Loading...
HomeMy WebLinkAboutEncore on Penn_First Floor Bui10 & 120_CONSTRUCTION DRAWI... 10ALTERNATE BID NOT IN SCOPE NOT IN SCOPE A.0 B.0 C.0 D.0 E.0 F.0 G.0 H.0 I.0 2.0 1.0 3.0 4.0 5.0 6.0 NOT IN SCOPE mech chase above ALTERNATE BID NOT IN SCOPE FUTURE COPIER LOCATION ST101 STAIR 1 EV100 ELEVATOR 102 VESTIBULE ST102 STAIR 2 101 UTILITY 92 SF CONFERENCE ROOM 111 OFFICE 112 OFFICE 119 IT CLOSET 118 OFFICE 117 UNISEX RESTROOM 115 UNISEX RESTROOM 116 KITCHENETTE 114 SUITE 120 ENTRY 120 SMALL CONFERENCE 122 LARGE CONFERENCE 123 WAITING 121 FUTURE TENANT SUITE 100 100 OPEN OFFICE 113 1 1 1 1 1 1 1 2 Xref Y:\2017\17116 - Loan Depot Suite at Encore on Penn\9.0 Drawings\Plans\Revit_temp\17116-MEPbase_NIELSEGO5173 - Reflected Ceiling Plan - A-FIRST FLOOR-16113-MEP_ 18"x12" 18"x10" Shell FCU-1-11 Shell FCU-1-12 Shell FCU-1-5 Shell FCU-1-4 Shell FCU-1-10 Shell FCU-1-1 Shell FCU-1-2 Shell FCU-1-7 Shell FCU-1-13 Shell FCU-1-8 8"ø 10"ø 12"ø 12"x10" SDG-1 95 SDG-1 95 SDG-1 95 SDG-1 SDG-1 90 90 SDG-1 90 LS-1 100 LS-1 100 LS-1 50 PD-1 75 16"x10" 10"ø 6"ø 6"ø 6"ø 5"ø 16"x10" 24"x12" LS-3 145 LS-3 LS-3 150 145 LS-3 145 LS-3 150 LS-3 145 SDG-1 75 SDG-1 75 SDG-1 70 SDG-1 70 SDG-1 70 SDG-1 75 10"ø 8"ø PD-1 75 PD-1 75 6"ø 7"ø 6"ø 7" ø 12"ø LS-3 145 LS-3 150 16"x10" 24"x12" 10"x10" 12"x10" 16"x10" LS-1 50 LS-2 LS-2 90 80 LS-2 80 LS-2 80 LS-2 80 PD-1 150 PD-1 75 PD-1 110 PD-1 100 6"ø 6"ø 7"ø 6"ø 5"ø 7"ø 6"ø 24"x12" LS-2 80 LS-2 80 LS-2 80 LS-2 80 8"ø 10"ø 12"ø SDG-1 95 SDG-1 90 SDG-1 95 SDG-1 95 SDG-1 95 SDG-1 90 16"x10" 24"x12" 6"ø 6"ø 6"ø 6"ø SDG-1 95 SDG-1 95 SDG-1 95 SDG-1 95 SDG-1 95 SDG-1 95 10"ø 8"ø 12"ø 16"x10" 12"x10" 8"ø 8"ø 8"ø 8"ø 8"ø PD-1 150 PD-1 145 PD-1 150 PD-1 145 PD-1 145 PD-1 145 PD-1 175 PD-1 175 PD-1 175 PD-1 175 PD-1 180 Shell FCU-1-3 8"ø 16"x10" 6"ø 6"ø 6"ø 6" ø 5"ø 5"ø LS-2 80 LS-2 80 PD-1 70 PD-1 40 PD-1 40 8"x4" 8"x4" ER-1 75 ER-1 75 10"x4" 16"x10" 12"x10" 8"ø 8"ø 10"x4" ECR-1 ECR-1 ECR-1 ECR-1 ECR-1 ECR-1 ECR-1 ECR-1 DSFC-118 Relocate shell fan coil unit to this location. Extend wiring and piping as necessary. Ductless split fan coil unit, mount FCU as high on wall as possible. Route lineset thru plenum and up in chase to roof. Mount outdoor unit on roof. Coordinate outdoor unit location other equipment on roof. 2NCP 0QVGU )GPGTCN 0QVGU 1. These plans are diagrammatic in nature, and do not represent every necessary offset and fitting. Contractor shall install his work in a manner that will conform with the structure. Contractor shall avoid obstructions, preserve head room and maintain maximum clearance without additional cost to the owner. 2. Conceal all linesets, piping, power wiring, control wiring and control components unless otherwise noted. If concealment is not possible, contact Engineer for alternatives prior to fabrication. 3. Insulate all interior linesets with 1 2" thick, flexible elastomeric insulation. Insulate exterior linesets with 1" thick flexible elastomeric insulation with external .020" aluminum protective jacket. 4. Sheet metal supply ductwork in concealed spaces shall be insulated with 11 2" thick, .75 PCF density, fiberglass ductwrap. All ductwork in unconditioned spaces shall be insulated with 2" thick, 1.0 PCF density, fiberglass ductwrap. (Min R6) 5. Phenolic duct by Pal-Duct or Kool-Duct is an acceptable alternative to sheetmetal duct and insulation in concealed spaces. Use flanged joints. 6. Keep all ductwork, duct system and equipment openings covered with adhesive duct protective wrap like VentureTape 1512, until system start-up. This is to prevent intrusion of construction dirt and debris into the duct system, and HVAC equipment. 7. If any questions arise concerning the HVAC requirements of these documents, please contact The Engineering Collaborative at (317) 636-3941, prior to bidding, fabrication or installation of equipment. 8. Sheet metal transitions by Sheet Metal Contractor. 9. Refer to detail sheets M600's for additional requirements and information that applies to this project. 1 2 ALL INFORMATION CONTAINED IN THIS DOCUMENT IS CONSIDERED TO BE BOTH CONFIDENTIAL AND PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE STUDIO AND SHALL NOT BE COPIED, REPRODUCED, DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO. UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT PERMITTED. c 2018 BLACKLINE STUDIO ARCHITECT BLACKLINE 1 N MERIDIAN ST, SUITE 4 00 INDIANAPOLIS, INDIANA 4 6204 BLACKLINESTUDIO.NET 317.803.7900 CERTIFICATION: CHECKED BY: DRAWN BY: MEP ENGINEER THE ENGINEERING COLLABORATIVE 24 10 EXECUTIVE DRIVE, SUITE 100 INDIANAPOLIS, INDIANA 4 624 1 WWW.TEC-MEP.COM 317.636.3941 # Date Description P R O F E S S I O N A L E N G N I E E R S A M U E L L. H U R T I N D I A N A 0 N P E 1 6 o . 10 0 87 S T A T E O F R E T E G I S D E R 12411 Pennsylvania St. Carmel, Indiana 46032 Permit Set JANUARY 17, 2018 Encore on Penn - Permit Set 01.17.18 First Floor Office Build-Out: Suites M101 FIRST FLOOR HVAC PLAN XXX XXX 3/16" = 1'-0" 1 FIRST FLOOR HVAC PLAN 03/07/18 Nick Mishler