HomeMy WebLinkAboutE102 LIGHTING PLANEXAM 1
103
EXAM 2
104
TREATMENT
120 STORAGE
119
OFFICE
118
WAITING
100
ESTHETICIAN
109
FRONT OFFICE
101
CLEAN LINEN
107
TLT- PATIENT
108
SOILED
113
OFFICE/ CONSULT
110
BIO
112
CHECK OUT
102
CORR.
114
EXAM 3
105
STORAGE
111
MA STATION
106
OFFICE
117
BREAK ROOM
116
CORRIDOR
121
8' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
9' - 0"
APC-1
3' - 0"
8' - 0"
GB-1
9' - 0"
APC-1
1
1 1
1
1
1
1 1
1
1
2
3
3
3
3
3
NOT IN SCOPE
4 STAIR
4
4
5
6 6
6
6 6
6 6
6 6 6
6 6 6
6
6
6
6
6
6
EXIST.
EQ EQ
EQ EQ
DESIGN BUILD ELECTRICAL NOTES
•
•
•
•
•
•
•
•
•
•
•
•
•
GENERAL SCOPE:
THE HVAC, ELECTICAL/VOICE/DATA AND PLUMBING DRAWINGS ARE SCHEMATIC IN NATURE AND SERVE ONLY TO
CONVEY THE "INTENT" OF THE TENANT'S REQUIREMENTS. IT IS THE RESPONSIBILITY OF THE DESIGN/BUILD
CONTRACTORS TO FULLY ENGINEER THESE SYSTEMS. SEALED DRAWINGS ARE NOT REQUIRED UNLESS STATED
OTHERWISE. DRAWINGS SHALL BE PREPARED AS SHOP DRAWINGS AND SUBMITTED TO THE ARCHITECT FOR
APPROVAL.
CONTRACTORS SHALL FURNISH AND INSTALL ALL NECESSARY WORK AND COMPONENTS IN COMPLETE COMPLIANCE
WITH ALL CURRENT FEDERAL, STATE AND LOCAL CODES AND ORDINANCES. CONTRACTORS TO SUBMIT ALL FINAL
HVAC DRAWINGS TO LANDLORD AND OWNER FOR REVIEW AND MUST RECEIVE FINAL APPROVAL FROM BOTH PARTIES
PRIOR TO CONSTRUCTION.
DESIGN/BUILD SUBCONTRACTORS SHALL REVIEW BUILDING SYSTEM SCOPE DOCUMENTS AND OFFER ANY
MODIFICATIONS THAT MAY BE APPROPRIATE FOR COMPLETE AND OPERABLE SYSTEMS.
ELECTRICAL SYSTEMS:
THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE TENANT'S VENDORS IN REGARDS TO THE
AUDIO/VISUAL SYSTEMS, SECURITY SYSTEMS, AND IT SYSTEMS.
THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE BASE BUILDING OWNER AS TO THE ADEQUACY OF
THE EXISTING ELECTRICAL SERVICE AND MODIFICATIONS WHICH MAY BE REQUIRED TO ACCOMMODATE THIS
TENANT.
THE ELECTRICAL CONTRACTOR SHALL PERMANENTLY LABEL ALL ELECTRICAL PANELS AND CIRCUITS.
THE ELECTRICAL CONTRACTOR SHALL VERIFY LOCATION OF ALL ELECTRICAL OUTLETS THAT ARE DEDICATED.
REFER TO TYPICAL MOUNTING HEIGHTS SHEET FOR DEVICE MOUNTING HEIGHTS.
PROVIDE AND INSTALL ROUGH-INS AS REQUIRED FOR AUDIO/VISUAL, SECURITY SYSTEMS, AND IT SYSTEMS.
AUDIO VISUAL SYSTEMS:
THE PROJECT MANAGER IS TO PROVIDE AND COORDINATE ALL AV VENDORS WITH THE GENERAL CONTRACTOR
FOR ALL AUDIO VISUAL, SECURITY ITEMS, INCLUDING, BUT NOT LIMITED TO: TELEVISION JACKS, SPEAKERS, AUDIO
SOURCES, NURSE CALL DEVICES, AND ELECTRIC DOOR HARDWARE.
THE CONTRACTOR SHALL PROVIDE THE ARCHITECT WITH A SET OF SHOP DRAWINGS SHOWING THE LOCATIONS
OF ALL ITEMS. ALL SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE ARCHITECT PRIOR TO ANY
CONSTRUCTION.
THE AUDIO VISUAL CONTRACTOR SHALL COORDINATE WITH THE TENANT'S VENDORS IN REGARDS TO THEIR
SYSTEMS AND DEVICES.
THE AUDIO VISUAL CONTRACTOR SHALL COORDINATE WITH THE ELECTICAL CONTRACTOR FOR ELECTRICAL
ROUGH-INS NECESSARY TO POWER AUDIO VISUAL SYSTEMS DEVICES.
SECURITY SYSTEMS:
THE SECURITY SYSTEM CONTRACTOR SHALL PROVIDE THE ARCHITECT WITH A SET OF SHOP DRAWINGS
SHOWING THE LOCATIONS OF ALL FIRE ALARM DEVICES, SECURITY DEVICES, SMOKE DETECTORS, CARD
READERS AND FIRE SUPRESSION SYSTEMS. SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE
ARCHITECT PRIOR TO ANY CONSTRUCTION.
THE SECURITY SYSTEM CONTRACTOR SHALL COORDINATE WITH THE TENANT'S VENDORS IN REGARDS TO THEIR
SYSTEMS AND DEVICES.
THE SECURITY SYSTEM CONTRACTOR SHALL COORDINATE BLOCKING WITH THE GENERAL CONTRACTOR FOR
DEVICES REQUIRING SUPPORT.
THE SECURITY SYSTEM CONTRACTOR SHALL COORDINATE WITH THE ELECTICAL CONTRACTOR REGARDING
ELECTRICAL ROUGH-INS NECESSARY TO POWER ALL SECURITY SYSTEMS AND DEVICES.
• ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2008 N.E.C. AND ASHREA 90.1 2007
ADDITIONAL ELECTRICAL REQUIREMENTS:
1. NFPA 99 COMPLIANCE FOR ADDITIONAL GROUNDING AND CHASSIS GROUNDING:
2. HFC MC CABLE TO BE USED:
3. HCF MCAP Type MC Cable - "All Purpose" is suitable for use as follows:
4. Branch-circuit wiring for general purpose in patient care areas of hospitals, medical and other health care
facilities. Such areas include nursing homes, dental offices, and outpatient facilites.
5. Use in hazardous anesthetizing areas and essential electrical system circuits are prohibited, except where
permitted per 2008 NEC® 517.30(C)(3)(3).
6. Applications requiring redundant, dedicated or isolated grounding paths.
7. Environmental air-handling spaces per NEC® 300.22(C); Dry locations; fished or embedded in plaster.
8. Places of Assembly per NEC® 518.4 and theaters per NEC® 520.5.
Installation in cable tray and approved raceways.
9. Under raised floors for information technology equipment conductors and cables per NEC® 645.5(D) &
645.5(D)(2).
10. Multiple neutral and multi-circuit cables totaling more than 4 current-carrying conductors are now possible.
NEW GYP BOARD CEILING - REFER TO
TYPES SHEET FOR ADDITIONAL
INFORMATION
NEW APC CEILING - REFER TO TYPES
SHEET FOR ADDITIONAL
INFORMATION
NEW LIGHTING SWITCH:
X - NUMBER OF POLES
SCHEMATIC WIRE
EXHAUST DIFFUSER
- MATCH BUILDING STANDARD
CEILING SYMBOLS
x
RETURN DIFFUSER
- MATCH BUILDING STANDARD
NEW SUPPLY DIFFUSER
- MATCH BUILDING STANDARD
NEW LIGHT FIXTURE:
- 6" RECESSED LED CAN LIGHT
#RL38 CAN / LED DK6 11W940 DIM G7 LED
MODULE. 11 WATTS.
NEW LIGHT FIXTURE
- OCCUPANCY SENSOR INTEGRATED
- 2' WIDE WALL MOUNT LIGHT FIXTURE
#BLCSLED2FT 20 4K MV ET / OCS / 20 WATTS
2'
NEW LIGHT FIXTURE
- 2'x4' LAY-IN INDIRECT LED / 39 WATTS
#BCBLED24-40W-4K MV PRM BES
NEW LIGHT FIXTURE
- 2'x4' LAY-IN TROFFER
#LEDPNL2X4-35W-4K / 2X4 PANEL /
36 WATTS
NEW EXIT SIGN FIXTURE
- CEILING MOUNT LED EXIT SIGN
#CBRCOMBO / 4W LED EXIT WITH
TWIN EM HEADS.
EXISTING APC CEILING - REFER TO
TYPES SHEET FOR ADDITIONAL
INFORMATION
EXISTING GYP BOARD CEILING - REFER
TO TYPES SHEET FOR ADDITIONAL
INFORMATION
TRUE
NORTH
arcDESIGN Project Number:
Date:
Drawing Title:
Drawing Number:
Revisions:
Drawn By:
Client Project Number:
201 N. Delaware Street, Suite B
Indianapolis, IN 46204
317.951.9192 T | 317.951.9194 F
www.arcdesign.us
This drawing and its contents are the property
of arcDESIGN P.C., and shall not be
reproduced in whole or in part by any means,
mechanical or electronic, without express
written permission of arcDESIGN.
1/16/2018 9:48:59 AM C:\Users\jlillibridge\Documents\Revit 2017 Local\Dr.Paul Plastic Surgery-Suite 140_aD17_jlillibridgeVYYUA.rvt
ST. VINCENT MEDICAL GROUP
E102
REFLECTED
CEILING PLAN
17124
01.12.2018
90% CD'S/PRICING
PLANS
30102 - CARMEL PLASTIC SURGERY
13450 N. MERIDIAN, SUITE 140
CARMEL, IN 46032
JBL
30102
1/4" = 1'-0" ?
1 REFLECTED CEILING PLAN
REFLECTED CEILING PLAN NOTES
1 MECHANICAL AND LIGHT FIXTURES TO REMAIN AS IS UNLESS NOTED
OTHERWISE.
2 CEILING MOUNTED EXAM LIGHT PROVIDED BY TENANT, INSTALLED BY
CONTRACTOR. CONTRACTOR TO PROVIDE SHOP DRAWINGS AND INSTALL
UNISTRUT CEILING MOUNTED LIGHT SUPPORT. CONTRACTOR TO PROVIDE
120V DEDICATED CIRCUIT FOR FIXTURE.
3 TIE EXTENDED BULKHEAD INTO EXISTING BULKHEAD. MATCH HEIGHT,
RADIAL CURVATURE, AND TYPE OF EXISTING, ADJACENT CEILING TYPE.
4 LIGHT TO BE ON OCCUPANCY SENSOR.
5 ROOM TO RECEIVE 24-7 EXHAUST FAN.
6 INSTALL SALVAGED LIGHT FIXTURE IN ROOM.
ATC ELECTRIC
P.O. BOX 205
Pittsboro, IN. 46167
100% CD'S