Loading...
HomeMy WebLinkAbout008 - A221 - Reflected Ceiling PlanS W S S S S 1 2 3 4 5 6 7 8 P1 A B C D E F G H ? ? P1 P1 P1 D1 D1 F1 F1 F1 F1 F1 F1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K2 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K2 K1 K1 K2 K1 K1 K1 K1 K1 K1 K1 K1 D1 D1 D1 D1 D1 D1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K2 K1 K1 K1 K1 K1 K2 K1 K1 K2 K1 K1 K1 K1 K2 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 D3 F1.1 D2 D2 D2 D2 D1 D1 D1 D1 D1 D1 R2 R3 K1 K1 R4 R1 R4 R1 R5 R5 R5 6 3/4" 6 3/4" 6 3/4" R6 R6 D2 8' - 0" 8' - 0" D2 9' - 0" EQ. EQ. 10" 1' - 0" 4 7/8" 4 7/8" 4 7/8" 4 7/8" 9' - 10" 13' - 0" R7 P8 1 3' - 0" 3' - 0" 9' - 2" 7' - 0" P2 P2 P2 1 9' - 2" R5 R9 R10 R11 Existing ceiling grid to remain. Recessed Downlight Fixture Indicates new ceiling grid to be installed. Wall mounted light switch. Refer to Project Standards on sheet A001 for color and style requirements. 3-Way switch Building Standard 2x4 fluorescent light fixture Indicates new gypsum board bulkhead to be installed. Speaker Dimmer switch Building Standard illuminated exit light. Solid area denotes direction of face plate. Emergency light fixture with emergency exit lighting pack and battery back up. Building Standard 2x2 fluorescent light fixture. See typical 2x4 notes above. Building Standard fixture on night light / emergency circuit (Refer to Fixture Schedule) Fixture Type - refer to schedule Recessed Linear Diffuser Occupancy Sensor Miscellaneous Specialty Item and/or Equipment - refer to Miscellaneous Specialties and Equipment Schedule on sheet A203 Indicates area not in contract. Refer to floor plans for additional information. Finish Tag - refer to Finish Legend on sheet A204 Wireless Access Point (WAP) 3 D OS A 1. Refer to attached M, E, & P drawings for more information. If drawings are not included and scope requires M, P, or E work Contractor shall provide design build- design and permitting services for the scope required for a successful project. 2. The design and installation of all MEP systems shall comply with the current Codes in force by the AHJ at the project location. Any required energy compliance or environmental reports required by the AHJ shall be prepared by the Contractor if not provided by the Owner or Architect’s consultants. 3. Contractor to field verify all existing building conditions and systems affected by the project work and be familiar with the drawings and project requirements prior to bid or contracting with Owner. No structural cutting, coring, or drilling shall be performed that impacts any part of the existing facility, without prior approval. Contractor shall retain the services of a structural engineer, if required by the Architect, Owner, or AHJ to obtain a required approval. 4. Architectural drawing have been provided to show the locations of all devices and systems. Contractor shall be responsible for reconfigurations, modifications, and/or new work needed to provide a complete functioning job without permanently disrupting existing building systems. Contractor shall coordinate with Owner, Building Facilities, and or other Tenants 48 hours minimum in advance of any interruption of any building service. 5. Architectural drawings shall take precedence over all other trades drawings when conflicts arise. Contractor to bring conflicts or inconsistencies between the architectural drawings and the drawing of other trades to the attention of the architect prior to bid, order, or installation. 6. Fire sprinkler modifications and new work shall be designed by a licensed fire sprinkler system designer in the state the project resides in, and must be installed by a state licensed installer. Contractor shall obtain any required approvals from the AHJ prior to start of construction. 7. Zoning of MEP systems shall be exclusive to the project area without cross over to other building areas, except as is indicated on the documents or as approved in advance. 8. Contractor to provide all required test and balance reports, O&M manuals, and commissioning activities required by the AHJ or project requirements in the appropriate phases of the project. Note: E.C. and/or design build contractor is to verify that project meets Indiana ASHRAE 90.1 energy codes. Design intent is to be within watts per square foot. Provide energy managment controls, such as sensor controls (ultrasonic and motion detection) and/or relay time clocks, as required by the code. Indiana required energy compliance report (ComCheck) is the responsibility of the owner or owner's representative. Drawings, specifications and energy control devices are shown with the intent of meeting current state energy codes. Submitting party is to alert designer and owner of any additional devices or load changes necessary to adhere to the code prior to submission of ComCheck. 1 REFLECTED 1/8" = 1'-0" CEILING PLAN LEGEND - REFLECTED CEILING MECH, ELEC, & PLUMBING DESIGN REQ. GENERAL NOTES - REFLECTED CEILING A. REFER TO GENERAL NOTES AND REFERENCE SPECIFICATIONS ON SHEET A001 & A021 FOR SPECIFICATIONS REGARDING NEW CONSTRUCTION AND FINISHES. B. Refer to Construction Floor Plans (A21 Series Sheets) for typical wall types (walls to deck, rated walls, etc.) and additional wall-to-ceiling design conditions and considerations. C. Refer to Finish Plan and Finish Notes (A24 Series Sheets) for specific ceiling types and materials. D. The architectural reflected ceiling plan shall govern the layout of all ceiling elements and/or penetrations. If applicable, coordinate any field verified or as-built conditions that differ from what is shown on these plans with the Architect.. E. Sizes of mechanical equipment (if shown) are for reference only. If applicable, coordinate actual sizes with the Mechanical Engineer. F. Sizes and shapes of lighting and other miscellaneous electrical equipment (if shown) are for reference only. If applicable, coordinate actual sizes with the Electrical Engineer. G. Install suspended ceiling grid with equal size panels at each side or end of the individual spaces unless otherwise indicated. No panel shall be less than 4" wide. H. All ceiling mounted items (sprinkler heads, mounting mechanisms, etc.) shall be centered in the ceiling panels unless otherwise indicated. J. Where existing ceiling grid is remodeled to meet new construction, the contractor shall: A. Replace all damaged or un-repairable portions of the existing grid with new grid to match the existing building standards. B. Remove portions of the existing grid or provide new grid as required by new construction. All new grid must match existing grid to remain or match the existing building standards. C. Replace all damaged ceiling tiles with new tiles to match the existing to remain or that match the existing building standards. K. Provide night light circuits as required by the Building Code. L. Lay-in ceiling height to be 9'-10" AFF. KEYED NOTES - REFLECTED CEILING R1 Painted gypsum board bulkhead. Paint white to match ceiling tile unless otherwise indicated. R2 Water heater above ceiling in this location, see MEP drawings for more information. R3 Insulation above ceiling in Conference room. R4 Set bulkhead back 2" from face of wall. Bulkhead to be constructed at minimal dimensions. R5 Paint bulkhead P2, all sides including underside. R6 Paint bulkhead P3, all sides including underside. R7 Bulkhead to align to outside edge of column. R8 P1 light fixtue to be centered over Island bar height wood wrap. R9 Install at 8'-0" AFF R10 Install at 8'-8" AFF R11 Install at 9'-4" AFF SCHEDULE - LIGHT FIXTURES Type Mark Count Manufacturer Model Comments D1 14 Alphabet NU4 RD All on dimmers. Conference Room 414 to be White Finish. All others to be in matte chrome. D2 6 Alphabet BETA4 Pendant mounted from deck above. installed at highest AFF dimension possible while maintainting proper lumens. Black finish D3 4 TBD TBD To match existing downlight in shower room. F1 6 Finelite HP-2 Direct Pendant mounted from deck above. F1.1 1 Finelite HP-2 wall wash Verify final location with designer. K1 113 Columbia Lighting LCAT 2'x2' Troffer K2 7 Columbia Lighting LCAT 2'x2' Troffer with ELL14 Emergency Battery Pack Verify quantity and location per code. P1 3 Bruck Classic Black dome with matte chrome P2 3 Uplighting Group Pilke 60 Pendant SF P6005 White Shade / White Cable and Canopy Grand total: 157 SHEET NUMBER: COPYRIGHT 2015 CARSON DESIGN ASSOCIATES JOB NO. DATE: DRAWING TITLE: STAMP: ISSUE: MIDWEST SOUTHWEST 12301 Research Blvd Bldg IV - Suite 130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 www.carsondesign.com 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 A221 I1720009 01.31.18 Reflected Ceiling Plan 211 W. Main St., Carmel, IN 46032 Invesque, Inc. Monon & Main Suite 400 01.31.18 Construction Documents - Addendum No.1 01.31.18 0' 1/8" = 1'-0" 8' 4' 8' 16' PLAN Contact: ESL Spectrum Jennifer Hall 317.223.2628 jhall@esl-spectrum.com 1 1 1 Addendum No. 1 12.28.17 02/26/18 Nick Mishler