HomeMy WebLinkAboutEncore on Penn_First Floor Bui10 & 120_CONSTRUCTION DRAWI... 141 NO SCALE
Rec. Total
= 1 Pole
= 2 Pole
= 3 Pole
Legend
Light Equip.
Total Demand (KW)
Heat A/C Other
Total Demand Amps = 133±
Demand load (KW)
Connected load (KW)
Wire Size:
Fed From:
Conduit:
Feeder Calculated ±
Light Other
Wire: 4
Remarks
225
120/208
Amps:
Phase:
Voltage:
3
Heat
<Load (KW)>
Rec. A/C Equip.
Mounting:
Location:
Other
1 Pole
20 AMP
U.O.N.
1
Cir.
No.
Cir.
No. A/C
<Load (KW)>
Equip. Heat Rec.
Restroom Alcove
Light
Copper
Recessed
Bus:
Main: Main Circuit Breaker
Remarks
2
3
5
7
9
11
13
15
17
19
4
6
8
10
12
14
16
18
20
21
23
25
27
29
31
33
35
37
39
41
22
24
26
28
30
32
34
36
38
40
42
2CPGN .&
47.9
WH-A
Receptacle
Television
Panel
"LD1A"
120/208V.,
3Ø,4W.
100 Amp
M.L.O.
4#4/O,1#4,21
2"C.
Restroom Alcove
To existing
meter center
ELECTRICAL RISER DIAGRAM
Existing
Meter
Center
Building Exterior
Refrigerator 1.2 1.5 Microwave
= GFCI circuit breaker
Notes:
G
G
Television 1.2
1.0
1.0
IT Receptacle
IT Receptacle
1.6 Future Copier
1.2 Dishwasher
1.5 Signage
2.5 20
G
Receptacle
Receptacle
1.2
.6
1.0
.8
Alternate Bid Only
Receptacle
Receptacle
Receptacle .8 Receptacle
.6
1.2
1.2
FCUs 15
FCUs 15
2.3
2.3
6.9
Rec. Total
= 1 Pole
= 2 Pole
= 3 Pole
Legend
Light Equip.
Total Demand (KW)
Heat A/C Other
Total Demand Amps = 53±
Demand load (KW)
Connected load (KW)
Wire Size:
Fed From:
Conduit:
Feeder Calculated ±
Light Other
Wire: 4
Remarks
100
120/208
Amps:
Phase:
Voltage:
3
Heat
<Load (KW)>
Rec. A/C Equip.
Mounting:
Location:
Other
1 Pole
20 AMP
U.O.N.
1
Cir.
No.
Cir.
No. A/C
<Load (KW)>
Equip. Heat Rec.
Restroom Alcove
Light
Copper
Recessed
Bus:
Main: Main Lug Only
Remarks
2
3
5
7
9
11
13
15
17
19
4
6
8
10
12
14
16
18
20
21
23
25
27
29
22
24
26
28
30
2CPGN .&#
19.2
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
Furniture System
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
Spare
Spare
Spare
Spare
Spare
Spare
100
Panel "LD1A"
Panel
"LD1"
120/208V.,
3Ø,4W.
225 Amp
M.C.B.
9.6
9.6
9.6
9.6
19.2
19.2
.9 Lighting
Lighting
.7 Lighting
1.4
4#3,1#8,11
4"C.
Utilize a spare meter base (field verify exact
location). Provide and install a 225 Amp
branch breaker (service entrance rated) as
required if branch breaker is not present.
1.0 Lighting Contactor "LC1"
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
6.9
4.6
4.6
3.0
3.0
6.5
6.5
22.4 4.5
22.4 4.5
4.5 25.4 4.6 13.4
ALL INFORMATION CONTAINED IN THIS
DOCUMENT IS CONSIDERED TO BE BOTH
CONFIDENTIAL AND PROPRIETARY
INTELLECTUAL PROPERTY OF BLACKLINE
STUDIO AND SHALL NOT BE COPIED,
REPRODUCED, DISTRIBUTED OR ASSIGNED TO
A THIRD PARTY WITHOUT PRIOR WRITTEN
CONSENT OF BLACKLINE STUDIO.
UNAUTHORIZED USE OF THESE DOCUMENTS IS
NOT PERMITTED.
c 2018 BLACKLINE STUDIO
ARCHITECT
BLACKLINE
1 N MERIDIAN ST, SUITE 4 00
INDIANAPOLIS, INDIANA 4 6204
BLACKLINESTUDIO.NET
317.803.7900
CERTIFICATION:
CHECKED BY:
DRAWN BY:
MEP ENGINEER
THE ENGINEERING COLLABORATIVE
24 10 EXECUTIVE DRIVE, SUITE 100
INDIANAPOLIS, INDIANA 4 624 1
WWW.TEC-MEP.COM
317.636.3941
# Date Description
P
R
O
F
E
S
S
I
O
N
A
L
E
N
G
N
I
E
E
R
S
A
M
U
E
L
L.
H
U
R
T
I
N
D
I
A
N
A
0
N
P E 1 6
o .
10 0 87
S T A T E O F
R
E
T
E
G
I
S
D
E
R
12411 Pennsylvania St.
Carmel, Indiana 46032
Permit Set
JANUARY 17, 2018
Encore on Penn - Permit Set 01.17.18
First Floor Office Build-Out: Suites
E601
ELECTRICAL RISER DIAGRAM &
SCHEDULES
SLH
ALB
03/07/18
Nick Mishler