HomeMy WebLinkAbout1757840H-111
CEF-1
83
TO RC-1
2
3
4
PROVIDE MIN. 6" DEEP
GRILLE PLENUM BOX AT ALL
RETURN GRILLES PER DETAIL
ON SHEET H3.0 (TYP.)
CEF-2
RTAC-1
3
RTAC-2
4
UCD
DATA
116
CONSULT 6
106
CONSULT 1
101
CONSULT 2
102
CONSULT 3
103
RETAIL
100
HALLWAY
110
BREAKROOM
114
CONSULT 4
104
WOMENS
RESTROOM
128
DISCOVERY
ROOM
113
MENS
RESTROOM
129
CONSULT 5
130
STORAGE
115
UCD
1
SG1-8
(100)
SG1-8
(100)
SG1-8
(100)
SG1-8
(100)
SG1-8
(100)
SG1-8
(100)
SG1-10
(300)
SG2S-10/8
(300)
SG2S-10/8
(300)
SG2S-10/8
(300)
SG2S-8/8
(200)
SG2S-8/8
(200)
SG2S-10/8
(300)
SG2S-10/8
(300)
RG1-8
(100)
RG1-8
(100)
RG1-8
(100)
RG1-8
(100)
RG1-8
(100)
RG1-8
(100)
RG2S-20/18
(1,200)
(BOTTOM OF GRILLE
AT 12'-0" A.F.F.)
RG2S-12/10
(400)
RG2S-14/12
(600)
18/12
20/18
29/8
5
6 16/16
12/8 14/14
14/10
14/12
12/10
18/12
12/8
8/8
29/10
18/6
7
8
APPROX. 85'
1 1/4" GAS DN ALONG BUILDING
TO NEW TENANT GAS METER-
COORDINATE WITH UTILITY CO.
1 1/4" GAS
ON ROOF
1"
3/4"
MOUNT THERMOSTAT AT 48" A.F.F. IN LOCATIONS AS SHOWN, UNLESS LOCAL
CODE AUTHORITY WILL ALLOW A MOUNTING HEIGHT OF 60" A.F.F. THERMOSTATS
SHALL BE HONEYWELL VISION PRO THR8320R COMMERCIAL SERIES OR
APPROVED EQUAL. THERMOSTAT FURNISHED BY HVAC CONTRACTOR.
COORDINATE BUILDING PENETRATION WITH LANDLORD. PROVIDE GRAVITY BACK
DRAFT DAMPER BELOW ROOF DECK. EXHAUST OUTLET LOCATION MUST BE AT
LEAST 10'-0" AWAY FROM ANY OUTSIDE AIR INTAKE.
ROOF TOP UNIT FOR NEW TENANT CONSTRUCTION. SEE RTAC SCHEDULE ON
SHEET H4.0 & A0.1 FOR RESPONSIBILITY OF INSTALLATION. VERIFY FINAL
INSTALLATION LOCATION WITH LANDLORD.
TRANSITION FROM RTAC SUPPLY AND RETURN DUCT SIZES TO SIZE SHOWN ON
PLAN. TRANSITION SIZE IN VERTICAL IF TRANSITION CAN MEET SPECIFICATIONS,
OTHERWISE TRANSITION AFTER ELBOW. PROVIDE TURNING VANES IN DUCT
ELBOWS OR TEES.
18/20 SA UP TO RTAC-1
11/29 RA UP TO RTAC-1
18/20 SA UP TO RTAC-2
11/29 RA UP TO RTAC-2
KEYED NOTES
1
2
3
4
NOTES:
- DETAIL REFERENCES ON PLANS ARE TO AID THE CONTRACTOR IN
IDENTIFYING THE APPLICABLE DETAIL. NOT ALL DETAILS, OR
INSTANCES OF DETAILS, ARE REFERENCED ON PLANS.
CONTRACTOR IS RESPONSIBLE TO REVIEW AND COMPLY WITH ALL
APPLICABLE DETAILS WHETHER OR NOT REFERENCED ON PLANS.
- COORDINATE LOCATION OF ALL EXPOSED PIPING AND DUCTWORK
WITH OWNER PRIOR TO INSTALLATION.
- IF DUCT SYSTEMS ARE USED FOR TEMPORARY HEAT,
PROVIDE TEMPORARY FILTERS AT RETURN AIR OPENINGS
AND INSTALL FILTERS IN THE UNITS EQUIVALENT TO THE
EFFICIENCY OF THE SPECIFIED FILTERS FOR THE UNIT. IF
PROPER EFFICIENCY FILTERS ARE NOT INSTALLED IN UNIT,
UNIT AND ALL DUCTWORK DOWNSTREAM OF UNIT SHALL BE
CLEANED BEFORE TEST AND BALANCE.
- COORDINATE GRILLE LOCATIONS WITH FINAL REFLECTED
CEILING PLAN AND CORRESPONDING LIGHTING CONFIGURATION.
- MOUNT DUCTWORK IN AREAS AS HIGH AS POSSIBLE ABOVE
SPACES WITH 10'-0" HIGH CEILINGS.
5
6
7
8
HVAC CALCULATION NOTES:
HVAC CALCULATIONS ASSUMES THE FOLLOWING FOR ENVELOPE.
CONSTRUCTION:
- EXISTING WALL WITH BRICK VENNER/WOOD STUDS: ESTIMATED
R-VALUE= 18.34 TOTAL
EXSTIMATED WALL HEIGHT OF 17'-10"
- ROOF:
ESTIMATED R-VALUE = 20.0
- GLASS: INSULATED CLEAR GLAZING
ESTIMATED U-VALUE = 0.4
ESTIMATED SHADING COEFFICIENT = 0.5
IF ACTUAL ENVELOPE CONSTRUCTION VARIES FROM THESE
ESTIMATES,
CONTRACTOR TO CONTACT EXCEL ENGINEERING INC.
2016 EXCEL ENGINEERING, INC.
SHEET INFORMATION
SHEET NUMBER
PROJECT INFORMATION
PROJECT NUMBER
PROFESSIONAL SEAL
1757840
TENANT BUILD-OUT FOR:
PROFILE BY SANFORD
ϭϭϱϬϯ ^WZ/E' D/>> Z͕ ^h/d ϳϬϬ භ ZD>͕ /E ϰϲϬϯϮ
NOT FOR CONSTRUCTION
PRELIMINARY DATES
H1.1
FIRST FLOOR PLAN
JAN. 31, 2018
FLOOR PLAN
SCALE: 1/4" = 1'-0"
4' 0 4' 8'
03/29/18
Nick Mishler