HomeMy WebLinkAboutA141 REFLECTED CEILING PLANEXAM 1
103
EXAM 2
104
TREATMENT
120
STORAGE
119
OFFICE
118
WAITING
100
ESTHETICIAN
109
FRONT OFFICE
101
CLEAN LINEN
107
TLT- PATIENT
108
SOILED
113
OFFICE/ CONSULT
110
BIO
112
CHECK OUT
102
CORR.
114
EXAM 3
105
STORAGE
111
MA STATION
106
OFFICE
117
BREAK ROOM
116
CORRIDOR
121
8' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
3' - 0"
8' - 0"
GB-1
9' - 0"
APC-1
1
1
1
1
1
1
1
1
1
1
2
3
3
3
3
3
NOT IN SCOPE
STAIR
4
4
4
5
6 6
6
6
6
6 6
6 6 6
6 6 6
6
6
6
6
6
6
EXIST.
EQ EQ
EQ EQ
DESIGN BUILD HVAC, ELECTRICAL, PLUMBING NOTES
GENERAL SCOPE:
THE HVAC, ELECTICAL/VOICE/DATA AND PLUMBING DRAWINGS ARE SCHEMATIC IN NATURE AND SERVE ONLY TO
CONVEY THE "INTENT" OF THE TENANT'S REQUIREMENTS. IT IS THE RESPONSIBILITY OF THE DESIGN/BUILD
CONTRACTORS TO FULLY ENGINEER THESE SYSTEMS. SEALED DRAWINGS ARE NOT REQUIRED UNLESS STATED
OTHERWISE. DRAWINGS SHALL BE PREPARED AS SHOP DRAWINGS AND SUBMITTED TO THE ARCHITECT FOR
APPROVAL.
CONTRACTORS SHALL FURNISH AND INSTALL ALL NECESSARY WORK AND COMPONENTS IN COMPLETE COMPLIANCE
WITH ALL CURRENT FEDERAL, STATE AND LOCAL CODES AND ORDINANCES. CONTRACTORS TO SUBMIT ALL FINAL
HVAC DRAWINGS TO LANDLORD AND OWNER FOR REVIEW AND MUST RECEIVE FINAL APPROVAL FROM BOTH PARTIES
PRIOR TO CONSTRUCTION.
DESIGN/BUILD SUBCONTRACTORS SHALL REVIEW BUILDING SYSTEM SCOPE DOCUMENTS AND OFFER ANY
MODIFICATIONS THAT MAY BE APPROPRIATE FOR COMPLETE AND OPERABLE SYSTEMS.
HVAC:
• THE HVAC CONTRACTOR SHALL "BALANCE" THE SYSTEM PRIOR TO THE TENANT'S MOVE-IN DATE.
• THE HVAC CONTRACTOR SHALL VERIFY WITH THE TENANT HOW THE SYSTEM IS TO BE "ZONED" AND IDENTIFY THE
LOCATION OF ALL THERMOSTATS.
• IN EXISTING SPACES BEING FULLY OR PARTIALLY DEMOLISHED, ALL HVAC SUPPLY AND RETURN DIFFUSERS SHALL
BE NEW.
• PROVIDE "SOUND BOOTS" IN ALL RETURN AIR GRILLES IN ALL AREAS.
• ALL HVAC DIFFUSERS, THERMOSTATS, GRILLES, AND EXHAUST FANS TO MATCH BUILDING STANDARD.
• REFER TO TYPICAL MOUNTING HEIGHTS SHEET FOR THERMOSTAT MOUNTING HEIGHTS.
• THE HVAC CONTRACTOR SHALL COORDINATE WITH THE ELECTICAL CONTRACTOR IN REGARDS TO ELECTRICAL
ROUGH-IN NECESSARY TO POWER HVAC SYSTEMS OR DEVICES.
ELECTRICAL SYSTEMS:
• THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE TENANT'S VENDORS IN REGARDS TO THE
AUDIO/VISUAL SYSTEMS, SECURITY SYSTEMS, AND IT SYSTEMS.
• THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE BASE BUILDING OWNER AS TO THE ADEQUACY OF
THE EXISTING ELECTRICAL SERVICE AND MODIFICATIONS WHICH MAY BE REQUIRED TO ACCOMMODATE THIS
TENANT.
• THE ELECTRICAL CONTRACTOR SHALL PERMANENTLY LABEL ALL ELECTRICAL PANELS AND CIRCUITS.
• THE ELECTRICAL CONTRACTOR SHALL VERIFY LOCATION OF ALL ELECTRICAL OUTLETS THAT ARE DEDICATED.
• REFER TO TYPICAL MOUNTING HEIGHTS SHEET FOR DEVICE MOUNTING HEIGHTS.
• PROVIDE AND INSTALL ROUGH-INS AS REQUIRED FOR AUDIO/VISUAL, SECURITY SYSTEMS, AND IT SYSTEMS.
PLUMBING:
• ALL NEW AND EXISTING HOT WATER LINES SHALL BE INSULATED.
• ALL NEW AND EXISTING PVC OVERHEAD PIPING ABOVE THE CEILINGS SHALL BE WRAPPED WITH "FIRE TAPE".
• ALL FIXTURES TO BE WHITE. ALL EXPOSED PIPING AND SUPPLY FITTINGS SHALL BE CHROMIUM PLATED. ALL
PIPING WALL PENETRATIONS SHALL HAVE CHROMIUM PLATED ESCUTCHEONS.
• ALL PIPING SHOWN ON PLUMBING DRAWINGS IS DIAGRAMATIC. FIELD VERIFY FOR EXACT ROUTING.
• ACCESSIBLE PLUMBING FIXTURES SHALL COMPLY WITH ADA.
• AFTER COMPLETION OF THE WATER SUPPLY SYSTEM ROUGH-IN AND BEFORE THE FIXTURES HAVE BEEN SET, THE
ENTIRE COLD AND HOT WATER SUPPLY SYSTEM SHALL BE PRESSURE TESTED TO AT LEAST 100 PSI AND BE FREE
OF LEAKS.
• THE ENTIRE DOMESTIC WATER SUPPLY SYSTEM SHALL BE THOROUGHLY STERILIZED WITH A SOLUTION OF 50
PARTS PER MILLION CHLORINE IN ACCORDANCE WITH THE RECOMMENDATION OF THE MANUFACTURER FOR
SUCH USE.
• REFER TO TYPICAL MOUNTING SHEET FOR PLUMBING FIXTURE MOUNTING HEIGHTS.
• PROVIDE AND INSTALL "HANDI-LAV-GUARD" INSULATION AT EACH LAVATORY - TRUEBRO INC. - WHITE (VERIFY
MODEL NUMBER)
• PROVIDE AND INSTALL SHUT-OFF-VALVES TO ISOLATE ALL PLUMBING WITHIN SUITE.
AUDIO VISUAL SYSTEMS:
• THE PROJECT MANAGER IS TO PROVIDE AND COORDINATE ALL AV VENDORS WITH THE GENERAL CONTRACTOR
FOR ALL AUDIO VISUAL, SECURITY ITEMS, INCLUDING, BUT NOT LIMITED TO: TELEVISION JACKS, SPEAKERS, AUDIO
SOURCES, NURSE CALL DEVICES, AND ELECTRIC DOOR HARDWARE.
• THE CONTRACTOR SHALL PROVIDE THE ARCHITECT WITH A SET OF SHOP DRAWINGS SHOWING THE LOCATIONS
OF ALL ITEMS. ALL SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE ARCHITECT PRIOR TO ANY
CONSTRUCTION.
• THE AUDIO VISUAL CONTRACTOR SHALL COORDINATE WITH THE TENANT'S VENDORS IN REGARDS TO THEIR
SYSTEMS AND DEVICES.
• THE AUDIO VISUAL CONTRACTOR SHALL COORDINATE WITH THE ELECTICAL CONTRACTOR FOR ELECTRICAL
ROUGH-INS NECESSARY TO POWER AUDIO VISUAL SYSTEMS DEVICES.
SECURITY SYSTEMS:
• THE SECURITY SYSTEM CONTRACTOR SHALL PROVIDE THE ARCHITECT WITH A SET OF SHOP DRAWINGS
SHOWING THE LOCATIONS OF ALL FIRE ALARM DEVICES, SECURITY DEVICES, SMOKE DETECTORS, CARD
READERS AND FIRE SUPRESSION SYSTEMS. SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE
ARCHITECT PRIOR TO ANY CONSTRUCTION.
• THE SECURITY SYSTEM CONTRACTOR SHALL COORDINATE WITH THE TENANT'S VENDORS IN REGARDS TO THEIR
SYSTEMS AND DEVICES.
• THE SECURITY SYSTEM CONTRACTOR SHALL COORDINATE BLOCKING WITH THE GENERAL CONTRACTOR FOR
DEVICES REQUIRING SUPPORT.
• THE SECURITY SYSTEM CONTRACTOR SHALL COORDINATE WITH THE ELECTICAL CONTRACTOR REGARDING
ELECTRICAL ROUGH-INS NECESSARY TO POWER ALL SECURITY SYSTEMS AND DEVICES.
NEW GYP BOARD CEILING - REFER TO
TYPES SHEET FOR ADDITIONAL
INFORMATION
NEW APC CEILING - REFER TO TYPES
SHEET FOR ADDITIONAL
INFORMATION
NEW LIGHTING SWITCH:
X - NUMBER OF POLES
SCHEMATIC WIRE
EXHAUST DIFFUSER
- MATCH BUILDING STANDARD
CEILING SYMBOLS
x
RETURN DIFFUSER
- MATCH BUILDING STANDARD
NEW SUPPLY DIFFUSER
- MATCH BUILDING STANDARD
NEW LIGHT FIXTURE:
- 6" RECESSED LED CAN LIGHT
- REFER TO LIGHTING PLAN
NEW LIGHT FIXTURE
- OCCUPANCY SENSOR
- 2' WIDE WALL MOUNT LIGHT FIXTURE
- REFER TO LIGHTING PLAN
2'
NEW LIGHT FIXTURE
- 2'x4' LAY-IN INDIRECT FLUORESCENT
- REFER TO LIGHTING PLAN
NEW LIGHT FIXTURE
- 2'x4' LAY-IN TROFFER
- REFER TO LIGHTING PLAN
NEW EXIT SIGN FIXTURE
- CEILING MOUNT LED EXIT SIGN
- REFER TO LIGHTING PLAN
EXISTING APC CEILING - REFER TO
TYPES SHEET FOR ADDITIONAL
INFORMATION
EXISTING GYP BOARD CEILING - REFER
TO TYPES SHEET FOR ADDITIONAL
INFORMATION
TRUE
NORTH
arcDESIGN Project Number:
Date:
Drawing Title:
Drawing Number:
Revisions:
Drawn By:
Client Project Number:
201 N. Delaware Street, Suite B
Indianapolis, IN 46204
317.951.9192 T | 317.951.9194 F
www.arcdesign.us
This drawing and its contents are the property
of arcDESIGN P.C., and shall not be
reproduced in whole or in part by any means,
mechanical or electronic, without express
written permission of arcDESIGN.
2/20/2018 12:49:56 PM C:\Users\jlillibridge\Documents\Revit 2017 Local\Dr.Paul Plastic Surgery-Suite 140_aD17_jlillibridgeVYYUA.rvt
ST. VINCENT MEDICAL GROUP
A141
REFLECTED
CEILING PLAN
17124
02.20.2018
100% CD'S
30102 - CARMEL PLASTIC SURGERY
13450 N. MERIDIAN, SUITE 140
CARMEL, IN 46032
JBL
30102
1/4" = 1'-0" ?
1 REFLECTED CEILING PLAN
REFLECTED CEILING PLAN NOTES
1 MECHANICAL AND LIGHT FIXTURES TO REMAIN AS IS UNLESS NOTED
OTHERWISE.
2 CEILING MOUNTED EXAM LIGHT PROVIDED BY TENANT, INSTALLED BY
CONTRACTOR. CONTRACTOR TO PROVIDE SHOP DRAWINGS AND INSTALL
UNISTRUT CEILING MOUNTED LIGHT SUPPORT. CONTRACTOR TO PROVIDE
120V DEDICATED CIRCUIT FOR FIXTURE.
3 TIE EXTENDED BULKHEAD INTO EXISTING BULKHEAD. MATCH HEIGHT,
RADIAL CURVATURE, AND TYPE OF EXISTING, ADJACENT CEILING TYPE.
4 LIGHT TO BE ON OCCUPANCY SENSOR.
5 ROOM TO RECEIVE 24-7 EXHAUST FAN.
6 INSTALL SALVAGED LIGHT FIXTURE IN ROOM.