Loading...
HomeMy WebLinkAbout009 - A231 - Electrical Location & Equipment PlanDN GFCI +42" +42" +42" +42" +42" GFCI D D +54" 1/1 +54" +54" TV +54" TV +54" TV D D +54" U181813 U183013F F183013U U181813 U181813 U183013F U181813 F183013U 181840BCR 181840BCL 181840BCR 181840BCL MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 RS3078TL RS3078TR RS3078TL RS3078TR DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 1033.BK2.T.AR4 1033.BK2.T.AR4 U181813 U183013F U181813 F183013U U181813 U183013F F183013U U181813 181840BCR 181840BCL 181840BCR 181840BCL MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 RS3078TL RS3078TR RS3078TL RS3078TR DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 1033.BK2.T.AR4 1033.BK2.T.AR4 U181813 U183013F U181813 F183013U U181813 U183013F F183013U U181813 181840BCR 181840BCL 181840BCR 181840BCL MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 RS3078TL RS3078TR RS3078TL RS3078TR DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 1033.BK2.T.AR4 1033.BK2.T.AR4 U181813 U183013F U181813 F183013U U181813 U183013F F183013U U181813 181840BCR 181840BCL 181840BCR 181840BCL MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 RS3078TL RS3078TR RS3078TL RS3078TR DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 1033.BK2.T.AR4 1033.BK2.T.AR4 U181813 U183013F F183013U U181813 U181813 U183013F U181813 F183013U 181840BCR 181840BCL 181840BCR 181840BCL MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 MTL228 RS3078TL RS3078TR RS3078TL RS3078TR DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 DMD4410 DP3040 DMD4410 DP3040 1033.BK2.T.AR4 1033.BK2.T.AR4 1033.BK2.T.AR4 1 2 3 4 5 6 7 8 P1 A B C D E F G H E1 E1 E1 E1 E1 E1 E1 E1 E1 Office 403 Office 404 Office 405 Office 406 Office 407 Office 408 Office 409 Office 410 Lounge 411 Office 412 Office 413 Conference 414 Open Office 415 Corridor 421 Corridor 400 IT / Storage 419 Wellness/Conference 417 Janitor RESTROOM RESTROOM Shower 416 Entrance 400 Elevator STAIR 4 STAIR 3 Copy 416 E3 E3 E3 E3 E3 E3 E3 E3 E2 E5 E6 E1 E3 E6 E4 Breakroom 401 Storage 402 E4 E7 E3 9' - 11" EQ. EQ. E8 E8 E8 1 1 E8 1 E9 E2 E7 E8 TA20 TA20 TA20 TA20 TA20 TA20 TA20 TA20 TA20 TA20 +42" Wall mounted dedicated duplex outlet on dedicated circuit at standard height. Special mounting height indication for wall outlets. Taken to centerline. Wall mounted electrical J-box outlet Thermostat Wall mounted duplex outlet at standard height. Wall mounted duplex ground fault circuit interrupt outlet at standard height. Wall mounted data outlet. Wall mounted audio / video box. Wall mounted cable television box. Wall mounted telephone and data shared outlet (1 Data / 1 Voice U.O.N.) Wall mounted quadruplex outlet at standard height. Wall mounted quadruplex ground fault circuit interrupt outlet at standard height. Floor mounted power and/or data Ceiling mounted electrical J-box outlet Miscellaneous Specialty Item and/or Equipment - refer to Miscellaneous Specialties and Equipment Schedule Indicates area not in contract. Refer to floor plans for additional information. 1i NOTE: Standard outlet height is 18" A.F.F. (U.O.N.) 3 Indicates switching type (3, 4, D, K, K3, OS) Wall mounted switch 1. Refer to attached M, E, & P drawings for more information. If drawings are not included and scope requires M, P, or E work Contractor shall provide design build- design and permitting services for the scope required for a successful project. 2. The design and installation of all MEP systems shall comply with the current Codes in force by the AHJ at the project location. Any required energy compliance or environmental reports required by the AHJ shall be prepared by the Contractor if not provided by the Owner or Architect’s consultants. 3. Contractor to field verify all existing building conditions and systems affected by the project work and be familiar with the drawings and project requirements prior to bid or contracting with Owner. No structural cutting, coring, or drilling shall be performed that impacts any part of the existing facility, without prior approval. Contractor shall retain the services of a structural engineer, if required by the Architect, Owner, or AHJ to obtain a required approval. 4. Architectural drawing have been provided to show the locations of all devices and systems. Contractor shall be responsible for reconfigurations, modifications, and/or new work needed to provide a complete functioning job without permanently disrupting existing building systems. Contractor shall coordinate with Owner, Building Facilities, and or other Tenants 48 hours minimum in advance of any interruption of any building service. 5. Architectural drawings shall take precedence over all other trades drawings when conflicts arise. Contractor to bring conflicts or inconsistencies between the architectural drawings and the drawing of other trades to the attention of the architect prior to bid, order, or installation. 6. Fire sprinkler modifications and new work shall be designed by a licensed fire sprinkler system designer in the state the project resides in, and must be installed by a state licensed installer. Contractor shall obtain any required approvals from the AHJ prior to start of construction. 7. Zoning of MEP systems shall be exclusive to the project area without cross over to other building areas, except as is indicated on the documents or as approved in advance. 8. Contractor to provide all required test and balance reports, O&M manuals, and commissioning activities required by the AHJ or project requirements in the appropriate phases of the project. Note: E.C. and/or design build contractor is to verify that project meets Indiana ASHRAE 90.1 energy codes. Design intent is to be within watts per square foot. Provide energy managment controls, such as sensor controls (ultrasonic and motion detection) and/or relay time clocks, as required by the code. Indiana required energy compliance report (ComCheck) is the responsibility of the owner or owner's representative. Drawings, specifications and energy control devices are shown with the intent of meeting current state energy codes. Submitting party is to alert designer and owner of any additional devices or load changes necessary to adhere to the code prior to submission of ComCheck. 1 ELECTRICAL 1/8" = 1'-0" LOCATION & EQUIPMENT PLAN ELECTRICAL LEGEND MECH, ELEC, & PLUMBING DESIGN REQ. GENERAL NOTES - ELECTRICAL A. REFER TO GENERAL NOTES AND REFERENCE SPECIFICATIONS ON SHEET A001 & A021 FOR SPECIFICATIONS REGARDING NEW CONSTRUCTION AND ELECTRICAL/LIGHTING. B. See detail 4/A001 for typical installation alignment requirements for electrical devices. C. Refer to Construction Floor Plans (A21 Series Sheets) for additional Miscellaneous Specialties & Equipment items that may not be indicated on this sheet. D. All dimensions are from finished wall surface or column centerline to centerline of outlets or centerline of pairs of outlets. E. All wall mounted wiring devices and receptacles shown back-to-back shall be offset a minimum of 8" and acoustically sealed. F. Where direct connection to prewired furniture panels occurs, provide power and telecommunication feeds to indicated panel locations from wall, column or floor source directly adjacent to this location. G. All existing floor mounted electrical/telecommunication locations which are not reused are to be removed. Remove all associated cable, wire and conduit back to the source. Properly patch and repair affected wall, floor and/or ceiling construction. H. Unless otherwise noted, all device elevations refer to centerline. J. Refer to Reflected Ceiling Plans (A22 Series Sheets) for locations of light switches. K. All outlets that are in the vicinity of any wet areas (kitchens, break rooms, restrooms, janitorial rooms with floor sinks, laundry rooms, stand alone wall mounted sinks, electrical water fountains, etc.) ground fault circuit interrupt (G.F.C.I.) type. See Electrical Legend. L. Furniture will be provided by tenant and is shown for reference only. M. If 50% or more of the total number of light fixtures or luminaires are replaced, provide lighting and occupancy controls per 2015 IECC. N. Provide emergency lighting as required by code. KEYED NOTES - ELECTRICAL E1 Core Drill final location TBD. Type of poke thru to be verified with tenant and furniture requirements. E2 Core to be drilled for future use. Cap opening and install carpet tile over. E3 2 data drops E4 POTS line E5 Coordinate with tenant for location and height requirement for IT equipment. E6 IT equipment installed overhead no less than 80" AFF. Contractor to provide designer with options for installation. E7 duplex only this location. E8 Provide data drop in wall for future TV location. Cap off and keep concealed in wall. E9 Data to be provided for future conference use. Cap off and keep concealed in floor. MISC. SPECIALTIES & EQUIPMENT Mark Item Make Model Comments Count E1 Refrigerator TBD TBD TFCI 1 E2 Microwave TBD TBD TFCI 1 E3 Dishwasher TBD TBD TFCI - GC to provide 1/4" copper line 1 E4 Copier TBD TBD TFCI 1 E5 Television TBD TBD TFCI 3 E6 Mini Fridge TBD TBD TFCI 1 E7 Coffee Maker TBD TBD TFCI 1 E8 Water Cooler TBD TBD TFCI, countertop model 1 TA20 Coat hook DOUG MOCKETT CH53 CPCI 17 SHEET NUMBER: COPYRIGHT 2015 CARSON DESIGN ASSOCIATES JOB NO. DATE: DRAWING TITLE: STAMP: ISSUE: MIDWEST SOUTHWEST 12301 Research Blvd Bldg IV - Suite 130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 www.carsondesign.com 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317.843.5975 A231 I1720009 01.31.18 Electrical Location & Equipment Plan 211 W. Main St., Carmel, IN 46032 Invesque, Inc. Monon & Main Suite 400 01.31.18 Construction Documents - Addendum No.1 01.31.18 0' 1/8" = 1'-0" 8' 4' 8' 16' PLAN **NOTE: Tenant to provide cut-sheets for all tenant provided equipment for contractor coordination. Verify final locations of equipment with tenant. 1 1 Addendum No. 1 12.28.17 02/26/18 Nick Mishler