIS OR TRAPEZE HANGERS OR BRACKETS AT SUFFICIENT INTERVALS TO MAINTAIN A STRAIGHT LINE, BUT NOT TO EXCEED SPACING (INDICATED BELOW) ON CENTERS OF HANGERS IN ANY CASE, WITH A SEPARATE HANGER FOR EACH BRANCH. REFER TO DETAIL SHEETS FOR ADDITIONAL SUPPORT SPACING REQUIREMENTS. 3. ALL NEW VERTICAL PIPE RISERS SHALL BE ANCHORED MIDWAY OF THEIR HEIGHT, AND SHALL BE SUPPORTED AT EACH FLOOR BY 1-1/2" x 1/4" BAR CLAMPS ATTACHED TO PIPES AND RESTING ON THE FLOOR CONSTRUCTION. 4. WHERE INSULATED PIPE IS SUPPORTED, PROVIDE SADDLES, BLOCKS OR OTHER METHOD williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M5.01 NOTES: 1. CONTRACTOR SHALL USE TITUS BORDER TYPE 2A AND SHALL ASSURE THAT THE BORDER COVERS EXISTING DIFFUSER OPENING. 2. COLOR AND FINISH SHALL BE SELECTED BY ARCHITECT. 3. SURFACE MOUNTED FLANGED FRAME WITH SCREW FASTENING. 4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. 5. SCHEDULED MANUFACTURER AND MODEL SHALL BE BASE BID. HEAT PUMP CASSETTE (C) EQUIP. TAG GENERAL INFORMATION PERFORMANCE ELECTRICAL NOTES SERVICE LOCATION MFR MODEL TYPE REFRIGERANT TYPE OPERATING WEIGHT (LBS.) DIMENSIONS (IN.) PIPING CONNECTIONS FAN (HIGH / MED / LOW SPEEDS) COOLING MODE HEATING MODE RLA VOLTS HZ PHASE WIDTH DEPTH HEIGHT LIQUID (IN., O.D.) GAS (IN., O.D.) DRAIN (IN., I.D.) CFM SOUND PRESSURE dB(A) EAT TOTAL CAPACITY (MBH) POWER INPUT (KW) EAT r) CAPACITY (MBH) POWER INPUT (KW) DB r) WB r) BRIDGE BRIDGE SAMSUNG AM036 HEAT PUMP 4-WAY R410A 41 33.07 33.07 11.34 3 8 5 8 1 848, 777, 706 40, 37, 33 95 75 36 75 -10 40 75 0.56 208-230 60 1 SEE BELOW BRIDGE BRIDGE SAMSUNG AM036 HEAT PUMP 4-WAY R410A 41 33.07 33.07 11.34 3 8 5 8 1 848, 777, 706 40, 37, 33 95 75 36 75 -10 40 75 0.56 208-230 60 1 SEE BELOW BRIDGE BRIDGE SAMSUNG AM036 HEAT PUMP 4-WAY R410A 41 33.07 33.07 11.34 3 8 5 8 1 848, 777, 706 40, 37, 33 95 75 36 75 -10 40 75 0.56 208-230 60 1 SEE BELOW BRIDGE BRIDGE SAMSUNG AM036 HEAT PUMP 4-WAY R410A 41 33.07 33.07 11.34 3 8 5 8 1 848, 777, 706 40, 37, 33 95 75 36 75 -10 40 75 0.56 208-230 60 1 SEE BELOW NOTES: C B1 C B2 C B3 C B4 ENERGY RECOVERY UNIT - PLATE & FRAME HX (ERV) TAG GENERAL DATA DIMENSIONAL DATA (INCHES) FRESH AIR DATA EXHAUST AIR DATA ELECTRICAL DATA NOTES SERVICE LOCATION MFR MODEL ORIENTATION SHIPPING WEIGHT (LBS) OPERATING WEIGHT (LBS) FILTER TYPE QTY. L W H AIRFLOW (CFM) ESP (IN. WG) FILTER TEMP EFF % TOTAL EFF% SUMMER/ WINTER AIRFLOW (CFM) ESP (IN. WG) FILTER TEMP EFF% TOTAL EFF% SUMMER/ WINTER FLA MCA MOCP VOLTS HZ PHASE BRIDGE BRIDGE ROOFTOP RENEWAIRE HE1XRT HORIZONTAL 425 330 MERV8 2 81 40.25 42.25 500 1.45 MERV 8 76 67 / 57 700 1.0 MERV 8 72 64 / 52 1.15 2.6 15 460 60 3 SEE BELOW NOTES: ERV 1 1. FRESH AIR FAN AND EXHAUST FAN TO INCLUDE SEPARATE ECM MOTORS. 2. UNIT TO BE MOUNTED ON STANDARD 14" ROOF CURB (MANUFACTURER PROVIDED). 3. ALL CAPACITIES ARE BASED ON MEDIUM SPEEDS. 4. PROVIDE WITH CODE REQUIRED DISCONNECT SWITCH. 5. FURNISH AND INSTALL STARTER ON SUPPLY AND EXHAUST FANS. 6. PROVIDE WITH MEANS OF LOCALLY ADJUSTING FAN SPEEDS. 7. ARCHITECTURAL SCREENING TO BE ATTACHED TO UNIT PER SCREENING MANUFACTURER'S SPECIFICATIONS. 1. FURNISH WITH CONDENSATE PUMP (MANUFACTURER PROVIDED). 2. COLOR AND FINISH SHALL BE SELECTED BY ARCHITECT. 3. HANG FROM STRUCTURE ABOVE PER MANUFACTURER'S GUIDELINES. 4. PROVIDE WITH BACNET INTERFACE. COORDINATE WITH THE BASC AS REQUIRED. 5. SCHEDULED MANUFACTURER AND MODEL SHALL BE BASE BID. ALTERNATE MANUFACTURERS INCLUDE: LG, LENNOX, MISTUBISHI AND SANYO. *MFG. TO BE SAME AS OUTDOOR CONDENSING UNIT MFG. 6. BASC SHALL PROVIDE ENABLE/DISABLE, SPACE TEMP (ADJ. VIA BAS), GENERAL ALARM, HEATING/COOLING MODE. 7. PROVIDE WITH DISCONNECT. 8. PROVIDE ALL REQUIRED CONDUIT AND WIRING FOR ALL CONTROLS FOR A FULLY FUNCTIONING SYSTEM. HOT WATER UNIT CABINET HEATER SCHEDULE (CUH) TAG GENERAL DATA DIMENSIONAL DATA (INCHES) HOT WATER HEATING COIL DATA (2-ROW COIL) FAN DATA ELECTRICAL DATA NOTES SERVICE LOCATION MFR MODEL SHIPPING WEIGHT (LBS) INLET/ OUTLET MOUNTING L W H MBH LWT r) EWT r) GPM WATER P.D. (FT) HP RPM (HIGH) AIRFLOW (CFM) FLA MCA MOP WATTS VOLTS HZ PHASE WEST ENTRANCE VESTIBULE WEST ENTRANCE VESTIBULE ZEHNDER RITTLING RFRW-08 155 OPEN IN, LVR OUT WALL, FULL RECESS 68.2 10.0 26.4 86.6 180.0 200.0 9.0 2.2 30.0 1150 810 1.73 2.2 15 200 120 60 1 SEE BELOW EAST ENTRANCE VESTIBULE EAST ENTRANCE VESTIBULE ZEHNDER RITTLING RFRW-08 155 OPEN IN, LVR OUT WALL, FULL RECESS 68.2 10.0 26.4 86.6 180.0 200.0 9.0 2.2 30.0 1150 810 1.73 2.2 15 200 120 60 1 SEE BELOW NOTES: 1. FURNISH WITH FACTORY MOUNTED DISCONNECT SWITCHES. 2. CONTRACTOR TO DETERMINE RIGHT HAND OR LEFT HAND PIPING CONNECTION BASED ON LOCATION OF EXISTING PIPING. 3. PROVIDE WITH FACTORY PROGRAMMABLE THERMOSTAT WHICH MEETS CURRENT CODE REQUIREMENTS. 4. PROVIDE WITH FACTORY STANDARD FINISHES AND COLOR. CUH R11 CUH R12 SINGLE DUCT TERMINAL UNIT SCHEDULE (VAV) TAG AHU TAG ROOM MODEL SIZE CFM STATIC PRESSURE NC LEVELS HOT WATER HEAT COIL HAND Unit Outlet Max Min Inlet Down Min Rad Dis CFM MBH EAT EWT LAT LWT Apd GPM WPd Rows FPI AHU-R10 1102 DESV 08 12x10 700 350 1 0.3 0.31 22 20 350 13.3 55 140 90 121.3 0.29 1.4 0.34 2-RH 10 RH AHU-R11 2201 DESV 06 12x8 320 160 1 0.3 0.21 18 16 160 6.8 55 140 94.3 123.4 0.13 0.8 0.14 2-RH 10 RH Notes: 1. SELECTIONS ARE BASED ON TITUS AS MANUFACTURER. 2. ALL PERFORMANCE BASED ON TESTS CONDUCTED IN ACCORDANCE WITH ASHRAE 130-2008 AND AHRU 880-2008. 3. ALL NC LEVELS DETERMINED USING AHRI 885-2008 APPENDIX E. 4. ALL AIRFLOW, PRESSURE LOSSES AND HEATING PERFORMANCE VALUES HAVE BEEN CORRECTED FOR ALTITUDE. 81,762)0($685(',0(16,216 ,1 $,5)/2: &)0 :$7(5)/2: *30 $,535(6685( ,1:* :$7(5+($'/266(6 )7 $1'7(03(5$785(6 ƒ) 6. WATER PRESSURE DROP (WPD) UNITS IS IN FT. WATER. TB R14 TB R15 RADIANT CEILING PANEL EQUIP TAG. LOCATION MFR PANEL TYPE, INSTALLALTION DESCRIPTION NOMINAL WIDTH (IN) ACTIVE LENGTH (FT) COIL PASSES OUTPUT (BTUH/FT) FLOW RATE (GPM) PRESSURE DROP (FT) MIN. FLOW RATE (GPM) ˂7 r) MEAN WATER 7(03 r) # OF CIRCUITS NOTES WEST SECURITY DESK STERLING RCP1, T-BAR LINEAR 42.0 13.0 7 674 0.76 0.69 0.27 20.0 175.0 1 SEE BELOW EAST SECURITY DESK STERLING RCP1, T-BAR LINEAR 42.0 10.5 7 674 0.76 0.69 0.27 20.0 175.0 1 SEE BELOW NOTES: RP R10 RP R11 1. MANUFACTURER MUST BE ABLE TO PROVIDE CEILING PANEL WITH SIMILAR STYLE AS EXISTING POOL RADIANT CEILING PANELS. 2. PROVIDE 1" FOIL DENSITY BATT TYPE INSULATION AFTER INSTALLATION, CONNECTIONS AND TESTING HAVE BEN COMPLETED. 3. PLACE INSULATION FOIL FACE DOWN TO PANEL. 4. PROVIDE TRIM PIECE TO IN FILL BETWEEN PANEL AND MOLLION. 5. RP-R10 FINISH TO BE WHITE TO MATCH NEW CEILING. COORDINATE COLOR SAMPLES FROM USG. 6. RP-R11 FINISH TO BE SATIN SILVER TO MATCH NEW CEILING. COORDINATE COLOR SAMPLES FROM USG. 7. REFER TO DETAILS FOR PIPING TRIM. williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M4.01 127(,167$//r,168/$7,213527(&7,21 SHIELDS AT ALL PIPING SECURED WITH U-BOLTS AND U-CLAMPS. PROVIDE HIGH DENSITY INSULATION SUPPORTS AT ALL CLEVIS HANGERS, SUPPORTS, AND TRAPEZE HANGERS. PROVIDE STEEL PIPE INSULATION SADDLES ON ALL PIPES SUPPORTED BY ROLLERS. STEEL CHANNEL OR ANGLE IRON ROLLER CHAIR SUPPORT STEEL PIPE SADDLE FOR HEATING PIPING. WOOD SADDLE ON CHILLED WATER PIPE r0(7$/3,3(&29(5 MIN. 8" LONG AT U-BOLTS AND U-CLAMPS HIGH DENSITY INSULATION SUPPORT NUT SCALE: NO SCALE 5 PIPE COVERING PROTECTION SHIELDS AND PIPE SADDLES PIPE SIZE LENGTH "L" GA. 3/4" TO MIN. 2" 12" 18 2-1/2" TO 4" 12" 16 5" TO 6" 18" 16 8" AND UP 24" 14 LOCKING NUT SUPPORT NUT VAPOR BARRIER JACKET STEEL HANGER ROD (SEE SCHEDULE) SUPPORT FROM STEEL BEAM, JOIST OF CHANNEL IRON BETWEEN JOISTS (TYP.) CONTRACTOR SHALL PROVIDE CLEVIS HANGER OF SIZE TO FIT AROUND PIPE COVER O.D. STEEL HANGER ROD (SEE SCHEDULE) SUPPORT FROM STEEL BEAM, JOIST OF CHANNEL IRON BETWEEN JOISTS (TYP.) CONTRACTOR SHALL PROVIDE CLEVIS HANGER OF SIZE TO FIT AROUND PIPE COVER O.D. WATER PIPE BLOCKING OF HIGH DENSITY RIGID INSULATION BLOCKING OF HIGH DENSITY RIGID INSULATION PIPE INSULATION (SEE SPECIFICATIONS) SHEET METAL PIPE SHIELDS AT ALL CLEVIS HANGERS AND TRAPEZE SUPPORTS PIPE INSULATION (SEE SPECIFICATIONS) STEEL PIPE SADDLE (TYP.) SADDLES FOR PIPES 2" THRU 10" SADDLES FOR PIPES 12" & LARGER (STEEL PIPE SADDLES AT PIPE ROLLERS) 127(,167$//r,168/$7,213527(&7,21 SHIELDS AT ALL PIPING SECURED WITH U-BOLTS AND U-CLAMPS. PROVIDE HIGH DENSITY INSULATION SUPPORTS AT ALL CLEVIS HANGERS, SUPPORTS, AND TRAPEZE HANGERS. PROVIDE STEEL PIPE INSULATION SADDLES ON ALL PIPES SUPPORTED BY ROLLERS. r STEEL PIPE SADDLES GALVANIZED STEEL SHEET METAL PIPE SHIELD BY INSULATION INSTALLER 8" MIN. L 2" MIN. 12" 4 SCALE: NO SCALE PIPE CURB ASSEMBLY DETAIL 3-1/2" PIPE COLLARS PLAN ELEVATION CURB COVER ELECTRICAL CONDUITS, REFRIGERANT PIPING, RELIEF PIPING, OR SIMILAR BOOT CLAMPS 4 CURB COVER PENETRATIONS PER CURB REFER TO ARCHITECTURAL PLANS FOR ROOF CONSTRUCTION INFORMATION 1 CURB BY THYCURB DECK BASE PLATE WOOD NAILER ROOF FLASHING PREFABRICATED COUNTER FLASHING SCALE: NO SCALE ROOF EQUIPMENT CURB 2 SEQUENCE OF OPERATIONS HEAT PUMP AND EXISTING FIN TUBE RADIATION A. DESCRIPTION 1. EXISTING FIN TUBE RADIATION: FOUR (4) PERIMETER HEATING UNITS PROVIDE ADDITIONAL HEAT TO THE BRIDGE. 2. NEW HEAT PUMPS: FOUR (4) NEW HEAT PUMP CASSETTES SERVED BY AN OUTDOOR UNIT WILL HAVE THE ABILITY TO HEAT OR COOL THE BRIDGE. B. TEMPERATURE CONTROL - LOCAL THERMOSTAT OR BAS 1. COOLING: a. HEAT PUMP WILL BE ONLY SOURCE OF COOLING. BAS SHALL ENABLE HEAT PUMP AND DISABLE FIN TUBE RADIATION. b. ,1,7,$/&22/,1*6(732,172)r) ADJUSTABLE VIA BAS.: 2. HEATING: a. FIN TUBE RADIATION WILL MODULATE CONTINUOUSLY DURING OCCUPIED HEATING SEASON. WHEN FIN TUBE RADIATION FALLS r)%(/2:6(732,17)250,187(6+($7 PUMP SHALL ENABLE AND RUN TO MEET SETPOINT. E,1,7,$/+($7,1*6(732,172)r) ADJUSTABLE VIA BAS. SCALE: NO SCALE BRIDGE SEQUENCE OF OPERATIONS 6 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M3.02 8" LIQUID PIPE CONNECTION BOTTOM VIEW DRAIN PIPE CONNECTION TOP VIEW SUSPENSION CONNECTIONS SIDE VIEW SCALE: NO SCALE HEAT PUMP CASSETTE DETAIL 2 4" FRESH AIR INTAKE AIR OUTLET LOUVER (x4) AIR INLET GRILLE LINEAR BAR AIR OUTLET ENERGY RECOVERY VENTILATOR (ERV) 1 SCALE: NO SCALE NOTES: 1. EXHAUST FAN, FRESH AIR FAN AND PLATE AND FRAME HX COMPARTMENTS INCLUDED WITH ACCESS DOORS. 2. INSTALL TYPE RTV CONFIGURATION. 3. INSTALL ON ROOF CURB (NOT SHOWN). 4. CONTROLS CONTRACTOR TO OPERATE SUPPLY AND EXHAUST FANS ON A TIMER. TIMER SHALL BE ADJUSTABLE VIA FINAL GRAPHICS. INITIAL RUN HOURS SHALL BE FROM 5:00AM - 10:00PM DAILY. THE TIMER SHALL BE A 7 DAY PROGRAMMABLE TIMER. E-BOX FOR FRESH AIR AND EXHAUST FANS SUSPENSION CONNECTIONS (x4) OUTSIDE AIR FAN FAN EXHAUST AIR FAN PLATE & FRAME HX CROSS FLOW EXISTING SUPPLY PLENUM TO REMAIN FRESH AIR INTAKE EXHAUST DUCT TO EXTEND BEFORE TERMINATION INSTALLED FRESH AIR TO SPACE RETURN AIR FROM SPACE UNION (TYP.) REDUCER / INCREASER AS REQUIRED (TYP.) BALANCING VALVE ISOLATION BALL VALVE (TYP.) MANUAL AIR VENT 3/4" HOT WATER PIPING THRU WALL INTO BACK OF UNIT HOT WATER HEATING COIL T BAS THERMOSTAT BOTTOM FRONT RETURN INLET RECESSED WALL UNIT, REMOVE NECESSARY WALL TO ACCOMMODATE NEW CUH TOP FRONT SUPPLY DISCHARGE FLANGE SCALE: NO SCALE FULLY RECESSED WALL CUH RADIANT CEILING PANEL 7 6 SCALE: NO SCALE SCALE: NO SCALE FLEXIBLE CONNECTION DETAIL CONNECT WITH FLEXIBLE DUCT TO COLLAR WITH 22 GA. CLAMP AND FOUR SHEET METAL SCREWS AND SEAL WITH DUCT TAPE FLEXIBLE DUCT. SEE PLANS FOR SIZE. MAXIMUM OF 1'-0" LENGTH 3 HEAT PUMP CASSETTE OA DUCT CONNECTION HW SUPPLY HW RETURN HW SUPPLY HW RETURN 7 ROW RADIANT PANEL COPPER LOOP SUPPLY TRIM UNION PIPE REDUCER ISOLATION VALVE RETURN TRIM UNION PIPE REDUCER 2-WAY MOD. CONTROL VALVE ISOLATION VALVE 1" HWS HEADER 1" HWR HEADER 42" PANEL NOTES: 1. EXACT LOCATION AND MOUNTING HEIGHT TO BE DETERMINED ON SITE. 2. BASC SHALL CONTROL EXISTING BASEBOARD SO AS TO NOT CONFLICT WITH HEAT PUMP COOLING. UTILIZE BASEBOARD AS FIRST SOURCE OF HEAT BEFORE OPERATING HEAT PUMP IN HEATING. HOSE BIB VALVED DRAIN NOTES: 1. NEW CUH TO BE CONTROLLED VIA BAS. 2. BAS TO CONTROL BOTH THE FAN AND 2-POSITION CONTROL VALVE. HWS HWR HOT WATER REHEAT COIL PRIMARY AIR IN SUPPLY AIR OUT CFM PRIMARY AIRFLOW (CFM) HOT WATER VALVE MODULATION (%) MOD MOD PRIMARY AIR DAMPER COMMAND (%) PRIMARY AIR DAMPER POSITION (%) MOD T DISCHARGE AIR TEMPERATURE r) T SPACE TEMPERATURE r) CO2 SPACE CO2 (PPM) REMOTE SENSORS SCALE: NO SCALE VAV CONTROLS DIAGRAM 5 AUTOMATED LOGIC CONTROL VALVE PROVIDE ALL PIPE TRIM AS RECOMMENDED BY MANUFACTURER. VALVED DRAIN MANUAL AIR VENT williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M3.01 UNDER THIS CONTRACTOR'S WORK. C. CONTRACTOR SHALL VISIT THE BUILDING, BEFORE SUBMITTING HIS BID, TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS WHICH MAY AFFECT HIS WORK. D. BEFORE STARTING ANY DEMOLITION WORK ON HVAC EQUIPMENT WHICH HAS AN ELECTRICAL CONNECTION AND IS INDICATED TO BE REMOVED, THIS CONTRACTOR SHALL MEET WITH ELECTRICAL CONTRACTOR TO IDENTIFY ALL SUCH EQUIPMENT. ELECTRICAL CONTRACTOR SHALL DISCONNECT THE POWER TO EACH UNIT AND REMOVE CONDUIT, WIRING, DISCONNECT SWITCHES, AND STARTERS UNDER THIS CONTRACT. THIS CONTRACTOR SHALL REMOVE ALL EQUIPMENT, ELECTRICAL TEMPERATURE CONTROL WIRING, AND CONDUIT UNDER THIS CONTRACT. E. CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN CLEANUP THROUGHOUT THE COURSE OF THE DEMOLITION WORK. F. NO EQUIPMENT, PIPING, VALVES, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, ONE (1) WEEK ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER. SHUTDOWNS SHALL BE A MAXIMUM OF EIGHT (8) HOURS UNLESS OTHERWISE INDICATED. G. ALL EQUIPMENT, MATERIAL, ETC. THAT IS BEING DEMOLISHED WILL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. ALL SUCH ITEMS WILL BE REMOVED FROM THE BUILDING SITE BY THE CONTRACTOR IN A PROPER AND LEGAL MANNER. NO ITEM WHICH IS BEING REMOVED UNDER THE DEMOLITION CONTRACT MAY BE REUSED UNDER THE NEW WORK CONTRACT UNLESS NOTED ON THE DRAWINGS. ALL ITEMS TO BE TURNED OVER TO THE OWNER SHALL BE STORED PER THE OWNER'S INSTRUCTION. H. SEQUENCE OF ALL DEMOLITION WORK SHALL BE IN STRICT ACCORDANCE WITH THE CONTRACT DOCUMENTS AND/OR AS DIRECTED BY THE ENGINEER. ALL SHUTDOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE OWNER. I. COORDINATE USE OF THE BUILDING ELEVATORS AND ALL MATERIAL DELIVERIES WITH THE OWNER. J. IF ANY ISOLATION VALVES SHOULD FAIL DURING DEMOLITION, OTHER THAN THOSE CALLED OUT TO BE REPLACED, THIS CONTRACTOR SHALL REPAIR/REPLACE THE VALVE AND SUBMIT A CHANGE ORDER REQUEST FOR APPROVAL. K. THE CONTRACTOR PERFORMING THE DEMOLITION WORK SHALL REMOVE NO MORE THAN 8" OF BUILDING MATERIAL AROUND EACH DEVICE BEING DEMOLISHED. PROVIDE PATCHING AS REQUIRED FOR FINISHED WORK. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER OR ENGINEER PRIOR TO PERFORMING REMOVAL OF MATERIAL FROM EXISTING BUILDING CONSTRUCTION. L. CONTRACTOR SHALL PROTECT ALL WINDOWS AND SURFACES DURING DEMOLITION. ANY COSTS INCURRED BY DAMAGE FROM CUTTING TORCHES, SPARKS, HEAT, OR OTHER DEMOLITION PROCEDURES WILL NOT BE THE RESPONSIBILITY OF THE OWNER. M. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIAL REQUIRED TO PATCH ALL OPENINGS IN EXISTING WALLS, FLOORS, AND FIRE SEPARATIONS CREATED BY THE REMOVAL OF EACH TRADE'S MATERIAL AND EQUIPMENT WHERE THESE OPENINGS ARE NOT TO BE REUSED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AT AREAS THAT MECHANICAL EQUIPMENT WAS REMOVED BACK TO ITS ORIGINAL CONDITION INCLUDING ALL DRYWALL, PLASTER, PAINTING, ETC. CONTRACTOR SHALL EMPLOY TRADES EXPERIENCED IN GENERAL CONSTRUCTION TO PATCH ALL OPENINGS. TOOTH IN MASONRY USING WHOLE UNITS TO MATCH EXISTING MASONRY CONSTRUCTION. N. EXISTING PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS NOT SHOWN SHALL REMAIN UNLESS INDICATED TO BE DEMOLISHED ON THE MECHANICAL AND ELECTRICAL PLANS. INSTALLATION OF NEW EQUIPMENT MAY NECESSITATE THE REROUTING OF EXISTING SYSTEMS TO REMAIN. COORDINATE WITH ENGINEER AND OWNER. 1. ROUTE REFRIGERANT GAS AND REFRIGERANT LIQUID LINES STRAIGHT DOWN THROUGH ROOF. REFRIGERANT GAS AND LIQUID PIPING DROP THROUGH CEILING TO MAINTAIN SERVICE CLEARANCE OF AT LEAST 36" FROM ENERGY RECOVERY UNIT. 2. INSTALL NEW CONTROL VALVE ACTUATOR AS REQUIRED FOR EXISTING BASEBOARD HEATERS. 3. REFRIGERANT GAS, REFRIGERANT LIQUID AND DRAIN PIPE ROUTING SHALL NOT INTERFERE WITH NEW SUPPLY DUCT AND NEW FLEX DUCT CONNECTIONS. ALL PIPING TO BE INDEPENDENTLY SUPPORTED FROM OTHER TRADES. 4. ROUTE CONDENSATE DRAIN PIPE TO NEAREST FLOOR DRAIN IN NEARBY ELECTRICAL ROOM 2221. SLOPE CONDENSATE PIPING TOWARDS DRAIN 1 8" : 1' AS POSSIBLE. 5. NEW 3 4" HWS/R LINE TO TB-R16. 6. REFER TO DUCTWORK DRAWINGS FOR SCREENING TO BE INSTALLED AROUND NEW UNIT. 7. NEW HOT WATER SUPPLY AND RETURN TO BE TIED INTO EXISTING 4" LINES. FURNISH VAV TERMINAL UNIT WITH 2-WAY MODULATING CONTROL VALVE. REFER TO DETAILS FOR MORE INFORMATION. 8. CONDENSATE PIPE SHALL NOT BE ROUTED OVER ANY ELECTRICAL EQUIPMENT. 9. NE WCONDENSATE PIPE TO PENETRATE WALL. PIPING SHALL BE ROUTED ABOVE EXISTING LOBBY CEILING. 10. INSTALL NEW THERMOSTAT IN PLACE OF EXISTING TO CONTROL BASEBOARD HEAT. 11. MODIFY ROOFING AS REQUIRED. MAINTAIN ALL EXISTING ROOFING WARRANTIES. 12. INSTALL CU-B1 ON NEW EQUIPMENT RAILS. KEYED MECHANICAL NEW WORK NOTES # williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M2.02 CHASE ELEV. MECH TB-1203 TB-R1209-FP TB-R1211-FP TB-R1202 HWR HWS 1 HWR HWS 2 4.9 GPM 1" T NIC NIC HWR HWS 7 GPM 1 1/4" 5 T 6 11.9 GPM 1 1/4" 3 4" 3 4" 3 4" 1" 1 1/4" 7 8 7 SCALE: SCALE: 2 PIPING 1/8' = 1'-0" NEW WORK - EAST LOBBY 1 PIPING 1/8" = 1'-0" NEW WORK - WEST LOBBY GENERAL NEW PIPING CONSTRUCTION NOTES A. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. B. ALL DEMOLITION OF THE HVAC SYSTEM AS CALLED FOR ON THE DEMOLITION DRAWINGS SHALL BE UNDER THIS CONTRACTOR'S WORK. C. CONTRACTOR SHALL VISIT THE BUILDING, BEFORE SUBMITTING HIS BID, TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS WHICH MAY AFFECT HIS WORK. D. BEFORE STARTING ANY DEMOLITION WORK ON HVAC EQUIPMENT WHICH HAS AN ELECTRICAL CONNECTION AND IS INDICATED TO BE REMOVED, THIS CONTRACTOR SHALL MEET WITH ELECTRICAL CONTRACTOR TO IDENTIFY ALL SUCH EQUIPMENT. ELECTRICAL CONTRACTOR SHALL DISCONNECT THE POWER TO EACH UNIT AND REMOVE CONDUIT, WIRING, DISCONNECT SWITCHES, AND STARTERS UNDER THIS CONTRACT. THIS CONTRACTOR SHALL REMOVE ALL EQUIPMENT, ELECTRICAL TEMPERATURE CONTROL WIRING, AND CONDUIT UNDER THIS CONTRACT. E. CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN CLEANUP THROUGHOUT THE COURSE OF THE DEMOLITION WORK. F. NO EQUIPMENT, PIPING, VALVES, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, ONE (1) WEEK ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER. SHUTDOWNS SHALL BE A MAXIMUM OF EIGHT (8) HOURS UNLESS OTHERWISE INDICATED. G. ALL EQUIPMENT, MATERIAL, ETC. THAT IS BEING DEMOLISHED WILL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. ALL SUCH ITEMS WILL BE REMOVED FROM THE BUILDING SITE BY THE CONTRACTOR IN A PROPER AND LEGAL MANNER. NO ITEM WHICH IS BEING REMOVED UNDER THE DEMOLITION CONTRACT MAY BE REUSED UNDER THE NEW WORK CONTRACT UNLESS NOTED ON THE DRAWINGS. ALL ITEMS TO BE TURNED OVER TO THE OWNER SHALL BE STORED PER THE OWNER'S INSTRUCTION. H. SEQUENCE OF ALL DEMOLITION WORK SHALL BE IN STRICT ACCORDANCE WITH THE CONTRACT DOCUMENTS AND/OR AS DIRECTED BY THE ENGINEER. ALL SHUTDOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE OWNER. I. COORDINATE USE OF THE BUILDING ELEVATORS AND ALL MATERIAL DELIVERIES WITH THE OWNER. J. IF ANY ISOLATION VALVES SHOULD FAIL DURING DEMOLITION, OTHER THAN THOSE CALLED OUT TO BE REPLACED, THIS CONTRACTOR SHALL REPAIR/REPLACE THE VALVE AND SUBMIT A CHANGE ORDER REQUEST FOR APPROVAL. K. THE CONTRACTOR PERFORMING THE DEMOLITION WORK SHALL REMOVE NO MORE THAN 8" OF BUILDING MATERIAL AROUND EACH DEVICE BEING DEMOLISHED. PROVIDE PATCHING AS REQUIRED FOR FINISHED WORK. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER OR ENGINEER PRIOR TO PERFORMING REMOVAL OF MATERIAL FROM EXISTING BUILDING CONSTRUCTION. L. CONTRACTOR SHALL PROTECT ALL WINDOWS AND SURFACES DURING DEMOLITION. ANY COSTS INCURRED BY DAMAGE FROM CUTTING TORCHES, SPARKS, HEAT, OR OTHER DEMOLITION PROCEDURES WILL NOT BE THE RESPONSIBILITY OF THE OWNER. M. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIAL REQUIRED TO PATCH ALL OPENINGS IN EXISTING WALLS, FLOORS, AND FIRE SEPARATIONS CREATED BY THE REMOVAL OF EACH TRADE'S MATERIAL AND EQUIPMENT WHERE THESE OPENINGS ARE NOT TO BE REUSED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AT AREAS THAT MECHANICAL EQUIPMENT WAS REMOVED BACK TO ITS ORIGINAL CONDITION INCLUDING ALL DRYWALL, PLASTER, PAINTING, ETC. CONTRACTOR SHALL EMPLOY TRADES EXPERIENCED IN GENERAL CONSTRUCTION TO PATCH ALL OPENINGS. TOOTH IN MASONRY USING WHOLE UNITS TO MATCH EXISTING MASONRY CONSTRUCTION. N. EXISTING PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS NOT SHOWN SHALL REMAIN UNLESS INDICATED TO BE DEMOLISHED ON THE MECHANICAL AND ELECTRICAL PLANS. INSTALLATION OF NEW EQUIPMENT MAY NECESSITATE THE REROUTING OF EXISTING SYSTEMS TO REMAIN. COORDINATE WITH ENGINEER AND OWNER. 1. MOUNT NEW CABINET UNIT HEATER FULLY RECESSED IN BRICK WALL IN PLACE OF OLD UNIT HEATER. REFER TO ARCHITECTURAL DRAWINGS FOR WALL MODIFICATIONS FOR CUH AND PIPE/CONDUIT ROUTINGS. ASSURE THAT PIPING ACCESS SECTION IS ON THE SIDE MOST APPROPRIATE TO ACCOMMODATE HOT WATER PIPING. NO PIPING OR CONDUIT WILL BE EXPOSED TO THE VESTIBULE. 2. EXACT ROUTING OF NEW HOT WATER SUPPLY AND RETURN LINES TO BE DETERMINED ON SITE. 3. CONNECT NEW 3/4" HOT WATER PIPING TO NEW VAV BOX. PIPING TO BE FURNISHED WITH A TWO-WAY MODULATING CONTROL VALVE. INSTALL NEW VAV BOX AND PIPING SO THAT IT DOES NOT INTERFERE WITH EXISTING MECHANICAL, ELECTRICAL OR FIRE PROTECTION EQUIPMENT. REFER TO DETAILS SHEET FOR MORE INFORMATION. 4. NEW RADIANT CEILING PANEL SHALL BE INSTALLED IN CEILING ABOVE NEW SECURITY DESK AREA. ROUTE NEW 1 1 4" HOT WATER SUPPLY AND RETURN PIPING OVER RADIANT CEILING PANEL AT FRONT DESK. HOT WATER SUPPLY AND RETURN BRANCH PIPING SERVING RADIANT CEILING PANEL TO DROP DOWN AND CONFIGURED SO THAT HOT WATER IS SUPPLIED AND RETURNED PER MANUFACTURER'S SPECIFICATIONS. EXACT LOCATION AND ORIENTATION TO BE DETERMINED ON SITE. 5. NEW THERMOSTAT TO CONTROL BOTH NEW VAV BOX AND NEW CUH. EXACT ROUTING OF CONDUIT AND WIRE TO BE DETERMINED ON SITE WITH ARCHITECT AND ENGINEER. 6. NEW THERMOSTAT TO CONTROL NEW RADIANT CEILING. EXACT ROUTING OF CONDUIT AND WIRE TO BE DETERMINED ON SITE WITH ARCHITECT AND ENGINEER. 7. REFER TO ARCHITECTURAL DRAWINGS FOR ROUTING OF PIPING WITHIN VESTIBULE AND EXACT LOCATION OF CUH. 8. PROVIDE ISOLATION VALVES AT NEW CONNECTION TO EXISTING. KEYED MECHANICAL NEW WORK NOTES # williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M2.01 EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. B. ALL DEMOLITION OF THE HVAC SYSTEM AS CALLED FOR ON THE DEMOLITION DRAWINGS SHALL BE UNDER THIS CONTRACTOR'S WORK. C. CONTRACTOR SHALL VISIT THE BUILDING, BEFORE SUBMITTING HIS BID, TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS WHICH MAY AFFECT HIS WORK. D. BEFORE STARTING ANY DEMOLITION WORK ON HVAC EQUIPMENT WHICH HAS AN ELECTRICAL CONNECTION AND IS INDICATED TO BE REMOVED, THIS CONTRACTOR SHALL MEET WITH ELECTRICAL CONTRACTOR TO IDENTIFY ALL SUCH EQUIPMENT. ELECTRICAL CONTRACTOR SHALL DISCONNECT THE POWER TO EACH UNIT AND REMOVE CONDUIT, WIRING, DISCONNECT SWITCHES, AND STARTERS UNDER THIS CONTRACT. THIS CONTRACTOR SHALL REMOVE ALL EQUIPMENT, ELECTRICAL TEMPERATURE CONTROL WIRING, AND CONDUIT UNDER THIS CONTRACT. E. CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN CLEANUP THROUGHOUT THE COURSE OF THE DEMOLITION WORK. F. NO EQUIPMENT, PIPING, VALVES, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, ONE (1) WEEK ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER. SHUTDOWNS SHALL BE A MAXIMUM OF EIGHT (8) HOURS UNLESS OTHERWISE INDICATED. G. ALL EQUIPMENT, MATERIAL, ETC. THAT IS BEING DEMOLISHED WILL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. ALL SUCH ITEMS WILL BE REMOVED FROM THE BUILDING SITE BY THE CONTRACTOR IN A PROPER AND LEGAL MANNER. NO ITEM WHICH IS BEING REMOVED UNDER THE DEMOLITION CONTRACT MAY BE REUSED UNDER THE NEW WORK CONTRACT UNLESS NOTED ON THE DRAWINGS. ALL ITEMS TO BE TURNED OVER TO THE OWNER SHALL BE STORED PER THE OWNER'S INSTRUCTION. H. SEQUENCE OF ALL DEMOLITION WORK SHALL BE IN STRICT ACCORDANCE WITH THE CONTRACT DOCUMENTS AND/OR AS DIRECTED BY THE ENGINEER. ALL SHUTDOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE OWNER. I. COORDINATE USE OF THE BUILDING ELEVATORS AND ALL MATERIAL DELIVERIES WITH THE OWNER. J. IF ANY ISOLATION VALVES SHOULD FAIL DURING DEMOLITION, OTHER THAN THOSE CALLED OUT TO BE REPLACED, THIS CONTRACTOR SHALL REPAIR/REPLACE THE VALVE AND SUBMIT A CHANGE ORDER REQUEST FOR APPROVAL. K. THE CONTRACTOR PERFORMING THE DEMOLITION WORK SHALL REMOVE NO MORE THAN 8" OF BUILDING MATERIAL AROUND EACH DEVICE BEING DEMOLISHED. PROVIDE PATCHING AS REQUIRED FOR FINISHED WORK. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER OR ENGINEER PRIOR TO PERFORMING REMOVAL OF MATERIAL FROM EXISTING BUILDING CONSTRUCTION. L. CONTRACTOR SHALL PROTECT ALL WINDOWS AND SURFACES DURING DEMOLITION. ANY COSTS INCURRED BY DAMAGE FROM CUTTING TORCHES, SPARKS, HEAT, OR OTHER DEMOLITION PROCEDURES WILL NOT BE THE RESPONSIBILITY OF THE OWNER. M. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIAL REQUIRED TO PATCH ALL OPENINGS IN EXISTING WALLS, FLOORS, AND FIRE SEPARATIONS CREATED BY THE REMOVAL OF EACH TRADE'S MATERIAL AND EQUIPMENT WHERE THESE OPENINGS ARE NOT TO BE REUSED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AT AREAS THAT MECHANICAL EQUIPMENT WAS REMOVED BACK TO ITS ORIGINAL CONDITION INCLUDING ALL DRYWALL, PLASTER, PAINTING, ETC. CONTRACTOR SHALL EMPLOY TRADES EXPERIENCED IN GENERAL CONSTRUCTION TO PATCH ALL OPENINGS. TOOTH IN MASONRY USING WHOLE UNITS TO MATCH EXISTING MASONRY CONSTRUCTION. N. EXISTING PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS NOT SHOWN SHALL REMAIN UNLESS INDICATED TO BE DEMOLISHED ON THE MECHANICAL AND ELECTRICAL PLANS. INSTALLATION OF NEW EQUIPMENT MAY NECESSITATE THE REROUTING OF EXISTING SYSTEMS TO REMAIN. COORDINATE WITH ENGINEER AND OWNER. GENERAL MECHANICAL CONSTRUCTION NOTES 1. ENERGY RECOVERY UNIT (ERV-B1) TO BE MOUNTED ON NEW 14" ROOF CURB WITH FRESH AIR AND EXHAUST AIR DUCTWORK PENETRATIONS. FRESH AIR AND EXHAUST AIR DUCTWORK DROPS STRAIGHT DOWN THROUGH ROOF BELOW ERV. DASHED LINES REPRESENT ERV ROOF CURB, PENETRATIONS, AND DROP DUCTWORK. MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES. REFER TO MANUFACTURER'S CUT SHEET FOR SPECIFIC DIMENSIONAL DATA. COORDINATE ROOF PENETRATIONS WITH EXISTING STRUCTURE. EXISTING STRUCTURAL MEMBERS SHALL NOT BE ALTERED IN ANY WAY TO ACCOMMODATE NEW ROOF PENETRATIONS. 2. EXHAUST DUCT TERMINATION AND SUPPLY DUCT TERMINATION TO BE A MINIMUM OF 15' HORIZONTAL DISTANCE PER CODE REQUIREMENTS. PROVIDE SUPPORTS TO ROOFING AS REQUIRED TO ADEQUATELY SUPPORT NEW DUCTWORK. 3. USE MANUFACTURER'S DAMPER AND HOOD FOR SUPPLY AND EXHAUST DUCT TERMINATION. 4. EXHAUST AND SUPPLY DUCT INTAKE FROM FROM. COORDINATE WITH PIPING DRAWINGS EXACT LOCATION OF DUCT DROPS AND ROUTING TO AVOID CONFLICT WITH NEW REFRIGERANT PIPING. SUPPLY AIR DUCT TO EXTEND TO NEW MAIN SUPPLY DUCT CONNECTING INTO HEAT PUMP CASSETTES. 5. CONTRACTOR RESPONSIBLE FOR INSTALLING HEAT PUMP CASSETTES SUCH THAT THE OA DUCT CONNECTION FACES MAIN SUPPLY DUCT. CONNECT 4" DIAMETER FLEX DUCT FROM SUPPLY MAIN TO HEAT PUMP CASSETTES. CASSETTES SHALL BE NO LESS THAN 3' FROM THE NORTH WALL. REFER TO DETAILS SHEET FOR HEAT PUMP CASSETTE INFORMATION AND CLARIFICATION. COORDINATE WITH LIGHTING LAYOUT TO MINIMIZE IMPACT ON LIGHTING. FINAL DUCT CONNECTION TO CASSETTE SHALL BE MADE WITH FLEXIBLE DUCTWORK NO LONGER THAN 1 FOOT. FLEXIBLE DUCT SHALL BE STRAIGHT WITH NO ELBOWS. 6. HEAT PUMP CASSETTES TO MAINTAIN 26' IN BETWEEN EACH OTHER FOR IDEAL AIR THROW. CONTRACTOR RESPONSIBLE FOR INSTALLING HEAT PUMP CASSETTES AT LEAST 3' HORIZONTAL FROM EXISTING PIPING TO REMAIN (NOT SHOWN). 7. INSTALL NEW DUCTWORK CONNECTIONS TO ACCOMMODATE NEW TERMINAL BOX. RE-USE DUCTWORK CONNECTING TO SUPPLY DUCT AS SHOWN. 8. REFER TO ARCHITECTURAL PLANS FOR SCREENING TO BE INSTALLED AROUND ROOFTOP EQUIPMENT. MAINTAIN ALL REQUIRED SERVICE CLEARANCES AS RECOMMENDED BY EQUIPMENT MANUFACTURER. 9. TERMINATE DUCT WITH 8x32 EXHAUST OPENING ON TOP OF DUCT. FURNISH WITH MESH SCREEN. MAINTAIN ONE FOOT FROM TOP OF EXHAUST DUCT TO STRUCTURE ABOVE. 10. PROVIDE VOLUME DAMPER AND BALANCE FOR EQUAL OUTSIDE AIRFLOW TO EACH CASSETTE. 11. MODIFY ROOFING AS REQUIRED; MAINTAIN ALL EXISTING ROOFING WARRANTIES. 12. SCREENING SHALL NOT IMPEDE ON EQUIPMENT CLEARANCES SPECIFIED BY MANUFACTURER. 13. MECHANICAL CONTRACTOR TO COORDINATE DUCT AND REFRIGERANT PIPING ROOF PENETRATIONS WITH EXISTING CEILING CONFLICTS TO DETERMINE EXACT LOCATIONS. 14. INSTALL NEW WALL-MOUNTED DOCK FAN ON SOUTHEAST AND SOUTHWEST ENDS OF BRIDGE. COORDINATE WITH ELECTRICAL DRAWINGS FOR RECEPTACLE CONNECTION. KEYED MECHANICAL NEW WORK NOTES # williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M1.02 VEST. LOBBY CHECK-IN COUNTER LAN / IT ELEV MENS CHASE ELEV. MECH TB-R1202 TB-R1211-FP TB-R1203 SD3-420 SD5-840 ෘ T ෘ ෘ 12x6 SD2-300 RG1-200 20x12 T 6 NIC NIC SCALE: SCALE: 2 DUCTWORK NO SCALE NEW WORK - EAST LOBBY 1 DUCTWORK NO SCALE NEW WORK - WEST LOBBY A. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. B. ALL DEMOLITION OF THE HVAC SYSTEM AS CALLED FOR ON THE DEMOLITION DRAWINGS SHALL BE UNDER THIS CONTRACTOR'S WORK. C. CONTRACTOR SHALL VISIT THE BUILDING, BEFORE SUBMITTING HIS BID, TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS WHICH MAY AFFECT HIS WORK. D. BEFORE STARTING ANY DEMOLITION WORK ON HVAC EQUIPMENT WHICH HAS AN ELECTRICAL CONNECTION AND IS INDICATED TO BE REMOVED, THIS CONTRACTOR SHALL MEET WITH ELECTRICAL CONTRACTOR TO IDENTIFY ALL SUCH EQUIPMENT. ELECTRICAL CONTRACTOR SHALL DISCONNECT THE POWER TO EACH UNIT AND REMOVE CONDUIT, WIRING, DISCONNECT SWITCHES, AND STARTERS UNDER THIS CONTRACT. THIS CONTRACTOR SHALL REMOVE ALL EQUIPMENT, ELECTRICAL TEMPERATURE CONTROL WIRING, AND CONDUIT UNDER THIS CONTRACT. E. CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN CLEANUP THROUGHOUT THE COURSE OF THE DEMOLITION WORK. F. NO EQUIPMENT, PIPING, VALVES, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, ONE (1) WEEK ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER. SHUTDOWNS SHALL BE A MAXIMUM OF EIGHT (8) HOURS UNLESS OTHERWISE INDICATED. G. ALL EQUIPMENT, MATERIAL, ETC. THAT IS BEING DEMOLISHED WILL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. ALL SUCH ITEMS WILL BE REMOVED FROM THE BUILDING SITE BY THE CONTRACTOR IN A PROPER AND LEGAL MANNER. NO ITEM WHICH IS BEING REMOVED UNDER THE DEMOLITION CONTRACT MAY BE REUSED UNDER THE NEW WORK CONTRACT UNLESS NOTED ON THE DRAWINGS. ALL ITEMS TO BE TURNED OVER TO THE OWNER SHALL BE STORED PER THE OWNER'S INSTRUCTION. H. SEQUENCE OF ALL DEMOLITION WORK SHALL BE IN STRICT ACCORDANCE WITH THE CONTRACT DOCUMENTS AND/OR AS DIRECTED BY THE ENGINEER. ALL SHUTDOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE OWNER. I. COORDINATE USE OF THE BUILDING ELEVATORS AND ALL MATERIAL DELIVERIES WITH THE OWNER. J. IF ANY ISOLATION VALVES SHOULD FAIL DURING DEMOLITION, OTHER THAN THOSE CALLED OUT TO BE REPLACED, THIS CONTRACTOR SHALL REPAIR/REPLACE THE VALVE AND SUBMIT A CHANGE ORDER REQUEST FOR APPROVAL. K. THE CONTRACTOR PERFORMING THE DEMOLITION WORK SHALL REMOVE NO MORE THAN 8" OF BUILDING MATERIAL AROUND EACH DEVICE BEING DEMOLISHED. PROVIDE PATCHING AS REQUIRED FOR FINISHED WORK. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER OR ENGINEER PRIOR TO PERFORMING REMOVAL OF MATERIAL FROM EXISTING BUILDING CONSTRUCTION. L. CONTRACTOR SHALL PROTECT ALL WINDOWS AND SURFACES DURING DEMOLITION. ANY COSTS INCURRED BY DAMAGE FROM CUTTING TORCHES, SPARKS, HEAT, OR OTHER DEMOLITION PROCEDURES WILL NOT BE THE RESPONSIBILITY OF THE OWNER. M. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIAL REQUIRED TO PATCH ALL OPENINGS IN EXISTING WALLS, FLOORS, AND FIRE SEPARATIONS CREATED BY THE REMOVAL OF EACH TRADE'S MATERIAL AND EQUIPMENT WHERE THESE OPENINGS ARE NOT TO BE REUSED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AT AREAS THAT MECHANICAL EQUIPMENT WAS REMOVED BACK TO ITS ORIGINAL CONDITION INCLUDING ALL DRYWALL, PLASTER, PAINTING, ETC. CONTRACTOR SHALL EMPLOY TRADES EXPERIENCED IN GENERAL CONSTRUCTION TO PATCH ALL OPENINGS. TOOTH IN MASONRY USING WHOLE UNITS TO MATCH EXISTING MASONRY CONSTRUCTION. N. EXISTING PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS NOT SHOWN SHALL REMAIN UNLESS INDICATED TO BE DEMOLISHED ON THE MECHANICAL AND ELECTRICAL PLANS. INSTALLATION OF NEW EQUIPMENT MAY NECESSITATE THE REROUTING OF EXISTING SYSTEMS TO REMAIN. COORDINATE WITH ENGINEER AND OWNER. GENERAL MECHANICAL CONSTRUCTION NOTES 1. ROUTE NEW SUPPLY DUCT FEEDING VESTIBULE DIFFUSER UNDER EXISTING DUCTWORK AND TIE INTO EXISTING 14x12 TO DIFFUSER. EXACT ROUTING TO BE DETERMINED ON SITE. DUCTWORK TO BE CONTAINED WITHIN NEW EXPOSED SOFFIT. REFER TO ARCHITECTURAL DRAWINGS FOR MORE INFORMATION. 2. CONTRACTOR TO CAP EXISTING SUPPLY TAKEOFF FEEDING VESTIBULE DIFFUSER AS NEEDED TO ACCOMMODATE NEW WORK. 3. CONTRACTOR TO ORIENT NEW LINEAR SLOT DIFFUSER DOWN BLAST TOWARDS TOP OF FRONT ENTRANCE DOORS. CONTRACTOR RESPONSIBLE FOR ASSURING DIFFUSER FRAME COVERS EXISTING DIFFUSER OPENING PROVIDE NEW PLENUM FOR NEW DIFFUSER AS REQUIRED. REFER TO DIFFUSER DETAIL AND SCHEDULE FOR MORE INFORMATION. 4. NEW DUCT TO BE ROUTED THROUGH EXISTING CONCRETE BLOCK WALL. SEAL RESULTING OPENING TO MAINTAIN FIRE RATING. 5. BALANCE EXISTING VAV BOX AND ASSOCIATED DIFFUSERS. REFER TO MECHANICAL SPECIFICATIONS FOR FURTHER INFORMATION. 6. RELOCATE EXISTING PLENUM RETURN GRILLE IN EAST LOBBY AS SHOWN AS TO NOT INTERFERE WITH NEW CEILING. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL COORDINATION. 7. EXACT LOCATION OF VAV BOX TO BE DETERMINED ON SITE. 8. EXACT ROUTING OF DUCTWORK TO BE DETERMINED ON SITE. KEYED MECHANICAL NEW WORK NOTES # williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M1.01 CONTRACTOR'S WORK. C. CONTRACTOR SHALL VISIT THE BUILDING, BEFORE SUBMITTING HIS BID, TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS WHICH MAY AFFECT HIS WORK. D. BEFORE STARTING ANY DEMOLITION WORK ON HVAC EQUIPMENT WHICH HAS AN ELECTRICAL CONNECTION AND IS INDICATED TO BE REMOVED, THIS CONTRACTOR SHALL MEET WITH ELECTRICAL CONTRACTOR TO IDENTIFY ALL SUCH EQUIPMENT. ELECTRICAL CONTRACTOR SHALL DISCONNECT THE POWER TO EACH UNIT AND REMOVE CONDUIT, WIRING, DISCONNECT SWITCHES, AND STARTERS UNDER THIS CONTRACT. THIS CONTRACTOR SHALL REMOVE ALL EQUIPMENT, ELECTRICAL TEMPERATURE CONTROL WIRING, AND CONDUIT UNDER THIS CONTRACT. E. CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN CLEANUP THROUGHOUT THE COURSE OF THE DEMOLITION WORK. F. NO EQUIPMENT, PIPING, VALVES, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, ONE (1) WEEK ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER. SHUTDOWNS SHALL BE A MAXIMUM OF EIGHT (8) HOURS UNLESS OTHERWISE INDICATED. G. ALL EQUIPMENT, MATERIAL, ETC. THAT IS BEING DEMOLISHED WILL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. ALL SUCH ITEMS WILL BE REMOVED FROM THE BUILDING SITE BY THE CONTRACTOR IN A PROPER AND LEGAL MANNER. NO ITEM WHICH IS BEING REMOVED UNDER THE DEMOLITION CONTRACT MAY BE REUSED UNDER THE NEW WORK CONTRACT UNLESS NOTED ON THE DRAWINGS. ALL ITEMS TO BE TURNED OVER TO THE OWNER SHALL BE STORED PER THE OWNER'S INSTRUCTION. H. SEQUENCE OF ALL DEMOLITION WORK SHALL BE IN STRICT ACCORDANCE WITH THE CONTRACT DOCUMENTS AND/OR AS DIRECTED BY THE ENGINEER. ALL SHUTDOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE OWNER. I. COORDINATE USE OF THE BUILDING ELEVATORS AND ALL MATERIAL DELIVERIES WITH THE OWNER. J. IF ANY ISOLATION VALVES SHOULD FAIL DURING DEMOLITION, OTHER THAN THOSE CALLED OUT TO BE REPLACED, THIS CONTRACTOR SHALL REPAIR/REPLACE THE VALVE AND SUBMIT A CHANGE ORDER REQUEST FOR APPROVAL. K. THE CONTRACTOR PERFORMING THE DEMOLITION WORK SHALL REMOVE NO MORE THAN 8" OF BUILDING MATERIAL AROUND EACH DEVICE BEING DEMOLISHED. PROVIDE PATCHING AS REQUIRED FOR FINISHED WORK. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER OR ENGINEER PRIOR TO PERFORMING REMOVAL OF MATERIAL FROM EXISTING BUILDING CONSTRUCTION. L. CONTRACTOR SHALL PROTECT ALL WINDOWS AND SURFACES DURING DEMOLITION. ANY COSTS INCURRED BY DAMAGE FROM CUTTING TORCHES, SPARKS, HEAT, OR OTHER DEMOLITION PROCEDURES WILL NOT BE THE RESPONSIBILITY OF THE OWNER. M. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIAL REQUIRED TO PATCH ALL OPENINGS IN EXISTING WALLS, FLOORS, AND FIRE SEPARATIONS CREATED BY THE REMOVAL OF EACH TRADE'S MATERIAL AND EQUIPMENT WHERE THESE OPENINGS ARE NOT TO BE REUSED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AT AREAS THAT MECHANICAL EQUIPMENT WAS REMOVED BACK TO ITS ORIGINAL CONDITION INCLUDING ALL DRYWALL, PLASTER, PAINTING, ETC. CONTRACTOR SHALL EMPLOY TRADES EXPERIENCED IN GENERAL CONSTRUCTION TO PATCH ALL OPENINGS. TOOTH IN MASONRY USING WHOLE UNITS TO MATCH EXISTING MASONRY CONSTRUCTION. N. EXISTING PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS NOT SHOWN SHALL REMAIN UNLESS INDICATED TO BE DEMOLISHED ON THE MECHANICAL AND ELECTRICAL PLANS. INSTALLATION OF NEW EQUIPMENT MAY NECESSITATE THE REROUTING OF EXISTING SYSTEMS TO REMAIN. COORDINATE WITH ENGINEER AND OWNER. GENERAL MECHANICAL DEMOLITION NOTES 1. DEMOLISH AND REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED PIPING AS SHOWN ALONG WITH ALL ASSOCIATED VALVING AND CONTROLS. 2. DEMOLISH EXISTING PIPING FEEDING BOTH EXISTING BRIDGE TERMINAL UNITS BACK TO MAIN 4" LINES ALONG WITH ALL ASSOICATED VALVING AND CONTROLS. PROVIDE CONTROL VALVES AND COIL TO OWNER FOR ATTIC STOCK. 3. DEMOLISH AND REMOVE EXISTING CONTROL VALVE ACTUATOR TO ACCOMMODATE NEW WORK AS REQUIRED. 4. EXISTING THERMOSTAT TO BE DEMOLISHED AND REMOVED. ASSOCIATED WIRING CAN BE REUSED AS APPLICABLE. KEYED MECHANICAL DEMOLITION NOTES # williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 SCALE: 1 DUCTWORK 1/8" = 1'-0" DEMO - WEST LOBBY SCALE: 3 DUCTWORK 1/8" = 1'-0" DEMO - BRIDGE A. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. B. ALL DEMOLITION OF THE HVAC SYSTEM AS CALLED FOR ON THE DEMOLITION DRAWINGS SHALL BE UNDER THIS CONTRACTOR'S WORK. C. CONTRACTOR SHALL VISIT THE BUILDING, BEFORE SUBMITTING HIS BID, TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS WHICH MAY AFFECT HIS WORK. D. BEFORE STARTING ANY DEMOLITION WORK ON HVAC EQUIPMENT WHICH HAS AN ELECTRICAL CONNECTION AND IS INDICATED TO BE REMOVED, THIS CONTRACTOR SHALL MEET WITH ELECTRICAL CONTRACTOR TO IDENTIFY ALL SUCH EQUIPMENT. ELECTRICAL CONTRACTOR SHALL DISCONNECT THE POWER TO EACH UNIT AND REMOVE CONDUIT, WIRING, DISCONNECT SWITCHES, AND STARTERS UNDER THIS CONTRACT. THIS CONTRACTOR SHALL REMOVE ALL EQUIPMENT, ELECTRICAL TEMPERATURE CONTROL WIRING, AND CONDUIT UNDER THIS CONTRACT. E. CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN CLEANUP THROUGHOUT THE COURSE OF THE DEMOLITION WORK. F. NO EQUIPMENT, PIPING, VALVES, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, ONE (1) WEEK ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER. SHUTDOWNS SHALL BE A MAXIMUM OF EIGHT (8) HOURS UNLESS OTHERWISE INDICATED. G. ALL EQUIPMENT, MATERIAL, ETC. THAT IS BEING DEMOLISHED WILL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. ALL SUCH ITEMS WILL BE REMOVED FROM THE BUILDING SITE BY THE CONTRACTOR IN A PROPER AND LEGAL MANNER. NO ITEM WHICH IS BEING REMOVED UNDER THE DEMOLITION CONTRACT MAY BE REUSED UNDER THE NEW WORK CONTRACT UNLESS NOTED ON THE DRAWINGS. ALL ITEMS TO BE TURNED OVER TO THE OWNER SHALL BE STORED PER THE OWNER'S INSTRUCTION. H. SEQUENCE OF ALL DEMOLITION WORK SHALL BE IN STRICT ACCORDANCE WITH THE CONTRACT DOCUMENTS AND/OR AS DIRECTED BY THE ENGINEER. ALL SHUTDOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE OWNER. I. COORDINATE USE OF THE BUILDING ELEVATORS AND ALL MATERIAL DELIVERIES WITH THE OWNER. J. IF ANY ISOLATION VALVES SHOULD FAIL DURING DEMOLITION, OTHER THAN THOSE CALLED OUT TO BE REPLACED, THIS CONTRACTOR SHALL REPAIR/REPLACE THE VALVE AND SUBMIT A CHANGE ORDER REQUEST FOR APPROVAL. K. THE CONTRACTOR PERFORMING THE DEMOLITION WORK SHALL REMOVE NO MORE THAN 8" OF BUILDING MATERIAL AROUND EACH DEVICE BEING DEMOLISHED. PROVIDE PATCHING AS REQUIRED FOR FINISHED WORK. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER OR ENGINEER PRIOR TO PERFORMING REMOVAL OF MATERIAL FROM EXISTING BUILDING CONSTRUCTION. L. CONTRACTOR SHALL PROTECT ALL WINDOWS AND SURFACES DURING DEMOLITION. ANY COSTS INCURRED BY DAMAGE FROM CUTTING TORCHES, SPARKS, HEAT, OR OTHER DEMOLITION PROCEDURES WILL NOT BE THE RESPONSIBILITY OF THE OWNER. M. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIAL REQUIRED TO PATCH ALL OPENINGS IN EXISTING WALLS, FLOORS, AND FIRE SEPARATIONS CREATED BY THE REMOVAL OF EACH TRADE'S MATERIAL AND EQUIPMENT WHERE THESE OPENINGS ARE NOT TO BE REUSED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AT AREAS THAT MECHANICAL EQUIPMENT WAS REMOVED BACK TO ITS ORIGINAL CONDITION INCLUDING ALL DRYWALL, PLASTER, PAINTING, ETC. CONTRACTOR SHALL EMPLOY TRADES EXPERIENCED IN GENERAL CONSTRUCTION TO PATCH ALL OPENINGS. TOOTH IN MASONRY USING WHOLE UNITS TO MATCH EXISTING MASONRY CONSTRUCTION. N. EXISTING PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS NOT SHOWN SHALL REMAIN UNLESS INDICATED TO BE DEMOLISHED ON THE MECHANICAL AND ELECTRICAL PLANS. INSTALLATION OF NEW EQUIPMENT MAY NECESSITATE THE REROUTING OF EXISTING SYSTEMS TO REMAIN. COORDINATE WITH ENGINEER AND OWNER. GENERAL MECHANICAL DEMOLITION NOTES 1. DEMOLISH AND REMOVE EXISTING BRANCH DUCT WORK SERVING EXISTING WEST VESTIBULE SUPPLY GRILL AS SHOWN TO ACCOMMODATE NEW DUCTWORK. EXISTING SUPPLY GRILLE TO REMAIN. 2. DEMOLISH EXISTING SUPPLY GRILLE. EXISTING SUPPLY PLENUM TO BE REPLACED FOR NEW DIFFUSER. 3. DEMOLISH AND REMOVE EXISTING SUPPLY DIFFUSERS (x32) MAIN SUPPLY DUCT SERVING BRIDGE. ALL HOT WATER, CHILLED WATER PIPING TO REMAIN. 4. REMOVE EXISTING VAV BOXES AND RETURN TO OWNER FOR ATTIC STOCK. DEMOLISH AND REMOVE ASSOCIATED DUCTWORK BACK TO MAIN AS SHOWN. KEYED MECHANICAL DEMOLITION NOTES # williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 PIPE UNION PIPE WELL PSI PRESSURE GAUGE PRESSURE/SAFETY RELIEF VALVE PRESSURE REDUCING/REGULATING VALVE PUMP STRAINER SUCTION DIFFUSER TEST PLUG r) THERMOMETER THREE-WAY, MODULATING AUTOMATIC CONTROL VALVE THREE-WAY, TWO-POSITION AUTOMATIC CONTROL VALVE TRIPLE DUTY VALVE TWO-WAY, MODULATING AUTOMATIC CONTROL VALVE TWO-WAY, TWO-POSITION AUTOMATIC CONTROL VALVE DUCTWORK NEW DUCTWORK EXISTING DUCTWORK TO REMAIN EXISTING DUCTWORK TO BE DEMOLISHED DIRECTION OF AIRFLOW DDC THERMISTOR TE TT TW T DDC OR STANDALONE PROGRAMMABLE THERMOSTAT TYPE EQUIPMENT TAG NUMBER P 1 FLOOR DRAIN POINT OF CONNECTION OF NEW TO EXISTING WORK DPS DIFFERENTIAL PRESSURE SWITCH DPT DIFFERENTIAL PRESSURE TRANSDUCER TE TEMPERATURE ELEMENT TT TEMPERATURE TRANSMITTER TW TEMPERATURE WELL VFD VARIABLE FREQUENCY DRIVE 3,3((/%2:'2:1$1'r+25,=217$/ Y-STRAINER CHECK VALVE PIPE REDUCER/INCREASER TEE PIPE TEE, FOUR-WAY, HORIZONTAL FID FIRE DAMPER AD ACCESS DOOR RECTANGULAR EXHAUST/RETURN DUCTWORK DOWN RECTANGULAR EXHAUST/RETURN DUCTWORK UP RECTANGULAR SUPPLY DUCTWORK DOWN RECTANGULAR SUPPLY DUCTWORK UP ROUND DUCTWORK DOWN ROUND DUCTWORK UP DUCTWORK BREAK LINE (OR CONTINUATION) FLEXIBLE DUCTWORK CONNECTION FC MANUAL VOLUME (OR BALANCING) DAMPER VD CO2 CARBON DIOXIDE DETECTOR/SENSOR AUTOMATIC CONTROL (OR MOTOR OPERATED) DAMPER GRILLE/REGISTER/DIFFUSER TAG NECK SIZE CFM SERVICE TYPE A 6x6 NK 100-S PIPE BREAK T STEAM TRAP ANGLE VALVE ACD AUTOMATIC CONTROL DAMPER ACV AUTOMATIC CONTROL VALVE AD ACCESS DOOR AFF ABOVE FINISHED FLOOR AHU AIR HANDLING UNIT AP ACCESS PANEL APD AIR PRESSURE DROP AS AIR SEPARATOR ASU AIR SUPPLY UNIT B BOILER BAS BUILDING AUTOMATION SYSTEM BASC BUILDING AUTOMATION SYSTEM CONTRACTOR BFV BUTTERFLY VALVE BFW BOILER FEED WATER BHP BRAKE HORSEPOWER BOD BOTTOM OF DUCT BOI BOTTOM OF INSULATION BOP BOTTOM OF PIPE BT BUFFER TANK BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNIT PER HOUR BV BALL VALVE BWR BOILER WATER RETURN BWS BOILER WATER SUPPLY C COMMON CBV CIRCUIT BALANCING VALVE CC COOLING COIL CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CHWR CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY CK GAS COCK CKV CHECK VALVE CO CLEANOUT COND CONDENSATE COP COEFFICIENT OF PERFORMANCE CO2 CARBON DIOXIDE CR CONDENSATE RETURN CT COOLING TOWER CU CONDENSING UNIT CV CONVECTOR CW COLD (OR CITY) WATER CWR CONDENSER WATER RETURN CWS CONDENSER WATER SUPPLY D DRAIN DB DRY BULB DG DOOR GRILLE DHW DOMESTIC HOT WATER DHWR DOMESTIC HOT WATER RECIRCULATION DN DOWN DOAS DEDICATED OUTDOOR AIR SYSTEM DS DUCT SLEEVE DTR DUAL TEMPERATURE WATER RETURN DTS DUAL TEMPERATURE WATER SUPPLY -E EXHAUST EA EXHAUST AIR EAD EXHAUST AIR DAMPER EAT ENTERING AIR TEMPERATURE EBB ELECTRIC BASEBOARD EC ELECTRICAL CONTRACTOR ECM ELECTRONICALLY COMMUTATED MOTOR EDH ELECTRIC DUCT HEATER EER ENERGY EFFICIENCY RATIO EF EXHAUST FAN EG ETHYLENE GLYCOL EJ EXPANSION JOINT ERCP ELECTRIC RADIANT CEILING PANEL ESP EXTERNAL STATIC PRESSURE ECUH ELECTRIC CABINET UNIT HEATER ET EXPANSION TANK EUH ELECTRIC UNIT HEATER EWT ENTERING WATER TEMPERATURE F FAHRENHEIT FC FLEXIBLE CONNECTOR (OR CONNECTION) FD FLOOR DRAIN FCU FAN COIL UNIT FID FIRE DAMPER FSD FIRE/SMOKE DAMPER FFA FROM FLOOR ABOVE FFB FROM FLOOR BELOW FLA FULL LOAD AMPS FOB FLAT ON BOTTOM FOT FLAT ON TOP FPF FINS PER FOOT FPI FINS PER INCH FPM FEET PER MINUTE FS FILL SYSTEM FTR FINNED TUBE RADIATION FV FACE VELOCITY G GAS GA GAUGE GPM GALLONS PER MINUTE GV GATE VALVE HC HEATING COIL HG HOT GAS HP HORSEPOWER HPS HIGH PRESSURE STEAM HWR HOT WATER RETURN HWS HOT WATER SUPPLY HX HEAT EXCHANGER HZ HIGH ZONE IPLV INTEGRATED PART LOAD VALUE KG KEYED GUARD KH KITCHEN HOOD LAT LEAVING AIR TEMPERATURE LPS LOW PRESSURE STEAM LWT LEAVING WATER TEMPERATURE LZ LOW ZONE MAU MAKE-UP AIR UNIT MBH MILLION BRITISH THERMAL UNITS PER HOUR MC MECHANICAL CONTRACTOR MCA MINIMUM CIRCUIT AMPACITY MOCP MAXIMUM OVER-CURRENT PROTECTION MOD MOTOR OPERATED DAMPER MU MAKE-UP WATER NC NORMALLY CLOSED NIC NOT IN CONTRACT NK NECK NO NORMALLY OPEN NPLV NONSTANDARD PART LOAD VALUE NPSH NET POSITIVE SUCTION HEAD NTS NOT TO SCALE OA OUTDOOR AIR OAD OUTDOOR AIR DAMPER OSD OPEN SITE DRAIN OS&Y OUTSIDE STEM AND YOKE P PUMP PD PRESSURE DROP PG PROPYLENE GLYCOL PHC PREHEAT COIL PRD PRESSURE RELIEF DOOR PRV PRESSURE REDUCING (OR REGULATING) VALVE PS PIPE SLEEVE PSI POUNDS PER SQUARE INCH -R RETURN RA RETURN AIR RAD RETURN AIR DAMPER RCP RADIANT CEILING PANEL RF RETURN FAN RHC REHEAT COIL RL REFRIGERANT LIQUID RPM REVOLUTIONS PER MINUTE RS REFRIGERANT SUCTION RTU ROOFTOP UNIT RV RELIEF VALVE -S SUPPLY SA SUPPLY AIR SAN SANITARY SD SMOKE DAMPER SEER SEASONAL ENERGY EFFICIENCY RATIO SF SUPPLY FAN SP STATIC PRESSURE SS STAINLESS STEEL SST SATURATED SUCTION TEMPERATURE ST STORM STM STEAM STR STRAINER SUH SUSPENDED UNIT HEATER T THERMOSTAT -T TRANSFER TDH TOTAL DYNAMIC HEAD TDV TRIPLE DUTY VALVE TYP TYPICAL TFA TO FLOOR ABOVE TFB TO FLOOR BELOW TSP TOTAL STATIC PRESSURE UC UNDERCUT DOOR UH UNIT HEATER V VENT VAV VARIABLE AIR VOLUME VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE VTR VENT THROUGH ROOF WB WET BULB WC WATER COLUMN WG WATER GAUGE WL WALL LOUVER WMS WIRE MESH SCREEN WPD WATER PRESSURE DROP VSD VARIABLE SPEED DRIVE ABBREVIATIONS SCOPE OF WORK 1. THIS PROJECT IS FOCUSED ON THE MECHANICAL RENOVATION OF THE EAST AND WEST LOBBIES AND PEDESTRIAN BRIDGE, WHICH IS BEING CONVERTED TO ADDITIONAL FITNESS SPACE. THE NEW MECHANICAL SYSTEMS ARE INTENDED TO MEET THE CURRENT AND FUTURE NEEDS OF THE SPACES WITHIN SCOPE. 2. MECHANICAL: 2.1. DEMOLISH AND/OR RECONFIGURE EXISTING TERMINAL DEVICES, DUCTWORK AND UNIT HEATERS AS SHOWN ON THE DRAWINGS TO ACCOMMODATE NEW LOBBY DESIGN. 2.2. PROVIDE ADDITIONAL HEAT TO THE EAST AND WEST LOBBY VESTIBULES TO ELIMINATE COLD DRAFTS BEING INTRODUCED INTO THE BUILDING. 2.3. INSTALL NEW RADIANT CEILING PANELS ABOVE THE RE-LOCATED SECURITY DESKS TO PROVIDE ADDITIONAL HEAT TO OCCUPANTS. 2.4. REMOVE OR RECONFIGURE EXISTING FIN TUBE RADIATION CURRENTLY SERVING THE CENTRAL BRIDGE TO ACCOMMODATE NEW BRIDGE DESIGN 2.5. INSTALL A NEW ROOFTOP ENERGY RECOVERY UNIT (ERV) AND VARIABLE REFRIGERANT FLOW (VRF) SYSTEM TO PROVIDE HEATING, COOLING AND VENTILATION TO THE CENTRAL BRIDGE. 2.6. PROVIDE NEW DUCTWORK AND PIPING DISTRIBUTION TO BOTH THE LOBBIES AND CENTRAL BRIDGE. 2.7. PROVIDE CONTROLS ASSOCIATED WITH ALL NEW MECHANICAL EQUIPMENT. CONTROLS WILL BE INTEGRATED INTO THE EXISTING BUILDING MANAGEMENT SYSTEM (BMS). 3. ELECTRICAL 3.1. DEMOLISH AND REMOVE EXISTING POWER, LIGHTING, AND EMERGENCY EXIT LIGHTING, FIRE ALARM AND DATA ASSOCIATED WITH EXISTING SECURITY DESK. 3.2. DEMOLISH AND REMOVE APPROPRIATE LOBBY LIGHTING TO ACCOMMODATE NEW LOBBY DESIGN. 3.3. PROVIDE NEW RECEPTACLES, LIGHTING, EMERGENCY EXIT LIGHTING, FIRE ALARM AND DATA AS REQUIRED TO ACCOMMODATE NEW SPACE LAYOUTS. 3.4. DEMOLISH AND REMOVE APPROPRIATE BRIDGE LIGHTING TO ACCOMMODATE NEW LOBBY DESIGN. 3.5. PROVIDE NEW RECEPTACLES, LIGHTING, EMERGENCY EXIT LIGHTING AND FIRE ALARM AS REQUIRED TO ACCOMMODATE NEW BRIDGE DESIGN. 4. FIRE PROTECTION 4.1. RECONFIGURE EXISTING SPRINKLER HEADS IN BOTH THE LOBBIES AND BRIDGE TO ACCOMMODATE NEW SPACE LAYOUTS. IMC MINIMUM VENTILATION REQUIREMENTS - BRIDGE ROOM NUMBER ROOM NAME FLOOR AREA (SQ.FT.) OCCUPAN TS EQUIPMENT TAG MINIMUM VENTILATION RATES (FROM IMC TABLE 403.3) REQUIRED VENTILATION ACTUAL VENTILATION OUTSIDE AIR (CFM/PERSO N) OUTSIDE AIR (CFM/SF) EXHAUST AIR (CFM/SF) MAKE-UP AIR (CFM) EXHAUST AIR (CFM) MAKE-UP AIR (CFM) EXHAUST AIR (CFM) 2200 PEDESTRIAN TERRACE 2560 12 ERV-1 (NEW) 20 0.06 437 437 0 500 700 williams/associates/architects, ltd. COPYRIGHT C 2017 GRAPHIC NORTH ISSUE FOR BID - ISSUED 30 JUNE 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 M0.01 SUPPLY/RETURN/EXHAUST FAN PROBE PITOT PARALLEL BLADE DAMPER OPPOSED BLADE DAMPER FILTER WITH DP SERPENTINE FILTER VFD VARIABLE FREQUENCY DRIVE BINARY INPUT DDD PIPE ARROW BINARY OUTPUT WB ANALOG WET BULB TEMPERATURE INPUT %RH ANALOG RELATIVE HUMIDITY INPUT A ANALOG INPUT T ANALOG TEMPERATURE INPUT CFM ANALOG AIRFLOW INPUT DPT ANALOG DIFFERENTIAL PRESSURE INPUT Hz ANALOG FREQUENCY INPUT PT ANALOG PRESSURE INPUT MOD PROPORTIONAL FEEDBACK INPUT CT ANALOG CURRENT INPUT MS MULTI-STATE INPUT NOTE: NOT ALL SYMBOLS LISTED ABOVE MAY BE USED OR APPEAR ON THIS DRAWING. KW POWER INPUT KWH ELECTRICAL USAGE INPUT CO2 CO2 SENSOR MOD ANALOG OUTPUT BACNET BACNET PROTOCOL NETWRK NETWORK CONNECTION INTLK HARDWIRED INTERLOCK CONTROLS DIAGRAM SYMBOLS Sheet List Table Sheet Number Sheet Title MECHANICAL M0.01 MECHANICAL TITLE SHEET MD1.01 DUCTWORK DEMOLITION MD2.01 PIPING DEMOLITION M1.01 DUCTWORK NEW WORK - FIRST FLOOR PLAN M1.02 DUCTWORK NEW WORK - BRIDGE M2.01 PIPING NEW WORK - FIRST FLOOR PLAN M2.02 PIPING NEW WORK - SECOND FLOOR PLAN M3.01 MECHANICAL DETAILS M3.02 MECHANICAL DETAILS M4.01 MECHANICAL SCHEDULES M5.01 MECHANICAL SPECIFICATIONS M5.02 MECHANICAL SPECIFICATIONS ELECTRICAL E0.01 ELECTRICAL TITLE SHEET ED1.01 LIGHTING DEMOLITION - FIRST FLOOR PLAN ED1.02 LIGHTING DEMOLITION - SECOND FLOOR PLAN E1.01 LIGHTING NEW WORK - FIRST FLOOR PLAN E1.02 LIGHTING NEW WORK - SECOND FLOOR PLAN E2.01 POWER NEW WORK - FIRST FLOOR PLAN E2.02 POWER NEW WORK - SECOND FLOOR PLAN FIRE PROTECTION FP0.01 FIRE PROTECTION TITLE SHEET FPD1.01 FIRE PROTECTION DEMOLITION PLANS FP1.01 FIRE PROTECTION NEW WORK PLANS 3'-0" 26'-1" 1 7 NEW FLOORING EXISTING FLOORING RF-4 EXISTING FLOORING NEW FLOORING RENOVATION SECOND FLOOR- WEST BUILDING - TRACK ENTRANCE SCALE: 1/8" = 1'-0" R35'-1" 2'-6" SEE DOOR SCHEDULE 4" SEE DOOR SCHEDULE EQ. EQ. GLASS. TEMPERED. ALUM. SEE DOOR SCHEDULE GLASS. TEMPERED. ALUM. PANIC HARDWARE. 3FORM PANEL. 1/4". BACK TO BACK. SEE ID SHEETS. STAINLESS STEEL. TO MATCH ADJACENT POSTS. CONTINUOUS HINGE. ƒ6:,1* GLASS. TEMPERED. STAINLESS STEEL. TO MATCH ADJACENT POSTS. CONTINUOUS HINGE. ƒ6:,1* PANIC HARDWARE. LATCH. STOPPER. GLASS. TEMPERED. STOREFRONT WINDOW SYSTEM. ALUM. GLASS. TEMPERED. STOREFRONT WINDOW SYSTEM. ALUM. GLASS. TEMPERED. STOREFRONT WINDOW SYSTEM. ALUM. GLASS. TEMPERED. STOREFRONT WINDOW SYSTEM. ALUM. CLOSURE. ALUMINUM. MATCH WINDOW FRAME. EXISTING STOREFRONT WINDOW SYSTEM. STOREFRONT WINDOW SYSTEM. ALUM. TIE INTO EXISTING STOREFRONT WINDOW SYSTEM. SEE DETAIL. DETAIL / SILL DETAIL / SCALE: 1-1/2" = 1'-0" 9 ALUMINUM FRAME SCALE: 1-1/2" = 1'-0" 4 MULLIONS ALUMINUM FRAME DETAIL A9.1 24 DETAIL / SCALE: 1-1/2" = 1'-0" 14 HEAD DETAIL / SCALE: 1-1/2" = 1'-0" 19 ALUMINUM FRAME DETAIL JAMB DETAIL / SCALE: 1-1/2" = 1'-0" 24 ALUMINUM FRAME DETAIL JAMB AT EX. TRACK CURTAIN WALL ALUMINUM FRAME DETAIL DETAIL / SCALE: 1-1/2" = 1'-0" 10 INFILL FRAMING AT VESTIBULE DETAIL / SCALE: 1-1/2" = 1'-0" 15 ALUMINUM FRAME DETAIL INFILL FRAMING AT VESTIBULE DETAIL ELEVATION / INFILL FRAMING AT VESTIBULE SCALE: 1" = 1'-0" 20 ALUMINUM FRAME DETAIL ALUMINUM FRAME DETAIL CONTRACTOR TO VERIFY IN FIELD MASONRY COL TO MASONRY COL - CONTRACTOR TO VERIFY IN FIELD CONTRACTOR TO VERIFY IN FIELD VIF VIF VIF ȭ ȭ 5/8" 3/4" 5/8" EQ EQ MDF. STANCHION. (OFFSET SLIGHTLY AS NEEDED.) 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 1/2" REVEAL. PAINT. (PT-6). 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 3" MAX 1/2" 3" 5/8" 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 1/2" REVEAL. PAINT. (PT-6). MDF. MAX 2'-10" ADJUSTABLE SHELVES. PLASTIC LAMINATE. 1/2" SHELVES (TYP.) (PL-1). PVC EDGE BAND TO MATCH. COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). TOE KICK. RUBBER BASE. (RB-1). 2'-0" 0'-1 1/2" BASE CABINET. PLASTIC LAMINATE. (PL-1). 0'-2" 2X BLOCKING AS REQ. APRON. PLASTIC LAMINATE. (PL-1). BOLT TO STRUCTURE BEHIND VIA ANGLE. FIN. FLR. 3" 2'-4" 1'-11" 1/2" COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). 12" DIA. CHUTE. 1/4" BEVEL. SOLID SURFACE. STORAGE CABINET. PLASTIC LAMINATE. (PL-1). PVC EDGE BAND TO MATCH. MAX 2'-10" 2'-1" PULL, MOCKETT DP55A. STAINLESS STEEL. CABINET INTERIOR: MELAMINE BOARD. LAUNDRY CADDY. BY OWNER. 2X BLOCKING AS REQ. TOE KICK. RUBBER BASE. (RB-1). TOE KICK IS INTEGRAL TO DOOR. FIN. FLR. 1 1/2" 2'-7" 1'-9" 3" 4" 6" 6" 1/2" STOPPER. PLASTIC LAMINATE. (PL-1). 1'-0" BOLT TO STRUCTURE BEHIND VIA ANGLE. 3/4" A8.1 2 SIM 10 A8.1 9 A8.1 COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). PLASTIC LAMINATE ADJUSTABLE SHELVES FOR TOWELS. 1/2" SHELVES (TYP.) (PL-1). PVC EDGE BAND TO MATCH. PLASTIC LAMINATE BASE CABINET. (PL-1). PVC EDGE BAND TO MATCH. 3'-0" 3'-0" MAX 2'-10" TOE KICK. RUBBER BASE. (RB-1). EQ EQ PULL, MOCKETT DP55A. STAINLESS STEEL. 0'-2" 0'-2" 2'-4 1/2" 0'-1 1/2" LAUNDRY CADDY. BY OWNERS. 4" FIN. FLR. SIDE PANELS. BOTH SIDES. PLASTIC LAMINATE. (PL-1) 1/2" REVEAL AT COUNTERTOP. PAINT REVEAL. (PT-6). ACCOMMODATE THICKNESS OF RUBBER BASE IN FRONT FOR OVERLAP. TOE KICK. RUBBER BASE. (RB-1). 2'-11" 2'-11" 2'-11" 3'-6" SOLID SURFACE CAP. (SSF-1). 1/2" REVEAL. PAINT. (PT-6). PLASTIC LAMINATE. (PL-1). PRIVACY WALL. WOOD, QUARTZ.(PL-1). FIN. FLR. 3'-4" 1/2" 1 1/2" SOLID SURFACE CAP. (SSF-1). 3 FORM. 5/8" W/ MIRROR BACKING. (3F-X). FASTEN WITH STANCHION BY 3 FORM. SUPPORT WALL REVEAL. PLYWOOD. 3/4". (PT-X). 3'-4" 1/2" 1 1/2" 2'-11" 2'-11" 2'-11" WOOD, QUARTZ. MITER EDGES. (QZ-1). 3'-6" FIN. FLR. SUPPORT PANEL. PLASTIC LAMINATE. (PL-1). TRANSACTION COUNTER. WOOD, QUARTZ. (QZ-1). COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). 3'-0" SUPPORT WALL. MDF. 3/4" PAINT BLACK. (PT-1) ON SIDE OF 3 FORM. PLASTIC LAMINATE (PL-1) ON INTERIOR OF DESK. 3 FORM. 5/8" W/ MIRROR 1'-5" 1'-6" BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 1" 2'-8 1/2" 1 1/2" MAX 2'-10" 3" 3/4" 3/4" 3/4" INSET WOOD SUPPORT/ TOP. SOLID SURFACE OR QUARTZ. 1/4" BULLNOSE. SECTION/ PRIVACY WALL SCALE: 3/4" = 1'-0" 1 DETAIL/ COUNTERTOP SCALE: 6" = 1'-0" 2 DETAIL/ PLASTIC LAMINATE SCALE: 12" = 1'-0" 3 DETAIL/ BASE OF CABINETS - TOE KICKS SCALE: 6" = 1'-0" 4 DETAIL/ COUNTER @ 3 FORM TYP. SCALE: 6" = 1'-0" 5 SECTION/ 3 FORM END CAP SCALE: 6" = 1'-0" 6 DETAIL/ 3 FORM REVEAL SCALE: 6" = 1'-0" 7 SECTION/ TOWEL STORAGE SCALE: 1" = 1'-0" 9 SECTION/ TOWEL DROP CABINET SCALE: 1" = 1'-0" 10 INT. ELEV./ TOWEL STATION - BRIDGE SCALE: 1/2" = 1'-0" 8 DISPENSE & DROP. ARCHITECTS ARCHITECTS PLANNERS WILLIAMS Phone 630-221-1212 / Fax 630-221-1220 500 Park Boulevard, Suite 800, Itasca, IL 60143 revised waa no date drawn checked williams/associates/architects, ltd. COPYRIGHT C 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 2016-060 30 JUNE 2017 NLC / JCS / AMZ FP / NLC / CAK ISSUED FOR BID GRAPHIC NORTH A8.1 DETAILS INT. ELEV./ PRIVACY WALL ( FROM BEHIND MAIN DESK) SCALE: 3/4" = 1'-0" 11 INT. ELEV./ PRIVACY WALL (FROM RAMP) SCALE: 3/8" = 1'-0" 12 SECTION/ EAST DESK - ADA COUNTER FACING 3 FORM SCALE: 3/4" = 1'-0" 13 DETAIL/ MAIN DESK - ADA APRON SCALE: 6" = 1'-0" 14 WOOD, QUARTZ. (QZ-1). 3'-0 1/2" 9 A8.0 FIN. FLR. 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 3 FORM. 5/8" W/ MIRROR BACKING ON RETURN. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 2'-5" 1/2" 2'-5" 2" 6 A8.1 13 A8.1 A8.0 2 A8.0 7 7'-0" 6'-5" 1'-4" A8.0 1 8 A8.0 3'-0" 1'-7" 1'-5" 5'-0" 3 A8.0 4 A8.0 10 A8.0 3'-0" 5'-9" G G G 4" 1'-0" 2'-0" 9 A8.0 ALIGN 13 A8.1 11'-0" 9'-4" 1'-5" 2'-0" A8.0 11 A8.0 19 A8.0 18 A8.0 x A8.0 23 13 A8.0 15 A8.0 14 A8.0 SERVICE COUNTER. 12 G 3'-5 1/2" 10'-1" 1'-8" 3 1/2" 1'-5" 25 A8.0 24 A8.0 25 A8.0 SIM. 5" N 20'-4" 3'-1" HOLD. 5'-1" GROMMET BY MOCKETT. TYP. G G G G G G 4 1/2" 9 1/4" 4'-0" 1'-5" TYP. 4" TYP. 4" 20 A8.0 COUNTER SUPPORT. STEEL. HSS 2" X 2" x 1/4" SUPPORT BRACKET. GRIND EXPOSED EDGES SMOOTH. COUNTER SUPPORT. STEEL. HSS 2" X 2" x 1/4" SUPPORT BRACKET. GRIND EXPOSED EDGES SMOOTH. A8.1 6 SIM G 2'-11" 2'-11" 2'-11" 5" 7" G G 1 0 A8.1 11 A8.1 12 5" 173.0° 175.9° 2'-6" 3" 1'-5" 3'-3" 3'-3" 15 A8.0 TRANSACTION COUNTERTOP. WOOD, QUARTZ. (QZ-1). 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. COUNTERTOP. SOLID SURFACE. (SSF-1). 13 A8.0 TYP. 4" 3'-5" 3'-5" 3'-5" 1/2" 1/2" 2" 3'-2" 1/2" 3'-2" 1/2" 3'-2" PRIVACY WALL. WOOD, QUARTZ. (QZ-1). SEE 1/A8.1. 3 FORM. 5/8" W/ MIRROR BACKING ON RETURN. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 11'-0" 20'-4" 9'-4" FIN. FLR. 20 A8.0 14 A8.0 4" ADA COUNTER. 5" 11" 2'-7" 3" MAX 2'-10" 10'-1" 25 A8.0 OPEN TOWEL STORAGE W/ ADJUSTABLE SHELVES. PLASTIC LAMINATE. (PL-1). PVC EDGE BANDING TO MATCH. COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). STORAGE CABINET. LOCKABLE. BOTH SIDES. ADJUSTABLE SHELVES. PLASTIC LAMINATE. (PL-1). PVC EDGE BANDING TO MATCH. 3'-5" 3'-3" 3'-5" TOE KICK. RUBBER BASE. (RB-1). ON FACE ONLY. DO NOT TURN ONTO SIDE PANELS. 24 A8.0 25 A8.0 SIM. HARDWARE BY MOCKETT. TYPICAL. (1) SHELF (1) SHELF (2) SHELVES FIN. FLR. 5 1/2" 2'-6" 7'-1 1/2" POWER & DATA ACCESS. 4" 2'-4" 1 1/2" MAX 2'-10" SIDE PANELS. BOTH SIDES. PLASTIC LAMINATE. (PL-1). 1/2" REVEAL AT COUNTERTOP. PAINT REVEAL. (PT-6). ACCOMMODATE THICKNESS OF RUBBER BASE IN FRONT FOR OVERLAP. TV BY OWNER. ACCESS PANEL BEHIND SHELVING. 6" 10'-1" LATERAL FILE. LOCKABLE. PLASTIC LAMINATE. (PL-1). PVC EDGE BANDING TO MATCH. W/ HANGING RAILS. COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). STORAGE CABINET W/ DRAWER. LOCKABLE. PLASTIC LAMINATE. (PL-1). PVC EDGE BANDING TO MATCH. SOFT CLOSE. 0'-1 1/2" FIN. FLR. MAX 2'-10" 4" 2'-5" EQ EQ 4" 1'-10" 6" TV BY OWNER. (2) LAT. FILES (2) LAT. FILES (1) DRAWER (1) SHELF 24 A8.0 25 A8.0 TV STAND. WOOD, PLASTIC LAMINATE. (PL-1). ALL SIDES / TOP. SIDE PANELS. BOTH SIDES. PLASTIC LAMINATE. (PL-1). 1/2" REVEAL AT COUNTERTOP. PAINT REVEAL. (PT-6). ACCOMMODATE THICKNESS OF RUBBER BASE IN FRONT FOR OVERLAP. TOE KICK. RUBBER BASE. (RB-1). ON FACE ONLY. DO NOT TURN ONTO SIDE PANELS. 3'-5" 3'-3" 3'-5" 7'-1 1/2" 2'-6" 5 1/2" 25 A8.0 SIM. (3) CASH DRAWER. BY OWNER. PRINTER CABINET. (PL-1). OPEN SHELF FOR RECEIPT PRINTER.(PL-1). MAX 2'-10" 13 A8.0 14 A8.0 5'-0" 15 A8.0 COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). TRANSACTION COUNTER. QUARTZ. (QZ-1). PRIVACY WALL. WOOD, QUARTZ. (QZ-1). 4'-0" 3/4" 5'-0" 8" 4'-6" 2'-0" 4'-0" 5" DESK INTERIOR. PLASTIC LAMINATE. TYP. ALL AROUND. (PL-1). SUPPORT PANEL. PLASTIC LAMINATE. (PL-1). FIN. FLR. 6" 20 A8.0 A8.1 1 SIM PRIVACY WALL. QUARTZ. (QZ-1). SEE 1/A8.1. LATERAL FILES. SEE 25/A8.0. COUNTER. WOOD, SOLID SURFACE. (SSF-1). TRANSACTION COUNTERTOP, WOOD, QUARTZ. (QZ-1). 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). MAX 2'-10" SIDE PANELS. BOTH SIDES. PLASTIC LAMINATE. (PL-1). 1/2" REVEAL AT COUNTERTOP. PAINT REVEAL. (PT-6). ACCOMMODATE THICKNESS OF RUBBER BASE IN FRONT FOR OVERLAP. HOLD 5'-1" 1'-8" 3 1/2" 1'-5" TV STAND . SEE 25/ A8.0. PLASTIC LAMINATE. (PL-1). A8.1 6 FIN. FLR. 1'-5" 2'-0" 4" 2'-10" 8" 3'-6" 3'-6" MAX 2'-10" 6'-5" 7'-0" 8 A8.0 3 A8.0 10 A8.0 TRANSACTION COUNTERTOP. WOOD, QUARTZ. (QZ-1). 4 A8.0 COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). 5" 1 1/2" 9 1/2" 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 13'-5" 2'-8 1/2" 3 FORM. 5/8" W/ MIRROR BACKING ON RETURN. (3F-1). FASTEN WITH STANCHION BY 3 FORM. EQ 1/2" EQ 1/2" EQ 1/2" EQ FIN. FLR. 2X BLOCKING AS REQUIRED. 3/4" THK P-LAM SHELF ON PULL-OUT SHELF ON GLIDE SYSTEM. ROUTED PULL. (PL-1). ALL AROUND. ADJUSTABLE SHELVES. PLASTIC LAMINATE. 1/2" SHELVES (TYP.) (PL-1). PVC EDGE BAND TO MATCH. 3'-0" MAX 2'-10" COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). CASH DRAWER. BY OWNER. WIRE MANAGEMENT GROMMET. DOUG MOCKETT EDP PLASTIC TYP. COORDINATE FINAL LOCATION W/ OWNER. 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. FIN. FLR. TOE KICK. RUBBER BASE. (RB-1). TYPICAL. ON FACE ONLY. DO NOT TURN ONTO SIDE PANELS. 4" 1'-11" 6" 2" 1'-10" 11" 2'-11" SUPPORT WALL. MDF. 3/4". PAINT WALL (PT-6). ON SIDE OF 3 FORM. A8.1 5 SIM 1" PRINTER. BY OWNER. 2X BLOCKING AS REQUIRED. 3/4" THK P-LAM PULL-OUT SHELF ON GLIDE SYSTEM. ROUTED PULL. (PL-1). ALL AROUND. PRINTER. BY OWNER. ADJUSTABLE SHELVES. PLASTIC LAMINATE. 1/2" SHELVES (TYP.) ALL AROUND. (PL-1). PVC EDGE BANDING TO MATCH. CASH DRAWER. BY OWNER. 2" COUNTERTOP. SOLID SURFACE. (SSF-1). TRANSACTION COUNTERTOP. WOOD, QUARTZ. MITER CORNERS. ALL AROUND. (QZ-1). MAX 2'-10" 3'-6" 11" 1'-5" 2'-0" TOE KICK. RUBBER BASE. (RB-1). TYPICAL ON FACE ONLY. DO NOT TURN ONTO SIDE PANELS. 11" 4" 1'-10" 6" 1 1/2" 1'-10 1/2" 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. FIN. FLR. WIRE MANAGEMENT GROMMET. DOUG MOCKETT EDP PLASTIC TYP. COORDINATE FINAL LOCATION W/ OWNER. 1" 2'-5" 1/2" 3" SUPPORT WALL. MDF. 3/4" PAINT. (PT-6) ON SIDE OF 3 FORM. 3" COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). HOLD 1'-5" PLASTIC LAMINATE. (PL-1). ALL AROUND. 3'-1" WIRE MANAGEMENT GROMMET. DOUG MOCKETT EDP PLASTIC TYP. COORDINATE FINAL LOCATION W/ OWNER. HOLD 1'-5" 2'-8 1/2" 1 1/2" MAX 2'-10" FIN. FLR. 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. SIDE PANELS. BOTH SIDES. PLASTIC LAMINATE. (PL-1). 1/2" REVEAL AT COUNTERTOP. PAINT REVEAL. (PT-6). SUPPORT WALL. MDF. 3/4". PAINT. (PT-6). ON SIDE OF 3 FORM. PLASTIC LAMINATE. (PL-1). ON INTERIOR OF DESK. 1" COUNTER SUPPORT. STEEL. HSS 2" X 2" x 1/4" SUPPORT BRACKET. GRIND EXPOSED EDGES SMOOTH. PROVIDE AS NOTED. A8.1 14 SIM A8.1 6 SIM 3" 3" 1'-0" 2'-6" 3 FORM . 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. A8.1 14 SIM 2X BLOCKING AS REQUIRED. COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). ADJUSTABLE SHELVES. PLASTIC LAMINATE. 1/2" SHELVES(TYP.) (PL-1). PVC EDGE BANDING TO MATCH. TOE KICK. RUBBER BASE. (RB-1). TYPICAL. ON FACE ONLY. DO NOT TURN ONTO SIDE PANELS. 3/4" MDF SUPPORT WALL. PAINT. (PT-6). ON SIDE OF 3 FORM. 0'-4" 2'-6" MAX 2'-10" 2" FIN. FLR. 1'-5" 3'-1" 1'-5" 3" 1'-2 1/2" 1/2" 1" 2'-6" 3" 2X BLOCKING AS REQUIRED. 1'-2" 1'-10" COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). TRANSACTION COUNTERTOP BEYOND. WOOD, QUARTZ. (QZ-1). 11" 1" 2'-7" 1/2" 1'-2" 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 4" FIN. FLR. 3'-6" MAX 2'-10" TOE KICK. RUBBER BASE. (RB-1). CABINET W/ PAPER FILES DRAWERS. PLASTIC LAMINATE. (PL-1). W/ HANGING RAILS. INT. MELAMINE. PVC EDGE BAND TO MATCH. 3'-0" 2'-11" 1/2" 2'-11" 1/2" 1 1/2" 8" 1 1/2" 2" PULL, MOCKETT DP55A. STAINLESS STEEL. 3" 3" 4" 2'-1" SUPPORT WALL. MDF. 3/4" PAINT. (PT-6) ON SIDE OF 3 FORM. 2X BLOCKING AS REQUIRED. COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). TRANSACTION COUNTERTOP. WOOD, QUARTZ. MITER CORNERS. ALL AROUND. (QZ-1). 3'-6" 9 1/2" 1'-4" 2'-0" 11" 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. WIRE MANAGEMENT GROMMET. DOUG MOCKETT EDP PLASTIC TYP. COORDINATE FINAL LOCATION W/ OWNER. 1" 2'-7" 1/2" 3" 3" 4" 2'-1" 3'-4" MAX 2'-10" FIN. FLR. A8.1 5 SIM SUPPORT WALL. MDF. 3/4" PAINT. (PT-6) ON SIDE OF 3 FORM. STORAGE CABINET W/ ADJUSTABLE SHELF. PLASTIC LAMINATE. (PL-1). PVC EDGE BANDING TO MATCH. INT. MELAMINE. 1'-2" 1'-2" 0'-4" COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). MAX 2'-10" PULL, MOCKETT DP55A. STAINLESS STEEL. LATERAL FILE. PLASTIC LAMINATE. (PL-1). W/ HANGING RAILS. PVC EDGE BANDING TO MATCH. INT. MELAMINE. 1'-3" 2" 3 1/2" 2" 1'-6" 1/2" 1'-8" 3 1/2" 1'-4" 1/2" FIN. FLR. 3'-0" 1 1/2" 4" 2'-4" 1 1/2" 2X BLOCKING AS REQUIRED. POWER & DATA ACCESS. COORDINATE WITH ELECTRICAL. TV STAND SUPPORT. 2X. BRACE THROUGH CENTER OF CABINET. CANTILEVER VERTICALLY. STRUCTURE FOR FLUSH TV MOUNTS. TV. BY OWNER. MOUNTED TO EACH SIDE OF STAND. VERIFY POWER & DATA. COORDINATE W/ OWNER. TOE KICK. RUBBER BASE. (RB-1). TYPICAL. ON FACE ONLY. DO NOT TURN ONTO SIDE PANELS. TV STAND. ONE SIDE OF UNIT. WOOD, PLASTIC LAMINATE. (PL-1). ALL SIDES AND TOP. 4 ACCESS PANEL. 1'-8" 3 1/2" COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1) ADJUSTABLE SHELVES. PLASTIC LAMINATE .1/2" SHELVES (TYP.) (PL-1). PVC EDGE BANDING TO MATCH. STORAGE CABINET W/ DRAWER. PLASTIC LAMINATE. LOCKABLE. (PL-1). TOE KICK. RUBBER BASE. TYPICAL. (RB-1). CABINET INTERIOR: MELAMINE BOARD. 2X BLOCKING AS REQ. 4" 1'-10" 6 1/2" 1 1/2" FIN. FLR. PULL, MOCKETT DP55A. STAINLESS STEEL. OPEN TOWEL STORAGE. PLASTIC LAMINATE. SOFT CLOSE. ADJUSTABLE SHELVES. (PL-1). PVC EDGE BANDING TO MATCH. 2'-8 1/2" 1 1/2" 2" 1'-6" 3 1/2" 1'-3" WIRE MANAGEMENT GROMMET. DOUG MOCKETT EDP. BLACK PLASTIC. TYPICAL. COORDINATE FINISH LOCATION WITH OWNER. 1/2" 3'-5 1/2" ACCESS PANEL AS REQ. MELAMINE. 2" 1'-5" A8.1 2 SIM TYP. 2X BLOCKING AS REQUIRED. TRANSACTION COUNTERTOP BEYOND. WOOD, QUARTZ. (QZ-1) SUPPORT PANEL BEYOND. PLASTIC LAMINATE. (PL-1) COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1) 3" MAX 2'-10" 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 11" 1 1/2" 3'-0" WIRE MANAGEMENT GROMMET. DOUG MOCKETT EDP PLASTIC TYP. COORDINATE FINAL LOCATION W/ OWNER. FIN. FLR. A8.1 5 SIM 3 1/2" SUPPORT WALL. MDF. 3/4" PAINT. (PT-6) ON SIDE OF 3 FORM. 2'-8 1/2" SUPPORT PANEL. PLASTIC LAMINATE. (PL-1). FIN. FLR. TRANSACTION COUNTER. WOOD, QUARTZ. (QZ-1). COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). MAX 2'-10" 3'-0" 1 1/2" 3'-6" SUPPORT WALL. MDF. 3/4" PAINT. (PT-6) ON SIDE OF 3 FORM. PLASTIC LAMINATE (PL-1) ON INTERIOR OF DESK. 1'-6" 1'-5" 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 1" 1/2" 3 1/2" 3'-1" 2'-3" CASH DRAWER. BY OWNER. COUNTERTOP. WOOD, SOLID SURFACE. (SSF-1). TRANSACTION COUNTERTOP. WOOD, QUARTZ. (QZ-1). CABINET BEYOND. PLASTIC LAMINATE. (PL-1). SUPPORT WALL. MDF. 1/2". PAINT. (PT-6). ON SIDE OF 3 FORM. PLASTIC LAMINATE (PL-1). ON INTERIOR OF DESK. 3 FORM. 5/8" W/ MIRROR BACKING. (3F-1). FASTEN WITH STANCHION BY 3 FORM. 1" 2'-5 1/2" FIN. FLR. 4" 6" 1 1/2" 1'-5" MAX 2'-10" 1'-5" 3" 1'-5" 3'-1" 2" 2'-0" A8.1 14 SIM ARCHITECTS ARCHITECTS PLANNERS WILLIAMS Phone 630-221-1212 / Fax 630-221-1220 500 Park Boulevard, Suite 800, Itasca, IL 60143 revised waa no date drawn checked williams/associates/architects, ltd. COPYRIGHT C 2017 CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER ENTRANCE AND FITNESS EXPANSION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 ISSUED FOR BID - ISSUED 30 JUNE 2017 2016-060 30 JUNE 2017 NLC / JCS / AMZ FP / NLC / CAK ISSUED FOR BID INT. ELEV./ EAST DESK (SIDE) SCALE: 3/8" = 1'-0" 7 INT. ELEV./ EAST DESK (BEHIND) SCALE: 3/8" = 1'-0" 2 ENLARGED PLAN/ EAST DESK SCALE: 1/4" = 1'-0" 6 ENLARGED PLAN/ MAIN DESK SCALE: 1/2" = 1'-0" 17 INT. ELEV./ MAIN DESK (FRONT) SCALE: 1/4" = 1'-0" 11 INT. ELEV./ SERVICE COUNTER (FACING PUBLIC) SCALE: 1/2" = 1'-0" 19 INT. ELEV./ SERVICE COUNTER (FACING MAIN DESK) SCALE: 1/2" = 1'-0" 18 INT. ELEV./ MAIN DESK (BEHIND) SCALE: 1/4" = 1'-0" x INT. ELEV./ MAIN DESK & SERVICE COUNTER (SIDE) SCALE: 1/4" = 1'-0" 23 INT. ELEV./ EAST DESK (FRONT) SCALE: 3/8" = 1'-0" 1 SECTION/ EAST DESK - PRINTER CABINET SCALE: 3/4" = 1'-0" 10 SECTION/ MAIN DESK - PRINTER CABINET SCALE: 3/4" = 1'-0" 13 SECTION/ MAIN DESK - ADA COUNTER SCALE: 3/4" = 1'-0" 15 SECTION/ MAIN DESK - RECEIPT CABINET SCALE: 3/4" = 1'-0" 14 SECTION/ EAST DESK - FILE CABINET SCALE: 3/4" = 1'-0" 8 SECTION/ EAST DESK -TRANSACTION COUNTER SCALE: 3/4" = 1'-0" 3 SECTION/ SERVICE COUNTER - TV STAND / CABINETS SCALE: 3/4" = 1'-0" 25 SECTION/ SERVICE COUNTER - CABINET/ OPEN STORAGE SCALE: 3/4" = 1'-0" 24 SECTION/ EAST DESK - SUPPORT PANEL SCALE: 3/4" = 1'-0" 4 12 GENERAL NOTES: 1. ALL UNDER COUNTER CABINETS/ SHELVING SHOULD BE ADJUSTABLE. 2. PROVIDE ALL CABINET HARDWARE AS MANUFACTURED BY MOCKETT NO. DP55A-SSS. 3. PROVIDE CONTINUOUS HINGE AT COUNTER CABINETS. 4. FINISH INTERIORS OF CABINETS AND DESK. P-LAM. (PL-1) TYPICAL. IF ENCLOSED, MELAMINE. 5. ALL PLASTIC CABINETS TO HAVE MATCHING PVC EDGE BANDING. 6. STANCHION BY 3 FORM TO BE: 1" POINT SUPPORT. SECTION/ EAST DESK - ADA FACING TRANSACTION COUNTER SCALE: 3/4" = 1'-0" 9 SECTION/ MAIN DESK - ADA FACING TRANSACTION COUNTER SCALE: 3/4" = 1'-0" 20 GRAPHIC NORTH A8.0 MILLWORK NORTH R: 136'-6" A8.1 T T T T T T T T T T (E) T T T T T T T T T 2'-8" 1'-9" 2'-0" 5'-11" TO 8'-2" AFF TO B/ SOFFIT DEMOLITION KEYNOTES 2 A1.1A 5 D6 A2 A1 D6 A2 A1.1A 5 A2 A1 A18 D1 D3 D6 A2 A1 A7 A6 8'-2" A5 A4 A1 T T T T T T T T T T T A2 A1 A7 D1 D2 D3 D4 D8 A6 A2 A1 A6 D6 D7 D8 A1 A4 A5 D5 A18 A15 D8 TYP D10 100% 3'-0" 4" 5'-0" A10 TYP OF 2 A10 A21 100% A1 A9 A11 A15 FLR MTD POWER STRIPS A11 A15 EQ EQ A8 100% - SEE INTERIORS FOR COLOR. PAINT STRUCTURAL BEAMS, COLUMNS AND BRACING GRAY TO MATCH EXISTING ADJACENT STRUCTURE. A22 FAN A22 FAN A22 FAN A22 FAN SCALE: 1/8" = 1'-0" BRIDGE SEE MECH DWGS SEE MECH DWGS A2.1 10 OPEN 6'-0" 6'-0" 2'-9" 1'-8" 6'-0" 12'-0" 5'-0" 4'-2" 14'-7" 3'-10 1/2" ALIGN 15'-0" ALIGN 9'-5" R151'-5" 1'-6 1/2" EL= +9'-0" B/ GYP BD SOFFIT 4'-8" ALIGN DEMOLITION KEYNOTES 2 A1.2 19 TYP A14 A12 A13 A14 A12 A14 A12 A13 A17 A14 A15 TYP OF 7 A22 A16 D8 TYP OF 3 D10 APPROX 300 SF D12 D13 A13 A12 D11 A22 PAINT SIDES & BOT. TO MATCH EX. ADJ. SOFFIT. (GRAY) 1'-5" 6'-0" D18 D8 A7 A25 A8.0 6 1'-6" 2" 3'-2" 5" 3'-2" 5" 3'-2" 5" 3'-2" 5" 2" ȭ DESK ȭ ȭȭ ȭȭ ȭȭ ȭȭ ƒ ƒ A1.2 24 3 1/2" 2" 2'-0" 3'-2" 5" ȭ ȭ ȭȭ A1.1A 20 TYP A1.1A 15 TYP A12 D14 D14 D14 D14 A13 D14 7'-4" MIN. HEADROOM TO B/ SIGNAGE A14 A19 A19 7'-4" MIN HEADROOM TO B/ SIGNAGE A1.1A 25 INT ELEV / RAMP GUARDRAIL WEST BUILDING FRONT ENTRANCE D14 A13 D3 NEW GUARDRAIL EXISTING GUARDRAIL SCALE: 1/4" = 1'-0" 19 SCALE: 1/4" = 1'-0" 18 3'-7" 5" 3'-2" 5" 5" 1'-2 1/2" 5" 5" 3'-2" 5" 3'-2" 5" 3'-2" 5" 3'-2" 6 1/2" 5 1/2" ƒ ƒ ƒ ȭ ȭ ȭ ȭ ȭ ȭ ȭȭ ȭȭ ȭ ȭ ȭ ȭ ȭ ȭ ȭ ȭ ȭ 3 '-7" 5" 5" 3'-7" 5" 3'-7" 5" CORNER OF NEW DESK ȭ ȭ ȭ ȭ ȭ ȭ ȭ ȭ ȭ 6" 6" 3'-7" 6" 3'-7" 6" 3'-7" 6" 6" PLAN DETAIL / GUARDRAILS N ȭ ȭ ȭ ȭ ȭ ȭ ȭȭ 6" 3'-7" ƒ 5" ȭ ȭ ȭ 3'-7" 1'-11" ȭ ȭ 10 1/2" ȭ ȭ LAYOUT PLAN DETAIL / GUARDRAILS AND GATES PLAN DETAIL / GUARDRAILS AND GATES SCALE: 1/4" = 1'-0" 23 LAYOUT LAYOUT 5" 3'-7" 7" 5"1'-0" 3'-2" 10" 5" 5" 1'-4" 7" ȭȭ ȭ ȭȭ ȭ ȭ ȭȭ ȭȭ ȭ 5'-5 1/2" 1'-4 1/2" 3'-0" LANDING RAMP PLAN DETAIL / GUARDRAILS AND GATES SCALE: 1/4" = 1'-0" 24 LAYOUT AT DESK 4 1/2" 1'-1 1/2" 3'-2" 1'-1 1/2" 4 1/2" 5" ȭ ȭ ȭ ȭ ȭ 3'-2" 1'-1" 1'-9" ȭ ȭ ȭ ȭ ȭ 6" ȭ TYP OF 5 D8 D10 D13 D12 A20 A15 A14 A17 A16 A23 BOTH SIDES 23'-5" 6'-4" 4'-0" 22'-2" D18 A24 A7 A25 TYP OF 4 A22 DETAIL/ SCALE: 1-1/2" = 1'-0" 15 ARCHITECTURAL FINISH NOTES 5 NEW FEATURE WALL DETAIL/ SCALE: 1-1/2" = 1'-0" 20 MASONRY DOOR JAMB RETROFIT DETAIL NEW FEATURE WALL DETAIL/ SCALE: 1-1/2" = 1'-0" 25 MASONRY DOOR LINTEL RETROFIT DETAIL NEW FEATURE WALL MASONRY END RETROFIT DETAIL A9.1 15 A9.1 10 9 A1.1B 16'-0" 12'-2" HORIZ. D19 A27 A8.0 17 A1.1B 18 A1.1B 19 A1.1B 23 A1.1B 24 DEAD LOAD 25 psf LIVE LOAD 20 psf SNOW LOADS GROUND SNOW - 20 PSF IMPORTANCE FACTOR - 1.1 GENERAL THE STRUCTURAL FRAMING INDICATED ON THE FOLLOWING STRUCTURAL DOCUMENTS ARE TENANT IMPROVEMENTS TO AN EXISTING STRUCTURE. STRUCTURAL IMPROVEMENTS ARE DESIGNED IN ACCORDANCE WITH THE BUILDING CODE NOTED ABOVE ALL EXISTING FRAMING SHOWN IS BASED ON THE ORIGINAL STRUCTURAL DESIGN DRAWINGS THORNTON TAMASETTI GROUP DATED 2007. THE CONTRACTOR SHALL VERIFY IN THE FIELD ALL EXISTING CONDITIONS INCLUDING ALL DIMENSIONS AND ELEVATIONS. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND THE DESIGN DOCUMENTS. THE STRUCTURAL DRAWINGS ARE TO BE USED IN CONJUNCTION WITH THE ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS. REFERENCE MUST BE MADE TO ALL BID DOCUMENTS AS WELL AS THE PROJECT SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL AND ARCHITECTURAL DRAWINGS AND WITH THE MECHANCIAL CONTRACTOR, THE LOCATION OF ALL MECHANCIAL EQUIPMENT. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IF THE WEIGHT OF MECHANICAL UNITS ETC. ARE DIFFERENT FROM THE WEIGHTS POSTED ON THE DESIGN DRAWINGS. DISCREPANCIES SHALL BE RESOLVED BEFORE PROCEEDING WITH CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY OF ANY DISCREPANCIES TO AVOID THE POSSIBILITY OF UNNECESSARY FUTURE PROBLEMS AND POSSIBLE FIELD ORDERS. FAILURE TO DO SO WILL PUT THE FULL RESPONSIBILITY OF CORRECTION ON THE CONTRACTOR. THE CONTRACTOR SHALL COORDINATE THE WORK OF ALL TRADES AND MAKE NECESSARY INVESTIGATIONS AND FIELD MEASUREMENTS. DO NOT SCALE DRAWINGS. THE STRUCTURAL ENGINEER HAS NO SUPERVISORY RESPONSIBLITY, HAS NO CONTROL OF OR RESPONSIBILITY FOR THE MEANS, METHODS, TECHNIQUES, PROCEDURES OR SEQUENCE OF CONSTRUCTION, HAS NO RESPONSIBILITY FOR THE FAILURE OF ANY CONTRACTOR TO PERFORMTHE WORK IN ACCORDANCE WITH THE DESIGN DOCUMENTS AND NO RESPONSIBILITY TO DEVISE, IMPLEMENT OR ENFORCE ANY SAFETY PRECAUTIONS OR PROGRAMS FOR THE PROJECT. STRUCTURAL STEEL GENERAL ALL STRUCTURAL STEEL WORK SHALL CONFORM TO THE AISC "SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS" 2010, "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS" 2010, "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES," 2010 AND AWS D1.1 2010. THE PROVISIONS OF THE ALLOWABLE STRENGTH DESIGN METHOD (ASD) WAS USED AS A BASIS FOR DESIGN. THE CONTRACTOR’S STRUCTURAL STEEL DETAILER SHALL PREPARE STEEL ERECTION AND SHOP DRAWINGS IN ACCORDANCE WITH THE GUIDELINES AND GOOD PRACTICES NOTED IN THE AISC “DETAILING FOR STEEL CONSTRUCTION.” THIRD EDITION SUBMITTALS CHECKED STEEL SHOP DRAWINGS.PREPARED IN ACCORDANCE WITH AISC DETAILING FOR STEEL CONSTRUCTION 3RD ED. MATERIALS ALL STRUCTURAL STEEL PLATES AND ANGLES SHALL BE ASTM A36 (Fy=36 KSI). ALL WELDING SHALL CONFORM TO AMERICAN WELDING SOCIETY "STRUCTURAL WELDING CODE", AWS D1.1. ALL WELD ELECTRODES SHALL BE E70XX AND ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS. ALL WELDING TO CLEAN BARE STEEL. ALL STEEL SHALL BE SHOP COATED WITH PRIME PAINT AS SPECIFIED. MASK SURFACES TO BE FIELD WELDED AND AT BOLT HOLES IN FAYING SURFACES OF SLIP CRITICAL BOLTED CONNECTIONS. EXECUTION VERIFY THAT FIELD CONDITIONS ARE ACCEPTABLE AND ARE READY TO RECEIVE WORK. STEEL ERECTION TOLERANCES SHALL BE IN ACCORDANCE WITH THE CODE OF STANDARD PRACTICE. METAL DECK - EXISTING DO NOT HANG ANY LOADS EXCEEDING 50 LBS FROM EXISTING METAL DECK UNISTRUT MEMBERS ALL UNISTRUT MEMBERS SHALL BE BY UNISTRUT INC AND INSTALLED PER MANUFACTURER'S INSTRUCTIONS STRUCTURAL STABILITY AND CONSTRUCTION INDIVIDUAL STRUCTURAL COMPONENTS ARE DESIGNED TO SUPPORT LOADS IN THEIR FINAL ERECTED POSITION AS PART OF THE TOTAL COMPLETED STRUCTURE. PROVIDE TEMPORARY GUYING AND BRACING AS REQUIRED UNTIL ALL CONSTRUCTION AFFECTING LATERAL STABILITY IS COMPLETED. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR STABILITY OF STRUCTURE, ITS PARTS AND JOB SITE SAFETY BY USE OF GUYING, BRACING, SHORING, BARRICADES, SAFETY RAILINGS AND DEVICES DURING THE ENTIRE PERIOD OF CONSTRUCTION. DEMOLITION THE CONTRACTOR SHALL CAREFULLY REMOVE ONLY THE EXISTING ITEMS IDENTIFIED ON THE ARCHITECTURAL DRAWINGS. IN NO CASE SHALL THE REMOVAL OF ANY PORTION OF THE EXISTING STRUCTURE BE PERFORMED IN SUCH A WAY AS TO AFFECT THE STRUCTURAL INTEGRITY OF THE REMAINING PORTION OF THE BUILDING. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY OF ANY STRUCTURAL ITEMS WHICH NEED TO BE DEMOLISHED BUT ARE NOT CLEARLY IDENTIFIED ON THE STRUCTURAL OR ARCHITECTURAL DRAWINGS. THE CONTRACTOR SHALL MINIMIZE THE EXTENT OF THE DEMOLITION TO THE EXISTING STRUCTURE TO ONLY THAT REQUIRED TO INSTALL THE NEW BUILDING MODIFICATIONS. RISK OCCUPANCY III UNIFORM FLAT ROOF - 22 PSF EXPOSURE FACTOR - 1.0 THERMAL FACTOR - 1.0 WIND LOADS BASIC WIND SPEED - 120 MPH RISK CATEGORY - III EXPOSURE CATEGORY - C INTERNAL PRESSURE COEFFICIENT - +/- .18 SEISMIC LOADS IMPORTANCE FACTOR - 1.25 Ss - .146 Sds - .156 S1 - .081 Sd1 - .13 SITE CLASS D SEISMIC DESIGN CATEGORY B ALL STRUCTURAL HSS SHALL BE ASTM A500 GR B (Fy=4 KSI). T/ EXIST. STEEL EL. 25'-4 1/4"(V.I.F.) EXIST. ROOF DECK (V.I.F.) UNISTRUT P1001 1/2"Ø A36 THRD'D HANGER ROD, TYP. HPC SEE MECH. SHTS. EXIST. W14 (V.I.F.) UNISTRUT P2786 BRACKET, EACH SIDE UNISTRUT P1000 EXIST. W14 (V.I.F.) EXIST. W14 (V.I.F.) EXIST. W14 (V.I.F.) EXIST. L6X6 HORIZ BRACE V.I.F.) CU ERU HSS3-1/2X3-1/2X1/4 L4X3X1/4X4" HSS3-1/2X3-1/2X1/4 FIT BETWEEN FLUTS 4 1/8" VIF BRIDGE ROOF FRAMING PLAN SCALE: 1/8" = 1'-0" 1 SECTION SCALE: 3/4" = 1'-0" 2 GENERAL NOTES 3 williams/associates/architects, ltd. COPYRIGHT C 2017 revised waa no date drawn ARCHITECTS checked ARCHITECTS PLANNERS WILLIAMS Phone 630-221-1212 / Fax 630-221-1220 500 Park Boulevard, Suite 800, Itasca, IL 60143 GRAPHIC NORTH CARMEL CLAY PARKS& RECREATION MONON COMMUNITY RECREATION CENTER FITNESS AND CONTROL DESK RENOVATION 1235 CENTRAL PARK DR E CARMEL - INDIANA - 46032 2016-060 30 JUNE 2017 NLC / JCS / AMZ FP / NLC / CAK ISSUED FOR BID ISSUED FOR BID - ISSUED 30 JUNE 2017 S1.0 PLAN & GENERAL NOTES CT CERAMIC TILE G GROUT WD WOOD RF RUBBER FLOORING LN LINOLEUM CONC CONCRETE PL PLASTIC LAMINATE SSF SOLID SURFACE QZ QUARTZ SURFACE MATERIAL P PAINT WC WALL COVERING TP TOILET PARTITION 3F 3FORM RESIN PANEL INT INTERLAM MDF PANEL TZ TERRAZZO FLOORING MISC MISCELLANEOUS NIC NOT IN CONTRACT NA NOT APPLICABLE NTS NOT TO SCALE GENERAL INFORMATION G1.0 TITLE SHEET G1.1 ABBREVIATIONS, SYMBOLS, LEGENDS, & SHEET INDEX STRUCTURAL S1.0 STRUCTURAL PLAN AND GENERAL NOTES ARCHITECTURAL A0.1 FIRST FLOOR KEY PLAN A0.2 SECOND FLOOR KEY PLAN A1.1A FIRST FLOOR WEST BUILDING ENTRY A1.1B FIRST FLOOR WEST BUILDING ENTRY A1.2 FIRST FLOOR EAST BUILDING ENTRY A2.1 SECOND FLOOR BRIDGE A2.2 SECOND FLOOR FITNESS PLAN (MULTI) A8.0 CASEWORK PLANS, ELEVATIONS AND DETAILS A8.1 CASEWORK DETAILS A9.0 DOOR SCHEDULE AND DETAILS INTERIOR DESIGN ID1.0 INTERIOR FIRST FLOOR - FLOOR FINISH PLAN ID2.0 INTERIOR SECOND FLOOR - FLOOR FINISH PLAN MECHANICAL M0.01 MECHANICAL TITLE SHEET MD1.01 DUCTWORK DEMOLITION MD2.01 PIPING DEMOLITION M1.01 DUCTWORK NEW WORK - FIRST FLOOR PLAN M1.02 DUCTWORK NEW WORK - BRIDGE M2.01 PIPING NEW WORK - FIRST FLOOR PLAN M2.02 PIPING NEW WORK - SECOND FLOOR PLAN M3.01 MECHANICAL DETAILS M3.02 MECHANICAL DETAILS M4.01 MECHANICAL SCHEDULES M5.01 MECHANICAL SPECIFICATIONS M5.02 MECHANICAL SPECIFICATIONS ELECTRICAL E0.01 ELECTRICAL TITLE SHEET ED1.01 LIGHTING DEMOLITION - FIRST FLOOR PLAN ED1.02 LIGHTING DEMOLITION - SECOND FLOOR PLAN ED2.01 POWER DEMOLITION - FIRST FLOOR PLAN ED2.02 POWER DEMOLITION - SECOND FLOOR PLAN E1.01 LIGHTING NEW WORK - FIRST FLOOR PLAN E1.02 LIGHTING NEW WORK - SECOND FLOOR PLAN E2.01 POWER NEW WORK - FIRST FLOOR PLAN E2.02 POWER NEW WORK - SECOND FLOOR PLAN FIRE PROTECTION FP0.01 FIRE PROTECTION TITLE SHEET FPD1.01 FIRE PROTECTION DEMOLITION PLANS FP1.01 FIRE PROTECTION NEW WORK PLANS FIRE RATINGS