Loading...
HomeMy WebLinkAbout18030094 Truss Plans (2)DE DANSCO ENGINEERING, LLC P.O. Box 3400 Apollo Beach, FL 33572 Telephone (813) 645-0166 Facsimile (813) 645-9698 The truss drawing(s) listed below have been prepared by Stark Truss, Inc. under my direct supervision based on the parameters provided by the truss designers. Job: 1801821-12T 81 truss design(s) 56827-W1 2/16/18 Samuel A. Greenberg, P.E. Indiana Reg. #19700485 Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length is the distance from the top chord to bottom chord. The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of this component for any particular building is the responsibility of the building designer, per ANSI/TPI 1-2007 Chapter 2. Warning !—Verify design parameters and read notes before use. These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication, quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss J01 TrussType Jack-Open Qty 6 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:372018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-8CKs99aZ?Zhoog7Y7SjvmZAXRq5LuxnK5dTnY3zkaDG Scale:3/4"=1' W1 T1 B1 B2 B3 1 2 3 8 7 6 9 4 5 1.5x4 1.5x4 1.5x4 1.5x4 2x4 2-6-0 2-6-0 3-3-8 0-9-8 -0-10-12 0-10-12 2-6-0 2-6-0 3-3-8 0-9-8 1-2-152-7-61-7-62-3-01-0-05.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.10 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 -0.01 (loc) 6 7 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 *Except*B2: 2x4SPFStud WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-3-8 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)8=171/0-6-0(min. 0-1-8), 4=53/Mechanical, 5=47/Mechanical Max Horz8=65(LC 13) Max Uplift8=-24(LC 16), 4=-23(LC 16), 5=-29(LC 16)MaxGrav8=196(LC 2), 4=61(LC 2), 5=52(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-3-9,Interior(1) 2-3-9 to 3-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 24 lb uplift at joint 8, 23 lb uplift at joint 4 and 29 lb uplift at joint 5. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss J02 TrussType Jack-Open Qty 4 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:382018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-cOuENVbBmspfPqikh9E8Jmii6ESXdO1UKHCL4VzkaDF Scale=1:11.7 W1 T1 B1 1 2 5 3 4 1.5x4 1.5x4 1-2-7 1-2-7 -0-10-12 0-10-12 1-2-7 1-2-7 1-2-151-8-151-4-91-8-155.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.10 0.05 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 -0.00 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 5 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 1-2-7 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)5=116/0-6-0(min. 0-1-8), 3=5/Mechanical, 4=6/Mechanical Max Horz5=43(LC 13) Max Uplift5=-30(LC 12), 3=-23(LC 22), 4=-10(LC 13)MaxGrav5=148(LC 22), 3=6(LC 2), 4=18(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 30 lb uplift at joint 5, 23 lb uplift at joint 3 and 10 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss J03 TrussType DiagonalHipGirder Qty 2 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:382018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-cOuENVbBmspfPqikh9E8Jmih?ERJdO1UKHCL4VzkaDF Scale=1:15.7 W1 T1 B1 B2 B3 1 2 3 8 7 6 9 4 10 5 1.5x4 1.5x4 1.5x4 1.5x4 2x4 3-4-15 3-4-15 4-6-6 1-1-7 -1-3-3 1-3-3 3-4-15 3-4-15 4-6-6 1-1-7 1-2-152-6-151-6-152-2-141-0-03.5412 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.17 0.12 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 -0.01 (loc) 7 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 15 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 *Except*B2: 2x4SPFStud WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-6-6 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)8=143/0-8-2(min. 0-1-8), 4=63/Mechanical, 5=42/Mechanical Max Horz8=55(LC 11) Max Uplift8=-111(LC 10), 4=-32(LC 12), 5=-32(LC 16)MaxGrav8=164(LC 2), 4=72(LC 2), 5=56(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 111 lb uplift at joint 8, 32 lb uplift at joint 4 and 32 lb uplift at joint 5. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 14 lb down and 14 lb up at 1-9-8, and 14 lb down and 14 lb up at 1-9-8 on top chord, and 2 lb down and 15 lb up at 1-9-8, and 2 lb down and 15 lb up at 1-9-8on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf)Vert: 1-2=-51 Concentrated Loads(lb) Vert: 10=1(F=1,B=1)Trapezoidal Loads(plf) Vert: 2=-2(F=24,B=24)-to-4=-58(F=-3,B=-3), 8=0(F=10,B=10)-to-7=-16(F=2,B=2), 6=-16(F=2,B=2)-to-5=-23(F=-1,B=-1) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss J04 TrussType Jack-Open Qty 7 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:392018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-4aScarbpWAxW1_HxFtlNr_FsGdnJMrHdZxyudxzkaDE Scale=1:14.0 W1 T1 B1 1 2 5 3 4 1.5x4 2x4 2-3-8 2-3-8 -0-10-12 0-10-12 2-3-8 2-3-8 1-2-152-2-61-10-02-2-65.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.14 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 8 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-3-8 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)5=140/0-4-0(min. 0-1-8), 3=41/Mechanical, 4=19/Mechanical Max Horz5=54(LC 13) Max Uplift5=-46(LC 12), 3=-39(LC 16), 4=-19(LC 13)MaxGrav5=161(LC 2), 3=48(LC 2), 4=39(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 46 lb uplift at joint 5, 39 lb uplift at joint 3 and 19 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss J05 TrussType DiagonalHipGirder Qty 2 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:402018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-Ym0_nBcRHU3Nf8s7paHcOBo1V18u5IWnoahS9OzkaDD Scale=1:13.7 W1 T1 B1 1 2 5 6 3 4 1.5x4 1.5x4 3-1-6 3-1-6 -1-3-3 1-3-3 3-1-6 3-1-6 1-2-152-1-151-9-142-1-153.5412 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.17 0.05 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-1-6 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)5=118/0-5-5(min. 0-1-8), 3=26/Mechanical, 4=11/Mechanical Max Horz5=48(LC 11) Max Uplift5=-96(LC 8), 3=-53(LC 10), 4=-22(LC 11)MaxGrav5=159(LC 18), 3=31(LC 2), 4=40(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 96 lb uplift at joint 5, 53 lb uplift at joint 3 and 22 lb uplift at joint 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf) Vert: 1-2=-51 Trapezoidal Loads(plf)Vert: 2=-2(F=24,B=24)-to-3=-40(F=6,B=6), 5=0(F=10,B=10)-to-4=-16(F=2,B=2) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB01 TrussType GABLE Qty 14 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:412018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-0zaM?Xd42nBEGIQJMIorxPKC3RTZqkLw0ER?hqzkaDC Scale=1:33.1 W1 T1 T2 B1 ST2 ST1 1 2 3 4 5 8 7 6 9 10 11 1.5x4 1.5x4 4x4 3x4 1.5x4 1.5x4 1.5x4 10-9-12 10-9-12 2-11-0 2-11-0 10-9-12 7-10-12 3-2-35-3-20-1-100-4-70-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.19 0.09 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 5 5 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 37 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 10-0-10. (lb)-Max Horz8=-171(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 8, 4, 7 except 6=-163(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 8, 4 except 6=376(LC 31), 7=268(LC 31) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 3-6=-310/212 NOTES-1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-11-0,Interior(1) 5-11-0 to 10-6-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8, 4, 7 except(jt=lb) 6=163. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB01GE TrussType GABLE Qty 2 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:422018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-U98kCteip5J5uS?Vw?J4TctO1rqZZCB4FuAYDGzkaDB Scale=1:31.0 W1 T1 T2 B1 ST1 ST1 ST2 ST3 1 2 3 4 5 6 7 8 13 12 11 10 9 14 15 3x4 3x4 10-9-12 10-9-12 2-11-0 2-11-0 10-9-12 7-10-12 3-2-35-3-20-1-100-4-70-1-108.0012 PlateOffsets(X,Y)-- [3:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.11 0.04 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 7 8 7 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 43 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.All bearings 10-0-13. (lb)-Max Horz13=-171(LC 12)Max UpliftAll uplift 100 lb orless at joint(s) 13, 7, 12, 11, 10, 9 MaxGravAllreactions 250 lb orless at joint(s) 13, 7, 12, 11, 10, 9 FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES-1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-11-0,Interior(1) 5-11-0 to 10-6-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)Gablestudsspaced at 2-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 13, 7, 12, 11, 10, 9. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1. 13)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB02 TrussType Piggyback Qty 5 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:432018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-zLi7QDfKaPRxWbaiUjqJ0qQXHF8fIfdDUYw6mjzkaDA Scale=1:19.6 T1 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 11 12 4x4 2x4 2x41.5x4 8-9-7 8-9-7 4-4-12 4-4-12 8-9-7 4-4-11 0-4-72-11-20-1-100-4-70-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.20 0.11 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 0.00 (loc) 5 5 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 23 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2OTHERS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=164/7-3-3(min. 0-1-8), 4=164/7-3-3(min. 0-1-8), 6=235/7-3-3(min. 0-1-8)Max Horz2=72(LC 15) Max Uplift2=-52(LC 16), 4=-62(LC 17) MaxGrav2=189(LC 2), 4=189(LC 2), 6=261(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-3-5,Interior(1) 3-3-5 to 4-4-12,Exterior(2) 4-4-12 to 7-4-12zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB02GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:442018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-RYFVdZfyLiZo7l9u2QLYY1yk_eVx16vMiCffI9zkaD9 Scale=1:19.6 T1 T1 B1 ST1 ST1 1 2 3 4 5 6 7 9 8 10 11 12 13 3x4 2x4 2x41.5x4 1.5x4 1.5x4 1.5x4 8-9-7 8-9-7 4-4-12 4-4-12 8-9-7 4-4-11 0-4-72-11-20-1-100-4-70-1-108.0012 PlateOffsets(X,Y)-- [4:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.08 0.05 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 24 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 7-3-3. (lb)-Max Horz2=-72(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 9, 8MaxGravAllreactions 250 lb orless at joint(s) 2, 6, 9, 8 FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-4-11,Interior(1) 3-4-11 to 4-4-12,Exterior(2) 4-4-12 to 7-4-12 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Gablerequirescontinuous bottomchord bearing. 8)Gablestudsspaced at 2-0-0 oc.9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9, 8. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB03 TrussType Piggyback Qty 5 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:452018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-vkptruga60hflvk4b8sn5FVtm2qXmZBWxsPCqbzkaD8 Scale=1:19.4 W1 T1 T2 B1 ST1 1 2 3 4 6 5 7 8 9 1.5x4 1.5x4 4x4 2x41.5x4 6-0-12 6-0-12 1-8-0 1-8-0 6-0-12 4-4-11 1-8-32-11-20-1-100-4-70-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.20 0.09 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 0.00 (loc) 4 4 3 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 18 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)6=37/5-3-10(min. 0-1-8), 3=148/5-3-10(min. 0-1-8), 5=204/5-3-10(min. 0-1-8) Max Horz6=-89(LC 14) Max Uplift6=-30(LC 16), 3=-38(LC 17), 5=-6(LC 17)MaxGrav6=59(LC 30), 3=169(LC 2), 5=241(LC 31) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 4-8-0,Interior(1) 4-8-0 to 5-9-6zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 3, 5. 9)Beveled plate orshimrequired to provide full bearingsurfacewith trusschord at joint(s) 3.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB04 TrussType Piggyback Qty 1 Ply 3 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:462018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-NwNF2EhCtKpWN3JH9rN0eS24sSBJV0nfAW8mM1zkaD7 Scale=1:16.7 T1 T2 W1 B1 ST1 1 2 3 4 6 5 7 8 9 4x4 1.5x4 1.5x42x41.5x4 7-11-14 7-11-14 5-10-10 5-10-10 7-11-14 2-1-3 0-4-12-5-70-1-101-5-50-1-105.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.12 0.05 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.01 0.00 (loc) 1 1 5 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 62 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=47/6-10-4(min. 0-1-8), 2=199/6-10-4(min. 0-1-8), 6=266/6-10-4(min. 0-1-8) Max Horz2=56(LC 13) Max Uplift5=-33(LC 17), 2=-59(LC 16), 6=-15(LC 16)MaxGrav5=56(LC 2), 2=228(LC 34), 6=296(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 3-4-14,Interior(1) 3-4-14 to 5-10-10,Exterior(2) 5-10-10 to 7-10-2 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 6) Unbalancedsnowloads have been considered for this design. 7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 8)Gablerequirescontinuous bottomchord bearing. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 2, 6. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB05 TrussType Piggyback Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:472018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-r7xdFaiqedxN_DuTjYvFAgaApsVvETWpPAuJvUzkaD6 Scale=1:16.7 T1 T2 W1 B1 ST1 1 2 3 4 6 5 7 8 9 4x4 1.5x4 1.5x42x41.5x4 7-11-14 7-11-14 5-10-10 5-10-10 7-11-14 2-1-3 0-4-12-3-150-1-81-5-70-1-85.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.36 0.16 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.02 0.00 (loc) 1 1 5 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)5=47/6-10-9(min. 0-1-8), 2=196/6-10-9(min. 0-1-8), 6=267/6-10-9(min. 0-1-8) Max Horz2=56(LC 13) Max Uplift5=-33(LC 17), 2=-57(LC 16), 6=-15(LC 16)MaxGrav5=56(LC 2), 2=224(LC 34), 6=298(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-7 to 3-5-7,Interior(1) 3-5-7 to 5-10-10,Exterior(2) 5-10-10 to 7-10-2 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 2, 6. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB06 TrussType Piggyback Qty 5 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:482018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-JJV0TwiTPx3EcNTfHGQUjt7LZGqazwYydqdtRwzkaD5 Scale=1:19.6 T1 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 11 12 4x4 2x4 2x41.5x4 11-9-5 11-9-5 5-10-10 5-10-10 11-9-5 5-10-10 0-4-12-3-150-1-80-4-10-1-85.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.36 0.19 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 0.04 0.00 (loc) 5 5 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 27 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2OTHERS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=201/9-6-11(min. 0-1-8), 4=201/9-6-11(min. 0-1-8), 6=341/9-6-11(min. 0-1-8)Max Horz2=-40(LC 17) Max Uplift2=-66(LC 16), 4=-73(LC 17), 6=-9(LC 16) MaxGrav2=231(LC 2), 4=231(LC 2), 6=381(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 3-6=-262/122 NOTES- 1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-7 to 3-5-7,Interior(1) 3-5-7 to 5-10-10,Exterior(2) 5-10-10 to 8-10-10 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4, 6. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB07 TrussType Piggyback Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:492018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-nV3OgGj5AFC5EW2sqzxjF5gXjf9hiN_5sUNQzMzkaD4 Scale=1:20.5 0-1-100-1-10T1 T2 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 11 12 3x4 3x4 2x4 2x41.5x4 1.5x4 11-9-5 11-9-5 5-0-15 5-0-15 6-8-6 1-7-6 11-9-5 5-0-15 0-4-12-1-60-1-100-4-10-1-105.0012 PlateOffsets(X,Y)-- [3:0-2-0,Edge], [5:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.27 0.20 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 0.03 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 27 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)2=226/9-6-2(min. 0-1-10), 6=226/9-6-2(min. 0-1-10), 8=311/9-6-2(min. 0-1-10) Max Horz2=33(LC 20) Max Uplift2=-75(LC 16), 6=-79(LC 17)MaxGrav2=344(LC 39), 6=344(LC 39), 8=338(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-9=-281/135, 6-12=-281/134 NOTES-1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 3-4-14,Interior(1) 3-4-14 to 5-0-15,Exterior(2) 5-0-15 to 6-8-6, Interior(1) 10-7-11 to 11-4-7zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss PB08 TrussType Piggyback Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:492018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-nV3OgGj5AFC5EW2sqzxjF5gZFf9biMg5sUNQzMzkaD4 Scale=1:20.5 0-1-100-1-10T1 T2 T1 B1 W1 1 2 3 4 5 6 7 8 9 10 3x4 3x4 2x4 2x4 1.5x4 1.5x4 11-9-5 11-9-5 3-0-15 3-0-15 8-8-6 5-7-6 11-9-5 3-0-15 0-4-11-3-60-1-100-4-10-1-105.0012 PlateOffsets(X,Y)-- [3:0-2-0,Edge], [5:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.17 0.21 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 25 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)2=225/9-6-2(min. 0-1-8), 6=225/9-6-2(min. 0-1-8), 8=353/9-6-2(min. 0-1-8) Max Horz2=-18(LC 17) Max Uplift2=-62(LC 12), 6=-62(LC 13), 8=-37(LC 12)MaxGrav2=281(LC 39), 6=281(LC 39), 8=436(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-300/180, 3-9=-258/180, 4-9=-261/179, 4-10=-261/179, 5-10=-258/180, 5-6=-300/180 BOT CHORD 2-8=-125/258, 6-8=-125/258WEBS4-8=-317/151 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 7-3-14,Interior(1) 7-3-14 to 8-8-6,Exterior(2) 8-8-6 to 11-4-7 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6, 8. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T01 TrussType COMMON Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:502018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-GidmuckjxYKyrgc2OhSyoICdU3VsRlHF586zWpzkaD3 Scale=1:40.0 T1 T2 B1 W3 W4 W5 W1 W2 W1 W6 1 2 3 4 5 9 8 7 6 10 11 12 13 14 15 3x6 4x4 1.5x4 1.5x4 3x6 6x6 4x8 3x6 1-9-0 1-9-0 5-2-0 3-5-0 10-4-0 5-2-0 1-9-0 1-9-0 5-2-0 3-5-0 10-4-0 5-2-0 11-6-12 1-2-12 1-4-06-6-01-4-012.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.59 0.20 0.30 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.05 -0.06 0.00 (loc) 6-7 6-7 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 55 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)9=460/0-6-0(min. 0-1-8), 6=460/0-6-0(min. 0-1-8), 8=916/0-6-0(min. 0-1-11) Max Horz9=-198(LC 12) Max Uplift9=-170(LC 12), 6=-80(LC 17), 8=-323(LC 13)MaxGrav9=579(LC 32), 6=524(LC 2), 8=1074(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-2=-386/245, 2-10=-664/593, 10-11=-364/379, 11-12=-300/334, 3-12=-250/295, 3-13=-234/301, 13-14=-274/286, 14-15=-303/280, 4-15=-388/276, 1-9=-570/390, 4-6=-481/351BOT CHORD 7-8=-120/276 WEBS 2-8=-1152/978, 1-8=-144/255 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 5-2-0,Exterior(2) 5-2-0 to 8-2-0zone; cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6 except(jt=lb)9=170, 8=323. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf)Vert: 3-4=-51, 4-5=-51, 6-9=-20 Trapezoidal Loads(plf) Vert: 1=-471-to-3=-51 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T01GE TrussType Common SupportedGable Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:512018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-kuB85ylLisSpTqBEyOzBLWlvmTt?ADsOJosX2FzkaD2 Scale=1:42.3 W1 T1 T1 W1 B1 ST3 ST2 ST1 ST2 ST1 1 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 17 18 2x4 3x4 4x4 3x4 2x4 10-4-0 10-4-0 -1-2-12 1-2-12 5-2-0 5-2-0 10-4-0 5-2-0 11-6-12 1-2-12 1-4-00-1-46-6-01-4-00-1-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.17 0.08 0.22 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 -0.00 (loc) 9 9 10 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 55 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 10-4-0. (lb)-Max Horz16=-210(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) except 16=-159(LC 12), 10=-143(LC 13), 14=-112(LC 16),15=-158(LC 16), 12=-112(LC 17), 11=-154(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 16, 10, 13, 14, 15, 12, 11 FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 5-17=-164/253, 5-18=-164/252 WEBS 5-13=-285/130 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3)-1-2-12 to 1-9-4,Exterior(2) 1-9-4 to 5-2-0, Corner(3) 5-2-0 to 8-2-0zone; cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing.9)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 10)Gablestudsspaced at 2-0-0 oc. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.12)Bearing at joint(s) 16, 10 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 159 lb uplift at joint 16, 143 lb uplift atjoint 10, 112 lb uplift at joint 14, 158 lb uplift at joint 15, 112 lb uplift at joint 12 and 154 lb uplift at joint 11. 14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T02 TrussType Common Qty 2 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:522018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-C4kWJImzSAag5_mQW6UQtjI_Jt7CveeYYSb4ahzkaD1 Scale=1:73.3 T2 T2 B1 W3 W4 W5 W6 W1 W2 W1 W7 T1 T1 B21 2 3 4 5 6 7 8 9 14 13 12 11 10 15 16 17 18 3x4 4x6 3x8 2x4 3x4 3x6 4x4 3x8 4x4 5x6 3x8 3x4 5-5-12 5-5-12 12-9-0 7-3-4 21-4-0 8-7-0 -1-2-12 1-2-12 5-5-12 5-5-12 10-8-0 5-2-4 17-10-14 7-2-14 21-4-0 3-5-2 22-6-12 1-2-12 1-4-012-0-01-4-012.0012 PlateOffsets(X,Y)-- [2:0-2-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.57 0.47 0.38 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.25 -0.29 0.01 (loc) 10-11 10-11 10 l/defl >401 >350 n/a L/d 240 180 n/a PLATES MT20 Weight: 115 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W5: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 3-11, 5-11 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)14=500/0-6-0(min. 0-1-8), 11=787/0-6-0(min. 0-1-8), 10=342/0-6-0(min. 0-1-8)Max Horz14=-354(LC 14) Max Uplift14=-31(LC 16), 11=-190(LC 16), 10=-19(LC 12) MaxGrav14=570(LC 2), 11=886(LC 2), 10=404(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-463/45, 3-15=-353/76, 2-14=-524/116BOT CHORD 13-14=-334/391, 12-13=-144/406, 11-12=-144/406 WEBS 3-11=-421/257, 5-11=-363/22, 7-11=-403/342, 7-10=-307/101 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-12 to 1-9-4,Interior(1) 1-9-4 to 10-8-0,Exterior(2) 10-8-0 to 13-8-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchright exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 31 lb uplift at joint 14, 190 lb uplift atjoint 11 and 19 lb uplift at joint 10. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T02GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:532018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-gHIvWdmbDTiXi8Ld3p?fQxqCDHYde4Whn6Le67zkaD0 Scale=1:79.9 T1 T1 B1 W3 W4 W5 W5 W4 W3 W1 W2 W1 W2 ST4 ST5 ST2 ST3ST1 ST4 ST2 B212 3 4 5 6 7 89 19 18 17 16 15 14 13 11 10 30 31 32 33 34 35 12 3x4 3x4 3x6 3x4 3x4 3x4 3x6 3x4 3x6 3x6 3-8-0 3-8-0 9-8-0 6-0-0 11-8-0 2-0-0 13-0-0 1-4-0 17-8-0 4-8-0 21-4-0 3-8-0 -1-2-12 1-2-12 3-8-0 3-8-0 9-8-0 6-0-0 10-8-0 1-0-0 11-8-0 1-0-0 17-8-0 6-0-0 21-4-0 3-8-0 22-6-12 1-2-12 1-4-012-0-01-4-012.0012 PlateOffsets(X,Y)-- [5:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.37 0.14 0.40 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 0.01 (loc) 11-12 11-12 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 154 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W5: 2x4SPF No.2OTHERS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing,Except: 10-0-0 oc bracing: 12-13,11-12.WEBS 1 Row at midpt 4-14, 6-13 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 13-0-0 except(jt=length) 10=0-6-0, 12=0-3-8. (lb)-Max Horz19=-354(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 19, 18, 12 except 14=-517(LC 16),13=-526(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 19, 18, 15, 16, 12 except 14=582(LC 30), 13=624(LC 31), 10=349(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-30=-258/202, 3-31=-310/328, 31-32=-276/342, 4-32=-264/370, 6-33=-256/369, 33-34=-268/341, 7-34=-302/328, 7-35=-251/167, 8-35=-278/131, 8-10=-321/84 BOT CHORD 18-19=-324/326, 17-18=-234/318, 16-17=-234/318, 15-16=-234/318, 14-15=-234/318, 13-14=-508/496, 12-13=-191/268, 11-12=-191/268 WEBS 3-14=-352/314, 4-14=-440/353, 6-13=-436/346, 7-13=-402/361, 8-11=-150/254 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-2-12 to 1-9-4,Interior(1) 1-9-4 to 10-8-0,Exterior(2) 10-8-0 to 13-8-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchright exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated.8)Gablestudsspaced at 2-0-0 oc. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 19, 18, 12except(jt=lb) 14=517, 13=526. Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T02GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:542018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-8TsHjznD_nqOKIwpdXXuy8NNzgusNXmr0m4BfazkaD? NOTES- 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T03 TrussType CommonGirder Qty 1 Ply 2 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:552018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-cfQfxJosl5yFyRV?BE27VMwU94CP5w7_EQqkB0zkaD_ Scale=1:74.3 T2 T3 B1 W3 W4 W5 W1 W2 W7 W6 T1 1 2 3 4 5 6 10 9 8 7111213141516 3x4 4x4 5x6 4x6 3x5 4x8 8x8 8x8 3x6 5-4-9 5-4-9 10-8-0 5-3-7 13-0-0 2-4-0 -1-2-12 1-2-12 5-4-9 5-4-9 10-8-0 5-3-7 13-0-0 2-4-0 1-4-012-0-09-8-012.0012 PlateOffsets(X,Y)-- [8:0-1-12,0-5-12], [9:0-3-8,0-5-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.59 0.24 0.65 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.11 0.00 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 238 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x8SP 2400F 2.0E WEBS 2x4SPF No.2 *Except* W3,W1,W2: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-7 REACTIONS.(lb/size)10=3520/0-6-0(min. 0-1-8), 7=4026/0-6-0(min. 0-1-11) Max Horz10=413(LC 12)Max Uplift10=-201(LC 12), 7=-518(LC 12) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-3149/180, 3-4=-2980/204, 4-5=-1025/138, 5-6=-956/147, 2-10=-2694/169, 6-7=-3435/458 BOT CHORD 10-11=-496/481, 11-12=-496/481, 9-12=-496/481, 9-13=-371/2159, 13-14=-371/2159, 14-15=-371/2159, 8-15=-371/2159 WEBS 4-9=-215/3012, 4-8=-2325/441, 5-8=-135/1126, 2-9=-148/1810, 6-8=-372/2819 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.605)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 6) Unbalancedsnowloads have been considered for this design.7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 10=201, 7=518. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1. 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1096 lb down and 94 lb up at 2-0-12, 1096 lb down and 94 lb up at 4-0-12, 1096 lb down and 94 lb up at 6-0-12, 1096 lb down and 94 lb up at 8-0-12, and 1096lb down and 94 lb up at 10-0-12, and 1098 lb down and 92 lb up at 12-0-12 on bottomchord.The design/selection of such connection device(s)is the responsibility of others. LOADCASE(S)StandardContinued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T03 TrussType CommonGirder Qty 1 Ply 2 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:552018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-cfQfxJosl5yFyRV?BE27VMwU94CP5w7_EQqkB0zkaD_ LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf)Vert: 1-2=-51, 2-5=-51, 5-6=-51, 7-10=-20 Concentrated Loads(lb) Vert: 11=-1096(B) 12=-1096(B) 13=-1096(B) 14=-1096(B) 15=-1096(B) 16=-1098(B) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T04 TrussType PiggybackBase Qty 10 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:562018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-4r_18fpUWO45Zb4ClxZM2ZSaxUUkqO27T4ZIiSzkaCz Scale=1:71.5 W1 T1 T2 B1 W2 W1 W2 W1 W3 W4 W6 W5 T3 B2 1 2 3 4 5 6 12 11 10 9 8 7 13 14 15 1617 18 19 1.5x4 4x4 6x12MT18H 3x6 3x45x8 1.5x4 3x4 3x5 4x4 3x4 4x4 5-4-14 5-4-14 10-9-12 5-4-14 18-3-4 7-5-9 25-7-0 7-3-12 5-4-14 5-4-14 10-9-12 5-4-14 18-3-4 7-5-9 25-7-0 7-3-12 11-6-01-7-1311-6-08.0012 PlateOffsets(X,Y)-- [3:0-8-8,0-1-12], [6:0-1-4,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.91 0.49 0.60 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.20 0.02 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 154 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W4,W6,W5: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 9-9-4 oc bracing. WEBS 1 Row at midpt 1-12, 2-11, 3-11, 5-9 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)12=979/Mechanical, 7=918/MechanicalMax Horz12=-379(LC 17) Max Uplift12=-195(LC 12), 7=-74(LC 17) MaxGrav12=1160(LC 34), 7=1116(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-12=-1111/268, 1-13=-434/96, 2-13=-434/96, 2-14=-434/96, 14-15=-434/96,3-15=-434/96, 3-16=-672/121, 16-17=-707/101, 4-17=-722/100, 4-5=-937/76, 5-18=-1131/92, 18-19=-1275/64, 6-19=-1360/64, 6-7=-1051/110 BOT CHORD 11-12=-354/379, 10-11=0/606, 9-10=0/606, 8-9=0/1062 WEBS 1-11=-224/1009, 2-11=-581/192, 3-11=-568/196, 3-9=-95/526, 5-9=-628/271, 6-8=0/986 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 10-9-12,Exterior(2) 10-9-12 to 13-9-12zone;cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)All plates areMT20 plates unless otherwiseindicated.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7 except(jt=lb)12=195. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T04GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:572018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-Y2YPM?p6HiCyBlfOIf4ban?oUusSZxRHikJrEvzkaCy Scale=1:73.5 W1 T1 T2 W3 B1 ST1 ST1 ST1 ST1 ST1 ST2 ST3 ST4 ST5 ST6 ST7 ST8 T3 B2 W2 1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 32 33 34 5x6 5x6 3x4 3x4 3x5 3x63x4 3x4 25-7-0 25-7-0 10-9-12 10-9-12 25-7-0 14-9-4 11-6-01-7-1311-6-08.0012 PlateOffsets(X,Y)-- [7:0-2-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.73 0.34 0.21 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.01 (loc) - - 17 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 190 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W1: 2x4SPF No.2OTHERS2x4SPF No.2 *Except* ST5,ST6,ST7,ST8: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 7-11-2 oc bracing. WEBS 1 Row at midpt 1-31, 2-30, 3-29, 4-28, 5-27, 6-25, 8-24,9-23 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 25-7-0. (lb)-Max Horz31=-444(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 31, 30, 29, 28, 27, 25, 24, 23, 22, 21, 20, 19 except 17=-302(LC 15), 18=-331(LC 12) MaxGravAllreactions 250 lb orless at joint(s) 31, 30, 29, 28, 27, 25, 24, 23, 22, 21, 20, 19 except 17=521(LC 12), 18=323(LC 15) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 9-10=-261/280, 10-11=-312/332, 11-12=-324/321, 12-13=-386/383, 13-34=-440/434, 14-34=-447/414, 14-15=-511/488, 15-16=-564/534, 16-17=-763/694 BOT CHORD 30-31=-493/534, 29-30=-493/534, 28-29=-493/534, 27-28=-493/534, 26-27=-493/534, 25-26=-493/534, 24-25=-493/534, 23-24=-493/534, 22-23=-493/534, 21-22=-493/534, 20-21=-493/534, 19-20=-493/534, 18-19=-493/534 WEBS 16-18=-637/685 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3) 0-1-12 to 3-1-12,Exterior(2) 3-1-12 to 10-9-12, Corner(3) 10-9-12 to 13-11-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates are 1.5x4MT20 unless otherwiseindicated.7)Gablerequirescontinuous bottomchord bearing. 8)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 9)Gablestudsspaced at 2-0-0 oc.10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T04GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:582018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-1E6oZLqk20KppvEasMbq7_XzEIChIOhQwO2OnLzkaCx NOTES- 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 31, 30, 29, 28, 27, 25, 24, 23, 22, 21, 20, 19 except (jt=lb) 17=302, 18=331. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T05 TrussType PIGGYBACK BASE Qty 4 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:34:592018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-VQfAnhrMpJSgQ3pnQ463fC45NhWS1lna92oyJnzkaCw Scale=1:71.5 W1 T1 T2 B1 W2 W1 W2 W1 W3 W4 W6 W5 T3 B2 1 2 3 4 5 6 7 13 12 11 10 9 8 14 15 16 1718 19 20 1.5x4 4x4 6x12MT18H 3x4 3x45x8 1.5x4 3x4 3x5 4x4 3x4 5x6 5-4-14 5-4-14 10-9-12 5-4-14 18-3-4 7-5-9 25-7-0 7-3-12 5-4-14 5-4-14 10-9-12 5-4-14 18-3-4 7-5-9 25-7-0 7-3-12 26-9-12 1-2-12 11-6-01-7-1311-6-08.0012 PlateOffsets(X,Y)-- [3:0-8-8,0-1-12], [6:0-3-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.90 0.49 0.60 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.20 0.02 (loc) 9-10 9-10 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 155 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W4,W6,W5: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 9-5-9 oc bracing. WEBS 1 Row at midpt 1-13, 2-12, 3-12, 5-10 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)13=978/Mechanical, 8=990/0-6-0(min. 0-1-14)Max Horz13=-411(LC 17) Max Uplift13=-196(LC 12), 8=-105(LC 17) MaxGrav13=1159(LC 35), 8=1187(LC 36) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-13=-1110/268, 1-14=-433/96, 2-14=-433/96, 2-15=-433/96, 15-16=-433/96,3-16=-433/96, 3-17=-669/119, 17-18=-703/99, 4-18=-720/97, 4-5=-934/74, 5-19=-1127/96, 19-20=-1266/69, 6-20=-1356/59, 6-8=-1122/148 BOT CHORD 12-13=-378/411, 11-12=0/604, 10-11=0/604, 9-10=0/1054 WEBS 1-12=-224/1008, 2-12=-581/192, 3-12=-567/197, 3-10=-94/521, 5-10=-619/269, 6-9=0/964 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 10-9-12,Exterior(2) 10-9-12 to 13-9-12zone;cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)13=196, 8=105. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T05GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:002018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-zdDY_1s_adaX2DNz_neICPdSm5y9mIOjOiXVrDzkaCv Scale=1:73.5 W1 T1 T2 W3 B1 ST1 ST1 ST1 ST1 ST1 ST2 ST3 ST4 ST5 ST6 ST7 ST8 T3 B2 W2 1 2 3 4 5 6 7 8 9 1011 12 13 14 15 1617 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 33 34 3x4 3x4 3x5 3x63x4 3x4 25-7-0 25-7-0 10-9-12 10-9-12 25-7-0 14-9-4 26-9-12 1-2-12 11-6-01-7-1311-6-08.0012 PlateOffsets(X,Y)-- [7:0-2-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.15 0.08 0.20 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.02 (loc) 17 17 18 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 191 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W1: 2x4SPF No.2OTHERS2x4SPF No.2 *Except* ST5,ST6,ST7,ST8: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 9-7-10 oc bracing,Except: 9-7-8 oc bracing: 19-206-0-0 oc bracing: 18-19. WEBS 1 Row at midpt 1-32, 2-31, 3-30, 4-29, 5-28, 6-26, 8-25, 9-24 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 25-7-0.(lb)-Max Horz32=-411(LC 17) Max UpliftAll uplift 100 lb orless at joint(s) 32, 31, 30, 29, 28, 26, 25, 24, 23, 22, 21, 20 except 18=-160(LC 15), 19=-432(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 32, 31, 30, 29, 28, 26, 25, 24, 23, 22, 21, 20 except 18=582(LC 17), 19=254(LC 15) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 12-13=-273/219, 13-34=-331/271, 14-34=-337/259, 14-15=-406/326, 15-16=-455/376, 16-18=-568/444 BOT CHORD 31-32=-380/458, 30-31=-380/458, 29-30=-380/458, 28-29=-380/458, 27-28=-380/458, 26-27=-380/458, 25-26=-380/458, 24-25=-380/458, 23-24=-380/458, 22-23=-380/458, 21-22=-380/458, 20-21=-380/458, 19-20=-380/458 WEBS 16-19=-465/569 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3) 0-1-12 to 3-1-12,Exterior(2) 3-1-12 to 10-9-12, Corner(3) 10-9-12 to 13-11-0 zone;cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.602)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding.7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing.Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T05GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:002018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-zdDY_1s_adaX2DNz_neICPdSm5y9mIOjOiXVrDzkaCv NOTES- 9)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 10)Gablestudsspaced at 2-0-0 oc. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 32, 31, 30, 29, 28, 26, 25, 24, 23, 22, 21, 20 except (jt=lb) 18=160, 19=432. 13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T06 TrussType PiggybackBase Qty 5 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:022018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-v?LIPitF6EqFHWXL5CgnHqidVvSuE4w0r00cw6zkaCt Scale=1:73.9 T1 T2 T3 B1 W3 W4 W5 W6 W6 W5 W7 W8W1 W2 W10 W9 T4 B3B2 1 2 3 4 5 6 7 8 9 17 16 15 14 13 12 11 10 18 19 20 21 22 23 24 25 264x6 5x6 5x6 3x6 3x10MT18H 4x6 3x5 3x8 3x8 4x4 3x8 3x5 5x6 3x6 4x10 3x6 6-3-6 6-3-6 12-3-5 5-11-14 21-0-12 8-9-7 28-6-10 7-5-14 36-4-0 7-9-6 6-3-6 6-3-6 12-3-5 5-11-14 16-8-0 4-4-11 21-0-12 4-4-11 28-6-10 7-5-14 36-4-0 7-9-6 38-6-12 2-2-12 3-3-1311-6-01-3-1311-6-08.0012 PlateOffsets(X,Y)-- [1:Edge,0-1-12], [3:0-3-0,0-2-3], [5:0-3-8,0-2-8], [8:0-4-8,0-1-8], [10:Edge,0-5-8], [16:0-3-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.84 0.83 0.71 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.17 -0.48 0.09 (loc) 13-15 13-15 10 l/defl >999 >905 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 206 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF 2100F 1.8E*Except*T1: 2x4SPF No.2, T2: 2x6SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except*W3,W8,W1,W2: 2x4SPFStud,W10: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-4-9 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-15, 4-15, 7-13 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)17=1661/0-6-0(min. 0-3-2), 10=2859/0-6-0(min. 0-4-15)Max Horz17=-361(LC 12) Max Uplift17=-211(LC 16), 10=-517(LC 17) MaxGrav17=1984(LC 39), 10=3154(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-18=-1913/303, 18-19=-1816/307, 19-20=-1804/310, 2-20=-1673/331, 2-21=-1992/404,3-21=-1818/440, 3-22=-1503/417, 4-22=-1504/416, 4-23=-1881/485, 5-23=-1871/483, 5-24=-2263/508, 6-24=-2312/485, 6-7=-2524/475, 7-25=-2668/456, 25-26=-3051/448, 8-26=-3084/448, 1-17=-1923/322, 8-10=-3078/660 BOT CHORD 16-17=-289/345, 15-16=-227/1519, 14-15=-187/1721, 13-14=-187/1721, 12-13=-216/2385, 11-12=-216/2385, 10-11=-98/554 WEBS 2-16=-632/168, 2-15=-162/339, 3-15=-121/689, 4-15=-757/281, 4-13=-147/554, 5-13=-1/325, 7-13=-702/283, 1-16=-212/1644, 8-11=-231/2048 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 12-3-4,Exterior(2) 12-3-4 to 25-3-10, Interior(1) 25-3-10 to 38-6-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates areMT20 plates unless otherwiseindicated.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 17=211, 10=517.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T06 TrussType PiggybackBase Qty 5 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:022018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-v?LIPitF6EqFHWXL5CgnHqidVvSuE4w0r00cw6zkaCt NOTES- 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 748 lb down and 143 lb up at 20-8-0, and 748 lb down and 143 lb up at 36-2-0 on top chord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-23=-61, 8-9=-51, 10-17=-20 Concentrated Loads(lb) Vert: 8=-650 23=-650 Trapezoidal Loads(plf) Vert: 23=-61-to-5=-62, 5=-52-to-8=-111 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T06GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:042018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-rOT3qOvVes4zXqhkDdiFMFn15iH3i66JJJVj_?zkaCr Scale=1:75.4 T1 T2 T3 B1 W1 W2 T4 B3B2 ST7ST7ST6ST5ST4ST3ST2ST1 ST7 ST7 ST6 ST5 ST4 ST3 ST2 ST1 ST8 ST9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1920 21 22 23 24 45 44 43 42 41 40 39 38 37 3635 34 33 3231 30 29 28 27 26 25 46 47 48 49 50 51 2x4 3x6 3x6 3x6 2x4 3x6 4x8 4x4 3x6 36-4-0 36-4-0 12-3-5 12-3-5 16-8-0 4-4-11 21-0-12 4-4-11 36-4-0 15-3-4 38-6-12 2-2-12 3-3-1311-6-01-3-1311-6-08.0012 PlateOffsets(X,Y)-- [8:0-3-0,0-0-2], [13:0-3-0,0-0-2] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.52 0.21 0.22 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.13 0.02 (loc) 23-24 23-24 25 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 251 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W2: 2x6SPF No.2OTHERS2x4SPF No.2 *Except* ST3,ST2,ST1,ST8,ST9: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 10-37, 9-38, 7-39, 6-40, 11-35, 12-34,14-33, 15-32 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 36-4-0. (lb)-Max Horz45=-310(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 45, 37, 38, 40, 41, 42, 43, 35, 34, 33, 32, 30, 29, 28, 27 except 25=-238(LC 13), 44=-112(LC 16), 26=-243(LC 12) MaxGravAllreactions 250 lb orless at joint(s) 45, 37, 38, 39, 40, 41, 42, 43, 44, 35, 34, 33, 32, 30, 29, 28, 27 except 25=443(LC 30), 26=297(LC 15) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 5-6=-228/265, 6-7=-292/344, 7-8=-255/296, 8-9=-259/315, 9-10=-259/315, 10-48=-259/315, 11-48=-259/315, 11-12=-259/315, 12-13=-259/315, 13-14=-255/296, 14-15=-292/368, 15-16=-228/317, 16-49=-158/281, 49-50=-167/274, 17-50=-178/269, 21-51=-316/302, 22-51=-321/283, 23-25=-306/302 BOT CHORD 44-45=-266/286, 43-44=-266/286, 42-43=-266/286, 41-42=-266/286, 40-41=-266/286, 39-40=-266/286, 38-39=-266/286, 37-38=-266/286, 36-37=-266/286, 35-36=-266/286, 34-35=-266/286, 33-34=-266/286, 32-33=-266/286, 31-32=-266/286, 30-31=-266/286, 29-30=-266/286, 28-29=-266/286, 27-28=-266/286, 26-27=-266/286, 25-26=-266/286 WEBS 22-25=-499/389 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-8-0,Interior(1) 3-8-0 to 12-3-5,Exterior(2) 12-3-5 to 26-2-6,Interior(1) 26-2-6 to 38-6-12zone;cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustryGableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 7)Provide adequate drainage to preventwater ponding.Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T06GE TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:052018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-Ja1R1kw7P9Dq9_GwmKDUvTKCr6dIRZMSYzFGWRzkaCq NOTES- 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablerequirescontinuous bottomchord bearing. 10)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).11)Gablestudsspaced at 2-0-0 oc. 12)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 45, 37, 38, 40, 41, 42, 43, 35, 34, 33, 32, 30, 29, 28, 27 except(jt=lb) 25=238, 44=112, 26=243. 14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T07 TrussType PiggybackBase Qty 5 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:062018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-onbpF4wl9TLhm8r7K2kjSgtG_Wu_Atxcmd_q3tzkaCp Scale=1:66.7 W1 T1 T2 B1 W2 W3 W4 W5 W7 W6 T3 B2 1 2 3 4 5 6 11 10 9 8 7 12 13 14 15 16 17 18 3x5 3x4 6x6 3x4 3x43x4 3x5 4x4 4x6 5x12MT18H 6-0-12 6-0-12 13-6-10 7-5-14 21-4-0 7-9-6 6-0-12 6-0-12 13-6-10 7-5-14 21-4-0 7-9-6 23-6-12 2-2-12 11-6-01-3-1311-6-08.0012 PlateOffsets(X,Y)-- [2:0-3-8,0-2-8], [5:0-5-0,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 1.00 0.56 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.20 0.03 (loc) 7-8 7-8 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 125 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except*T1: 2x6SPF No.2, T3: 2x4SPF 1650F 1.5E BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except*W5: 2x4SPFStud,W7: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-11, 4-10 2 Rows at 1/3 pts 2-11 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)11=1400/0-6-0(min. 0-2-5), 7=2044/0-4-0(min. 0-3-9)Max Horz11=-449(LC 17) Max Uplift11=-331(LC 17), 7=-342(LC 17) MaxGrav11=1463(LC 35), 7=2266(LC 36) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-11=-358/109, 2-15=-678/120, 15-16=-791/103, 3-16=-817/101, 3-4=-1081/87,4-17=-1366/130, 17-18=-1751/121, 5-18=-1784/119, 5-7=-2194/418 BOT CHORD 10-11=-22/724, 9-10=0/1305, 8-9=0/1305, 7-8=-94/538 WEBS 2-11=-1426/368, 2-10=-113/682, 4-10=-839/309, 5-8=0/991 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 6-0-12,Exterior(2) 6-0-12 to 9-0-12 zone;cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding. 7)All plates areMT20 plates unless otherwiseindicated. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=331, 7=342. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1. 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 707 lb down and 143 lb up at 5-2-0, and 707 lb down and 143 lb up at 21-2-0 on top chord.The design/selection of suchconnection device(s)is theresponsibility of others. LOADCASE(S)StandardContinued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T07 TrussType PiggybackBase Qty 5 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:062018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-onbpF4wl9TLhm8r7K2kjSgtG_Wu_Atxcmd_q3tzkaCp LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf)Vert: 1-14=-61, 5-6=-51, 7-11=-20 Concentrated Loads(lb) Vert: 5=-650 14=-650 Trapezoidal Loads(plf) Vert: 14=-61-to-2=-64, 2=-54-to-5=-111 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T08 TrussType PiggybackBaseGirder Qty 1 Ply 3 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:082018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-k9iagmy?h4bO0R?VSTnBX5ycqKYVekHuExTw7mzkaCn Scale=1:59.5 T2 T3 W7 B1 W1 W2 W3 W4 W5 W6 W7 W8 W7 W8T1 B2 HW11 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3x4 1.5x4 8x8 6x16MT18H 5x6 6x8 3x4 3x6 8x8 5x6 10x10 5x8 8x8 5x8 5x6 5x6 5-5-11 5-5-11 10-7-13 5-2-3 15-10-0 5-2-3 21-0-2 5-2-3 25-0-1 3-11-15 29-0-0 3-11-15 5-5-11 5-5-11 10-7-13 5-2-3 15-10-0 5-2-3 21-0-2 5-2-3 25-0-1 3-11-15 29-0-0 3-11-15 1-2-1510-0-05.0012 PlateOffsets(X,Y)-- [1:0-11-2,Edge], [7:0-5-4,0-2-0], [8:0-2-8,0-2-0], [11:0-2-8,0-2-0], [12:0-3-8,0-4-0], [13:0-3-8,0-5-12], [15:0-3-8,0-6-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.98 0.63 0.91 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.45 0.06 (loc) 15-16 15-16 10 l/defl >999 >763 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 678 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except*T1: 2x4SPF 2100F 1.8E BOT CHORD2x8SP 2400F 2.0E WEBS 2x4SPFStud*Except*W7,W6: 2x4SPF No.2, W8: 2x4SPF 1650F 1.5E SLIDER Left 2x8SP 2400F 2.0E 2-6-0 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-11-15 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 9-10 REACTIONS.(lb/size)10=9412/0-6-0(min. 0-2-10), 1=8670/0-6-0(min. 0-2-7) Max Horz1=358(LC 12) Max Uplift10=-1716(LC 8), 1=-1549(LC 12)MaxGrav10=9415(LC 31), 1=8851(LC 31) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-7263/1206, 2-3=-14130/2482, 3-21=-13632/2356, 4-21=-13581/2372, 4-5=-10240/1767, 5-6=-10088/1789, 6-22=-6173/1083, 7-22=-6081/1097, 7-8=-3343/611 BOT CHORD 1-24=-2553/12826, 24-25=-2553/12826, 16-25=-2553/12826, 16-26=-2553/12826, 26-27=-2553/12826, 27-28=-2553/12826, 15-28=-2553/12826, 15-29=-2408/12587, 14-29=-2408/12587, 14-30=-2408/12587, 13-30=-2408/12587, 13-31=-1772/9366, 31-32=-1772/9366, 12-32=-1772/9366, 12-33=-1062/5727, 33-34=-1062/5727, 11-34=-1062/5727, 11-35=-611/3343, 35-36=-611/3343, 10-36=-611/3343 WEBS 3-16=-203/835, 3-15=-370/168, 4-15=-692/4015, 4-13=-4574/904, 6-13=-1121/6328, 6-12=-6422/1249, 7-12=-1410/7797, 7-11=-6180/1171, 8-11=-1465/8147, 8-10=-8913/1627 NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:Topchordsconnected as follows: 2x4- 1 row at 0-4-0 oc. Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-6-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc.2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)Provide adequate drainage to preventwater ponding. 7)All plates areMT20 plates unless otherwiseindicated. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T08 TrussType PiggybackBaseGirder Qty 1 Ply 3 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:082018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-k9iagmy?h4bO0R?VSTnBX5ycqKYVekHuExTw7mzkaCn NOTES- 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 10=1716, 1=1549. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1140 lb down and 215 lb up at 2-0-12, 1140 lb down and 215 lb up at 4-0-12, 1140 lb down and 215 lb up at 6-0-12, 1140 lb down and 215 lb up at 8-0-12, 1140 lb down and 215 lb up at 10-0-12, 1140 lb down and 215 lb up at 12-0-12, 1140lb down and 215 lb up at 14-0-12, 1140 lb down and 215 lb up at 16-0-12, 1140 lb down and 215 lb up at 18-0-12, 1140 lb down and 215 lb up at 20-0-12, 1139 lb down and 216 lb up at 22-0-12, 1139 lb down and 216 lb up at 24-0-12, and 1139 lb down and 216 lb up at 26-0-12, and 1141 lb down and 214 lb up at 28-0-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-7=-51, 7-9=-61, 10-17=-20Concentrated Loads(lb) Vert: 13=-1140(F) 24=-1140(F) 25=-1140(F) 26=-1140(F) 27=-1140(F) 28=-1140(F) 29=-1140(F) 30=-1140(F) 31=-1140(F) 32=-1140(F) 33=-1139(F) 34=-1139(F) 35=-1139(F) 36=-1141(F) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T09 TrussType PiggybackBase Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:092018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-CMGyt6zeSOjFdbZi?AIQ3JVrdjvdNEi2SbDUgCzkaCm Scale=1:63.3 T2 T3 W7 B1 W3 W4 W5 W6 W7 W8 W9 W1 W2 T1 B2 1 2 3 4 5 6 7 13 12 11 10 9 8 14 15 16 17 1819 20 3x4 4x6 1.5x4 3x43x43x4 3x4 5x6 3x4 3x4 5x8 4x4 5x6 7-2-6 7-2-6 14-1-4 6-10-14 21-0-2 6-10-14 29-0-0 7-11-14 7-2-6 7-2-6 14-1-4 6-10-14 21-0-2 6-10-14 24-10-5 3-10-3 29-0-0 4-1-11 1-2-1510-0-05.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.72 0.57 0.70 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.27 0.05 (loc) 8-9 8-9 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 153 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 *Except* W3,W5,W1,W2: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-4-2 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 8-2-15 oc bracing. WEBS 1 Row at midpt 7-8, 4-9, 5-9, 6-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)8=1084/0-6-0(min. 0-1-13), 13=1027/0-6-0(min. 0-1-14) Max Horz13=341(LC 16)Max Uplift8=-202(LC 12), 13=-156(LC 16) MaxGrav8=1148(LC 2), 13=1208(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-2009/223, 2-14=-1948/241, 2-15=-1655/175, 3-15=-1562/176, 3-4=-1465/204, 4-16=-924/102, 16-17=-796/107, 5-17=-794/121, 5-6=-734/151, 1-13=-1138/193BOT CHORD 12-13=-394/293, 11-12=-508/1799, 10-11=-350/1442, 9-10=-350/1442, 8-9=-97/407 WEBS 2-11=-431/181, 4-11=-12/425, 4-9=-984/278, 6-9=-184/935, 6-8=-1057/258, 1-12=-114/1637 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 21-0-2,Exterior(2) 21-0-2 to 25-3-1 zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)8=202, 13=156. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T10 TrussType PiggybackBase Qty 7 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:102018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-gYqK4RzGDir6Fl8uZupfcW1_C7Du6ddBhFy1CezkaCl Scale=1:71.0 T2 T3 T4 B1 W3 W4 W5 W6 W7 W8 W7 W8 W7 W1 W2 W10 W9 T1 B1B2 1 2 3 4 5 6 7 8 17 16 15 14 13 12 11 10 9 18 19 20 21 22 23 24 25 263x6 5x8 4x4 3x6 3x4 6x6 3x4 3x4 3x4 5x8 1.5x4 4x8 4x6 6x8 3x4 4x6 3x6 7-2-6 7-2-6 14-1-4 6-10-14 21-0-2 6-10-14 26-10-13 5-10-10 32-9-7 5-10-10 39-0-0 6-2-9 7-2-6 7-2-6 14-1-4 6-10-14 21-0-2 6-10-14 26-10-13 5-10-10 32-9-7 5-10-10 39-0-0 6-2-9 1-2-1510-0-07-4-1510-0-05.0012 PlateOffsets(X,Y)-- [5:0-5-4,0-2-4], [7:0-5-4,0-2-4], [16:0-3-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.86 0.69 0.98 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.15 -0.39 0.10 (loc) 15-16 13-15 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 207 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W3,W5,W1,W2,W10: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals.BOT CHORD Rigidceiling directly applied or 7-10-8 oc bracing. WEBS 1 Row at midpt 4-13, 5-11, 6-11, 7-10, 8-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)17=1407/0-6-0(min. 0-2-8), 9=1452/0-6-0(min. 0-2-7) Max Horz17=282(LC 16)Max Uplift17=-217(LC 16), 9=-204(LC 12) MaxGrav17=1578(LC 38), 9=1548(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-18=-2724/339, 2-18=-2662/358, 2-19=-2478/342, 3-19=-2385/343, 3-4=-2288/371, 4-20=-1783/323, 20-21=-1773/336, 5-21=-1674/355, 5-22=-1342/330, 6-22=-1342/330,6-23=-1342/330, 23-24=-1342/330, 7-24=-1342/330, 7-25=-917/220, 25-26=-920/205, 8-26=-987/201, 1-17=-1505/253, 8-9=-1493/321 BOT CHORD 16-17=-339/269, 15-16=-556/2457, 14-15=-414/2202, 13-14=-414/2202, 12-13=-275/1554, 11-12=-275/1554, 10-11=-136/836 WEBS 2-15=-313/164, 4-15=0/397, 4-13=-938/264, 5-13=-105/782, 5-11=-574/154, 6-11=-570/188, 7-11=-186/1010, 7-10=-833/238, 1-16=-219/2282, 8-10=-206/1276 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 21-0-2,Exterior(2) 21-0-2 to 37-0-6, Interior(1) 37-0-6 to 38-10-4zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 17=217, 9=204. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T11 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:122018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-cwy4V7?WlJ5qU3IGhIr7hx7S5x_haZ6U9ZR8GXzkaCj Scale=1:92.6 0-1-100-1-10T2 T3 T4 B1 B2 B3 W3 W4 W5 W7 W6 W8 W9 W10 W11 W12 W13 W12 W11 W14 W15 W16 W17 W1 W2 W1 W18 T1 T5 B41 2 3 4 5 6 7 8 9 10 11 12 13 14 28 27 26 25 24 23 22 21 20 19 18 17 16 15 29 30 31 32 33 34 35 36 4x6 6x6 6x6 4x6 3x5 3x4 3x4 4x6 4x4 6x6 5x10 4x4 6x10 4x12 2x4 3x6 2x4 3x8 3x5 4x4 3x5 4x4 6x6 5x8 3x5 6x8 4x6 5-3-0 5-3-0 10-2-8 4-11-8 15-2-0 4-11-8 18-7-9 3-5-9 22-1-2 3-5-9 26-10-13 4-9-11 31-8-8 4-9-11 37-4-8 5-8-0 43-0-8 5-8-0 49-0-0 5-11-8 5-3-0 5-3-0 10-2-8 4-11-8 15-2-0 4-11-8 18-7-9 3-5-9 22-1-2 3-5-9 26-10-13 4-9-11 31-8-8 4-9-11 37-4-8 5-8-0 43-0-8 5-8-0 49-0-0 5-11-8 49-10-12 0-10-12 1-2-1510-3-1210-5-61-2-152-0-05.0012 PlateOffsets(X,Y)-- [24:0-3-8,0-2-12], [26:0-1-12,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.32 0.35 0.85 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.23 -0.54 0.24 (loc) 23-24 23-24 15 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 341 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SP 2400F 2.0EBOT CHORD2x4SP 2400F 2.0E*Except* B2: 2x4SPFStud WEBS 2x4SPFStud*Except*W7,W11,W12,W13,W14,W2,W18: 2x4SPF No.2, W1: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-8-12 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-22, 7-21 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)28=1761/0-6-0(min. 0-1-11), 15=1829/0-6-0(min. 0-1-12)Max Horz28=166(LC 16) Max Uplift28=-260(LC 16), 15=-239(LC 17) MaxGrav28=2013(LC 39), 15=2136(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-3345/517, 2-29=-3578/563, 3-29=-3493/574, 3-4=-4624/774, 4-5=-4535/784,5-6=-4579/846, 6-7=-3359/688, 7-30=-3017/652, 8-30=-3018/652, 8-31=-3018/652, 31-32=-3017/652, 9-32=-3016/652, 9-10=-3147/623, 10-33=-3429/627, 11-33=-3463/621, 11-34=-3518/612, 12-34=-3575/608, 12-35=-3480/546, 35-36=-3482/537, 13-36=-3563/522, 1-28=-1946/346, 13-15=-2066/423 BOT CHORD 27-28=-212/319, 26-27=-519/3026, 5-24=-311/137, 23-24=-504/3576, 22-23=-504/3576, 21-22=-396/3055, 20-21=-325/2815, 19-20=-325/2815, 18-19=-413/3248, 17-18=-413/3248, 16-17=-410/3212, 15-16=-82/464 WEBS 2-27=-434/136, 2-26=-9/295, 3-26=-1384/266, 24-26=-516/3478, 3-24=-151/1083, 6-24=-295/1277, 6-22=-1118/271, 7-22=-190/1076, 7-21=-190/268, 8-21=-484/158, 9-21=-124/629, 9-19=-83/539, 10-19=-608/203, 12-16=-359/134, 1-27=-372/2754, 13-16=-354/2785 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 5-3-0,Interior(1) 5-3-0 to 22-1-2,Exterior(2) 22-1-2 to 38-7-10,Interior(1) 38-7-10 to 49-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T11 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:122018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-cwy4V7?WlJ5qU3IGhIr7hx7S5x_haZ6U9ZR8GXzkaCj NOTES- 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 28=260, 15=239. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T12 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:142018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-ZJ3rwp1mHwLYkMSfojubmMCptkfX2U?nctwFLQzkaCh Scale=1:92.4 0-1-100-1-10T2 T3 T2 B1 B2 B3W3W4 W5 W7 W6 W8 W9 W10 W11 W10 W9 W12 W13 W14 W15 W1 W2 W1W16 T1 T4 B5B41 2 3 4 5 6 7 8 9 10 11 12 13 26 25 24 23 22 21 20 19 18 17 16 15 14 27 28 29 3031 32 33 34 4x6 6x8 6x6 4x6 3x5 3x4 3x4 4x6 4x4 6x6 4x12 4x4 6x10 2x4 2x4 4x8 3x5 4x4 3x5 4x4 6x6 5x8 3x5 6x8 4x6 5-3-0 5-3-0 10-2-8 4-11-8 15-2-0 4-11-8 20-1-2 4-11-2 26-10-13 6-9-11 33-8-8 6-9-11 38-8-8 5-0-0 43-8-8 5-0-0 49-0-0 5-3-8 5-3-0 5-3-0 10-2-8 4-11-8 15-2-0 4-11-8 20-1-2 4-11-2 26-10-13 6-9-11 33-8-8 6-9-11 38-8-8 5-0-0 43-8-8 5-0-0 49-0-0 5-3-8 49-10-12 0-10-12 1-2-159-5-129-7-61-2-152-0-05.0012 PlateOffsets(X,Y)-- [6:0-2-0,0-1-12], [22:0-3-8,0-3-0], [24:0-3-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.30 0.33 0.83 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.52 0.23 (loc) 21-22 21-22 14 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 321 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SP 2400F 2.0EBOT CHORD2x4SP 2400F 2.0E*Except* B2: 2x4SPFStud WEBS 2x4SPFStud*Except*W7,W8,W10,W2,W16: 2x4SPF No.2, W1: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-10-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-20 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)26=1779/0-6-0(min. 0-1-10), 14=1851/0-6-0(min. 0-1-12)Max Horz26=151(LC 16) Max Uplift26=-243(LC 16), 14=-242(LC 13) MaxGrav26=1974(LC 39), 14=2089(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-3283/522, 2-27=-3481/575, 3-27=-3442/588, 3-28=-4418/785, 4-28=-4404/796,4-29=-4334/797, 5-29=-4322/806, 5-6=-4397/895, 6-7=-3327/701, 7-30=-3327/701, 30-31=-3327/701, 8-31=-3325/701, 8-9=-3124/637, 9-32=-3339/636, 10-32=-3351/626, 10-11=-3422/624, 11-33=-3258/546, 33-34=-3265/536, 12-34=-3353/525, 1-26=-1908/349, 12-14=-2023/422 BOT CHORD 25-26=-196/314, 24-25=-487/2970, 5-22=-342/179, 21-22=-456/3212, 20-21=-457/3209, 19-20=-360/2838, 18-19=-360/2838, 17-18=-435/3112, 16-17=-435/3112, 15-16=-413/3014, 14-15=-71/433 WEBS 2-25=-425/137, 2-24=-11/251, 3-24=-1317/271, 22-24=-528/3377, 3-22=-162/1015, 6-22=-344/1446, 6-21=0/265, 6-20=-125/397, 7-20=-691/228, 8-20=-153/837, 8-18=-58/463, 9-18=-468/178, 11-16=-25/279, 11-15=-401/137, 1-25=-377/2708, 12-15=-369/2625 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 5-3-0,Interior(1) 5-3-0 to 20-1-2,Exterior(2) 20-1-2 to 40-7-10,Interior(1) 40-7-10 to 49-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T12 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:142018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-ZJ3rwp1mHwLYkMSfojubmMCptkfX2U?nctwFLQzkaCh NOTES- 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 26=243, 14=242. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T13 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:152018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-1VdD891P2ETPLW1rMRPqJal_18?PnxpwrXgotszkaCg Scale=1:94.8 0-1-100-1-10T2 T3 T5 B1 B2 B3W3W4 W5 W7 W6 W8 W9 W10 W11 W10 W11 W10 W9 W12 W13 W14 W15 W1 W2 W1W16 T1 T4 B5B4 12 3 4 5 6 7 8 9 10 11 12 13 14 15 28 27 26 25 24 23 22 21 2019 18 17 16 29 30 31 32 33 34 35 36 37 4x6 6x8 4x6 3x5 3x4 3x4 4x4 6x6 4x10 4x4 6x10 2x4 5x8 2x4 4x4 3x8 6x6 3x5 4x4 3x5 4x4 6x6 6x8 3x5 6x8 4x6 5-3-0 5-3-0 10-2-8 4-11-8 15-2-0 4-11-8 18-1-2 2-11-2 23-11-0 5-9-14 29-10-10 5-11-10 35-8-8 5-9-14 40-0-8 4-4-0 44-4-8 4-4-0 49-0-0 4-7-8 -0-10-12 0-10-12 5-3-0 5-3-0 10-2-8 4-11-8 15-2-0 4-11-8 18-1-2 2-11-2 23-11-0 5-9-14 29-10-10 5-11-10 35-8-8 5-9-14 40-0-8 4-4-0 44-4-8 4-4-0 49-0-0 4-7-8 49-10-12 0-10-12 1-2-158-7-128-9-61-2-152-0-05.0012 PlateOffsets(X,Y)-- [7:0-2-0,0-2-0], [21:0-3-8,0-1-8], [22:0-4-0,0-3-0], [24:0-3-12,0-2-12], [26:0-1-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.28 0.35 0.79 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.55 0.24 (loc) 22 22-23 16 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 327 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SP 2400F 2.0EBOT CHORD2x4SP 2400F 2.0E*Except* B2: 2x4SPFStud WEBS 2x4SPFStud*Except*W7,W10,W2,W16: 2x4SPF No.2, W1: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)28=1855/0-6-0(min. 0-1-11), 16=1872/0-6-0(min. 0-1-11) Max Horz28=152(LC 16)Max Uplift28=-250(LC 16), 16=-269(LC 13) MaxGrav28=2009(LC 2), 16=2046(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-3205/501, 3-29=-3131/513, 4-29=-3131/522, 4-30=-3352/596, 5-30=-3272/609, 5-31=-4268/801, 6-31=-4199/821, 6-7=-4183/881, 7-8=-3852/765, 8-32=-3850/763,9-32=-3850/763, 9-33=-3850/763, 10-33=-3850/763, 10-34=-3697/732, 11-34=-3697/732, 11-12=-3227/645, 12-35=-3296/637, 13-35=-3327/625, 13-36=-2983/538, 36-37=-2992/530, 14-37=-3095/520, 2-28=-1944/407, 14-16=-1984/423 BOT CHORD 27-28=-204/400, 26-27=-497/2890, 23-24=-522/3488, 22-23=-524/3485, 21-22=-523/3694, 20-21=-393/2947, 19-20=-393/2947, 18-19=-447/3045, 17-18=-412/2762, 16-17=-60/394 WEBS 4-27=-395/133, 4-26=-23/302, 5-26=-1244/287, 24-26=-553/3229, 5-24=-140/1083, 7-24=-268/1115, 7-22=-125/678, 8-22=-546/182, 10-22=-93/358, 10-21=-715/214, 11-21=-192/1137, 11-19=-49/354, 12-19=-336/151, 13-18=-44/430, 13-17=-451/141, 2-27=-357/2548, 14-17=-378/2447 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 4-0-1,Interior(1) 4-0-1 to 18-1-2,Exterior(2) 18-1-2 to 42-7-10, Interior(1) 42-7-10 to 49-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)28=250, 16=269. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T13 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:162018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-ViBbLV21pYbGzgc2w8w3rnH9nYLeWO343BPLPIzkaCf LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T14 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:172018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-zulzYr3farj7bqBETsRIO?qLcyecFppDIr9vykzkaCe Scale=1:93.6 0-1-100-1-10T2 T3 T5 B1 B2 B3W3W4 W5 W7 W6 W8 W10 W11 W10 W11 W10 W11 W10 W9 W12 W13 W1 W2 W1W14T1 T4 B5B4 1 2 3 45 6 7 8 9 10 11 12 13 14 15 29 28 27 26 25 24 23 22 21 20 19 18 17 16 3031 32 33 34 35 36 37 38 39 4x6 6x8 4x6 10x12 3x4 3x4 6x6 4x4 6x6 5x10 4x4 6x10 2x4 4x4 4x4 2x4 4x8 4x4 4x6 6x6 4x4 4x4 6x6 10x124x6 5-3-0 5-3-0 10-2-8 4-11-8 15-2-0 4-11-8 16-1-2 0-11-2 21-5-1 5-4-0 26-10-13 5-5-12 32-4-8 5-5-12 37-8-8 5-4-0 43-2-8 5-6-0 49-0-0 5-9-8 -0-10-12 0-10-12 5-3-0 5-3-0 10-2-8 4-11-8 15-2-0 4-11-8 16-1-2 0-11-2 21-5-1 5-4-0 26-10-13 5-5-12 32-4-8 5-5-12 37-8-8 5-4-0 43-2-8 5-6-0 49-0-0 5-9-8 49-10-12 0-10-12 1-2-157-9-127-11-61-2-152-0-05.0012 PlateOffsets(X,Y)-- [7:0-2-8,0-2-8], [16:0-5-4,0-2-0], [16:0-3-6,0-1-6], [17:0-3-0,0-2-8], [25:0-3-12,0-2-12], [27:0-1-12,0-2-8], [28:0-3-0,0-2-8], [29:0-3-6,0-1-6], [29:0-5-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.21 0.56 0.95 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.25 -0.58 0.20 (loc) 22-23 22-23 16 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 363 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x6SP 2400F 2.0EBOT CHORD2x6SP 2400F 2.0E*Except* B2: 2x4SPFStud WEBS 2x4SPFStud*Except*W7,W10: 2x4SPF No.2, W1: 2x8SP 2400F 2.0E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-8-4 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)29=1871/0-6-0(min. 0-1-11), 16=1893/0-6-0(min. 0-1-11) Max Horz29=140(LC 16)Max Uplift29=-274(LC 12), 16=-298(LC 13) MaxGrav29=2008(LC 2), 16=2008(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-30=-3180/516, 30-31=-3094/527, 3-31=-3086/536, 3-32=-3349/607, 32-33=-3315/615, 4-33=-3257/626, 4-5=-3246/628, 5-6=-4322/827, 6-7=-4179/849, 7-8=-4648/840,8-34=-4747/832, 34-35=-4747/832, 9-35=-4747/832, 9-10=-4747/832, 10-36=-4747/832, 11-36=-4747/832, 11-37=-4285/768, 12-37=-4282/768, 12-13=-3494/641, 13-38=-3155/595, 38-39=-3158/587, 14-39=-3252/573, 2-29=-1890/406, 14-16=-1891/430 BOT CHORD 28-29=-217/699, 27-28=-507/2849, 6-25=-8/276, 24-25=-598/3940, 23-24=-598/3933, 22-23=-656/4646, 21-22=-584/4282, 20-21=-584/4282, 19-20=-423/3232, 18-19=-423/3232, 17-18=-457/2913, 16-17=-125/740 WEBS 3-28=-384/132, 3-27=-30/367, 5-27=-1249/293, 25-27=-554/3190, 5-25=-143/1204, 7-25=-163/545, 7-24=-6/330, 7-23=-174/1015, 8-23=-614/194, 9-22=-454/153, 11-22=-104/652, 11-20=-964/243, 12-20=-247/1496, 13-18=-98/406, 13-17=-342/144, 2-28=-319/2185, 14-17=-353/2214 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 4-0-1,Interior(1) 4-0-1 to 16-1-2,Exterior(2) 16-1-2 to 44-7-10, Interior(1) 44-7-10 to 49-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers andforces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 29=274, 16=298.Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T14 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:172018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-zulzYr3farj7bqBETsRIO?qLcyecFppDIr9vykzkaCe NOTES- 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T15 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:192018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-vHtkzW4v6Tzrq8KdbHTmTQvhYlL6jlaWm9e00dzkaCc Scale=1:93.2 0-1-100-1-10T2 T3 T5 B1 B2 B3 W1 W2 W3 W4 W5 W6 W7 W9 W8 W10 W11W12 W11W12 W11W12 W11 W12W11 W12 W13 W14 W15W16W17 HW1 HW2 T1 T4 B5B4 12 3 4 5 6 78 9 10 11 12 13 14 15 16 17 18 19 35 34 33 3231 30 29 28 27 26 25 24 23 22 21 20 44 4546 47 48 49 6x8 8x12MT18H 6x8 6x8 12x18MT18H 3x10MT18H 8x8 4x8 4x6 3x6 4x6 4x6 12x18MT18H 5x8 3x6 3x6 5x8 8x8 4x6 4x8 3x6 6x86x8 3-6-9 3-6-9 7-0-12 3-6-3 10-6-15 3-6-3 14-1-2 3-6-3 15-2-0 1-0-14 19-1-15 3-11-15 23-3-9 4-1-11 27-5-4 4-1-11 31-6-15 4-1-11 35-8-9 4-1-11 39-8-8 3-11-15 42-9-9 3-1-1 45-10-9 3-1-1 49-0-0 3-1-7 -0-10-12 0-10-12 3-6-9 3-6-9 7-0-12 3-6-3 10-6-15 3-6-3 14-1-2 3-6-3 15-2-0 1-0-14 19-1-15 3-11-15 23-3-9 4-1-11 27-5-4 4-1-11 31-6-15 4-1-11 35-8-9 4-1-11 39-8-8 3-11-15 42-9-9 3-1-1 45-10-9 3-1-1 49-0-0 3-1-7 49-10-12 0-10-12 1-2-156-11-127-1-61-2-152-0-05.0012 PlateOffsets(X,Y)-- [2:0-3-3,0-3-0], [7:0-8-4,0-2-8], [8:0-6-8,0-1-0], [15:0-4-0,0-3-0], [18:0-3-3,0-3-0], [30:0-6-0,0-8-12], [31:0-2-12,0-0-0], [31:0-1-8,0-7-8], [32:0-2-12,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.18 0.49 0.81 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.28 -0.62 0.22 (loc) 28 28 18 l/defl >999 >932 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 530 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x8SP 2400F 2.0E*Except*T3,T4: 2x10SP 2400F 2.0E BOT CHORD2x10SP 2400F 2.0E*Except* B2: 2x6SP 2400F 2.0EWEBS2x4SPFStud*Except* W7,W9,W8,W10: 2x6SP 2400F 2.0E SLIDER Left 2x4SP 2400F 2.0E 3-2-9, Right 2x4SP 2400F 2.0E 2-9-0 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-4-2 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 30-31. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)2=1891/0-6-0(min. 0-1-11), 18=1916/0-6-0(min. 0-1-11) Max Horz2=155(LC 16)Max Uplift2=-294(LC 12), 18=-323(LC 13) MaxGrav2=2009(LC 2), 18=2009(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-1569/278, 3-44=-3517/627, 4-44=-3501/641, 4-5=-3534/652, 5-6=-3499/665, 6-7=-3768/708, 7-8=-4386/797, 8-9=-4700/840, 9-45=-6283/1027, 45-46=-6283/1027, 10-46=-6283/1027, 10-11=-6229/1013, 11-12=-6229/1013, 12-13=-6229/1013, 13-47=-5798/947, 14-47=-5798/947, 14-15=-4929/813, 15-16=-3973/679, 16-48=-3692/643, 17-48=-3698/633, 17-49=-1516/279, 18-49=-1536/272 BOT CHORD 2-35=-482/2696, 34-35=-487/2709, 33-34=-567/3232, 32-33=-533/3262, 31-32=-128/853, 30-31=-830/120, 8-30=-86/742, 29-30=-880/5991, 28-29=-880/5991, 27-28=-922/6283, 26-27=-922/6283, 25-26=-842/5798, 24-25=-700/4925, 23-24=-700/4925, 22-23=-503/3713, 21-22=-506/3410, 20-21=-439/2714, 18-20=-434/2698 WEBS 3-35=-283/89, 3-34=-94/693, 4-33=-253/110, 6-33=-531/114, 6-32=-114/365, 7-32=-4051/589, 30-32=-848/5825, 7-30=-700/4800, 9-30=-1823/297, 9-29=0/307, 9-28=-72/416, 11-26=-340/113, 13-26=-94/615, 13-25=-815/193, 14-25=-203/1245,14-23=-1278/274, 15-23=-291/1790, 16-22=-58/438, 16-21=-388/97, 17-21=-107/821, 17-20=-312/90 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 4-0-1,Interior(1) 4-0-1 to 14-1-2,Exterior(2) 14-1-2 to 46-7-10, Interior(1) 46-7-10 to 49-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T15 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:192018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-vHtkzW4v6Tzrq8KdbHTmTQvhYlL6jlaWm9e00dzkaCc NOTES- 6)Provide adequate drainage to preventwater ponding. 7)All plates areMT20 plates unless otherwiseindicated. 8)All plates are 5x6MT20 unless otherwiseindicated.9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=294, 18=323. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T16 TrussType HipGirder Qty 1 Ply 3 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:212018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-rf?UOC69d4EY3RU?ihWEYr_2UZ4SBgopDT765WzkaCa Scale=1:91.8 0-1-100-1-10T1 T2 T4 B1 B2 B3 W1 W2 W3 W4 W5 W7 W6 W8 W9 W10 W9 W10 W9 W10 W9 W10 W9 W10 W11W12W13 T3 B5B4 HW1 HW2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 30 29 28 27 26 25 24 23 22 21 20 19 18 17 39 40 41 42 43 44 454647 48 49 50 51 8x8 6x8 6x8 3x6 3x6 8x12MT18H 8x8 4x84x6 3x6 4x6 6x12 5x8 3x6 3x6 5x8 8x8 4x8 4x6 3x66x8 6x8 4-1-114-1-11 7-11-143-10-3 11-10-23-10-3 13-6-11-7-1515-2-01-7-15 19-6-74-4-7 24-0-94-6-3 28-6-124-6-3 33-0-154-6-3 37-7-14-6-3 41-11-84-4-7 45-4-03-4-8 49-0-03-8-0 -0-10-120-10-12 4-1-114-1-11 7-11-143-10-3 11-10-23-10-3 13-6-11-7-1515-2-01-7-15 19-6-74-4-7 24-0-94-6-3 28-6-124-6-3 33-0-154-6-3 37-7-14-6-3 41-11-84-4-7 45-4-03-4-8 49-0-03-8-0 49-10-120-10-12 1-2-156-0-86-2-21-2-152-0-05.0012 PlateOffsets(X,Y)-- [2:0-3-3,0-3-0], [5:0-4-4,0-2-12], [13:0-4-0,0-3-0], [15:0-3-3,0-3-0], [26:0-3-12,0-4-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.09 0.25 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.28 -0.62 0.15 (loc) 24 23-24 15 l/defl >999 >941 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 1524 lbFT= 20% GRIP 197/144 244/190 LUMBER- TOP CHORD2x8SP 2400F 2.0E*Except*T2,T3: 2x10SP 2400F 2.0E BOT CHORD2x10SP 2400F 2.0E*Except* B2: 2x6SP 2400F 2.0EWEBS2x4SPFStud*Except* W5,W7,W6,W8: 2x6SP 2400F 2.0E SLIDER Left 2x4SP 2400F 2.0E 3-10-5, Right 2x4SP 2400F 2.0E 3-4-2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)2=3868/0-6-0(min. 0-1-8), 15=3823/0-6-0(min. 0-1-8) Max Horz2=139(LC 12)Max Uplift2=-1037(LC 8), 15=-1030(LC 9) MaxGrav2=4130(LC 2), 15=4050(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-39=-4228/1063, 2-3=-4458/1144, 3-4=-8089/2146, 4-5=-8388/2311, 5-6=-14888/4186, 6-40=-15129/4253, 7-40=-15129/4253, 7-8=-18201/5228, 8-41=-17723/5031, 9-41=-17723/5031, 9-10=-17723/5031, 10-42=-17723/5031, 11-42=-17723/5031, 11-12=-15815/4370, 12-43=-11950/3226, 13-43=-11947/3227, 13-14=-8198/2171, 14-15=-4069/1057 BOT CHORD 2-30=-1509/5793, 29-30=-1521/5831, 28-29=-1976/7505, 27-28=-204/747, 26-27=-283/1179, 6-26=-412/139, 26-44=-4946/17546, 44-45=-4946/17546, 25-45=-4946/17546, 25-46=-4946/17546, 46-47=-4946/17546, 24-47=-4946/17546, 24-48=-5148/18201, 48-49=-5148/18201, 23-49=-5148/18201, 23-50=-4291/15815, 22-50=-4291/15815, 22-51=-4291/15815, 21-51=-4291/15815, 20-21=-3144/11946, 19-20=-3144/11946, 18-19=-1983/7761, 17-18=-1354/5373, 15-17=-1338/5318 WEBS 3-30=-964/305, 3-29=-534/1996, 4-29=-701/253, 4-28=-322/526, 5-28=-4598/1325,26-28=-2249/8394, 5-26=-2929/10381, 7-26=-3053/958, 7-25=-215/736, 7-24=-258/862, 8-24=-184/272, 8-23=-625/247, 10-23=-309/130, 11-23=-817/2435, 11-21=-1702/594, 12-21=-1416/4839, 12-19=-3364/1016, 13-19=-1471/5302, 13-18=-659/236,14-18=-744/2865, 14-17=-1297/381 NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc, 2x10- 2 rowsstaggered at 0-9-0 oc. Bottomchordsconnected as follows: 2x10- 2 rowsstaggered at 0-4-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc.Websconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T16 TrussType HipGirder Qty 1 Ply 3 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:212018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-rf?UOC69d4EY3RU?ihWEYr_2UZ4SBgopDT765WzkaCa NOTES- 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone; cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15PlateDOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 8)Provide adequate drainage to preventwater ponding. 9)All plates areMT20 plates unless otherwiseindicated. 10)All plates are 5x6MT20 unless otherwiseindicated. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=1037, 15=1030.13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 14) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1057 lb down and 280 lb up at 14-11-4, 245 lb down and 117 lb up at 16-10-12, 245 lb down and 117 lb up at 18-10-12, 245 lb down and 117 lb up at 20-10-12, 245 lb down and 117 lb up at 22-10-12, 245 lb down and 117 lb up at 24-10-12, 245 lb down and 117 lb up at 26-10-12, 245 lb down and 117 lb up at 28-10-12, and 245 lb down and 117 lb up at 30-10-12, and 1144 lb down and 264 lb up at 32-7-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-5=-51, 5-13=-61, 13-16=-51, 27-31=-20, 26-35=-20 Concentrated Loads(lb) Vert: 27=-948(B) 22=-233 44=-233 45=-233 46=-233 47=-233 48=-233 49=-233 50=-233 51=-1026(B) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T17 TrussType Roof Special Qty 3 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:222018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-KsYscY7oOOMPhb3BGP1T52X4DzJvwDDyS7sgdyzkaCZ Scale=1:30.8 T1 T2 B1 B2 B3 B2 B4 W2 W4 W3 W5 W4 W3W2 W1 W61 2 3 4 5 6 7 8 17 16 15 14 13 12 11 10 9 18 19 20 21 22 4x6 3x4 4x4 2x4 3x4 2x4 1.5x4 3x4 3x4 3x4 4x10 1.5x4 3x4 4x8 3x4 4x6 1-4-12 1-4-12 2-6-0 1-1-4 7-8-0 5-2-0 12-10-0 5-2-0 13-11-4 1-1-4 14-10-0 0-10-12 -0-10-12 0-10-12 1-4-12 1-4-12 2-6-0 1-1-4 7-8-0 5-2-0 12-10-0 5-2-0 13-11-4 1-1-4 14-10-0 0-10-12 1-2-154-5-41-5-71-0-05.0012 PlateOffsets(X,Y)-- [2:0-3-0,0-1-12], [12:0-6-4,0-1-8], [14:0-7-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.67 0.68 0.37 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.18 -0.37 0.27 (loc) 13-14 13-14 9 l/defl >946 >477 n/a L/d 240 180 n/a PLATES MT20 Weight: 53 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except* B2: 2x4SPFStud WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-4-3 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)17=570/0-6-0(min. 0-1-8), 9=513/Mechanical Max Horz17=50(LC 13)Max Uplift17=-108(LC 16), 9=-80(LC 17) MaxGrav17=646(LC 2), 9=579(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-375/85, 3-4=-1104/230, 4-18=-889/184, 18-19=-846/184, 5-19=-818/198, 5-20=-839/212, 20-21=-855/198, 21-22=-865/196, 6-22=-897/194, 6-7=-962/208,2-17=-435/157, 8-9=-320/72 BOT CHORD 16-17=-89/251, 13-14=-141/798, 12-13=-141/799 WEBS 3-16=-471/106, 3-14=-148/849, 5-13=0/312, 7-12=-176/850, 7-10=-404/102 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-3-9,Interior(1) 2-3-9 to 7-8-0,Exterior(2) 7-8-0 to 10-8-0zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9 except(jt=lb) 17=108.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T18 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:242018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-GEgd0E82w?c7wvDaOq3xATcOomyuO5mFvRLnhqzkaCX Scale=1:31.4 0-1-100-1-10T1 T2 T1 B1 B2 B3 B2 B1 W2 W4 W3 W5 W5 W4 W2 W3 W1 W1 1 2 3 4 5 6 7 8 9 10 20 19 18 17 16 15 14 13 12 11 21 22 23 24 25 26 5x6 5x6 4x6 3x4 3x5 3x5 3x4 4x6 3x5 3x4 4x10 1.5x4 1.5x4 4x10 3x5 3x4 4x6 4x6 1-4-12 1-4-12 2-6-0 1-1-4 7-3-8 4-9-8 8-0-8 0-9-0 12-10-0 4-9-8 13-11-4 1-1-4 15-4-0 1-4-12 -0-10-12 0-10-12 1-4-12 1-4-12 7-3-8 5-10-12 8-0-8 0-9-0 13-11-4 5-10-12 15-4-0 1-4-12 16-2-12 0-10-12 1-2-154-1-124-3-61-2-151-0-04-1-125.0012 PlateOffsets(X,Y)-- [2:0-3-0,0-1-12], [9:0-3-0,0-1-12], [11:Edge,0-3-8], [14:0-7-8,0-1-8], [17:0-7-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.79 0.84 0.49 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.19 -0.38 0.35 (loc) 16-17 16-17 11 l/defl >931 >480 n/a L/d 240 180 n/a PLATES MT20 Weight: 58 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except* B2: 2x4SPFStud WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-9-12 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)20=589/0-6-0(min. 0-1-8), 11=589/0-6-0(min. 0-1-8) Max Horz20=30(LC 15)Max Uplift20=-107(LC 16), 11=-107(LC 17) MaxGrav20=851(LC 39), 11=851(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-489/97, 3-4=-1463/237, 4-21=-1219/187, 21-22=-1187/191, 22-23=-1186/193, 5-23=-1151/206, 5-6=-1094/235, 6-24=-1151/225, 24-25=-1186/212, 25-26=-1187/210,7-26=-1219/206, 7-8=-1463/214, 8-9=-489/97, 2-20=-581/163, 9-11=-581/162 BOT CHORD 19-20=-67/325, 16-17=-117/1100, 15-16=-119/1094, 14-15=-119/1100, 11-12=-34/325 WEBS 3-19=-621/92, 3-17=-149/1141, 8-14=-143/1141, 8-12=-621/73 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-3-9,Interior(1) 2-3-9 to 7-3-8,Exterior(2) 7-3-8 to 8-0-8, Interior(1) 12-3-7 to 16-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)20=107, 11=107. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T19 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:252018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-kRE?Ea9ghJk_Y3omxXaAjh9eTANc7Z6P855KEHzkaCW Scale=1:29.0 0-1-100-1-10T1 T2 T1 B1 B2 B3 B2 B1 W2 W4 W3 W5 W5 W4 W3 W2W1 W1 1 2 3 4 5 6 7 8 9 10 20 19 18 17 16 15 14 13 12 11 21 22 23 24 25 26 4x4 4x4 4x4 2x4 3x4 3x4 2x4 4x4 3x4 3x4 4x8 1.5x4 1.5x4 3x4 4x8 3x4 4x6 4x6 1-4-12 1-4-12 2-6-0 1-1-4 5-3-8 2-9-8 10-0-8 4-9-0 12-10-0 2-9-8 13-11-4 1-1-4 15-4-0 1-4-12 -0-10-12 0-10-12 1-4-12 1-4-12 2-6-0 1-1-4 5-3-8 2-9-8 10-0-8 4-9-0 12-10-0 2-9-8 13-11-4 1-1-4 15-4-0 1-4-12 16-2-12 0-10-12 1-2-153-3-123-5-61-2-151-0-03-3-125.0012 PlateOffsets(X,Y)-- [2:0-3-0,0-1-12], [9:0-3-0,0-1-12], [11:Edge,0-3-8], [14:0-6-4,0-1-8], [17:0-6-4,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.47 0.55 0.42 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.19 0.16 (loc) 16-17 16-17 11 l/defl >999 >938 n/a L/d 240 180 n/a PLATES MT20 Weight: 55 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except* B2: 2x4SPFStud WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-10-14 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)20=609/0-6-0(min. 0-1-8), 11=609/0-6-0(min. 0-1-8) Max Horz20=32(LC 15)Max Uplift20=-99(LC 12), 11=-99(LC 13) MaxGrav20=741(LC 39), 11=741(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-21=-413/113, 3-21=-376/118, 3-4=-1241/304, 4-5=-1117/259, 5-22=-1029/276, 22-23=-1029/276, 23-24=-1029/276, 24-25=-1029/276, 6-25=-1029/276, 6-7=-1117/273,7-8=-1241/256, 8-26=-376/119, 9-26=-413/114, 2-20=-514/171, 9-11=-514/170 BOT CHORD 19-20=-83/270, 16-17=-183/1036, 15-16=-186/1029, 14-15=-184/1036, 11-12=-41/270 WEBS 3-19=-534/146, 3-17=-184/976, 8-14=-174/976, 8-12=-534/103 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-3-9,Interior(1) 2-3-9 to 5-3-8,Exterior(2) 5-3-8 to 14-3-7, Interior(1) 14-3-7 to 16-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 20, 11.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T20 TrussType HipGirder Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:272018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-gpMlfGBwDw_inMy93ydeo6Exo_1CbPEhbOaRI9zkaCU Scale=1:29.0 0-1-100-1-10T1 T2 T1 B1 B2 B3 B2 B1 W2 W4 W3 W5 W6 W7 W6 W5 W4 W3 W2W1 W1 1 2 3 4 5 6 7 8 9 10 11 22 21 20 19 18 17 16 15 14 13 12 23 24 25 26 27 28 29 30 31 6x6 6x6 4x6 2x4 1.5x4 1.5x4 2x4 4x6 4x6 3x4 4x8 1.5x4 4x8 1.5x4 1.5x4 3x4 4x8 4x6 5x6 5x6 1-4-12 1-4-12 2-6-0 1-1-4 3-3-8 0-9-8 7-8-0 4-4-8 12-0-8 4-4-8 12-10-0 0-9-8 13-11-4 1-1-4 15-4-0 1-4-12 -0-10-12 0-10-12 1-4-12 1-4-12 2-6-0 1-1-4 3-3-8 0-9-8 7-8-0 4-4-8 12-0-8 4-4-8 12-10-0 0-9-8 13-11-4 1-1-4 15-4-0 1-4-12 16-2-12 0-10-12 1-2-152-5-122-7-61-2-151-0-02-5-125.0012 PlateOffsets(X,Y)-- [2:0-3-0,0-1-12], [10:0-3-0,0-1-12], [12:Edge,0-3-8], [15:0-5-8,0-1-4], [19:0-5-8,0-1-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.68 0.61 0.64 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.16 -0.31 0.14 (loc) 17 17 12 l/defl >999 >581 n/a L/d 240 180 n/a PLATES MT20 Weight: 64 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except* B2: 2x4SPFStud WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-0-11 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 7-0-9 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)22=746/0-6-0(min. 0-1-8), 12=758/0-6-0(min. 0-1-8) Max Horz22=34(LC 11)Max Uplift22=-310(LC 8), 12=-324(LC 9) MaxGrav22=796(LC 2), 12=810(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-486/208, 3-4=-1720/706, 4-5=-1802/742, 5-23=-2767/1022, 23-24=-2768/1022, 24-25=-2770/1022, 6-25=-2771/1021, 6-26=-2771/1022, 26-27=-2768/1022,7-27=-2766/1022, 7-8=-1842/779, 8-9=-1755/732, 9-10=-495/218, 2-22=-542/222, 10-12=-551/231 BOT CHORD 21-22=-137/334, 18-19=-676/1719, 18-28=-667/1714, 28-29=-667/1714, 17-29=-667/1714, 17-30=-696/1749, 30-31=-696/1749, 16-31=-696/1749, 15-16=-708/1756, 12-13=-133/340 WEBS 3-21=-689/291, 19-21=-137/331, 3-19=-563/1447, 5-17=-339/1096, 6-17=-473/146, 7-17=-300/1060, 13-15=-130/338, 9-15=-599/1477, 9-13=-702/297 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)22=310, 12=324. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T20 TrussType HipGirder Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:272018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-gpMlfGBwDw_inMy93ydeo6Exo_1CbPEhbOaRI9zkaCU NOTES- 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 60 lb down and 74 lb up at 3-3-8, 27 lb down and 28 lb up at 5-4-4, 27lb down and 28 lb up at 7-4-4, 27 lb down and 28 lb up at 9-4-4, and 27 lb down and 28 lb up at 11-4-4, and 60 lb down and 74 lb up at 12-0-8 on top chord, and 48 lb down and 118 lb up at 3-3-8, 32 lb down and 47 lb up at 5-4-4, 32 lb down and 47 lb up at 7-4-4, 32 lb down and 47 lb up at 9-4-4, and 32 lb down and 47 lb up at 11-4-4, and 48 lb down and 118 lb up at 11-11-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51, 2-5=-51, 5-7=-61, 7-10=-51, 10-11=-51, 20-22=-20, 15-19=-20, 12-14=-20 Concentrated Loads(lb) Vert: 5=-11(B) 7=-11(B) 18=-42(B) 16=-42(B) 24=-8(B) 25=-8(B) 26=-8(B) 27=-8(B) 28=-27(B) 29=-27(B) 30=-27(B) 31=-27(B) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T21 TrussType Jack-ClosedGirder Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:282018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-8?w7sbBY_E6ZPWWLdg8tLJnDQOPNKtVrq2K_qczkaCT Scale=1:39.0 W1 T1 W5 B1 W2 W3 W4 1 2 3 4 7 6 5 8 9 10 2x4 1.5x4 8x8 3x4 4x6 3x5 3-6-4 3-6-4 7-0-8 3-6-4 -0-10-12 0-10-12 3-6-4 3-6-4 7-0-8 3-6-4 3-2-156-2-25.0012 PlateOffsets(X,Y)-- [6:0-3-8,0-4-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.24 0.48 0.57 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 47 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x6SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)7=1060/0-6-0(min. 0-1-14), 5=950/Mechanical Max Horz7=148(LC 9)Max Uplift7=-155(LC 12), 5=-260(LC 12) MaxGrav7=1204(LC 2), 5=1077(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-890/122, 2-3=-658/80 BOT CHORD 6-10=-148/575, 5-10=-148/575WEBS2-6=-50/760, 3-6=-134/743, 3-5=-934/240 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=155, 5=260. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 559 lb down and 100 lb up at 1-4-4, and 559 lb down and 100 lb up at 3-4-4, and 559 lb down and 100 lb up at 5-4-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf) Vert: 1-2=-51, 2-4=-51, 5-7=-20 Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T21 TrussType Jack-ClosedGirder Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:282018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-8?w7sbBY_E6ZPWWLdg8tLJnDQOPNKtVrq2K_qczkaCT LOADCASE(S)Standard Concentrated Loads(lb) Vert: 6=-493(F) 9=-493(F) 10=-493(F) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T22 TrussType Jack-Closed Qty 8 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:292018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-cCTW4xCBlXEQ1g5YANf6tXKJjnnS3Sf_3i3XN2zkaCS Scale=1:26.6 W1 T1 W2 B1 1 2 3 5 4 6 7 8 3x4 3x4 3x5 3x5 7-0-8 7-0-8 -0-10-12 0-10-12 7-0-8 7-0-8 1-2-154-2-23-10-100-3-84-2-25.0012 PlateOffsets(X,Y)-- [4:Edge,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MR 0.52 0.37 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.21 0.00 (loc) 4-5 4-5 4 l/defl >999 >392 n/a L/d 240 180 n/a PLATES MT20 Weight: 23 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)5=296/0-6-0(min. 0-1-8), 4=235/0-1-8(min. 0-1-8) Max Horz5=116(LC 16)Max Uplift5=-41(LC 16), 4=-97(LC 16) MaxGrav5=337(LC 2), 4=265(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-5=-285/159 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 6-10-12zone;cantileverleft exposed ; endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Bearing at joint(s) 4 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 7)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 4. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 4. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T23 TrussType Jack-ClosedGirder Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:292018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-cCTW4xCBlXEQ1g5YANf6tXKOeni83Kc_3i3XN2zkaCS Scale=1:26.5 W1 T1 W5 B1 W2 W3 W4 1 2 3 4 7 6 5 8 9 10 2x4 1.5x4 8x8 3x5 4x6 3x8 3-6-4 3-6-4 7-0-8 3-6-4 -0-10-12 0-10-12 3-6-4 3-6-4 7-0-8 3-6-4 1-2-154-2-25.0012 PlateOffsets(X,Y)-- [6:0-3-8,0-4-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.21 0.64 0.52 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.04 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 37 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x6SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-13 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)7=1142/0-6-0(min. 0-2-1), 5=1027/Mechanical Max Horz7=117(LC 12)Max Uplift7=-202(LC 12), 5=-244(LC 12) MaxGrav7=1297(LC 2), 5=1164(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-7=-941/162, 2-3=-1269/174 BOT CHORD 6-10=-243/1138, 5-10=-243/1138WEBS2-6=-124/1179, 3-6=-135/1033, 3-5=-1382/295 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=202, 5=244. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 620 lb down and 111 lb up at 1-4-4, and 620 lb down and 111 lb up at 3-4-4, and 620 lb down and 111 lb up at 5-4-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf) Vert: 1-2=-51, 2-4=-51, 5-7=-20 Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T23 TrussType Jack-ClosedGirder Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:302018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-5O1uHHDpWrMHeqgkk4ALQksZNB2Nons8HMp5vUzkaCR LOADCASE(S)Standard Concentrated Loads(lb) Vert: 6=-546(B) 9=-546(B) 10=-546(B) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T24 TrussType Common Qty 4 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:302018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-5O1uHHDpWrMHeqgkk4ALQksY8B4loq?8HMp5vUzkaCR Scale=1:31.0 T1 T2 B1 W4 W3W3 W1 W2 W1 W2 B2 1 2 3 4 5 6 10 9 8 7 11 12 13 14 15 16 3x4 4x4 3x5 3x8 4x64x6 6x6 6x6 3x4 8-2-0 8-2-0 16-4-0 8-2-0 4-2-12 4-2-12 8-2-0 3-11-4 12-1-4 3-11-4 16-4-0 4-2-12 17-2-12 0-10-12 1-2-154-7-121-2-155.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.28 0.55 0.38 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.16 -0.22 0.02 (loc) 8-10 8-10 7 l/defl >999 >878 n/a L/d 240 180 n/a PLATES MT20 Weight: 67 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 7-6-14 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)10=566/Mechanical, 7=623/0-4-0(min. 0-1-8) Max Horz10=-40(LC 21) Max Uplift10=-194(LC 12), 7=-227(LC 13)MaxGrav10=640(LC 2), 7=706(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-12=-731/650, 12-13=-695/655, 3-13=-681/667, 3-14=-681/658, 14-15=-686/649, 4-15=-730/645 BOT CHORD 9-10=-527/724, 8-9=-527/724, 7-8=-505/715WEBS3-8=-400/345, 2-10=-749/488, 4-7=-733/456 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 8-2-0,Exterior(2) 8-2-0 to 11-2-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)10=194, 7=227. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T25 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:312018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-ZabGUdERH9U8G_FwIohayyPeBbUUXJqHW0YeRwzkaCQ Scale=1:30.2 0-1-100-1-10T1 T2 T1 B1 W3 W4 W3 W1 W2 W1 W2 B2 1 2 3 4 5 6 11 10 9 8 7 12 13 14 15 6x6 4x4 3x4 3x44x4 4x8 4x10 3x4 4x10 6-3-8 6-3-8 10-0-8 3-9-0 16-4-0 6-3-8 -0-10-12 0-10-12 6-3-8 6-3-8 10-0-8 3-9-0 16-4-0 6-3-8 17-2-12 0-10-12 1-2-153-8-123-10-61-2-153-8-125.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.59 0.27 0.21 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.10 0.01 (loc) 7-8 7-8 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 70 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud*Except* W1: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-6-6 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)11=638/0-4-0(min. 0-1-8), 7=638/0-4-0(min. 0-1-8) Max Horz11=-33(LC 14) Max Uplift11=-101(LC 16), 7=-101(LC 17)MaxGrav11=819(LC 39), 7=819(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-12=-896/168, 3-12=-784/193, 3-13=-727/218, 13-14=-727/218, 4-14=-727/218, 4-15=-785/194, 5-15=-897/169, 2-11=-759/230, 5-7=-758/230 BOT CHORD 10-11=-131/309, 9-10=-118/726, 8-9=-118/726, 7-8=-95/310WEBS2-10=-31/494, 5-8=-34/494 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 6-3-8,Exterior(2) 6-3-8 to 10-0-8, Interior(1) 14-3-7 to 17-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=101, 7=101. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T26 TrussType Hip Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:322018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-1n9eizE32Sc?u7q6sVCpV9yuR?nkGk1RlgIC_NzkaCP Scale=1:30.2 0-1-100-1-10T1 T2 T1 B1 W3 W4 W4 W3 W1 W2 W1W2 B2 1 2 3 4 5 6 7 12 11 10 9 8 13 14 15 16 17 18 4x4 4x4 3x6 3x54x8 3x4 4x8 3x6 3x6 3x6 4-3-8 4-3-8 12-0-8 7-9-0 16-4-0 4-3-8 -0-10-12 0-10-12 4-3-8 4-3-8 8-2-0 3-10-8 12-0-8 3-10-8 16-4-0 4-3-8 17-2-12 0-10-12 1-2-152-10-123-0-61-2-152-10-125.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.30 0.46 0.34 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.17 -0.23 0.02 (loc) 9-11 9-11 8 l/defl >999 >832 n/a L/d 240 180 n/a PLATES MT20 Weight: 67 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 6-2-13 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)12=660/0-4-0(min. 0-1-8), 8=660/0-4-0(min. 0-1-8) Max Horz12=33(LC 15) Max Uplift12=-275(LC 12), 8=-275(LC 13)MaxGrav12=711(LC 39), 8=711(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-13=-910/779, 3-13=-886/789, 3-14=-822/757, 14-15=-825/757, 4-15=-825/757, 4-16=-825/756, 16-17=-825/757, 5-17=-822/757, 5-18=-886/789, 6-18=-910/779, 2-12=-685/570, 6-8=-685/570BOT CHORD 10-11=-776/1119, 9-10=-776/1119 WEBS 4-11=-358/134, 4-9=-358/134, 2-11=-635/798, 6-9=-636/798 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 4-3-8,Exterior(2) 4-3-8 to 16-2-4, Interior(1) 16-2-4 to 17-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 12=275, 8=275.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T27 TrussType HipGirder Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:342018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-z9HP7fGJZ4si7R_VzwFHaa1EFoRHkcrjC_nI2FzkaCN Scale=1:30.2 0-1-100-1-10T1 T2 T1 B1 W3 W4 W5 W4 W5 W4 W3 W1 W2 W1W2 B2 1 2 3 4 5 6 7 8 15 14 13 12 11 10 9 16 17 18 19 20 21 6x6 6x6 3x6 3x53x43x5 3x4 1.5x4 4x8 3x4 3x4 3x6 3x4 2-3-8 2-3-8 6-1-15 3-10-7 10-2-1 4-0-3 14-0-8 3-10-7 16-4-0 2-3-8 -0-10-12 0-10-12 2-3-8 2-3-8 6-1-15 3-10-7 10-2-1 4-0-3 14-0-8 3-10-7 16-4-0 2-3-8 17-2-12 0-10-12 1-2-152-0-122-2-61-2-152-0-125.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.28 0.52 0.45 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.09 -0.15 0.03 (loc) 11-13 11-13 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 67 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-2-6 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)15=678/0-4-0(min. 0-1-8), 9=678/0-4-0(min. 0-1-8) Max Horz15=-35(LC 10) Max Uplift15=-423(LC 8), 9=-422(LC 9)MaxGrav15=747(LC 34), 9=747(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-839/472, 3-16=-1750/876, 4-16=-1753/875, 4-17=-1748/873, 5-17=-1748/873, 5-18=-1751/874, 6-18=-1748/874, 6-7=-839/471, 2-15=-733/418, 7-9=-733/417 BOT CHORD 14-19=-433/801, 13-19=-433/801, 12-13=-850/1750, 12-20=-850/1750, 11-20=-850/1750,11-21=-423/801, 10-21=-423/801 WEBS 3-14=-314/146, 3-13=-468/1050, 4-13=-372/149, 5-11=-372/148, 6-11=-468/1048, 6-10=-314/146, 2-14=-449/852, 7-10=-447/853 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 15=423, 9=422.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 64 lb down and 105 lb up at 2-3-8, 19 lb down and 38 lb up at 3-11-12, 19 lb down and 38 lb up at 5-11-12, 19 lb down and 38 lb up at 7-11-12, 19 lb downand 38 lb up at 9-11-12, and 19 lb down and 38 lb up at 11-11-12, and 64 lb down and 105 lb up at 14-0-8 on top chord, and 42 lb down and 70 lb up at 2-3-8, 10 lb down and 30 lb up at 3-11-12, 10 lb down and 30 lb up at 5-11-12, 10 lb down and 30 lb up at 7-11-12, 10 lb down and 30 lb up at 9-11-12, and 10 lb down and 30 lb up at 11-11-12, and 42 lb down and 70 lb up at 13-11-12on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).Continued on page 2 DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss T27 TrussType HipGirder Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:342018 Page2ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-z9HP7fGJZ4si7R_VzwFHaa1EFoRHkcrjC_nI2FzkaCN LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf)Vert: 1-2=-51, 2-3=-51, 3-6=-61, 6-7=-51, 7-8=-51, 9-15=-20 Concentrated Loads(lb) Vert: 14=2(B) 13=0(B) 11=0(B) 10=2(B) 19=0(B) 20=0(B) 21=0(B) DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V01 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:352018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-RMrnK?HxKN_ZlbZhXemW7oaQUCu3T7ZtReWsaizkaCM Scale=1:60.8 T1 T1 B1 ST3 ST2 ST1 ST2 ST1 B2 1 2 3 4 5 6 7 13 12 11 10 9 8 14 15 16 17 18 19 3x4 4x4 3x4 3x40-0-4 0-0-4 19-10-6 19-10-2 9-11-3 9-11-3 19-10-6 9-11-3 0-0-49-11-30-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.18 0.10 0.23 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.01 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 80 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2OTHERS2x4SPFStud*Except* ST3: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 4-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 19-9-14. (lb)-Max Horz1=-250(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 7 except 1=-128(LC 14), 11=-258(LC 16), 13=-185(LC 16),9=-258(LC 17), 8=-185(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 1, 7 except 10=265(LC 32), 11=403(LC 29), 13=298(LC 29), 9=403(LC 30), 8=299(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-339/215, 6-7=-298/192WEBS3-11=-365/307, 2-13=-277/229, 5-9=-365/307, 6-8=-277/229 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 9-11-3,Exterior(2) 9-11-3 to 12-11-3 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)All plates are 1.5x4MT20 unless otherwiseindicated. 6)Gablerequirescontinuous bottomchord bearing.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7 except(jt=lb) 1=128, 11=258, 13=185, 9=258, 8=185.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V02 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:362018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-vYP9YKIa5h7QNl8u5LHlf?6aqcEuCb70gIGP78zkaCL Scale=1:57.5 T1 T1 B1 ST2 ST1 ST1 B2 1 2 3 4 5 98 7 6 10 11 12 13 14 15 3x4 4x4 3x4 3x4 1.5x4 1.5x4 1.5x4 1.5x4 1.5x4 17-2-2 17-2-2 17-2-6 0-0-4 8-7-3 8-7-3 17-2-6 8-7-3 0-0-48-7-30-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.21 0.12 0.15 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.01 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 65 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2OTHERS2x4SPFStud*Except* ST2: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 3-7 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 17-1-14. (lb)-Max Horz1=-215(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 1 except 9=-291(LC 16), 6=-290(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 7 except 9=456(LC 29), 6=456(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-9=-390/320, 4-6=-390/320 NOTES-1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 8-7-3,Exterior(2) 8-7-3 to 11-7-3zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb) 9=291, 6=290. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V03 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:372018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-NkyXlgICs?FH_vi4e3o_CDfmR0aXx2XAuy?zfazkaCK Scale=1:45.2 T1 T1 B1 ST2 ST1 ST1 1 2 3 4 5 8 7 6 9 10 11 12 3x4 4x4 3x4 1.5x41.5x4 1.5x4 1.5x4 1.5x4 14-6-2 14-6-2 14-6-6 0-0-4 7-3-3 7-3-3 14-6-6 7-3-3 0-0-47-3-30-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.15 0.10 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 53 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2OTHERS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 14-5-14.(lb)-Max Horz1=-181(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 8=-244(LC 16), 6=-243(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 7 except 8=377(LC 29), 6=377(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 2-8=-337/279, 4-6=-337/279 NOTES- 1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-3-3,Interior(1) 3-3-3 to 7-3-3,Exterior(2) 7-3-3 to 10-3-3zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb) 8=244, 6=243. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V04 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:382018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-sxWvy0JqdIN8c2HGCmJDlQBwXQwggWVJ7clWB0zkaCJ Scale=1:38.8 T1 T1 B1 ST2 ST1 ST11 2 3 4 5 8 7 6 9 10 11 12 13 14 3x4 4x4 3x4 1.5x41.5x4 1.5x4 1.5x4 1.5x4 0-0-4 0-0-4 11-10-6 11-10-2 5-11-3 5-11-3 11-10-6 5-11-3 0-0-45-11-30-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.19 0.10 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 41 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2OTHERS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 11-9-14.(lb)-Max Horz1=-146(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 8=-247(LC 16), 6=-247(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 7 except 8=362(LC 29), 6=362(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 2-8=-354/286, 4-6=-354/286 NOTES- 1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 5-11-3,Exterior(2) 5-11-3 to 8-11-3zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb) 8=247, 6=247. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V05 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:392018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-K74IAMKSOcV?ECsTmTqSHek4LpF7P_8SMGU3jTzkaCI Scale=1:31.5 T1 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 2x4 4x4 2x4 1.5x4 9-2-2 9-2-2 9-2-6 0-0-4 4-7-3 4-7-3 9-2-6 4-7-3 0-0-44-7-30-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.32 0.15 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 29 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2OTHERS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=181/9-1-14(min. 0-1-8), 3=181/9-1-14(min. 0-1-8), 4=240/9-1-14(min. 0-1-8)Max Horz1=-111(LC 12) Max Uplift1=-57(LC 17), 3=-57(LC 17) MaxGrav1=208(LC 2), 3=208(LC 2), 4=265(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 4-7-3,Exterior(2) 4-7-3 to 7-7-3zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V06 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:392018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-K74IAMKSOcV?ECsTmTqSHek64pGNP_hSMGU3jTzkaCI Scale=1:23.1 T1 T1 B1 ST1 1 2 3 42x4 4x4 2x41.5x4 0-0-4 0-0-4 6-6-6 6-6-2 3-3-3 3-3-3 6-6-6 3-3-3 0-0-43-3-30-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.14 0.07 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 20 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2OTHERS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=124/6-5-14(min. 0-1-8), 3=124/6-5-14(min. 0-1-8), 4=165/6-5-14(min. 0-1-8)Max Horz1=-76(LC 12) Max Uplift1=-39(LC 17), 3=-39(LC 17) MaxGrav1=142(LC 2), 3=142(LC 2), 4=182(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V07 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:402018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-oJegNiL49wdsrMRfKBLhqrHJSDbC8RNcbwEdGvzkaCH Scale=1:12.5 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-4 0-0-4 3-10-6 3-10-2 1-11-3 1-11-3 3-10-6 1-11-3 0-0-41-11-30-0-412.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.04 0.10 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-10-6 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=112/3-9-14(min. 0-1-8), 3=112/3-9-14(min. 0-1-8) Max Horz1=-41(LC 12) Max Uplift1=-13(LC 17), 3=-13(LC 17)MaxGrav1=126(LC 2), 3=126(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V08 TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:412018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-GWC2b2LiwDljTW0rtutwM3pTAdybtsOlpazAoLzkaCG Scale=1:71.7 T2 W1 B1 ST9ST8 ST7ST6ST5ST4 ST3ST2ST1 T1 B21 2 3 4 5 6 7 8 9 10 11 12 22 21 20 19 18 17 16 15 14 13 3x4 3x4 5x6 20-3-6 20-3-6 20-3-6 20-3-6 13-6-48.0012 PlateOffsets(X,Y)-- [21:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.11 0.03 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 13 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 130 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 OTHERS 2x4SPFStud*Except*ST9,ST8,ST7,ST6: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 12-13, 11-14, 10-15, 9-16 MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 20-3-6.(lb)-Max Horz1=535(LC 16) Max UpliftAll uplift 100 lb orless at joint(s) 13, 1, 14, 15, 16, 17, 18, 19, 20, 21, 22MaxGravAllreactions 250 lb orless at joint(s) 13, 14, 15, 16, 17, 18, 19, 20, 21, 22 except 1=329(LC 16) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-616/489, 2-3=-554/438, 3-4=-492/391, 4-5=-427/320, 5-6=-420/340, 6-7=-361/289, 7-8=-296/238 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3) 0-5-12 to 3-5-12,Exterior(2) 3-5-12 to 20-1-10zone;cantileverleft exposed ; endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)All plates are 1.5x4MT20 unless otherwiseindicated. 6)Gablerequirescontinuous bottomchord bearing. 7)Gablestudsspaced at 2-0-0 oc.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 13, 1, 14, 15, 16, 17, 18, 19, 20, 21, 22.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V09 TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:422018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-kimQoOMKhXta5gb1RcO9vGMcP1HbcHqv2EjkKozkaCF Scale=1:67.3 T2 W1 B1 ST4 ST3 ST2 ST1 T1 B21 2 3 4 5 6 7 13 12 11 10 9 8 14 15 3x4 3x4 3x4 19-0-6 19-0-6 19-0-6 19-0-6 0-0-412-8-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.20 0.10 0.26 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 8 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 86 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST4: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-8, 6-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.All bearings 19-0-6. (lb)-Max Horz1=501(LC 16)Max UpliftAll uplift 100 lb orless at joint(s) 8, 1 except 9=-150(LC 16), 10=-137(LC 16), 11=-143(LC 16), 13=-127(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 8 except 1=304(LC 16), 9=381(LC 22), 10=335(LC 29), 11=353(LC 29), 13=312(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-2=-576/465, 2-14=-468/339, 3-14=-455/355, 3-4=-444/378, 4-5=-334/271 WEBS 6-9=-295/204, 5-10=-258/183, 4-11=-273/194 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 18-10-10zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)All plates are 1.5x4MT20 unless otherwiseindicated. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8, 1 except(jt=lb) 9=150, 10=137, 11=143, 13=127.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V10 TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:432018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-CuKo0kNzSr?RiqAE?JvOSUvmsRcZLmH2HuSHsEzkaCE Scale=1:59.9 T2 W1 B1 ST3 ST2 ST1 T1 B2 1 2 3 4 5 6 11 10 9 8 7 12 13 3x4 3x4 3x4 17-9-6 17-9-6 17-9-6 17-9-6 0-0-411-10-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.28 0.19 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 77 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST3: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-7, 5-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.All bearings 17-9-6. (lb)-Max Horz1=467(LC 16)Max UpliftAll uplift 100 lb orless at joint(s) 7 except 8=-155(LC 16), 9=-119(LC 16), 11=-195(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 7, 1 except 8=386(LC 22), 9=292(LC 29), 11=479(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-12=-493/376, 2-12=-473/408, 2-3=-328/221, 3-4=-304/261 WEBS 5-8=-296/207, 2-11=-345/234 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 17-7-10zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)All plates are 1.5x4MT20 unless otherwiseindicated. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7 except(jt=lb) 8=155, 9=119, 11=195. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V11 TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:442018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-g4tBD4ObD87IKzlQZ1Qd_hRy2qzy4AHCVYCqPgzkaCD Scale=1:55.7 T2 W1 B1 ST3 ST2 ST1 T1 B21 2 3 4 5 6 11 10 9 8 7 12 13 14 3x4 3x4 3x4 16-6-6 16-6-6 16-6-6 16-6-6 0-0-411-0-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.19 0.11 0.33 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 70 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST3: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-7 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.All bearings 16-6-6. (lb)-Max Horz1=433(LC 16)Max UpliftAll uplift 100 lb orless at joint(s) 7, 1 except 8=-151(LC 16), 9=-132(LC 16), 11=-160(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 7, 1 except 8=375(LC 29), 9=324(LC 29), 11=394(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-12=-470/361, 2-12=-445/386, 2-3=-333/230, 3-4=-319/270 WEBS 5-8=-289/204, 4-9=-254/181, 2-11=-289/198 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 16-4-10zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)All plates are 1.5x4MT20 unless otherwiseindicated. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7, 1 except(jt=lb) 8=151, 9=132, 11=160. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V12 TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:442018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-g4tBD4ObD87IKzlQZ1Qd_hRzBqz44BdCVYCqPgzkaCD Scale=1:49.2 T2 W1 B1 ST3 ST2 ST1 T1 1 2 3 4 5 6 10 9 8 7 11 3x4 3x4 15-3-6 15-3-6 15-3-6 15-3-6 0-0-410-2-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.18 0.10 0.30 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 63 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-7 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.All bearings 15-3-6. (lb)-Max Horz1=399(LC 16)Max UpliftAll uplift 100 lb orless at joint(s) 7, 1 except 8=-149(LC 16), 9=-140(LC 16), 10=-132(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 7, 1 except 8=369(LC 29), 9=342(LC 29), 10=326(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-449/369, 2-3=-336/254, 3-4=-322/277 WEBS 5-8=-287/202, 4-9=-267/188 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-3-6,Interior(1) 3-3-6 to 15-1-10zone;cantileverleft exposed ; endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)All plates are 1.5x4MT20 unless otherwiseindicated. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7, 1 except(jt=lb) 8=149, 9=140, 10=132. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V13 TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:452018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-8HRZRPPD_SF8y7Kc6kxsXv_6yEHhpeHLkCxOx7zkaCC Scale=1:57.0 T2 W1 B1 ST2 ST1 T1 1 2 3 4 5 8 7 6 9 10 3x4 1.5x4 1.5x4 3x4 1.5x4 1.5x4 1.5x4 1.5x4 14-0-6 14-0-6 14-0-6 14-0-6 0-0-49-4-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.31 0.21 0.21 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 55 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-6 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.All bearings 14-0-6. (lb)-Max Horz1=365(LC 16)Max UpliftAll uplift 100 lb orless at joint(s) 6 except 7=-129(LC 16), 8=-200(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 6, 1 except 7=319(LC 29), 8=491(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-9=-366/280, 2-9=-346/313 WEBS 4-7=-259/186, 2-8=-356/238 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 13-10-10zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6 except(jt=lb) 7=129, 8=200. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V14 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:462018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-dT?xelPrlmN?ZHupgRS536XF8edFY5rUzshxTZzkaCB Scale=1:51.6 T1 W1 B1 ST2 ST1 1 2 3 4 7 6 5 8 9 10 3x4 3x4 3x41.5x4 1.5x4 1.5x4 1.5x4 12-9-6 12-9-6 0-0-48-6-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.41 0.19 0.19 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 49 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-5 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.All bearings 12-9-0. (lb)-Max Horz1=323(LC 13)Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 6=-144(LC 16), 7=-164(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 1, 5 except 6=351(LC 29), 7=403(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-8=-408/389, 2-8=-388/415, 2-3=-298/298 WEBS 3-6=-309/193, 2-7=-308/206 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 12-7-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb) 6=144, 7=164. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V15 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:472018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-5fZJr5QTW3VsBRT?E9zKcK3OD2_iHZyeCWQU??zkaCA Scale=1:47.1 T1 W1 B1 ST2 ST1 1 2 3 4 7 6 5 8 9 3x4 1.5x4 1.5x41.5x4 1.5x4 1.5x4 1.5x4 11-6-6 11-6-6 0-0-47-8-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.52 0.11 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 43 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 11-6-0. (lb)-Max Horz1=289(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 6=-155(LC 16), 7=-133(LC 16)MaxGravAllreactions 250 lb orless at joint(s) 1, 5 except 6=383(LC 29), 7=327(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-2=-396/396, 2-8=-301/292, 3-8=-274/297 WEBS 3-6=-302/209, 2-7=-258/179 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-6-6,Interior(1) 3-6-6 to 11-4-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb) 6=155, 7=133. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V16 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:472018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-5fZJr5QTW3VsBRT?E9zKcK3Mi2_dHaYeCWQU??zkaCA Scale=1:42.1 T1 W1 B1 ST2 ST11 2 3 4 7 6 5 8 9 10 2x4 1.5x4 1.5x41.5x4 1.5x4 1.5x4 1.5x4 10-3-6 10-3-6 0-0-46-10-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.68 0.11 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 37 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.All bearings 10-3-0. (lb)-Max Horz1=256(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 6=-159(LC 16), 7=-113(LC 16)MaxGravAllreactions 250 lb orless at joint(s) 1, 5 except 6=391(LC 29), 7=277(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-2=-374/368, 2-8=-297/259, 8-9=-273/286, 3-9=-270/290 WEBS 3-6=-311/213 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 10-1-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb) 6=159, 7=113. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V17 TrussType GABLE Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:482018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-Zs7h3RR5GNdjpb2BosVZ8Xca8SJH01?nQAA2YRzkaC9 Scale=1:38.4 T1 W1 B1 ST1 1 2 3 5 4 6 7 8 2x4 1.5x4 1.5x41.5x4 1.5x4 9-0-6 9-0-6 0-0-46-0-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.51 0.15 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 31 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=126/9-0-6(min. 0-1-8), 4=95/9-0-6(min. 0-1-8), 5=374/9-0-6(min. 0-1-8) Max Horz1=223(LC 13) Max Uplift1=-1(LC 12), 4=-44(LC 13), 5=-184(LC 16)MaxGrav1=174(LC 30), 4=129(LC 29), 5=453(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-303/272, 6-7=-279/299, 2-7=-276/303 WEBS 2-5=-363/247 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 8-10-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb) 5=184. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V18 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:492018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-12h4GnSj1hlaQldOLa0ohl9n9rg9lUbxfqvb4uzkaC8 Scale=1:32.8 T1 W1 B1 ST1 1 2 3 5 4 6 7 2x4 1.5x4 1.5x41.5x4 1.5x4 7-9-6 7-9-6 0-0-45-2-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.36 0.11 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 26 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=82/7-9-0(min. 0-1-8), 4=107/7-9-0(min. 0-1-8), 5=318/7-9-0(min. 0-1-8) Max Horz1=190(LC 13) Max Uplift1=-11(LC 12), 4=-41(LC 13), 5=-156(LC 16)MaxGrav1=128(LC 30), 4=141(LC 29), 5=386(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-276/265, 2-6=-259/269 WEBS 2-5=-312/210 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-9-6,Interior(1) 3-9-6 to 7-7-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb) 5=156. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V19 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:502018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-VEFSU7SMo_tR2uCavHX1Eyh_lF0YUyv4uTf9cKzkaC7 Scale=1:27.9 T1 W1 B1 ST1 1 2 3 5 4 6 7 8 2x4 1.5x4 1.5x41.5x4 1.5x4 6-6-6 6-6-6 0-0-44-4-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.24 0.10 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=25/6-6-0(min. 0-1-8), 4=111/6-6-0(min. 0-1-8), 5=282/6-6-0(min. 0-1-8) Max Horz1=157(LC 13) Max Uplift1=-30(LC 14), 4=-37(LC 13), 5=-139(LC 16)MaxGrav1=79(LC 13), 4=144(LC 29), 5=343(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-254/238 WEBS 2-5=-280/198 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 6-4-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb) 5=139. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V20 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:502018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-VEFSU7SMo_tR2uCavHX1EyhywF_bUys4uTf9cKzkaC7 Scale=1:22.4 T1 W1 B1 1 2 3 4 5 6 2x4 1.5x4 1.5x4 5-3-6 5-3-6 0-0-43-6-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.36 0.22 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-3-6 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=165/5-3-0(min. 0-1-8), 3=165/5-3-0(min. 0-1-8) Max Horz1=124(LC 13) Max Uplift1=-17(LC 16), 3=-61(LC 16)MaxGrav1=186(LC 2), 3=208(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 5-1-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V21 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:512018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-zRpqhTT_ZI?Ig2nmT?2GmAE9RfMYDP5E67Oi9mzkaC6 Scale=1:16.4 T1 W1 B1 1 2 3 4 2x4 1.5x4 1.5x4 4-0-6 4-0-6 0-0-42-8-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.18 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 12 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-0-6 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=120/4-0-0(min. 0-1-8), 3=120/4-0-0(min. 0-1-8) Max Horz1=90(LC 13) Max Uplift1=-13(LC 16), 3=-44(LC 16)MaxGrav1=136(LC 2), 3=152(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 3-10-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V22 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:522018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-RdMCvpUcKc89HCMz1iZVJNnJp3hYysLNLn8FhDzkaC5 Scale=1:17.0 T1 W1 B1 1 2 3 4 2x4 1.5x4 1.5x4 4-2-13 4-2-13 0-0-42-9-148.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.21 0.13 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 12 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-2-13 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=128/4-2-7(min. 0-1-8), 3=128/4-2-7(min. 0-1-8) Max Horz1=96(LC 13) Max Uplift1=-14(LC 16), 3=-47(LC 16)MaxGrav1=144(LC 2), 3=161(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 4-1-1zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V23 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:532018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-vpwa69VE5vG0vMx9aQ4krbJXvT2EhJbWaRtpDfzkaC4 Scale=1:11.6 T1 W1 B1 1 2 3 2x4 1.5x4 1.5x4 2-7-5 2-7-5 0-0-41-8-148.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.06 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 7 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-7-5 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=70/2-6-15(min. 0-1-8), 3=70/2-6-15(min. 0-1-8) Max Horz1=53(LC 13) Max Uplift1=-7(LC 16), 3=-26(LC 16)MaxGrav1=79(LC 2), 3=88(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V24 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:532018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-vpwa69VE5vG0vMx9aQ4krbJVET1ChJbWaRtpDfzkaC4 Scale=1:15.8 T1 W1 B1 1 2 3 2x4 1.5x4 1.5x4 3-10-5 3-10-5 0-0-42-6-148.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.16 0.10 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-10-5 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=114/3-9-15(min. 0-1-8), 3=114/3-9-15(min. 0-1-8) Max Horz1=86(LC 13) Max Uplift1=-12(LC 16), 3=-42(LC 16)MaxGrav1=129(LC 2), 3=144(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V25 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:542018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-O0UzJUWssDOtXWWL87czOosdMsLpQmrgp5dMl5zkaC3 Scale=1:21.5 T1 W1 B1 1 2 3 4 5 2x4 1.5x4 1.5x4 5-1-5 5-1-5 0-0-43-4-148.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.33 0.21 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 15 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-1-5 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=159/5-0-15(min. 0-1-8), 3=159/5-0-15(min. 0-1-8) Max Horz1=119(LC 15) Max Uplift1=-17(LC 16), 3=-58(LC 16)MaxGrav1=179(LC 2), 3=200(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 4-11-9zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V26 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:552018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-sC2LXqWUdXWk8g4Xiq7Cx0PqjGjj9D8p1lMwIXzkaC2 Scale=1:27.2 T1 W1 B1 ST1 1 2 3 5 4 6 7 8 2x4 1.5x4 1.5x41.5x4 1.5x4 6-4-5 6-4-5 0-0-44-2-148.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.23 0.10 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=14/6-3-15(min. 0-1-8), 4=111/6-3-15(min. 0-1-8), 5=281/6-3-15(min. 0-1-8) Max Horz1=152(LC 13) Max Uplift1=-38(LC 14), 4=-36(LC 13), 5=-138(LC 16)MaxGrav1=78(LC 13), 4=144(LC 29), 5=340(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-252/236 WEBS 2-5=-279/199 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 6-2-9zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb) 5=138. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V27 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:552018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-sC2LXqWUdXWk8g4Xiq7Cx0PowGjc9C5p1lMwIXzkaC2 Scale:3/8"=1' T1 W1 B1 ST1 1 2 3 5 4 6 7 2x4 1.5x4 1.5x41.5x4 1.5x4 7-7-5 7-7-5 0-0-45-0-148.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.34 0.11 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 26 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=75/7-6-15(min. 0-1-8), 4=108/7-6-15(min. 0-1-8), 5=311/7-6-15(min. 0-1-8) Max Horz1=185(LC 13) Max Uplift1=-13(LC 12), 4=-40(LC 13), 5=-153(LC 16)MaxGrav1=121(LC 30), 4=142(LC 29), 5=378(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-273/261, 2-6=-256/265 WEBS 2-5=-306/207 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-7-5,Interior(1) 3-7-5 to 7-5-9zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb) 5=153. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V28 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:562018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-KOcjkAX6OqebmpfkGYeRTDx?cg2LugLzGP6Tq_zkaC1 Scale=1:12.4 T1 W1 B1 1 2 3 4 2x4 1.5x4 1.5x4 4-7-8 4-7-8 0-0-41-11-25.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.22 0.14 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 12 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-7-8 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=132/4-6-14(min. 0-1-8), 3=132/4-6-14(min. 0-1-8) Max Horz1=68(LC 13) Max Uplift1=-24(LC 16), 3=-38(LC 16)MaxGrav1=149(LC 2), 3=149(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 4-5-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V29 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:572018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-obA5yWYl98mSOzEwpF9g0QUB54P5d7d6V3r0MQzkaC0 Scale=1:20.8 T1 W1 B1 ST1 1 2 3 5 4 6 7 2x4 1.5x4 1.5x41.5x4 1.5x4 7-9-14 7-9-14 0-0-43-3-25.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.17 0.10 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 22 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=73/7-9-5(min. 0-1-8), 4=108/7-9-5(min. 0-1-8), 5=309/7-9-5(min. 0-1-8) Max Horz1=127(LC 13) Max Uplift4=-24(LC 16), 5=-105(LC 16)MaxGrav1=85(LC 30), 4=122(LC 2), 5=350(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-5=-262/199 NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-14,Interior(1) 3-9-14 to 7-8-2zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb) 5=105. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V30 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:582018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-GnkT9sZNwSuI?7p6NzgvYe0M3UlVMZnFjjbauszkaC? Scale=1:24.7 W1 T1 W2 B1 ST1 1 2 3 4 7 6 5 8 9 10 1.5x4 3x4 1.5x4 1.5x41.5x4 1.5x4 -0-10-12 0-10-12 7-0-8 7-0-8 0-11-83-10-115.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.16 0.09 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 2 1 5 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 24 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)7=139/7-0-8(min. 0-1-8), 5=117/7-0-8(min. 0-1-8), 6=275/7-0-8(min. 0-1-8) Max Horz7=120(LC 16) Max Uplift5=-36(LC 16), 6=-129(LC 16)MaxGrav7=160(LC 2), 5=132(LC 2), 6=310(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 6-10-12zone;cantileverleft exposed ; endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5 except(jt=lb) 6=129. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V31 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:582018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-GnkT9sZNwSuI?7p6NzgvYe0D1UjeMatFjjbauszkaC? Scale=1:17.9 0-1-10T1 T2 W1 B1 ST1 1 2 3 5 4 6 7 2x4 4x4 1.5x4 1.5x41.5x4 7-4-2 7-4-2 6-4-0 6-4-0 7-4-2 1-0-2 0-0-42-6-12-7-112-6-15.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.74 0.21 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 21 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=180/7-3-8(min. 0-1-8), 4=-26/7-3-8(min. 0-1-8), 5=311/7-3-8(min. 0-1-8) Max Horz1=96(LC 13) Max Uplift1=-43(LC 16), 4=-95(LC 7), 5=-13(LC 16)MaxGrav1=271(LC 35), 5=392(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-5=-255/186 NOTES-1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 6-4-0,Exterior(2) 6-4-0 to 7-2-6zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4, 5.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V32 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:35:592018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-kzHrNCZ?hl09dHOJxgB85rZVBt3z514PyNK7RJzkaC_ Scale=1:10.4 0-1-10T1 T2 W1 B1 1 2 3 4 2x4 3x4 3x4 2x4 5-4-2 5-4-2 2-4-0 2-4-0 5-4-2 3-0-2 0-0-40-10-10-11-110-10-15.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.26 0.14 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 12 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-4-2 oc purlins,except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizerInstallation guide. REACTIONS.(lb/size)1=166/5-3-8(min. 0-1-8), 4=177/5-3-8(min. 0-1-8) Max Horz1=23(LC 13)Max Uplift1=-22(LC 12), 4=-35(LC 13) MaxGrav1=181(LC 35), 4=216(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-260/142 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Bearing at joint(s) 4 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V33 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:36:002018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-C9rEaYadS380FRzVVOiNe36gkHPjqUKYB14gylzkaBz Scale=1:13.9 T1 W1 B1 1 2 3 4 5 2x4 1.5x4 1.5x4 5-0-8 5-0-8 0-0-42-1-35.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.27 0.17 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 13 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-0-8 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=147/4-11-14(min. 0-1-8), 3=147/4-11-14(min. 0-1-8) Max Horz1=76(LC 13) Max Uplift1=-27(LC 16), 3=-42(LC 16)MaxGrav1=166(LC 2), 3=166(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 4-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job # 56827-W1 Dansco Engineering, LLC Date: 2/16/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1801821-12T Truss V34 TrussType Valley Qty 1 Ply 1 1801821-12TDWH Jackson'sGrantLot187 Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.FriFeb1612:36:012018 Page1ID:0sl2?b7GGKmI8OMqWkf_tizP6AS-gMPcnubFDNGtsbYh25EcAGeulhn0ZxaiQhpEUBzkaBy Scale=1:9.1 T1 W1 B1 1 2 3 2x4 1.5x4 1.5x4 3-0-8 3-0-8 0-0-41-3-35.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.07 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 7 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2WEBS2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-0-8 oc purlins, except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide.REACTIONS.(lb/size)1=76/2-11-14(min. 0-1-8), 3=76/2-11-14(min. 0-1-8) Max Horz1=39(LC 13) Max Uplift1=-14(LC 16), 3=-22(LC 16)MaxGrav1=86(LC 2), 3=86(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard