Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
06-A101
I" XAXB X1; � X2 X4 X5 ADJACENT TENANT (NOT IN CONTRACT) LItM131NU VVALL XF (XG (XHi XI XJ XK XL XM 00 n„, (3LU E6 %` ••rryrrrwr ... lkl��___0", � E2 > 19 WOMENS �. E5 - _ COOLER \ • ---- D4D15 IIII 108 L _0 III Dg N 12 _ E5 III 20 cLU D13 los D5 I III I � E8 \ �� II III E4 121 D7 E4 \ II E1 107 o D III III E8 E2 E5 E12 ___, MENS III -- - - - -- D4 --- - - - - -J E2 _ D15 10 107 � IIII � D4 E5 � 12 E2 III 17 15 -----� D4 E8 "' 11 BEER C OLER 14 D6 III D15 ' --�' E2 4 n/ L 21 III 15 E5 --- D15 121 -� E8 E5 5D20 D1 E9 D2 E6 D11 4'-4" E 1 D5 D3 - - - - - - - - - - - - - - - - - Hill D1 12 D1 / \ I II I D1 D3 \ ED4 4 / \ II D1 12 21 / ll V� / D3 \ D3 D13 %// D1 18 13 \\ D IF - I T � IS I I D3 S N ---------------------- JL - -- / E x _ 10 --- - - - - - - - - - -T- -- - - - - - R/j 18 D3 18 E3 12 kV ---------------------- IIS I��� II II I� IIII // RELEASED FOR CONSTRUCTION SohjecM to comipolianice with all regulations of Stale and (local Codes City of!Carmoll DATE: 03/14/18 Nick Mishler 01 -DEMO PLAN 1/4" = 1'-0" SYMBOLS LEGEND 01 EQUIPMENT TAG (SEE SHEET A2.01 FOR SCHEDULE) 0o CODED NOTE TAG (SEE EACH DRAWING FOR SCHEDULE) o� PARTITION / WALL TYPE (SEE SHEET A0.04) 101 DOOR NUMBER TAG (SEE SHEET A8.01 FOR DOOR SCHEDULE) SF A STOREFRONT WALL TAG (SEE DRAWING A8.02 FOR STOREFRONT ELEVATIONS xx oo MATERIAL / FINISH TAG (SEE SHEET A3.02 FOR INTERIOR FINISH SCHEDULE) CONTRACT DOCUMENTS THAT AFFECT ANY WORK, NOTIFY ARCHITECT AND OWNERS REP AT ONCE FOR EXISTING WALL / PARTITION TO BE REMOVED THE CONTRACTOR SHALL FIELD VERIFY EXTENT OF DEMOLITION. THE WORK INCLUDES BUT IS NOT LIMITED TO EXISTING WALL / PARTITION INSTRUCTIONS ON HOW TO PROCEED. NEW WALL / PARTITION (SEE SHEET A0.04 FOR SCHEDULE) THE DEMOLITION REMOVAL OF WALLS, FLOORS - FLOOR FINISHES, CEILINGS, BUILT IN COUNTERS, AND COOLER BOX PANEL 37-0" E13 / GENERAL NOTES - DEMOLITION 1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH 13. THE G.C. SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS SHOWN ON THIS SHEET BEFORE STARTING OSHA GUIDELINES. WORK. SHOULD A DISCREPENCY APPEAR IN THE DRAWINGS, OR IN THE WORK DONE BY OTHERS FROM THE CONTRACT DOCUMENTS THAT AFFECT ANY WORK, NOTIFY ARCHITECT AND OWNERS REP AT ONCE FOR 2. THE CONTRACTOR SHALL FIELD VERIFY EXTENT OF DEMOLITION. THE WORK INCLUDES BUT IS NOT LIMITED TO INSTRUCTIONS ON HOW TO PROCEED. THE DEMOLITION REMOVAL OF WALLS, FLOORS - FLOOR FINISHES, CEILINGS, BUILT IN COUNTERS, AND CABINETS, DISPLAY COUNTERS, BULKHEADS, DOORS, FIXTURES, PLUMBING, MECHANICAL 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUESTING ALL INSPECTIONS REQUIRED. AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK AS SHOWN ON DRAWINGS OR AS REQUIRED FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. 15. REMOVE ANY ABANDONED EQUIPMENT PENETRATIONS, VENTS AND PIPE NOT BEING USED. PATCH AND REPAIR FOR A WATERTIGHT SEAL. 3. REMOVE EVERYTHING AS IDENTIFIED AND DESCRIBED TO PROVIDE A COMPLETE OPEN SHELL READY FOR NEW CONSTRUCTION. COORDINATE ALL DEMOLITION QUESTIONS THROUGH THE GENERAL CONTRACTOR 16. PLAN, SCHEDULE AND COORDINATE ALL REMOVAL AND DEMOLITION (AS WELL AS NEW WORK) TO AVOID AND THE OWNERS REPRESENTATIVE. INTERUPTION TO ELECTRICAL, HVAC, PLUMBING AND FIRE PROTECTION SERVICES TO OTHER TENANTS. 4. PROVIDE TEMPORARY WEATHER AND SECURITY BARRIERS. 17 REMOVE EXISTING PLUMBING FIXTURES AND PLUMBING LINES AS NOTED. UPON REMOVAL CAP REMAINING EXISTING SANITARY SEWER SERVICE AND DOMESTIC WATER LINES AT POINT OF ENTRY. 5. PROVIDE TEMPORARY SHORING FOR NEW OPENINGS. 18. REMOVE SELECT EXISTING AIR HANDLING EQUIPMENT AND DUCTWORK. COORDINATE WITH MEP. 6. PATCH AND REPAIR WALLS AND SLAB WHERE DEMOLITION, DAMAGE OR INCOMPLETE WORK HAS OCCURRED. PREPARE FOR NEW SCHEDULED FINISH. COORDINATE EXTENTS WITH CONSTRUCTION PLAN. 19. REMOVE EXISTING ELECTRICAL EQUIPMENT, CONDUIT, AND CONDUCTORS AS NOTED. UPON REMOVAL TERMINATE AT POINT OF ENTRY. 7. WHERE PORTIONS OF THE INTERIOR SURFACES OF THE FACILITY ARE EXPOSED TO THE WEATHER PROTECT ALL SURFACES AT ALL TIMES WITH PLASTIC BARRIERS. 20. CONTRACTOR TO PROTECT ANY EXISTING ITEMS TO REMAIN FROM DAMAGE DURING CONSTRUCTION. 8. PROTECT ALL REMAINING ELECTRICAL ITEMS PER CODE. 21. REMOVE GAS LINES AS NOTED. UPON REMOVAL CAP AT POINT OF ENTRY. 9. TERMINATE ALL ELECTRICAL AND MECHANICAL SERVICE TO BE REMOVED IN A MANNER CONFORMING TO 22. CONTRACTOR SHALL PATCH AND REPAIR AS REQUIRED FOR EXISTING ITEMS TO REMAIN. THE NATIONALLY RECOGNIZED CODE COVERING THE SPECIFIC UTILITY AND SATISFACTORY TO THE OWNER AND BUILDING OFFICIALS. 23. ANY DAMAGED ROOF DECK DISCOVERED DURING DEMOLITION SHALL BE REPAIRED OR REPLACED 10. COMPLY WITH FEDERAL, STATE AND LOCAL HAULING AND DISPOSAL REGULATIONS. 24. ANY EXISTING EQUIPMENT OR COMPONENT IN OR PERTAINING TO THE PREMISES THAT IS BEING ABANDONED MUST BE DEMOLISHED COMPLETELY AND PROPERLY REMOVED FROM PREMISES. 11. ALL WORK SHALL COMPLY WITH ALL STATE AND LOCAL BUILDING CODES, ORDINANCES, AND ANY GOVERNING AGENCES HAVING JURISDICTION OVER THE PROJECT. 25. ALL ABOVE GROUND UTILITY LINES NOT TO BE RE -USED MUST BE REMOVED TO POINT OF ORIGIN. ALL UNDER SLAB UTILITY LINES TO BE CUT, CAPPED AND SEALED PER CODE. 12. THE JOB SITE SHALL BE MAINTAINED IN A CLEAN, ORDERLY CONDITION FREE OF DEBRIS AND LITTER AND SHALL NOT BE UNREASONABLY ENCUMBERED WITH ANY MATERIALS OR EQUIPMENT. ALL DEBRIS SHALL BE REMOVED 26. ALL ROOF MOUNTED EQUIPMENT ABOVE THE LEASED PREMISES NOT TO BE RE -USED MUST BE REMOVED BY AT MINIMUM ONCE PER DAY, OR AS REQUIRED TO MAINTAIN SAFE JOBSITE CONDITIONS. EACH TENANT G.C. AT TENANT EXPENSE. ROOF MUST BE PROPERLY PATCHED BY MALL REQUIRED ROOFER. ROOF SUBCONTRACTOR IMMEDIATELY UPON COMPLETION OF EACH PHASE OF HIS WORK SHALL REMOVE ALL CURBS MUST BE REMOVED AND ROOF PATCHED - DO NOT CAP. COORDINATE ALL WORK WITH MALL TRASH AND DEBRIS AS A RESULT OF HIS OPERATION. OPERATIONS DIRECTOR. 27. COVER AND PROTECT FLOOR DRAINS / FLOOR SINKS TO REMAIN. EXISTING - CODED NOTES E1 EXISTING STEEL COLUMN TO REMAIN. IF PRESENT, GC TO PROTECT FIRE PROOFING DURING CONSTRUCTION AND REPLACE AS REQUIRED E2 EXISTING FLOOR FINISH AND SLAB TO REMAIN. PREP FOR NEW FINISH OVERLAY IF REQUIRED. SEE FINISH PLAN. E3 EXISTING ENTRANCE DOOR, FRAME AND HARDWARE TO REMAIN. VERIFY HARDWARE IS IN GOOD WORKING ORDER (SEE SHEET A8.01 FOR ADDITIONAL INFORMATION). RE -KEY ALL EXISTING LOCKSETS TO REMAIN. E4 EXISTING ELECTRICAL PANEL TO REMAIN (SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION). E5 EXISTING CONCRETE CLAB TO REMAIN. E6 EXISTING WALK IN COOLER AND FREEZER TO REMAIN. GC TO PROTECT DURING CONSTRUCTION. E7 NOT USED. E8 EXISTING EXHAUST HOOD TO REMAIN. GC TO VERIFY EXISTING FIRE SUPPRESSION SYSTEM. E9 EXISTING WATER SOFTENER TO REMAIN.GC TO PROTECT DURING CONSTRUCTION. 10 EXISTING WATER HEATER TO REMAIN. GC TO PROTECT DURING CONSTRUCTION. 11 EXISTING MOP SINK AND FIXTURE TO REMAIN. GC TO PROTECT DURING CONSTRUCTION. 12 EXISTING COOLER DOOR AND HARDWARE TO REMAIN. VERIFY HARDWARE IS IN GOOD WORKING ORDER (COORDINATE WITH EQUIPMENT SUPPLIER IF REQUIRED). 13 EXISTING STOREFRONT TO REMAIN DEMOLITION PLAN - CODED NOTES D1 REMOVE EXISTING METAL STUD WALL AND SHEATHING. PATCH AND REPAIR ADJACENT WALL/SLAB AS REQUIRED FOR A SMOOTH, CONSISTENT FINISH. D2 REMOVE EXISTING FINISH FLOOR, ADHESIVES AND ALL ITEMS ASSOCIATES WITH FLOOR SYSTEM. PREP TO RECEIVE NEW FINISH FLOOR. GC RESPONSIBLE FOR REPAIRING AND MAINTAINING FLASHING, TRANSITIONS AND WATERPROOFING. D3 REMOVE EXISTING STOREFRONT. PATCH AND REPAIR ADJACENT WALL AS REQUIRED FOR A SMOOTH, CONSISTENT FINISH. D4 REMOVE EXISTING KITCHEN EQUIPMENT D5 REMOVE ALL PLUMBING FIXTURES FOR REPLACEMENT, THIS ROOM. NEW FIXTURES TO UTILIZE EXISTING LINES PLUMBING LINES IF POSSIBLE. GC TO VERIFY LINE LOCATION. SEE ARCHITECTURE AND PLUMBING DRAWINGS. D6 REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED COMPONENTS. PATCH AND REPAIR TO RECEIVE NEW STOREFRONT INFILL. GC TO RETAIN EXISTING PANIC HARDWARE TO BE REUSED. PROTECT AND STORE DURING CONSTRUCTION D7 REMOVE EXISTING HOOD AND ALL ASSOCIATED COMPONENTS. PATCH AND REPAIR SURROUNDING FINISHES AS NECESSARY. EXISTING DUCT TO BE CUT BACK TO EXISTING SHARED DUCT AND CAPPED. D8 NOT USED D9 REMOVE EXISTING PORTION OF COLOR WALL FROM FINISH FLOOR TO 8'-0"AFF (MIN, VERIFY IN FIELD). PATCH AND REPAIR ADJACENT WALL/SLAB AS REQUIRED TO RECEIVE DOOR 10 REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED COMPONENTS. PATCH AND REPAIR TO RECEIVE NEW STOREFRONT INFILL. 11 REMOVE EXISTING WALL TILE, PARTITIONS, MILLWORK. 12 REMOVE EXISTING MILLWORK. PATCH AND REPAIR REMAINING FLOOR AND FINISH WALLS AS NEEDED. 13 REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED COMPONENTS. PATCH AND REPAIR TO RECEIVE NEW COOLER WALL. 14 REMOVE ALL EXISTING CEILING SYSTEMS AND ASSOCIATED COMPONENTS INCLUDING, BUT NOT LIMITED TO LIGHTS, DIFFUSERS, RETURNS, CEILING TILE, GRID AND MOUNTING COMPONENTS 15 REMOVE EXISTING CEILING TILES AND LIGHTS. DIFFUSERS AND RETURNS. CEILING GRID AND MOUNTING COMPONENTS TO REMAIN. PATCH AND REPAIR AS NECESSARY IN ORDER TO RECEIVE NEW FINISHES. 16 REMOVE EXISTING PAVERS, MAINTAIN AND PROTECT PAVER STOCK FOR RE -USE, RETURN BALANCE OF PAVERS TO LANDLORD UPON COMPLETION. EXCAVATE AS NECESSARY. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. 17 REMOVE EXISTING AWNING. GC TO PATCH AND REPAIR AS NEEDED. VERIFY EXISTING COVERED FINISHES WITH OWNER TO DETERMINE FINAL FINISHING CONDITION. 18 VERIFY REQUIRED MINIMUM CLEARANCE REQUIREMENT IN FIELD PRIOR TO DEMOLITION. SEE SHEET A0.02 FOR ADDITIONAL INFORMATION. 19 GC TO COORDINATE REMOVAL OF EXISTING PARTITION WITH EQUIPMENT SUPPLIER 20 REMOVE EXISTING LIGHTS AND DIFFUSERS. EXISTING CEILING TO REMAIN. GC TO FIELD VERIFY WITH OWNER CONDITION OF CEILING. 21 REMOVE ALL EXISTING FINISHES INCLUDING, BUT NOT LIMITED TO WAINSCOTTING, BASEBOARDS, WOOD TRIM, WOOD FINISHES AND ALL OTHER FINISHES AND ASSOCIATED COMPONENTS CANVAS DESIGN � �4aiiAl l l l I l it is/ii, a Cl 11700160 s 01 'lillllll' llYlltr,t KYLE P. SCHNEIDER LICENSE # 11700160 EXPIRES: 12.31.2019 PIES AND PINTS CLAY TERRACE 14550 CLAY TERRACE BLVD A29 CARMEL, INDIANA 46032 © 2018 BY: CANVAS DESIGN, LLC ALLRIGHTS RESERVED THE ARRANGEMENTSDEPICTEDHEREINARETHE SOLE PROPERTYOF CANVAS DESIGN LLC., AND MAY NOT BE REPRODUCEDWITHOUT ITS WRITTENPERMISSION NOTE: 1. ALL BIDDERSSHALLVISITTHE SITE AND BECOME FAMILIARW/THE EXISTING CONDITIONS AND REQUIREMENTSOF THE PROJECTAND SHALL NOTIFYTHE ARCHITECTOF ANY ERRORSAND OMISSIONS SUBSEQUENTLYDISCOVEREDIN THE CONTRACT DOCUMENTS. 2. THE CONTRACT DOCUMENTSARECOMPRISED OFTHE DRAWINGS AND THE PROJECT MANUAL IN THEIR ENTIRETY.THE INFORMATION IN THESE DOCUMENTS IS DEPENDENTUPON AND COMPLEMENTARYOF EACH OTHER. SEPARATIONOF THE CONTRACT DOCUMENTS SHALL NOT BE PERMITTED.IF THE CONTRACTOR CHOOSESTO SEPARATETHE DOCUMENTS, THEYDO SO ATTHEIROWN RISKAND EXPENSE. 3. ADDITIONALLY, SEE GENERAL INFORMATION ON "AO" SHEETS. 4. THE CLIENTACKNOWLEDGESTHE CONSULTANTS (ARCHITECT) DRAWINGSAND SPECIFICATION, INCLUDING ALL DOCUMENTSON ELECTRONICMEDIAAS INSTRUMENTSOF THE CONSULTANTS (ARCHITECT) PROFESSIONALSERVICE.THE CLIENTSHALL NOT REUSE OR MAKE OR PERMITTO BE MADE ANY MODIFICATION TO THE DRAWINGSAND SPECIFICATIONSWITHOUT THE PRIOR WRITTENAUTHORIZATIONOF THE CONSULTANT (ARCHITECT). THE CLIENTAGREESTO WAIVE ANY CLAIM AGAINSTTHE CONSULTANT (ARCHITECT) ARISING FROM ANY UNAUTHORIZED TRANSFER, REUSE OR MODIFICATIONOF THE DRAWINGSAND SPECIFICATIONS. 5. ARCHITECTCANNOT WAR RANTTH E ACCURACY OF DATA CONTAINED HEREIN. ANY USE OR REUSE OF ORIGINAL OR ALTEREDCADD DESIGN MATERIALSBYTHE USER OR OTHER PARITESWITHOUT THE REVIEWAND WRITTEN APPROVALOF THEARCHITECTSHALLBEATTHE SOLE RISK OF THE USER. FURTHERMORE, USERAGREESTO DEFEND, INDEMNIFY, AND HOLD ARCHITECT HARMLESS FROM ALLCLAIMS, INJURIES, DAMAGES, LOSSES, EXPENSES, AND ATTORNEYS FEESARISING OUT OF THE MODIFICATIONOR REUSE OF THESE MATERIALS. 6. THESE DRAWINGS AS PART OF THE CONTRACT DOCUMENTS ARE DIAGRAMMATICAND ARE NOT INTENDED TO DEFINE EXACT QUANTITIES, LOCATIONSOR CODIFIED REQUIREMENTS.THE DRAWINGS SHALL NOT BE SCALED. EXACTSTATEAND LOCALCODE REQUIREMENTS AND OTHER APPLICABLECODE REQUIRMENTSSHALLBE VERIFIEDBYAND ARE THE SOLE RESPONSIBILITYOF THIS CONTRACTOR. ANY INFORMATION WHICH DIRECTLY CONFLICTSWITHANY OFTHESE CODES OR ANY DISCREPANCIESFOUND IN THE CONTRACT DOCUMENTS SHALLBEBROUGHT TOTHE ATTENTIONOFTHE PROJECT ARCHITECT. # Description Date 0 Permit Set PROJECT DATE: 02-05-18 PROJECT #: 17-001 DEMOLITION PLAN A1.01