Loading...
HomeMy WebLinkAboutEncore on Penn_First Floor Bui10 & 120_CONSTRUCTION DRAWI... 3REF. DW CONTINUOUS DEFLECTION TRACK ANCHORED TO EXISTING FLOOR SLAB/STRUCTURE ABOVE ROOF/CEILING/JOIST STRUCTURE WALL BASE. REFER TO ROOM FINISH SCHEDULE REFER TO ROOM FINISH SCHEDULE FOR FLOOR FINISH. FLOOR CONSTRUCTION VARIES - SEE PLANS CONTINUOUS 6" METAL STUD TRACK ANCHORED TO EXISTING FLOOR 6" METAL STUD FRAMING @ 16" O.C. 5/8" TYPE X GYPSUM BOARD U.N.O. 1/2" HEAD PLAN BASE 'S6A' CONTINUOUS DEFLECTION TRACK ANCHORED TO EXISTING FLOOR SLAB/STRUCTURE ABOVE ROOF/CEILING TRUSS/STRUCTURE CONTINUOUS SEALANT BEAD AT JUNCTURE OF GYPSUM BOARD AND FLOOR/CEILING ASSEMBLY WALL BASE. REFER TO ROOM FINISH SCHEDULE REFER TO ROOM FINISH SCHEDULE FOR FLOOR FINISH. FLOOR CONSTRUCTION VARIES - SEE PLANS CONTINUOUS 1 5/8" METAL STUD TRACK ANCHORED TO FLOOR 1 5/8" METAL STUD FRAMING @ 16" O.C. 5/8" TYPE X GYPSUM BOARD U.N.O. HEAD PLAN BASE 'S2A' CONTINUOUS DEFLECTION TRACK ANCHORED TO EXISTING FLOOR SLAB/STRUCTURE ABOVE ROOF/CEILING TRUSS/STRUCTURE PROVIDE "ZIP-STRIP" TRIM AT TOP EDGE OF GYPSUM BOARD WALL BASE. REFER TO ROOM FINISH SCHEDULE REFER TO ROOM FINISH SCHEDULE FOR FLOOR FINISH. FLOOR CONSTRUCTION VARIES - SEE PLANS CONTINUOUS 3 5/8" METAL STUD TRACK ANCHORED TO EXISTING FLOOR 3 5/8" METAL STUD FRAMING @ 16" O.C. 5/8" TYPE X GYPSUM BOARD U.N.O. 1/2" HEAD PLAN BASE 'S4A' 2 1/4" EXISTING WALL CONSTRUCTION VARIES, V.I.F. 1/2" 4 7/8" 7 1/4" SOUND BATT INSULATION SOUND BATT INSULATION 'S4C' PROVIDE ALL COMPONENTS IDENTIFIED WITHIN WALL TYPE 'S4.1' WITH THE FOLLOWING EXCEPTIONS: • OMIT LAYER OF GYP ADJACENT TO EXISTING WALL. 1 1/2" RIGID INSULATION A.0 B.0 C.0 D.0 E.0 F.0 G.0 H.0 I.0 2.0 1.0 3.0 4.0 5.0 6.0 NOT IN SCOPE mech chase above 100C 114 115 116 118 UTILITY 101 CONFERENCE ROOM 111 OFFICE 112 OFFICE 119 IT CLOSET 118 OFFICE 117 UNISEX RESTROOM 115 UNISEX RESTROOM 116 KITCHENETTE 114 SUITE 110 ENTRY 110 A901 1 ALTERNATE BID SUITE 120 ENTRY 120 SMALL CONFERENCE 122 LARGE CONFERENCE 123 WAITING 121 FUTURE TENANT SUITE 100 100 A201 1 OPEN OFFICE 113 STAIR 2 ST102 STAIR 1 ST101 ELEVATOR EV100 S4A S4A S4A S4A S4A S4A S2A S2A S2A S4A S4A S4A S2A S2A S2A S2A S2A S2A S2A S2A 122 123 A201 7 A201 8 1 5 6 5 7 7 7 100A 100B 2 4 3 8 8 8 8 A201 7 Sim 8 9 ST102-1 1 HR NOT IN SCOPE 10 10 11 10 10 FUTURE COPIER LOCATION 119 A601 3 A601 4 111 112 117 A601 5 8 5 7 11' - 11 3/8" 11 1/2" 4' - 2 3/4" 11' - 11 7/8" ALIGN ALIGN 5' - 5" ALIGN 17' - 9" 4' - 7 1/4" 11' - 7 1/4" ALIGN ALIGN 12 12 GENERAL FLOOR PLAN NOTES THE FOLLOWING GENERAL NOTES ARE APPLICABLE THROUGHOUT THESE CONSTRUCTION DRAWINGS. A. NOTHING SET FORTH IN THESE DRAWINGS SHALL RELEASE THE CONTRACTOR FROM ITS RESPONSIBILITY TO PROVIDE APPROPRIATE QUANTITIES, FIELD MEASUREMENTS, DIMENSIONAL STABILITY, INSTALLATION, ANCHORAGE, AND COORDINATION WITH ALL OTHER SUBCONTRACTORS AND TRADES, OR RELEASE THE CONTRACTOR OF RESPONSIBILITY TO IDENTIFY AND RESOLVE DEVIATIONS FROM THE REQUIREMENTS OF THESE DOCUMENTS, OR RELEASE THE CONTRACTOR OF RESPONSIBILITY TO ALERT THE ARCHITECT TO ERRORS OR OMISSIONS CONTAINED THEREIN. B. THE CONTRACTOR AND ALL ITS SUBCONTRACTORS SHALL VERIFY IN THE FIELD ALL NEW AND EXISTING APPLICABLE CONDITIONS, DIMENSIONS, RELATIONSHIPS, ETC. SHOWN IN THESE DRAWINGS AND AS PERTINENT TO THE INTENT OF THESE DRAWINGS. ANY DISCREPANCY DISCOVERED SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO THE COMMENCEMENT OF ANY WORK AFFECTED BY, OR RELATED TO, SUCH DISCREPANCY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH, OR CAUSED BY, ITS FAILURE TO COMPLY WITH THIS REQUIREMENT. C. ALL FLOOR PLAN DIMENSIONS SHOWN ON THE NEW FLOOR PLANS ARE FROM FACE OF STUD (WHETHER NEW OR EXISTING WALL) UNLESS INDICATED OTHERWISE BY THE DESIGNATIONS "CLR", "CLEAR", OR "MIN." COORDINATE WITH APPLICABLE NEW WALL TYPES AND WITH APPLICABLE SECTIONS/DETAILS. D. ALL NEW HOLLOW METAL (HM). DOOR FRAMES ARE LOCATED 4" FROM THE ADJACENT WALL FACE (TO OUTER EDGE OF FRAME) UNLESS DIMENSIONED OR DETAILED OTHERWISE. E. COORDINATE, PROVIDE, AND INSTALL 2X FIRE TREATED WOOD WALL BLOCKING AS REQUIRED FOR THE ANCHORAGE AND SUPPORT OF ALL NEW CASEWORK, TRIM, FIRE EXTINGUISHER CABINETS, TOILET ACCESSORIES, MARKER BOARDS, TACK BOARDS, DOOR HARDWARE ACCESSORIES, ETC., AS APPLICABLE. F. ALL NEW OR EXISTING FLOOR AREAS THAT REQUIRE LEVELING WITH A CONCRETE TOPPING OR LEVELING COMPOUND SHALL BE INSTALLED SUCH THAT THE FLATNESS EQUALS 35/24 (ON ALL SLABS) AND THE LEVELNESS EQUALS (SLAB ON GRADE) AND 80% OF THAT VALUE ON ELEVATED SLABS. G. AT ALL WALLS SCHEDULED TO RECEIVE CERAMIC TILE, PROVIDE GLASS MAT INTERIOR GYPSUM WALLBOARD FOR THE STANDARD GYPSUM WALLBOARD IDENTIFIED IN THE WALL TYPES. REFER TO ROOM FINISH SCHEDULE FOR LOCATIONS OF CERAMIC TILE. PROVIDE CEMENT BACKER BOARD AT NATURAL SLATE TILE. REFER TO ROOM FINISH SCHEDULE FOR LOCATIONS OF SLATE TILE. H. AT ALL AREAS WHERE EXISTING FLOOR COVERING OR WALL COVERING MATERIAL WAS REMOVED, THE CONTRACTOR SHALL PROPERLY PREPARE THE SURFACE TO RECEIVE NEW FINISHES. I. CONTRACTOR SHALL ENSURE THAT ANY AND ALL BACKBOXES LOCATED WITHIN 'PARTY WALLS' THAT SEPARATE ROOMS ARE NOT LOCATED BACK TO BACK OR IN THE SAME CAVITY. STAGGER BOXES ONE STUD CAVITY EITHER SIDE OF ONE ANOTHER. P1 9'-0" A.F.F. GB-1 10'-6" A.F.F. APC 09 29 00.02 09 51 13.01 09 29 00.02 09 51 13.03 05 40 00.03 R T AR19900111 A C R H C E T I STATE OF B T T O C S No. T S I G E R E R E D N E T R A E P K S N I I A N A D N I ALL INFORMATION CONTAINED IN THIS DOCUMENT IS CONSIDERED TO BE BOTH CONFIDENTIAL AND PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE STUDIO AND SHALL NOT BE COPIED, REPRODUCED, DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO. UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT PERMITTED. c 201 8 BLACKLINE STUDIO ARCHITECT BLACKLINE 1 N MERIDIAN ST, SUITE 400 INDIANAPOLIS, INDIANA 46204 BLACKLINESTUDIO.NET 31 7.803.7900 CERTIFICATION: CHECKED BY: DRAWN BY: MEP ENGINEER THE ENGINEERING COLLABORATIVE 241 0 EXECUTIVE DRIVE, SUITE 1 00 INDIANAPOLIS, INDIANA 46241 TEC-MEP.COM 31 7.636.3941 1/18/2018 3:09:06 PM C:\Users\emaher\Documents\Encore Sotheby's Build-Out_maher@blacklinestudio.net.rvt A101 FIRST FLOOR PLAN Encore on Penn - Permit Set 01.17.18 First Floor Office Build-Out: Suites 12411 Pennsylvania St. Carmel, Indiana 46032 COPYRIGHT 2014 Permit Set January 17, 2018 SBP ERM 1" = 1'-0" 2 INTERIOR WALL TYPES 3/16" = 1'-0" 1 FIRST FLOOR PLAN # Date Description FLOOR PLAN NOTES Number Desciption 1 REMOVE EXISTING FIRE EXTINGUISHER AND HOOK. RELOCATE FIRE EXTINUISHER TO NEW FIRE EXTINGUISHER CABINET. 2 PROVIDE NEW REMOVEABLE CORE FOR LOCK AT EXISTING TENANT SUITE ENTRY. SEE DOOR SCHEDULE. 3 NEW SEMI-RECESSED FIRE EXTINGUISHER CABINET. SEE SHEET LS101 FOR MOUTING HEIGHTS. 4 PROVIDE FIRE RETARDANT WOOD BLOCKING FOR ALL WALL HUNG CASEWORK, REF. INTERIOR ELEVATIONS. 5 BULKHEAD ABOVE, SEE RCP. 6 FUTURE SIGNAGE BY OTHERS. SEE ELECTRCIAL. 7 LINE OF CEILING ABOVE, SEE RCP. 8 TENANT FUTURNITURE PROVIDED BY OWNER. 9 PROVIDE NEW DOOR SWEEP AT EXISTING DOOR LOCATION. SEE DOOR SCHEDULE. 10 TRENCH/REMOVE EXISTING SLAB ON GRADE WHERE INDICATED. PATCH SLAB ON GRADE WITH CONCRETE TO SMOOTH AND LEVEL FINISH. COORDINATE EXTENT OF REMOVAL WITH PLUMBING AND ELECTRICAL DRAWINGS. FIELD VERIFY. 11 RECESSED ELECTRICAL PANEL. PAINT PANEL TO MATCH ADJACENT WALL. REFER TO ELECTRICAL DRAWINGS. 12 PROVIDE AND INSTALL RESTROOM SIGNS BEARING THE INTERNATIONAL SYMBOL OF ACCESSIBILITY. MOUNTING HEIGHT SHALL BE 60" AFFF TO THE CENTERLINE OF THE SIGN. 1 1/2" = 1'-0"REFERENCE: 1 / A110 3 BULKHEAD (TYP.) 03/07/18 Nick Mishler