HomeMy WebLinkAbout008 - A221 - Reflected Ceiling PlanS W
S
S
S
S
1
2
3
4
5
6
7
8
P1
A B C D E F G H
?
?
P1
P1
P1
D1
D1
F1
F1
F1
F1
F1
F1
K1 K1 K1 K1 K1 K1 K1 K1 K1
K1 K1 K1 K1
K1
K1 K2 K1 K1
K1 K1
K1
K1 K1
K1
K1 K1 K1 K1
K2 K1 K1
K2
K1
K1
K1
K1 K1 K1 K1 K1
D1
D1
D1
D1
D1
D1
K1
K1
K1 K1
K1
K1
K1
K1 K1
K2
K1
K1
K1
K1
K1
K2
K1
K1 K2
K1
K1
K1
K1
K2
K1
K1 K1
K1
K1 K1
K1
K1
K1 K1
K1 K1
K1
K1 K1
K1 K1
K1 K1
K1 K1 K1
K1 K1
K1
K1 K1
K1 K1
K1 K1
K1 K1
K1 K1
K1 K1
K1 K1
K1
K1
K1 K1
K1
K1
K1 K1
K1
D3
F1.1
D2 D2
D2 D2
D1 D1 D1
D1 D1 D1
R2
R3
K1 K1
R4
R1
R4
R1
R5
R5
R5
6 3/4"
6 3/4"
6 3/4"
R6
R6
D2
8' - 0" 8' - 0"
D2
9' - 0"
EQ. EQ.
10"
1' - 0"
4 7/8"
4 7/8"
4 7/8"
4 7/8"
9' - 10"
13' - 0"
R7
P8
1
3' - 0" 3' - 0"
9' - 2"
7' - 0"
P2
P2
P2
1
9' - 2"
R5
R9
R10 R11
Existing ceiling grid to
remain.
Recessed Downlight Fixture
Indicates new ceiling grid to
be installed.
Wall mounted light switch.
Refer to Project Standards
on sheet A001 for color
and style requirements.
3-Way switch
Building Standard 2x4
fluorescent light fixture
Indicates new gypsum board
bulkhead to be installed.
Speaker
Dimmer switch
Building Standard illuminated
exit light. Solid area denotes
direction of face plate.
Emergency light fixture with
emergency exit lighting pack
and battery back up.
Building Standard 2x2
fluorescent light fixture. See
typical 2x4 notes above.
Building Standard fixture on
night light / emergency circuit
(Refer to Fixture Schedule)
Fixture Type - refer to schedule
Recessed Linear Diffuser
Occupancy
Sensor
Miscellaneous Specialty
Item and/or Equipment -
refer to Miscellaneous
Specialties and
Equipment Schedule on
sheet A203
Indicates area not in
contract. Refer to floor
plans for additional
information.
Finish Tag - refer to Finish
Legend on sheet A204
Wireless Access Point (WAP)
3
D
OS
A
1. Refer to attached M, E, & P drawings for more information. If drawings are not
included and scope requires M, P, or E work Contractor shall provide design build-
design and permitting services for the scope required for a successful project.
2. The design and installation of all MEP systems shall comply with the current Codes
in force by the AHJ at the project location. Any required energy compliance or
environmental reports required by the AHJ shall be prepared by the Contractor if
not provided by the Owner or Architect’s consultants.
3. Contractor to field verify all existing building conditions and systems affected by
the project work and be familiar with the drawings and project requirements prior
to bid or contracting with Owner. No structural cutting, coring, or drilling shall be
performed that impacts any part of the existing facility, without prior approval.
Contractor shall retain the services of a structural engineer, if required by the
Architect, Owner, or AHJ to obtain a required approval.
4. Architectural drawing have been provided to show the locations of all devices
and systems. Contractor shall be responsible for reconfigurations, modifications,
and/or new work needed to provide a complete functioning job without
permanently disrupting existing building systems. Contractor shall coordinate with
Owner, Building Facilities, and or other Tenants 48 hours minimum in advance of
any interruption of any building service.
5. Architectural drawings shall take precedence over all other trades drawings
when conflicts arise. Contractor to bring conflicts or inconsistencies between the
architectural drawings and the drawing of other trades to the attention of the
architect prior to bid, order, or installation.
6. Fire sprinkler modifications and new work shall be designed by a licensed fire
sprinkler system designer in the state the project resides in, and must be installed
by a state licensed installer. Contractor shall obtain any required approvals from
the AHJ prior to start of construction.
7. Zoning of MEP systems shall be exclusive to the project area without cross over to
other building areas, except as is indicated on the documents or as approved in
advance.
8. Contractor to provide all required test and balance reports, O&M manuals, and
commissioning activities required by the AHJ or project requirements in the
appropriate phases of the project.
Note: E.C. and/or design build contractor is to verify that project meets Indiana ASHRAE
90.1 energy codes. Design intent is to be within watts per square foot. Provide energy
managment controls, such as sensor controls (ultrasonic and motion detection) and/or
relay time clocks, as required by the code. Indiana required energy compliance report
(ComCheck) is the responsibility of the owner or owner's representative. Drawings,
specifications and energy control devices are shown with the intent of meeting current
state energy codes. Submitting party is to alert designer and owner of any additional
devices or load changes necessary to adhere to the code prior to submission of
ComCheck.
1 REFLECTED 1/8" = 1'-0" CEILING PLAN
LEGEND - REFLECTED CEILING
MECH, ELEC, & PLUMBING DESIGN REQ.
GENERAL NOTES - REFLECTED CEILING
A. REFER TO GENERAL NOTES AND REFERENCE SPECIFICATIONS ON SHEET A001 & A021
FOR SPECIFICATIONS REGARDING NEW CONSTRUCTION AND FINISHES.
B. Refer to Construction Floor Plans (A21 Series Sheets) for typical wall types (walls to deck,
rated walls, etc.) and additional wall-to-ceiling design conditions and considerations.
C. Refer to Finish Plan and Finish Notes (A24 Series Sheets) for specific ceiling types and
materials.
D. The architectural reflected ceiling plan shall govern the layout of all ceiling elements
and/or penetrations. If applicable, coordinate any field verified or as-built conditions
that differ from what is shown on these plans with the Architect..
E. Sizes of mechanical equipment (if shown) are for reference only. If applicable,
coordinate actual sizes with the Mechanical Engineer.
F. Sizes and shapes of lighting and other miscellaneous electrical equipment (if shown)
are for reference only. If applicable, coordinate actual sizes with the Electrical
Engineer.
G. Install suspended ceiling grid with equal size panels at each side or end of the
individual spaces unless otherwise indicated. No panel shall be less than 4" wide.
H. All ceiling mounted items (sprinkler heads, mounting mechanisms, etc.) shall be
centered in the ceiling panels unless otherwise indicated.
J. Where existing ceiling grid is remodeled to meet new construction, the contractor shall:
A. Replace all damaged or un-repairable portions of the existing grid with new grid
to match the existing building standards.
B. Remove portions of the existing grid or provide new grid as required by new
construction. All new grid must match existing grid to remain or match the existing
building standards.
C. Replace all damaged ceiling tiles with new tiles to match the existing to remain or
that match the existing building standards.
K. Provide night light circuits as required by the Building Code.
L. Lay-in ceiling height to be 9'-10" AFF.
KEYED NOTES - REFLECTED CEILING
R1 Painted gypsum board bulkhead. Paint white to match ceiling tile unless otherwise
indicated.
R2 Water heater above ceiling in this location, see MEP drawings for more information.
R3 Insulation above ceiling in Conference room.
R4 Set bulkhead back 2" from face of wall. Bulkhead to be constructed at minimal
dimensions.
R5 Paint bulkhead P2, all sides including underside.
R6 Paint bulkhead P3, all sides including underside.
R7 Bulkhead to align to outside edge of column.
R8 P1 light fixtue to be centered over Island bar height wood wrap.
R9 Install at 8'-0" AFF
R10 Install at 8'-8" AFF
R11 Install at 9'-4" AFF
SCHEDULE - LIGHT FIXTURES
Type Mark Count Manufacturer Model Comments
D1 14 Alphabet NU4 RD All on dimmers. Conference Room 414 to be White Finish. All others to be in
matte chrome.
D2 6 Alphabet BETA4 Pendant mounted from deck above. installed at highest AFF dimension
possible while maintainting proper lumens. Black finish
D3 4 TBD TBD To match existing downlight in shower room.
F1 6 Finelite HP-2 Direct Pendant mounted from deck above.
F1.1 1 Finelite HP-2 wall wash Verify final location with designer.
K1 113 Columbia Lighting LCAT 2'x2' Troffer
K2 7 Columbia Lighting LCAT 2'x2' Troffer with ELL14 Emergency Battery
Pack
Verify quantity and location per code.
P1 3 Bruck Classic Black dome with matte chrome
P2 3 Uplighting Group Pilke 60 Pendant SF P6005 White Shade / White Cable and Canopy
Grand total: 157
SHEET NUMBER:
COPYRIGHT 2015 CARSON DESIGN ASSOCIATES
JOB NO.
DATE:
DRAWING TITLE:
STAMP:
ISSUE:
MIDWEST
SOUTHWEST
12301 Research Blvd
Bldg IV - Suite 130
Austin, TX 78759
Tel 512.977.0520 Fax 512.977.0384
www.carsondesign.com
9229 Delegates Row
Suite 250
Indianapolis, IN 46240
Tel 317.843.5979 Fax 317.843.5975
A221
I1720009
01.31.18
Reflected Ceiling Plan
211 W. Main St., Carmel, IN 46032
Invesque, Inc.
Monon & Main
Suite 400
01.31.18
Construction Documents -
Addendum No.1 01.31.18
0'
1/8" = 1'-0"
8' 4' 8' 16'
PLAN
Contact:
ESL Spectrum
Jennifer Hall
317.223.2628
jhall@esl-spectrum.com
1
1
1 Addendum No. 1 12.28.17
02/26/18
Nick Mishler