Job: 1801820-12T
85 truss design(s)
56780-W1
2/14/18
Samuel A. Greenberg, P.E.
Indiana Reg. #19700485
Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural
gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length
is the distance from the top chord to bottom chord.
The seal on these drawings indicate acceptance of professional engineering
responsibility solely for the truss components shown. The suitability and use of this
component for any particular building is the responsibility of the building designer, per
ANSI/TPI 1-2007 Chapter 2.
Warning !—Verify design parameters and read notes before use.
These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of
design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown
is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the
erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication,
quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J01
TrussType
Jack-Open
Qty
13
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:292018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-KO8dKTFabqh7VKdt4ArhFgj89X6DZj3MvEgFA8zlDAe
Scale=1:13.7
T1
B11
2
8
9
3
4
2x4
4-5-0
4-5-0
-0-10-12
0-10-12
4-5-0
4-5-0
0-4-12-2-21-9-112-2-25.0012
PlateOffsets(X,Y)-- [2:0-0-2,0-0-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.22
0.19
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.05
-0.05
-0.00
(loc)
4-7
4-7
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 12 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-5-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)3=95/Mechanical, 2=204/0-4-0(min. 0-1-8), 4=54/Mechanical
Max Horz2=87(LC 16)
Max Uplift3=-58(LC 16), 2=-74(LC 12), 4=-21(LC 13)MaxGrav3=111(LC 2), 2=233(LC 2), 4=79(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 4-4-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J02
TrussType
Jack-Open
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:302018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-oai?YoGDM8p_6UC4euNwnuGMIwUkIAJV8uQojbzlDAd
Scale=1:9.4
T1
B11
2
3
4
2x4
2-3-15
2-3-15
-0-10-12
0-10-12
2-3-15
2-3-15
0-4-11-3-110-11-41-3-115.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.06
0.04
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.00
(loc)
7
7
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 7 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-3-15 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=45/Mechanical, 2=135/0-4-0(min. 0-1-8), 4=26/MechanicalMax Horz2=52(LC 16)
Max Uplift3=-26(LC 16), 2=-56(LC 12), 4=-11(LC 13)
MaxGrav3=52(LC 2), 2=155(LC 2), 4=39(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J03
TrussType
DiagonalHipGirder
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:312018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-GmGNl8Gr7SxrkenGBbu9K5pRDKlh1dZeNY9LF1zlDAc
Scale=1:14.4
T1
B11
2
8
9
3
10 4
3x4
6-1-7
6-1-7
-1-3-3
1-3-3
3-4-4
3-4-4
6-1-7
2-9-3
0-4-12-1-111-9-92-1-113.5412
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.44
0.31
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.12
-0.14
0.00
(loc)
4-7
4-7
2
l/defl
>604
>519
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 16 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=142/Mechanical, 2=185/0-5-5(min. 0-1-8), 4=75/MechanicalMax Horz2=78(LC 38)
Max Uplift3=-91(LC 8), 2=-160(LC 10), 4=-27(LC 8)
MaxGrav3=167(LC 2), 2=214(LC 2), 4=112(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 4 except(jt=lb)
2=160.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 18 lb down and 22 lb up at
3-4-9, and 18 lb down and 22 lb up at 3-4-9 on top chord, and 7 lb down and 24 lb up at 3-4-9, and 7 lb down and 24 lb up at 3-4-9on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-2=-51
Concentrated Loads(lb)
Vert: 10=-10(F=-5,B=-5)Trapezoidal Loads(plf)
Vert: 2=0(F=25,B=25)-to-3=-78(F=-13,B=-13), 5=0(F=10,B=10)-to-4=-31(F=-5,B=-5)
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J04
TrussType
Jack-Open
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:322018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-kzpmzUHTul3iMoMSlJPOsJLglk84m4pobBvvnTzlDAb
Scale:1"=1'
T1
B11
2
8
9
3
4
2x4
3-7-0
3-7-0
-0-10-12
0-10-12
3-7-0
3-7-0
0-4-11-9-151-5-91-9-155.0012
PlateOffsets(X,Y)-- [2:0-0-2,0-0-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.13
0.11
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.02
-0.02
-0.00
(loc)
4-7
4-7
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 10 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)3=76/Mechanical, 2=176/0-4-0(min. 0-1-8), 4=43/Mechanical
Max Horz2=73(LC 16)
Max Uplift3=-46(LC 16), 2=-66(LC 12), 4=-17(LC 13)MaxGrav3=88(LC 2), 2=201(LC 2), 4=63(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 3-6-4zone;cantileverleft exposed ;
endverticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber
DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J05
TrussType
Jack-Open
Qty
3
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:332018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-C9N8AqI5f3BYzyxeJ0wdPWujz8Q7VX3xqreSJwzlDAa
Scale=1:24.4
W1
T1
B1
1
2
5
6
7
3
4
4x6
3x4
4-8-0
4-8-0
-0-10-12
0-10-12
4-8-0
4-8-0
2-4-14-3-63-10-154-3-65.0012
PlateOffsets(X,Y)-- [5:0-0-0,0-1-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.68
0.38
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.05
-0.06
-0.16
(loc)
4-5
4-5
3
l/defl
>999
>919
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 14 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-8-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)5=217/0-6-0(min. 0-1-8), 3=104/Mechanical, 4=48/Mechanical
Max Horz5=105(LC 13)Max Uplift5=-13(LC 16), 3=-88(LC 16)
MaxGrav5=248(LC 2), 3=122(LC 2), 4=86(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 4-7-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J06
TrussType
Jack-Open
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:332018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-C9N8AqI5f3BYzyxeJ0wdPWunq8SgVX3xqreSJwzlDAa
Scale=1:20.2
W1
T1
B1
1
2
5
6
3
4
3x4
3x4
2-6-15
2-6-15
-0-10-12
0-10-12
2-6-15
2-6-15
2-4-13-4-155.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.43
0.22
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
-0.01
-0.06
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 9 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-15 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=148/0-6-0(min. 0-1-8), 3=49/Mechanical, 4=23/Mechanical
Max Horz5=81(LC 13)
Max Uplift5=-15(LC 12), 3=-53(LC 16), 4=-15(LC 13)MaxGrav5=171(LC 2), 3=58(LC 2), 4=45(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 2-6-3zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 3, 4.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J07
TrussType
DiagonalHipGirder
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:342018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hLxWNAJjQNJPb6WrtjRsykRwbYlDE_J53VO?sMzlDAZ
Scale=1:25.3
W1
T1
B1
1
2
5
6
3
7
4
3x4
2x4
6-5-11
6-5-11
-1-3-3
1-3-3
3-2-13
3-2-13
6-5-11
3-2-13
2-4-14-2-153-10-134-2-153.5412
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.56
0.39
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.13
-0.18
-0.20
(loc)
4-5
4-5
3
l/defl
>598
>409
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 19 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)5=204/0-8-2(min. 0-1-8), 3=162/Mechanical, 4=72/Mechanical
Max Horz5=90(LC 9)
Max Uplift5=-111(LC 10), 3=-122(LC 12), 4=-8(LC 9)MaxGrav5=235(LC 2), 3=191(LC 2), 4=125(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
5=111, 3=122.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 24 lb down and 49 lb up at 3-8-13, and 24 lb down and 49 lb up at 3-8-13 on top chord, and 10 lb down and 29 lb up at 3-8-13, and 10 lb down and 29 lb up at
3-8-13 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-2=-51
Concentrated Loads(lb)Vert: 7=-1(F=-0,B=-0)
Trapezoidal Loads(plf)
Vert: 2=-2(F=24,B=24)-to-3=-82(F=-16,B=-16), 5=0(F=10,B=10)-to-4=-32(F=-6,B=-6)
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J08
TrussType
Jack-Open
Qty
7
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:352018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9YVubWJLBgRGDF51QRy5UxzAAx8PzRYEH97ZOozlDAY
Scale=1:14.2
T1
B11
2
8
9
3
4
2x4
4-8-0
4-8-0
-0-10-12
0-10-12
4-8-0
4-8-0
0-4-12-3-61-10-152-3-65.0012
PlateOffsets(X,Y)-- [2:0-0-2,0-0-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.25
0.20
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.03
-0.06
0.00
(loc)
4-7
4-7
2
l/defl
>999
>937
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 12 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-8-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)3=101/Mechanical, 2=213/0-6-0(min. 0-1-8), 4=57/Mechanical
Max Horz2=91(LC 16)
Max Uplift3=-62(LC 16), 2=-45(LC 16)MaxGrav3=118(LC 2), 2=243(LC 2), 4=84(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 4-7-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J09
TrussType
Jack-Open
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:362018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-dk3GosKzx_Z7qPfD_8UK19WOnLX?iuoOWpt6wEzlDAX
Scale=1:9.9
T1
B11
2
8
3
4
2x4
2-6-15
2-6-15
-0-10-12
0-10-12
2-6-15
2-6-15
0-4-11-4-155.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.06
0.05
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
0.00
(loc)
7
4-7
2
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 7 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-15 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=51/Mechanical, 2=143/0-6-0(min. 0-1-8), 4=30/MechanicalMax Horz2=56(LC 16)
Max Uplift3=-30(LC 16), 2=-37(LC 16)
MaxGrav3=59(LC 2), 2=164(LC 2), 4=44(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 2-6-3zone;cantileverleft and rightexposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
J10
TrussType
DiagonalHipGirder
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:372018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-5wdf0CLciIh_SZEQYs?ZZM3RGlnFRL2XlTcgShzlDAW
Scale=1:15.0
T1
B11
2
8
3
9 4
3x4
6-5-11
6-5-11
-1-3-3
1-3-3
3-6-6
3-6-6
6-5-11
2-11-5
0-4-12-2-151-10-132-2-153.5412
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.53
0.37
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.09
-0.18
0.00
(loc)
4-7
4-7
2
l/defl
>886
>419
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 17 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)3=160/Mechanical, 2=198/0-8-2(min. 0-1-8), 4=85/MechanicalMax Horz2=81(LC 8)
Max Uplift3=-93(LC 12), 2=-96(LC 10)
MaxGrav3=188(LC 2), 2=228(LC 2), 4=123(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6) Refer to girder(s) for truss to trussconnections.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 21 lb down and 28 lb up at
3-8-13, and 21 lb down and 28 lb up at 3-8-13 on top chord, and 8 lb down and 5 lb up at 3-8-13, and 8 lb down and 5 lb up at
3-8-13 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51Concentrated Loads(lb)
Vert: 9=-12(F=-6,B=-6)
Trapezoidal Loads(plf)Vert: 2=0(F=25,B=25)-to-3=-82(F=-16,B=-16), 5=0(F=10,B=10)-to-4=-32(F=-6,B=-6)
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB01GE
TrussType
Piggyback
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:382018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Z7B1DXMETbpr4jpc6ZWo6abi19BEAn9g_7MD?7zlDAV
Scale=1:17.4
0-1-150-1-15T1
T2
T1
B1
ST1
1
2
3 4 5
67
8
9 10
3x4 3x4
2x4 2x41.5x4
1.5x4
8-8-2
8-8-2
1-9-5
1-9-5
6-10-13
5-1-7
8-8-2
1-9-5
0-5-101-10-152-0-140-1-100-5-100-1-1014.0012
PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [3:0-2-2,0-1-8], [5:0-2-2,0-1-8], [6:0-2-10,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.14
0.13
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
7
7
6
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 22 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=172/7-7-11(min. 0-1-8), 6=172/7-7-11(min. 0-1-8), 8=281/7-7-11(min. 0-1-8)
Max Horz2=48(LC 15)
Max Uplift2=-35(LC 16), 6=-35(LC 17), 8=-31(LC 13)MaxGrav2=228(LC 39), 6=228(LC 39), 8=422(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 4-8=-327/132
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-7 to 6-0-4,Interior(1) 6-0-4 to 6-10-13,Exterior(2) 6-10-13 to 8-5-11
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6, 8.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB02
TrussType
Piggyback
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:392018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-1JkPRtNsEvxihtOofH11fn8tUZWRvFxqCn5mXZzlDAU
Scale=1:22.7
0-1-150-1-15T1
T2
T1
B1
ST1
1
2
3 4 5
67
8
9 10
3x4 3x4
2x4 2x41.5x4
1.5x4
8-8-2
8-8-2
3-2-7
3-2-7
5-5-10
2-3-3
8-8-2
3-2-7
0-5-103-6-153-8-140-1-100-5-100-1-103-5-514.0012
PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [3:0-2-2,0-1-8], [5:0-2-2,0-1-8], [6:0-2-10,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.16
0.13
0.04
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.01
0.00
(loc)
7
7
6
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 26 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=217/7-7-11(min. 0-1-8), 6=217/7-7-11(min. 0-1-8), 8=162/7-7-11(min. 0-1-8)
Max Horz2=93(LC 15)
Max Uplift2=-74(LC 16), 6=-77(LC 17)MaxGrav2=381(LC 39), 6=381(LC 39), 8=233(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-9=-324/143, 6-10=-324/144
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB03
TrussType
Piggyback
Qty
4
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:402018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-VVIneDNU?D3ZJ1z?D_YGB?h_jytleiwzRRrK30zlDAT
Scale=1:34.0
T1 T1
B1
ST1
1
2
3
4
5
6
7
8 9
10
4x4
2x4 2x4
1.5x4
8-8-2
8-8-2
4-4-1
4-4-1
8-8-2
4-4-1
0-5-105-0-120-1-100-5-100-1-1014.0012
PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [4:0-2-10,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.32
0.12
0.06
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 29 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=186/7-7-11(min. 0-1-8), 4=186/7-7-11(min. 0-1-8), 6=201/7-7-11(min. 0-1-8)
Max Horz2=-132(LC 14)
Max Uplift2=-64(LC 17), 4=-56(LC 17)MaxGrav2=214(LC 2), 4=214(LC 2), 6=233(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-7 to 3-2-7,Interior(1) 3-2-7 to 4-4-1,Exterior(2) 4-4-1 to 7-4-1zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB04
TrussType
Piggyback
Qty
1
Ply
2
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:412018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-zis9rZO6mWCQxAYBni3VkCDC_MEyN9m7g5atbSzlDAS
Scale=1:34.0
T1 T1
B1
ST1
1
2
3
4
5
6
7
8 9
10
4x4
2x4 2x4
1.5x4
8-8-2
8-8-2
4-4-1
4-4-1
8-8-2
4-4-1
0-5-105-0-120-1-100-5-100-1-1014.0012
PlateOffsets(X,Y)-- [2:0-2-10,0-1-0], [4:0-2-10,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.16
0.06
0.02
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.01
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 57 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)2=186/7-7-11(min. 0-1-8), 4=186/7-7-11(min. 0-1-8), 6=201/7-7-11(min. 0-1-8)
Max Horz2=132(LC 15)
Max Uplift2=-64(LC 17), 4=-56(LC 17)MaxGrav2=214(LC 2), 4=214(LC 2), 6=233(LC 7)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc.
Bottomchordsconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-7 to 3-2-7,Interior(1) 3-2-7 to 4-4-1,Exterior(2) 4-4-1 to 7-4-1zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
6) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
8)Gablerequirescontinuous bottomchord bearing.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB05
TrussType
Piggyback
Qty
13
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:422018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SuQY3vPkXqKHYK7NLPalGQmNfmZj6bPGulKR8uzlDAR
Scale=1:41.9
T1 T1
B1
ST2
ST1 ST1
1
2
3
4
5
6 7
10 9 8
11
12
13 14
15
16
4x4
3x4 3x4
1.5x41.5x4
1.5x4
1.5x4
1.5x4
15-11-8
15-11-8
7-11-12
7-11-12
15-11-8
7-11-12
0-4-136-7-130-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-2-1,0-1-8], [6:0-2-1,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.17
0.09
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
6
7
6
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 53 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 14-8-1.
(lb)-Max Horz2=-168(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2 except 10=-204(LC 16), 8=-203(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 2, 6, 9 except 10=383(LC 30), 8=382(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 3-10=-314/240, 5-8=-314/240
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 3-2-14,Interior(1) 3-2-14 to 7-11-12,Exterior(2) 7-11-12 to
10-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb)10=204, 8=203.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB05GE
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:432018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-w4_wGFQNI8S8AUiZu66_pdJZ_AwXr2RP7P3_gKzlDAQ
Scale=1:40.2
T1 T1
B1
ST3
ST2
ST1
ST3
ST2
ST1
1
2
3
4
5
6
7
8
9
10
11
17 16 15 14 13 12
18 19
3x4
3x4 3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
15-11-8
15-11-8
7-11-12
7-11-12
15-11-8
7-11-12
0-4-136-7-130-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-0-0,0-0-0], [6:0-2-0,Edge], [7:0-0-0,0-0-0], [8:0-0-0,0-0-0], [9:0-0-0,0-0-0], [10:0-0-0,0-0-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.07
0.06
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
10
11
10
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 64 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 14-8-1.
(lb)-Max Horz2=-168(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 15, 16, 14 except 17=-115(LC 16), 13=-101(LC 17),12=-114(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 2, 10, 15, 16, 17, 14, 13, 12
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 2-11-12,Interior(1) 2-11-12 to 7-11-12,Exterior(2) 7-11-12 to
10-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Gablerequirescontinuous bottomchord bearing.8)Gablestudsspaced at 2-0-0 oc.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 15, 16, 14except(jt=lb) 17=115, 13=101, 12=114.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB06
TrussType
Piggyback
Qty
4
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:442018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-OHYIUbQ?3Ra?oeHmSqdDMrrfdaDiaVvZM3pXCnzlDAP
Scale=1:41.9
T1 T1
B1
ST2
ST1 ST1
1
2
3
4
5
6 7
10 9 8
11
12
13 14
15
1617
4x4
3x4 3x4
1.5x41.5x4
1.5x4
1.5x4
1.5x4
15-11-8
15-11-8
7-11-12
7-11-12
15-11-8
7-11-12
0-4-136-7-130-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-2-1,0-1-8], [6:0-2-1,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.39
0.19
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.01
0.00
(loc)
7
7
6
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 53 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 14-8-1.
(lb)-Max Horz2=-168(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 6 except 10=-205(LC 16), 8=-251(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 2, 6, 9 except 10=388(LC 30), 8=613(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 3-10=-317/241, 5-8=-496/282
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 3-2-14,Interior(1) 3-2-14 to 7-11-12,Exterior(2) 7-11-12 to
10-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6 except(jt=lb)10=205, 8=251.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 275 lb down and 57 lb up at
13-1-0 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-4=-51, 4-7=-51, 2-6=-20
Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB06
TrussType
Piggyback
Qty
4
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:442018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-OHYIUbQ?3Ra?oeHmSqdDMrrfdaDiaVvZM3pXCnzlDAP
LOADCASE(S)Standard
Concentrated Loads(lb)
Vert: 17=-240
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB06GE
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:452018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-sT6ghxRdqlirQory0X8Su2OvszaiJyaibjY5lDzlDAO
Scale=1:40.2
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
1
2
3
4
5
6
7
8 9
14 13 12 11 10
15
16
17 18
19
20
4x4
3x4 3x4
1.5x41.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
15-11-8
15-11-8
7-11-12
7-11-12
15-11-8
7-11-12
0-4-136-7-130-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-0-0,0-0-0], [8:0-0-0,0-0-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.10
0.07
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
9
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 63 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 14-8-1.
(lb)-Max Horz2=-168(LC 14)
Max UpliftAll uplift 100 lb orless at joint(s) 2, 13, 11 except 14=-156(LC 16), 10=-156(LC 17)MaxGravAllreactions 250 lb orless at joint(s) 2, 8, 12, 13, 11 except 14=298(LC 30), 10=299(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-14 to 3-2-14,Interior(1) 3-2-14 to 7-11-12,Exterior(2) 7-11-12 to
10-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Gablerequirescontinuous bottomchord bearing.
8)Gablestudsspaced at 2-0-0 oc.9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 13, 11 except
(jt=lb) 14=156, 10=156.11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB07
TrussType
Piggyback
Qty
11
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:462018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Kfg2vHSFb3qi1yQ8aFfhRGx5GNvK2PHspNIeHfzlDAN
Scale=1:15.7
T1 T1
B11
2
3
4
5
3x4
2x4 2x4
5-5-1
5-5-1
2-8-9
2-8-9
5-5-1
2-8-9
0-4-132-3-20-1-100-4-130-1-1010.0012
PlateOffsets(X,Y)-- [2:0-2-1,0-1-0], [3:0-2-0,Edge], [4:0-2-1,0-1-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.06
0.18
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 13 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-5-1 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=167/4-1-10(min. 0-1-8), 4=167/4-1-10(min. 0-1-8)
Max Horz2=-54(LC 14)
Max Uplift2=-29(LC 16), 4=-29(LC 17)MaxGrav2=190(LC 2), 4=190(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB08
TrussType
Piggyback
Qty
1
Ply
2
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:462018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Kfg2vHSFb3qi1yQ8aFfhRGx4KNsA2PHspNIeHfzlDAN
Scale=1:17.4
T1 T1
B11
2
3
4
5
6
7
8 9
10
11
3x4
2x4 2x4
10-4-3
10-4-3
5-2-2
5-2-2
10-4-3
5-2-2
0-4-12-1-140-1-100-4-10-1-105.0012
PlateOffsets(X,Y)-- [3:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.12
0.38
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.01
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 44 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)2=323/8-1-0(min. 0-1-8), 4=323/8-1-0(min. 0-1-8)Max Horz2=-35(LC 17)
Max Uplift2=-64(LC 16), 4=-64(LC 17)
MaxGrav2=367(LC 2), 4=367(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-6=-339/180, 6-7=-300/185, 7-8=-296/186, 3-8=-273/193, 3-9=-273/193,9-10=-296/186, 10-11=-300/185, 4-11=-339/180
BOT CHORD 2-4=-110/276
NOTES-
1) 2-ply truss to be connected together as follows:
Topchordsconnectedwith 10d (0.131"x3") nails as follows: 2x4- 1 row at 0-9-0 oc.
Bottomchordsconnectedwith 10d (0.131"x3") nails as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 3-4-14,Interior(1) 3-4-14 to 5-2-2,Exterior(2) 5-2-2 to 8-2-2zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.16) Unbalancedsnowloads have been considered for this design.
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.8)Gablerequirescontinuous bottomchord bearing.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB09
TrussType
Piggyback
Qty
5
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:472018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-orDR6cTtMMyZf5?L7yAwzTTD8n6UnsW?211Bp6zlDAM
Scale=1:17.4
T1 T1
B11
2
3
4
5
6
7
8 9
10
11
3x4
2x4 2x4
10-4-3
10-4-3
5-2-2
5-2-2
10-4-3
5-2-2
0-4-12-1-140-1-100-4-10-1-105.0012
PlateOffsets(X,Y)-- [3:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.25
0.76
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.03
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 22 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=323/8-1-0(min. 0-1-8), 4=323/8-1-0(min. 0-1-8)
Max Horz2=-35(LC 17)
Max Uplift2=-64(LC 16), 4=-64(LC 17)MaxGrav2=367(LC 2), 4=367(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-6=-339/180, 6-7=-300/185, 7-8=-296/186, 3-8=-273/193, 3-9=-273/193,
9-10=-296/186, 10-11=-300/185, 4-11=-339/180
BOT CHORD 2-4=-110/276
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 3-4-14,Interior(1) 3-4-14 to 5-2-2,Exterior(2) 5-2-2 to 8-2-2zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Gablerequirescontinuous bottomchord bearing.7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB10
TrussType
Piggyback
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:482018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-G2npKyTV7g4QHFaXhgh9Wh0PmBbKWJ_9HhnlLYzlDAL
Scale=1:18.0
0-1-100-1-10T1
T2
T1
B1
ST1
1
2
3 4 5
6
7
8
9
10 11
12
3x4 3x4
2x4 2x41.5x4
1.5x4
10-4-3
10-4-3
4-6-9
4-6-9
5-9-10
1-3-1
10-4-3
4-6-9
0-4-11-10-120-1-100-4-10-1-105.0012
PlateOffsets(X,Y)-- [3:0-2-0,Edge], [5:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.19
0.14
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.00
(loc)
7
7
6
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 23 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=187/8-1-0(min. 0-1-8), 6=187/8-1-0(min. 0-1-8), 8=285/8-1-0(min. 0-1-8)
Max Horz2=-29(LC 21)
Max Uplift2=-63(LC 16), 6=-67(LC 17), 8=-1(LC 12)MaxGrav2=285(LC 39), 6=285(LC 39), 8=326(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 3-4-14,Interior(1) 3-4-14 to 4-6-9,Exterior(2) 4-6-9 to 5-9-10
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 6, 8.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building
designer.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
PB11
TrussType
Piggyback
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:492018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-kELBXIU7u_CHuP9jFNCO3uYVsbslFm0IVLWIu_zlDAK
Scale=1:18.0
0-1-100-1-10T1
T2
T1
B11
2
3 4
5
6
7 8
3x4 3x4
3x5 3x5
10-4-3
10-4-3
2-6-9
2-6-9
7-9-10
5-3-1
10-4-3
2-6-9
0-4-11-0-120-1-100-4-10-1-105.0012
PlateOffsets(X,Y)-- [2:0-3-0,0-1-8], [3:0-1-12,0-0-15], [4:0-1-12,0-0-15], [5:0-3-0,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-R
0.49
0.45
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.02
0.01
(loc)
6
6
5
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 21 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-0-8 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=349/8-1-0(min. 0-1-8), 5=349/8-1-0(min. 0-1-8)
Max Horz2=-15(LC 21)
Max Uplift2=-75(LC 12), 5=-75(LC 13)MaxGrav2=367(LC 2), 5=367(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-945/333, 3-7=-912/312, 7-8=-912/312, 4-8=-912/312, 4-5=-945/333
BOT CHORD 2-5=-268/912
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-14 to 6-9-8,Interior(1) 6-9-8 to 7-9-10,Exterior(2) 7-9-10 to 9-11-6
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.7)Gablerequirescontinuous bottomchord bearing.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 5.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified buildingdesigner.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T01GE
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:502018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DQvZkeVmeHK8WZkwp5kdb65ln_I6_BPRk?GsQQzlDAJ
Scale=1:70.8
T2
T3
B1
W1 HW2
ST2
ST1
ST3
ST4 ST5
W2T1
2
3 4
5
6
7
8
9
10 11
17 16 15 14 13 12
1
184x6
4x6
1.5x4
3x4
4x4
1.5x4
2x4
3x4
2x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
-5-0-0
5-0-0
11-4-0
11-4-0
-5-0-0
5-0-0
5-2-0
5-2-0
11-4-0
6-2-0
11-11-12
0-7-12
0-8-77-8-64-10-60-6-114.0012
PlateOffsets(X,Y)-- [2:0-1-4,0-2-0], [6:Edge,0-1-14]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.16
0.06
0.18
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
-0.01
(loc)
17
16-17
1
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 81 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*T3: 2x4SPF No.2
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStudOTHERS2x4SPFStud
WEDGE
Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 16-17.
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 11-4-0 except(jt=length) 1=0-5-8.
(lb)-Max Horz17=324(LC 13)Max UpliftAll uplift 100 lb orless at joint(s) 17, 10, 15, 14 except 16=-329(LC 16),
13=-169(LC 17), 12=-140(LC 17), 1=-166(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 15, 16, 14, 13, 12, 1 except
17=445(LC 32), 10=272(LC 17)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 9-10=-394/325, 2-17=-430/143
BOT CHORD 16-17=-315/301, 15-16=-223/306, 14-15=-224/306, 13-14=-224/306, 12-13=-224/306,
10-12=-224/306
WEBS 2-16=-456/592
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-4-9-4 to -1-9-4,Exterior(2)-1-9-4 to 5-2-0, Corner(3) 5-2-0 to 8-2-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Gablestudsspaced at 2-0-0 oc.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 17, 10, 15, 14
except(jt=lb) 16=329, 13=169, 12=140, 1=166.
10)Beveled plate orshimrequired to provide full bearingsurfacewith trusschord at joint(s) 1.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T01GE
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:502018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DQvZkeVmeHK8WZkwp5kdb65ln_I6_BPRk?GsQQzlDAJ
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T02GE
TrussType
PiggybackBase StructuralGableCOMMONllGablelGable
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:522018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9p1K9KX0AvasltuIwVm5gXAy?orGSzmkCJlyUJzlDAH
Scale=1:69.1
T1
T2
T3
B1
W1
W2 W2
W7
W2 W2
W1
ST5
ST6
ST3
ST4ST2ST1
ST5
ST6
ST3
ST4 ST2 ST1
B1
W5
W5
W6
W3
W4
1
2
3
4 5 6 7 8
9
10
16 15 14 13 12 11
40
38
17
41
39
42
4950
51
52
53
54
55 56
8x8 5x6
3x8
3x6 3x4
3x4
2x4 2x4 8x8
2x42x42x4
2x4
2x4 2x4
2x4
2x48x8
5x6
3-8-85-0-08-11-158-11-15 10-4-01-4-1
11-4-0
1-0-0 13-4-02-0-0 15-4-02-0-0 17-8-12-4-1 26-8-08-11-15
-0-7-12
0-7-12
4-7-3
4-7-3
8-11-15
4-4-12
11-4-0
2-4-1
13-4-0
2-0-0
15-4-0
2-0-0
17-8-1
2-4-1
22-0-13
4-4-12
26-8-0
4-7-3
0-6-111-0-00-6-111-0-014.0012
PlateOffsets(X,Y)-- [2:0-6-0,0-1-15], [4:0-5-0,0-1-12], [8:0-2-11,Edge], [10:0-8-0,0-2-3], [11:0-3-8,0-4-8], [13:0-4-0,0-4-8], [15:0-3-0,0-2-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.75
0.59
0.64
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.17
-0.35
0.04
(loc)
12
12
10
l/defl
>999
>553
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 248 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPF No.2 *Except*
W1,W7,W5,W6: 2x4SPFStudOTHERS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-10-11 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 4-16, 4-15, 5-15
JOINTS 1Brace at Jt(s): 17, 38, 39, 40, 41, 42
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)10=2001/0-6-0(min. 0-2-2), 2=1717/0-6-0(min. 0-1-13), 15=-111/0-6-0(min. 0-1-8)Max Horz2=301(LC 13)
Max Uplift10=-372(LC 17), 2=-314(LC 17), 15=-511(LC 49)
MaxGrav10=2533(LC 39), 2=2212(LC 39), 15=252(LC 12)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-49=-2660/440, 49-50=-2544/454, 3-50=-2397/474, 3-51=-2414/498, 4-51=-2213/535,4-5=-1664/452, 5-6=-1742/466, 6-7=-1742/466, 7-8=-1712/461, 8-52=-2620/600,
9-52=-2813/563, 9-53=-2798/527, 53-54=-2935/507, 10-54=-3061/493
BOT CHORD 2-16=-226/1655, 15-16=-137/1427, 14-15=-159/1697, 13-14=-160/1703, 13-55=-160/1703,
12-55=-160/1703, 11-12=-161/1712, 11-56=-234/1910, 10-56=-234/1910
WEBS 3-16=-368/268, 4-16=-310/205, 14-40=-97/527, 38-40=-105/559, 5-38=-121/610,
8-11=-325/1619, 9-11=-357/267, 4-15=-564/1821, 5-15=-1122/254
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-7-12 to 2-4-4,Interior(1) 2-4-4 to 8-11-15,Exterior(2) 8-11-15 to 22-2-0,
Interior(1) 22-2-0 to 26-8-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Provide adequate drainage to preventwater ponding.8)All plates are 1.5x4MT20 unless otherwiseindicated.
9)Gablestudsspaced at 2-0-0 oc.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
10=372, 2=314, 15=511.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T02GE
TrussType
PiggybackBase StructuralGableCOMMONllGablelGable
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:522018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9p1K9KX0AvasltuIwVm5gXAy?orGSzmkCJlyUJzlDAH
NOTES-
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
13)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-4=-51, 4-8=-61, 8-10=-51, 46-55=-20, 43-56=-20
Trapezoidal Loads(plf)
Vert: 55=-500(F=-480)-to-56=-20
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T03
TrussType
PiggybackBase
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:532018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-d?biNgXexCijN0TUUDHKDkjCKCCkBUsuQzUW1lzlDAG
Scale:3/16"=1'
T1
T2
T3
B1
W1
W2
W3 W3
W2
W1
B1 HW1HW11
2
3
4 5 6
7
8
11 10 9
18
19
20
21 22 23
24
25
4x4 4x4
4x6
4x6
3x43x8
1.5x4
3x4
3x8
1.5x4
8-11-15
8-11-15
17-8-1
8-8-2
26-8-0
8-11-15
-0-7-12
0-7-12
4-7-3
4-7-3
8-11-15
4-4-12
13-4-0
4-4-1
17-8-1
4-4-1
22-0-13
4-4-12
26-8-0
4-7-3
0-6-111-0-00-6-111-0-014.0012
PlateOffsets(X,Y)-- [2:0-6-0,0-0-7], [8:0-6-0,0-0-7]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.39
0.58
0.39
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.34
0.04
(loc)
9-14
9-14
8
l/defl
>999
>938
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 139 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W1: 2x4SPFStudWEDGE
Left: 2x4SPFStud, Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-13 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 5-11, 5-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)8=987/0-6-0(min. 0-2-0), 2=1020/0-6-0(min. 0-2-1)
Max Horz2=301(LC 13)
Max Uplift8=-84(LC 17), 2=-99(LC 16)MaxGrav8=1282(LC 39), 2=1315(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-18=-1481/208, 18-19=-1376/222, 3-19=-1214/243, 3-20=-1234/281, 4-20=-1027/318,
4-21=-669/275, 5-21=-669/275, 5-22=-670/276, 6-22=-670/276, 6-23=-1027/320,
7-23=-1235/283, 7-24=-1214/245, 24-25=-1377/224, 8-25=-1482/210
BOT CHORD 2-11=-225/895, 10-11=-125/771, 9-10=-125/771, 8-9=-55/896
WEBS 3-11=-386/276, 4-11=-123/520, 5-11=-289/190, 5-9=-288/189, 6-9=-123/520,
7-9=-387/277
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-7-12 to 2-4-4,Interior(1) 2-4-4 to 8-11-15,Exterior(2) 8-11-15 to 22-2-0,
Interior(1) 22-2-0 to 26-8-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8, 2.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T04
TrussType
PiggybackBase
Qty
4
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:542018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-5C84a0YGiWqa?A2h2woZlyGN4cYzwx51fdE3ZCzlDAF
Scale=1:63.3
T1
T2
T1
B1
W1
W2
W3 W3
W2
W1
B1HW1 HW1
1
2
3 4 5
6
7
10 9 8
17
18
19
20 21
22
23
24
4x6
4x4 4x4
4x63x43x8
1.5x4
3x4
3x8
1.5x4
8-11-15
8-11-15
17-8-1
8-8-2
26-8-0
8-11-15
4-7-3
4-7-3
8-11-15
4-4-12
13-4-0
4-4-1
17-8-1
4-4-1
22-0-13
4-4-12
26-8-0
4-7-3
0-6-111-0-00-6-111-0-014.0012
PlateOffsets(X,Y)-- [1:0-6-0,0-0-7], [7:0-6-0,0-0-7]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.39
0.58
0.39
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.34
0.04
(loc)
10-13
10-13
7
l/defl
>999
>938
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 138 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W1: 2x4SPFStudWEDGE
Left: 2x4SPFStud, Right: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-13 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 4-10, 4-8
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)1=987/0-6-0(min. 0-2-0), 7=987/0-6-0(min. 0-2-0)
Max Horz1=-289(LC 14)
Max Uplift1=-84(LC 16), 7=-84(LC 17)MaxGrav1=1282(LC 38), 7=1282(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-1482/210, 17-18=-1378/224, 2-18=-1215/245, 2-19=-1235/283, 3-19=-1028/321,
3-20=-670/276, 4-20=-670/276, 4-21=-670/276, 5-21=-670/276, 5-22=-1028/321,
6-22=-1235/283, 6-23=-1215/245, 23-24=-1378/224, 7-24=-1482/210
BOT CHORD 1-10=-226/896, 9-10=-126/771, 8-9=-126/771, 7-8=-55/896
WEBS 2-10=-387/277, 3-10=-124/520, 4-10=-289/190, 4-8=-289/189, 5-8=-124/520,
6-8=-387/277
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 8-11-15,Exterior(2) 8-11-15 to 22-2-0,
Interior(1) 22-2-0 to 26-8-0zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &
MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 7.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T05
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:562018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-1aGq?haWE74IEUB39Lq1rNLfLPFmOqJK6wjAd4zlDAD
Scale=1:65.7
T1
T2
T1
B1
W1 W2
W3 W4 W3 W4 W3
W2 W1
B1
HW1
HW1
1
2
3
4 5 6
7
8
9
14 13 12 11 10
23
24 25
26
27 28 29 30 31 32 33 34 35 36 37 38
4x4
6x6
8x12MT18H 8x12MT18H
4x4
6x6
3x4
3x6 8x8 8x8
1.5x4
8x8
3x4
3x6
4-5-10
4-5-10
8-11-15
4-6-5
13-4-0
4-4-1
17-8-1
4-4-1
22-2-6
4-6-5
26-8-0
4-5-10
4-5-10
4-5-10
8-11-15
4-6-5
13-4-0
4-4-1
17-8-1
4-4-1
22-2-6
4-6-5
26-8-0
4-5-10
0-6-111-0-00-6-111-0-014.0012
PlateOffsets(X,Y)-- [1:0-2-1,0-2-7], [1:0-2-9,0-4-0], [3:0-0-12,0-1-8], [4:0-2-11,Edge], [6:0-2-11,Edge], [7:0-0-12,0-1-8], [9:0-2-1,0-2-7], [9:0-2-9,0-4-0], [10:0-4-0,0-1-8],[11:0-3-8,0-4-8], [12:0-4-0,0-4-8], [13:0-3-8,0-4-8], [14:0-4-0,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
NOIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.60
0.43
0.48
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.24
0.06
(loc)
10-11
10-11
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 393 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF 1650F 1.5E*Except*
T2: 2x4SPF No.2
BOT CHORD2x6SP 2400F 2.0EWEBS2x4SPF No.2 *Except*
W1,W2: 2x4SPFStud
SLIDER Left 2x6SPF No.2 1-6-0, Right 2x6SPF No.2 1-6-0
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-9-2 oc purlins.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)1=8457/0-6-0(min. 0-3-10), 9=7652/0-6-0(min. 0-3-5)
Max Horz1=-281(LC 10)Max Uplift1=-1454(LC 12), 9=-1309(LC 13)
MaxGrav1=8762(LC 34), 9=7957(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-7013/1117, 2-3=-8915/1501, 3-23=-7281/1295, 4-23=-7104/1333, 4-24=-5215/1014,
5-24=-5215/1014, 5-25=-5215/1014, 6-25=-5215/1014, 6-26=-7111/1334,
7-26=-7287/1297, 7-8=-8907/1501, 8-9=-6966/1109
BOT CHORD 1-27=-1105/5701, 1-28=-1105/5701, 14-28=-1105/5701, 14-29=-1105/5701,
29-30=-1105/5701, 13-30=-1105/5701, 13-31=-877/4635, 31-32=-877/4635,
12-32=-877/4635, 12-33=-795/4640, 33-34=-795/4640, 11-34=-795/4640,
11-35=-891/5693, 35-36=-891/5693, 10-36=-891/5693, 10-37=-891/5693,
37-38=-891/5693, 9-38=-891/5693
WEBS 3-14=-368/2106, 3-13=-1686/503, 4-13=-768/3865, 4-12=-380/1535, 5-12=-501/153,6-12=-378/1523, 6-11=-771/3880, 7-11=-1667/500, 7-10=-365/2084
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-7-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-5-0 oc.Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plategrip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.
7)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T05
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:572018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-VnqDC1a9?RD8semGj3MGNauq4pb?7HZTLaSjAXzlDAC
NOTES-
8)All plates areMT20 plates unless otherwiseindicated.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 1=1454, 9=1309.11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1094 lb down and 205 lb up at 0-7-4, 1090 lb down and 209 lb up at
2-7-4, 1090 lb down and 209 lb up at 4-7-4, 1090 lb down and 209 lb up at 6-7-4, 1090 lb down and 209 lb up at 8-7-4, 1090 lb down and 209 lb up at 10-7-4, 1090 lb
down and 209 lb up at 12-7-4, 1090 lb down and 209 lb up at 14-7-4, 1090 lb down and 209 lb up at 16-7-4, 1090 lb down and 209 lb up at 18-7-4, 1090 lb down and
209lb up at 20-7-4, and 1090 lb down and 209 lb up at 22-7-4, and 1090 lb down and 209 lb up at 24-7-4 on bottomchord.The design/selection of suchconnection
device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15Uniform Loads(plf)
Vert: 1-4=-51, 4-6=-61, 6-9=-51, 15-19=-20
Concentrated Loads(lb)
Vert: 14=-1090(B) 27=-1094(B) 28=-1090(B) 29=-1090(B) 30=-1090(B) 31=-1090(B) 32=-1090(B) 33=-1090(B) 34=-1090(B) 35=-1090(B) 36=-1090(B)
37=-1090(B) 38=-1090(B)
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T06
TrussType
PiggybackBase
Qty
13
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:582018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_zObQNbnmlL?ToLSHmtVwoQv5DwhsjqdaECHizzlDAB
Scale=1:64.7
T1
T2
W3
B1
W3 W4 W3 W4
W1
W2
B2
1
2 3 4
9 8 7 6 5
10 11 12
8x8
2x41.5x4 3x43x4
1.5x4
3x10
4x4
3x4
3-5-8
3-5-8
11-5-4
7-11-12
19-5-0
7-11-12
3-5-8
3-5-8
11-5-4
7-11-12
19-5-0
7-11-12
8-5-1311-4-610.0012
PlateOffsets(X,Y)-- [1:0-1-8,0-1-8], [2:0-4-12,0-1-12], [6:0-2-4,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.97
0.46
0.54
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.25
0.00
(loc)
5-6
5-6
5
l/defl
>999
>932
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 132 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*T2: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 4-5, 2-8, 3-6, 1-9
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)5=770/Mechanical, 9=742/Mechanical
Max Horz9=114(LC 16)Max Uplift5=-189(LC 13), 9=-74(LC 13)
MaxGrav5=1110(LC 34), 9=921(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-10=-366/79, 2-10=-303/81, 2-11=-531/98, 3-11=-531/98, 3-12=-531/98, 4-12=-531/98,
4-5=-1041/226, 1-9=-906/90BOT CHORD 7-8=-111/273, 6-7=-111/273
WEBS 2-8=-545/138, 2-6=-88/440, 3-6=-917/271, 4-6=-167/897, 1-8=-69/728
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 7-8-7
zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9 except(jt=lb)5=189.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T06GE
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:58:592018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-S9yzdjcPX2Ts5xweqUOkS?zITdNdbHfmpuxqEPzlDAA
Scale=1:65.6
W1
T1
T2
W3
B1
ST2ST2ST2ST2ST2ST2ST2ST2ST1
B2
W2
1
2
3 4 5 6 7 8 9 10 1112
24 23 22 2120 19 18 17 16 15 1413
3x4
3x4
3x43x4
19-5-0
19-5-0
3-5-8
3-5-8
19-5-0
15-11-8
8-5-1311-4-610.0012
PlateOffsets(X,Y)-- [1:0-1-8,0-1-8], [3:0-2-0,0-1-13]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.10
0.03
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
13
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 187 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2
OTHERS 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 1-24, 12-13, 11-14, 10-15, 9-16, 8-17, 7-18, 6-19, 5-20, 4-22, 2-23, 1-23
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 19-5-0.
(lb)-Max Horz24=114(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 13, 14, 15, 16, 17, 18, 19, 20, 22 except 24=-122(LC 14), 23=-512(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 13, 14, 15, 16, 17, 18, 19, 20, 22
except 24=467(LC 16), 23=376(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-24=-454/329
WEBS 1-23=-341/432
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3) 0-1-12 to 3-1-12,Exterior(2) 3-1-12 to 3-5-8, Corner(3) 3-5-8 to 6-4-12
zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.6)Provide adequate drainage to preventwater ponding.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.9)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).
10)Gablestudsspaced at 2-0-0 oc.
11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 13, 14, 15, 16,
17, 18, 19, 20, 22 except(jt=lb) 24=122, 23=512.
13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T07
TrussType
PiggybackBase
Qty
3
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:012018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-OY4j2Pef3gjaKF41yuQCYQ2T_Q_93zr3GCQxJIzlDA8
Scale=1:74.8
T1
T2
T3
B1
B2
B3
B2
B4
W3
W5
W4
W6
W7 W6
W9
W8
W3 W10 W3
W11
W12
W1
W2
W14W13
1
2 3 4 5 6 7
8
9
10
21 20 19
18 17 16
15 14 13 12 11
22 23 24
25 26
27
28 29
4x8 4x4
3x4 1.5x4
3x4 3x4
1.5x4 3x43x8
5x8 3x8
1.5x4
5x6
5x8
3x10
3x8
3x4
3x4
4x4
5x6
3-5-8
3-5-8
6-6-0
3-0-8
10-10-0
4-4-0
15-2-0
4-4-0
16-9-0
1-7-0
19-5-0
2-8-0
24-8-5
5-3-6
29-4-0
4-7-11
3-5-8
3-5-8
6-6-0
3-0-8
10-10-0
4-4-0
15-2-0
4-4-0
16-9-0
1-7-0
19-5-0
2-8-0
24-8-5
5-3-6
29-4-0
4-7-11
30-2-12
0-10-12
8-5-1311-4-63-1-31-0-011-4-610.0012
PlateOffsets(X,Y)-- [1:0-0-12,0-1-8], [2:0-6-4,0-2-0], [7:0-2-0,0-1-13], [8:0-1-8,0-1-8], [9:0-2-12,0-1-8], [14:0-3-0,0-3-0], [16:0-5-8,0-4-8], [18:0-5-8,0-4-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.80
0.35
0.97
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.05
-0.08
0.05
(loc)
12-13
16-17
11
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 255 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W5,W9,W12,W14,W13: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-4-3 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
9-6-11 oc bracing: 20-216-0-0 oc bracing: 19-20,15-16.
1 Row at midpt 3-18, 5-16
WEBS 1 Row at midpt 2-20, 3-17, 4-17, 6-14, 7-13, 8-13, 1-21
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)21=654/Mechanical, 11=941/0-4-0(min. 0-1-8), 14=1503/0-6-0(min. 0-2-14)Max Horz21=-413(LC 12)
Max Uplift21=-104(LC 12), 11=-275(LC 12), 14=-410(LC 12)
MaxGrav21=785(LC 38), 11=1226(LC 39), 14=1839(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-22=-357/251, 2-22=-314/254, 2-3=-372/234, 3-23=-390/236, 4-23=-390/236,
4-5=-390/236, 6-7=-263/288, 7-25=-265/297, 25-26=-469/319, 8-26=-499/322,
8-27=-628/384, 27-28=-663/391, 28-29=-890/515, 9-29=-935/512, 1-21=-756/211,
9-11=-1185/661
BOT CHORD 20-21=-367/371, 3-18=-416/219, 17-18=-220/430, 5-16=-832/223, 12-13=-252/509
WEBS 2-20=-522/116, 18-20=-225/341, 2-18=-90/568, 4-17=-470/138, 5-17=-146/596,
14-16=-271/282, 6-16=-220/761, 6-14=-1609/567, 6-13=-431/633, 8-13=-520/413,
1-20=-165/568, 9-12=-220/525
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 23-7-15,
Interior(1) 23-7-15 to 30-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchright exposed;C-Cformembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8) Refer to girder(s) for truss to trussconnections.
Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T07
TrussType
PiggybackBase
Qty
3
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:012018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-OY4j2Pef3gjaKF41yuQCYQ2T_Q_93zr3GCQxJIzlDA8
NOTES-
9)Bearing at joint(s) 11 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverifycapacity of bearingsurface.
10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 21=104, 11=275, 14=410.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 287 lb down and 176 lb up at 28-2-0, and 287 lb down and 176 lb up
at 16-6-8 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 2-24=-61, 9-28=-51, 9-10=-51, 19-21=-20, 16-18=-20, 11-15=-20
Concentrated Loads(lb)
Vert: 24=-240 28=-240Trapezoidal Loads(plf)
Vert: 24=-60-to-7=-76, 7=-66-to-28=-111
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T08
TrussType
PiggybackBase
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:032018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-KwBUT5fvbHzIaZEP3JTgdr8pVEg5XvUMjWv2NAzlDA6
Scale=1:65.4
T1
T2
T3
B1
W3 W4 W3 W5 W3 W6 W3
W7
W8
W1
W2
W10
W9
B2
1
2 3 4 5
6
78
16 15 14 13 12 11 10 9
17 18 19 20
21
22
23
24 25
5x8 4x4
1.5x4 3x43x43x8
1.5x4 3x8
1.5x4
3x8
3x4
3x4
3x4
3x5
5x6
3-5-8
3-5-8
10-1-4
6-7-12
16-9-0
6-7-12
19-5-0
2-8-0
24-8-5
5-3-6
29-4-0
4-7-11
3-5-8
3-5-8
10-1-4
6-7-12
16-9-0
6-7-12
19-5-0
2-8-0
24-8-5
5-3-6
29-4-0
4-7-11
30-2-12
0-10-12
8-5-1311-4-63-1-311-4-610.0012
PlateOffsets(X,Y)-- [1:0-1-8,0-1-8], [2:0-6-0,0-1-12], [5:0-2-0,0-1-13], [6:0-1-8,0-1-8], [7:0-2-12,0-1-8], [9:0-3-0,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.80
0.32
0.83
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.05
-0.10
0.01
(loc)
10-11
14-15
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 208 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*T2: 2x4SPF 2100F 1.8E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W8,W10,W9: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-1-3 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-15, 3-14, 4-12, 5-11, 6-11, 1-16
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)16=739/Mechanical, 12=1305/0-6-0(min. 0-2-8), 9=1054/0-4-0(min. 0-2-1)Max Horz16=-275(LC 12)
Max Uplift16=-114(LC 12), 12=-341(LC 12), 9=-334(LC 12)
MaxGrav16=894(LC 38), 12=1585(LC 38), 9=1324(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-352/144, 2-17=-296/146, 2-18=-492/241, 3-18=-492/241, 3-19=-492/241,19-20=-492/241, 4-20=-492/241, 4-5=-342/344, 5-21=-366/351, 21-22=-583/373,
6-22=-613/376, 6-23=-714/437, 23-24=-748/445, 24-25=-976/568, 7-25=-1020/566,
1-16=-874/247, 7-9=-1282/683
BOT CHORD 15-16=-279/296, 14-15=-180/313, 10-11=-267/575
WEBS 2-15=-520/188, 2-14=-188/454, 3-14=-736/220, 4-14=-100/555, 4-12=-1458/606,
4-11=-345/520, 6-11=-485/386, 1-15=-134/686, 7-10=-238/602
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 23-7-15,
Interior(1) 23-7-15 to 30-2-12zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8) Refer to girder(s) for truss to trussconnections.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
16=114, 12=341, 9=334.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI1.
Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T08
TrussType
PiggybackBase
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:032018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-KwBUT5fvbHzIaZEP3JTgdr8pVEg5XvUMjWv2NAzlDA6
NOTES-
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 272 lb down and 176 lb up at 16-6-8, and 272 lb down and 176 lb up
at 28-2-0 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-2=-51, 2-20=-61, 7-24=-51, 7-8=-51, 9-16=-20
Concentrated Loads(lb)
Vert: 20=-240 24=-240
Trapezoidal Loads(plf)
Vert: 20=-60-to-5=-76, 5=-66-to-24=-111
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T08GE
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:042018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-o7lsgQgYLb59Bjocd1_v93g8ne4SGWcVyAfbvdzlDA5
Scale=1:69.4
T1
T2
T3
B1
W1
W3ST6
ST5
ST4
ST1
ST2ST3ST3ST3ST3ST3ST3ST3ST2
ST1
B2
W2
1 2
3 4 5 6 7 8 9 10 11
12
13
14
15
16
17
33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18
34 35
36
37
3x4
3x4
4x4
5x6
4x4
29-4-0
29-4-0
3-5-8
3-5-8
19-5-0
15-11-8
29-4-0
9-11-0
30-2-12
0-10-12
8-5-1311-4-63-1-311-4-610.0012
PlateOffsets(X,Y)-- [3:0-2-0,0-1-13], [11:0-2-0,0-1-13], [16:0-1-8,0-1-8], [26:0-3-0,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.19
0.05
0.20
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.01
0.01
(loc)
17
17
18
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 240 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W1: 2x4SPF No.2OTHERS2x4SPF No.2 *Except*
ST6,ST5: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 18-19.WEBS 1 Row at midpt 1-33, 12-22, 11-23, 10-24, 9-25, 8-26, 7-27
, 6-28, 5-29, 4-30, 3-31, 2-32
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.All bearings 29-4-0.
(lb)-Max Horz33=-275(LC 12)Max UpliftAll uplift 100 lb orless at joint(s) 33, 20, 21, 22, 23, 24, 25, 26, 27,
28, 29, 30, 32 except 18=-367(LC 15), 19=-528(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 33, 20, 21, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32 except 18=607(LC 17), 19=459(LC 49), 22=251(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 15-37=-308/218, 16-37=-315/203, 16-18=-597/399
BOT CHORD 32-33=-281/296, 31-32=-281/296, 30-31=-281/296, 29-30=-281/296, 28-29=-281/296,
27-28=-281/296, 26-27=-281/296, 25-26=-281/296, 24-25=-281/296, 23-24=-281/296,
22-23=-281/296, 21-22=-281/296, 20-21=-281/296, 19-20=-281/296
WEBS 16-19=-450/526
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 23-5-4,Interior(1) 23-5-4 to 30-2-12zone;cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS for
reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustryGableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
7)Provide adequate drainage to preventwater ponding.
8)All plates are 1.5x4MT20 unless otherwiseindicated.9)Gablerequirescontinuous bottomchord bearing.
10)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb).Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T08GE
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:052018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-GJJEumhA6uD0psNoBkV8iGDJX1Qh?ysfBqO8S3zlDA4
NOTES-
11)Gablestudsspaced at 2-0-0 oc.
12)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 33, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 32 except(jt=lb) 18=367, 19=528.
14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T09
TrussType
PiggybackBase
Qty
6
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:062018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-lVtc56hotCLtR0y_lS0NFUmKLRffkLKoQU8i_VzlDA3
Scale=1:71.1
T1
T2
T3
B1
W3 W4
W5 W6 W5
W4
W3
W7 W8
W1 W2
T4
B2
1
2
3 4
5
6
7
8 9
16 15 14 13 12 11 10
20
21
22 23
24 25 26 27
28
29
30
31
4x4
4x8 4x6
3x4
3x4 3x4
3x4
3x5 3x4 3x8
3x4
4x4
4x4
3x5
3x4
3-8-23-8-2 9-7-85-11-6 15-0-95-5-1 21-0-05-11-6 26-11-65-11-6 27-2-00-2-10
28-2-0
1-0-0
3-8-2
3-8-2
9-7-8
5-11-6
15-0-9
5-5-1
21-0-0
5-11-6
26-11-6
5-11-6
28-2-0
1-2-10
29-0-12
0-10-12
3-4-211-4-60-5-311-4-610.0012
PlateOffsets(X,Y)-- [1:0-1-8,0-2-0], [2:0-1-8,0-1-8], [3:0-6-0,0-1-12], [6:0-1-8,0-1-8], [7:0-1-8,0-2-0], [10:0-2-12,0-1-8], [16:0-2-4,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.82
0.46
0.51
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.05
-0.13
0.04
(loc)
11-12
11-12
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 160 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*T3,T4: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*W4,W5,W6: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-2 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-14, 6-12
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)16=1119/0-6-0(min. 0-1-8), 10=1782/0-5-4(min. 0-3-6)Max Horz16=-344(LC 14)
Max Uplift16=-126(LC 16), 10=-294(LC 17)
MaxGrav16=1508(LC 39), 10=2151(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-20=-1105/175, 20-21=-939/195, 2-21=-928/199, 2-22=-1304/269, 22-23=-1197/277,3-23=-1097/310, 3-24=-975/324, 24-25=-975/324, 25-26=-975/324, 26-27=-975/324,
4-27=-975/324, 4-28=-1021/319, 28-29=-1270/335, 5-29=-1418/321, 5-6=-1551/319,
6-30=-1591/271, 30-31=-1822/263, 7-31=-2015/263, 1-16=-1482/215
BOT CHORD 15-16=-271/316, 14-15=-184/891, 13-14=-107/841, 12-13=-107/841, 11-12=-71/1391,
10-11=-22/284, 8-10=-22/284
WEBS 2-15=-617/162, 2-14=-124/255, 3-12=-165/389, 4-12=-52/271, 6-12=-630/276,
7-11=-105/1178, 7-10=-2067/499, 1-15=-139/1087
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-7-8,Exterior(2) 9-7-8 to 19-3-8,
Interior(1) 19-3-8 to 29-0-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to allexposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Bearing at joint(s) 16 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)16=126, 10=294.
Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T09
TrussType
PiggybackBase
Qty
6
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:062018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-lVtc56hotCLtR0y_lS0NFUmKLRffkLKoQU8i_VzlDA3
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 287 lb down and 53 lb up at 26-8-0, and 287 lb down and 53 lb up at
16-0-0 on top chord.The design/selection of suchconnection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-51, 3-4=-61, 4-28=-51, 7-9=-51, 16-17=-20
Concentrated Loads(lb)
Vert: 7=-240 28=-240
Trapezoidal Loads(plf)
Vert: 28=-51-to-7=-112
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T09GE
TrussType
GABLEl l
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:082018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hu?NWoj2PpbbgK6Nss2rKvriiFNJCGX5todp3OzlDA1
Scale=1:71.9
T1
T2
T3
B1
W3 W4
W5 W6 W5
W7
W8
W1
W2
ST1
ST2 ST3
ST4
ST5
ST6
ST7
ST8
ST9
ST10 ST11 ST12
ST13
ST14
ST15 T4
B2
ST16
ST17
1
2
3 4
5
6
7 8
18 17 16 14 13 12 11 9
49
50
51
52
53 54 55 56
57
58
59
15
10
3x4
4x8 5x6
3x43x4
3x4 3x4 3x8
3x4
5x6 4x4
5-10-8
5-10-8
6-2-8
0-4-0
11-5-8
5-3-0
16-10-9
5-5-1
23-3-9
6-5-0
26-9-8
3-5-15
30-0-0
3-2-8
5-10-8
5-10-8
11-5-8
5-7-0
16-10-9
5-5-1
23-3-9
6-5-0
30-0-0
6-8-7
30-10-12
0-10-12
1-9-1311-4-60-5-311-4-610.0012
PlateOffsets(X,Y)-- [1:0-0-12,0-1-8], [2:0-1-8,0-1-8], [3:0-6-4,0-2-0], [4:0-4-0,0-1-12], [6:0-1-8,0-1-8], [7:Edge,0-0-1], [13:0-3-0,0-3-0], [19:0-1-10,0-0-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.70
0.38
0.40
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.05
-0.15
0.03
(loc)
11-12
11-12
46
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 252 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*
W3,W8,W1,W2: 2x4SPFStudOTHERS2x4SPFStud*Except*
ST6,ST7,ST10,ST11: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-7-5 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
6-0-0 oc bracing: 15-16,14-15.WEBS 1 Row at midpt 2-16, 3-14, 6-12
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 6-6-0 except(jt=length) 7=3-6-0, 9=3-6-0, 15=0-3-8, 10=0-3-8,
7=3-6-0.
(lb)-Max Horz18=-323(LC 14)Max UpliftAll uplift 100 lb orless at joint(s) 18, 9 except 16=-237(LC 16),
7=-102(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 18, 17, 9, 15, 10 except16=1270(LC 39), 7=1063(LC 39), 7=807(LC 1)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-51=-765/215, 51-52=-727/216, 3-52=-561/254, 3-53=-600/270, 53-54=-600/270,
54-55=-600/270, 55-56=-600/270, 4-56=-600/270, 4-57=-782/265, 5-57=-870/233,
5-6=-1006/220, 6-58=-1188/198, 58-59=-1336/172, 7-59=-1438/163
BOT CHORD 17-18=-279/328, 16-17=-279/328, 13-14=-79/483, 12-13=-79/483, 11-12=-21/1027,
10-11=-21/1027, 9-10=-21/1027, 7-9=-21/1027
WEBS 2-16=-1319/225, 2-14=-7/533, 3-14=-307/63, 3-12=-104/421, 6-12=-579/263
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 11-5-8,Exterior(2) 11-5-8 to 21-1-8,
Interior(1) 21-1-8 to 30-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
5) Unbalancedsnowloads have been considered for this design.6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
7)Provide adequate drainage to preventwater ponding.8)All plates are 1.5x4MT20 unless otherwiseindicated.
9)Gablestudsspaced at 2-0-0 oc.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T09GE
TrussType
GABLEl l
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:092018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-94Ylk8kgA7jSIUhZQaZ4s6NtSfiYxjnE6SMMbqzlDA0
NOTES-
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 18, 9 except(jt=lb) 16=237, 7=102, 7=102.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T10
TrussType
PiggybackBase
Qty
4
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:102018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-dH67xUlIxRrIveGm_H5JPKw?k22wg8oOL66v7GzlDA?
Scale=1:71.2
T1
T2
T3
B1
W3 W4 W3
W5
W6
W7 W8
W1
W2 T4
B2
1
2 3
4
5
6
7 8
14 13 12 11 10 9
18 19 20 21
22
23
24
25
26
4x8 4x6
3x4
3x4 3x43x4 3x8
3x4
4x4
3x4
3x5
4x4
3x4
3-5-83-5-8 8-10-95-5-1 14-10-05-11-6 20-9-65-11-6 21-0-00-2-10
22-0-0
1-0-0
3-5-8
3-5-8
8-10-9
5-5-1
14-10-0
5-11-6
20-9-6
5-11-6
22-0-0
1-2-10
22-10-12
0-10-12
8-5-1311-4-60-5-311-4-610.0012
PlateOffsets(X,Y)-- [1:0-0-12,0-1-8], [2:0-6-4,0-2-0], [5:0-1-8,0-1-8], [6:0-1-4,0-1-8], [9:0-2-12,0-1-8], [11:0-2-12,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.86
0.37
0.54
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.04
-0.11
0.02
(loc)
10-11
10-11
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 139 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*T4: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W6,W7,W8: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-2 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 9-5-9 oc bracing.
WEBS 1 Row at midpt 2-13, 3-11, 5-11, 1-14
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)14=949/0-6-0(min. 0-1-13), 9=1512/0-5-4(min. 0-2-13)Max Horz14=-414(LC 14)
Max Uplift14=-146(LC 17), 9=-257(LC 17)
MaxGrav14=1141(LC 39), 9=1803(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-18=-503/274, 2-18=-460/276, 2-19=-622/276, 19-20=-622/276, 20-21=-622/276,3-21=-622/276, 3-22=-585/260, 22-23=-781/277, 23-24=-796/276, 4-24=-986/262,
4-5=-1065/260, 5-25=-1149/219, 25-26=-1379/211, 6-26=-1573/210, 1-14=-1111/267
BOT CHORD 13-14=-372/367, 12-13=-130/424, 11-12=-130/424, 10-11=-1/1053, 9-10=-18/269,
7-9=-18/269
WEBS 2-13=-612/278, 2-11=-206/726, 5-11=-672/282, 6-10=-70/855, 6-9=-1734/464,
1-13=-216/758
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 3-5-8,Exterior(2) 3-5-8 to 13-1-8,
Interior(1) 13-1-8 to 22-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)14=146, 9=257.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 287 lb down and 53 lb up at 9-11-0, and 287 lb down and 53 lb up at 20-6-0 on top chord.The design/selection of suchconnection device(s)is the
responsibility of others.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T10
TrussType
PiggybackBase
Qty
4
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:102018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-dH67xUlIxRrIveGm_H5JPKw?k22wg8oOL66v7GzlDA?
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-2=-51, 2-3=-61, 3-22=-51, 6-8=-51, 14-15=-20
Concentrated Loads(lb)
Vert: 6=-240 22=-240
Trapezoidal Loads(plf)
Vert: 22=-51-to-6=-112
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T11
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:122018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-ZfEtMAmZT2509xQ85i7nUl?OUsi88y6hoQb0B9zlD9z
Scale=1:80.2
T2
T3
T4
B1
W3 W4
W5 W6
W7
W8 W9
W10
W9 W10 W9
W8 W7
W1
W2
W12
W11
T1
B1B2
1
2
3
4 5
6 7 8
9
10
20 19 18 17 16 15 14 13 12 11
21
22
23 24
25 26 27 28 29 30 31 32 33 34 35 36 37
4x8
8x8
6x12MT18H 6x12MT18H
4x4
8x10
8x8
4x4
10x10
5x6
10x10
6x8
10x10
2x4
8x8
6x6
8x8
6x12MT18H
3x8
8x8
5-4-8
5-4-8
11-1-11
5-9-3
16-0-6
4-10-11
21-11-14
5-11-8
27-2-0
5-2-2
32-4-2
5-2-2
38-3-9
5-11-7
41-0-0
2-8-7
5-4-8
5-4-8
11-1-11
5-9-3
16-0-6
4-10-11
21-11-14
5-11-8
27-2-0
5-2-2
32-4-2
5-2-2
38-3-9
5-11-7
41-0-0
2-8-7
2-4-111-6-07-10-1111-6-05.0012
PlateOffsets(X,Y)-- [1:0-4-0,0-2-0], [5:0-2-8,0-2-8], [6:0-5-4,0-2-12], [8:0-5-12,0-4-0], [9:0-2-12,0-2-4], [10:0-4-0,0-3-0], [11:Edge,0-5-8], [12:0-2-12,0-3-4], [13:0-3-8,0-4-12],[14:0-4-12,0-6-0], [15:0-3-8,0-5-4], [16:0-3-8,0-6-0], [18:0-3-8,0-6-0], [19:0-3-8,0-4-4], [20:0-0-2,0-3-12]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
NOIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.59
0.45
0.94
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.29
-0.60
0.10
(loc)
15-16
15-16
11
l/defl
>999
>803
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 731 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2
BOT CHORD2x8SP 2400F 2.0E
WEBS 2x4SPF No.2 *Except*W3,W4,W5: 2x4SPFStud,W1: 2x8SP 2400F 2.0E
W2: 2x4SPF 1650F 1.5E,W12: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.WEBS 1 Row at midpt 5-15, 6-14, 8-13, 9-12, 10-11
REACTIONS.(lb/size)20=9951/0-6-0(min. 0-4-3), 11=7902/0-6-0(min. 0-3-6)
Max Horz20=261(LC 57)
Max Uplift20=-1079(LC 12), 11=-934(LC 9)MaxGrav20=10139(LC 34), 11=8101(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-12690/1354, 2-21=-14141/1526, 3-21=-14080/1539, 3-4=-12923/1420,
4-22=-12811/1436, 5-22=-12794/1440, 5-6=-10200/1188, 6-7=-8168/1035,
7-23=-8169/1036, 23-24=-8169/1036, 8-24=-8169/1036, 8-9=-6467/829, 9-10=-2591/313,
1-20=-9141/1009, 10-11=-7895/917
BOT CHORD 20-25=-369/852, 25-26=-369/852, 19-26=-369/852, 19-27=-1484/11632,
27-28=-1484/11632, 28-29=-1484/11632, 18-29=-1484/11632, 18-30=-1560/13021,
17-30=-1560/13021, 16-17=-1560/13021, 16-31=-1383/11858, 31-32=-1383/11858,
15-32=-1383/11858, 15-33=-1052/9400, 33-34=-1052/9400, 14-34=-1052/9400,
14-35=-687/5866, 35-36=-687/5866, 13-36=-687/5866, 13-37=-267/2308,
12-37=-267/2308WEBS2-19=-1696/281, 2-18=-143/1694, 3-18=-129/1659, 3-16=-1921/294, 5-16=-402/4095,
5-15=-4344/580, 6-15=-641/6188, 6-14=-2924/337, 7-14=-427/180, 8-14=-599/5348,
8-13=-2738/333, 9-13=-726/6182, 9-12=-6699/843, 1-19=-1192/11520, 10-12=-817/7058
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:Topchordsconnected as follows: 2x6- 2 rowsstaggered at 0-7-0 oc, 2x8- 2 rowsstaggered at 0-9-0 oc.
Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-9-0 oc.
Websconnected as follows: 2x4- 1 row at 0-9-0 oc.2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.
3) Unbalancedroofliveloads have been considered for this design.4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T11
TrussType
PiggybackBaseGirder
Qty
1
Ply
2
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:132018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2soGZVnBEMEtn5_KfQe01yYZEG2NtPLq14KajbzlD9y
NOTES-
7)Provide adequate drainage to preventwater ponding.
8)All plates areMT20 plates unless otherwiseindicated.
9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 20=1079, 11=934.
11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
12) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 901 lb down and 94 lb up at 2-0-12, 901 lb down and 94 lb up at
4-0-12, 901 lb down and 94 lb up at 6-0-12, 901 lb down and 94 lb up at 8-0-12, 901 lb down and 94 lb up at 10-0-12, 901 lb down and 94 lb up at 12-0-12, 901 lb down
and 94 lb up at 14-0-12, 901 lb down and 94 lb up at 16-0-12, 901 lb down and 94 lb up at 18-0-12, 901 lb down and 94 lb up at 20-0-12, 901 lb down and 94 lb up at
22-0-12, 901 lb down and 94 lb up at 24-0-12, 901 lb down and 94 lb up at 26-0-12, 765 lb down and 124 lb up at 28-0-12, 765 lb down and 124 lb up at 30-0-12, and
765lb down and 124 lb up at 32-0-12, and 874 lb down and 134 lb up at 34-0-12 on bottomchord.The design/selection of suchconnection device(s)is the
responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-6=-51, 6-8=-61, 8-10=-51, 11-20=-20
Concentrated Loads(lb)
Vert: 17=-901(B) 16=-901(B) 15=-901(B) 13=-765(B) 25=-901(B) 26=-901(B) 27=-901(B) 28=-901(B) 29=-901(B) 30=-901(B) 31=-901(B) 32=-901(B) 33=-901(B)
34=-901(B) 35=-765(B) 36=-765(B) 37=-874(B)
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T12
TrussType
PiggybackBase
Qty
3
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:142018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-W2Menrop?fMkOFZXD79FZA5ergLGctTzFk47F1zlD9x
Scale=1:82.9
T2
T3
T4
B1
W3
W4 W5
W6 W7
W8
W7 W8 W7 W9
W1
W2
W11
W10T1
B1B2
1
2
3 4
5 6 7
8
9
18 17 16 15 14 13 12 11 10
19
20
21
22
23 24 25 26
27
3x8
5x8
3x4
3x4 3x6
3x4
4x8 3x4
3x4
3x4
5x12MT18H
1.5x4
4x8 3x4
3x4
4x6
3x53x6
7-2-0
7-2-0
13-10-4
6-8-4
21-11-14
8-1-11
27-2-0
5-2-2
32-4-2
5-2-2
41-0-0
8-7-14
7-2-0
7-2-0
13-10-4
6-8-4
21-11-14
8-1-11
27-2-0
5-2-2
32-4-2
5-2-2
36-5-15
4-1-13
41-0-0
4-6-1
2-4-111-6-07-10-1111-6-05.0012
PlateOffsets(X,Y)-- [5:0-8-0,0-1-12], [7:0-5-12,0-2-8], [10:0-2-4,0-1-8], [17:0-3-0,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.98
0.66
0.88
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.17
-0.44
0.10
(loc)
10-11
10-11
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 238 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*T2: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2
WEBS 2x4SPF No.2 *Except*W3,W1,W2: 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied, except end verticals.BOT CHORD Rigidceiling directly applied or 8-2-4 oc bracing.
WEBS 1 Row at midpt 2-16, 3-14, 5-12, 6-12, 7-11, 9-10, 8-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)18=1476/0-6-0(min. 0-2-10), 10=1510/0-6-0(min. 0-2-11)
Max Horz18=314(LC 13)Max Uplift18=-238(LC 16), 10=-203(LC 13)
MaxGrav18=1664(LC 38), 10=1711(LC 38)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-19=-2268/305, 2-19=-2205/323, 2-20=-2341/360, 3-20=-2171/387, 3-4=-1776/357,
4-21=-1751/361, 21-22=-1649/376, 5-22=-1630/395, 5-23=-1333/394, 6-23=-1333/394,6-24=-1333/394, 24-25=-1333/394, 25-26=-1333/394, 7-26=-1333/394, 7-8=-1148/344,
1-18=-1595/275
BOT CHORD 17-18=-361/333, 16-17=-513/2035, 15-16=-478/2094, 14-15=-478/2094, 13-14=-359/1513,
12-13=-359/1513, 11-12=-241/996, 10-11=-206/684
WEBS 2-17=-451/153, 3-16=0/303, 3-14=-810/263, 5-14=-91/706, 5-12=-538/141,
6-12=-496/163, 7-12=-197/847, 7-11=-574/191, 8-11=-89/821, 1-17=-229/2044,
8-10=-1624/347
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 21-11-14,Exterior(2) 21-11-14 to
36-6-10,Interior(1) 36-6-10 to 40-10-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers
and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.6)All plates areMT20 plates unless otherwiseindicated.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)18=238, 10=203.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T13
TrussType
PiggybackBase
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:162018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SRUOCXp3XHcSeZjvKYBjfbA7ZT1N4lLGj2ZEKwzlD9v
Scale=1:105.0
T3
T4
T5
B1
B4
B5
W1
W2 W3 W4 W5
W6 W7
W8
W7
W8 W7
W9
W11
W10
W12
W13 W14 W16
W15
T1
T6
B3B2
B6
T2
F2
F112
3
4
5
6 7 89
10 11
12
13 14
28 27 26 25 24 23 22 21 20
19
18
17 16 15
32
33
34
35
36 37 38 39
40
41 42
43
8x8 10x12
4x6
5x8 8x10
8x8 4x6
8x8
3x6 4x6
4x4
8x8
4x6 4x8
3x6
6x6
3x6
8x8
4x4
6x8
4x4
5x6 3x5
5x8
6x8
2x4
6-7-56-7-5 10-11-104-4-5 15-8-54-8-11 21-11-146-3-9 27-2-05-2-2 32-4-05-2-0 32-4-20-0-2
32-10-0
0-5-14
39-10-137-0-13 46-8-66-9-9 54-4-07-7-10
-0-10-12
0-10-12
6-7-5
6-7-5
10-11-10
4-4-5
15-8-5
4-8-11
21-11-14
6-3-9
27-2-0
5-2-2
32-4-2
5-2-2
32-10-0
0-5-14
39-10-13
7-0-13
46-8-6
6-9-9
54-4-0
7-7-10
55-2-12
0-10-12
0-4-19-6-011-6-02-4-12-0-011-6-05.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-2-14], [5:0-4-0,0-4-8], [6:0-1-12,0-4-4], [8:0-1-15,0-4-4], [15:0-2-4,0-2-4], [16:0-2-8,0-2-4], [17:0-3-0,0-2-8], [19:0-4-0,0-5-0], [20:0-5-8,0-5-12],[21:0-3-0,0-3-12], [25:0-3-8,0-6-0], [25:0-0-0,0-3-10]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
YESIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.39
0.62
0.98
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.24
-0.56
0.19
(loc)
24-26
24-26
15
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 431 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T4: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0E
BOT CHORD2x8SP 2400F 2.0E*Except*B4: 2x4SPF No.2, B5,B6: 2x6SP 2400F 2.0E,F2: 2x4SPFStud
WEBS 2x4SPF No.2 *Except*
W1,W2,W3,W4,W5,W14,F1: 2x4SPFStud,W16: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-4 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:10-0-0 oc bracing: 19-20
WEBS 1 Row at midpt 5-24, 6-22, 7-22, 8-22, 9-21
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=2016/0-6-0(min. 0-1-14), 15=2015/0-6-0(min. 0-1-14)
Max Horz2=150(LC 20)Max Uplift2=-296(LC 16), 15=-296(LC 17)
MaxGrav2=2285(LC 39), 15=2283(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-32=-5212/649, 3-32=-5157/671, 3-33=-4902/654, 4-33=-4856/671, 4-34=-4407/637,
5-34=-4269/654, 5-35=-3612/599, 6-35=-3505/619, 6-36=-3304/621, 36-37=-3305/621,
7-37=-3305/621, 7-38=-3305/621, 38-39=-3304/621, 8-39=-3303/621, 8-9=-3320/639,
9-40=-3631/623, 10-40=-3759/605, 10-11=-3260/542, 11-41=-3262/539, 41-42=-3357/526,
12-42=-3440/514, 12-43=-3160/455, 13-43=-3237/424, 13-15=-2189/399
BOT CHORD 2-28=-582/4761, 27-28=-584/4755, 26-27=-509/4516, 25-26=-439/4011, 24-25=-439/4011,
23-24=-314/3250, 22-23=-314/3250, 21-22=-306/3318, 20-21=-280/3016, 9-20=-42/504,
16-17=-328/2917
WEBS 3-27=-374/149, 4-27=-30/323, 4-26=-687/175, 5-26=-48/567, 5-24=-1088/271,
6-24=-120/913, 6-22=-98/432, 7-22=-473/152, 8-22=-208/371, 8-21=-135/513,
17-20=-320/3091, 10-20=0/526, 10-17=-941/176, 12-16=-604/167, 13-16=-286/2808
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 21-11-14,Exterior(2) 21-11-14 to
36-7-0,Interior(1) 36-7-0 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T13
TrussType
PiggybackBase
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:162018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SRUOCXp3XHcSeZjvKYBjfbA7ZT1N4lLGj2ZEKwzlD9v
NOTES-
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=296, 15=296.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T14
TrussType
PiggybackBase
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:182018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Opb9cDrK2usAtstISzEBk0FS1HndYjFZAM2KOpzlD9t
Scale=1:102.1
T3
T4
T5
B1
B4
B5
B6
B7 B8
B9
W1 W2
W3
W4 W5
W6
W5
W6 W5W7
W9
W8
W10
W12
W11 W13 W14
W15
W17
W16
W18T1
T6
B3B2
T2
F2
F1
12
3
4 5
6 7 8 9
10
11
12
13 14
15
30 2928 27 26 25 24
23 22 21
20 19 18
17 16
34
35
36
37
38 39 40 41 42
43
44
4x6
8x8 8x8
8x8
5x8 6x8
3x4
8x8 3x4
8x10
5x6
3x4
3x6
4x6
8x8
4x4
4x6 4x8
3x6
10x14MT18H
3x6
5x12
4x10
4x4
5x6
4x6
6x8
5x6
6x8
2x4
8-3-138-3-13 14-11-76-7-10 21-11-147-0-7 27-2-05-2-2 32-4-05-2-0 32-4-20-0-2
32-10-0
0-5-14
37-2-64-4-6 40-10-03-7-10 46-7-05-9-0 52-4-05-9-0 53-2-40-10-4
54-4-0
1-1-12
-0-10-12
0-10-12
8-3-13
8-3-13
14-11-7
6-7-10
21-11-14
7-0-7
27-2-0
5-2-2
32-4-2
5-2-2
32-10-0
0-5-14
37-2-6
4-4-6
40-10-0
3-7-10
46-7-0
5-9-0
52-4-0
5-9-0
53-2-4
0-10-4
54-4-0
1-1-12
55-2-12
0-10-12
0-4-19-6-011-6-02-4-12-0-011-6-05.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-2-14], [6:0-1-12,0-4-4], [8:0-5-4,0-4-0], [10:0-3-10,0-2-0], [11:0-4-0,Edge], [14:0-2-12,0-2-4], [18:0-5-8,0-2-4], [20:0-2-12,0-4-0], [22:0-6-0,0-2-0], [23:0-4-0,0-5-0], [24:0-8-0,0-5-0], [24:0-2-4,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
YESIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.46
0.38
0.77
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.25
-0.59
0.26
(loc)
27
27-29
16
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 443 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T4: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0E
BOT CHORD2x8SP 2400F 2.0E*Except*B4,B6: 2x4SPF No.2, B5,B7,B9: 2x6SP 2400F 2.0E
B8,F2: 2x4SPFStud
WEBS 2x4SPF No.2 *Except*W1,W2,W3,W13,W14,W15,F1: 2x4SPFStud,W18: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-12 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:6-0-0 oc bracing: 17-18.
10-0-0 oc bracing: 23-24
WEBS 1 Row at midpt 4-27, 6-25, 7-25, 8-25, 10-22
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=2013/0-6-0(min. 0-1-14), 16=2011/0-6-0(min. 0-1-14)Max Horz2=150(LC 20)
Max Uplift2=-298(LC 16), 16=-299(LC 17)
MaxGrav2=2282(LC 39), 16=2279(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-34=-5154/642, 3-34=-5141/675, 3-35=-4523/629, 35-36=-4511/632, 4-36=-4347/658,
4-5=-3620/590, 5-37=-3529/600, 6-37=-3497/620, 6-38=-3314/629, 38-39=-3315/628,
7-39=-3315/628, 7-40=-3315/628, 40-41=-3315/629, 8-41=-3314/629, 8-9=-3383/640,
9-42=-3498/629, 10-42=-3585/612, 10-11=-3846/646, 11-43=-3779/589, 43-44=-3811/577,
12-44=-3895/564, 12-13=-3990/541, 13-14=-2331/318, 14-16=-2234/365
BOT CHORD 2-30=-556/4696, 29-30=-559/4688, 28-29=-458/4116, 27-28=-458/4116, 26-27=-320/3242,
25-26=-320/3242, 24-25=-303/3220, 21-22=-46/312, 11-20=-359/159, 19-20=-411/3635,
18-19=-298/2211, 13-18=-1168/206
WEBS 3-30=0/320, 3-29=-676/224, 4-29=-13/510, 4-27=-1159/283, 6-27=-108/857,
6-25=-106/466, 7-25=-487/159, 8-25=-95/494, 8-24=-161/706, 22-24=-315/3119,
10-24=-21/687, 10-22=-1954/257, 20-22=-260/2753, 10-20=-245/1349, 12-19=-253/120,
13-19=-139/1478, 14-18=-317/2404
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 21-11-14,Exterior(2) 21-11-14 to36-7-0,Interior(1) 36-7-0 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T14
TrussType
PiggybackBase
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:192018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-s?9XqZsypC_1V0SU?glQGDodnh7sHAUjP?ouwFzlD9s
NOTES-
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=298, 16=299.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T15
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:212018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-pOHHFEtCLpElkKct75nuMetyBUnol2K?sJH??7zlD9q
Scale=1:108.3
0-1-100-1-10T2
T3
T4
B1
B4
B5
B6
B7 B8
B9
W1 W2
W3
W4 W5
W6
W7
W6 W5
W8
W10
W9
W11
W13
W12 W14 W15
W16 W19
T1
T5
B3B2
W18
W17
F2
F11
2
3
4
5 6 7 8
9
10
11
12 13
14
30 29 28 27 26 25 2423
22 21 20
19 18 17
16 15
34
35
36
37
38 39 40 41
42
43
44
8x12MT18H
8x8 8x8
4x8 5x6
3x4
8x8 3x4
8x8
8x10
5x6
3x4
2x4
4x4
4x4
4x4 4x8
3x6
2x4
6x10
2x4
5x12
4x10
4x4
5x6
5x6
4x6
4x6
6x82x4
7-11-67-11-6 15-2-157-3-9 22-6-87-3-9 27-2-04-7-8 31-9-84-7-8 32-4-00-6-8
32-10-0
0-6-0
37-2-64-4-6 40-10-03-7-10 46-7-05-9-0 52-4-05-9-0 54-4-02-0-0
-0-10-12
0-10-12
7-11-6
7-11-6
15-2-15
7-3-9
22-6-8
7-3-9
27-2-0
4-7-8
31-9-8
4-7-8
32-10-0
1-0-8
37-2-6
4-4-6
40-10-0
3-7-10
46-7-0
5-9-0
52-4-0
5-9-0
54-4-0
2-0-0
55-2-12
0-10-12
0-4-19-7-211-8-122-4-12-0-011-7-25.0012
PlateOffsets(X,Y)-- [2:0-1-9,0-0-4], [5:0-4-0,0-3-4], [7:0-2-8,0-3-4], [9:0-3-10,0-2-0], [10:0-4-0,Edge], [13:0-2-12,0-2-4], [17:0-5-8,0-2-4], [19:0-3-0,0-4-0], [21:0-6-0,0-2-0],[22:0-4-0,0-5-0], [23:0-3-12,0-2-12]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
YESIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.53
0.48
0.87
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.28
-0.67
0.31
(loc)
27-29
27-29
15
l/defl
>999
>965
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 421 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T3: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0E
BOT CHORD2x6SP 2400F 2.0E*Except*B4,B6: 2x4SPF No.2, B8,F2: 2x4SPFStud
WEBS 2x4SPF No.2 *Except*
W1,W3,W14,W15,W16,F1: 2x4SPFStud,W19: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-1-9 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:6-0-0 oc bracing: 16-17.
10-0-0 oc bracing: 22-23
WEBS 1 Row at midpt 4-27, 5-25, 6-25, 7-25, 9-21JOINTS1Brace at Jt(s): 23
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=2007/0-6-0(min. 0-1-14), 15=2019/0-6-0(min. 0-1-15)
Max Horz2=152(LC 20)
Max Uplift2=-298(LC 16), 15=-302(LC 17)MaxGrav2=2291(LC 39), 15=2306(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-34=-5333/649, 3-34=-5274/679, 3-35=-4582/621, 35-36=-4494/633, 4-36=-4398/650,
4-37=-3677/595, 5-37=-3551/614, 5-38=-3336/619, 38-39=-3339/618, 6-39=-3339/617,
6-40=-3340/618, 40-41=-3340/619, 7-41=-3337/619, 7-8=-3529/646, 8-42=-3611/623,
9-42=-3692/610, 9-10=-3919/639, 10-43=-3831/582, 43-44=-3882/569, 11-44=-3961/557,
11-12=-4042/534, 12-13=-2361/315, 13-15=-2260/363
BOT CHORD 2-30=-594/4869, 29-30=-596/4859, 28-29=-449/4166, 27-28=-449/4166, 26-27=-310/3274,
25-26=-310/3274, 24-25=-289/3257, 23-24=-289/3262, 20-21=-45/317, 10-19=-356/159,
18-19=-406/3683, 17-18=-300/2240, 12-17=-1185/207
WEBS 3-30=0/359, 3-29=-805/250, 4-29=-9/537, 4-27=-1163/291, 5-27=-120/892,
5-25=-107/459, 6-25=-508/151, 7-25=-107/484, 7-24=-12/326, 7-23=-185/549,
21-23=-305/3196, 9-23=-22/733, 9-21=-2056/257, 19-21=-256/2819, 9-19=-246/1341,
11-18=-257/119, 12-18=-136/1497, 13-17=-320/2436
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 22-6-8,Exterior(2) 22-6-8 to 36-0-7,
Interior(1) 36-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T15
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:212018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-pOHHFEtCLpElkKct75nuMetyBUnol2K?sJH??7zlD9q
NOTES-
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=298, 15=302.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T16
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:222018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HarfSauq67MbMUB3hpI7usQ71u64UTe95z0YXazlD9p
Scale=1:105.1
0-1-100-1-10T2
T3
T4
B1 B4
B5
B6
B7 B8
B9
W1 W2
W3
W4 W5 W6 W7 W8 W9
W10
W11
W13
W12
W14 W15
W16 W19
T1
T5
B3B2 W18
W17
F2F1
1
2
3
4
5 6 7 8
9
10
11 12
13
27 26 25 24 23 22 21
20 19
18 17 16
15 14
32
33
34
35
36 37 3839
40
41
8x8
8x8 8x8
8x8
4x8 5x6 8x8
3x4
8x8
5x6
3x4
2x4
4x4
4x4
4x4 4x8
3x6
6x10
2x4
5x8
4x4
5x6
5x6
4x6
6x10
4x6
2x4
2x4
7-10-07-10-0 14-2-46-4-4 20-6-86-4-4 26-8-46-1-12 32-4-05-7-12 33-9-81-5-8
35-9-8
2-0-0 40-10-05-0-8 46-7-05-9-0 52-4-05-9-0 54-4-02-0-0
-0-10-12
0-10-12
7-10-0
7-10-0
14-2-4
6-4-4
20-6-8
6-4-4
26-8-4
6-1-12
33-9-8
7-1-5
35-9-8
1-11-15
40-10-0
5-0-8
46-7-0
5-9-0
52-4-0
5-9-0
54-4-0
2-0-0
55-2-12
0-10-12
0-4-18-9-210-10-122-4-12-0-010-9-25.0012
12.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-1-14], [5:0-4-0,0-3-4], [7:0-4-0,0-3-4], [8:0-4-0,0-2-0], [9:0-4-0,Edge], [12:0-2-12,0-2-8], [16:0-5-8,0-2-0], [18:0-2-8,0-4-0], [20:0-7-12,0-3-8],[20:0-1-4,0-2-4], [21:0-5-12,0-4-0]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
YESIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.52
0.48
1.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.26
-0.66
0.34
(loc)
21-22
21-22
14
l/defl
>999
>986
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 426 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x6SP 2400F 2.0E*Except*
T3: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0E
BOT CHORD2x6SP 2400F 2.0E*Except*B6: 2x4SPF No.2, B8: 2x4SP 2400F 2.0E,F2: 2x4SPFStud
WEBS 2x4SPF No.2 *Except*
W1,W2,W3,W14,W15,W16,W18,W17,F1: 2x4SPFStudW19: 2x6SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:6-0-0 oc bracing: 15-16.
WEBS 1 Row at midpt 4-24
2 Rows at 1/3 pts 8-20
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=2027/0-6-0(min. 0-1-14), 14=2039/0-6-0(min. 0-1-14)Max Horz2=137(LC 20)
Max Uplift2=-280(LC 16), 14=-283(LC 17)
MaxGrav2=2247(LC 39), 14=2259(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-32=-5220/672, 32-33=-5161/699, 3-33=-5080/701, 3-34=-4514/653, 4-34=-4419/678,
4-35=-3701/625, 5-35=-3597/644, 5-36=-3591/667, 36-37=-3594/665, 6-37=-3594/665,
6-38=-3595/665, 38-39=-3592/666, 7-39=-3591/667, 7-8=-3541/656, 8-40=-3718/677,
9-40=-3802/668, 9-41=-3734/600, 10-41=-3830/584, 10-11=-3954/550, 11-12=-2287/320,
12-14=-2200/365
BOT CHORD 2-27=-587/4764, 26-27=-590/4755, 25-26=-484/4100, 24-25=-484/4100, 23-24=-360/3321,
22-23=-360/3321, 21-22=-330/3271, 20-21=-394/3791, 19-20=-38/317, 9-18=-452/194,
17-18=-415/3601, 16-17=-287/2194, 11-16=-1140/205
WEBS 3-27=0/340, 3-26=-740/230, 4-26=-25/488, 4-24=-1053/259, 5-24=-108/833,
5-22=-108/649, 6-22=-744/233, 7-22=-106/673, 7-21=-160/906, 8-21=-164/1956,
8-20=-2986/350, 18-20=-258/2549, 8-18=-262/1278, 11-17=-142/1459, 12-16=-297/2314
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 20-6-8,Exterior(2) 20-6-8 to 38-0-7,
Interior(1) 38-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T16
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:222018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HarfSauq67MbMUB3hpI7usQ71u64UTe95z0YXazlD9p
NOTES-
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=280, 14=283.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T17
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:242018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DzyQtGv4ekcJbnKSoELbzHVVGipRyPuSZHVfcSzlD9n
Scale=1:107.2
0-1-100-1-10T2
T3 T5
B1
B4
B5
W1 W2
W3 W4 W5 W6 W7 W8 W7 W6
W10
W9
W11 W12 W13
W14 W15
W17W16
T1
T4
T6
B3B2
B6F2
1
2
3
4
5 6 7 8 9
10 11
12
13
14
28 27 26 25 24 23 22 21
20 19
18
17 16 15
33
34
35
36
37 38 39
40
41 42
8x8
6x6 8x10 4x6
4x8 5x6
3x4
8x8 4x6
2x4 4x4
4x4
4x4
8x12MT18H
2x4
2x4
10x10
8x8
6x8
4x4
4x4
4x4
4x6 3x5
5x6
2x4
2x4
6-3-16-3-1 13-1-156-10-14 18-6-85-4-8 22-5-153-11-8 28-10-86-4-9 32-4-03-5-8 32-10-00-6-0
35-9-8
2-11-8 42-1-86-3-15 48-1-55-11-13 54-4-06-2-11
-0-10-12
0-10-12
6-3-1
6-3-1
13-1-15
6-10-14
18-6-8
5-4-8
22-5-15
3-11-8
28-10-8
6-4-9
32-10-0
3-11-8
35-9-8
2-11-8
42-1-8
6-3-15
48-1-5
5-11-13
54-4-0
6-2-11
55-2-12
0-10-12
0-4-17-11-210-0-122-4-12-0-09-11-25.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-1-14], [7:0-2-4,0-4-8], [9:0-4-8,0-3-4], [13:0-2-12,0-2-4], [16:0-2-0,0-2-0], [19:0-3-0,0-2-0], [20:0-4-0,0-5-0], [21:0-2-12,0-4-4], [23:0-0-0,0-2-12],[24:0-1-12,0-0-0], [24:0-3-0,0-4-8]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
YESIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.41
0.42
0.82
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.27
-0.67
0.26
(loc)
22-24
22-24
15
l/defl
>999
>964
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 393 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T3,T4: 2x6SP 2400F 2.0E,T1: 2x4SP 2400F 2.0E
BOT CHORD2x6SP 2400F 2.0E*Except*B4: 2x4SPF No.2, F2: 2x4SPFStud
WEBS 2x4SPF No.2 *Except*
W1,W2,W3,W4,W13,W14,W15,F1: 2x4SPFStudW17: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-1-10 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:6-0-0 oc bracing: 20-21
WEBS 1 Row at midpt 4-25, 7-24, 7-21, 9-19, 11-19
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=2046/0-6-0(min. 0-1-13), 15=2059/0-6-0(min. 0-1-14)
Max Horz2=122(LC 20)Max Uplift2=-262(LC 12), 15=-270(LC 13)
MaxGrav2=2218(LC 2), 15=2232(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-33=-5200/704, 33-34=-5170/710, 3-34=-5114/724, 3-35=-4467/673, 4-35=-4386/701,
4-36=-3876/658, 5-36=-3808/680, 5-6=-3823/696, 6-37=-3821/695, 7-37=-3821/695,
7-38=-3698/674, 8-38=-3698/674, 8-9=-3692/674, 9-39=-2999/590, 10-39=-3033/571,
10-11=-3082/565, 11-40=-3178/556, 12-40=-3264/531, 12-41=-2803/445,
41-42=-2864/442, 13-42=-2927/426, 13-15=-2150/400
BOT CHORD 2-28=-622/4772, 27-28=-625/4763, 26-27=-521/4068, 25-26=-521/4068, 24-25=-410/3518,
23-24=-458/3931, 22-23=-458/3931, 21-22=-455/3937, 18-19=-345/2933,
17-18=-345/2933, 16-17=-325/2643
WEBS 3-28=0/300, 3-27=-764/220, 4-27=0/445, 4-25=-983/236, 5-25=-123/788, 5-24=-145/852,
6-24=-474/156, 7-24=-336/88, 7-22=0/254, 7-21=-598/97, 19-21=-347/3257,
9-21=-327/2628, 9-19=-1592/209, 11-19=-423/199, 12-17=-36/476, 12-16=-719/175,
13-16=-301/2622
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 18-6-8,Exterior(2) 18-6-8 to 40-0-7,
Interior(1) 40-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T17
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:242018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DzyQtGv4ekcJbnKSoELbzHVVGipRyPuSZHVfcSzlD9n
NOTES-
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=262, 15=270.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T18
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:262018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9M4AIyxLALs1q5UqweN32ibsFVVwPH8l0b_mgLzlD9l
Scale=1:107.5
0-1-100-1-10T2
T3 T5
B1
B4
B5
W1 W2
W3 W4
W5 W6 W7 W8 W7 W6
W10
W9
W11 W12 W13
W14 W15
W17W16
T1
T4
T6
B3B2
B6F2
1
2
3
4
5 6 7 8 9 10
1112
13
14
15
29 28 27 26 2524 23 22
21 20
19
18 17 16
34 35
36
37
38 39 40 41 42
43 44 45
8x8
8x8 6x8 4x6
4x8 5x12MT18H
3x6
8x8 7x14MT18H
2x4 4x4
4x4
4x4
4x4
4x6
4x4
4x6
8x12MT18H
8x8
4x4
4x4
4x4
4x6 3x6
5x6
5x12MT18H
2x4
2x4
5-11-6
5-11-6
10-10-0
4-10-10
16-6-8
5-8-8
21-10-15
5-4-8
27-5-8
5-6-9
32-4-0
4-10-8
32-10-0
0-6-0
37-9-8
4-11-8
43-5-15
5-8-7
48-3-0
4-9-0
54-4-0
6-1-0
-0-10-12
0-10-12
5-11-6
5-11-6
10-10-0
4-10-10
16-6-8
5-8-8
21-10-15
5-4-8
27-5-8
5-6-9
32-10-0
5-4-8
37-9-8
4-11-8
43-5-15
5-8-7
48-3-0
4-9-0
54-4-0
6-1-0
55-2-12
0-10-12
0-4-17-1-29-2-122-4-12-0-09-1-25.0012
PlateOffsets(X,Y)-- [2:0-4-0,0-1-14], [5:0-4-0,0-3-4], [10:0-5-4,0-2-8], [14:0-2-12,0-2-4], [17:0-2-0,0-2-0], [19:0-4-8,0-4-8], [19:0-0-0,0-2-12], [20:0-1-12,0-0-0], [21:0-4-0,0-5-0], [22:0-3-12,0-3-4], [27:0-2-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
YESIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.38
0.42
0.90
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.27
-0.67
0.25
(loc)
23
23
16
l/defl
>999
>969
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 399 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x6SPF No.2 *Except*
T3,T4: 2x8SP 2400F 2.0E,T1: 2x4SP 2400F 2.0E
BOT CHORD2x6SP 2400F 2.0E*Except*B4: 2x4SPF No.2, F2: 2x4SPFStud
WEBS 2x4SPFStud*Except*
W6,W8,W10,W9,W11,W12,W16: 2x4SPF No.2, W17: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-3-8 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:10-0-0 oc bracing: 21-22
WEBS 1 Row at midpt 7-22, 10-20, 12-20
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=2066/0-6-0(min. 0-1-13), 16=2079/0-6-0(min. 0-1-14)
Max Horz2=108(LC 20)Max Uplift2=-287(LC 12), 16=-295(LC 13)
MaxGrav2=2218(LC 2), 16=2232(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-34=-5152/728, 34-35=-5112/735, 35-36=-5104/736, 3-36=-5059/747, 3-4=-4679/740,
4-37=-4110/684, 5-37=-4053/703, 5-38=-4488/762, 6-38=-4493/761, 6-39=-4712/777,
7-39=-4712/777, 7-8=-4394/744, 8-40=-4394/744, 9-40=-4394/744, 9-41=-4391/745,
10-41=-4387/746, 10-42=-3087/598, 11-42=-3116/579, 11-12=-3151/576,
12-13=-3204/560, 13-43=-2746/453, 43-44=-2787/441, 44-45=-2788/440,
14-45=-2866/434, 14-16=-2147/405
BOT CHORD 2-29=-645/4719, 28-29=-647/4709, 27-28=-581/4300, 26-27=-581/4300, 25-26=-464/3748,
24-25=-553/4487, 23-24=-553/4487, 22-23=-593/4712, 9-22=-502/160, 19-20=-356/2911,
18-19=-356/2911, 17-18=-328/2573
WEBS 3-28=-573/163, 4-28=-8/364, 4-26=-908/218, 5-26=-69/689, 5-25=-203/1179,
6-25=-816/224, 6-23=-63/398, 7-22=-517/82, 20-22=-355/3010, 10-22=-356/2573,
10-20=-1119/189, 12-20=-303/221, 12-18=-279/94, 13-18=-54/555, 13-17=-732/172,14-17=-307/2538
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 16-6-8,Exterior(2) 16-6-8 to 42-0-7,Interior(1) 42-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces
&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flatroofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T18
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:262018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9M4AIyxLALs1q5UqweN32ibsFVVwPH8l0b_mgLzlD9l
NOTES-
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=287, 16=295.
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T19
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:282018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-5kCxjeybiz6l4PeD13PX87gD8JAMtBI1TvTslEzlD9j
Scale=1:101.0
0-1-100-1-10T1
T3 T5
B1
B4
B5
W1 W2 W3 W4
W5 W6 W7 W8 W7 W8 W7 W6
W10
W9
W11
W12 W13
HW1
W15W14
T4
B3B2
B6
T2
T6
F2
12
3
4
5
6 7 8 9 10 11 12
13
14
15 16
30 29 28 27 26 25 24 23 22
21 20 19 18 17
3637
38 39 40 41
42
4344 45
10x10
8x8 6x8
6x8
6x10
3x5
5x8
6x8
3x6
8x8 6x8
3x6 4x6
4x6
4x6
4x6
4x6
4x8
3x6
3x6
4x8
10x14MT18H
8x8
6x8
4x6
5x6 4x6
6x6
6x12MT18H
2x4
3x6
6-3-14
6-3-14
10-2-2
3-10-4
14-6-8
4-4-6
19-1-6
4-6-14
23-8-4
4-6-14
28-3-2
4-6-14
32-4-0
4-0-14
32-10-0
0-6-0
39-9-8
6-11-8
47-0-4
7-2-12
54-4-0
7-3-12
-0-10-120-10-12 6-3-146-3-14 10-2-23-10-4 14-6-84-4-6 19-1-64-6-14 23-8-44-6-14 28-3-24-6-14 32-10-04-6-14 39-9-86-11-8 47-0-47-2-12 54-4-07-3-12 55-2-120-10-12
0-4-16-3-28-4-122-4-12-0-05.0012
PlateOffsets(X,Y)-- [2:0-4-12,0-6-8], [15:0-2-8,0-3-0], [17:0-3-12,0-2-0], [18:0-2-12,0-2-8], [19:0-3-0,0-2-8], [21:0-4-0,0-5-12], [25:0-5-4,0-3-0], [32:0-2-4,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.22
0.42
0.92
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.29
-0.67
0.22
(loc)
23
23-24
17
l/defl
>999
>964
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 471 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x8SP 2400F 2.0E*Except*T1: 2x4SP 2400F 2.0E
BOT CHORD2x8SP 2400F 2.0E*Except*
B4: 2x4SPF No.2, F2: 2x4SPFStudWEBS2x4SPFStud*Except*
W10,W9,W11,W12,W14: 2x4SPF No.2, W15: 2x6SP 2400F 2.0E
SLIDER Left 2x4SPFStud 2-7-1
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-7-2 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.Except:
10-0-0 oc bracing: 21-22WEBS1 Row at midpt 14-19
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=2091/0-6-0(min. 0-1-13), 17=2090/0-6-0(min. 0-1-13)
Max Horz2=93(LC 20)
Max Uplift2=-319(LC 12), 17=-319(LC 13)MaxGrav2=2223(LC 2), 17=2222(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-36=-3724/484, 2-37=-3647/504, 3-37=-3614/504, 3-4=-4930/759, 4-5=-4729/763,
5-6=-4559/743, 6-38=-5089/836, 7-38=-5089/835, 7-39=-5560/903, 8-39=-5560/903,
8-9=-5560/903, 9-10=-5361/890, 10-11=-5361/890, 11-40=-5356/890, 40-41=-5355/890,
12-41=-5355/891, 12-42=-3334/594, 13-42=-3372/575, 13-14=-3397/574,
14-43=-3015/508, 43-44=-3047/489, 44-45=-3080/484, 15-45=-3113/479,
15-17=-2105/412
BOT CHORD 2-30=-638/4550, 29-30=-639/4539, 28-29=-608/4416, 27-28=-519/4223, 26-27=-519/4223,
25-26=-664/5087, 24-25=-664/5087, 23-24=-769/5684, 22-23=-769/5684,
11-22=-514/176, 18-19=-376/2783, 17-18=-59/340
WEBS 4-30=0/251, 4-29=-383/133, 5-29=-16/255, 5-28=-686/171, 6-28=-67/607,
6-26=-232/1381, 7-26=-986/236, 7-24=-123/753, 8-24=-377/124, 9-22=-504/78,
19-22=-400/3121, 12-22=-422/2857, 12-19=-959/213, 14-19=-87/495, 14-18=-557/182,
15-18=-330/2525
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-14,Interior(1) 2-1-14 to 14-6-8,Exterior(2) 14-6-8 to 44-0-7,
Interior(1) 44-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T19
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:282018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-5kCxjeybiz6l4PeD13PX87gD8JAMtBI1TvTslEzlD9j
NOTES-
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=319, 17=319.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T20
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:302018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-27Kh8J_rEaNTJioc9US?DYlSX6q2L7KKxDyzp6zlD9h
Scale=1:99.1
0-1-100-1-10T1
T2
T1
B1
B5
B4
W1 W2
W3 W4 W5 W6 W5 W6 W5
W7
W9
W8
W10 W11 W12
W13 W14
W16W15
T3
B3B2
B6
1 2
3
4 5 6 7 8 9 10 11
12
13 14
29 28 27 26 25 24 23
22
21 20 1918 17 16 15
33 34
35
3637 38 39 40
41
42 43 44
5x6 3x6
4x6 3x6
3x4
3x4 3x6
3x5
2x4 3x5 3x10
2x4 4x8
2x4 5x6
3x6
3x5
5x8
3x8
3x8
3x5
3x5 3x4
4x6
5x6
3x6
6-8-9
6-8-9
12-6-8
5-9-15
18-9-5
6-2-13
25-0-3
6-2-13
31-3-0
6-2-13
32-10-0
1-7-0
37-6-8
4-8-8
41-9-8
4-3-0
47-4-15
5-7-6
54-4-0
6-11-1
-0-10-12
0-10-12
6-8-9
6-8-9
12-6-8
5-9-15
18-9-5
6-2-13
25-0-3
6-2-13
31-3-0
6-2-13
32-10-0
1-7-0
37-6-8
4-8-8
41-9-8
4-3-0
47-4-15
5-7-6
54-4-0
6-11-1
55-2-12
0-10-12
0-4-15-5-27-6-122-4-12-0-05.0012
PlateOffsets(X,Y)-- [4:0-3-0,0-1-12], [8:0-2-12,0-1-8], [13:0-2-0,0-2-0], [22:0-2-8,0-2-0], [23:0-3-0,0-3-0], [26:0-2-4,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.68
0.53
0.82
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.14
-0.25
0.07
(loc)
26-28
26-28
23
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 264 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except*
B5: 2x4SPFStud
WEBS 2x4SPFStud*Except*W4,W6,W11: 2x4SPF No.2, W16: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-8-11 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 5-7-4 oc bracing.Except:
10-0-0 oc bracing: 20-22WEBS1 Row at midpt 6-23, 10-22
JOINTS 1Brace at Jt(s): 22
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=1007/0-4-0(min. 0-1-14), 23=2644/0-6-0(min. 0-4-10), 15=605/0-6-0(min. 0-1-8)
Max Horz2=80(LC 20)Max Uplift2=-409(LC 12), 23=-850(LC 13), 15=-169(LC 17)
MaxGrav2=1198(LC 39), 23=2941(LC 38), 15=872(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-34=-2085/1204, 3-34=-1990/1229, 3-35=-1476/937, 4-35=-1406/956, 4-36=-1233/804,
36-37=-1234/803, 5-37=-1236/803, 5-6=-1233/802, 6-38=-599/1289, 7-38=-599/1289,
7-39=-599/1289, 8-39=-599/1289, 8-9=-538/944, 9-40=-532/931, 10-40=-532/931,
10-11=-375/203, 11-41=-401/188, 12-41=-502/166, 12-42=-797/185, 42-43=-885/158,
13-43=-895/155, 13-15=-808/205
BOT CHORD 2-29=-1093/1837, 28-29=-1093/1837, 27-28=-745/1292, 26-27=-745/1292,
25-26=-109/310, 24-25=-109/310, 23-24=-109/310, 22-23=-1289/792, 18-19=-187/367,
17-18=-187/367, 16-17=-114/736
WEBS 3-28=-783/378, 4-28=-317/473, 4-26=-486/175, 5-26=-587/196, 6-26=-660/1196,
6-23=-2070/1124, 8-23=-1446/319, 8-22=-193/1140, 19-22=-210/395, 10-22=-1266/541,
10-17=-227/697, 12-17=-532/161, 13-16=-64/625
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 12-6-8,Exterior(2) 12-6-8 to 46-0-7,
Interior(1) 46-0-7 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C for
members and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T20
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:302018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-27Kh8J_rEaNTJioc9US?DYlSX6q2L7KKxDyzp6zlD9h
NOTES-
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=409, 23=850, 15=169.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T21
TrussType
Roof Special
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:312018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-WJu3Lf?T_uVKxsNoiCzEllIaJWAt4aBUAtiWMYzlD9g
Scale=1:99.1
0-1-100-1-10T1
T2 T4
T5
B1
B5
B4
W1 W2
W3 W4 W5 W6 W5 W6 W5
W7
W9
W8
W10
W11
W12
W13 W14
W16W15
T3
B3B2
B6
1 2
3
4 5 6 7 8 9 10
11
12
13 14
28 27 26 25 24 23 22
21
20 19 18 17 16 15
3233
34
35 36 37 38 39 40
41
42
5x6 3x6
5x6
4x6 3x6
3x4
3x4 5x10
3x5
2x4 3x5 3x10
2x4
4x8
2x4 5x6
3x6
5x8
6x8
3x8
3x5
3x5 3x4
4x6
3x6
5-7-4
5-7-4
10-6-8
4-11-4
17-5-5
6-10-13
24-4-3
6-10-13
31-3-0
6-10-13
32-10-0
1-7-0
38-10-8
6-0-8
41-4-0
2-5-8
47-8-4
6-4-4
54-4-0
6-7-12
-0-10-12
0-10-12
5-7-4
5-7-4
10-6-8
4-11-4
17-5-5
6-10-13
24-4-3
6-10-13
31-3-0
6-10-13
32-10-0
1-7-0
38-10-8
6-0-8
41-4-0
2-5-8
47-8-4
6-4-4
54-4-0
6-7-12
55-2-12
0-10-12
0-4-14-7-25-9-17-9-12-4-12-0-05.0012
PlateOffsets(X,Y)-- [4:0-3-0,0-1-12], [6:0-4-0,0-1-12], [8:0-2-12,0-1-8], [10:0-2-12,0-2-0], [13:0-2-12,0-2-0], [18:0-2-12,0-3-0], [21:0-2-4,0-2-0], [22:0-3-0,0-3-0], [25:0-2-8,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
YESIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.87
0.56
0.78
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.19
-0.33
0.08
(loc)
25-27
25-27
22
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 258 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2 *Except*
B5: 2x4SPFStudWEBS2x4SPFStud*Except*
W4,W6,W12,W13: 2x4SPF No.2, W16: 2x6SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-9-12 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 5-5-13 oc bracing.Except:10-0-0 oc bracing: 19-21
WEBS 1 Row at midpt 4-25, 6-22, 10-21
JOINTS 1Brace at Jt(s): 21
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)2=1031/0-4-0(min. 0-1-14), 22=2604/0-6-0(min. 0-4-9), 15=610/0-6-0(min. 0-1-8)Max Horz2=84(LC 20)
Max Uplift2=-425(LC 12), 22=-819(LC 12), 15=-169(LC 17)
MaxGrav2=1181(LC 42), 22=2907(LC 41), 15=853(LC 24)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-32=-2111/1244, 32-33=-2094/1245, 3-33=-2050/1264, 3-34=-1729/1064,
4-34=-1686/1078, 4-35=-1736/1023, 35-36=-1736/1022, 5-36=-1739/1022,
5-37=-1736/1021, 6-37=-1736/1021, 6-38=-681/1476, 7-38=-681/1476, 7-8=-681/1476,
8-9=-614/1083, 9-39=-602/1052, 10-39=-601/1054, 10-11=-443/208, 11-40=-444/182,
12-40=-571/168, 12-41=-809/186, 41-42=-887/170, 13-42=-943/165, 13-15=-793/202
BOT CHORD 2-28=-1139/1893, 27-28=-1139/1893, 26-27=-894/1585, 25-26=-894/1585,
24-25=-293/635, 23-24=-293/635, 22-23=-293/635, 21-22=-1476/841, 9-21=-267/95,
17-18=-76/330, 16-17=-119/819
WEBS 3-27=-601/264, 4-27=-270/397, 4-25=-273/180, 5-25=-640/218, 6-25=-682/1298,
6-23=-165/272, 6-22=-2487/1296, 8-22=-1399/289, 8-21=-179/1076, 18-21=-83/332,
10-21=-1322/550, 10-17=-206/423, 12-17=-512/157, 13-16=-77/791
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 10-6-8,Exterior(2) 10-6-8 to 13-6-8,
Interior(1) 38-10-8 to 55-2-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowloadgoverns. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T21
TrussType
Roof Special
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:322018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_WRRZ?06lBdBY0x_GvUTIzql3wW6p1QdOXR4u?zlD9f
NOTES-
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=425, 22=819, 15=169.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T22
TrussType
HalfHip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:332018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-Si?qmL0kWVl2AAWAqd?irANxcKq?YXumdBBdQRzlD9e
Scale=1:44.6
0-1-10T1
T2
W5
B1
W3 W4 W5 W4 W5
W4
W1 W2
T3
B2
1
2 3 4 5 6
12 11 10 9 8 7
13
14
15 16 17
6x6 3x4 3x8
3x63x63x43x84x4
3x4 1.5x4
5x10
3x6
4-10-0
4-10-0
11-5-6
6-7-7
18-2-9
6-9-3
25-1-8
6-10-15
4-10-0
4-10-0
11-5-6
6-7-7
18-2-9
6-9-3
25-1-8
6-10-15
1-10-93-9-23-10-123-9-25.0012
PlateOffsets(X,Y)-- [11:0-3-8,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.82
0.65
0.58
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.15
-0.28
0.05
(loc)
9-11
8-9
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 104 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W4: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 4-11-13 oc bracing.
WEBS 1 Row at midpt 6-8
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.(lb/size)7=999/0-6-0(min. 0-2-0), 12=961/MechanicalMax Horz12=84(LC 13)
Max Uplift7=-449(LC 12), 12=-397(LC 12)
MaxGrav7=1270(LC 34), 12=1061(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-13=-1407/883, 13-14=-1402/893, 2-14=-1361/904, 2-15=-2318/1355, 15-16=-2319/1354, 3-16=-2322/1354, 3-4=-1909/1088, 4-5=-1909/1088, 5-17=-1909/1088, 6-17=-1909/1088,
6-7=-1205/630, 1-12=-1024/674
BOT CHORD 10-11=-872/1302, 9-10=-872/1302, 8-9=-1353/2319
WEBS 2-11=-336/129, 2-9=-563/1152, 3-9=-406/167, 3-8=-460/307, 5-8=-605/209,
6-8=-1191/2091, 1-11=-807/1343
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 4-10-0,Exterior(2) 4-10-0 to 9-0-14
zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
7=449, 12=397.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T23
TrussType
HalfHip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:342018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-wuZCzh1MHptuoK5NOKWxNOwAck94HwywsrwBytzlD9d
Scale=1:44.5
0-1-10T1
T2
W5
B1
W3 W4 W5 W4 W5 W4 W5 W4W1W2
T3
B2
1
2 3 4 5 6 7
14 13 12 11 10 9 8
15 16
6x6 3x6 3x10
3x63x64x63x83x8
3x4 1.5x4
3x10
3x5
4x8
4x4
2-10-0
2-10-0
8-3-2
5-5-2
13-10-0
5-6-14
19-4-14
5-6-14
25-1-8
5-8-10
2-10-0
2-10-0
8-3-2
5-5-2
13-10-0
5-6-14
19-4-14
5-6-14
25-1-8
5-8-10
1-10-92-11-23-0-122-11-25.0012
PlateOffsets(X,Y)-- [9:0-3-8,0-2-0], [12:0-3-8,0-1-8], [13:0-3-8,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.55
0.72
0.85
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.20
-0.41
0.07
(loc)
10-12
10-12
8
l/defl
>999
>727
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 102 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W4: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-11-4 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 4-8-3 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)8=1002/0-6-0(min. 0-2-0), 14=978/Mechanical
Max Horz14=61(LC 13)Max Uplift8=-450(LC 12), 14=-419(LC 12)
MaxGrav8=1286(LC 34), 14=1155(LC 34)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-1181/728, 2-15=-2730/1557, 3-15=-2733/1556, 3-4=-3063/1703, 4-5=-3063/1703,
5-6=-3063/1703, 6-16=-2209/1220, 7-16=-2209/1220, 7-8=-1230/638, 1-14=-1142/720BOT CHORD 12-13=-708/1128, 11-12=-1555/2730, 10-11=-1555/2730, 9-10=-1220/2209
WEBS 2-13=-606/269, 2-12=-946/1788, 3-12=-684/234, 3-10=-176/369, 4-10=-452/155,
6-10=-540/945, 6-9=-909/369, 7-9=-1318/2388, 1-13=-776/1292
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 7-0-14,Interior(1) 7-0-14 to 24-11-12zone;cantileverleft
exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber
DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)Provide adequate drainage to preventwater ponding.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
8=450, 14=419.9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T24
TrussType
HalfHipGirder
Qty
1
Ply
2
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:382018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-pfpjp24sL1NKGxP8dAbtYE4wHLciDo1WnTuO5ezlD9Z
Scale=1:51.4
0-1-10T1
T2
W3
B1
W1 W2 W3 W2 W3 W2 W3 W2 W3 W2 W3 W2
T3
B212
3 4 5 6 78 9 10
18 17 16 15 14 13 12 11
2122 23 24 25 26 27 28
29 30 31 32 33 34 35 36
8x8 8x8 5x6
2x43x85x12MT18H2x44x4
4x6
4x4
4x6
4x8
3x6
4x4
4x6
4x6
4-5-0
4-5-0
8-4-1
3-11-1
12-4-14
4-0-13
16-5-12
4-0-13
20-6-9
4-0-13
24-7-7
4-0-13
28-10-0
4-2-9
-0-10-12
0-10-12
4-5-0
4-5-0
8-4-1
3-11-1
12-4-14
4-0-13
16-5-12
4-0-13
20-6-9
4-0-13
24-7-7
4-0-13
28-10-0
4-2-9
0-4-12-0-82-2-22-0-85.0012
PlateOffsets(X,Y)-- [2:0-9-13,0-1-8], [3:0-4-0,0-1-0], [7:0-4-0,0-6-0], [7:0-0-0,0-3-10], [9:0-2-12,0-2-0], [10:0-2-12,0-2-8], [11:Edge,0-3-8], [12:0-2-12,0-1-8], [13:0-1-12,0-1-8],[15:0-2-12,0-2-8], [17:0-1-12,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLLBCDL
20.0
10.0
0.010.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncrCode
2-0-0
1.15
1.15
NOIBC2012/TPI2007
CSI.
TC
BC
WBMatrix-MSH
0.31
0.36
0.58
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.32
-0.59
0.09
(loc)
14-16
14-16
11
l/defl
>999
>580
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 372 lb FT= 14%
GRIP
197/144
244/190
LUMBER-
TOP CHORD2x8SP 2400F 2.0E*Except*
T1: 2x4SP 2400F 2.0E
BOT CHORD2x6SP 2400F 2.0EWEBS2x4SPFStud*Except*
W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
REACTIONS.(lb/size)11=1919/0-6-0(min. 0-1-8), 2=2876/0-4-0(min. 0-1-8)
Max Horz2=72(LC 9)
Max Uplift11=-809(LC 8), 2=-1202(LC 8)MaxGrav11=2115(LC 31), 2=2925(LC 31)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-7249/2918, 3-21=-9212/3613, 21-22=-9215/3613, 4-22=-9223/3614,
4-23=-10258/3962, 5-23=-10258/3962, 5-24=-9840/3769, 6-24=-9840/3769,
6-25=-9840/3769, 7-25=-9840/3769, 7-8=-9840/3769, 8-26=-7905/3014, 9-26=-7905/3014,
9-27=-4644/1772, 27-28=-4644/1772, 10-28=-4644/1772, 10-11=-1962/753
BOT CHORD 2-29=-2696/6738, 18-29=-2696/6738, 18-30=-2646/6610, 17-30=-2646/6610,
17-31=-3576/9209, 16-31=-3576/9209, 16-32=-3930/10258, 15-32=-3930/10258,
14-15=-3930/10258, 14-33=-2982/7905, 13-33=-2982/7905, 13-34=-1742/4644,
12-34=-1742/4644
WEBS 3-18=-599/1541, 3-17=-1021/2838, 4-17=-1097/427, 4-16=-377/1118, 5-14=-516/240,
6-14=-406/185, 8-14=-805/2064, 8-13=-1067/439, 9-13=-1325/3478, 9-12=-1551/621,10-12=-1799/4761
NOTES-
1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows:
Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x8- 2 rowsstaggered at 0-9-0 oc.
Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-7-0 oc.Websconnected as follows: 2x4- 1 row at 0-9-0 oc.
2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to
plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated.3) Unbalancedroofliveloads have been considered for this design.
4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;Lumber DOL=1.60 plate grip DOL=1.60
5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
6) Unbalancedsnowloads have been considered for this design.
Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T24
TrussType
HalfHipGirder
Qty
1
Ply
2
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:382018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-pfpjp24sL1NKGxP8dAbtYE4wHLciDo1WnTuO5ezlD9Z
NOTES-
7)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.
8)Provide adequate drainage to preventwater ponding.
9)All plates areMT20 plates unless otherwiseindicated.10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=809, 2=1202.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
13) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 183 lb down and 163 lb up at 4-5-0, 91 lb down and 67 lb up at
6-5-12, 91 lb down and 67 lb up at 8-5-12, 91 lb down and 67 lb up at 10-5-12, 91 lb down and 67 lb up at 12-5-12, 91 lb down and 67 lb up at 14-5-12, 91 lb down and
67lb up at 16-5-12, 91 lb down and 67 lb up at 18-5-12, 91 lb down and 67 lb up at 20-5-12, 91 lb down and 67 lb up at 22-5-12, 91 lb down and 67 lb up at 24-5-12,
and 91 lb down and 67 lb up at 26-5-12, and 97 lb down and 64 lb up at 28-3-4 on top chord, and 1367 lb down and 557 lb up at 3-7-12, 95 lb down and 110 lb up at
4-5-0, 39 lb down and 41 lb up at 6-5-12, 39 lb down and 41 lb up at 8-5-12, 39 lb down and 41 lb up at 10-5-12, 39 lb down and 41 lb up at 12-5-12, 39 lb down and 41
lb up at 14-5-12, 39 lb down and 41 lb up at 16-5-12, 39 lb down and 41 lb up at 18-5-12, 39 lb down and 41 lb up at 20-5-12, 39 lb down and 41 lb up at 22-5-12, 39 lbdown and 41 lb up at 24-5-12, and 39 lb down and 41 lb up at 26-5-12, and 51 lb down and 35 lb up at 28-3-4 on bottomchord.The design/selection of such
connection device(s)is the responsibility of others.
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-51, 3-10=-61, 2-11=-20
Concentrated Loads(lb)
Vert: 3=-121(F) 7=-39(F) 18=-82(F) 17=-34(F) 4=-39(F) 16=-34(F) 5=-39(F) 14=-34(F) 6=-39(F) 13=-34(F) 9=-39(F) 12=-34(F) 22=-39(F) 23=-39(F) 24=-39(F)
25=-39(F) 26=-39(F) 27=-39(F) 28=-57(F) 29=-1367(B) 30=-34(F) 31=-34(F) 32=-34(F) 33=-34(F) 34=-34(F) 35=-34(F) 36=-40(F)
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T25
TrussType
FlatGirder
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:392018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-HsM51O5V6LVBu5_KAt664Rd5jlyty9zf?7eye5zlD9Y
Scale=1:13.4
W1
T1
W1
B1
W2 W1 W2
1 2 3
6
5 4
7
8 9 10
3x6 3x6
7x14MT18H
4x8 1.5x4 4x8
2-11-4
2-11-4
5-10-8
2-11-4
2-11-4
2-11-4
5-10-8
2-11-4
1-9-15PlateOffsets(X,Y)-- [5:0-7-0,0-4-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.27
0.36
0.99
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.03
-0.05
-0.00
(loc)
5
5-6
4
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 30 lb FT= 20%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x6SP 2400F 2.0E
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-4-1 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)6=1387/Mechanical, 4=1376/Mechanical
Max Uplift6=-537(LC 8), 4=-542(LC 8)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-6=-1001/394, 1-7=-1701/647, 2-7=-1701/647, 2-3=-1701/647, 3-4=-1015/404WEBS1-5=-729/1918, 3-5=-729/1918
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
3) Unbalancedsnowloads have been considered for this design.
4)Provide adequate drainage to preventwater ponding.
5)All plates areMT20 plates unless otherwiseindicated.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7) Refer to girder(s) for truss to trussconnections.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
6=537, 4=542.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 63 lb down and 37 lb up at
0-7-4, and 66 lb down and 40 lb up at 5-8-12 on top chord, and 34 lb down and 32 lb up at 0-7-4, 1135 lb down and 439 lb up at
1-11-4, and 1041 lb down and 417 lb up at 3-11-4, and 40 lb down and 29 lb up at 5-8-12 on bottomchord.The design/selectionofsuchconnection device(s)is the responsibility of others.
11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)Vert: 1-3=-61, 4-6=-20
Concentrated Loads(lb)
Vert: 4=-32(B) 3=-42(B) 7=-33(B) 8=-29(B) 9=-1135(F) 10=-1041(F)
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T26
TrussType
Roof Special
Qty
2
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:402018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-l2wTEk67tfd2WFZXkbdLdfAEy8FHhjeoEnNVAXzlD9X
Scale=1:50.4
T1 T2
B1
B2
B3
W1 W2
W3 W4
W6
W5
W7
W9
W8
1
2
3
4
5
6 7
13 12 11
10 9 8
17
18 19 20 21
22
3x5
4x4
3x4
1.5x4 2x4
3x4
1.5x4 3x8 6x8
3x4
4x4
4x8
7-5-13
7-5-13
13-0-0
5-6-3
15-6-0
2-6-0
20-5-2
4-11-2
26-0-0
5-6-14
7-5-13
7-5-13
13-0-0
5-6-3
15-6-0
2-6-0
20-5-2
4-11-2
26-0-0
5-6-14
26-10-12
0-10-12
0-4-15-9-17-9-12-4-12-0-05.0012
PlateOffsets(X,Y)-- [1:0-0-14,Edge], [6:0-1-12,0-2-0], [11:0-5-12,0-4-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.43
0.54
0.51
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.08
-0.22
0.10
(loc)
12-13
12-13
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 116 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-9-4 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)1=928/0-6-0(min. 0-1-10), 8=956/0-6-0(min. 0-1-11)
Max Horz1=-79(LC 17)Max Uplift1=-153(LC 16), 8=-172(LC 17)
MaxGrav1=1048(LC 2), 8=1083(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-1958/247, 2-17=-1880/268, 2-18=-1381/225, 18-19=-1323/234, 3-19=-1307/248,
3-4=-1335/265, 4-20=-1583/279, 20-21=-1605/277, 5-21=-1694/259, 5-22=-1122/197,6-22=-1183/181, 6-8=-1030/235
BOT CHORD 1-13=-197/1735, 12-13=-197/1735, 11-12=-138/1508, 4-11=-49/414
WEBS 2-13=0/254, 2-12=-620/198, 3-12=-100/781, 4-12=-572/169, 9-11=-141/1109,
5-11=-23/515, 5-9=-736/171, 6-9=-102/1053
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 13-0-0,Exterior(2) 13-0-0 to 16-0-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=153, 8=172.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T27
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:412018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DEUrR47leylv8O7jII8a9siNzYYuQ81yTR72izzlD9W
Scale=1:51.0
0-1-100-1-10T1
T2
T3
B1
B2
B3
W1 W2
W3
W4
W5
W7
W6
W8
W10
W9
1
2
3 4
5
6
7 8
14 13 12
11 10 9
18
19 20
21 22 23
24
25
3x5
4x4 4x6
1.5x4
1.5x4 2x4
3x4
1.5x4 3x8 5x8
3x4
4x6
4x8
6-10-6
6-10-6
12-8-0
5-9-9
13-4-0
0-8-1
15-6-0
2-2-0
20-5-2
4-11-2
26-0-0
5-6-14
6-10-6
6-10-6
12-8-0
5-9-9
13-4-0
0-8-1
15-6-0
2-2-0
20-5-2
4-11-2
26-0-0
5-6-14
26-10-12
0-10-12
0-4-15-5-127-7-62-4-12-0-07-5-125.0012
PlateOffsets(X,Y)-- [1:0-0-6,Edge], [4:0-3-0,0-0-12], [9:0-2-0,0-1-4], [10:0-4-0,0-1-12], [12:0-2-8,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.54
0.64
0.63
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.27
0.12
(loc)
13-14
13-14
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 122 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-2-7 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)1=929/0-6-0(min. 0-2-2), 9=961/0-6-0(min. 0-2-3)
Max Horz1=-75(LC 17)Max Uplift1=-150(LC 16), 9=-170(LC 17)
MaxGrav1=1345(LC 39), 9=1379(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-18=-2584/292, 2-18=-2485/310, 2-19=-1843/248, 19-20=-1834/251, 20-21=-1794/255,
3-21=-1742/274, 3-4=-1607/293, 4-5=-2016/344, 5-22=-1987/296, 22-23=-1993/287,6-23=-2079/277, 6-24=-1443/217, 7-24=-1528/201, 7-9=-1324/244
BOT CHORD 1-14=-247/2294, 13-14=-247/2294, 12-13=-114/1576
WEBS 2-13=-763/196, 3-13=-12/281, 4-13=-98/265, 4-12=-172/645, 10-12=-140/1404,
6-12=-29/566, 6-10=-922/167, 7-10=-109/1347
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 12-8-0,Exterior(2) 12-8-0 to 13-4-0,
Interior(1) 17-6-15 to 26-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=150, 9=170.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T28
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:422018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hR2DfQ7NPGtmlYivs?fpi4FZtyv99cO5h4scEQzlD9V
Scale=1:46.1
0-1-100-1-10T1
T2
T3
B1
B2
B3
W1 W2
W3 W4
W6
W5
W7
W9
W8
1
2
3 4
5
6 7
13 12 11
10 9 8
17
18
19
20 21
22
23
24
3x5
4x4 6x6
1.5x4 2x4
3x4
1.5x4 3x8 6x8
3x4
4x4
4x8
5-9-1
5-9-1
10-8-0
4-10-15
15-6-0
4-10-0
20-5-1
4-11-1
26-0-0
5-6-15
5-9-1
5-9-1
10-8-0
4-10-15
15-4-0
4-8-1
20-5-1
5-1-1
26-0-0
5-6-15
26-10-12
0-10-12
0-4-14-7-126-9-62-4-12-0-05.0012
PlateOffsets(X,Y)-- [4:0-2-0,0-2-1], [6:0-1-8,0-2-0], [8:0-2-0,0-1-0], [9:0-4-0,0-1-12], [11:0-6-0,0-4-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.46
0.58
0.56
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.25
0.11
(loc)
12-13
11-12
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 114 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-6-5 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)1=947/0-6-0(min. 0-1-15), 8=983/0-6-0(min. 0-2-0)
Max Horz1=-62(LC 17)Max Uplift1=-133(LC 16), 8=-153(LC 17)
MaxGrav1=1232(LC 39), 8=1294(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-17=-2393/358, 17-18=-2311/358, 2-18=-2244/371, 2-19=-1804/316, 3-19=-1718/336,
3-20=-1583/346, 20-21=-1583/346, 4-21=-1581/346, 4-22=-1789/338, 5-22=-1883/317,5-23=-1226/251, 23-24=-1302/248, 6-24=-1385/235, 6-8=-1241/258
BOT CHORD 1-13=-313/2133, 12-13=-313/2133, 11-12=-191/1618, 4-11=-31/497
WEBS 2-12=-606/169, 3-12=0/363, 9-11=-158/1302, 5-11=-47/513, 5-9=-878/187,
6-9=-142/1217
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 10-8-0,Exterior(2) 10-8-0 to 19-6-15,
Interior(1) 19-6-15 to 26-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
1=133, 8=153.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T29
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:432018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9dcbsm8?Aa?dNiH5PjA2FHofRME?u_nFwkc9nszlD9U
Scale=1:46.4
0-1-100-1-10T1
T2
T3
B1
B2
B3
W1 W2
W4
W3
W5
W6 W8W7
1
2 3 4
5
6 7
12 11
10 9 8
16
17
18
19 20 21
22
23
3x8
4x6 5x63x5
1.5x4
3x4
8x10
4x8
4x4
1.5x4
3x5
8-8-0
8-8-0
15-6-0
6-10-0
17-4-0
1-10-0
26-0-0
8-8-0
8-8-0
8-8-0
15-6-0
6-10-0
17-4-0
1-10-0
21-11-5
4-7-5
26-0-0
4-0-11
26-10-12
0-10-12
0-4-13-9-125-11-62-4-12-0-05.0012
PlateOffsets(X,Y)-- [1:0-4-2,0-1-8], [3:0-2-4,0-1-8], [4:0-3-0,0-0-12], [5:0-1-12,0-2-0], [6:0-2-0,0-0-8], [9:0-2-12,0-1-8], [11:0-5-12,0-6-4]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.79
0.67
0.87
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.14
-0.38
0.16
(loc)
8-9
8-9
8
l/defl
>999
>822
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 108 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*T1: 2x4SPF 1650F 1.5E
BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStudWEBS2x4SPFStud*Except*
W2: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)1=976/0-6-0(min. 0-1-13), 8=995/0-6-0(min. 0-1-13)
Max Horz1=-46(LC 17)
Max Uplift1=-118(LC 16), 8=-144(LC 13)MaxGrav1=1137(LC 39), 8=1170(LC 39)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-16=-1874/289, 16-17=-1821/296, 17-18=-1789/302, 2-18=-1775/321, 2-19=-1633/347,
19-20=-1633/347, 20-21=-1633/347, 3-21=-1635/347, 3-4=-1999/399, 4-22=-1182/277,
5-22=-1192/256
BOT CHORD 1-12=-232/1644, 11-12=-297/2059, 3-11=-389/159, 8-9=-159/920
WEBS 2-12=0/382, 3-12=-540/108, 9-11=-180/1705, 4-11=-333/2027, 4-9=-1312/231,
5-9=0/301, 5-8=-1219/238
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 8-8-0,Exterior(2) 8-8-0 to 21-6-15,
Interior(1) 21-6-15 to 26-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)1=118, 8=144.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T30
TrussType
Hip
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:442018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-dpA_469dxt8U?ssIzQiHnVKnXmZadSQO9OLjJIzlD9T
Scale:1/4"=1'0-1-100-1-10T1
T2
T1
B1 B2
B3
W1 W2 W3 W2
W5
W4
W6
W8W7
1 2
3 4 5 6
7 8
14 13 12
11 10 9
18
19 20
21 22 23
24 25
26
4x4 5x6
3x8
1.5x4
1.5x4 3x4
3x4
3x8
1.5x4 8x8
5x12MT18H
4x8
6-8-0
6-8-0
11-1-0
4-5-0
15-6-0
4-5-0
19-4-0
3-10-0
26-0-0
6-8-0
-0-10-12
0-10-12
6-8-0
6-8-0
11-1-0
4-5-0
15-6-0
4-5-0
19-4-0
3-10-0
26-0-0
6-8-0
26-10-12
0-10-12
0-4-12-11-125-1-62-4-12-0-05.0012
PlateOffsets(X,Y)-- [2:0-4-2,0-1-8], [6:0-3-0,0-1-12], [7:0-3-0,0-1-12], [12:0-2-8,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.90
0.71
0.78
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.17
-0.38
0.15
(loc)
12-13
12-13
9
l/defl
>999
>809
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 109 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2 *Except*
B2: 2x4SPFStud
WEBS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-4-8 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 9-5-11 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)2=1036/0-6-0(min. 0-1-12), 9=1019/0-6-0(min. 0-1-11)
Max Horz2=52(LC 15)Max Uplift2=-168(LC 12), 9=-170(LC 13)
MaxGrav2=1102(LC 2), 9=1083(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-19=-2130/325, 19-20=-2114/330, 3-20=-2091/349, 3-21=-1908/360, 4-21=-1911/359,
4-22=-2652/446, 5-22=-2652/446, 5-23=-2621/443, 6-23=-2619/443, 6-24=-1224/262,24-25=-1237/243, 7-25=-1262/242, 7-9=-1020/269
BOT CHORD 2-14=-274/1938, 13-14=-388/2730, 12-13=-388/2730, 5-12=-387/122
WEBS 3-14=-20/573, 4-14=-955/165, 10-12=-166/1261, 6-12=-275/1819, 6-10=-822/194,
7-10=-123/1131
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 6-8-0,Exterior(2) 6-8-0 to 23-6-15,
Interior(1) 23-6-15 to 26-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and
forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload
governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.
4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=168, 9=170.10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T31
TrussType
HIPGIRDER
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:472018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2Or6i7BWDoW2sJbteZF_P7yOozejqpJqrMaNwdzlD9Q
Scale:1/4"=1'0-1-100-1-10T1
T2
T1
B1 B2
B3
W1 W2 W3 W2
W5
W4
W6 W7 W8
W10W9
T3
1 2
3 4 5 6 7 8
9 10
17 16 15
14 13 12 11
20 21 22 23 24 25 26 27 2829
30 31 32 33 34 35
36 37
8x8 4x6
4x6
3x4
2x4 4x6
2x4 4x6
4x4
5x6
6x16MT18H
4x12
4x6
5x8
5x6
4-8-0
4-8-0
10-1-0
5-5-0
15-6-0
5-5-0
18-10-6
3-4-6
21-4-0
2-5-10
26-0-0
4-8-0
-0-10-12
0-10-12
4-8-0
4-8-0
10-1-0
5-5-0
15-6-0
5-5-0
18-10-6
3-4-6
21-4-0
2-5-10
26-0-0
4-8-0
26-10-12
0-10-12
0-4-12-1-124-3-62-4-12-0-05.0012
PlateOffsets(X,Y)-- [2:0-1-0,0-0-2], [3:0-4-2,Edge], [7:0-5-4,0-1-12], [11:Edge,0-3-8], [12:0-2-0,0-2-8], [15:0-7-8,0-3-12], [16:0-2-4,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.52
0.49
0.77
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.28
-0.66
0.20
(loc)
15-16
15-16
11
l/defl
>999
>469
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 162 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2 *Except*T2,T3: 2x6SP 2400F 2.0E
BOT CHORD2x6SP 2400F 2.0E*Except*
B2: 2x4SP 2400F 2.0E,B3: 2x6SPF No.2WEBS2x4SPFStud*Except*
W2: 2x4SPF No.2, W5: 2x6SP 2400F 2.0E,W4: 2x6SPF No.2
W10: 2x4SP 2400F 2.0E
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-10 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except:
8-8-14 oc bracing: 15-169-3-4 oc bracing: 12-13.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=1633/0-6-0(min. 0-1-8), 11=1591/0-6-0(min. 0-2-11)
Max Horz2=51(LC 57)
Max Uplift2=-361(LC 8), 11=-450(LC 9)MaxGrav2=1757(LC 2), 11=1708(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-4247/882, 3-20=-6365/1460, 20-21=-6368/1460, 21-22=-6370/1460,
22-23=-6371/1461, 4-23=-6376/1461, 4-24=-6368/1576, 24-25=-6368/1576,
25-26=-6368/1576, 5-26=-6368/1576, 5-6=-6218/1554, 6-27=-6218/1554,
7-27=-6218/1554, 7-28=-1686/515, 28-29=-1680/512, 8-29=-1675/514, 8-9=-1879/540,
9-11=-1638/463
BOT CHORD 2-17=-794/3911, 17-30=-802/3883, 30-31=-802/3883, 31-32=-802/3883, 16-32=-802/3883,
16-33=-1424/6369, 33-34=-1424/6369, 34-35=-1424/6369, 15-35=-1424/6369,
5-15=-381/198, 13-37=-635/2420, 12-37=-635/2420
WEBS 3-17=0/432, 3-16=-656/2735, 4-16=-702/347, 13-15=-704/2702, 7-15=-1000/4290,
7-13=-1302/418, 7-12=-1342/306, 8-12=-1/446, 9-12=-470/1785
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate
grip DOL=1.603)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all
exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4.4) Unbalancedsnowloads have been considered for this design.
5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.6)Provide adequate drainage to preventwater ponding.
7)All plates areMT20 plates unless otherwiseindicated.
8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=361, 11=450.Continued on page 2
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T31
TrussType
HIPGIRDER
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:472018 Page2ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2Or6i7BWDoW2sJbteZF_P7yOozejqpJqrMaNwdzlD9Q
NOTES-
10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 214 lb down and 177 lb up at 4-8-0, 78 lb down and 71 lb up at 5-3-5
, 78 lb down and 71 lb up at 7-3-5, 78 lb down and 71 lb up at 9-3-5, 78 lb down and 71 lb up at 11-3-5, 78 lb down and 71 lb up at 13-3-5, 78 lb down and 71 lb up at 15-3-5, 80 lb down and 96 lb up at 17-3-5, and 80 lb down and 96 lb up at 19-3-5, and 218 lb down and 230 lb up at 21-4-0 on top chord, and 110 lb down at 4-8-0, 44
lb down at 5-3-5, 44 lb down at 7-3-5, 44 lb down at 9-3-5, 44 lb down at 11-3-5, 44 lb down at 13-3-5, 44 lb down at 15-3-5, 46 lb down at 17-3-5, and 46 lb down at
19-3-5, and 114 lb down and 30 lb up at 21-3-5 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others.
12)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).
LOADCASE(S)Standard
1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15
Uniform Loads(plf)
Vert: 1-3=-51, 3-8=-61, 8-9=-51, 9-10=-51, 2-15=-20, 11-14=-20Concentrated Loads(lb)
Vert: 3=-149(F) 17=-96(F) 12=-72(F) 8=-154(F) 20=-48(F) 22=-46(F) 23=-46(F) 24=-46(F) 25=-46(F) 26=-46(F) 27=-49(F) 28=-49(F) 30=-37(F) 31=-37(F) 32=-37(F)
33=-37(F) 34=-37(F) 35=-37(F) 36=-28(F) 37=-28(F)
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T32
TrussType
Common
Qty
5
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:482018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-WbPUvTC8_6evTTA3CGmDyLVZ1Nw4ZMn_40JwS3zlD9P
Scale=1:59.2
T1 T1
B1
W1 W2
W3
W2 W1
W4B212
3
4
5
6
7 8
13 12 11 10 9
20
21
22 23
24
25
4x4
3x4
3x4
3x5
1.5x4 3x8
3x5
1.5x4
1.5x4
1.5x4
3x45-7-125-7-12 11-0-05-4-4 16-4-45-4-4 20-9-64-5-2 21-0-00-2-10
22-0-0
1-0-0
-0-10-12
0-10-12
5-7-12
5-7-12
11-0-0
5-4-4
16-4-4
5-4-4
20-9-6
4-5-2
22-0-0
1-2-10
22-10-12
0-10-12
0-5-39-7-30-5-310.0012
PlateOffsets(X,Y)-- [2:0-1-5,0-1-8], [7:0-4-0,0-0-3]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.55
0.74
0.44
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.18
0.03
(loc)
10-11
10-11
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 98 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W3: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-3-15 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)2=795/0-6-0(min. 0-1-8), 9=854/0-5-4(min. 0-1-8)
Max Horz2=-259(LC 14)
Max Uplift2=-122(LC 16), 9=-129(LC 17)MaxGrav2=900(LC 2), 9=967(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-20=-1065/123, 3-20=-968/150, 3-21=-744/171, 21-22=-680/189, 4-22=-679/208,
4-23=-671/207, 23-24=-674/186, 5-24=-734/184, 5-25=-900/133, 6-25=-934/102,
6-7=-644/24BOT CHORD 2-13=-133/822, 12-13=-133/822, 11-12=-133/822, 10-11=-12/634, 9-10=-12/634,
7-9=-12/634
WEBS 3-11=-421/220, 4-11=-120/604, 5-11=-297/200, 6-9=-509/209
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 11-0-0,Exterior(2) 11-0-0 to 14-0-0
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb)
2=122, 9=129.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
T32GE
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:492018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_nzt7pDmlQmm5dlFm_HSUY2r?nR_ItP7Ig3T_WzlD9O
Scale=1:58.4
T1 T1
B1
ST5
ST4
ST3
ST2
ST1
ST5
ST4
ST3
ST2
ST1
B212
3
4
5
6
7
8
9
10
11
12
13
14
15
25 24 23 22 21 20 19 18 17 16
26 27
3x4
3x4
5x6
3x4
22-0-0
22-0-0
-0-10-12
0-10-12
11-0-0
11-0-0
22-0-0
11-0-0
22-10-12
0-10-12
0-5-39-7-30-5-310.0012
PlateOffsets(X,Y)-- [8:0-2-0,Edge], [23:0-3-0,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.09
0.05
0.16
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
0.01
(loc)
14
14
14
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 117 lb FT= 20%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud*Except*
ST5: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 7-21, 9-20
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.All bearings 22-0-0.
(lb)-Max Horz2=259(LC 15)Max UpliftAll uplift 100 lb orless at joint(s) 2, 21, 23, 24, 18, 17, 14 except 22=-111(LC 16), 25=-103(LC 16),
19=-116(LC 17), 16=-102(LC 17)
MaxGravAllreactions 250 lb orless at joint(s) 2, 21, 22, 23, 24, 25, 20, 19, 18, 17, 16, 14
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-3=-342/228, 13-14=-310/233BOT CHORD 2-25=-201/286, 24-25=-201/286, 23-24=-201/286, 22-23=-201/286, 21-22=-201/286,
20-21=-201/286, 19-20=-201/286, 18-19=-201/286, 17-18=-201/286, 16-17=-201/286,
14-16=-201/286
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-C Corner(3)-0-10-12 to 2-0-0,Exterior(2) 2-0-0 to 11-0-0, Corner(3) 11-0-0 to 14-0-0
zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry
GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1.
4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
5) Unbalancedsnowloads have been considered for this design.
6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangsnon-concurrentwith otherliveloads.
7)All plates are 1.5x4MT20 unless otherwiseindicated.
8)Gablerequirescontinuous bottomchord bearing.9)Gablestudsspaced at 2-0-0 oc.
10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 21, 23, 24, 18,17, 14 except(jt=lb) 22=111, 25=103, 19=116, 16=102.
12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI
1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V01
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:502018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SzXFK9EOWjudjnJSKhoh1ma09AkN1M7HXKo1XyzlD9N
Scale=1:21.8
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-3
0-0-3
5-4-8
5-4-5
2-8-4
2-8-4
5-4-8
2-8-4
0-0-43-1-100-0-414.0012
PlateOffsets(X,Y)-- [2:Edge,0-3-1]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.12
0.24
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 15 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-4-8 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=168/5-4-1(min. 0-1-8), 3=168/5-4-1(min. 0-1-8)
Max Horz1=75(LC 13)
Max Uplift1=-23(LC 17), 3=-23(LC 16)MaxGrav1=190(LC 2), 3=190(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V02
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:502018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SzXFK9EOWjudjnJSKhoh1ma1nAnY1M7HXKo1XyzlD9N
Scale=1:10.2
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-3
0-0-3
2-6-3
2-6-0
1-3-2
1-3-2
2-6-3
1-3-2
0-0-41-5-100-0-414.0012
PlateOffsets(X,Y)-- [2:Edge,0-3-1]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.02
0.03
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 6 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-6-3 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=67/2-5-13(min. 0-1-8), 3=67/2-5-13(min. 0-1-8)
Max Horz1=-30(LC 14)
Max Uplift1=-9(LC 17), 3=-9(LC 16)MaxGrav1=75(LC 2), 3=75(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1) Unbalancedroofliveloads have been considered for this design.2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V03
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:512018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-w95dYVE0H10UKxuetOKwZz7B4a7jmn0Qm_Ya3OzlD9M
Scale=1:65.5
T2
W1
B1
ST5
ST4
ST3
ST2
ST1
T1
1
2
3
4
5
6
7
8
14 13 12 11 10 9
15
1617
3x4
1.5x4
1.5x4
3x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
12-10-4
12-10-4
12-10-4
12-10-4
0-0-410-8-910.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.11
0.04
0.15
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
9
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 74 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2
OTHERS 2x4SPFStud*Except*
ST5: 2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 8-9, 7-10
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.All bearings 12-10-4.
(lb)-Max Horz1=418(LC 16)Max UpliftAll uplift 100 lb orless at joint(s) 9, 1, 10, 11, 12, 13 except 14=-118(LC 16)
MaxGravAllreactions 250 lb orless at joint(s) 9, 10, 11, 12, 13, 14 except 1=303(LC 16)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-2=-500/414, 2-15=-396/300, 3-15=-389/309, 3-4=-383/323, 4-5=-311/257
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 12-8-8zone;cantileverleft exposed ;
endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9, 1, 10, 11, 12,
13 except(jt=lb) 14=118.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V04
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:522018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-OMf?lrFf2L8Ly5TqR6r96BfHO_Q0VDHZ?eH8bqzlD9L
Scale=1:50.5
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
10-0-10
10-0-10
0-0-48-4-910.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.40
0.23
0.21
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 40 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 3-4
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizerInstallation guide.
REACTIONS.(lb/size)1=161/10-0-10(min. 0-1-8), 4=79/10-0-10(min. 0-1-8), 5=433/10-0-10(min. 0-1-8)
Max Horz1=323(LC 16)Max Uplift4=-51(LC 16), 5=-275(LC 16)
MaxGrav1=219(LC 31), 4=105(LC 22), 5=542(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 1-6=-333/263, 6-7=-314/301, 2-7=-294/306
WEBS 2-5=-469/349
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 9-10-14zone;cantileverleft exposed
; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
5=275.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V05
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:532018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-tYDNzBGHpeGCaF20?pMOfOCQFOoCEigjDI1h7HzlD9K
Scale=1:38.3
T1 W1
B1
ST1
1
2
3
5 4
6
7
2x4
1.5x4
1.5x41.5x4
1.5x4
7-3-1
7-3-1
0-0-46-0-910.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.52
0.10
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
4
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 27 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=64/7-3-1(min. 0-1-8), 4=109/7-3-1(min. 0-1-8), 5=302/7-3-1(min. 0-1-8)
Max Horz1=223(LC 13)
Max Uplift1=-38(LC 12), 4=-62(LC 13), 5=-192(LC 16)MaxGrav1=140(LC 30), 4=154(LC 29), 5=378(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-362/341, 2-6=-345/346
WEBS 2-5=-334/248
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-3-1,Interior(1) 3-3-1 to 7-1-5zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb)
5=192.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V06
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:542018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-LkmmAXHvayO3BOdDZXtdBclf0o6dzA6sSymEgjzlD9J
Scale=1:21.5
T1
W1
B1
1
2
3
4
2x4
1.5x4
1.5x4
4-5-7
4-5-7
0-0-43-8-910.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.26
0.15
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 15 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-5-7 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=138/4-5-7(min. 0-1-8), 3=138/4-5-7(min. 0-1-8)
Max Horz1=130(LC 13)
Max Uplift1=-4(LC 16), 3=-61(LC 16)MaxGrav1=160(LC 30), 3=183(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 4-3-11zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V07
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:542018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-LkmmAXHvayO3BOdDZXtdBclhUo7WzA6sSymEgjzlD9J
Scale=1:18.4
T1
W1
B1
1
2
32x4
1.5x4
1.5x4
3-8-6
3-8-6
0-0-43-0-1510.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.17
0.10
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 12 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-8-6 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=111/3-8-1(min. 0-1-8), 3=111/3-8-1(min. 0-1-8)
Max Horz1=104(LC 15)
Max Uplift1=-4(LC 16), 3=-49(LC 16)MaxGrav1=129(LC 30), 3=148(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V08
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:552018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-pxK8NtHXLGWwpYCP6EOskpHl9BPIidM0hcWoC9zlD9I
Scale=1:34.2
T1 W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
6-5-15
6-5-15
0-0-45-4-1510.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.62
0.38
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 22 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=211/6-5-15(min. 0-1-8), 3=211/6-5-15(min. 0-1-8)
Max Horz1=197(LC 13)
Max Uplift1=-7(LC 16), 3=-93(LC 16)MaxGrav1=244(LC 30), 3=279(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-295/237
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 6-4-3zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V09
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:562018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-H7uWbCI96ZenRinbgyv5G1q?wborR2H9vGFLkczlD9H
Scale=1:48.6
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
9-3-9
9-3-9
0-0-47-8-1510.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.30
0.17
0.15
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 36 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=137/9-3-9(min. 0-1-8), 4=91/9-3-9(min. 0-1-8), 5=391/9-3-9(min. 0-1-8)
Max Horz1=297(LC 16)
Max Uplift4=-58(LC 16), 5=-249(LC 16)MaxGrav1=196(LC 31), 4=114(LC 29), 5=490(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-6=-312/249, 6-7=-293/282, 2-7=-279/287
WEBS 2-5=-426/315
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 9-1-13zone;cantileverleft exposed ;
endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 4 except(jt=lb)
5=249.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V10
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:562018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-H7uWbCI96ZenRinbgyv5G1q0QbpiR019vGFLkczlD9H
Scale=1:59.4
W1
T1 W3
B1
ST2
ST1
W2
1 2
3
4
5
9 8 7 6
10
11
3x5
3x4
1.5x4
1.5x41.5x4
1.5x4
3x4
1.5x4
-0-10-12
0-10-12
9-11-0
9-11-0
1-9-1310-0-1510.0012
PlateOffsets(X,Y)-- [2:0-1-8,0-1-8], [9:0-2-12,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.20
0.11
0.29
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.00
(loc)
1
1
6
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 53 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
WEBS 2x4SPFStud*Except*
W3: 2x4SPF No.2OTHERS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,except end verticals.
BOT CHORD Rigidceiling directly applied or 9-10-4 oc bracing.
WEBS 1 Row at midpt 5-6
MiTekrecommends that Stabilizers and requiredcross bracingbeinstalled during truss erection,in accordancewithStabilizer
Installation guide.
REACTIONS.All bearings 9-11-0.(lb)-Max Horz9=335(LC 16)
Max UpliftAll uplift 100 lb orless at joint(s) 6 except 9=-166(LC 14), 7=-207(LC
16), 8=-439(LC 16)MaxGravAllreactions 250 lb orless at joint(s) 6 except 9=528(LC 16), 7=406(LC
30), 8=362(LC 30)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
TOP CHORD 2-9=-530/415, 2-3=-401/361, 3-10=-282/244, 4-10=-252/249
BOT CHORD 8-9=-362/322
WEBS 4-7=-352/262, 3-8=-257/164, 2-8=-434/487
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 1-11-0,Interior(1) 1-11-0 to 9-9-4zone;cantileverleft exposed ;
endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs
non-concurrentwith otherliveloads.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6 except(jt=lb)
9=166, 7=207, 8=439.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V11
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:572018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-lJSuoYJnttme2sMoEfRKpEN6_?AtAX1J8w?vG2zlD9G
Scale=1:38.6
T1
W1
B1
ST2
ST1
1
2
3
4
7 6 5
8
9
2x4
1.5x4
1.5x41.5x4
1.5x4
1.5x4
1.5x4
7-3-12
7-3-12
0-0-46-1-210.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.53
0.05
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 32 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.All bearings 7-3-12.
(lb)-Max Horz1=224(LC 13)
Max UpliftAll uplift 100 lb orless at joint(s) 1, 5, 6 except 7=-135(LC 16)MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 6 except 7=264(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-8=-353/313, 2-8=-335/335
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-3-12,Interior(1) 3-3-12 to 7-2-0zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Bearing at joint(s) 5 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5, 6 except
(jt=lb) 7=135.8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V12
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:582018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-DW0G0uKPeBuVg0x_oNyZLSvG?PROv_5SNakSpUzlD9F
Scale=1:33.3
T1 W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
6-3-12
6-3-12
0-0-45-3-210.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.58
0.36
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 21 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=204/6-3-12(min. 0-1-8), 3=204/6-3-12(min. 0-1-8)
Max Horz1=191(LC 13)
Max Uplift1=-7(LC 16), 3=-90(LC 16)MaxGrav1=237(LC 30), 3=270(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 2-3=-287/232
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 6-2-0zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V13
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:592018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hiafDEK2OU0LIAWAL4ToufSUhppVeQLbcEU?LxzlD9E
Scale=1:26.7
T1 W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
5-3-12
5-3-12
0-0-44-5-210.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.39
0.24
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 18 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-3-12 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=169/5-3-12(min. 0-1-8), 3=169/5-3-12(min. 0-1-8)
Max Horz1=158(LC 13)
Max Uplift1=-5(LC 16), 3=-75(LC 16)MaxGrav1=196(LC 30), 3=223(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 5-2-0zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V14
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1413:59:592018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-hiafDEK2OU0LIAWAL4ToufSX3pqzeQLbcEU?LxzlD9E
Scale=1:21.0
T1 W1
B1
1
2
3
4
2x4
1.5x4
1.5x4
4-3-12
4-3-12
0-0-43-7-210.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.24
0.14
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 14 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 4-3-12 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=133/4-3-12(min. 0-1-8), 3=133/4-3-12(min. 0-1-8)
Max Horz1=125(LC 13)
Max Uplift1=-4(LC 16), 3=-59(LC 16)MaxGrav1=155(LC 30), 3=176(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-13 to 3-4-13,Interior(1) 3-4-13 to 4-2-0zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V15
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:002018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-9u81RaLg9o9CvJ4Nvn_1Rt?iZCAHNtblquDZtNzlD9D
Scale=1:16.8
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
3-3-12
3-3-12
0-0-42-9-210.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.13
0.07
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 10 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-3-12 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=98/3-3-7(min. 0-1-8), 3=98/3-3-7(min. 0-1-8)
Max Horz1=92(LC 13)
Max Uplift1=-3(LC 16), 3=-43(LC 16)MaxGrav1=114(LC 30), 3=130(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V16
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:012018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-e5iPewMIw6H3XTfZTVVGz4XvVcXD6Kru3Yz6PpzlD9C
Scale=1:12.6
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
2-3-12
2-3-12
0-0-41-11-210.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.05
0.03
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 7 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-3-12 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=62/2-3-7(min. 0-1-8), 3=62/2-3-7(min. 0-1-8)
Max Horz1=59(LC 13)
Max Uplift1=-2(LC 16), 3=-28(LC 16)MaxGrav1=72(LC 30), 3=83(LC 29)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V17
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:012018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-e5iPewMIw6H3XTfZTVVGz4Xs?cO16Kru3Yz6PpzlD9C
Scale:3/4"=1'
T1 T1
B1
1
2
34
5 6
7
2x4
3x4
2x4
0-0-10
0-0-10
8-10-0
8-9-7
4-5-0
4-5-0
8-10-0
4-5-0
0-0-41-10-10-0-45.0012
PlateOffsets(X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.21
0.62
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 19 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=259/8-8-13(min. 0-1-8), 3=259/8-8-13(min. 0-1-8)
Max Horz1=27(LC 20)
Max Uplift1=-43(LC 16), 3=-43(LC 17)MaxGrav1=293(LC 2), 3=293(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.TOP CHORD 1-4=-318/182, 4-5=-284/187, 2-5=-257/194, 2-6=-257/194, 6-7=-284/187, 3-7=-318/182
BOT CHORD 1-3=-131/262
NOTES-
1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 4-5-0,Exterior(2) 4-5-0 to 7-5-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)Gablerequirescontinuous bottomchord bearing.
6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V18
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:022018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-6HFnrGNwhPPw9dEl1C0VWI4wV0mNrm62ICifyFzlD9B
Scale=1:27.0
T1 T1
B1
ST1
B2
1
2
3
5 4
6
7
8 9
10
11
3x5
8x12MT18H
3x53x51.5x4
0-0-10
0-0-10
16-10-0
16-9-7
8-5-0
8-5-0
16-10-0
8-5-0
0-0-43-6-10-0-45.0012
PlateOffsets(X,Y)-- [1:0-0-6,Edge], [3:0-2-6,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.68
0.48
0.13
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
MT18H
Weight: 41 lb FT= 14%
GRIP
197/144
197/144
LUMBER-
TOP CHORD2x4SPF No.2BOT CHORD2x4SPF No.2
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=235/16-8-13(min. 0-1-15), 3=235/16-8-13(min. 0-1-15), 4=615/16-8-13(min. 0-1-15)
Max Horz1=-56(LC 21)
Max Uplift1=-61(LC 16), 3=-71(LC 17), 4=-55(LC 16)MaxGrav1=275(LC 33), 3=275(LC 34), 4=692(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-4=-438/152
NOTES-1) Unbalancedroofliveloads have been considered for this design.
2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 8-5-0,Exterior(2) 8-5-0 to 11-5-0zone;
cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown;
Lumber DOL=1.60 plate grip DOL=1.60
3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
4) Unbalancedsnowloads have been considered for this design.
5)All plates areMT20 plates unless otherwiseindicated.
6)Gablerequirescontinuous bottomchord bearing.
7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3, 4.
9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V19
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:032018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-aTp93cOYSjXnmnpxawXk2VdFBQDkaELBXsSDUizlD9A
Scale=1:8.2
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
2-7-0
2-7-0
0-0-41-0-155.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.04
0.02
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 6 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-7-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=60/2-6-6(min. 0-1-8), 3=60/2-6-6(min. 0-1-8)
Max Horz1=31(LC 13)
Max Uplift1=-11(LC 16), 3=-17(LC 16)MaxGrav1=67(LC 2), 3=67(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V20
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:042018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2gNYGxOAD1feOxO88d3zbj9I2qUzJhaLlWBm08zlD99
Scale=1:17.6
T1
W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
6-7-0
6-7-0
0-0-42-8-155.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.54
0.34
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 17 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=201/6-6-6(min. 0-1-8), 3=201/6-6-6(min. 0-1-8)
Max Horz1=104(LC 13)
Max Uplift1=-37(LC 16), 3=-58(LC 16)MaxGrav1=227(LC 2), 3=227(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 6-5-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V21
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:042018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-2gNYGxOAD1feOxO88d3zbj9KJqWaJg8LlWBm08zlD99
Scale=1:27.3
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
10-7-0
10-7-0
0-0-44-4-155.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.40
0.24
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
4
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 31 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=166/10-7-0(min. 0-1-8), 4=76/10-7-0(min. 0-1-8), 5=443/10-7-0(min. 0-1-8)
Max Horz1=177(LC 13)
Max Uplift1=-4(LC 16), 4=-22(LC 13), 5=-150(LC 16)MaxGrav1=188(LC 2), 4=98(LC 22), 5=501(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-5=-375/229
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 10-5-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb)
5=150.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V22
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:052018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-WsxwUHPo_KnV05zKiLaC8wiXRDte27ZU_AxKYazlD98
Scale=1:26.1
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
9-11-0
9-11-0
0-0-44-1-95.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.31
0.19
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
4
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 29 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
OTHERS 2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=146/9-11-0(min. 0-1-8), 4=87/9-11-0(min. 0-1-8), 5=406/9-11-0(min. 0-1-8)
Max Horz1=165(LC 13)
Max Uplift1=-1(LC 16), 4=-23(LC 13), 5=-137(LC 16)MaxGrav1=165(LC 2), 4=107(LC 22), 5=458(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.WEBS 2-5=-344/219
NOTES-1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;
MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 9-9-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4 except(jt=lb)
5=137.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V23
TrussType
GABLE
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:062018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-_2VIhdQRlevMdEYWG25Rg8FZdd7Jnb4dDpgt51zlD97
Scale=1:21.0
T1 W1
B1
1
2
3
4
5
2x4
1.5x4
1.5x4
7-11-0
7-11-0
0-0-43-3-95.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.86
0.54
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 21 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 2-7-8 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=248/7-11-0(min. 0-1-8), 3=248/7-11-0(min. 0-1-8)
Max Horz1=128(LC 13)
Max Uplift1=-46(LC 16), 3=-72(LC 16)MaxGrav1=281(LC 2), 3=281(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 7-9-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V24
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:072018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SE3gvzR3Wy1DFO7jpmcgDLnrJ1WxW2KnRTQQdTzlD96
Scale=1:15.8
T1
W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
5-11-0
5-11-0
0-0-42-5-95.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.42
0.26
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 15 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 5-11-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=178/5-10-6(min. 0-1-8), 3=178/5-10-6(min. 0-1-8)
Max Horz1=92(LC 13)
Max Uplift1=-33(LC 16), 3=-51(LC 16)MaxGrav1=201(LC 2), 3=201(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2) 0-9-1 to 3-9-1,Interior(1) 3-9-1 to 5-9-4zone;cantileverleft and right
exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate
grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V25
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:072018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-SE3gvzR3Wy1DFO7jpmcgDLnvf1ZgW2KnRTQQdTzlD96
Scale=1:10.9
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
3-11-0
3-11-0
0-0-41-7-95.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.14
0.09
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 9 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 3-11-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=107/3-10-6(min. 0-1-8), 3=107/3-10-6(min. 0-1-8)
Max Horz1=55(LC 13)
Max Uplift1=-20(LC 16), 3=-31(LC 16)MaxGrav1=121(LC 2), 3=121(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3.
7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.
LOADCASE(S)Standard
DE Job # 56780-W1
Dansco Engineering, LLC
Date: 2/14/18
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood
Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1801820-12T
Truss
V26
TrussType
Valley
Qty
1
Ply
1
1801820-12TDWH Jackson'sGrantLot180
Job Reference (optional)Run:8.100 s Apr92017 Print:8.100 s Apr92017MiTekIndustries,Inc.WedFeb1414:00:082018 Page1ID:0BpXM0NRYTrYjZn63Rlk28zXfaZ-wRd26JRhHF94tYivNT7vlZK6LRw8FVawg79_9vzlD95
Scale=1:6.7
T1
W1
B1
1
2
3
2x4
1.5x4
1.5x4
1-11-0
1-11-0
0-0-40-9-95.0012
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
PlateGrip DOL
Lumber DOL
RepStressIncr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.01
0.01
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 4 lb FT= 14%
GRIP
197/144
LUMBER-
TOP CHORD2x4SPF No.2
BOT CHORD2x4SPF No.2WEBS2x4SPFStud
BRACING-
TOP CHORD Structuralwoodsheathing directly applied or 1-11-0 oc purlins,
except end verticals.BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing.
MiTekrecommends that Stabilizers and requiredcross bracing
beinstalled during truss erection,in accordancewithStabilizer
Installation guide.REACTIONS.(lb/size)1=36/1-10-6(min. 0-1-8), 3=36/1-10-6(min. 0-1-8)
Max Horz1=19(LC 13)
Max Uplift1=-7(LC 16), 3=-10(LC 16)MaxGrav1=41(LC 2), 3=41(LC 2)
FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown.
NOTES-
1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed;MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right
exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60
2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat
roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1
3) Unbalancedsnowloads have been considered for this design.
4)Gablerequirescontinuous bottomchord bearing.
5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.
6)Bearing at joint(s) 3 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify
capacity of bearingsurface.