Loading...
HomeMy WebLinkAboutS000.0SHEET PROJECT INFO SEAL REVISIONS DRAWING TITLE PROJECT CLIENT STEVE BARGER 17140 02-16-18 STATE SUBMITTAL THE LITTLE GYM CARMEL, IN CONSTRUCTION MANAGER CARMEL, IN GREENSBORO, NC # REVISION DATE D201 DEMOLITION PLAN SCALE: 01 DEMOLITION PLAN 1/4" = 1'-0" GENERAL DEMOLITION NOTES 1. COORDINATE ALL DEMOLITION WORK WITH CORRESPONDING NEW CONSTRUCTION. 2. GENERAL CONTRACTOR TO COORDINATE CONSTRUCTION WITH OWNER. 3. GENERAL CONTRACTOR SHALL PROTECT ALL FINISHES AND/OR EQUIPMENT TO REMAIN DURING CONSTRUCTION. 4. DEMOLITION SHALL BE PERFORMED WITHOUT DAMAGE TO ADJACENT RETAINED WORK. WHERE SUCH DAMAGE OCCURS, PATCH, REPAIR OR OTHERWISE RESTORE TO ITS ORIGINAL CONDITION. 5. WHERE DEMOLITION WORK LEAVES HOLES OR DAMAGED SURFACES THAT WILL BE EXPOSED IN FINISHED WORK, THE DAMAGED AREAS SHALL BE PATCHED AND REPAIRED TO MATCH FINAL FINISH. 6. SOLID LINES INDICATE STRUCTURE AND/OR EQUIPMENT TO REMAIN. 7. DASHED LINES INDICATE STRUCTURE AND/OR EQUIPMENT TO BE REMOVED. 8. ALL ITEMS NOT SPECIFICALLY INDICATED TO BE REMOVED THAT MUST BE DEMOLISHED TO ACCOMMODATE NEW CONSTRUCTION SHOULD BE VERIFIED WITH ARCHITECT BEFORE PROCEEDING. 9. ALL ASSEMBLIES NOTED TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY WITH FASTENERS, ANCHORS, SEALANTS, CAULKING, ADHESIVES, ETC. 10. REMOVE ALL DEBRIS FROM THE SITE RESULTING FROM DEMOLITION. TRANSPORT AND LEGALLY DISPOSE OFF-SITE. 11. REMOVE AND DISPOSE OF ALL EXISTING WINDOW TREATMENTS. 12. REMOVE ACOUSTICAL CEILING TILE, GRID, AND ASSOCIATED ITEMS THROUGHOUT PROJECT. 13. REMOVE ALL LIGHTING FIXTURES, DIFFUSERS AND CEILING ACCESSORIES. 14. REMOVE ALL COLUMN WRAPS TO ALLOW FOR NEW CONSTRUCTION. 15. REMOVE WALL FRAMING AND ASSOCIATED ITEMS, INCLUDING TOP TRACK AS NECESSARY TO ACCOMMODATE NEW CONSTRUCTION. 16. REMOVE INTERIOR DOORS, FRAMES, AND RELATED ITEMS. 17. REMOVE EXISTING FLOOR COVERING, WALL-BASE AND ASSOCIATED ITEMS. PREPARE FLOOR TO RECEIVE NEW FINISHES IF NECESSARY. 18. REMOVE SINKS AND PLUMBING FIXTURES COMPLETELY. SALVAGE ANYTHING NECESSARY TO REUSE IN NEW CONSTRUCTION RESTROOMS. 19. REMOVE RESTROOM TOILET PARTITIONS AND RELATED ITEMS. 20. REMOVE COUNTERS, CASEWORK, AND RELATED ITEMS. 21. BEFORE BEGINNING DEMOLITION, EXISTING MECHANICAL UNITS AND EQUIPMENT SHALL BE COVERED AND PROTECTED TO PREVENT DUST AND DEBRIS FROM ENTERING. ENTRY XXX R.R. XXX R.R. XXX LAUNDRY XXX OFFICE XXX OFFICE XXX STORAGE XXX STORAGE XXX SHOWERS XXX LOCKER ROOM XXX TANNING XXX DANCE ROOM XXX DAYCARE XXX STAGE XXX SAUNA XXX UTILITY XXX R.R. XXX UTILITY XXX CHECK-IN XXX LANDLORD DEMO NOTES: 1. Dumpster to be located behind Tenant space and the area around the dumpster must be kept clean daily. Any fines from the municipality will be passed onto the Tenant. 2. All dumpsters must be placed on 2x or plywood blocking 3. All loud and disruptive construction noise is to be done on adjoining Tenants’ off hours. Construction noise shall not be disruptive to Tenants or Patrons of the Shopping Center. CONSTRUCTION REVIEW APPROVED AS NOTED BY RAMCO-GERSHENSON APPROVAL AND/OR COMMENTS BY RAMCO-GERSHENSON'S CONSTRUCTION DEPARTMENT IN NO WAY ABROGATES OR MODIFIES THE TERMS OF THE LEASE AGREEMENT NOR DOES SAID APPROVAL SUPERSEDE ANY BUILDING CODES OR ORDINANCES. By Erin Seelig at 11:01 am, Feb 28, 2018 DEMO ALL WALLS OF THE SUANA 03/29/18 Nick Mishler