HomeMy WebLinkAbout04110031 Building Planssecond fir. plt. ht.
u/5 of ceiling joists
�n
top of floor sheathing
-- - - - 2 -rows brick
u/S of ceiling joists soldier coursr
brick veneer
�m
m
top of floor Sheathing
RIGHT ELEVATION
or IU LLcro: to be determined c -r , 4-r uric++,,
as 5pec'd by final grade quione w/
12" spacing
FRONT ELEVATION
SCALE: 1/4" = Ir -O"
bath 04 pit. ht-
jutter board
'rieze board w/
:rown mold
I mold
orner board
)p siding top of P
O
beam
2%%
second fir. pit, ht,
U/5 of ceiling joists
top of fir, sheathing
s gar. rftr. brng
u/s of ceiling , o sty
I I top of floor sr.eathing
fi-"
QO
1
LijV J
W
O
LIJ 7
7;60 O
I--
Cn
D
U
PRINT October 25, 2004
DATE:
DRAWN Bl': K. HAWKINS
SCALE: AS SHOWN
REVISIONS:
OCTOBER 21, 2004
SHEET.
1
I
I
f
I
�
4)
v-f)'
�
N
0
o
Co
W
n
A
N
N
Q
"o
I
N
4
n
Z
00
CO
Q
-j
1
N
O
n
O
fi-"
QO
1
LijV J
W
O
LIJ 7
7;60 O
I--
Cn
D
U
PRINT October 25, 2004
DATE:
DRAWN Bl': K. HAWKINS
SCALE: AS SHOWN
REVISIONS:
OCTOBER 21, 2004
SHEET.
1
I
I
f
I
second 1'1�, pit. rt,
u/s of ceiling joists
top of Floor sheathing -
u/s of ceiling ,joists
SS
61
top of floor sheathing
u/s of ceiling joists 1
top of Footing — -
1x6 window
wrap —\
1x6 gutter board -
1x10 frieze board w/
5/4" crown mold i
dentil molding—/
1x6 lap siding
1x6 corner board-
2- rows brick -
soldier course
brick veneer -
12
REAR ELEVATION
SCALE: 1/4" = 1'-O"
12
112
6xro wood
posts
V v 17 N C;1,00
.� O
L Q O N N
Q N N
z- n 2 00 00
�Q�NN
Li-
z n o
Ell
X
FINALS
4
LTL
(4
o� o
ti, �I
.111
rrTT11�
I
�1
�MM
W
1
r
C�
W
second fir.
- - -- —
u/s of ceiling joists
O
L I F
top of floor sheathing 6m 1
rommm" O
------
u/s of ceiling joists
V /
U
PRINT October 25, 2004
DATE:
top of floor sheathing DRAWN BY: K, HAWKINS
SCALE: AS SHOWN
u/s of ceiling joists REVISIONS:
OCTOBER 21, 2004
top of footing
L--- - --
SHEET:
2
0
a
a
I
0
I
I
I
I
SEEMS
iiiiM
1�
iiin
III
REAR ELEVATION
SCALE: 1/4" = 1'-O"
12
112
6xro wood
posts
V v 17 N C;1,00
.� O
L Q O N N
Q N N
z- n 2 00 00
�Q�NN
Li-
z n o
Ell
X
FINALS
4
LTL
(4
o� o
ti, �I
.111
rrTT11�
I
�1
�MM
W
1
r
C�
W
second fir.
- - -- —
u/s of ceiling joists
O
L I F
top of floor sheathing 6m 1
rommm" O
------
u/s of ceiling joists
V /
U
PRINT October 25, 2004
DATE:
top of floor sheathing DRAWN BY: K, HAWKINS
SCALE: AS SHOWN
u/s of ceiling joists REVISIONS:
OCTOBER 21, 2004
top of footing
L--- - --
SHEET:
2
0
a
a
I
0
I
I
I
I
52'-2"
8"XI(o" C.M.U.
O
POURED CONC. WALL FOOTER FOR BLOCK WALL
Z?,"CONS, LINTEL
I P I. O > P 1
OTER FOR 9' CONCRETE WALL
LINTEL DETAIL FOR BASEMENT
SCALE: 1/4" = 1'-0"
GENERAL FOUNDATION NOTES:
1) ALL SOIL IS BASED ON 2800 P.S.F., AND CONCRETE IS BASED ON
2800 P.S.I. 9 28 GAYS, FOOTERS ARE 16" WIDE AND 8" DEEP
UNLESS NOTED OTHERWISE ON PLANS,
2) BASEMENT WALL HEIGHT AS NOTED ON PLANS, W/ SHORT WALLS
ID CRAWL SPACE OR SLAB BELOW FROST LINE AS REQUIRED,
3) THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND JUDGE
FOR THEMSELVES, THE SUITABILITY OF THE CLANS IN RELATIONSHIP
TO THE BUILDING SITE, AND EXISTING GRADES.
4) THESE DRAWINGS SERVE SA A GUIDE TO THE CONSTRUCTION OF
THE BUILDING, DUE TO VARIATIONS IN DIFFERENT AREAS, THEY SAN
ONLY BE A GUIDE. AND 'N NO WAY DICTATE AN— OF THE LOCAL
AND/ OR STATE aUILDING CODES. 7 IS THE CONTRACTORS FULL
RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCURACY AND
CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE
OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY
FOR ERRORS IN DESIGN, DIMENSIONS OR 0-IISSIONS,
5) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEED,
AND MAY CHANGE AT ANY TIME, IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY ACTUAL NEED AND SIZES IF NOT SHOWN.
6) ALL WINDOW SIZES LISTED ARE AS MANUFACTURED BY FELLA PROLINE,
UNLESS NOTED OTHERWISE, AND MAY VARY BASED ON SUPPLIER, ALL
FINISHES AND ROUGH OPENING=S MUST BE VERIFIED B" OWNER/ CONTRACTOR.
l) ALL WALLS W/ BRICK ARE 1-1/2", ALL OTHERS TO BE ---1/2" UNLESS
NOTED OTHERWISE ON PLANS.
8) ALL CEILINGS ARE g' '-lAIN LEVEL AND 8 UPPER LEVEL OR AS
NOTED ON PLAN FOR GIVEN AREA.
g) ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION
OF THE CONTRACTOR IMMEDIATELY BEFORE CONSTRUCTION
IS TO RESUME, TO INSURE PROPER STEPS ARE TAKEN,
FOUNDATION PLAN
SCALE: 1/4" = 1'-OIl
8"X9' POURED CONC. WALLS
4" CONC, SLAB OVER
(v MIL POLY VAPOR BARRIER
4" MIN. GRAVEL FILL
FINALS
OI
FSI
OI
WN -
0
01"o)
w
:�E
O
Z
5
0
v
PRINT October 25, 2004
DATE, __
KINS
SCALE: AS SHOWN
REVISIONS:
OCTOBER 21, 2004
h I
SHEET:
3
0
I
I
I
"
0
IN
0
I
I
I
z
LJ
`)
�
O
00
WLd
Q
w
d
O
'71N
N
N
o
z
p
z
(\
I
o�0
d
d
o�p
Q
�
O
:y
T)
pi
z
FINALS
OI
FSI
OI
WN -
0
01"o)
w
:�E
O
Z
5
0
v
PRINT October 25, 2004
DATE, __
KINS
SCALE: AS SHOWN
REVISIONS:
OCTOBER 21, 2004
h I
SHEET:
3
0
I
I
I
"
0
IN
0
I
I
I
v
N
GENERAL PLAN NOTES:
1) THE CONTRACTOR SMALL VERIFY ALL CCND TONS AND JUDGE
FOR THEMSELvE5, THE SUITABILITY OF THE PLANS IN RELATIONSHIP
TO THE BUILDING SITE, AND EXISTING GRADES.
2) THESE DRAWINGS SER`✓E A5 A GUIDE TO THE CONSTRUCTION OF
THE BUILDING:, DUE TO VARIATIONS IN DIFFERENT AREAS, THEY CAN
ONLY BE A GUIDE, AND IN NO WAY DICTATE ANY OF THE LOCAL
AND/ OR STATE BUILDING CODES. IT 15 THE CONTRACTORS FULL
RESPONSIBILITY TO REVIEW ALL PLANS FOR ACCURACY AND
CLARITY, AND TO INSURE ALL SUBS ARE CLEAR AS TO THE SCOPE
OF THEIR WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY
FOR ERRORS IN DESIG=N, DIMEN5ION5 OR OMISSIONS,
3) ALL STRUCTURAL MEMBERS ARE BASED ON AN ASSUMED NEED,
AND MAY CHANGE AT ANY TME, IT 15 THE CONTRACTORS
RESPONSIBILITY TO VERIFY ACTUAL NEED AND SIZES IF NOT 5HOWN,
4) ALL WINDOW SIZES LISTED ARE BASIC GL455 517ES AND MAY vARY
BASED ON SUPPLIER, ALL FINISHES AND RCUGz 4 OPENINGS
MUST BE VERIFIED BY OWNER, CONTRACTOR.
5) ALL WALLS W/ BRICK ARE --112", ALL CTHERS TO BE 3-1/2° UNLESS
NOTED OTHERWISE ON PLANS.
6) ALL CEILINGS ARE 9' MAIN LEvEL AND S' UF:I=ER LEVEL OR AS
NOTED ON PLAN FOR GIVEN AREA.
lJ ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION
OF THE CONTRACTOR/ DE5'GNER IMMEDIATELY BEFORE CONSTRUCTION
15 TO RESUME, TO INSURE PROPER STEPS ARE TAKEN.
MAIN FLOOR PLAN
SCALE: 1/4" = 1'-0" 1,905 S.F.
FINALS
W
W
L
rmm"
PRINT October 25, 2004
DATE:
DRAWN By: K. HAWKINS
SCALE: AS SHOWN
REVISIONS:
OGTOeER 21, 2004
SHEET:
12
I
a
N
I
�
o
W
Q
n
a
o
N
N
o
-f)�
n
z
NN
00
0000
4)
d
a
N
FINALS
W
W
L
rmm"
PRINT October 25, 2004
DATE:
DRAWN By: K. HAWKINS
SCALE: AS SHOWN
REVISIONS:
OGTOeER 21, 2004
SHEET:
12
I
a
N
I
NOT TO SCALE:
51'-0°
4'-2° 4--2"
P�D3359-3
SEE r^AiN FLOOR PLAN POD3'59-3
F=3359 PGD3359
� � PCD2959 PCD2959 � �
-----------------------------
�'—O�"
18'—Oil
51'-6
SECOND FLOOR PLAN
SCALE: 1/4" = 1'-0" 2,055 S,F,
FINALS
�I
C7
Z
v
N
�-0
W
w
o
N
I
N
'
Q
v
z
p
;F 1 , I
1NN
�
00
ra
LL
Q
J
—j
Co
N
r
x
CL
c
I
71
rx
C�
W
I
FINALS
�I
U'
O.
},� L
1
L
cam'
;F 1 , I
Olt�
L /l
r
VD
I
C�
W
O
Z
r-.
O
V
U
PRINT October
DATE:
25, 2004
DRAWN B1': K. HALUKINS
SCALE: AS SHOWN
REVISIONS:
OCTOBER 21, 2004
SHEET:
15
r
0
I
a
0
I
1
I
0
I
I
0