HomeMy WebLinkAboutMP101 HVAC PLUMBINGGENERAL NOTES
SCOPE DOCUMENTS
1/8" = 1'-0"
HVAC PLAN
MP101
1/8"=1'-0" HVAC/PLUMBING PLANS
2/19/18
DMP
JDS
18203
HVAC/PLUMBING
PLUMBING PLAN
1/8" = 1'-0"
LEGEND
SPECIAL PLUMBING NOTES
SPECIAL HVAC NOTES
N.T.S.
SINK PLUMBING ISOMETRIC W&V
N.T.S.
SINK PLUMBING ISOMETRIC WATER
EXAM 1
103
EXAM 2
104
TREATMENT
120 STORAGE
119
OFFICE
118
WAITING
100
ESTHETICIAN
109
FRONT OFFICE
101
CLEAN LINEN
107
TLT- PATIENT
108
SOILED
113
OFFICE/ CONSULT
110
BIO
112
CHECK OUT
102
CORR.
114
EXAM 3
105
STORAGE
111
MA STATION
106
OFFICE
117
BREAK ROOM
116
CORRIDOR
121
3' - 0"
STAIR
EXIST.
EQ EQ
EQ EQ
SHEET NO.
CERTIFIED BY:
NORTH:
DATE
DRAWN BY
CHECKED BY
JOB NO.
PROPOSED INTERIORS FOR:
ST. VINCENTS MEDICAL GROUP
SCALE
/%5
%QPVTCEVKPI
5VQP[%TGGM9C[
0QDNGUXKNNG+PFKCPC
ÄÄ
5GTXKEGU+PE
/GEJCPKECN
13450 NORTH MERIDIAN ST. 140
CARMEL, INDIANA 46032
REV DATE DESCRIPTION
TITLE
CARMEL PLASTIC SURGERY
F.E.C.
CONNECT NEW DRAIN LINES INTO
EXISTING DRAIN LINES. FIELD VERIFY
EXISTING SANITARY LINE LOCATION
PRIOR TO STARTING TRENCHING FOR
NEW FIXTURES.
NOTE: CONSTRUCTION AREA IS SLAB ON GRADE
CONSTRUCTION. SAW CUT SLAB AND TRENCH AS
REQUIRED FOR NEW WORK. INFILL WITH CONCRETE TO
MATCH EXISTING
EXAM 1
103
EXAM 2
104
TREATMENT
120
STORAGE
119
OFFICE
118
WAITING
100
ESTHETICIAN
109
FRONT OFFICE
101
CLEAN LINEN
107
TLT- PATIENT
108
SOILED
113
OFFICE/ CONSULT
110
BIO
112
CHECK OUT
102
CORR.
114
EXAM 3
105
STORAGE
111
MA STATION
106
OFFICE
117
BREAK ROOM
116
CORRIDOR
121
STAIR
EXIST. WATER LINE
SUPPLY TIE IN TO FOR
NEW