HomeMy WebLinkAbout001 - A000 - Cover SheetSheet
Number Sheet Name
A000 Cover Sheet
A001 General Information and Standard Details
A002 2009 ICC/ANSI A117.1
A003 2009 ICC/ANSI A117.1 Restrooms & Parking
A011 Code Information
A021 Project Standards
A211 Construction Floor Plan
A221 Reflected Ceiling Plan
A231 Electrical Location & Equipment Plan
A241 Finish Plan and Notes
A270 Enlarged Floor Plans
A501 Interior Elevations
A551 Interior Sections and Details
A600 Door Notes, Elevations, and Details
A601 Door Schedule
E000 Electrical Notes, Symbols & Schedule
E101 Lighting Plan
E201 Power & Systems Plan
E500 Panel Schedules
P-410 04 Plumbing
P-420 04 HVAC Piping
P-421 Roof Layout Schedule
SM-01 Building / Area Duct Plan
TRUE
SHEET NUMBER:
COPYRIGHT 2017 CARSON DESIGN
JOB NO.
DATE:
DRAWING TITLE:
STAMP:
Drawing List
Area Map
MEP Requirements Key Plan
Carson Design Associates
9229 Delegates Row
Suite 250
Indianapolis, IN 46240
Architecture / Design Contact
MIDWEST
SOUTHWEST
12301 Research Blvd
Bldg IV - Suite 130
Austin, TX 78759
Tel 512.977.0520 Fax 512.977.0384
www.carsondesign.com
9229 Delegates Row
Suite 250
Indianapolis, IN 46240
Tel 317.843.5979 Fax 317.843.5975
ISSUE:
Project Description
01.31.18
I1720009
A000
I1720009
01.31.18
Cover Sheet
211 W. Main St., Carmel, IN 46032
211 W. Main St., Carmel, IN 46032
Invesque, Inc.
Monon & Main
Suite 400
Monon & Main
Suite 400
Invesque, Inc.
Matt Dziadosz
Phone: 317.567.0234
mdziadosz@leach-russellmech.com
Leach & Russell Mechanical
9151 Ford Circle
Fishers, IN 46038
Julie Berry
Phone: 317.843.3760
jberry@carsondesign.com
Mech. & Plumbing Engineer Contact
Drew Pojar
Phone: 317.780.2923
dpojar@ermco.com
Ermco
1625 W. Thompson Rd. (46217)
P.O. Box 1507
Indianapolis, IN 46206
Electrical Engineer Contact
Construction Documents -
Addendum No.1
01.31.18
This project consists of the build out of a suite in a newly constructed
building. This is a Design Build project, MEP drawings to follow.
Project Location
Area of Work
PLAN TRUE
1. Refer to attached M, E, & P drawings for more information. If drawings are not
included and scope requires M, P, or E work Contractor shall provide design build-
design and permitting services for the scope required for a successful project.
2. The design and installation of all MEP systems shall comply with the current Codes
in force by the AHJ at the project location. Any required energy compliance or
environmental reports required by the AHJ shall be prepared by the Contractor if
not provided by the Owner or Architect’s consultants.
3. Contractor to field verify all existing building conditions and systems affected by
the project work and be familiar with the drawings and project requirements prior
to bid or contracting with Owner. No structural cutting, coring, or drilling shall be
performed that impacts any part of the existing facility, without prior approval.
Contractor shall retain the services of a structural engineer, if required by the
Architect, Owner, or AHJ to obtain a required approval.
4. Architectural drawing have been provided to show the locations of all devices
and systems. Contractor shall be responsible for reconfigurations, modifications,
and/or new work needed to provide a complete functioning job without
permanently disrupting existing building systems. Contractor shall coordinate with
Owner, Building Facilities, and or other Tenants 48 hours minimum in advance of
any interruption of any building service.
5. Architectural drawings shall take precedence over all other trades drawings
when conflicts arise. Contractor to bring conflicts or inconsistencies between the
architectural drawings and the drawing of other trades to the attention of the
architect prior to bid, order, or installation.
6. Fire sprinkler modifications and new work shall be designed by a licensed fire
sprinkler system designer in the state the project resides in, and must be installed
by a state licensed installer. Contractor shall obtain any required approvals from
the AHJ prior to start of construction.
7. Zoning of MEP systems shall be exclusive to the project area without cross over to
other building areas, except as is indicated on the documents or as approved in
advance.
8. Contractor to provide all required test and balance reports, O&M manuals, and
commissioning activities required by the AHJ or project requirements in the
appropriate phases of the project.
Note: E.C. and/or design build contractor is to verify that project meets Indiana ASHRAE
90.1 energy codes. Design intent is to be within watts per square foot. Provide energy
managment controls, such as sensor controls (ultrasonic and motion detection) and/or
relay time clocks, as required by the code. Indiana required energy compliance report
(ComCheck) is the responsibility of the owner or owner's representative. Drawings,
specifications and energy control devices are shown with the intent of meeting current
state energy codes. Submitting party is to alert designer and owner of any additional
devices or load changes necessary to adhere to the code prior to submission of
ComCheck.
Addendum No.1
02/26/18
Nick Mishler