HomeMy WebLinkAbout0090 00000C Bid Documents (Add 2 Spec)Monon Community Center Entrance and Fitness
Expansion Project ITB-7 Carmel/Clay Board of Parks and Recreation
2014-060 Instructions to Bidders
delivered after the designated time in the Notice To Bidders will be returned to the
Bidder unopened.
6.2. All Bid Documents as herein prescribed must be submitted with, and as integral
parts of, each Bid Submission and shall be subject to all requirements of the
Contract Documents, including drawings and these Instructions To Bidders. Bid
Documents must be properly filled in and completed in every material respect and
without interlineations, excisions, special conditions, qualifications or exceptions.
Each Bid Document requiring a signature shall be signed by an individual duly
authorized to execute such document on Bidder’s behalf. A Bid executed by a
corporation, joint venture, or other entity with an assumed name shall have the
legal and correct name thereof followed by the word “by” and the signature and
title of the officer or other person authorized to sign for it and a corporate resolution
or similar document authorizing such person to bind the entity.
6.3. The Bid Documents to be thus submitted by each Bidder shall consist of all of the
following (6.3.1, 6.3.2 and 6.3.3):
6.3.1. Bidder’s Itemized Proposal and Declarations. A sample of this form is
included in the Project Manual and must be utilized by all Bidders. Such
document includes and consists of the following constituent “Parts”:
Request for Substitution
Bid Proposal Summary Page and Bidder Reminder List to be included in Bid
Package
Part 1 - Bidder Information;
Part 2 - Proposal (Bid);
Part 3 - Contract Items and Unit Prices;
Part 4 - Contract Documents and Addenda;
Part 5 - Exceptions;
Part 6 - Financial Statement (Revised 2013 State Form 96);
Part 7 - Additional Declarations;
Part 8 - Non-Collusion Affidavit;
Part 9 - IRAN Certification;
Part 10 - Non-Discrimination Affidavit;
Part 11 - Domestic Steel Affidavit;
Part 12 - E-Verify Affidavit;
Part 13 - Signature Affidavit.
POST Bid Submittal Requirements
Manufacturers List;
Subcontractors List;
Monon Community Center Entrance and Fitness
Expansion Project ITB-8 Carmel/Clay Board of Parks and Recreation
2014-060 Instructions to Bidders
Certificate of Insurance;
Surety Letter of Intent; and
Joint Venture Agreement (if applicable).
6.3.2. Bid Security in the form of a Bid Bond or Certified Check in an amount not less
than ten percent (10%) of the Bid price. Such Bid Security shall serve as security
to insure the execution of the Agreement and the furnishing of other required
documents by the successful Bidder, including Performance and Payment
Bonds. A sample Bid Bond form is included in the Project Manual and such form,
or such other form as may be approved in advance by Owner, shall be utilized if
such a bond is furnished as Bid Security. A Bid Bond shall be executed by a
surety company licensed to transact such business in the State of Indiana and
qualified as a surety under the underwriting limitations on the current list of
“Surety Companies Acceptable on Federal Bonds,” as published in the U.S.
Treasury Department Circular No. 570 and its supplements; the Bidder shall also
furnish as part of the Bid Submission a signed power of attorney establishing the
authority of the person executing such Bid Bond on behalf of the surety. Bid
Security shall be held until the Agreement is executed with the successful Bidder.
In the event that all Bids are rejected, the Bid Security of all Bidders will be
returned. No “Annual” Bid bonds, cash deposits or cashiers’ checks will be
accepted.
6.3.3. Drug Plan. Consistent with Section 12, each Bidder shall submit with and as a
part of their Bid that results in a contract equal to or more than One Hundred Fifty
Thousand and no/100’s Dollars ($150,000), a written plan for a program to test
the Bidder’s employees for drugs consistent with Indiana Code § 4-13-18-1
through Indiana Code § 4-13-18-7.
6.4. Bids may be withdrawn by a Bidder in person during normal hours of business prior
to the time fixed for opening of Bids. In the event of a valid withdrawal of a Bid, the
Bid Security of the withdrawing Bidder will be returned promptly. No Bid may be
withdrawn after opening of Bids has commenced except after expiration of such
period following the Bid Date as is specifically provided in the Notice To Bidders or
as otherwise governed by law.
6.5. Bids will be received up to the time specified in the Notice To Bidders except in the
event that the date is changed as allowed under Indiana Code § 36-1-12-4. Bids
received after that time will be returned unopened. All Bids will be stamped
showing the date and time received.
7. POST-BID REQUIREMENTS
Within three (3) business days of notification by Owner, the apparent lowest responsive
Bidder will be required to submit additional Documents and satisfy additional
requirements as conditions to such Bidder being found by the Owner to be a responsible
Bidder, as follows:
7.1. Proof of Insurability. The Bidder shall furnish: (1) proof of insurance showing
existing coverage in accordance with the terms and amounts stated in the
Standard General Conditions, or (2) a letter or statement certifying that, in the
Monon Community Center Entrance and Fitness
Expansion Project ITB-9 Carmel/Clay Board of Parks and Recreation
2014-060 Instructions to Bidders
event that the Bid is awarded by the Owner, an insurance company will provide
the required coverage to the Bidder submitting the Bid. Such proof of insurance
or the letter/statement shall be issued by a financially responsible insurance
company authorized to do business in the State of Indiana with at least the
minimum rating as set forth in the Standard General Conditions.
7.2. Surety Letter of Intent. The Bidder shall furnish a written statement or letter from
a Surety company licensed to transact such business in the State of Indiana and
qualified as a surety under the underwriting limitations on the current list of “Surety
Companies Acceptable on Federal Bonds”, as published in U.S. Treasury
Department Circular No. 570 which assures the Owner that, in the event the Bid is
accepted and a Contract is awarded by Owner, said Surety will execute and deliver
both a Performance Bond and Payment Bond as required by the Contract
Documents.
7.3. Joint Venture Agreement. If the Bidder is a joint venture, partnership or other
combination of two or more persons or entities, the Bidder shall submit a copy of
the joint venture or other Agreement by which such joint venture, partnership or
other association has been formed, executed by all such participating persons or
entities. If the Bid is signed by less than all parties that comprise the Bidder,
suitable written evidence of the authority of such signing party to bind all such
parties must also be furnished.
7.4. Manufacturers List. The Bidder shall submit a completed Manufacturers list on the
form provided in these Bid Documents.
7.5. Subcontractors List. The Bidder shall submit a completed Subcontractors list on
the form provided in these Bid Documents.
8. BID EVALUATION AND AWARD
8.1. Owner reserves the right to reject any and all Bids, including without limitation the
rights to reject any and all nonconforming, non-responsive, unbalanced or
conditional Bids and to reject the Bid of any Bidder if Owner believes that it would
not be in the best interest of the Project to make an award to that Bidder, whether
because the Bid is not responsive or the Bidder is unqualified or of doubtful
financial ability or fails to meet any other pertinent standard or criteria established
by the Owner. Discrepancies in the multiplication of units of Work and unit prices
will be resolved in favor of the unit prices. Discrepancies between the indicated
sum of any column of figures and the correct sum thereof will be resolved in favor
of the correct sum. Discrepancies between words and figures will be resolved in
favor of words.
8.2. Award of the Contract will be made to the lowest, responsible and responsive
Bidder where the Bid is reasonable and does not exceed the funds available for
the Project. The Owner reserves the right to reject all Bids and may waive or allow
a Bidder to correct errors, omissions or other irregularities in Bid Documents
consistent with applicable law and that are found not to have afforded the Bidder
a material competitive advantage over other Bidders.
Monon Community Center Entrance and Fitness
Expansion Project ITB-10 Carmel/Clay Board of Parks and Recreation
2014-060 Instructions to Bidders
8.2.1. Owner shall have the right to accept Alternates in any order or combination
or accept on the basis of the Base Bid alone and to determine the lowest
responsible and responsive Bidder on the basis of the sum of the Base Bid
and Alternates accepted.
8.3. The Owner shall have the right to reject any Bid if investigation of the Bidder fails
to satisfy the Owner that such Bidder is properly qualified to carry out the
obligations and complete the Work. Any or all Bids will be rejected if there is
reason to believe that collusion exists among Bidders.
8.4. Owner may consider the qualifications and experience of Subcontractors,
Suppliers, and other persons and organizations proposed for those portions of the
Work as to which the identity of Subcontractors and other persons and
organizations must be submitted as provided in the Standard General Conditions.
Owner also may consider the operating costs, maintenance requirements,
performance data, and guarantees of major items of materials and equipment
proposed for incorporation in the Work when such data is required to be submitted
prior to Notice Of Award.
8.5. For Contract Items and Unit Prices, estimated quantities and unit prices will serve
as the basis for determining the proposed price of each Bid. Patent math errors in
statements of Unit Prices or Totals may be corrected by the Owner or
Architect/Engineer, in which case the corrected amounts will be used for the
purpose of Bid evaluation, comparison and other award considerations. However,
neither the Owner nor the Architect/Engineer shall be required to discover or
correct any error or omission in a Bid and the Bidder shall assume the risk of and
be bound to the consequences of any such error or omission.
8.6. The Owner may, at its sole option, award the Contract to a Bidder on a conditional
basis to afford the Bidder additional time and opportunity to submit required
documents or to fulfill other requirements. In such case, the Owner will furnish to
the Bidder a notice of conditional award, which will establish (i) the additional
conditions to be fulfilled for the award to become effective, and (ii) the time limit
within which such conditions shall be satisfied. If the Bidder fails to satisfy the
conditions in the manner and within the time specified in such notice, the Owner
may declare such Bidder to be non-responsive and award the Contract,
conditionally or unconditionally, to another Bidder. Time limitations governing the
Owner’s award of the Contract shall be extended for such additional period as may
be required to effectuate the conditional award procedure set forth in this Sub-
section, and no Bid may be withdrawn during such period of extension.
8.7. If the Contract is to be awarded, Owner will give the Successful Bidder a Notice Of
Award as soon as practicable after the Bid Date.
9. NOTICE OF AWARD AND AWARD PROCEDURE
9.1. Prior to execution of the Agreement, the Owner will issue to the successful Bidder
a Notice Of Award stating that its Bid was the lowest responsible and responsive
Bid and that the enclosed Agreement is submitted for execution without further
negotiation. If the successful bidder finds it in accordance with the Contract
Monon Community Center Entrance and Fitness
Expansion Project ITB-11 Carmel/Clay Board of Parks and Recreation
2014-060 Instructions to Bidders
Documents, it is to be returned to the Owner by certified mail or in person within
six (6) calendar days after receipt for further execution (but not later than ten (10)
days after the acceptance of the Bid). Failure to fully execute the proper
Agreement and furnish the ancillary documents shall constitute reason for
surrender of the Bid Bond or certified check.
10. CONTRACT EXECUTION; SUBMITTALS
10.1. Within six (6) calendar days after the award notice, but no later than ten (10) days
after the acceptance of the Bid, the successful Bidder shall sign and deliver at least
two (2) counterparts of the Agreement with original signatures and only one (1)
Agreement with original signatures if the Bidder is satisfied with a copy thereof,
utilizing the form thereof included in the Project Manual and make delivery thereof
to the Owner, along with other Documents as prescribed by the Contract
Documents. After execution and delivery of the Agreement and other required
Documents, and acceptance thereof by the Owner, the Bid Security furnished by
each Bidder will be returned to the respective Bidders upon request. The
successful Bidder may deliver directly to Owner and/or through the
Architect/Engineer, an electronic copy of the signed Agreement to evidence a good
faith effort to meet the six (6) or ten (10) day requirement, prior to delivery of the
duplicate originals.
10.2. If the Bidder fails or neglects to execute and deliver the Agreement and other
required documents as prescribed herein, the Bidder may be deemed to have
repudiated the Agreement and upon notice from the Owner to that effect, the award
shall be null and void; and the Bid Security provided by the Bidder shall be forfeited
to and retained by the Owner as damages for such failure of the Bidder to execute
the Agreement, it being understood and agreed that the character and amount of
actual damages sustained by the Owner cannot reliably be ascertained and
measured and that the amount of the Bid Security is intended as a reasonable
prospective estimate of such actual damages.
10.3. Concurrently with the execution and delivery of the Agreement to the Owner, or
within such other period as the Owner may prescribe, the successful Bidder
(CONTRACTOR) shall submit the following as conditions to the Bidder’s right to
proceed with and receive payment for any Work:
10.3.1.A complete list of all Subcontractors and Manufacturers to be used on the
Project for the Work;
10.3.2.A one hundred percent (100%) Performance Bond and a one hundred
percent (100%) Payment Bond as prescribed by the Standard General
Conditions or other Contract Documents. Such bonds shall be executed
utilizing the sample forms included in the Project Manual or alternative
forms approved in advance by the Owner containing the language required
by applicable state law. Indemnification clauses between successful Bidder
and the Surety shall not be binding upon the Owner;
10.3.3.The preliminary schedules required by the Standard General Conditions;
and
Monon Community Center Entrance and Fitness
Expansion Project ITB-12 Carmel/Clay Board of Parks and Recreation
2014-060 Instructions to Bidders
10.3.4.Other post-Bid submittals required by the Contract Documents.
10.4. The Maintenance Bond form required after Final Completion is at MB-1 in the
Project Manual.
11. INDIANA REVISED 2013 FORM 96
Each Bidder shall submit with and as a part of their Bid, a completed State Board
of Accounts Prescribed, Form 96 (last revised 2013).
12. DRUG PLAN
For contracts that equal or exceed One Hundred Fifty Thousand and no/100’s
Dollars ($150,000), contractors of any tier must be in compliance with Indiana
Code § 4-13-18-1 through Indiana Code § 4-13-18-7 (Drug Testing of Employees
on Public Works Contracts). Each Bidder shall submit with and as a part of their
Bid that results in a contract equal to or more than One Hundred Fifty Thousand
and no/100’s Dollars ($150,000), a written plan for a program to test the Bidder’s
employees for drugs consistent with Indiana Code § 4-13-18-1 through Indiana
Code § 4-13-18-7.
13. EARLY PERFORMANCE COMPENSATION – SUPERIOR TIME
MANAGEMENT ALLOWANCE
13.1 Pursuant to Indiana Code § 5-22-17-6, the Contract Documents provide for the
payment of early performance compensation referred to as a Superior Time
Management Allowance and for a compensation deduction referred to as
liquidated damages in the event of unexcused failure by the CONTRACTOR to
complete the Work within the time required by the Contract Documents.
14. LIQUIDATED DAMAGES
14.1 Time is of the essence regarding timely completion of the Project due to the nature
of Owner’s operations at Central Park. Failure to meet the dates set forth in
Subsection 1.5.3 and/or Subsection 1.5.4 shall be considered a material breach of
the Agreement unless such are extended by a fully approved and executed
Change Order. Accordingly, the Contract Documents provide for the payment of
Liquidated Damages in the event of unexcused failure by the CONTRACTOR to
complete the Work within the time required by the Contract Documents. Unless
Owner agrees otherwise, in the event that the any of the Substantial Completion
Dates and/or Final Completion Dates set forth herein, are not met, Liquidated
Damages shall be assessed until Final Completion as follows:
14.2 If Substantial Completion is not met as set forth in Subsection 1.5.4, it will be
considered a material breach of the Agreement and Liquidated Damages will be
assessed in the amount of One Thousand Three Hundred and no/100’s Dollars
($1,300.00) per day until Substantial Completion is met.
In the event the Regular Substantial Completion Date is met and the Regular Final
Completion Date is not met as set forth in Subsection 1.5.5, it will be considered a
material breach of the Agreement and Liquidated Damages shall be assessed in
the amount of One Thousand Five Hundred and no/100’s Dollars ($1,500.00) per
day until Final Completion is reached or Owner and Contractor otherwise agree.