HomeMy WebLinkAboutConstruction Plans 11-09-17
CONSTRUCTION PLANS FOR
MAINTENANCE/ADMIN. BUILDING
11128 CROOKED STICK LANE
CARMEL, IN 46032
HAMILTON COUNTYHAMILTON COUNTY
146th ST.
Sheet List Table
146th ST.
PLANS PREPARED FOR
Sheet
141st ST.
Sheet Title
116th ST.
Number
11128 CROOKED STICK LANE
C001TITLE SHEET
CARMEL, IN 46032
C100STORMWATER POLLUTION PREVENTION PLAN PHASE I
MAIN ST.
131st ST.
TELEPHONE: (317) 573-2173
C101STORMWATER POLLUTION PREVENTION PLAN PHASE II
CONTACT PERSON: JAKE GARGASZ
126th ST.
EMAIL: JAKEGARGASZ@CROOKEDSTICK.ORG
C102STORMWATER POLLUTION PREVENTION SPECIFICATIONS
C103STORMWATER POLLUTION PREVENTION PLAN DETAILS
C200SITE PLAN
116th ST.
116th ST.
106th ST.
C201SITE DETAILS
111th ST.
PLANS PREPARED BY
C300GRADING & DRAINAGE PLAN
106th ST.
106th ST.
WEIHE ENGINEERS, INC.
C500SANITARY PLAN AND PROFILE
10505 N. COLLEGE AVE.
C501SANITARY SEWER DETAILS
INDIANAPOLIS, INDIANA 46280
C502SANITARY SEWER DETAILS
TELEPHONE: (317) 846-6611
N
96th ST.
96th ST.
FAX: (317) 843-0546
C600DRAINAGE PLAN
WE
CONTACT PERSON: SCOTT RUCKER, P.E.
C601DRAINAGE DETAILS
96th ST.
EMAIL: RUCKERS@WEIHE.NET
S
C602DRAINAGE DETAILS
86th ST.
86th ST.
NO SCALE
C800UTILITY PLAN
PROJECT LOCATION
PROJECT LOCATION
C801UTILITY DETAILS
AREA MAP
LOCATION MAP
L100LANDSCAPE PLAN
STEVEN SCOTT RUCKER P.E. 11300279
CITY OF CARMEL STANDARD NOTES
OPERATING AUTHORITIES
GENERAL NOTES
1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER
CITY OF CARMEL PLANNINGHAMILTON COUNTY HEALTH DEPARTMENT
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND
MANAGEMENT PERMIT
ONE CIVIC SQUARE18030 FOUNDATION DR. SUITE A
APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO
CARMEL, IN 46032NOBLESVILLE, INDIANA 46060
STARTING CONSTRUCTION.
2.THESE PLANS COMPLY WITH ALL ADA REQUIREMENTS.
ANGIE CONN / ALEXIA LOPEZJASON LEMASTER
TEL: 317/571-2417TEL: 317/776-8500
2.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL
EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING
CITY OF CARMEL ENGINEERINGCLAY TOWNSHIP REGIONAL WASTE DISTRICT
CONSTRUCTION
ONE CIVIC SQUARE10701 NORTH COLLEGE AVENUE, SUITE A
CARMEL, IN 46032INDIANAPOLIS, IN 46280-1098
3.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH
RYAN HARTMAN
JOHN THOMAS / ALEX JORDAN
ALL RESPECTIVE UTILITIES.
TEL: 317/571-2441TEL: 317/844-9200
4.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE
CITY OF CARMEL BLDG SERVICESDUKE ENERGY
ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS.
100 SOUTH MILL CREEK RD.
ONE CIVIC SQUARE
CARMEL, IN 46032NOBLESVILLE, INDIANA 46060
5.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL
TEL: 317/776-5352
JIM BLANCHARD
RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN
TEL: 317/571-2444
DESIGN DATA
DEPTH.
COMCAST
CITY OF CARMEL FIRE DEPARTMENT9750 E. 150th STREET
6.IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A
EXISTING ZONING
TWO CIVIC SQUARESUITE 1600
TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER.
P-1(PARK)
CARMEL, INDIANA 46032NOBLESVILLE, INDIANA 46060
TEL: 317/776-4495
CHRIS ELLISON
ZONING OVERLAY
7.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY
TEL: 317/571-2600
CONTROL THROUGHOUT THIS PROJECT.
NO OVERLAY
VECTREN GAS
TOTAL ACREAGE
P.O. BOX 1700
CARMEL CITY UTILITIES
8.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL
184.6 ACRES
30 W MAIN ST, SUITE 220NOBLESVILLE, INDIANA, 46060
STANDARDS.
BUILDING SQUARE FOOTAGE
CARMEL, INDIANA 46032TEL: 317/776-5573
9012 SQUARE FEET
JOHN DUFFY
9.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS
AT&T
TEL: 317/571-2648
ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS.
5858 NORTH COLLEGE
INDIANAPOLIS, INDIANA 46220
HAMILTON COUNTY SURVEYOR
10.ANY FIELD TILES ENCOUNTERED DURING EXCAVATION SHALL BE REPAIRED AND CONNECTED TO NEW
ONE HAMILTON COUNTY SQUARETEL: 317/252-5168
STORM SEWERS AND POSITIVE DRAINAGE PRESERVED.
SUITE 188
NOBLESVILLE, INDIANA 46060
11.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER THAT ALL LANDSCAPE REQUIREMENTS ARE MET
TEL: 317/776-8495
AND CONFORM TO APPLICABLE LOCAL STANDARDS.
HAMILTON COUNTY HIGHWAY DEPT
12.THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL
1700 SOUTH 10TH STREET
EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY
NOBLESVILLE, INDIANA 46060
SCALE ON FLOOD INSURANCE RATE MAP #18057C0205G, DATED NOVEMBER 19, 2014.
TEL: 317/773-7770
13.BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD
SURVEYS & PLAT FOR EXACT INFORMATION.
14.THIS SITE DOES NOT CONTAIN ANY WETLANDS AT SHOWN ON THE U.S. DEPARTMENT OF THE INTERIOR
FISH AND WILDLIFE SERVICE; CARMEL, INDIANA, NATIONAL WETLANDS INVENTORY MAP DATED 2017.
R
Know what's
SHEET NO.
C001
PROJECT NO.
W17.0206
GENERAL NOTES
SITE PREPARATION / SWPPP PHASE 1 NOTES
INSTALL PERMIT POSTING AREA. 4" PVC TUBE WITH END CAPS ATTACHED TO
1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
1
PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION
VERIFY WITH THE OWNER DURING BIDDING AND DURING
DRAWINGS AND PERMITS FOR INSPECTORS.
CONSTRUCTION ACTIVITIES ALL ITEMS TO BE REMOVED. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY
USE EXISTING DRIVE FOR CONSTRUCTION ENTRANCE. REFER TO DETAIL ON
2
MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY
SHEET C103
FOR THE INSTALLATION OF THE NEW WORK.
INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C103
3
2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF
INSTALL SILT FENCE. REFER TO DETAIL ON SHEET C103
4
WORK, AND TO VERIFY WHICH UTILITIES WILL BE REMOVED BY
UTILITY COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY THE
5LIMITS OF PROPOSED BUILDING
UTILITY COMPANY SHALL BE REMOVED BY THE CONTRACTOR.
STORM SEWER INLET TO BE MODIFIED TO RECIEVE ADDITIONAL STORM SEWER
6
3.UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE
CONNECTION.
RELOCATED AND/OR CAPPED AND ABANDONED BEFORE
CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
7PAVEMENT SAWCUT LIMITS.
4.ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE
REMOVE BUILDING, ELECTRIC SERVICE LINE(S) AND APPURTENANCES FROM
8
PROPERTY OF THE DEMOLITION CONTRACTOR AND SHALL BE
EXISTING BUILDING LOCATION.
PROPERLY DISPOSED OF OFF THE SITE.
9
REUSE SECONDARY (EMPTY) METER PIT FOR NEW DOMESTIC WATER SERVICE.
5.SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN
OFF THE SITE.
REMOVE EXISTING PAVEMENT FULL DEPTH.
10
6.ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT
11
REMOVE EXISTING TIMBER RETAINING WALL.
ARE REMAINING. NO UTILITY SERVICE SHALL BE INTERRUPTED
D
D
DURING THE CONSTRUCTION PROCESS.
STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING AREA, AND
12
PORT-O-LET AS NEEDED.
4
7.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR
REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR
REMOVE STONE DRIVE SURFACE AND STOCK PILE FOR REUSE ON STONE DRIVE
13
7
EXACT INFORMATION.
AREAS.
8.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE
1410'x20' BORING PIT FOR SANITARY SEWER AND GRINDER PUMP INSTALLATION (SEE
SHEET C500 FOR DETAILS).NOT SHOWN ON THE PLAN AS BEING REMOVED MAY BE DONE SO,
AS LONG AS THE TREE(S) ARE RELOCATED TO AN APPROVED
13
ALTERNATIVE LOCATION ON SITE.
9.IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION
PLAN, PLEASE CONTACT THE ENGINEER BEFORE CONTINUING
WORK.
EROSION CONTROL NOTES
IP
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
LOCATION OF LANDSCAPE BEDS.
2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT
FENCE TO FOLLOW CONTOUR.
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN
THE STREET.
7
EROSION CONTROL SPECIFICATIONS
5
10
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
12
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
13
8
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
4
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
LINE TYPES
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
EFFECTIVENESS.
11
UNDERGROUND GAS
GGG
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
UNDERGROUND WATER
WW
UNDERGROUND ELECTRIC
EEE
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
UNDERGROUND COMMUNICATIONS
CCC
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
7
UNDERGROUND FIBER OPTIC
FOFO
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
OVERHEAD UTILITY
OHUOHU
FULL STAND OF GRASS HAS BEEN OBTAINED.
FORCE MAIN
FMFM
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
SANITARY SEWER
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
STORM SEWER
AND/OR OWNER.
RIGHT OF WAY LINE
9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY
CHAIN LINK FENCE
TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION
BOARD FENCE
ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH
WROUGHT IRON FENCE
2
"RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER
FARM FENCE
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
GUARD RAIL
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
HAND RAIL
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT,
3
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO
STEVEN SCOTT RUCKER P.E. 11300279
SILT FENCE
SFSF
4
ANY CONSTRUCTION ACTIVITY.
BUILDING SETBACK LINE
10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
BOUNDARY LINE
CHART IN THESE PLANS.
FLOW LINE
4
11.PORTABLE TOILETS MUST BE ANCHORED.
SECTION LINE
CONTACT PERSON FOR EROSION
INDEX CONTOUR
INTERMEDIATE CONTOUR
CONTROL & SEDIMENT PRACTICES
14
SWPPP PHASE 1 LEGEND
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
- INLET PROTECTION - USE SUBSURFACE
IP
FAX: (317) 843-0546
INLET PROTECTION WITH OVERFLOW
1
EMAIL: PARKERF@WEIHE.NET
CAPABILITY (DANDY SAC)
CONTACT PERSON: FRED PARKER, CPESC
- CONSTRUCTION ENTRANCE (USE EXISTING
ASPHALT DRIVE)
HATCH LEGEND
IP
- STAGING AREA
REMOVED ASPHALT PAVEMENT
- POSTING AREA - 4" PVC TUBE WITH END CAPS
REMOVED STONE AREA
ATTACHED TO PROJECT CONSTRUCTION SIGN
IP
TO CONTAIN APPROVED CONSTRUCTION
DRAWINGS AND PERMITS FOR INSPECTORS.
OPEN CUT PAVEMENT FOR UTILITY TAPS
9
- CONCRETE WASHOUT
IP
- STOCKPILE AREA (TEMPORARY SEEDING
EXISTING AREAS
REQUIRED)
TOTAL SITE = 184.66 AC.
- SILT FENCE
SF
DISTURBED = 0.82 AC.
PERVIOUS = 0.25 AC.
- LIMITS OF DISTURBANCE
D
IMPERVIOUS = 0.57 AC.
N
R
WE
Know what's
SHEET NO.
C100
S
PROJECT NO.
W17.0206
LINE TYPESEROSION CONTROL NOTES
UNDERGROUND GAS
GGG
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
UNDERGROUND WATER
WW
LOCATION OF LANDSCAPE BEDS.
UNDERGROUND ELECTRIC
EEE
2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT
UNDERGROUND COMMUNICATIONS
CCC
FENCE TO FOLLOW CONTOUR.
UNDERGROUND FIBER OPTIC
FOFO
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN
OVERHEAD UTILITY
OHUOHU
THE STREET.
FORCE MAIN
FMFM
EROSION CONTROL SPECIFICATIONS
SANITARY SEWER
STORM SEWER
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
RIGHT OF WAY LINE
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
CHAIN LINK FENCE
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
BOARD FENCE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
WROUGHT IRON FENCE
CONSULTED IN THE EVENT THIS HAPPENS.
FARM FENCE
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
GUARD RAIL
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
HAND RAIL
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
SILT FENCE
SFSF
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
BUILDING SETBACK LINE
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
D
D
BOUNDARY LINE
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
FLOW LINE
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
SECTION LINE
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
INDEX CONTOUR
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
INTERMEDIATE CONTOUR
EFFECTIVENESS.
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
SWPPP PHASE 2 LEGEND
FULL STAND OF GRASS HAS BEEN OBTAINED.
IP
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
- INLET PROTECTION - USE SUBSURFACE
IP
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
INLET PROTECTION WITH OVERFLOW CAPABILITY
AND/OR OWNER.
(DANDY SAC)
9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY
- PERMANENT/TEMPORARY SEEDING
TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION
USE PLANTING CHART
ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH
- LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS)
D
"RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
*
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
- SITE DISCHARGE POINT
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT,
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO
ANY CONSTRUCTION ACTIVITY.
PROPOSED
ADMIN. BLDG.
10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
3600 SF
CHART IN THESE PLANS.
F.F.E. 874.8
11.PORTABLE TOILETS MUST BE ANCHORED.
MLAG=874.75
CONTACT PERSON FOR EROSION
IP
CONTROL & SEDIMENT PRACTICES
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
EMAIL: PARKERF@WEIHE.NET
CONTACT PERSON: FRED PARKER, CPESC
DISTURBED ACREAGE
-WARNING-
THIS PLAN TO BE USED FOR EROSION CONTROL
PURPOSES ONLY. ADDITIONAL EROSION
CONTROL MEASURES MAY BE REQUIRED IN THE
FIELD BY THE INSPECTOR.
-NOTE-
THIS PLAN INDICATES EROSION CONTROL
MEASURES REQUIRED AFTER SOIL STRIPPING
AND PAD BUILDING HAS TAKEN PLACE.
COORDINATE WITH DEVELOPER FOR
STEVEN SCOTT RUCKER P.E. 11300279
MEASURES REQUIRED UNTIL PROPERTY
TURNED OVER FOR DEVELOPMENT.
COORDINATE WITH SOIL CONSERVATION
DISTRICT REPRESENTATIVE FOR ANY OTHER
MEASURES REQUIRED DUE TO SITE
CONDITIONS.
IP
IP
IP
N
R
WE
Know what's
SHEET NO.
C101
S
PROJECT NO.
W17.0206
RULE 6. SPILLS OF OIL AND OTHER 327 IAC 2-6.1-6 REPORTABLE SPILLS; TRANSPORTATION
SEQENCE OF CONSTRUCTION
SECTION 1 EMERGENCY RESPONSE NUMBERS
IN COMMERCE. THIS DEFINITION EXCLUDES CARRIAGE WITHIN A FACILITY BY
AUTHORITY: IC 13-14-8-7
OBJECTIONABLE SUBSTANCES;
SEQUENCE DESCRIBING STORMWATER QUALITY MEASURE IMPLEMENTATION RELATIVE TO LAND DISTURBING ACTIVITIES -
TRANSPORTATION EQUIPMENT OWNED, OPERATED, OR CONTROLLED BY THAT
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
EMERGENCY FOR ANY LIFE THREATENING PROBLEM 911
1. A PRE-CONSTRUCTION MEETING WITH THE CITY OF CARMEL IS REQUIRED PRIOR TO THE COMMENCEMENT OF ANY
FACILITY.
SEC. 6. THE FOLLOWING SPILLS FROM A MODE OF TRANSPORTATION MUST
REPORTING, CONTAINMENT AND CLEANUP
EARTHWORK. ADDITIONALLY, IDEM IS REQUIRED TO BE CONTACTED AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.
(11) "OBJECTIONABLE SUBSTANCES" MEANS SUBSTANCES THAT ARE:
BE REPORTED:
CARMEL FIRE DEPARTMENT 317-571-2600
2. CONSTRUCTION ENTRANCE - USE EXISTING DRIVE
(A) OF A QUANTITY AND A TYPE; AND
(1) SPILLS THAT DAMAGE THE WATERS OF THE STATE SO AS TO CAUSE DEATH
(REPEALED BY WATER POLLUTION CONTROL BOARD; FILED FEB 25, 1997, 1:00 P.M.: 20 IR
3. INSTALL SILT FENCING AND ALL OTHER EROSION CONTROL MEASURES PRIOR TO ANY EARTH MOVING.
(B) PRESENT FOR A DURATION AND IN A LOCATION;
OR ACUTE INJURY OR ILLNESS TO HUMANS OR ANIMALS.
1734)
CARMEL POLICE DEPARTMENT 317-571-2500
4. EARTHWORK - STRIP TOPSOIL, BEGIN ROUGH GRADING AND PREPARE BUILDING PAD AND ROUGH GRADE.
SO AS TO DAMAGE WATERS OF THE STATE. THIS DEFINITION EXCLUDES
(2) SPILLS THAT DAMAGE SURFACE WATERS.
5. SANITARY SEWER - INSTALL SANITARY SEWER SYSTEM
HAZARDOUS SUBSTANCES, EXTREMELY HAZARDOUS SUBSTANCES,
(3) SPILLS TO SOIL:
RULE 6.1. SPILLS; REPORTING, CONTAINMENT, AND RESPONSE
INDIANA DEPT. OF NATURAL RESOURCES 812-477-8773
6. STORM SEWER - INSTALL STORM SEWER SYSTEM AND CORRESPONDING INLET PROTECTION
PETROLEUM, AND MIXTURES THEREOF.
(A) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS
7. UTILITIES - COORDINATE INSTALLATION OF ALL UTILITIES.
(12) "ON-SCENE COORDINATOR" MEANS A STATE OR FEDERAL OFFICIAL
SUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED (100)
327 IAC 2-6.1-1 APPLICABILITY
INDIANA DEPT. OF ENVIRONMENTAL MANAGEMENT 317-233-7745
8. FINISH GRADING AND PERMANENT EROSION CONTROL - FINISH GRADE AND PERMANENTLY SEED ALL PROPERTY
DESIGNATED BY THE DEPARTMENT, THE UNITED STATES ENVIRONMENTAL
POUNDS OR THE REPORTABLE QUANTITY, WHICHEVER IS LESS;
AUTHORITY: IC 13-14-8-7
PERIMETER AREAS.
PROTECTION AGENCY, OR THE UNITED STATES COAST GUARD TO DIRECT AND
(B) SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS
HAMILTON COUNTY COUNTY SOIL AND WATER 317-773-1406
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
9. PAVEMENT - INSTALL STONE, BASE COURSES AND FINISHED GRADES FOR ENTRY DRIVE.
COORDINATE SPECIAL SPILL RESPONSE ACTIVITIES.
FIFTY-FIVE (55) GALLONS;
SEC. 1. THIS RULE APPLIES TO THE REPORTING AND CONTAINMENT OF, AND THE
10. CLEANUP - CONTRACTOR SHALL SPOIL ALL EXCESS MATERIALS, REGRADE AND STABILIZE ALL AREAS DISTURBED BY
(13) "RECREATIONAL WATERS" MEANS ANY WATER USED FOR:
OR
CITY OF CARMEL ENGINEERING 317-571-2441
RESPONSE TO THOSE SPILLS OF HAZARDOUS SUBSTANCES,
UTILITY INSTALLATIONS AND RESEED.
(A) BOATING, SWIMMING, FISHING, HUNTING, TRAPPING, OR WILDLIFE
(C) SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11)
EXTREMELY HAZARDOUS SUBSTANCES, PETROLEUM, AND OBJECTIONABLE
11. FINAL LANDSCAPING - INSTALL FINAL LANDSCAPING.
VIEWING; OR
OF THIS RULE.
SUBSTANCES THAT ARE OF A QUANTITY, TYPE, DURATION AND IN A LOCATION AS
(B) PUBLIC ACCESS AREAS THAT ARE OWNED BY THE DEPARTMENT OF
SECTION 2 MATERIAL HANDLING AND(4) ANY SPILL FOR WHICH A SPILL RESPONSE HAS NOT BEEN DONE. (WATER
TO DAMAGE THE WATERS OF THE STATE. NOTHING IN THIS RULE IS INTENDED TO
NATURAL RESOURCES OR THE FEDERAL GOVERNMENT; AS LISTED BY THE
POLLUTION CONTROL BOARD; 327 IAC 2-6.1-6; FILED FEB 25, 1997, 1:00 P.M.: 20 IR
AFFECT REPORTING OR CLEAN-UP REQUIREMENTS SET FORTH BY OTHER
SPILL PREVENTION PLAN DEPARTMENT.
1733; READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED
FEDERAL, STATE, OR LOCAL LAWS. (WATER POLLUTION CONTROL BOARD; 327 IAC
(14) "REPORTABLE QUANTITY" MEANS THE AMOUNT OF A HAZARDOUS
NOV 21, 2007, 1:16 P.M.: 20071219-IR-327070553BFA)
2-6.1-1; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1731; READOPTED
IN ORDER TO MINIMIZE THE RELEASE OF POTENTIAL POLLUTANTS DURING
SUBSTANCE OR EXTREMELY HAZARDOUS SUBSTANCE THAT IS REQUIRED TO BE
FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16 P.M.:
CONSTRUCTION THE CONTRACTORS SHALL IMPLEMENT THIS MATERIAL
REPORTED UNDER FEDERAL LAW UNDER 42 U.S.C. 9602(A) AND (B) AND 42 U.S.C.
327 IAC 2-6.1-7 REPORTABLE SPILLS; RESPONSIBILITIES
20071219-IR-327070553BFA)
HANDLING AND SPILL PREVENTION PLAN. THE CONTRACTOR SHALL REVIEW
9603(A). (40 CFR 302.4 OR 40 CFR 355 APPENDIX A.) (15) "SPILL" MEANS ANY
AUTHORITY: IC 13-14-8-7
THIS PLAN WITH ALL SUBCONTRACTORS AND REQUIRE THAT THEY IMPLEMENT
UNEXPECTED, UNINTENDED, ABNORMAL, OR UNAPPROVED DUMPING, LEAKAGE,
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
327 IAC 2-6.1-2 SPECIAL AREAS
THE PLAN AS WELL.
DRAINAGE, SEEPAGE, DISCHARGE OR OTHER LOSS OF PETROLEUM,
SEC. 7. ANY PERSON WHO OPERATES, CONTROLS, OR MAINTAINS ANY
AUTHORITY: IC 13-14-8-7
HAZARDOUS SUBSTANCES, EXTREMELY HAZARDOUS SUBSTANCES, OR
MODE OF TRANSPORTATION OR FACILITY FROM WHICH A SPILL OCCURS SHALL,
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
1. CONSTRUCTION EQUIPMENT
OBJECTIONABLE SUBSTANCES. THE TERM DOES NOT INCLUDE RELEASES TO
UPON DISCOVERY OF A REPORTABLE SPILL TO THE SOIL OR SURFACE WATERS
SEC. 2. CERTAIN AREAS OF THE STATE ARE RECOGNIZED AS HAVING UNIQUE
A. FUELING, LUBRICATION AND FLUIDS: ALL OPERATIONS INVOLVING THE
IMPERMEABLE SURFACES WHEN THE SUBSTANCE DOES NOT MIGRATE OFF THE
OF THE STATE, DO THE FOLLOWING:
GEOLOGY. A LARGE SECTION OF THE MID-SOUTHERN PART OF THE STATE IS A KARST
ADDITION OF FLUIDS TO EQUIPMENT SHOULD BE DONE IN ONE LOCATION, AS
SURFACE OR PENETRATE THE SURFACE AND ENTER THE SOIL.
(1) CONTAIN THE SPILL, IF POSSIBLE, TO PREVENT ADDITIONAL SPILLED
REGION. PORTIONS OF SAINT JOSEPH, ELKHART, KOSCIUSKO, AND LAGRANGE
(16) "SPILL RESPONSE", FOR PURPOSES OF THIS RULE, MEANS THE FOLLOWING:
DESIGNATED BY THE CONSTRUCTION MANAGER, SO THAT SPILLS ARE LIMITED
MATERIAL FROM ENTERING THE WATERS OF THE STATE.
COUNTIES CONTAIN A SOLE SOURCE AQUIFER AS REFERENCED
(A) THE SPILL IS CONTAINED; AND
TO ONE LOCATION ON THE SITE, WHICH WILL FACILITATE THE CLEANUP OF
(2) UNDERTAKE OR CAUSE OTHERS TO UNDERTAKE ACTIVITIES NEEDED TO
IN 42 U.S.C. 300H-3(E). THE WATERS OF THE STATE ARE PARTICULARLY VULNERABLE TO
(B) FREE MATERIAL IS REMOVED OR NEUTRALIZED.
SPILLS. IF AN ONSITE-FUELING TANK IS PLANNED TO BE ON SITE, IT SHALL BE
ACCOMPLISH A SPILL RESPONSE.
DAMAGE FROM SPILLS IN THESE AREAS, AND CARE SHOULD BE
(17) "SPILL REPORT" MEANS AN ORAL REPORT THAT INCLUDES THE FOLLOWING
DOUBLE WALLED AND STORED IN THIS DESIGNED AREA. THIS LOCATION IS AN
(3) AS SOON AS POSSIBLE, BUT WITHIN TWO (2) HOURS OF DISCOVERY,
EXERCISED WHEN EVALUATING DAMAGE FROM SPILLS. INFORMATION ABOUT THESE
INFORMATION ABOUT A SPILL, TO THE EXTENT THAT THE INFORMATION IS
AREA THAT WILL NOT ALLOW SPILLED FLUIDS TO MIGRATE INTO SUBSURFACE
COMMUNICATE A SPILL REPORT TO THE DEPARTMENT OF ENVIRONMENTAL
AREAS CAN BE OBTAINED BY CALLING THE DEPARTMENT OF ENVIRONMENTAL
KNOWN AT THE TIME OF THE REPORT:
SOILS. IN THE EVENT OF A SPILL, THE FLUID SHALL IMMEDIATELY BE CLEANED
MANAGEMENT, OFFICE OF LAND QUALITY, EMERGENCY RESPONSE SECTION:
MANAGEMENT, OFFICE OF LAND QUALITY, EMERGENCY RESPONSE SECTION: AREA
(A) THE NAME, ADDRESS, AND TELEPHONE NUMBER OF THE PERSON
UP BY REMOVING THE CONTAMINATED SOIL OR STONE, WHICH SHALL BE
AREA CODE 1-888-233-7745 FOR IN-STATE CALLS (TOLL FREE), (317) 233-7745 FOR
CODE 1-888-233-7745 FOR IN-STATE CALLS (TOLL FREE), (317) 233-7745 FOR
MAKING THE SPILL REPORT.
DISPOSED OF IN AN ACCEPTABLE MANNER. SPILLS ON HARD SURFACES SHALL
OUT-OF-STATE CALLS. IF NEW OR UPDATED SPILL REPORT INFORMATION
OUT-OF-STATE CALLS. (WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-2; FILED FEB
(B) THE NAME, ADDRESS, AND TELEPHONE NUMBER OF A CONTACT
BE SOAKED UP BY AN ACCEPTABLE MATERIAL SUCH AS OIL DRY AND THE
BECOMES KNOWN THAT INDICATES A SIGNIFICANT INCREASE IN THE
25, 1997, 1:00 P.M.: 20 IR 1731; READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518;
PERSON IF DIFFERENT FROM CLAUSE (A).
ABSORBENT MATERIAL DISPOSED OF IN A PROPER MANNER. THE SPILL SHALL
LIKELIHOOD OF DAMAGE TO THE WATERS OF THE STATE, THE RESPONSIBLE
READOPTED FILED NOV 21, 2007, 1:16 P.M.: 20071219-IR-327070553BFA; ERRATA FILED
(C) THE LOCATION OF THE SPILL.
ALSO BE REPORTED IMMEDIATELY TO THE CONSTRUCTION MANAGER'S
PARTY SHALL NOTIFY THE DEPARTMENT AS SOON AS POSSIBLE BUT WITHIN
MAY 27, 2008, 2:06 P.M.: 20080625-IR-327080419ACA)
(D) THE TIME OF THE SPILL.
SUPERINTENDENT.
TWO (2) HOURS OF THE TIME THE NEW OR UPDATED INFORMATION BECOMES
(E) THE IDENTIFICATION OF THE SUBSTANCE SPILLED.
B. EQUIPMENT REPAIR, ESPECIALLY WHEN FLUIDS MUST BE REMOVED FROM
KNOWN.
327 IAC 2-6.1-3 EXCLUSIONS
(F) THE APPROXIMATE QUANTITY OF THE SUBSTANCE THAT HAS BEEN OR
THE EQUIPMENT OR THE POSSIBILITY OF FLUID SPILLS IS HIGH, SHOULD
(4) SUBMIT TO THE INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT,
AUTHORITY: IC 13-14-8-7
MAY FURTHER BE SPILLED.
ALWAYS BE DONE OFFSITE AT A FACILITY THAT IS MORE SUITABLE THAN A
OFFICE OF LAND QUALITY, EMERGENCY RESPONSE SECTION (MC 66-30), 2525 N.
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
(G) THE DURATION OF THE SPILL.
CONSTRUCTION SITE TO HANDLE SPILLS. WHEN EQUIPMENT MUST BESHADELAND AVE., SUITE 100, INDIANAPOLIS, IN 46219-1787, A WRITTEN COPY OF
SEC. 3. NOTWITHSTANDING ANY OTHER SECTION OF THIS RULE, THE REPORTING
(H) THE SOURCE OF THE SPILL.
THE SPILL REPORT IF REQUESTED IN WRITING BY THE DEPARTMENT.
REPAIRED ONSITE IT SHOULD BE MOVED TO THE MAINTENANCE AND FUELING
REQUIREMENT OF THIS RULE DOES NOT APPLY TO THE FOLLOWING
(I) NAME AND LOCATION OF THE WATERS DAMAGED.
(5) EXCEPT FROM MODES OF TRANSPORTATION OTHER THAN PIPELINES,
AREA IF POSSIBLE. OTHERWISE, SUITABLE ON SITE CONTAINERS SHOULD BE
OCCURRENCES:
(J) THE IDENTITY OF ANY RESPONSE ORGANIZATION RESPONDING TO THE
EXERCISE DUE DILIGENCE AND DOCUMENT ATTEMPTS TO NOTIFY THE
PLACED UNDER THE EQUIPMENT DURING REPAIR TO CATCH ANY SPILLED
(1) DISCHARGES OR EXCEEDANCES THAT ARE UNDER THE JURISDICTION OF AN
SPILL.
FOLLOWING:
FLUIDS AND THESE FLUIDS SHOULD BE DISPOSED OF IN A PROPER MANNER.
APPLICABLE PERMIT WHEN THE SUBSTANCE IN QUESTION IS COVERED
(K) WHAT MEASURES HAVE BEEN OR WILL BE UNDERTAKEN TO PERFORM
(A) FOR SPILLS TO SURFACE WATER THAT CAUSE DAMAGE, THE NEAREST
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS, SHALL BE
BY THE PERMIT AND DEATH OR ACUTE INJURY OR ILLNESS TO ANIMALS OR HUMANS
A SPILL RESPONSE.
AFFECTED DOWNSTREAM WATER USER LOCATED WITHIN TEN (10) MILES
INSPECTED FOR LEAKS EACH TIME THEY ARE USED. IF LEAKS ARE FOUND, THE
DOES NOT OCCUR.
(L) ANY OTHER INFORMATION THAT MAY BE SIGNIFICANT TO THE
OF THE SPILL AND IN THE STATE OF INDIANA;
FLUID SHALL BE REMOVED FROM THE CONTAINER IN A PROPER MANNER AND
(2) LAWFUL APPLICATION OF MATERIALS, INCLUDING, BUT NOT LIMITED TO:
RESPONSE ACTION.
AND
THE CONTAINER DISPOSED OF IN AN ACCEPTABLE MANNER. EMPTY
(A) COMMERCIAL OR NATURAL FERTILIZERS AND PESTICIDES ON OR TO
(18) "WATERS", AS DEFINED IN IC 13-11-2-265, MEANS THE ACCUMULATIONS OF
(B) FOR SPILLS TO SOIL OUTSIDE THE FACILITY BOUNDARY, THE AFFECTED
DISPOSABLE CONTAINER, SUCH AS GREASE TUBES AND LUBRICATING OIL AND
LAND OR WATER; OR
WATER, SURFACE AND UNDERGROUND, NATURAL AND ARTIFICIAL, PUBLIC AND
PROPERTY OWNER OR OWNERS, OPERATOR OR OPERATORS, OR OCCUPANT
BRAKE FLUID CONTAINERS, AND THEIR PACKAGING, SHALL BE DISPOSED OF IN A
(B) DUST SUPPRESSION MATERIALS.
PRIVATE, OR PARTS THEREOF, THAT ARE WHOLLY OR PARTIALLY WITHIN, FLOW
OR OCCUPANTS. (WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-7; FILED
PROPER MANNER AND SHALL NOT BE LEFT ON THE GROUND OR IN THE OPEN ON
(3) THE APPLICATION OF PETROLEUM NECESSARY FOR CONSTRUCTION THAT DOES NOT
THROUGH, OR BORDER UPON THIS STATE. THE TERM DOES NOT INCLUDE ANY
FEB 25, 1997, 1:00 P.M.: 20 IR 1733; READOPTED FILED JAN 10, 2001, 3:23 P.M.:
THE CONSTRUCTION SITE.
DAMAGE WATERS OF THE STATE.
PRIVATE POND OR ANY OFF-STREAM POND, RESERVOIR, OR FACILITY BUILT FOR
24 IR 1518; ERRATA FILED FEB 6, 2006, 11:15 A.M.: 29 IR 1936; ERRATA FILED OCT
2. CONSTRUCTION MATERIALS AND THEIR PACKAGING
(4) SPILLS OF LESS THAN ONE (1) POUND OR ONE (1) PINT.
REDUCTION OR CONTROL OF POLLUTION OR COOLING OF WATER PRIOR TO
20, 2006, 10:08 A.M.: 20061101-IR-327060497ACA; READOPTED FILED NOV 21,
A. EROSION CONTROL MEASURE SHOWN ON THE SUBJECT PROJECT SHALL BE
(5) SPILLS OF INTEGRAL OPERATING FLUIDS, IN THE USE OF MOTOR VEHICLES OR
DISCHARGE UNLESS THE DISCHARGE FROM THE POND, RESERVOIR, OR
2007, 1:16 P.M.: 20071219-IR-327070553BFA; ERRATA FILED MAY 27, 2008, 2:06
IMPLEMENTED PRIOR TO AND DURING CONSTRUCTION IN THE PROPER
OTHER EQUIPMENT, THE TOTAL VOLUME OF WHICH IS LESS THAN OR EQUAL TO
FACILITY CAUSES OR THREATENS TO CAUSE WATER
P.M.: 20080625-IR-327080419ACA)
SEQUENCING TO MINIMIZE SOIL EROSION. EROSION CONTROLS SHALL BE
FIFTY-FIVE (55) GALLONS AND WHICH DO NOT DAMAGE WATERS OF THE STATE.
POLLUTION. (WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-4; FILED FEB 25,
INSPECTED AND MAINTAINED AS DESCRIBED ELSEWHERE ON THE PLANS.
(6) OIL SHEENS PRODUCED AS A RESULT OF THE NORMAL OPERATION OF PROPERLY
1997, 1:00 P.M.: 20 IR 1731; ERRATA FILED MAR 7, 1997, 2:25 P.M.: 20 IR 1738;
327 IAC 2-6.1-8 EMERGENCY SPILL RESPONSE ACTIONS
EXCESSIVE DUSTING OF SOIL ON THE SITE SHALL BE MINIMIZED BY REDUCING
FUNCTIONING WATERCRAFT.
READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21,
AUTHORITY: IC 13-14-8-7
CONSTRUCTION TRAFFIC ACROSS BARE SOIL DURING DRY AND/OR WINDY
(7) A RELEASE OF A SUBSTANCE INTEGRAL TO A SPILL RESPONSE ACTIVITY THAT HAS
2007, 1:16 P.M.: 20071219-IR-327070553BFA)
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
WEATHER, AND BY APPLYING WATER OR OTHER ACCEPTABLE DUST CONTROL
BEEN APPROVED AND AUTHORIZED BY A STATE OR FEDERAL ONSCENE
SEC. 8. NOTWITHSTANDING ANY OTHER SECTION OF THIS RULE,
COORDINATOR. (WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-3; FILED FEB 25,
MEASURES TO THE SOIL. UPON COMPLETION OF CONSTRUCTION AND SUITABLE
327 IAC 2-6.1-5 REPORTABLE SPILLS; FACILITY
EMERGENCY SPILL RESPONSE ACTIONS TAKE PRECEDENCE OVER REPORTING
1997, 1:00 P.M.: 20 IR 1731; ERRATA FILED MAR 7, 1997, 2:25 P.M.:
ESTABLISHMENT OF PERMANENT VEGETATION, TEMPORARY EROSION CONTROL
AUTHORITY: IC 13-14-8-7
REQUIREMENTS, AND WHEN EMERGENCY SPILL RESPONSE ACTIVITIES RENDER
20 IR 1738; READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV
MEASURES SUCH AS SILT FENCE, CHECK DAMS AND INLET PROTECTION
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SPILL REPORTING INCONSISTENT WITH EFFECTIVE RESPONSE ACTIVITIES,
21, 2007, 1:16 P.M.: 20071219-IR-327070553BFA)
DEVICES SHALL BE REMOVED IN A MANNER TO MINIMIZE ADDITIONAL LAND
SEC. 5. THE FOLLOWING SPILLS FROM A FACILITY MUST BE REPORTED:
COMMUNICATION OF THE SPILL REPORT TO THE INDIANA DEPARTMENT OF
DISTURBANCE. ANY AREAS DISTURBED BY THESE OPERATIONS SHALL BE
(1) SPILLS THAT DAMAGE THE WATERS OF THE STATE SO AS TO CAUSE DEATH
ENVIRONMENTAL MANAGEMENT MAY BE DELAYED. IN SITUATIONS WHERE THE
327 IAC 2-6.1-4 DEFINITIONS
PROPERLY REVEGATATED.
OR ACUTE INJURY OR ILLNESS TO HUMANS OR ANIMALS.
SPILL REPORT IS DELAYED, THE BURDEN OF PROVING THE NEED FOR THE
B. LARGE WASTE MATERIALS CREATED BY CUTTING, SAWING, DRILLING, ORAUTHORITY: IC 13-14-8-7
(2) SPILLS FROM A FACILITY THAT HAS BEEN NOTIFIED IN WRITING BY A WATER
DELAY SHALL BE UPON THE RESPONSIBLE PERSON. (WATER POLLUTION
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17; IC 14-8-2-7; IC
OTHER OPERATIONS SHALL BE PROPERLY DISPOSED OF IN SUITABLE WASTE
UTILITY THAT IT IS LOCATED IN A DELINEATED PUBLIC WATER SUPPLY
CONTROL BOARD; 327 IAC 2-6.1-8; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1734;
14-25-7-13; IC 14-25-7-15
CONTAINERS. THE SITE SHALL BE CHECKED AT THE END OF THE DAY, AS A
WELLHEAD PROTECTION AREA AS APPROVED BY THE DEPARTMENT UNDER 327
READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21,
SEC. 4. IN ADDITION TO THE DEFINITIONS CONTAINED IN IC 13-11-2-17(D), IC
MINIMUM, AND ALL WASTE MATERIALS, INCLUDING THOSE BLOWN ACROSS OR
IAC 8-4.1 THAT ARE:
2007, 1:16 P.M.: 20071219-IR-327070553BFA)
13-11-2-35(A), IC 13-11-2-51, IC 13-11-2-158(A), IC 13-11-2-160, IC 13-11-2-260, IC 13-11-2-265,
OFF THE SITE BY WIND SHALL BE PICKED UP AND DISPOSED OF IN SUITABLE
(A) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS
AND IN 327 IAC 1, THE FOLLOWING DEFINITIONS APPLY THROUGHOUT THIS RULE:
CONTAINERS. WHERE POSSIBLE, OPERATIONS SUCH AS SAWING THAT CREATESUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED
327 IAC 2-6.1-9 COMPLIANCE CONFIRMATION
(1) "ANIMAL" MEANS ALL MAMMALS, BIRDS, REPTILES, AMPHIBIANS, FISH, CRUSTACEANS,
(100) POUNDS OR THE REPORTABLE QUANTITY, WHICHEVER IS LESS;
SMALL PARTICLES SHOULD BE PERFORMED IN ONE SPOT IN AN AREA
AUTHORITY: IC 13-14-8-7
AND MOLLUSKS.
(B) SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS
PROTECTED FROM WIND, AND WASTE PARTICLES COLLECTED AND DISPOSED
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
(2) "AQUATIC LIFE" MEANS THOSE PLANTS AND MACROINVERTEBRATES THAT ARE
FIFTY-FIVE (55) GALLONS; OR
OF FREQUENTLY TO MINIMIZE WIND DISPERSAL. PACKAGING USED TO
SEC. 9. WHEN SPILL REPORTING AND RESPONSE, AS PROVIDED FOR IN
DEPENDENT UPON AN AQUATIC ENVIRONMENT.
(C) SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11)
TRANSPORT MATERIALS TO THE SITE FOR CONSTRUCTION OF THE FACILITY
THIS RULE, HAS OCCURRED, THE DEPARTMENT SHALL, UPON REQUEST, ISSUE A
(3) "CONTAIN" MEANS TO TAKE SUCH IMMEDIATE ACTION AS NECESSARY TO DAM,
OF THIS RULE.
SHALL BE DISPOSED OF PROPERLY, WHETHER THE MATERIAL IS TAKEN OUT OF
LETTER CONFIRMING COMPLIANCE WITH THIS RULE AND STATING THAT NO
BLOCK, RESTRAIN, OR OTHERWISE ACT TO MOST EFFECTIVELY
(3) SPILLS THAT DAMAGE WATERS OF THE STATE AND THAT:
ITS PACKAGE AND INCORPORATED INTO THE PROJECT IMMEDIATELY OR
FURTHER ACTION IS REQUIRED UNDER THIS RULE. (WATER POLLUTION
PREVENT A SPILL FROM ENTERING WATERS OF THE STATE OR MINIMIZE DAMAGE TO
(A) ARE LOCATED WITHIN FIFTY (50) FEET OF A KNOWN PRIVATE DRINKING
STORED ONSITE FOR FUTURE USE. PACKAGED MATERIALS STORED ONSITE
CONTROL BOARD; 327 IAC 2-6.1-9; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1734;
THE WATERS OF THE STATE FROM A SPILL.
WATER WELL LOCATED BEYOND THE FACILITY PROPERTY BOUNDARY; OR
SHALL BE INSPECTED REGULARLY AND ANY LOOSE PACKAGING SHALL BE
READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21,
(4) "DAMAGE" MEANS THE ACTUAL OR IMMINENT ALTERATION OF THE WATERS OF THE
(B) ARE LOCATED WITHIN ONE HUNDRED (100) YARDS OF:
REPAIRED OR DISPOSED OF PROPERLY.
2007, 1:16 P.M.: 20071219-IR-327070553BFA)
STATE SO AS TO RENDER THE WATERS HARMFUL, DETRIMENTAL,
(I) ANY HIGH QUALITY WATER DESIGNATED AS AN OUTSTANDING
C. ALL DEWATERING OF ACTIVITIES SHALL BE DONE IN ACCORDANCE TO GOOD
OR INJURIOUS TO:
STATE RESOURCE PURSUANT TO 327 IAC 2-1-2(3), EXCLUDING LAKE
EROSION CONTROL PRACTICES. THESE PRACTICES SHOULD INCLUDE THE USE
(A) PUBLIC HEALTH, SAFETY, OR WELFARE;
MICHIGAN;
OF DIRT BAGS SUCH AS SILT FENCE INLET PROTECTION. THE USE OF THESE
(B) DOMESTIC, COMMERCIAL, INDUSTRIAL, AGRICULTURAL, OR RECREATIONAL
(II) ANY WATER DESIGNATED AS EXCEPTIONAL USE PURSUANT TO
TYPES OF DEWATERING DEVICES WILL REMOVE LARGE QUANTITIES OF SILT,
USES; OR
327 IAC 2-13(A)(6) \[SIC., 327 IAC 2-1-3(A)(6)\] AND 327 IAC 2-1-11(B);
SEDIMENT, AND DIRT AND PREVENT THESE MATERIALS TO ENTER THE STORM
(C) ANIMALS OR AQUATIC LIFE.
(III) ANY WATER DESIGNATED AS CAPABLE OF SUPPORTING A
SEWER SYSTEM.
(5) "DOWNSTREAM WATER USER" MEANS:
SALMONID FISHERY PURSUANT TO 327 IAC 2-1-6(C)(1), EXCEPT LAKE
D. IF THE USE OF LIME IS USED TO STABILIZE THE SOIL OF THE SITE THEN ALL
(A) A COMMUNITY PUBLIC WATER SUPPLY, AS IDENTIFIED BY THE
MICHIGAN;
CONSTRUCTION EQUIPMENT USED SHALL BE CLEANED OF ALL EXCESS
DEPARTMENT OF NATURAL RESOURCES UNDER IC 14-25-7-13(D);
OR
MATERIAL WITH WATER IN THE MAINTENANCE AND REFUELING AREA AS SHOWN
(B) A SIGNIFICANT WATER WITHDRAWAL FACILITY AS REGISTERED WITH THE
(IV) ANY WATER THAT IS A FISH HATCHERY, FISH AND WILDLIFE AREA,
WITHIN THESE PLANS.
DEPARTMENT OF NATURAL RESOURCES UNDER IC 14-25-7-15;
NATURE PRESERVE, OR RECREATIONAL WATER OWNED BY THE
E. NUTRIENTS AND FERTILIZERS SHALL ONLY BE USED TO ESTABLISH RAPID
(C) USERS OF RECREATIONAL WATERS; OR
DEPARTMENT OF NATURAL RESOURCES OR THE FEDERAL
VEGETATION. WHEN THESE PRODUCTS ARE UTILIZED, THE USER SHOULD PAY
(D) ANY OTHER USER MADE KNOWN TO THE PERSON WHO HAS A SPILL.
GOVERNMENT.
STRICT ATTENTION TO THE PRODUCTS RECOMMENDED USAGE.
(6) "EXTREMELY HAZARDOUS SUBSTANCE" MEANS A SUBSTANCE IDENTIFIED PURSUANT
(4) FOR ANY SPILL WHICH DOES NOT MEET THE CRITERIA IN SUBDIVISIONS (1)
STEVEN SCOTT RUCKER P.E. 11300279
3. CONCRETE WASTE WATER
TO 42 U.S.C. 11002 AND 11004. (40 CFR 355 APPENDIX A.)
THROUGH (3), THE FOLLOWING MUST BE REPORTED:
A. ALL CONCRETE WASTEWATER SHALL BE DISPOSED OF IN THE DESIGNED
(7) "FACILITY" MEANS ALL LAND, BUILDINGS, EQUIPMENT, STRUCTURES, AND OTHER
(A) SPILLS TO SURFACE WATERS:
AREA AS DIRECTED BY THE CONSTRUCTION MANAGER. THIS AREA IS TO BE A 3'
STATIONARY ITEMS THAT ARE LOCATED ON A SINGLE SITE OR
(I) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS
DEEP, 10' SQUARE PIT AS DETAILED ON THE EROSION CONTROL PLAN. THIS
ON CONTIGUOUS SITES AND THAT ARE OWNED OR OPERATED BY THE SAME PERSON OR
SUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED
AREA SHALL BE INSPECTED ON A DAILY BASIS AT A MINIMUM. WHEN THIS AREA
BY ANY PERSON WHO CONTROLS, IS CONTROLLED BY, OR IS
(100) POUNDS OR THE REPORTABLE QUANTITY, WHICHEVER IS LESS;
BECOMES FULL, THE POLLUTANTS SHALL BE EXCAVATED, PLACED IN AN
UNDER COMMON CONTROL WITH, SUCH PERSON.
(II) SPILLS OF PETROLEUM OF SUCH QUANTITY AS TO CAUSE A
ACCEPTABLE CONTAINER AND DISPOSED OF IN PROPER MANNER, BY THE
(8) "FACILITY BOUNDARY" MEANS THE BOUNDARY OF A FACILITY OR AN EASEMENT OR
SHEEN UPON THE WATERS;
EXCAVATION CONTRACTOR.
RIGHT-OF-WAY.
OR
4. PAINT PRODUCTS
(9) "HAZARDOUS SUBSTANCE" HAS THE MEANING SET FORTH IN 42 U.S.C. 9601(14).
(III) SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION
A. ALL EXCESS PAINT AND THEIR RELATED PRODUCTS SHALL BE DISPOSED OF
(10) "MODE OF TRANSPORTATION" INCLUDES, BUT IS NOT LIMITED TO, CARRIAGE BY:
4(11) OF THIS RULE.
IN THE MANNER AT WHICH THE MANUFACTURER SUGGESTS. UNDER NO
(A) RAIL AND MOTOR VEHICLES;
(B) SPILLS TO SOIL BEYOND THE FACILITY BOUNDARY:
CIRCUMSTANCES WILL PAINT OR THEIR RELATED PRODUCTS BE CLEANED OR
(B) AIRCRAFT;
(I) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS
DISPOSED OF IN SOIL, SANITARY SEWERS, STORM SEWERS OR DETENTION
(C) WATERCRAFT;
SUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED
(D) PIPELINES; OR
BASINS. ANY VIOLATION OF THIS SHALL BE REPORTED TO THE JOB
(100) POUNDS OR THE REPORTABLE QUANTITY, WHICHEVER IS LESS;
(E) OTHER MEANS OF TRANSPORTATION;
SUPERINTENDENT.
(II) SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS
IN THE EVENT OF ACCIDENTALLY CONTAMINATION ALL EFFORTS SHOULD BE
FIFTY-FIVE (55) GALLONS;
MADE TO REMOVE CONTAMINANTS IN AN APPROPRIATE MANNER. THE CARMEL
OR
FIRE DEPARTMENT SHOULD BE CONTACTED IMMEDIATELY TO DETERMINE IF(III) SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION
4(11) OF THIS RULE.
FURTHER MEASURES ARE NEEDED.
(C) SPILLS TO SOIL WITHIN THE FACILITY BOUNDARY:
(I) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS
SUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS THE
REPORTABLE QUANTITY;
(II) SPILLS OF PETROLEUM WHEN THE SPILLED AMOUNT EXCEEDS ONE
THOUSAND (1,000) GALLONS;
OR
HAMILTON COUNTY
(III) SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION
4(11) OF THIS RULE.
4
(5) ANY SPILL FOR WHICH A SPILL RESPONSE HAS NOT BEEN DONE.
146th ST.
146th ST.4
4
(WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-5; FILED FEB 25, 1997, 1:00
4
4
44
4
SOILS TYPE LEGEND
A
4
4
P.M.: 20 IR 1732; ERRATA FILED MAR 7, 1997, 2:25 P.M.: 20 IR 1738; READOPTED
4
4
4
141st ST.
4
4
4
FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16
4
4
4
44
4
SOIL
P.M.: 20071219-IR-327070553BFA)
4
4
Br
4
BROOKSTON SILTY CLAY LOAM
4
STABILIZATION
44
4
4
4
4
4
METHOD
THE MAIN SOIL FEATURES THAT ADVERSELY AFFECT ENGINEERING USES OF THIS
A
4
4
4
4
SOIL ARE A SEASONAL HIGH WATER TABLE, HIGH POTENTIAL FROST ACTION,
4
4
MAIN ST.PERMANENT
A
A
131st ST.
MODERATE SHRINK-SWELL POTENTIAL, AND MODERATE PERMEABILITY. THIS SOIL
SEEDING
4
146th ST.
4
HAS SEVERE LIMITATIONS FOR BUILDING SITES. THE SITES NEED TO BE
4
DORMANT
4
4 ARTIFICIALLY DRAINED AND PROTECTED FROM FLOODING. DWELLINGS AND SMALL
126th ST.
4
4
SEEDING
4
4
BUILDINGS WITH BASEMENTS SHOULD NOT BE CONSTRUCTED ON THIS SOIL. USING
4
4
4
4
PROPERLY DESIGNED FOUNDATIONS AND FOOTINGS HELPS TO PREVENT
4
4
4
4
4
TEMPORARY
44
4
STRUCTURAL DAMAGE FROM FROST ACTION AND SHRINKING AND SWELLING OF
4
4
4
4
SEEDING
4A
A
4
THE SOIL. THIS SOIL HAS SEVERE LIMITATIONS FOR LOCAL ROADS AND STREETS
4
Br
116th ST.
4
116th ST.4
BECAUSE OF SEASONAL HIGH WATER TABLE AND HIGH POTENTIAL FROST ACTION.
A4
4
CrA
SODDING
INSTALLATION OF DRAINAGE DITCHES ALONG ROADS HELPS TO LOWER THE WATER
4
4
111th ST.
TABLE AND PREVENT DAMAGE FROM FROST ACTION. THE BASE MATERIAL FOR
4
4
ROADS AND STREETS SHOULD BE REPLACED OR STRENGTHENED WITH SUITABLE
4
4
MULCHING
4
MATERIAL.
106th ST.
106th ST.
4
A
R
4
A = KENTUCKY BLUEGRASS* 40 LBS/ACRE; CREEPING RED FESCUE 40 LBS/ACRE;
N
4
CrA
4
CROSBY SILT LOAM
4
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS/ACRE.
4
4
4
0 TO 2 PERCENT SLOPES. THE MAIN SOIL FEATURES THAT ADVERSELY AFFECT THE
4
B = KENTUCKY BLUEGRASS* 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS/ACRE;
4
4
4
A
ENGINEERING USES OF THIS SOIL ARE A SEASONAL HIGH WATER TABLE,
4
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS/ACRE.
Br
WE
A
96th ST.
96th ST.
MODERATE SHRINK-SWELL POTENTIAL, HIGH POTENTIAL FROST ACTION, AND SLOW Know what's
C = SPRING OATS 3 BUSHEL/ACRE.
4
PERMEABILITY. THIS SOIL HAS SOME SEVERE LIMITATIONS FOR BUILDING SITES.
D = WHEAT OR RYE 2 BUSHEL/ACRE.
4
SHEET NO.
4
THE SITES NEED TO BE ARTIFICIALLY DRAINED TO PREVENT WETNESS FROM
4
4
E = ANNUAL RYEGRASS 40 LBS/ACRE.
4
4
4
A
4
C102
S
BECOMING A PROBLEM. DWELLINGS AND SMALL BUILDINGS WITH BASEMENTS
4
F = SOD (BLEND 3 IMPROVED VARIETIES).
4
4
SHOULD NOT BE CONSTRUCTED ON THIS SOIL. USING PROPERLY DRAINED
Br
G = STRAW MULCH 2 TONS/ACRE.
86th ST.
4
NO SCALE
86th ST.4
FOUNDATIONS AND FOOTINGS HELPS TO PREVENT STRUCTURAL DAMAGE FROM
4
*/I/* IRRIGATION NEEDED DURING JUNE, JULY, AND/OR SEPTEMBER.
A
LOW STRENGTH AND SHRINKING AND SWELLING OF THE SOIL. THIS SOIL HAS
** IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.
PROJECT LOCATION
SEVER LIMITATIONS FOR LOCAL ROADS AND STREETS. THE BASE MATERIAL FOR
*KENTUCKY BLUEGRASS BLEND OF 3 IMPROVED VARIETIES.
PROJECT LOCATION
PROJECT NO.
ROADS NEEDS TO BE STRENGTHENED OR REPLACED WITH SUITABLE MATERIAL.
SEASONAL SOIL PROTECTION CHART
AREA MAPSOILS MAP
W17.0206
TABLE 1. TEMPORARY SEEDING SPECIFICATIONSTABLE 1. TEMPORARY SEEDING SPECIFICATIONS
LIFT HANDLES
STANDARD 2"
OVERFLOW
SEED SPECIES RATE PER ACRE PLANTING DEPTH OPTIMUM DATES
12
11 GAUGE STEEL SUSPENSION SYSTEM
REAR CURB GUARD FLAP
AREA
WITH MAGNETIC TIE-DOWNS
150 LBS.
WHEAT OR RYESEPT. 15 - OCT. 30
SPRING OATS100 LBS. 1 INCHMARCH 1 - APRIL 15
MARCH 1 - MAY 1
40 LBS.
ANNUAL RYEGRASS
AUG. 1 - SEPT. 1
GERMAN MILLET
40 LBS.1 TO 2 INCHESMAY 1 - JUNE 1
SUDANGRASS35 LBS.
1 TO 2 INCHESMAY 1 - JULY 30
1 TO 2 INCHES APRIL 15 - JUNE 1
BUCKWHEAT60 LBS.
CORN (BROADCAST)300 LBS.
1 TO 2 INCHESMAY 11 - AUG. 10
SORGHUM35 LBS.
1 TO 2 INCHESMAY 1 - JULY 15
2-WOOD POST/STAKES WRAPPED
STAINLESS
MAXIMUM LOAD SLOPE AND DISTANCE FOR
WITH SILT FENCE AND ROTATED AT
STEEL
WHICH A SILT FENCE IS APPLICABLE
LEAST ONE FULL TURN TO SECURE
CLAMPING
SILT FENCE END IN PLACE
BAND
LOAD SLOPEMAX. DISTANCE ABOVE FENCE
REPLACEABLE SEDIMENT BAGSSILT FENCE
WITH GEOTEXTILE FILTER FABRIC
LESS THAN 2%100 FT.
2 TO 5%75 FT.
2-WOOD POST/STAKES WRAPPED
50 FT.
WITH SILT FENCE AND ROTATED5 TO 10%
25 FT.
AT LEAST TWO FULL TURNS TO10 TO 20%
15 FT.
PROVIDE A SECURE CONNECTIONMORE THAN 20%
POST
SILT FENCE
POSTS: STEEL T OR U TYPE, OR 2"X2" HARD WOOD POST
INSTALLATION:
FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING
TO JOIN TO
FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION.
1.REMOVE GRATE
ENDS OF TWO
2.DROP FLEXSTORM INLET FILTER ONTO
FENCES.
LOAD BEARING LIP OF CASTING OR
POST 2"X2" WOOD OR 1.33
CONCRETE STRUCTURE
POST 2"X2" WOOD OR 1.33 LBS/FOOT
LBS/FOOT STEEL 6' MAX.
STEEL 8' MAX. SPACING
3.REPLACE GRATE
SPACING
WIRE FENCE 14 GUAGE (MIN)-6" MESH
WOVEN FILTER FABRIC SILT
REQ'D. IN SWALES OR AREAS OF
FENCE MATERIAL COVER
CONCENTRATED FLOW
NONWOVEN FILTER FABRIC -
SECURE TO POSTS WITH 2" LATH
8"X4" TRENCH TO BE
8"X4" TRENCH TO BE
BACKFILLED AND
BACKFILLED AND COMPACTED
COMPACTED
TEMPORARY SEEDTEMPORARY SEED
FINISH GRADE
FINISH GRADE
DRAWN
ALL PRODUCTS MANUFACTURED
IPP
BY INLET & PIPE PROTECTION, INC
FLOWFLOW
CHECKED
DISTRIBUTED BY ADS
QA
WWW.INLETFILTERS.COM
(866) 287-8655 PH
GEOTEXTILE FABRIC LAID
MFG
GEOTEXTILE FABRIC LAID ON
(630) 355-3477 FX
ON DOWN SLOPE SIDE
UNDISTURBED
DOWN SLOPE SIDE AND
INFO@INLETFILTERS.COM
APPROVED
AND BOTTOM OF TRENCH
GROUND
BOTTOM OF TRENCH
SIZEDWG NOREV
UNDISTURBED
GROUND
EMBEDDED SILT FENCE MATERIAL MIN.EMBEDDED SILT FENCE MATERIAL
SCALESHEET 1 OF 1
8" INTO GROUND W/ 4" LAID ALONG
MIN. 8" INTO GROUND W/ 4" LAID
BOTTOM OF TRENCH. SOIL SLICING INALONG BOTTOM OF TRENCH. SOIL
ACCORDANCE WITH ASTM D 6462 8.2.2 ISSLICING IN ACCORDANCE WITH
ALSO ACCEPTABLE.
ASTM D 6462 8.2.2 IS ALSO
ACCEPTABLE.
WITHOUT WIRE SUPPORTWITH WIRE SUPPORT
NOTE:
USE THIS DETAIL IF EXISTING
ASPHALT HAS BEEN REMOVED.
INSTALLATION
PREFABRICATED SILT FENCE
NOTES:
1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE
1.THE SWPPP INFORMATION SIGN MUST BE LOCATED NEAR THE CONSTRUCTION
OF THE SLOPE TO PROVIDE A SEDIMENT STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT
WIDTH:
EXIT OF THE SITE, SUCH THAT IT IS ACCESSIBLE AND VIEWABLE BY THE
BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER ELEVATION THAN THE TOP OF THE FENCE AT ITS
(A) - 12' MINIMUM OR FULL WIDTH
GENERAL PUBLIC, BUT NOT OBSTRUCTING VIEWS AS TO CAUSE A SAFETY
LOWEST POINT.
OF ENTRANCE/EXIT DRIVE,
HAZARD.
2. EXCAVATE AN EIGHT-INCH DEEP BY FOUR-INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING
WHICHEVER IS GREATER.
IS ALSO ACCEPTABLE.
2.ALL POSTED DOCUMENTS MUST BE MAINTAINED IN A CLEARLY READABLE
#2 STONE AGGREGATE2"-3"(MIN.) (OPTIONAL)3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP-SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS
CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION AND UNTIL THE
ON THE DOWN-SLOPE SIDE OF THE TRENCH.
NOTICE-OF-TERMINATION (NOT) IS FILED FOR THE PERMIT.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS
GEOTEXTILE FABRIC UNDERLINER
6" (MIN.)
DRIVEN INTO THE SOIL. MINIMUM OF 12 INCHES OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH.
3.CONTRACTOR SHALL POST OTHER STORM WATER AND/OR EROSION AND
5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP-SLOPE SIDE OF THE
INSTALLATION
SEDIMENT CONTROL RELATED PERMITS ON THE SIGN AS REQUIRED BY THE
TRENCH.
1.REMOVE ALL VEGETATION AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA.
GOVERNING AGENCY.
6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE.
2.GRADE THE FOUNDATION AND CROWN FOR POSITIVE DRAINAGE.
3.INSTALL A CULVERT PIPE UNDER THE PAD IF NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE.
4.SIGN SHALL BE LOCATED OUTSIDE OF PUBLIC RIGHT-OF-WAY AND EASEMENTS
NOTE:
IF THE SILT FENCE IS BEING CONSTRUCTED ON-SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN
4.IF WET CONDITIONS ARE ANTICIPATED, PLACE GEOTEXTILE FABRIC ON THE GRADED FOUNDATION TO
UNLESS APPROVED BY THE GOVERNING AGENCY.
LATHE TO SECURE THE FABRIC TO THE POSTS. ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT
IMPROVE STABILITY.
FENCE INSTALLATION, FOLLOWING STEPS 1 THROUGH 6 ABOVE.
5.PLACE AGGREGATE (INDOT CA NO. 2) TO THE DIMENSIONS AND GRADE SHOWN IN THE CONSTRUCTION
5.CONTRACTOR IS RESPONSIBLE FOR ENSURING STABILITY OF THE SWPPP
PLANS, LEAVING THE SURFACE SMOOTH AND SLOPED FOR DRAINAGE.
INFORMATION SIGN.
6.TOP-DRESS THE DRIVE WITH WASHED AGGREGATE (INDOT CA NO.53).
MAINTENANCE
7.WHERE POSSIBLE, DIVERT ALL STORM WATER RUNOFF AND DRAINAGE FROM THE TEMPORARY
_ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
CONSTRUCTION INGRESS/EGRESS PAD TO A SEDIMENT TRAP OR BASIN.
_ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
NOTE: ALL REPAIRS SHOULD MEET SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE.
"SWPPP INFORMATION" MUST
MAINTENANCE OF EXISTING PAVEMENT
_ REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE-HALF THE HEIGHT OF THE
BE DISPLAYED PROMINENTLY
_ INSPECT DAILY.
FENCE AT ITS LOWEST POINT. WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT
ACROSS THE TOP OF THE SIGN,STEVEN SCOTT RUCKER P.E. 11300279
SWPPP INFORMATION
_ CHECK FOR RUTTING AND BREAKDOWN OF ASPHALT.
DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA, AND STABILIZE.
AS SHOWN IN THE DETAIL.
_ IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PRIVATE AND PUBLIC ROADS.
_ FLUSHING SHOULD ONLY BE USED IF THE WATER FROM THE CONSTRUCTION DRIVE CAN BE CONVEYED INTO A
REFERENCE IN CHAPTER 7 PAGES 215-221 IN THE INDIANA STORM WATER QUALITY MANUAL
COPY
SEDIMENT TRAP OR BASIN.
COPY OF
COPY
OF
- IF PAVEMENT FAILS AND BREAKS APART DURING CONSTRUCTION, REPLACE PAVEMENT SECTION WITH THE
IDEM
OFDRAINAGE
STONE AGGREGATE ENTRANCE DETAIL PROVIDED ON THIS SHEET.
NOTICE OF
NOI SEDIMENTATION/SILT FENCE
APPROVAL
SIGN TO BE CONSTRUCTED
SUFFICIENCY
LETTER
REFERENCED IN CHAPTER 7 PAGE 22 AND 23 IN INDIANA STORM WATER QUALITY MANUAL.
OF A RIGID MATERIAL, SUCH
(NO SCALE)
AS PLYWOOD OR OUTDOOR
SIGN BOARD. SIGN MUST BE
COPYCOPYCOPY
CONSTRUCTED IN A MANNER
OFOFOF
TO PROTECT DOCUMENTS
TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD
CONSTRUCTIONCONSTRUCTIONCONSTRUCTION
FROM DAMAGE DUE TO
SITESITESITE
WEATHER (WIND, SUN,
SMALL SITES - LESS THAN TWO ACRES(NO SCALE)
NOTICE ASNOTICE ASNOTICE AS
MOISTURE, ETC.).
APPLICABLEAPPLICABLEAPPLICABLE
DETAILED DESCRIPTION OF THE LOCATION OF THE
INSTALLATION
SWPPP DOCUMENTATION (BINDER AND SITE MAPS)
1.UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION
ON THE SITE.
PLAN TO INSTALL THE SYSTEM.
2.DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL
3/8" TREATED
1.ACTUAL LAYOUT DETERMINED IN
THE CONTAINMENT SYSTEM.
PLYWOOD 48"x24"
FIELD.
3.A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS AND
PAINTED WHITE
OTHER DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE
2.THE CONCRETE WASHOUT SIGN
WOOD OR METAL
LINING.
SHALL BE INSTALLED WITHIN
STAKES TO SECURE
4.INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING
WOOD OR METAL
BLACK LETTER 6" HEIGHT
METAL PINS OR STAPLES
30FT. OF THE TEMP. CONCRETE
THE STRAW BALES
SHOULD EXTEND OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED
STAKES TO SECURE
TO SECURE THE
CONCRETEWASHOUT FACILITY.
(TWO PER BALE)
SYSTEMS SHOULD BE INSTALLED OVER THE POOLING AREA WITH ENOUGH MATERIAL
THE STRAW BALES
POLYETHYLENE LINING
WASHOUT
TO EXTEND THE LINING OVER THE BERM OR CONTAINMENT SYSTEM. THE LINING
(TWO PER BALE)
0.5" LAG SCREWS
TO THE STRAW BALES
SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER FASTENERS.
BINDING WIRE
5.PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO
CONSTRUCTION EQUIPMENT AND OTHER TRAFFIC.
POLYETHYLENE LINING 10
6.PLACE A NON-COLLAPSING, NON-WATER HOLDING COVER OVER THE WASHOUT
SECTION LINE
MIL. EXTENDING OVER
FACILITY PRIOR TO A PREDICTED RAINFALL EVENT TO PREVENT ACCUMULATION OF
BALES
WOOD POST 3"x3"x8'
WATER AND POSSIBLE OVERFLOW OF THE SYSTEM (OPTIONAL).
STRAW BALE (TYP)
7.INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS.
8.POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED
LOCATIONS.
9.WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS (SEE TEMPORARY
CONSTRUCTION INGRESS/EGRESS PAD ON PAGE 17) OR ALTERNATIVE APPROACH
STRAW BALE (TYP)
PAD FOR CONCRETE WASHOUT SYSTEMS.
POLYETHYLENE LINING 10
10.USE A 10 MIL. POLYETHYLENE LINED DUMPSTER AS AN ALTERNATE.
SWPPP INFORMATION SIGN
MIL. EXTENDING OVER
10 MIL. PLASTIC LININGWOOD OR METAL
BALES
(NO SCALE)
STAKES (TYP) - 2 PER
MAINTENANCE
METAL PINS OR STAPLES
NATIVE MATERIAL (OPTIONAL)
BALE
SECTION
PLAN
1.INSPECT DAILY AND AFTER EACH STORM EVENT FOR LEAKS, SPILLS, TRACKING OF
TO SECURE THE
SOIL BY EQUIPMENT, AND THE POLYETHYLENE LINING FOR FAILURE.
POLYETHYLENE LINING TO
R
2.ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF THE MATERIAL.
THE STRAW BALES
EXCESS CONCRETE SHOULD BE REMOVED WHEN THE WASHOUT SYSTEM REACHES
50 PERCENT OF THE DESIGN CAPACITY AND SHOULD NOT BE USED UNTIL PROPERLY
CLEANED OUT.
ALTERNATE
Know what's
3.PLASTIC LINER SHOULD BE REPLACED AFTER EVERY CLEANING, THE REMOVAL OF
CONTRACTOR MAY USE A 10 MIL. POLYETHYLENE LINED DUMPSTER FOR CONCRETE WASHOUT.
SHEET NO.
MATERIAL USUALLY DAMAGES IT.
4.REPAIR OR ENLARGE AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE
C103
WASTE.
5.IF LIQUIDS DO NOT EVAPORATE IT MAY BE NECESSARY TO VACUUM OR REMOVE THE
LIQUIDS AND DISPOSE OF THEM IN AN ACCEPTABLE METHOD.
CONCRETE WASHOUT
6.WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED THEY SHALL BE
CLOSED AND HOLES, DEPRESSIONS AND OTHER DISTURBANCES ASSOCIATED WITHPROJECT NO.
TYPE "ABOVE GRADE
(NO SCALE)
THE SYSTEM SHOULD BE BACKFILLED, GRADED, AND STABILIZED.
W17.0206
W/ STRAW BALES"
SITE PLAN GENERAL NOTES
SITE PLAN NOTES
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR
PAVEMENT
VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM
THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO
P1
HEAVY DUTY ASPHALT PAVING
STARTING CONSTRUCTION.
P2
HEAVY DUTY CONCRETE WITH 1' CHAMFERED CORNERS
2.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE
SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED
P3
STORM INLET WITH CONCRETE APRON SHOWN ON SHEET C601
BY THE BIDDING CONTRACTORS.
MATCH EXISTING PAVEMENT ELEVATION
P4
3.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926,
REGRADE AND COMPACT EXISTING STONE
P5
SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET
IN DEPTH. IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN
DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A
HARDSCAPE
REGISTERED PROFESSIONAL ENGINEER.
H1
INTEGRAL WALK AND CURB
4.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND
CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS
ASPHALT PAVEMENT FLUSH WITH CONCRETE APRON
H2
PROJECT.
5.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO
BUILDING ACCESSORIES
CONFORM TO APPLICABLE LOCAL STANDARDS.
B1
REFER TO ARCHITECTURAL DRAWINGS FOR NEW BUILDING
6.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR
REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT
INFORMATION.
SIGNAGE & MARKINGS
7.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE
S1
4" PAINTED WHITE SOLID LINES (TYP)
CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE
PROJECT.
S2
P44" PAINTED WHITE SOLID LINE ISLAND
P5
8.ALL DIMENSIONS ARE BASED ON FACE OF CURB OR BACK OF ROLL
CURB OR FACE OF BUILDING.
9.SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING, BUILDING
DIMENSIONS AND SIGNAGE SPECIFICATIONS. DO NOT STAKE BUILDING
FROM THESE PLANS.
10.COORDINATE CONSTRUCTION ACTIVITIES WITH ADJOINING WORK IF
APPLICABLE. VERIFY EXTENT OF ADJOINING WORK AND COORDINATE
AS REQUIRED.
11.FIELD VERIFY EXISTING CURBS AND TAPER PROPOSED VERTICAL
CURBS TO MATCH WITHIN A MIN. OF THREE (3) FEET.
P4
12.
ON ACTUAL FIELD LAYOUT COORDINATES.
P2
13.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR
TO START OF CONSTRUCTION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES
ARE FOUND IN THESE PLANS FROM ACTUAL FIELD CONDITIONS, THE
S1
CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY.
14.PROVIDE SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO
P2
EXISTING AREAS AS NECESSARY. ALL AREAS WHERE PROPOSED
PAVEMENT MEETS EXISTING PAVEMENT, THE EXISTING EDGE OF
P1
PAVEMENT SHALL BE FREE OF ALL LOOSE DEBRIS. THE EDGE OF
H2
EXISTING ASPHALT PAVEMENT SHALL BE PROPERLY SEALED WITH A
TACK COAT MATERIAL IN ALL AREAS WHERE NEW ASPHALT PAVEMENT
PROPOSED
B1
IS INDICATED TO JOIN EXISTING.
ADMIN. BLDG.
H1P5
3600 SF
15.RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS
F.F.E. 874.8
ALL AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE
DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY CONTRACTORS,
P3MLAG=874.75
SUBCONTRACTORS, OR SUPPLIERS AFTER CONSTRUCTION WORK IS
COMPLETE.
16.THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE
PROPERTY CORNER MONUMENTS DURING CONSTRUCTION.
17.REFER TO ARCHITECTURAL PLANS FOR BUILDING ACCESSORY
DETAILS.
18.REFER TO SHEET C201 FOR SITE PLAN DETAILS UNLESS OTHERWISE
NOTED.
S2
SITE DATA
EXISTING BUILDING TO BE REMOVED = 2880 SF
P1
NEW BUILDING = 9014 SF
ZONING = P-1
FRONT YARD BSL REQUIRED = 40 FT
FRONT YARD BUFFER = 40 FT
P4
REAR YARD BSL REQUIRED = 15 FT
REAR YARD BUFFER = 25 FT
SIDE YARD BSL REQUIRED = 20 FT
SIDE YARD BUFFER = 15 FT
STEVEN SCOTT RUCKER P.E. 11300279
SITE PLAN LEGEND
PAVEMENT
UTILITIES
FIRE DEPT HOOKUPORNAMENTAL LIGHT
HEAVY DUTY ASPHALT
FIRE HYDRANTSTREET LIGHT
POST INDICATOR VALVECOMMUNICATIONS JUNCTION BOX
CONCRETE PAVEMENT
WATER MANHOLECOMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
SPRINKLER CONTROL BOX
COMPACTED CRUSHED
COMMUNICATIONS RISER
SPRINKLER CONTROL VALVE
LIMESTONE DRIVE SURFACE
BEEHIVE INLET
SPRINKLER
LANDSCAPE PLANTING AREA
CURB INLET
SPIGOT
(SEE LANDSCAPE PLAN FOR DETAILS)
ROUND INLET
WELL HEAD
SQUARE INLET
WATER METER
STORM MANHOLE
WATER VALVE
LINE TYPES
DOWN SPOUT
GAS METER
SANITARY SEWER CLEANOUTRIGHT OF WAY LINE
GAS VALVE
SANITARY SEWER MANHOLE
FENCE
ELECTRIC MANHOLE
FLAG POLE
GUARD RAIL
ELECTRIC OUTLET
SIGNBUILDING SETBACK LINE
ELECTRIC METER
POST
BOUNDARY LINE
ELECTRICAL RISER
GATE POST
SECTION LINE
TRANSFORMER
BOLLARD
GUY ANCHOR
ABBREVIATIONS
ELECTRIC JUNCTION BOX
ROW RIGHT OF WAY
GENERATOR
BSL BUILDING SETBACK LINE
ESMTEASEMENT
UTILITY POLE
D.&U.E.DRAINAGE AND UTILITY EASEMENT
UTILITY POLE W/ TRANSFORMER
FFE FINISH FLOOR ELEVATION
N
R
WE
Know what's
SHEET NO.
C200
S
PROJECT NO.
W17.0206
FILL PIPE FULL W/ CONCRETE
ROUND TOP TO DRAIN
6"DIA. SCHEDULE
40 STEEL ROUND
PIPE
SEALANT
SLOPE TO DRAIN
PAVING
4" TYP.
14" DIA. CONCRETE FOOTING
PIPE BOLLARD DETAIL
(NO SCALE)
7" FIBER ADDITIVE
REINFORCED CONC.
4"-#53 STONE
COMPACTED SUBGRADE MAY REQUIRE TREATMENT
BEFORE PAVING
(NO SCALE)
1.5"-#11 H.A.C. SURFACE
2.5"-H.A.C. BINDER
3.5"-5D H.A.C. BASE
8"-#53 AGGREGATE
COMPACTED SUBGRADE MAY REQUIRE TREATMENT
STEVEN SCOTT RUCKER P.E. 11300279
BEFORE PAVING
(NO SCALE)
VARIES (SEE PLANS)
8"
SCORE
1" RAD.
1/4" PER FOOT SLOPE
1/8"RAD.
CLASS "A" CONCRETE
2"
COMPACTED STONE DRIVE
4" COMPACTED
GRANULAR BASE
6"
INTEGRAL WALK AND CURB DETAIL
(NO SCALE)
R
Know what's
SHEET NO.
C201
PROJECT NO.
W17.0206
GENERAL GRADING NOTESGENERAL NOTES
1.CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION PREVENTION PLAN AND
1.THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD
DETAILS FOR CONSTRUCTION SCHEDULING AND EROSION CONTROL MEASURES TO BE
AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY
INSTALLED PRIOR TO EARTHMOVING ACTIVITIES.
MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE
PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD
INSURANCE RATE MAP #18057C0205G, DATED NOVEMBER
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS.
19, 2014.
THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE
REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT
STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
EXISTING AREAS
3.TOPSOIL SHALL BE STRIPPED FROM ALL AREAS TO RECEIVE PAVING AND FROM WITHIN THE
PERVIOUS = X.XXX AC.
LIMITS OF PROPOSED BUILDINGS AND STRUCTURES. TOPSOIL SHALL BE STRIPPED TO THE
IMPERVIOUS = X.XXX AC.
DEPTH AS NOTED IN THE GEOTECHNICAL REPORT.
PROPOSED AREAS
4.AFTER STRIPPING TOPSOIL, PROOFROLL AREAS TO BE FILLED WITH A MEDIUM WEIGHT
ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL.
PERVIOUS = 0.349 AC.
RECOMMENDATIONS FOR DRYING, AMENDING AND/OR REMOVAL OF ANY UNSUITABLE
IMPERVIOUS = 0.579 AC.
MATERIAL WITHIN THE PROPOSED PAVED AND/OR BUILDING AREAS WILL BE DETERMINED AT
THE TIME OF CONSTRUCTION BY THE OWNER'S GEOTECHNICAL TESTING REPRESENTATIVE.
5.TOPSOIL SHALL BE PLACED IN MOUNDING AREAS, NONSTRUCTURAL FILL AND/OR PLANTING
AREAS TO A MINIMUM DEPTH OF 6". EXCESS TOPSOIL SHALL BE REMOVED FROM THE SITE.
6.WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER, PROVIDE
ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL
MOISTURE OF SOILS. REFER TO GEOTECHNICAL REPORT AND/OR CONSULT WITH OWNER'S
GEOTECHNICAL TESTING REPRESENTATIVE FOR RECOMMENDATIONS.
7.FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW PITS OR
OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER AND OTHER
DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL BE PLACED IN
LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER MOISTURE
CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY.
ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FUTURE BUILDINGS SHALL BE
COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-1557. FIELD
COMPACTING TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND THE REQUIRED
COMPACTION ON EACH LIFT SHALL BE IN ACCORDANCE WITH INDOT SECTION 211.
8.MAXIMUM LAWN SLOPE IS 3:1.
9.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF
CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY
COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF
CARMEL REQUIREMENTS
ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS
NOT GUARANTEED.
1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE
10.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS,
WITHOUT AN APPROVED STORM WATER
SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION
MANAGEMENT PERMIT.
OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN
COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF
2.DECORATIVE SIGNS, SPRINKLER SYSTEMS, TREES,
THE CONTRACTOR.
LANDSCAPING MOUNDS, FENCES, LIGHT POLES OR
OTHER SUCH AMENITIES ARE NOT PERMITTED WITHIN
11.ALL SPOT ELEVATIONS ARE TO FINISHED GRADE.
THE RIGHT-0F-WAY.
12.COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS.
3.M.F.P.G. = MINIMUM FLOOD PROTECTION GRADE
M.F.P.G. OF ALL STRUCTURES FRONTING A POND OR
13.ALL GRADES AT BOUNDARY SHALL MEET EXISTING. CONTRACTOR SHALL ADJUST AND/OR
OPEN DITCH SHALL BE NO LESS THAN 2 FEET ABOVE
CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS
ANY ADJACENT 100-YEAR LOCAL OR REGIONAL
GRADE. BUTT JOINTS SHALL BE PROVIDED AT TRANSITIONAL AREAS BETWEEN PROPOSED
FLOOD ELEVATIONS, WHICHEVER IS GREATER, FOR
AND EXISTING PAVEMENT.
ALL WINDOWS, DOORS, PIPE ENTRANCES, WINDOW
PROPOSED
WELLS, AND ANY OTHER STRUCTURE MEMBER
ADMIN. BLDG.
14.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF
WHERE FLOOD WATERS CAN ENTER A BUILDING.
3600 SF
PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
F.F.E. 874.8
4.M.L.A.G. = LOWEST ADJACENT GRADE IS THE
15.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A.
ELEVATION OF THE LOWEST GRADE ADJACENT TO A
MLAG=874.75
STANDARDS FOR WORKER SAFETY.
STRUCTURE WHEN THE SOIL MEETS THE
FOUNDATION AROUND THE OUTSIDE OF THE
16.THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO THE START OF
STRUCTURE. (INCLUDING STRUCTURAL MEMBERS
CONSTRUCTION. IF AN EXCESS OR SHORTAGE OF EARTH IS ENCOUNTERED, THE
SUCH AS BASEMENT WALKOUT, PATIOS, DECKS,
CONTRACTOR SHALL CONFIRM WITH THE OWNER AND ENGINEER THE REQUIREMENTS FOR
PORCHES, SUPPORT POST, OR PIERS, AND RIM OF
STOCKPILING, REMOVAL OR IMPORTING OF EARTH.
THE WINDOW WELL.
17.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS AFTER INSTALLATION.
CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING CONDITIONS. ANY AREAS THAT
HOLD WATER MORE THAN 1/8" DEEP SHALL BE CUT OUT AND CORRECTED TO POSITIVE
DRAINAGE AT NO COST TO THE OWNER/ DEVELOPER OR ENGINEER.
18.ADA ACCESSIBLE PARKING SPACES, RAMPS, AND ROUTES SHALL BE IN ACCORDANCE WITH
THE LATEST ADA STANDARDS FOR ACCESSIBLE DESIGN.
19.VERTICAL CURVES, WITH A MINIMUM LENGTH OF 50', SHALL BE USED WHERE POSSIBLE
BETWEEN VERTICAL CHANGES IN DIRECTION (SLOPE) TO ALLOW FOR POSITIVE DRAINAGE
AND SMOOTH TRANSITIONS.
20.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS
MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWER FACILITIES,
WATER MAIN, AND STORM SEWERS IS 18" OR LESS.
21.ALL DISTURBED AREA SHALL BE STABILIZED IN ACCORDANCE TO THE STORM WATER
POLLUTION PREVENTION PLAN AND LANDSCAPE PLAN.
GRADING PLAN LEGEND
PAVEMENT
UTILITIES
STEVEN SCOTT RUCKER P.E. 11300279
FIRE DEPT HOOKUPORNAMENTAL LIGHT
HEAVY DUTY ASPHALT
FIRE HYDRANTSTREET LIGHT
POST INDICATOR VALVECOMMUNICATIONS JUNCTION BOX
CONCRETE PAVEMENT
WATER MANHOLECOMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
SPRINKLER CONTROL BOX
COMPACTED CRUSHED
COMMUNICATIONS RISER
SPRINKLER CONTROL VALVE
LIMESTONE DRIVE SURFACE
BEEHIVE INLET
SPRINKLER
CURB INLET
LINE TYPES
SPIGOT
ROUND INLET
WELL HEAD
RIGHT OF WAY LINE
SQUARE INLET
WATER METER
FENCE
STORM MANHOLE
WATER VALVE
GUARD RAIL
DOWN SPOUT
GAS METER
BOUNDARY LINE
SANITARY SEWER CLEANOUT
GAS VALVE
FLOW LINE
SANITARY SEWER MANHOLE
ELECTRIC MANHOLE
INDEX CONTOUR
FLAG POLE
ELECTRIC OUTLET
INTERMEDIATE CONTOUR
SIGN
ELECTRIC METER
UNDERGROUND GAS
GGG
POST
ELECTRICAL RISER
UNDERGROUND WATER
WW
GATE POST
TRANSFORMER
UNDERGROUND ELECTRIC
EEE
BOLLARD
GUY ANCHOR
UNDERGROUND COMMUNICATIONS
CCC
CURB & GUTTER ELEVATION
ELECTRIC JUNCTION BOX
UNDERGROUND FIBER OPTIC
FOFO
PAVEMENT SPOT ELEVATION
GENERATOR
OVERHEAD UTILITY
OHUOHU
GROUND SPOT ELEVATION
UTILITY POLE
FORCE MAIN
FMFM
EXISTING SPOT ELEVATION
UTILITY POLE W/ TRANSFORMER
SANITARY SEWER LATERAL
SANSAN
EMERGENCY FLOOD ROUTE
SANITARY SEWER MAIN
FLOW DIRECTION AND SLOPE
ROOF DRAIN
STMSTM
SUB SURFACE DRAIN
ABBREVIATIONS
STORM SEWER MAIN
GRADE BREAK LINE
ROW RIGHT OF WAY
ESMTEASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
N
TOCTOP OF CASTING
TCTOP OF CURB
GUTGUTTER
R
CMPCORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
WE
PVC POLYVINYL CHLORIDE PIPE
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
Know what's
DIP DUCTILE IRON PIPE
SHEET NO.
SSDSUB SURFACE DRAIN PIPE
C300
STMSTORM
S
SANSANITARY
STRSTRUCTURE
COCLEANOUT
PROJECT NO.
W17.0206
SANITARY SEWER NOTES
1.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND
LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL
UTILITIES
CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN
CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE
DRINKING FOUNTAIN
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES
FIRE DEPT HOOKUP
WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
FIRE HYDRANT
2.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN
POST INDICATOR VALVE
THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE
VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS
WATER MANHOLE
EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE
SPRINKLER CONTROL BOX
SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.
SPRINKLER CONTROL VALVE
3.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
SPRINKLER
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE
LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND
SPIGOT
MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE
WELL HEAD
UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
WATER METER
4.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY
WATER VALVE
AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
GAS METER
5.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH
GAS VALVE
O.S.H.A. STANDARDS FOR WORKER SAFETY.
ELECTRIC MANHOLE
6.ANY PART OF SANITARY TRENCHES RUNNING UNDER OR WITHIN 5' OF
ELECTRIC OUTLET
PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
ELECTRIC METER
7.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND
ELECTRICAL RISER
ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS
TRANSFORMER
RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR
DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
GUY ANCHOR
ELECTRIC JUNCTION BOX
8.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM /
SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY
GENERATOR
SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE
UTILITY POLE
PVC.
UTILITY POLE W/ TRANSFORMER
9.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL
MONITORING WELL
SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN
SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS.
LIQUID PROPANE GAS TANK
ORNAMENTAL LIGHT
10.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING
CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR
STREET LIGHT
AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO
PARKING LOT LIGHT (1 HEAD)
EXISTING CONDITIONS OR BETTER.
COMMUNICATIONS JUNCTION BOX
11.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER,
COMMUNICATIONS MANHOLE
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS.
COMMUNICATIONS PEDESTAL
COMMUNICATIONS RISER
12.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED
STORM CLEANOUT
AREAS.
BEEHIVE INLET
13.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT
CURB INLET
AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
FLOOR DRAIN
14.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO SANITARY SEWER
ROUND INLET
INSTALLATION.
SQUARE INLET
15.SANITARY SEWER LATERAL SHALL BE GRANULAR BACKFILL FOR ENTIRE RUN.
STORM MANHOLE
16.ALL EXISTING MANHOLES SHALL BE ADJUSTED TO NEW FINISH GRADE
DOWN SPOUT
ELEVATIONS.
SANITARY SEWER CLEANOUT
LIFT STATION
W
LINE TYPES
SANITARY SEWER MANHOLE
SANITARY STUB MARKER
SANITARY SEWER LATERAL
SANSAN
SANITARY SEWER MAIN
OTHER
FORCE MAIN
FMFM
SN
FLAG POLE
UNDERGROUND WATER
WW
SIGN
AERIAL ELECTRIC
E(A)E(A)
POST
UNDERGROUND ELECTRIC
EEE
GATE POST
E
OVERHEAD UTILITY
OHUOHU
BOLLARD
UNDERGROUND COMMUNICATIONS
CCC
PARKING WHEEL STOP
AERIAL COMMUNICATIONS
C(A)C(A)
ACCESSIBLE SPACE
UNDERGROUND FIBER OPTIC
FOFO
AERIAL FIBER OPTIC CABLE
FO(A)FO(A)
UNDERGROUND GAS
GGG
STORM SEWER MAIN
ROOF DRAIN
STMSTM
SUB SURFACE DRAIN
FLOW LINE
RIGHT OF WAY LINE
FENCE
GUARD RAIL
BOUNDARY LINE
885885
PAVEMENT
OPEN CUT PAVEMENT FOR UTILITY TAPS
STEVEN SCOTT RUCKER P.E. 11300279
880880
ABBREVIATIONS
ROW RIGHT OF WAY
ESMTEASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
875875
FFE FINISH FLOOR ELEVATION
TOCTOP OF CASTING
CMPCORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
870870
SSDSUB SURFACE DRAIN PIPE
STMSTORM
SANSANITARY
STRSTRUCTURE
COCLEANOUT
865865
860860
855855
850850
R
-0+500+000+501+001+502+002+503+003+504+004+505+005+506+006+507+007+508+008+509+009+5010+00
Know what's
SHEET NO.
C500
PROJECT NO.
W17.0206
STEVEN SCOTT RUCKER P.E. 11300279
SHEET NO.
C501
PROJECT NO.
W17.0206
STEVEN SCOTT RUCKER P.E. 11300279
SHEET NO.
C502
* ALL DETAILS SHOWN ON THIS SHEET
PROJECT NO.
W17.0206
WERE PROVIDED BY CITY OF CARMEL UTILITIES
GENERAL DRAINAGE NOTES
11.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE
VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE
1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS
PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM
AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S.
SEWERS IS 18" OR LESS.
PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH
CONSTRUCTION ACTIVITIES AND STORMWATER POLLUTION
12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING
PREVENTION PLAN.
CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT)
NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER.
STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS
AND CONSTRUCTION METHODS. THE SECTIONS BELOW FOR
13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET
VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE
WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND
REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER
GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS.
SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE
APPLICABLE.
14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES
IN PAVED AREAS.
3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE
UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO
15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH
ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER
PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED
IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE
16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM
CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH
LINES WITH PLUMBING DRAWINGS.
CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE
PLANS.
17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM
SEWER INSTALLATION.
4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED
WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION
18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE
PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS
ADJUSTED TO NEW FINISH GRADE ELEVATIONS.
CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF
ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY
19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED
OF THIS INFORMATION IS NOT GUARANTEED.
OUT TO REMOVE ALL SILT AND DEBRIS.
5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO
20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE
LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE
GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT.
CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF
UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING
21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH
CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY
WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND
COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE
COVERS.
CONTRACTOR.
22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM
6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND
POURED MORTAR CHANNEL FROM INVERT IN TO INVERT OUT.
VERIFY ANY AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF
ALL UTILITIES.
23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE
TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS PRIOR TO
7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN
FINAL TURNOVER TO THE OWNER.
COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY.
24.ALL HDPE PIPE SHALL BE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE
8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN
OR APPROVED EQUAL.
5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO
9.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION,
END CAPS, CLEANOUTS, REDUCERS, ETC., SHALL BE OF HDPE
SIZE, AND ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES,
MATERIAL COMPARABLE WITH STORAGE PIPES.
PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEER
OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION
26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8
DOCUMENTS.
AGGREGATE COMPACTED IN 8" LIFTS TO 95% MAXIMUM DRY
DENSITY.
10.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN
STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE
27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING
1
SERVICE. SANITARY SEWER LINE IN PROXIMITY OF WATER LINE
NEW STORM SEWER CONNECTION.
2SHALL BE C900 WATER MAIN GRADE PVC.
3
DRAINAGE PLAN NOTES
DOWNSPOUT/ROOF DRAIN POINT OF CONNNECTION.
1
COORDINATE WITH ARCHITECTURAL PLANS.
6" HDPE DUAL WALLED HANCOR HQ OR EQUIVALENT ROOF DRAIN
2
@ 1.0% MINIMUM
DRAINAGE STRUCTURES TO CONTAIN THE TRITON DROP INSERT
3
BMP. DETAILS PROVIDED ON SHEET C602 FOR SIZING AND
GENERAL INFORMATION.
3
1
DRAINAGE PLAN LEGEND
2
UTILITIES
CISTERNCOMMUNICATIONS JUNCTION BOX
DRINKING FOUNTAINCOMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
FIRE DEPT HOOKUP
COMMUNICATIONS RISER
FIRE HYDRANT
TRAFFIC SIGNAL POLE
POST INDICATOR VALVE
TRAFFIC SIGNAL
CHILLED WATER MANHOLE
STORM CLEANOUT
WATER MANHOLE
BEEHIVE INLET
SPRINKLER CONTROL BOX
CURB INLET
SPRINKLER CONTROL VALVE
FLOOR DRAIN
STEVEN SCOTT RUCKER P.E. 11300279
SPRINKLER
ROUND INLET
SPIGOT
SQUARE INLET
WELL HEAD
LINE TYPES
STORM MANHOLE
WATER METER
RIGHT OF WAY LINE
DOWN SPOUT
WATER VALVE
FENCE
SANITARY SEWER CLEANOUT
GAS METER
GUARD RAIL
LIFT STATION
GAS VALVE
BOUNDARY LINE
SANITARY SEWER MANHOLE
ELECTRIC MANHOLE
FLOW LINE
SANITARY STUB MARKER
ELECTRIC OUTLET
INDEX CONTOUR
SEPTIC TANK
ELECTRIC METER
INTERMEDIATE CONTOUR
DISTRIBUTION BOX
ELECTRICAL RISER
UNDERGROUND GAS
GGG
TRANSFORMER
UNDERGROUND WATER
OTHER
WW
GUY ANCHOR
AERIAL ELECTRIC
E(A)E(A)
FLAG POLE
ELECTRIC JUNCTION BOX
UNDERGROUND ELECTRIC
EEE
SIGN
GENERATOR
UNDERGROUND COMMUNICATIONS
CCC
POST
UTILITY POLE
AERIAL COMMUNICATIONS
C(A)C(A)
GATE POST
UTILITY POLE W/ TRANSFORMER
UNDERGROUND FIBER OPTIC
FOFO
BOLLARD
MONITORING WELL
AERIAL FIBER OPTIC CABLE
FO(A)FO(A)
PARKING METER
LIQUID PROPANE GAS TANK
OVERHEAD UTILITY
OHUOHU
PARKING WHEEL STOP
ORNAMENTAL LIGHT
FORCE MAIN
FMFM
ACCESSIBLE SPACE
STREET LIGHT
SANITARY SEWER LATERAL
SANSAN
EMERGENCY FLOOD ROUTE
PARKING LOT LIGHT (1 HEAD)
SANITARY SEWER MAIN
FLOW DIRECTION AND SLOPE
PARKING LOT LIGHT (2 HEAD)
ROOF DRAIN
STMSTM
PARKING LOT LIGHT (3 HEAD)
SUB SURFACE DRAIN
PARKING LOT LIGHT (4 HEAD)
STORM SEWER MAIN
ABBREVIATIONS
ROW RIGHT OF WAY
ESMTEASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
TOCTOP OF CASTING
N
CMPCORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
R
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
WE
DIP DUCTILE IRON PIPE
SSDSUB SURFACE DRAIN PIPE
Know what's
STMSTORM
SANSANITARY
SHEET NO.
STRSTRUCTURE
C600
S
COCLEANOUT
PROJECT NO.
W17.0206
6" CONCRETE
SLOPE
SLOPE
E.J. 5250
NEENAH R-3405
OR EQUAL
STEVEN SCOTT RUCKER P.E. 11300279
6"
6"
3'-6"3'-6"
"DUMP NO WASTE-DRAINS TO WATERWAY"
E.J. 5250
T.O.C. ELEVATION
NEENAH R-3405
OR EQUAL
PAVEMENT
6" (TYP.)
22"X22"
NOTES
1.6" CONCRETE PRECAST OR POURED IN PLACE.
2.REFER TO BEDDING DETAIL AS REQUIRED
6" (TYP.)
CLASS "A" CONCRETE
INLET SET ON 6" BASE OF
#8 STONE OR #2 STONE
SECTION
1.STRAIGHT-OUT CONNECTIONS SHOULD NOT BE
MADE TO EITHER PRECAST BOX OR INLET
WALL TOUCHED BY A SKEW/CORNER
CONNECTION UNLESS SUFFICIENT BOX INLET
WALL AREA REMAINS ON EACH SIDE OF THE
CONNECTING PIPE TO ENSURE STRUCTURAL
INTEGRITY OF THE PRECAST BOX.
2.A MAXIMUM OF TWO (2) SKEW/CORNER
CONNECTIONS WILL BE ALLOWED FOR EACH
PRECAST BOX INLET.
3.REFER TO PRECAST CONCRETE ADJUSTING
RING DETAIL AS REQUIRED
PAVED AREA INLET TYPE "A"
(NO SCALE)
PIPE SIZES 12" TO 15"
R
Know what's
SHEET NO.
C601
PROJECT NO.
W17.0206
STEVEN SCOTT RUCKER P.E. 11300279
R
Know what's
SHEET NO.
C602
PROJECT NO.
W17.0206
UTILITY PLAN NOTES
GENERAL UTILITY NOTES
SANITARY SEWER NOTES
1.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE
UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS PRIOR
DIRECTIONAL BORE AND CONNECT PROPOSED 2"
SS1
TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR
SANITARY SEWER FORCEMAIN TO EXISTING SANITARY
ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH
SEWER MANHOLE. COORDINATE CONNECTION WITH MEP.
THE PROPOSED IMPROVEMENTS. IT SHALL BE THE
PROVIDE AIR RELEASE STATION(S) AS REQUIRED. VERIFY
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL
INVERTS ON EXISTING LINE AND COORDINATE CONDITIONS
EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
WITH MEP. ADJUST AS REQUIRED, REFER TO PLAN SHEET
IMPROVEMENTS SHOWN ON THE PLANS.
C500.
2.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES
PROPOSED 6" SANITARY SEWER LATERAL.
LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO
SS2
INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES,
PROPOSED SANITARY SEWER GRINDER STATION, REFER
PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY
SS3
TO DETAIL ON SHEET \[C801\].
OBSERVATION OF ABOVE GROUND CONDITIONS BY THE
SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT
PROPOSED SANITARY LATERAL CLEANOUT TYPE 2 (IN
GUARANTEED.
SS4
PAVED AREAS OUTSIDE OF 3' OF BUILDING). REFER TO
DETAIL ON SHEET \[C801\].
3.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO
LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE
PROPOSED SANITARY LATERAL CLEANOUT TYPE 3 (IN
SS5
CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF
NON-PAVED AREAS ONLY). REFER TO DETAIL ON SHEET
UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE
\[C801\].
DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE
UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE
GREASE INTERCEPTOR, REFER TO PLUMBING PLANS FOR
CONTRACTOR.
SS6
DETAILS.
4.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES
PROVIDE 18" MINIMUM VERTICAL CLEARANCE BETWEEN
AND VERIFY ANY AND ALL FEES ASSOCIATED WITH THE
SS7
SANITARY/WATER/STORM SEWER PIPES AND ALL OTHER
INSTALLATION OF ALL UTILITIES.
PIPES. INSTALL CONCRETE CRADLE IF CLEARANCE IS LESS
THAN 18"
5.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN
COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY.
WATER SERVICE NOTES:
6.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING
UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH
COORDINATE AND CONNECT 2" WATER SERVICE LINE.
W1
GRANULAR MATERIAL.
REUSE VACANT METER PIT.
7.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION,
COORDINATE CONNECTION OF DOMESTIC SERVICE LINE
W2
SIZE, AND ELEVATION OF EXISTING UTILITIES, STRUCTURES,
WITH PLUMBING DRAWINGS.
PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY
ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE
COORDINATE CONNECTION OF DOMESTIC METER
CONSTRUCTION DOCUMENTS.
W3
LOCATION WITH LOCAL SERVICE PROVIDER.
8.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE
EXISTING FIRE HYDRANT.
W4
BETWEEN STORM / SANITARY SEWER SYSTEMS AND
DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER LINE IN
PROPOSED 2" PE DOMESTIC SERVICE LINE
W5
PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE
PVC.
ELECTRIC NOTES:
9.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE
VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF
COORDINATE AND CONNECT BUILDING ELECTRICAL LINE
E1
THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND
FROM SERVICE DROP LOCATION TO TRANSFORMER.
STORM SEWERS IS 18" OR LESS.
COORDINATE CONNECTION WITH POWER COMPANY AND
ELECTRICAL DRAWINGS. ADJUST AS REQUIRED. 2-4" EC
10.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED
CONDUITS TO BE INSTALLED WITH PULL STRINGS.
DURING CONSTRUCTION, IT SHALL BE THE CONTRACTORS
RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING
EXISTING TRANSFORMER PAD LOCATION. COORDINATE
E2
STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING
WITH UTILITY PROVIDER IF A NEW TRANSFORMER IS
CONDITIONS OR BETTER.
REQUIRED.
PROPOSED
11.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET
BUILDING ELECTRICAL LINE POINT OF CONNECTION.
ADMIN. BLDG.E3
WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND
COORDINATE CONNECTION WITH POWER COMPANY AND
3600 SF
GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF
ELECTRICAL DRAWINGS. ADJUST AS REQUIRED.
F.F.E. 874.8
SOILS.
MLAG=874.75
12.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL
COMMUNICATION NOTES:
UTILITIES IN PAVED AREAS.
COORDINATE AND CONNECT BUILDING COMMUNICATION
13.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH
C1
SERVICE LINE(S) TO CONNECTION POINT AS SHOWN.
WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND
ADJUST AS REQUIRED.
COVERS.
4" PVC CONDUIT TO BE INSTALLED WITH PULL STRINGS.
14.PROVIDE THRUST BLOCKS FOR ALL WATER LINE BENDS AND
TEES, INCLUDING TAP CONNECTION.
GAS SERVICE NOTES:
15.CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR
GAS SERVICE IS UNKNOWN ALONG CROOKED STICK LANE.
DOMESTIC AND FIRE SERVICE. CONNECT TO BUILDING
G1
SERVICE MAY NEED EXTENDED FROM THE CURRENT
DOMESTIC AND FIRE LINE. COORDINATE WITH PLUMBING
SERVICE.
DRAWINGS.
16.COORDINATE LOCATION OF ELECTRICAL AND COMMUNICATION
LINES WITH LOCAL UTILITIES.
UTILITY PLAN LEGEND
17.COORDINATE LOCATION OF REQUIRED CONDUITS FOR ELECTRIC
SERVICE, LIGHT POLES, COMMUNICATION SERVICE AND
IRRIGATION SYSTEM.
UTILITIES
18.COORDINATE LOCATION AND SIZE OF GAS SERVICE
COMMUNICATIONS JUNCTION BOX
CONNECTION AND INSTALLATION OF SERVICE LINE AND METER
WITH GAS COMPANY.
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
19.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING
COMMUNICATIONS RISER
STORM LINES WITH PLUMBING DRAWINGS.
STORM CLEANOUT
20.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO
BEEHIVE INLET
DOMESTIC/FIRE LINE INSTALLATION AND STORM SEWER /
SANITARY SEWER INSTALLATION.
CURB INLET
ROUND INLET
21.SANITARY SEWER LATERAL, WATER SERVICE, &
ELECTRICAL/COMMUNICATION CONDUITS SHALL BE GRANULAR
SQUARE INLET
BACKFILL FOR ENTIRE RUN.
STORM MANHOLE
22.ALL EXISTING MANHOLE AND CATCH BASIN GRATES, WATER OR
DOWN SPOUT
GAS VALVES SHALL BE ADJUSTED TO NEW FINISH GRADE
SANITARY SEWER CLEANOUT
STEVEN SCOTT RUCKER P.E. 11300279
ELEVATIONS.
LIFT STATION
SANITARY SEWER MANHOLE
LINE TYPES
SANITARY STUB MARKER
SANITARY SEWER LATERAL
SANSAN
FIRE DEPT HOOKUP
SANITARY SEWER MAIN
FIRE HYDRANT
FORCE MAIN
FMFM
POST INDICATOR VALVE
UNDERGROUND WATER
WW
WATER MANHOLE
AERIAL ELECTRIC
E(A)E(A)
SPRINKLER CONTROL BOX
UNDERGROUND ELECTRIC
EEE
SPRINKLER CONTROL VALVE
OVERHEAD UTILITY
OHUOHU
SPIGOT
UNDERGROUND COMM.
CCC
WELL HEAD
AERIAL COMMUNICATIONS
C(A)C(A)
WATER METER
UNDERGROUND FIBER OPTIC
FOFO
WATER VALVE
AERIAL FIBER OPTIC CABLE
FO(A)FO(A)
GAS METER
UNDERGROUND GAS
GGG
GAS VALVE
STORM SEWER MAIN
ELECTRIC MANHOLE
ROOF DRAIN
STMSTM
ELECTRIC METER
SUB SURFACE DRAIN
ELECTRICAL RISER
FLOW LINE
TRANSFORMER
RIGHT OF WAY LINE
GUY ANCHOR
FENCE
ELECTRIC JUNCTION BOX
GUARD RAIL
GENERATOR
BOUNDARY LINE
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
OTHER
MONITORING WELL
FLAG POLE
LIQUID PROPANE GAS TANK
SIGN
ORNAMENTAL LIGHT
POST
STREET LIGHT
BOLLARD
PARKING LOT LIGHT (1 HEAD)
ABBREVIATIONS
N
ROW RIGHT OF WAY
ESMTEASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
R
FFE FINISH FLOOR ELEVATION
TOCTOP OF CASTING
WE
CMPCORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
Know what's
PVC POLYVINYL CHLORIDE PIPE
SHEET NO.
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
C800
S
DIP DUCTILE IRON PIPE
SSDSUB SURFACE DRAIN PIPE
STMSTORM
SANSANITARY
STRSTRUCTURE
PROJECT NO.
COCLEANOUT
W17.0206
STEVEN SCOTT RUCKER P.E. 11300279
R
Know what's
SHEET NO.
C801
PROJECT NO.
W17.0206
GENERAL NOTES
1.IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE. IF IN QUESTION, CONTACT THE
LANDSCAPE DESIGNER.
2.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE NOT SHOWN ON THE PLAN AS BEING REMOVED SHALL BE BROUGHT TO THE
ATTENTION OF THE LANDSCAPE ARCHITECT. TREE(S) MAY BE RELOCATED (OR REPLACED) TO AN APPROVED ALTERNATE LOCATION
ONSITE FOLLOWING LANDSCAPE ARCHITECT APPROVAL.
3.ALL SHRUBS PLANTING AREAS TO BE COVERED WITH 3" THICK LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS
SHALL BE COVERED WITH 1" SHREDDED HARDWOOD BARK MULCH. BARK MULCH SHALL BE APPROVED BY LANDSCAPE DESIGNER AND
SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATIONS. NO UTILITY MULCH
OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED.
4.AN APPROVED PRE-EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING AND GROUND COVER BEDS AT RATES SPECIFIED BY
MANUFACTURER FOR EACH VARIETY OF PLANT.
5.FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE DESIGNER BEFORE PLANTING OPERATIONS ARE TO
PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODED STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND
COVER AND MULCH BED LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT LINE WITH OCCASIONAL WOOD STAKES FOR REFERENCE.
ALL STAKES SHALL BE REMOVED FOLLOWING PLANTINGS OPERATIONS. LANDSCAPE DESIGNER RESERVES THE RIGHT TO ADJUST PLANT
LOCATIONS ON SITE.
6.NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL
NOTIFY LANDSCAPE DESIGNER PRIOR TO BID DATE IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT
IDENTIFICATION AT NURSERY OR CONTRACTORS OPERATION PRIOR TO MOVING TO JOB SITE. PLANTS MAY ALSO BE INSPECTED AND
APPROVED OR REJECTED ON THE JOB SITE.
7.ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, LATEST EDITION, AS SET FORTH BY AMERICAN
ASSOCIATION OF NURSERYMEN.
8.PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT WITH CONSTRUCTION
OPERATIONS AND AS DIRECTED BY OWNER.
9.ALL NEW LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE
DESIGNER. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE DESIGNER SHALL BE
REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
10.THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS PORTION OF WORK.
11.PEAT MOSS TO BE USED ON PROJECT SHALL BE A DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF
PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO ALSO BE MILDLY ACIDIC IN CHARACTER AND SHALL MEET APPROVAL OF
LANDSCAPE DESIGNER.
12.LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER IN WRITING PRIOR TO BID DATE OF ANY PLANTS THAT HE FEELS MAY NOT
SURVIVE IN LOCATIONS NOTED.
13.ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR 1 YEAR FOLLOWING TURNOVER. MAINTENANCE TO INCLUDE WATERING, WEEDING,
CULTIVATION, MULCHING, MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF PLANTINGS.
NOTE: AT END OF MAINTENANCE PERIOD, CONTRACTOR TO REMOVE GUYING AND STAKING FROM TREES.
14.CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUESTED BY LANDSCAPE DESIGNER.
15.BACKFILL FOR TREE AND SHRUB PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL
SHALL BE 100% EXISTING TOPSOIL. A 5-10-5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO BACKFILL AT
APPROVED RATES.
16.PROVIDE MINIMUM 4" PLANTING SOIL IN ALL GROUND COVER AND FLOWER AREAS WITH MIXTURE COMPRISING OF ONE PART COMMERCIAL
GRADE 'POTTING SOIL,' 5 PARTS TOPSOIL AND 4 PARTS PEAT MOSS. A FULL 4" LAYER OF APPROVED SHREDDED FIBROUS PEAT MOSS MAY
BE USED IN LIEU OF PLANTING MIX.
17.PLANTS SHALL BEAR A TAG SHOWING GENUS, SPECIES AND VARIETY. REMOVE AT TIME OF FINAL ACCEPTANCE.
18.PLANTS SHALL BE CERTIFIED BY THE STATE OF INDIANA DEPARTMENT OF NATURAL RESOURCES AND FREE FROM DISEASE OR
HAZARDOUS INSECTS.
19.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF WORK.
UTILITIES ARE SHOWN TO BE APPROXIMATE. CALL UTILITY LOCATE PRIOR TO ANY PLACEMENT OF PLANT MATERIAL OR OTHER LANDSCAPE
MATERIAL.
20.CONTRACTOR TO REVIEW THE SWPPP SERIES PLANS FOR STABILIZATION (SEEDING/SOD/MULCH) REQUIREMENTS.
PROPOSED
ADMIN. BLDG.
3600 SF
F.F.E. 874.8
MLAG=874.75
E
E
E
E
E
E
E
E
C
E
C
E
C
E
C
E
C
E
E
C
E
C
C
C
C
C
C
C
C
N
WE
SHEET NO.
S
PROJECT NO.
W17.0206