Loading...
HomeMy WebLinkAbout04110031 Building Planssecond fir. plt. ht. u/5 of ceiling joists �n top of floor sheathing -- - - - 2 -rows brick u/S of ceiling joists soldier coursr brick veneer �m m top of floor Sheathing RIGHT ELEVATION or IU LLcro: to be determined c -r , 4-r uric++,, as 5pec'd by final grade quione w/ 12" spacing FRONT ELEVATION SCALE: 1/4" = Ir -O" bath 04 pit. ht- jutter board 'rieze board w/ :rown mold I mold orner board )p siding top of P O beam 2%% second fir. pit, ht, U/5 of ceiling joists top of fir, sheathing s gar. rftr. brng u/s of ceiling , o sty I I top of floor sr.eathing fi-" QO 1 LijV J W O LIJ 7 7;60 O I-- Cn D U PRINT October 25, 2004 DATE: DRAWN Bl': K. HAWKINS SCALE: AS SHOWN REVISIONS: OCTOBER 21, 2004 SHEET. 1 I I f I � 4) v-f)' � N 0 o Co W n A N N Q "o I N 4 n Z 00 CO Q -j 1 N O n O fi-" QO 1 LijV J W O LIJ 7 7;60 O I-- Cn D U PRINT October 25, 2004 DATE: DRAWN Bl': K. HAWKINS SCALE: AS SHOWN REVISIONS: OCTOBER 21, 2004 SHEET. 1 I I f I second 1'1�, pit. rt, u/s of ceiling joists top of Floor sheathing - u/s of ceiling ,joists SS 61 top of floor sheathing u/s of ceiling joists 1 top of Footing — - 1x6 window wrap —\ 1x6 gutter board - 1x10 frieze board w/ 5/4" crown mold i dentil molding—/ 1x6 lap siding 1x6 corner board- 2- rows brick - soldier course brick veneer - 12 REAR ELEVATION SCALE: 1/4" = 1'-O" 12 112 6xro wood posts V v 17 N C;1,00 .� O L Q O N N Q N N z- n 2 00 00 �Q�NN Li- z n o Ell X FINALS 4 LTL (4 o� o ti, �I .111 rrTT11� I �1 �MM W 1 r C� W second fir. - - -- — u/s of ceiling joists O L I F top of floor sheathing 6m 1 rommm" O ------ u/s of ceiling joists V / U PRINT October 25, 2004 DATE: top of floor sheathing DRAWN BY: K, HAWKINS SCALE: AS SHOWN u/s of ceiling joists REVISIONS: OCTOBER 21, 2004 top of footing L--- - -- SHEET: 2 0 a a I 0 I I I I SEEMS iiiiM 1� iiin III REAR ELEVATION SCALE: 1/4" = 1'-O" 12 112 6xro wood posts V v 17 N C;1,00 .� O L Q O N N Q N N z- n 2 00 00 �Q�NN Li- z n o Ell X FINALS 4 LTL (4 o� o ti, �I .111 rrTT11� I �1 �MM W 1 r C� W second fir. - - -- — u/s of ceiling joists O L I F top of floor sheathing 6m 1 rommm" O ------ u/s of ceiling joists V / U PRINT October 25, 2004 DATE: top of floor sheathing DRAWN BY: K, HAWKINS SCALE: AS SHOWN u/s of ceiling joists REVISIONS: OCTOBER 21, 2004 top of footing L--- - -- SHEET: 2 0 a a I 0 I I I I 52'-2" 8"XI(o" C.M.U. O POURED CONC. WALL FOOTER FOR BLOCK WALL Z?,"CONS, LINTEL I P I. O > P 1 OTER FOR 9' CONCRETE WALL LINTEL DETAIL FOR BASEMENT SCALE: 1/4" = 1'-0" GENERAL FOUNDATION NOTES: 1) ALL SOIL IS BASED ON 2800 P.S.F., AND CONCRETE IS BASED ON 2800 P.S.I. 9 28 GAYS, FOOTERS ARE 16" WIDE AND 8" DEEP UNLESS NOTED OTHERWISE ON PLANS, 2) BASEMENT WALL HEIGHT AS NOTED ON PLANS, W/ SHORT WALLS ID CRAWL SPACE OR SLAB BELOW FROST LINE AS REQUIRED, 3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND JUDGE FOR THEMSELVES, THE SUITABILITY OF THE CLANS IN RELATIONSHIP TO THE BUILDING SITE, AND EXISTING GRADES. 4) THESE DRAWINGS SERVE SA A GUIDE TO THE CONSTRUCTION OF THE BUILDING, DUE TO VARIATIONS IN DIFFERENT AREAS, THEY SAN ONLY BE A GUIDE. AND 'N NO WAY DICTATE AN— OF THE LOCAL AND/ OR STATE aUILDING CODES. 7 IS THE CONTRACTORS FULL RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCURACY AND CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ERRORS IN DESIGN, DIMENSIONS OR 0-IISSIONS, 5) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEED, AND MAY CHANGE AT ANY TIME, IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ACTUAL NEED AND SIZES IF NOT SHOWN. 6) ALL WINDOW SIZES LISTED ARE AS MANUFACTURED BY FELLA PROLINE, UNLESS NOTED OTHERWISE, AND MAY VARY BASED ON SUPPLIER, ALL FINISHES AND ROUGH OPENING=S MUST BE VERIFIED B" OWNER/ CONTRACTOR. l) ALL WALLS W/ BRICK ARE 1-1/2", ALL OTHERS TO BE ---1/2" UNLESS NOTED OTHERWISE ON PLANS. 8) ALL CEILINGS ARE g' '-lAIN LEVEL AND 8 UPPER LEVEL OR AS NOTED ON PLAN FOR GIVEN AREA. g) ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR IMMEDIATELY BEFORE CONSTRUCTION IS TO RESUME, TO INSURE PROPER STEPS ARE TAKEN, FOUNDATION PLAN SCALE: 1/4" = 1'-OIl 8"X9' POURED CONC. WALLS 4" CONC, SLAB OVER (v MIL POLY VAPOR BARRIER 4" MIN. GRAVEL FILL FINALS OI FSI OI WN - 0 01"o) w :�E O Z 5 0 v PRINT October 25, 2004 DATE, __ KINS SCALE: AS SHOWN REVISIONS: OCTOBER 21, 2004 h I SHEET: 3 0 I I I " 0 IN 0 I I I z LJ `) � O 00 WLd Q w d O '71N N N o z p z (\ I o�0 d d o�p Q � O :y T) pi z FINALS OI FSI OI WN - 0 01"o) w :�E O Z 5 0 v PRINT October 25, 2004 DATE, __ KINS SCALE: AS SHOWN REVISIONS: OCTOBER 21, 2004 h I SHEET: 3 0 I I I " 0 IN 0 I I I v N GENERAL PLAN NOTES: 1) THE CONTRACTOR SMALL VERIFY ALL CCND TONS AND JUDGE FOR THEMSELvE5, THE SUITABILITY OF THE PLANS IN RELATIONSHIP TO THE BUILDING SITE, AND EXISTING GRADES. 2) THESE DRAWINGS SER`✓E A5 A GUIDE TO THE CONSTRUCTION OF THE BUILDING:, DUE TO VARIATIONS IN DIFFERENT AREAS, THEY CAN ONLY BE A GUIDE, AND IN NO WAY DICTATE ANY OF THE LOCAL AND/ OR STATE BUILDING CODES. IT 15 THE CONTRACTORS FULL RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCURACY AND CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ERRORS IN DESIG=N, DIMEN5ION5 OR OMISSIONS, 3) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEED, AND MAY CHANGE AT ANY TME, IT 15 THE CONTRACTORS RESPONSIBILITY TO VERIFY ACTUAL NEED AND SIZES IF NOT 5HOWN, 4) ALL WINDOW SIZES LISTED ARE BASIC GL455 517ES AND MAY vARY BASED ON SUPPLIER, ALL FINISHES AND RCUGz 4 OPENINGS MUST BE VERIFIED BY OWNER, CONTRACTOR. 5) ALL WALLS W/ BRICK ARE --112", ALL CTHERS TO BE 3-1/2° UNLESS NOTED OTHERWISE ON PLANS. 6) ALL CEILINGS ARE 9' MAIN LEvEL AND S' UF:I=ER LEVEL OR AS NOTED ON PLAN FOR GIVEN AREA. lJ ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR/ DE5'GNER IMMEDIATELY BEFORE CONSTRUCTION 15 TO RESUME, TO INSURE PROPER STEPS ARE TAKEN. MAIN FLOOR PLAN SCALE: 1/4" = 1'-0" 1,905 S.F. FINALS W W L rmm" PRINT October 25, 2004 DATE: DRAWN By: K. HAWKINS SCALE: AS SHOWN REVISIONS: OGTOeER 21, 2004 SHEET: 12 I a N I � o W Q n a o N N o -f)� n z NN 00 0000 4) d a N FINALS W W L rmm" PRINT October 25, 2004 DATE: DRAWN By: K. HAWKINS SCALE: AS SHOWN REVISIONS: OGTOeER 21, 2004 SHEET: 12 I a N I NOT TO SCALE: 51'-0° 4'-2° 4--2" P�D3359-3 SEE r^AiN FLOOR PLAN POD3'59-3 F=3359 PGD3359 � � PCD2959 PCD2959 � � ----------------------------- �'—O�" 18'—Oil 51'-6 SECOND FLOOR PLAN SCALE: 1/4" = 1'-0" 2,055 S,F, FINALS �I C7 Z v N �-0 W w o N I N ' Q v z p ;F 1 , I 1NN � 00 ra LL Q J —j Co N r x CL c I 71 rx C� W I FINALS �I U' O. },� L 1 L cam' ;F 1 , I Olt� L /l r VD I C� W O Z r-. O V U PRINT October DATE: 25, 2004 DRAWN B1': K. HALUKINS SCALE: AS SHOWN REVISIONS: OCTOBER 21, 2004 SHEET: 15 r 0 I a 0 I 1 I 0 I I 0