HomeMy WebLinkAbout000 - Addendum #1 CoverMIDWEST – INDIANAPOLIS 9229 D e le g a te s Row Suite 250 Indianapolis, IN 46240 Tel 317 843 5979 F ax 317 843 5975 carsondesign.com
Page 1 of 1
A D D EN D UM
DATE: 31-JA N U A RY-2018
A D D E N D U M # : 1
PROJECT: Inv e sq ue, Inc.
ISSUED BY: C arson D esign Associates
T O :
G reg Sherwin - G arm o ng
M itc h H a nnum – G arm ong
Eric H a nnum - G arm o ng
COPIES TO:
D ennis D echow - Inv e sq ue
M ary C oyle - Inv e sq ue
PROJECT #: I1720009
This A d d endum shall be incorpora te d into the C ontra ct D o cum ents upon execution of the C ontract for
C onstruction. In case of conflict with previous A d d enda or other com m unications, this Addendum shall
ta ke preced ence. Each bidder shall prom ptly notify subcontractors and others from w hom he re c eived
bids of the relevant contents of this Addendum a nd shall acknowledge receipt of this Addendum in his bid.
SEC TIO N : PAG E
TA BLE OF ATTAC HM EN TS 1
TABLE O F A TTAC HM EN TS:
ARC HITEC TURAL
A 000
A 001
A 002
A 003
A 011
A 021
A 211
A 221
A 231
A 241
A 270
A 501
A 551
A 600
A 601
02/26/18
Nick Mishler