Loading...
HomeMy WebLinkAboutLandscape PlanHLINE REFER TO SHEET L101 5 VD APPROXIMATE' WETLAND LOCATION Plant Palette (.0C — ,a " U) c -0 CD � _ O SYM BOTANIC NAME COMMON NAME QUAN. SIZE SPACING Trees � y � I Y CU a) GT Gleditsia triacanthos inermis'Skycole' Skyline Honeylocust 25 2%" B&B 30' oc LT Liriodendron tulipifera Tulip Tree 27 2Yz" B&B 30' oc QC Quercus coccinea Scarlet Oak 15 2Yz" B&B 30' oc OR Quercus rubra Northern Red Oak 29 2Yz" B&B 30' oc ZS Zelkova serrate 'Green Vase' Green Vase Japanese Zelkova 23 2%" B&B 30' oc Shrubs Prune only dead or broken 9� r WN AA Aronia arbutifolia'Brilliantissima' Brilliant Red Chokeberry 37 5 gal. 6' oc HV Hamamelis vernalis Vernal Witch Hazel 43 5 gal. 6' oc HQ Hydrangea quercifolia Oakleaf Hydrangea 30 5 gal. 6' oc VB Viburnum burkwoodii Burkwood Viburnum 26 5 gal. 6' oc VD Viburnum dentatum 'Chicago Lustre' Chicago Lustre Arrowwood Viburnum 61 5 gal. of basket cutting horizontally VR Viburnum rhytidophyllum Leatherleaf Viburnum 90 5 gal. '0 O CD U f ti 5 VD — XISTING TREES TO REMAIN WATER HIGH PIA F Leave soil under ball undisturbed - ' to support root ball and reduce settling. 1 1'2 - 2 times ball diameter SHRUB PLANTING DETAIL NO[ TO SCALk ENCE POST i NSA81Lm StIC MESH CE //\� Leave soil under ball undisturbed to support root ball and reduce settling. 1 1, 2 - 2 times ball diameter TREE PLANTING DETAIL NOTE: AVOIDING DAMAGE DURING CONSTRUCTION THE SUREST WAY TO PROTECT TREES THAT ARE TO BE SAVED IS TO: (I) WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLAGCJNG AND/OR SIGNS ALL CONSTRUCTK)N ROADS. PARKING PLACES FOR WORKERS, AND AREAS FOR STORAGE OF BUILDING MATERIALS, GRAVEL AND SOIL. (2) WORK WITH THE UTILITY CONTRACTORS TO STAKE OUT THE EXACT LOCATION OF TRENCHES. AND (3) ERECT PHYSICAL BARRIERS AROUND ALL "SAVED' TREES OR, BETTER YET, AROUND GROUPS OF TREES. NEAR THE CONSTRUCTION ACTIVITY. BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT TREES DURING CONSTRUCTION. TREE PRESERVATION DETAIL (NO SCALE) NOT TO SCALE z 0 In Lu 0' DRAWING FILES DATE: SEPTEMBER 20, 2013 PROJECT NUMBER: DRAWN BY: CHECKED BY: RAF RAF SHEET TITLE: LANDSCAPE PLAN 0 15 30 60 7m%m=7= SHEET #: L1 02 a f (.0C — ,a " U) c -0 CD � _ O 3 V C O 3 N 0 C uo) J V � y � I Y CU a) 0-0 � v / 7 VR Lu o 00 rn C) M ,y Remove tags and labels. Remove transit guard. Remove; tags and labels.LIJ fr %i j w �4Vy/fib%/�%//l/j/////i. Prune only dead or broken 9� r WN Q 0 branches or double leaders at time. Remove It ire Baskets. hrauclies or double leader, LLJ Z EXISTING TREES TO REMAIN ( L1J planting Before tree is in pit remm e bottom at plaiting time. 5 VD — XISTING TREES TO REMAIN WATER HIGH PIA F Leave soil under ball undisturbed - ' to support root ball and reduce settling. 1 1'2 - 2 times ball diameter SHRUB PLANTING DETAIL NO[ TO SCALk ENCE POST i NSA81Lm StIC MESH CE //\� Leave soil under ball undisturbed to support root ball and reduce settling. 1 1, 2 - 2 times ball diameter TREE PLANTING DETAIL NOTE: AVOIDING DAMAGE DURING CONSTRUCTION THE SUREST WAY TO PROTECT TREES THAT ARE TO BE SAVED IS TO: (I) WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLAGCJNG AND/OR SIGNS ALL CONSTRUCTK)N ROADS. PARKING PLACES FOR WORKERS, AND AREAS FOR STORAGE OF BUILDING MATERIALS, GRAVEL AND SOIL. (2) WORK WITH THE UTILITY CONTRACTORS TO STAKE OUT THE EXACT LOCATION OF TRENCHES. AND (3) ERECT PHYSICAL BARRIERS AROUND ALL "SAVED' TREES OR, BETTER YET, AROUND GROUPS OF TREES. NEAR THE CONSTRUCTION ACTIVITY. BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT TREES DURING CONSTRUCTION. TREE PRESERVATION DETAIL (NO SCALE) NOT TO SCALE z 0 In Lu 0' DRAWING FILES DATE: SEPTEMBER 20, 2013 PROJECT NUMBER: DRAWN BY: CHECKED BY: RAF RAF SHEET TITLE: LANDSCAPE PLAN 0 15 30 60 7m%m=7= SHEET #: L1 02 a f Q 3 V O 7 VR Remove tags and labels. Remove transit guard. Remove; tags and labels.LIJ Prune only dead or broken Prune oniv dead or broken Q branches or double leaders at time. Remove It ire Baskets. hrauclies or double leader, Z EXISTING TREES TO REMAIN ( planting Before tree is in pit remm e bottom at plaiting time. Q of basket cutting horizontally — After tree is in pit remove the rest 1311d graft. 0 Z Root Collars Flare: of the basket cutting vertica!h Root (ollar- Flare: Z ' Collar shall be level or tip to Collar shall ':)c level or up to 1"-2" above finished grade. _ above finished grade. Z 2"-4" of hardy tod mulch. Aged wood 2°-4" of hardwood mulch. Aged wood —� u- -t-- 5 VD chips or similarmulch. Keep mulch Remove any excess soil to locate _ chips or similar mulch. Keep mulch Remove any excess soil to locate W O O 2"-3" from (runk. and expose root flare. 2"-3" from trunk. and expose root flare, 2E U) W � Sail grade. Soil grade. O 2 �— 7 VR 0 Backfill using e.xistim, soil. Water Score sides of the Baekfil(using existing soil. 1��ater Score sides of the 2i < O I thoroughly to eliminate air pockets.-' planting pit walls. thorouahly to eliminate air pockets, planting pit walls. U 7 QR l'C � `..s4'� ?Y: '�'_.,C. aWr .r•:)' [,: _ {. '7 7�.:,. J .W. .W. .W. aW. .Wr .W. y•.�' -n3.l-.r +.7 f -��. � F:rs4''- .'r''F;'i •W. •Ww •W. \ l �V �G Z. F t ! - n./' .W. .W. •W. 5 VD — XISTING TREES TO REMAIN WATER HIGH PIA F Leave soil under ball undisturbed - ' to support root ball and reduce settling. 1 1'2 - 2 times ball diameter SHRUB PLANTING DETAIL NO[ TO SCALk ENCE POST i NSA81Lm StIC MESH CE //\� Leave soil under ball undisturbed to support root ball and reduce settling. 1 1, 2 - 2 times ball diameter TREE PLANTING DETAIL NOTE: AVOIDING DAMAGE DURING CONSTRUCTION THE SUREST WAY TO PROTECT TREES THAT ARE TO BE SAVED IS TO: (I) WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLAGCJNG AND/OR SIGNS ALL CONSTRUCTK)N ROADS. PARKING PLACES FOR WORKERS, AND AREAS FOR STORAGE OF BUILDING MATERIALS, GRAVEL AND SOIL. (2) WORK WITH THE UTILITY CONTRACTORS TO STAKE OUT THE EXACT LOCATION OF TRENCHES. AND (3) ERECT PHYSICAL BARRIERS AROUND ALL "SAVED' TREES OR, BETTER YET, AROUND GROUPS OF TREES. NEAR THE CONSTRUCTION ACTIVITY. BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT TREES DURING CONSTRUCTION. TREE PRESERVATION DETAIL (NO SCALE) NOT TO SCALE z 0 In Lu 0' DRAWING FILES DATE: SEPTEMBER 20, 2013 PROJECT NUMBER: DRAWN BY: CHECKED BY: RAF RAF SHEET TITLE: LANDSCAPE PLAN 0 15 30 60 7m%m=7= SHEET #: L1 02 a f