HomeMy WebLinkAboutA.0003 (Architectural)1
(E) 3'-0"
(E) 32'-0"
(E) 32'-4"
(E) 11'-4"
(E) 2'-10"
(E) 21'-8" (E) 7'-7"
(E) 45'-8"
(E) 9'-0"
(E) 19'-7"
(E) 3'-8" (E) 4'-1"
T
(E) 11'-9"
(E) 3'-2" (E) 7'-8" (E) 2'-1" (E) 3'-8"
(E) 15'-7"
3
6
1
2
7
11
10
8
9
2 2
2
2
4
4
4
4
4
5
6
11
10
8
9
NOTE:
GC TO FIELD VERIFY EXISTING CONDITIONS & CONFIRM
RESPONSIBILITY OF ANY SLAB WORK OR INTERIOR
DEMISING WALLS PROVIDED BY TENANT
NOTE:
GC TO VERIFY IF ANY STRUCTURAL COLUMNS EXIST
WITHIN SPACE DURING INITIAL WALK THRU NOTIFY
ARCHITECT IMMEDIATELY.
PROJECT NAME AND LOCATION :
no. distribution date
A
project no:
dwg no:
no. revision date
ISSUE DATE 12.21.17
1
B SUBMITTAL DATE
THIS DRAWING AND ITS CONTENTS ARE CONSIDERED INSTRUMENTS OF SERVICE.
AS SUCH THEY ARE COPYRIGHTED PROPERTY OF RUN RUN DESIGN, LLC. THE USE
OF THESE DRAWINGS ARE LIMITED TO THIS SPECIFIC PROJECT AND ARE NOT TO BE
OTHERWISE REPRODUCED IN ANY WAY OR USED FOR SUPPLEMENTAL LOCATIONS
WITHOUT WRITTEN PERMISSION FROM RUN RUN DESIGN, LLC.
SHEET NAME:
DRAWING REVISIONS:
STORE #791
4335 W. 106TH STREET
UNIT #1200
CARMEL, IN 48032
12.22.17
STATE COMMENTS 01.11.18
2
3 STATE COMMENTS 02.14.18
17-085
STATE COMMENTS 01.30.18
NOTE:
GC MUST REVIEW MECHANICAL AND ELECTRICAL
DRAWINGS DURING DEMO PHASE TO VERIFY ALL
EXISTING SPECS AND COORDINATE W/ NEW WORK AS
DOCUMENTED ON MECH AND ELEC SHEETS.
SCALE:
NORTH
DEMOLITION PLAN
1 1/4" = 1'-0"
GENERAL DEMOLITION NOTES
A. GENERAL CONTRACTOR SHALL FURNISH ALL LABOR MATERIALS,
TOOLS, EQUIPMENT, TRANSPORTATION, INSURANCE, PROTECTION
AND OTHER RELATED SERVICE REQUIRED TO COMPLETE ALL
DEMOLITION WORK FOR THE TENANT IMPROVEMENTS.
B. GENERAL CONTRACTOR TO COORDINATE WITH TENANT, PHASING
AND/OR TIMING OF COMMENCEMENT, CONTINUATION AND
COMPLETION OF ALL DEMOLITION WORK.
C. GENERAL CONTRACTOR SHALL COORDINATE WITH LANDLORD,
ANY WORK AFFECTING THE CONTINUITY OF UTILITIES SERVICING
OTHER TENANTS ON THE PROPERTY. GENERAL CONTRACTOR
SHALL PROTECT ALL UTILITIES SERVING OTHER TENANTS, PEOPLE
AND EXISTING AND/OR ADJACENT CONSTRUCTION AND OTHER
AREAS FROM DAMAGE INCIDENTAL TO CONSTRUCTION
OPERATIONS WITH CONSTRUCTION BARRICADES IN ACCORDANCE
WITH CODES AND ORDINANCES OF THE CITY OF WESTMINSTER,
CA.
D. GENERAL CONTRACTOR SHALL REPAIR OR RESTORE TO EXISTING
CONDITION ADJACENT CONSTRUCTION AND PUBLIC OR PRIVATE
PROPERTY DAMAGED BY DEMOLITION WORK.
E. MATERIAL SHALL NOT BE DROPPED BY GRAVITY OR THROWN
OUTSIDE THE CONTRACT AREA DURING DEMOLITION. ANY
MATERIAL, WHICH IN ITS REMOVAL WILL CAUSE AN EXCESSIVE
AMOUNT OF DUST, SHALL BE WETTED DOWN TO PREVENT THE
CREATING OF A NUISANCE.
F. ALL PARTS OF THE CONTRACT AREA UNDER DEMOLITION SHALL BE
ADEQUATELY LIGHTED WHILE PERSONS ARE ENGAGED AT WORK.
G. RUBBISH AND TRASH SHALL BE REMOVED AS OFTEN AS
CONDITIONS WARRANT. COMBUSTIBLE RUBBISH, SHALL BE
REMOVED DAILY, AND SHALL NOT BE DISPOSED OF BY BURNING
ON THE PREMISES.
H. GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES OR HIDDEN CONDITIONS AFFECTING DEMOLITION
OF PROPOSED WORK.
I. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
SUB-TRADES WITH COMPLETE AND CURRENT DOCUMENTS.
J. UPON COMPLETION OF DEMOLITION, THE LEASED PREMISES AND
ADJACENT PUBLIC AND PRIVATE PROPERTY SHALL BE LEFT CLEAN
AND CLEAR OF DEBRIS.
K. VERIFY WITH ARCHITECTURAL DOCUMENTS ALL AREAS TO BE
MODIFIED.
L. ALL AREAS OF MODIFICATION OR DEMOLITION, WHICH ARE
INCORPORATED INTO THE NEW FACILITY, ARE TO BE PATCHED,
REPAIRED, OR ADJUSTED TO AN ACCEPTABLE CONDITION.
M. CONTRACTOR SHALL PROVIDE A PORTABLE FIRE EXTINGUISHER
WITH A RATING OF NOT LESS THAN 2A OR 2A10BC WITHIN 75'
TRAVEL DISTANCE OF ALL PORTIONS OF THE BUILDING DURING
THE DEMOLITION AND CONSTRICTION.
N. GENERAL CONTRACTOR SHALL VERIFY ALL ON SITE CONDITIONS
AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR
OMISSIONS PRIOR TO DEMOLITION AND CONSTRUCTION.
O. PATCH ALL CONCRETE SLABS AS REQUIRED DUE TO
MODIFICATIONS.
P. PROVIDE SECURITY ENCLOSURE AT ALL REMOVED DOORS OR
WALLS AS REQUIRED.
Q. NOTIFY BUILDING MANAGEMENT AND FIRE ALARM COMPANY OF
DEMOLITION OR CONSTRUCTION WORK. FIRE ALARM SYSTEM, (IE:
EXITING) IS TO REMAIN ACTIVATED AT ALL TIMES.
R. COORDINATE REMOVAL OF ALL FINISHES OF WITH BUILDING
OWNER PRIOR TO START OF DEMOLITION.
S. EXISTING FIRE SPRINKLER SYSTEM TO REMAIN.
T. EXISTING PLUMBING LINES FOR FLOORS ABOVE TO REMAIN.
U. EXISTING SPRAY-APPLIED FIRE PROOFING FOUND IN SEVERAL
AREAS ON FLOOR DECK ABOVE TO REMAIN
KEYNOTES
1. (E) ENTRY DOOR AND STOREFRONT BY LANDLORD TO REMAIN
2. (E) INTERIOR DOOR TO BE REMOVED
3. (E) RESTROOM PLUMBING FIXTURES TO BE REMOVED
4. (E) WALLS TO BE REMOVED PER DASHED LINES
5. LOCATION OF (E) ELECTRICAL PANEL - REFER TO ELECTRICAL
SHEETS
6. EXISTING DEMISING WALL TO REMAIN. PREP FOR NEW FINISHES.
GC TO VERIFY EXISTING DEMISING WALL IS CONSTRUCTED PER
SPECIFICATION ON PLAN.
7. EXISTING REAR DOOR TO REMAIN.
8. REMOVE EXISTING FLOOR FINISHES. SAND SMOOTH IN
PREPARATION FOR NEW FINISH. ADD OVERLAY IF REQUIRED.
9. REMOVE EXISTING CEILING GRID & CEILING TILES.
10. REMOVE ALL EXISTING LIGHT FIXTURES
11. EXISTING MECHANICAL GRILLES & DUCTWORK TO BE REMOVED
AND RELOCATED AS NECESSARY TO ACCOMMODATE CEILING
DESIGN - SEE MECHANICAL SHEETS.
XX
DEMOLITION PLAN
A1.2
03/19/18
Nick Mishler