Loading...
HomeMy WebLinkAboutMP101 HVAC PLUMBINGGENERAL NOTES SCOPE DOCUMENTS 1/8" = 1'-0" HVAC PLAN MP101 1/8"=1'-0" HVAC/PLUMBING PLANS 2/19/18 DMP JDS 18203 HVAC/PLUMBING PLUMBING PLAN 1/8" = 1'-0" LEGEND SPECIAL PLUMBING NOTES SPECIAL HVAC NOTES N.T.S. SINK PLUMBING ISOMETRIC W&V N.T.S. SINK PLUMBING ISOMETRIC WATER EXAM 1 103 EXAM 2 104 TREATMENT 120 STORAGE 119 OFFICE 118 WAITING 100 ESTHETICIAN 109 FRONT OFFICE 101 CLEAN LINEN 107 TLT- PATIENT 108 SOILED 113 OFFICE/ CONSULT 110 BIO 112 CHECK OUT 102 CORR. 114 EXAM 3 105 STORAGE 111 MA STATION 106 OFFICE 117 BREAK ROOM 116 CORRIDOR 121 3' - 0" STAIR EXIST. EQ EQ EQ EQ SHEET NO. CERTIFIED BY: NORTH: DATE DRAWN BY CHECKED BY JOB NO. PROPOSED INTERIORS FOR: ST. VINCENTS MEDICAL GROUP SCALE /%5 %QPVTCEVKPI 5VQP[%TGGM9C[ 0QDNGUXKNNG+PFKCPC ÄÄ 5GTXKEGU+PE /GEJCPKECN 13450 NORTH MERIDIAN ST. 140 CARMEL, INDIANA 46032 REV DATE DESCRIPTION TITLE CARMEL PLASTIC SURGERY F.E.C. CONNECT NEW DRAIN LINES INTO EXISTING DRAIN LINES. FIELD VERIFY EXISTING SANITARY LINE LOCATION PRIOR TO STARTING TRENCHING FOR NEW FIXTURES. NOTE: CONSTRUCTION AREA IS SLAB ON GRADE CONSTRUCTION. SAW CUT SLAB AND TRENCH AS REQUIRED FOR NEW WORK. INFILL WITH CONCRETE TO MATCH EXISTING EXAM 1 103 EXAM 2 104 TREATMENT 120 STORAGE 119 OFFICE 118 WAITING 100 ESTHETICIAN 109 FRONT OFFICE 101 CLEAN LINEN 107 TLT- PATIENT 108 SOILED 113 OFFICE/ CONSULT 110 BIO 112 CHECK OUT 102 CORR. 114 EXAM 3 105 STORAGE 111 MA STATION 106 OFFICE 117 BREAK ROOM 116 CORRIDOR 121 STAIR EXIST. WATER LINE SUPPLY TIE IN TO FOR NEW